OPERATIONS CONTROLLED DOCUMENT
SYRIA
ELECTRICAL SAFETY RULES
3.OMA.3.002
Document No: 3.OMA.3.002 Custodian: OTE/12
SupersedesRevision no: 4
Date: 1 April 1997
Revision no: 5
Date: 12 December 1998
Filename: ESRS.DOC
Administered by:
A AdamsonOTE/12
Date:
Verified:
S ElcoxOTE/1
Date:
Verified:
W deWiltTES/3
Date:
Approved:
B MeermanOTE
Date:
Approved:
M BaghdadiOTE/D
Date:
Reason for revision: Re-classification of Authority levels and re-definition of responsibilitiesfor Appointed Persons.
This document contains proprietary information and is intended for use by AFPC staff only. The contents of this controlled document shall not be
changed without formal approval of the document custodian.
7/30/2019 Esr00
http://slidepdf.com/reader/full/esr00 2/6
SYRIA ELECTRICAL SAFETY RULES Rev 05
Al Furat Petroleum Company
Electrical Safety Rules
Operations Controlled Document No: 3.OMA.3.002
Issue Control Form Part 1
It is essential that the recipient:
1 Completes and signs Part 1 and 2 of this Issue Control Form and returns Part
2 to the Operations Electrical Discipline Head . Form Part 1 is to be retained
in this document.
2 Maintains the document in good condition and keeps it up to date with any
amendments issued.
3 Makes himself fully familiar with the Electrical Safety Rules.
Volume No. …….. has been received by:
___________ _____________ ________________ _________ Name Signature Ref Indicator Date
7/30/2019 Esr00
http://slidepdf.com/reader/full/esr00 3/6
SYRIA
ELECTRICAL SAFETY RULES
Rev 5
Al Furat Petroleum Company
Electrical Safety Rules
Operations Controlled Document No: 3.OMA.3.002
Issue Control Form Part 2
It is essential that the recipient:
1 Completes and signs Part 1 and 2 of this Issue Control Form and return Part 2 to the
Operations Electrical Discipline Head.
Form Part 1 is to be retained in this document.
Volume No. …….. has been received by:
___________ _____________ ________________ _________
Name Signature Ref Indicator Date
Page 3 of 6 143082536.doc 5/2/2013
7/30/2019 Esr00
http://slidepdf.com/reader/full/esr00 4/6
SYRIA ELECTRICAL SAFETY RULES Rev 05
CONTENTS
0.0 COVER AND AUTHORITY
0.1 Preface
0.2 User Guidelines
1.0 INTRODUCTION
1.1 Objective
1.2 Interpretation
1.3 Duty1.4 Objections
1.5 Issue of Electrical Safety Rules
1.6 Dangerous Occurrences and Accidents
1.7 Failure of Supply
1.8 Admittance to Stations
2.0 GLOSSARY
2.1 Electrical Definitions
2.2 Documentation and Notices2.3 Safety Equipment
2.4 Persons
3.0 AUTHORISATION OF ELECTRICAL PERSONS
3.1 General
3.2 Appointment
3.3 Certificate of Appointment
3.4 Register of Appointments3.5 Responsibilities of Authorised Persons
4.0 RULES FOR INITIATION OF WORK
4.1 Access
4.2 Switching
4.3 Work and testing on High Voltage equipment
4.4 Work and testing on Low Voltage equipment
4.5 Earthing
Approach to exposed Live High Voltage conductors or supporting insulators
7/30/2019 Esr00
http://slidepdf.com/reader/full/esr00 5/6
SYRIA
ELECTRICAL SAFETY RULES
Rev 5
4.7 Testing of High Voltage equipment before connection to an electrical system
5.0 ISSUE AND CONTROL OF ELECTRICAL SAFETY DOCUMENTS
5.1 Initiation of documents
5.2 Procedure for issue and receipt
5.3 Precautions during progress of work
5.4 Procedure for completion and cancellation
6.0 PRECAUTIONS TO BE TAKEN ON SPECIFIC ITEMS OF
EQUIPMENT
6.1 Work on overhead lines
6.2 Work on underground cable
6.3 Work on High Voltage transformers
6.4 Work on High Voltage switchgear
6.5 Work in switchyards with exposed High Voltage conductors
6.6 Work on remotely or automatically controlled High Voltage equipment
6.7 Work and testing on High Voltage motor circuits
6.8 Work and testing on High Voltage generators
6.9 Work on Low Voltage switchboards
6.10 Work on Low Voltage motors
6.11 Work on Batteries
6.12 Switching, working or testing in hazardous areas
APPENDICES
A Approved Electrical Documents and Safety Equipment
B Electrical Permit to Work Certificate
C Sanction for Test Certificate
D Limitation of Access Certificate
E Electrical Isolation Certificate
F Certificate of Appointment
G Approved Notices
H Flowchart for Issue of Electrical Safety Documents
I Switching Programme
Page 5 of 6 143082536.doc 5/2/2013
7/30/2019 Esr00
http://slidepdf.com/reader/full/esr00 6/6
SYRIA ELECTRICAL SAFETY RULES Rev 05
0.0 COVER AND AUTHORITY
0.1 PREFACE
This document is intended for use by Al Furat Petroleum Company and its
nominated contractors and consultants.
The objective of this Operations Controlled Document is to specify Electrical
Safety Rules for all Al Furat Petroleum Company High Voltage and
associated Low Voltage electrical systems.
Company approval and authorisation of Operations Controlled Documents
(OCDs) and revisions of existing Operations Controlled Documents shall be in
accordance with OCD 1.AAG.1.002.
Responsibility for the technical content of this document rests with the
Custodian. The Custodian of this document is the Operations Electrical
Discipline Head.
0.2 USER GUIDELINESIt is the responsibility of the user to ensure that he is using the latest revision
of this Operations Controlled Document.
Furthermore this Operations Controlled Document may be modified from time
to time by revision or update to individual sections or pages. Advice on the
latest status of this Operations Controlled Document may be obtained from the
Custodian.
Any User of this Operations Controlled Document who encounters anyinaccuracy or ambiguity is requested to notify the Custodian immediately in
writing.
Words which are printed in Bold Letters in this document are those which
have been assigned a special meaning by being defined in these Electrical
Safety Rules, Section 2, Subsection 2.1.