GUIDELINESFORTHEREGISTRATIONOFENERGYSERVICECOMPANIES(ESCO)In linewith thegovernmentsefforts to furtherenhanceEnergyEfficiency inMalaysia, twoEntry
PointProjects (EPP)under theNationalKey EconomicAreas (NKEAs) for theOil,GasandEnergy
(OGE)sectorhasbeenentrustedtotheMinistryofEnergy,GreenTechnologyandWater(KeTTHA).
Toensure
successful
implementation
on
energy
efficiency
improvement
projects
based
on
the
EnergyPerformanceContracting (EPC)concept,EnergyServiceCompanies (ESCO) are required to
registerwiththeMinistryofFinance(MoF)forEPCactivities involvinggovernmentbuildingsunder
theGreenTechnologyServicesCode.
Scopeofworkof an EPC contractor that requires registration includes supply of energy efficient
devices and equipments, consultancy services, contractworks, energy audit, design engineering,
project financing, management of EPC contract, commissioning and services, operation and
maintenance of equipment or energyefficient installation and inspection of energy efficiency
improvementprojects.
Consequently,MoFrequiresthatESCOstoberegisteredwithSuruhanjayaTenaga(ST),basedonthe
following
requirements
and
criteria:
TheapplicanthasregisteredhisbusinesswitheithertheRegistrarofBusinessortheRegistrarofCompaniesasthecasemaybe;
The applicant has employed, on a full time basis, a Registered Electrical EnergyManager asprescribedundertheEfficientManagementofElectricalEnergyRegulations2008;
Theapplicanthasaccesstosuitablemonitoringandtestingequipmentandinstrumentsrequiredforenergyefficiencymanagementworks;
The applicant has satisfactorily furnished all the information as stipulated in the applicationform.
ThecertificateofRegistrationissuedunderthisguidelineisonlyvalidforaperiodofoneyearfrom
thedateofissuanceofthesaidCertificateofRegistration.
TherenewaloftheCertificateofRegistrationasanEnergyServiceCompanymustbemadenotless
than1monthbeforethedateofexpiryoftheregistration.
STmaycanceltheCertificateofRegistrationasanEnergyServiceCompanyif:
TheholderoftheCertificateceasestocarryonthebusinessinrespectofwhichheisregistered; TheholderoftheCertificatehasbeenadjudicatedabankrupt; Thecompanygoesintoliquidation.WhereaCertificateofRegistrationasanEnergyServiceCompanyiscancelledbyST,theCertificate
mustbereturnedtoSTwithinfourteendaysofthenotificationofthecancellation.
The
completed
application
form
together
with
all
the
supporting
documents
and
an
application
lettermustbesubmittedtotheDirectorofEnergyManagementandIndustryDevelopment,Energy
Commissionatthefollowingaddress:
DIRECTOR,EnergyManagementandIndustryDevelopment,EnergyCommission,No.12,JalanTunHussein,Presint2,62100,PUTRAJAYA.
-
7/30/2019 Esco Final 29april2013
2/2
Forenquiriesandclarification,kindlycontactSTat0388708657orvisitwww.st.gov.my
Notes: TheCertificateofRegistrationasanEnergyServiceCompanycannotbetransferredwithoutprior
writtenapprovalfromST. Any change of name, address and other details of the business or company stated in theCertificateofRegistrationmustbeinformedinwritingtoSTwithin14daysofsuchchange. In the event of any change or replacement of an appointed Registered Electrical Energy
Manager, the Energy Service Company shall ensure that a new Registered Electrical EnergyManagerbeappointed toeffectsuchchangeor replacementandtheEnergyServiceCompanyshallnotifyinwritingtoSTwithin14daysofsuchchangeorreplacement.
Allelectricalworks inrelationtotheEnergyServicesprovidedbytheRegisteredEnergyServiceCompanymustbeperformedbyCompetentPersonsinaccordancewiththeElectricitySupplyAct1990andtheElectricitySupplyRegulations1994.