ertms in italy : obbligation and opportunities · brescia mi p.vittoria mi molteno lecco como...

17

Upload: others

Post on 24-Jun-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: ERTMS in Italy : Obbligation and Opportunities · Brescia MI P.Vittoria MI Molteno Lecco Como Chiasso MI Certosa Cadorna (F.N.M.) P.Garibaldi Treviglio Bergamo Cremona "Genova" "Bologna"
Page 2: ERTMS in Italy : Obbligation and Opportunities · Brescia MI P.Vittoria MI Molteno Lecco Como Chiasso MI Certosa Cadorna (F.N.M.) P.Garibaldi Treviglio Bergamo Cremona "Genova" "Bologna"

ERTMS in Italy : Obbligation and Opportunities

ERTMS (ETCS+ GSM-R)

High

Speed

Network

Level 2

(Baseline 2)

Without fallback

High Density

Urban Nodes

Level2 /Level 3

(Baseline 3)

Overlapped to

National CCS

Freight &

Passenger

Tent-T

Corridors

Level 1/Level 2

(Baseline 3)

Overlapped to

National CCS

Low

density

Lines

Level2 /Level 3

(Baseline 3)

Satellite &

Public Bearer

In realization

2018 : HD Rome and Milan

Node (headway 3’)

Virtual Section by

Train Integrrty

Detection

Pilot Line

in Sardinia 2017

ERSAT merging two

EU project (Galileo and

ERTMS) for

Interoperable Virtual

Balise

concept

In realization 2015 Pilot Line Corr D

2016:Ranzo Luino, Domo

Iselle

2017: Domo Novara

2018:Milano Chiasso

2020 Novara –Villa

Opicina; Fortezza Verona;

Milano Genova

10 years In Operation and

always in Evolution

2016 UpGrading 230d Ro Na

2016 Treviglio Brescia

2018 Roma Firenze

2020 Brescia - Verona

Page 3: ERTMS in Italy : Obbligation and Opportunities · Brescia MI P.Vittoria MI Molteno Lecco Como Chiasso MI Certosa Cadorna (F.N.M.) P.Garibaldi Treviglio Bergamo Cremona "Genova" "Bologna"

… one big network

RFI: national railway infrastructure

~ 1.000 km

~ 950 km

~ 2.900 km

~ 3.900 km

~ 7.950 km

High Speed

City network

Basic performance

Medium performance

Low traffic line

Network : 16.703 km Double track : 7.513 Km

Single track: 9.190 Km

Power supplied lines: 11.902 km (71 %)

Tunnels and bridges 1.980 km

Stations : 2.300

Signalling technologies

SSC – SCMT 15.839 km

ERTMS 741 km

GSM-R 9.000 km

ERTMS priority: • High Speed , • CNCs • High Density

ERTMS

Migration

at 2030

Page 4: ERTMS in Italy : Obbligation and Opportunities · Brescia MI P.Vittoria MI Molteno Lecco Como Chiasso MI Certosa Cadorna (F.N.M.) P.Garibaldi Treviglio Bergamo Cremona "Genova" "Bologna"

Trackside ETCS BL2 2005-2020 1100km

Trackside SCMT 2003-2008 11000km

SSB SCMT 5000 fleet

High Speed Network To-Mi-Na Ro-Fi Tr-Brescia

Trk SSC 2005-2006

4000km

SSB ETCS BL3

SSB ETCS BL3+STM

SSB ETCS BL2+STM 200 HS Fleet

SSB SCMT/SSC 1000 Fleet

Trackside ETCS BL3 from 2016

CNs and EU/TEN-T Network High Density by ERTMS on Urban Nodes New High Speed Lines from 2020

CCS A and B in Italy : System Evolution for Interoperability and Intraoperability

SSB ETCS BL3+STM

Trk ETCS BL3 Other IM Network

2019

Page 5: ERTMS in Italy : Obbligation and Opportunities · Brescia MI P.Vittoria MI Molteno Lecco Como Chiasso MI Certosa Cadorna (F.N.M.) P.Garibaldi Treviglio Bergamo Cremona "Genova" "Bologna"

RBC Number for Nodes and Lines 2016-2025 ERTMS

Bari

Fortezza

Genova

Torino Bologna

Domodossola Luino Stabio

2020-2025

2016-2020

High Speed 2005-2025

Nodo Torino RBC#17

Nodo Roma RBC#10

Nodo Firenze

RBC#9

Nodo Novara

RBC#1

Nodo Milano

RBC#3 Nodo

Verona RBC#6

BBT

Mestre Venezia

Nodo Napoli RBC#16

Brescia

Villa Opicina

Modane

Chiasso

500M€ ERTMS Trackside Investement Forecast

Nodo Genova

RBC#20

Page 6: ERTMS in Italy : Obbligation and Opportunities · Brescia MI P.Vittoria MI Molteno Lecco Como Chiasso MI Certosa Cadorna (F.N.M.) P.Garibaldi Treviglio Bergamo Cremona "Genova" "Bologna"

| Packet 44 (SCMT Data)

Euro Balise

SCMT

Existing BTS GSM-R

SCMT Train

ERTMS/ETCS L2 overlapped at (Class B) SCMT

Existing Class B (SCMT) Eurobalises and Encoder

ETCS Train

RBC

ETCS

ETCS L2 Telegram L2+L3 ETCS functionalities

For High Density

ETCS

For CNCs and High Density (HD) in Urban Nodes

X

Page 7: ERTMS in Italy : Obbligation and Opportunities · Brescia MI P.Vittoria MI Molteno Lecco Como Chiasso MI Certosa Cadorna (F.N.M.) P.Garibaldi Treviglio Bergamo Cremona "Genova" "Bologna"

CTC ATO/ATS

Architecture Principle

ERTMS AREA

E-IXL E-IXL IXL E-IXL

Area HD ERTMS Area HD ERTMS

Block E-Block E-Block

ERTMS Area

(NO HD)

ERTMS- RBC

IXL

- Interface line/station

ERTMS Area

(NO HD) No ERTMS

Area

No ERTMS Area

E-IXL: Electronic Interlocking E-Block : Electronic Block

Page 8: ERTMS in Italy : Obbligation and Opportunities · Brescia MI P.Vittoria MI Molteno Lecco Como Chiasso MI Certosa Cadorna (F.N.M.) P.Garibaldi Treviglio Bergamo Cremona "Genova" "Bologna"

Train Integrity

Page 9: ERTMS in Italy : Obbligation and Opportunities · Brescia MI P.Vittoria MI Molteno Lecco Como Chiasso MI Certosa Cadorna (F.N.M.) P.Garibaldi Treviglio Bergamo Cremona "Genova" "Bologna"
Page 10: ERTMS in Italy : Obbligation and Opportunities · Brescia MI P.Vittoria MI Molteno Lecco Como Chiasso MI Certosa Cadorna (F.N.M.) P.Garibaldi Treviglio Bergamo Cremona "Genova" "Bologna"

To Mi Rho Bs Treviglio

Mi Melegnano

ERTMS CNC Corridors A/D BL3

SCMT

ERTMS HS Line BL3

(from 2020)

Monza

ERTMS HD and «link HS» BL3

Bologna

Chiasso

RBC Node

ERTMS BL3

ERTMS HS Line BL2

Vr Pd Mi C.le Vi Tr

Genova

Domodossola

Mi Greco

Pioltello Mi Gdi

Mi Lambrate

Page 11: ERTMS in Italy : Obbligation and Opportunities · Brescia MI P.Vittoria MI Molteno Lecco Como Chiasso MI Certosa Cadorna (F.N.M.) P.Garibaldi Treviglio Bergamo Cremona "Genova" "Bologna"

Torino (Linea AV/AC)

MI Rogoredo

Smistamento

MI Lambrate

Sesto S.G.

Greco P.

P.Martesana

MI P.Genova

MI S.Cristoforo

Pioltello L.

B.M

US

OC

CO

B.

MIR

AB

ELLO

Bovisa

Lancetti

Villapizzone

Laveno

Novara

Como

Monza

Seveso

AfforiSaronno

Milano

centrale

I.D.P.

Fiorenza

Brescia

MI P.Vittoria

MI

MoltenoLecco

Como

Chiasso

MI Certosa

Cadorna(F.N.M.)

TreviglioP.Garibaldi

Bergamo

Cremona

"Genova"

"Bologna"

Bologna

Genova

Me

leg

na

no

Ta

va

zza

no

Bologna (Linea AV/AC)

Sesto C.

Torino

MortaraAlbairate

PM

GhisolfaRho

Rho F

iera

Melzo

Cassano

Gallarate

Luino

Varese

Scalo

PM BIVIO ADDA

B.

BE

RG

AM

O

Garibaldi

RepubblicaP.Venezia

Dateo

Mi P.Romana

Segrate Vignate Melzo

Treviglio O.

"Venezia"

"Genova

"

"Bolo

gna"

"DD

Venezia

"

"LL V

enezia

"

"Passante

"

"Merc

i"

1

2

Page 12: ERTMS in Italy : Obbligation and Opportunities · Brescia MI P.Vittoria MI Molteno Lecco Como Chiasso MI Certosa Cadorna (F.N.M.) P.Garibaldi Treviglio Bergamo Cremona "Genova" "Bologna"

High Density: a new opportunity with ERTMS L2 + OB train integrity

Track circuit x occupied Track circuit x+1 free

ETCS or SCMT Train 2 SCMT Train 1

Virtual Track Circuits 1, 2 and 3 not involved

Track circuit x free Track circuit x+1 occupied

ETCS or SCMT Train 2 SCMT Train 1

Virtual Track Circuits 1, 2 and 3 not involved

Track circuit x occupied Track circuit x+1 free

SCMT Train 4 ETCS Train 3

Virtual Track Circuits 1 and 2 free but not available for SCMT Train 4) Virtual Track Circuit 3 occupied

Track circuit x occupied Track circuit x+1 free

ETCS Train 4 ETCS Train 3

Virtual Track Circuit 1 free available for ETCS Train 4 Virtual Track Circuit 2 occupied Virtual Track Circuit 3 free available for ETCS Train 3

Virtual Track Circuit 2 and 3 occupied Track circuit x+1 occupied Track circuit x occupied

ETCS Train 6 ETCS Train 5 ETCS Train 4 ETCS Train 3

Virtual Track Circuit 1 free available for ETCS Train 6

Page 13: ERTMS in Italy : Obbligation and Opportunities · Brescia MI P.Vittoria MI Molteno Lecco Como Chiasso MI Certosa Cadorna (F.N.M.) P.Garibaldi Treviglio Bergamo Cremona "Genova" "Bologna"

High Density main elements

a)

b)

c)

Section x occupied

Line where ERTMS is over posed to the national signalling system

The train in front to the signal is an ERTMS train and there’s an available MA for that train

(from its current position to the first ETCS Stop Marker). Driver is asked to follow DMI info.

1) The train in front to the signal is not an ERTMS train and there isn’t any available MA for that train

Driver is asked to look outside and follow indication provided by signals.

2) The train in front to the signal is an ERTMS train and there isn’t any available MA after the signal

Virtual track section 1 not yet cleared or an SCMT train is still occupying section x.

or

Pre conditions for the High Density Function: • ERTMS L2 Baseline 3

• The train running first (train 1) connected with RBC and with train integrity function active on-board

• Position report (after a Virtual Track Circuit) valid including the confirmation of the Train Integrity checked on-board

• The train 2, following the train 1, connected with RBC

• The signal c) with the symbol X active

Track circuit section x

ETCS Train 2

Virtual Track circuit s 1 and 2 (section x)

ETCS Train 1

Overlap

Virtual Overlap

a)

b)

C)

Page 14: ERTMS in Italy : Obbligation and Opportunities · Brescia MI P.Vittoria MI Molteno Lecco Como Chiasso MI Certosa Cadorna (F.N.M.) P.Garibaldi Treviglio Bergamo Cremona "Genova" "Bologna"

ETCS Train 2 ETCS Train 1

Train

Integrity Position

report

ETCS Train 2

Train

Integrity Position

report

Position

report

ETCS Train 1

Position

report

Train Integrity (On Board Function)

ETCS Train 2 ETCS Train 1

Train

Integrity

Position

report

Page 15: ERTMS in Italy : Obbligation and Opportunities · Brescia MI P.Vittoria MI Molteno Lecco Como Chiasso MI Certosa Cadorna (F.N.M.) P.Garibaldi Treviglio Bergamo Cremona "Genova" "Bologna"

HD ERTMS System Requirement for Train and for EVC ERTMS/ETCS

HD ERTMS have to guarantee the high density headway only for chain of trains with this

minimum characteristics (Gamma Trains) :

• Max lenght a 200 m;

• time delay for breaking system application< 4,5 s .;

• 140 % Weith Breaking;

• 1,0 m/s2 average deceleration for EB in the speed range 0-100 km/h

The Train using the HD ERTMS functionalities must be use ETCS EVC BL3 R2 with:

• the “ETCS smart sleeping” functionality (without the breaking of the train in case

of losing connection with tail EVC)

• Position Report (Q_lenght parameter ) to RBC to check the safe tail of the train.

• Cab Radio for GPRS and MT with professional Filter agains interferences

• 0,9 the parametre of “rolling stock correction factors”

Page 16: ERTMS in Italy : Obbligation and Opportunities · Brescia MI P.Vittoria MI Molteno Lecco Como Chiasso MI Certosa Cadorna (F.N.M.) P.Garibaldi Treviglio Bergamo Cremona "Genova" "Bologna"

N° of sections L- Movement Authority Distance EoA – SL

(overlap)

Nominal Speed

1 350 m ≥ 50 m 30 km/h

≥ 100 m 40 km/h

2 700 m ≥ 50 m 85 km/h

≥ 100 m 90 km/h

3 1050 m ≥ 50 m 120 km/h

Increase Average Speed: Emi Path and virtual overlap

Page 17: ERTMS in Italy : Obbligation and Opportunities · Brescia MI P.Vittoria MI Molteno Lecco Como Chiasso MI Certosa Cadorna (F.N.M.) P.Garibaldi Treviglio Bergamo Cremona "Genova" "Bologna"

Simulatore GdV (20 NVP)

RBC NTG

BL2.3.0.d RM-NA

RBC

GdV ACC-M

RBC NTG

BL2.3.0.d BO-FI

CC

RBC RBC

BL2.3.0.d TO-MI

CC

RBC

GdV ACC-M

RBC RBC

BL2.3.0.d MI-BO

CC

RBC CC

BL2.3.0.d Treviglio-BS

GdV ACC-M

RBC

BL2.3.0.d FI-RM

GdV ACC-M

RBC

BL3 MI-Chiasso

GdV ACC-M

RBC CC

BL3 Pioltello-Treviglio

GdV ACC-M

RBC

BL3 Nodo HD RM

GdV ACC-M

RBC

BL3 Nodo HD MI

GdV ACC-M

RIU

BL3 Domodossola-NO

RIU

BL3 Pilot Line

RIU

High Speed ETCS L2 BaseLine 2.3.0.d

Corridors TEN-T and High Density

ETCS L2 BL3

Corridors TENT e ETCS L1 BL3

RBC

Different ERTMS Levels , Baselines and Suppliers

Guarantee the System integration : lab ERTMS IM (RFI)

EVCs BL3