www.ESCOAtlantic.com (443) 553-5888
Epoxy Cool Roof Systems
![Page 2: ESCO ATLANTIC - Epoxy Cool Roof System](https://reader038.vdocument.in/reader038/viewer/2022110317/55d0a1ddbb61ebb7688b477b/html5/thumbnails/2.jpg)
This is the beginning of the job laying out the roof so that it can be scrubbed with harsh detergents and scrub brushes….the only way to eliminate all of the oils and dirt which get in
between the encapsulation process and the roof. s
![Page 3: ESCO ATLANTIC - Epoxy Cool Roof System](https://reader038.vdocument.in/reader038/viewer/2022110317/55d0a1ddbb61ebb7688b477b/html5/thumbnails/3.jpg)
Safety First
![Page 4: ESCO ATLANTIC - Epoxy Cool Roof System](https://reader038.vdocument.in/reader038/viewer/2022110317/55d0a1ddbb61ebb7688b477b/html5/thumbnails/4.jpg)
Bad areas can be replaced before ECRS installation
![Page 5: ESCO ATLANTIC - Epoxy Cool Roof System](https://reader038.vdocument.in/reader038/viewer/2022110317/55d0a1ddbb61ebb7688b477b/html5/thumbnails/5.jpg)
Repairing leaks
![Page 6: ESCO ATLANTIC - Epoxy Cool Roof System](https://reader038.vdocument.in/reader038/viewer/2022110317/55d0a1ddbb61ebb7688b477b/html5/thumbnails/6.jpg)
Preparation is the most important part of the job. All of the dirt and wales need to be removed so that the primer coat can fuse with the roof. The only way this can be done is by two hand
washings with harsh detergents and re-scrub again s
![Page 7: ESCO ATLANTIC - Epoxy Cool Roof System](https://reader038.vdocument.in/reader038/viewer/2022110317/55d0a1ddbb61ebb7688b477b/html5/thumbnails/7.jpg)
The roof is thoroughly washed and rinsed s
![Page 8: ESCO ATLANTIC - Epoxy Cool Roof System](https://reader038.vdocument.in/reader038/viewer/2022110317/55d0a1ddbb61ebb7688b477b/html5/thumbnails/8.jpg)
This is the roof before it is primer coated. This particular roof was about 26 thousand square feet and we started with the interior perimeter first and then build out from there
![Page 9: ESCO ATLANTIC - Epoxy Cool Roof System](https://reader038.vdocument.in/reader038/viewer/2022110317/55d0a1ddbb61ebb7688b477b/html5/thumbnails/9.jpg)
After prep....all coatings that may have been applied previously, are sanded
![Page 10: ESCO ATLANTIC - Epoxy Cool Roof System](https://reader038.vdocument.in/reader038/viewer/2022110317/55d0a1ddbb61ebb7688b477b/html5/thumbnails/10.jpg)
Beginning the process
![Page 11: ESCO ATLANTIC - Epoxy Cool Roof System](https://reader038.vdocument.in/reader038/viewer/2022110317/55d0a1ddbb61ebb7688b477b/html5/thumbnails/11.jpg)
Primer with polymesh fabric mat rolled in and then back rolled with 2nd coat of primer
![Page 12: ESCO ATLANTIC - Epoxy Cool Roof System](https://reader038.vdocument.in/reader038/viewer/2022110317/55d0a1ddbb61ebb7688b477b/html5/thumbnails/12.jpg)
Fiber and fabric on seams with 2 primer coats
![Page 13: ESCO ATLANTIC - Epoxy Cool Roof System](https://reader038.vdocument.in/reader038/viewer/2022110317/55d0a1ddbb61ebb7688b477b/html5/thumbnails/13.jpg)
Primer and fabric application
![Page 14: ESCO ATLANTIC - Epoxy Cool Roof System](https://reader038.vdocument.in/reader038/viewer/2022110317/55d0a1ddbb61ebb7688b477b/html5/thumbnails/14.jpg)
This is a picture of the primer coat with fiberglass strand embedded in it… there are 2 coats of this gray with fiberglass trends in it as well as a coat of reflective white epoxy as the finish
![Page 15: ESCO ATLANTIC - Epoxy Cool Roof System](https://reader038.vdocument.in/reader038/viewer/2022110317/55d0a1ddbb61ebb7688b477b/html5/thumbnails/15.jpg)
Epoxy with fiberglass strand as a primer coat
![Page 16: ESCO ATLANTIC - Epoxy Cool Roof System](https://reader038.vdocument.in/reader038/viewer/2022110317/55d0a1ddbb61ebb7688b477b/html5/thumbnails/16.jpg)
Close to finishing a large section
![Page 17: ESCO ATLANTIC - Epoxy Cool Roof System](https://reader038.vdocument.in/reader038/viewer/2022110317/55d0a1ddbb61ebb7688b477b/html5/thumbnails/17.jpg)
Closing out a large section
![Page 18: ESCO ATLANTIC - Epoxy Cool Roof System](https://reader038.vdocument.in/reader038/viewer/2022110317/55d0a1ddbb61ebb7688b477b/html5/thumbnails/18.jpg)
Closing out a large section
![Page 19: ESCO ATLANTIC - Epoxy Cool Roof System](https://reader038.vdocument.in/reader038/viewer/2022110317/55d0a1ddbb61ebb7688b477b/html5/thumbnails/19.jpg)
Further finishing up a section
![Page 20: ESCO ATLANTIC - Epoxy Cool Roof System](https://reader038.vdocument.in/reader038/viewer/2022110317/55d0a1ddbb61ebb7688b477b/html5/thumbnails/20.jpg)
Close up
![Page 21: ESCO ATLANTIC - Epoxy Cool Roof System](https://reader038.vdocument.in/reader038/viewer/2022110317/55d0a1ddbb61ebb7688b477b/html5/thumbnails/21.jpg)
Finished
![Page 22: ESCO ATLANTIC - Epoxy Cool Roof System](https://reader038.vdocument.in/reader038/viewer/2022110317/55d0a1ddbb61ebb7688b477b/html5/thumbnails/22.jpg)
Finished