esco final 29april2013

Upload: razali131266

Post on 14-Apr-2018

216 views

Category:

Documents


0 download

TRANSCRIPT

  • 7/30/2019 Esco Final 29april2013

    1/2

    GUIDELINESFORTHEREGISTRATIONOFENERGYSERVICECOMPANIES(ESCO)In linewith thegovernmentsefforts to furtherenhanceEnergyEfficiency inMalaysia, twoEntry

    PointProjects (EPP)under theNationalKey EconomicAreas (NKEAs) for theOil,GasandEnergy

    (OGE)sectorhasbeenentrustedtotheMinistryofEnergy,GreenTechnologyandWater(KeTTHA).

    Toensure

    successful

    implementation

    on

    energy

    efficiency

    improvement

    projects

    based

    on

    the

    EnergyPerformanceContracting (EPC)concept,EnergyServiceCompanies (ESCO) are required to

    registerwiththeMinistryofFinance(MoF)forEPCactivities involvinggovernmentbuildingsunder

    theGreenTechnologyServicesCode.

    Scopeofworkof an EPC contractor that requires registration includes supply of energy efficient

    devices and equipments, consultancy services, contractworks, energy audit, design engineering,

    project financing, management of EPC contract, commissioning and services, operation and

    maintenance of equipment or energyefficient installation and inspection of energy efficiency

    improvementprojects.

    Consequently,MoFrequiresthatESCOstoberegisteredwithSuruhanjayaTenaga(ST),basedonthe

    following

    requirements

    and

    criteria:

    TheapplicanthasregisteredhisbusinesswitheithertheRegistrarofBusinessortheRegistrarofCompaniesasthecasemaybe;

    The applicant has employed, on a full time basis, a Registered Electrical EnergyManager asprescribedundertheEfficientManagementofElectricalEnergyRegulations2008;

    Theapplicanthasaccesstosuitablemonitoringandtestingequipmentandinstrumentsrequiredforenergyefficiencymanagementworks;

    The applicant has satisfactorily furnished all the information as stipulated in the applicationform.

    ThecertificateofRegistrationissuedunderthisguidelineisonlyvalidforaperiodofoneyearfrom

    thedateofissuanceofthesaidCertificateofRegistration.

    TherenewaloftheCertificateofRegistrationasanEnergyServiceCompanymustbemadenotless

    than1monthbeforethedateofexpiryoftheregistration.

    STmaycanceltheCertificateofRegistrationasanEnergyServiceCompanyif:

    TheholderoftheCertificateceasestocarryonthebusinessinrespectofwhichheisregistered; TheholderoftheCertificatehasbeenadjudicatedabankrupt; Thecompanygoesintoliquidation.WhereaCertificateofRegistrationasanEnergyServiceCompanyiscancelledbyST,theCertificate

    mustbereturnedtoSTwithinfourteendaysofthenotificationofthecancellation.

    The

    completed

    application

    form

    together

    with

    all

    the

    supporting

    documents

    and

    an

    application

    lettermustbesubmittedtotheDirectorofEnergyManagementandIndustryDevelopment,Energy

    Commissionatthefollowingaddress:

    DIRECTOR,EnergyManagementandIndustryDevelopment,EnergyCommission,No.12,JalanTunHussein,Presint2,62100,PUTRAJAYA.

  • 7/30/2019 Esco Final 29april2013

    2/2

    Forenquiriesandclarification,kindlycontactSTat0388708657orvisitwww.st.gov.my

    Notes: TheCertificateofRegistrationasanEnergyServiceCompanycannotbetransferredwithoutprior

    writtenapprovalfromST. Any change of name, address and other details of the business or company stated in theCertificateofRegistrationmustbeinformedinwritingtoSTwithin14daysofsuchchange. In the event of any change or replacement of an appointed Registered Electrical Energy

    Manager, the Energy Service Company shall ensure that a new Registered Electrical EnergyManagerbeappointed toeffectsuchchangeor replacementandtheEnergyServiceCompanyshallnotifyinwritingtoSTwithin14daysofsuchchangeorreplacement.

    Allelectricalworks inrelationtotheEnergyServicesprovidedbytheRegisteredEnergyServiceCompanymustbeperformedbyCompetentPersonsinaccordancewiththeElectricitySupplyAct1990andtheElectricitySupplyRegulations1994.