ess & micro-grid brochure

9
ESS & Micro-Grid Brochure en.hopewind.com

Upload: others

Post on 27-Jan-2022

4 views

Category:

Documents


0 download

TRANSCRIPT

ESS & Micro-GridBrochure

en.hopewind.com

en.hopewind.comen.hopewind.com 0302

Shenzhen Hopewind Electric Co., Ltd. (Stock Code: 603063) focuses on the research, manufacture, sales and service

of renewable energy & electric drive products, with main products of wind power generation products, photovoltaic

generation products, power conversion products, industrial drive products and electric car products. Furthermore,

Hopewind owns independent development & testing platforms of integrated high-power power electric equipment

and monitoring system. Through innovation in technology and service, Hopewind continuously creates value for

customers, and has become one of the most competitive enterprises in renewable energy field.

In the field of power conversion system, Hopewind provides competitive common AC/DC PCS overall solutions,

including power conversion system (PCS), energy management system (EMS) and overall energy store system.

Relative PCS products have obtained the certification and test reports from CGC, TUV-SUD, CEPRI HLVRT (including

ZVRT) and so on.

>> About Hopewind

All-in-one Energy Storage System Solution - C&I Industry

Overview of Energy Store System Application

Cabinet Type - AC/DC Bi-directional PCS

Outdoor Wall-mounted Type - AC/DC Bi-directional PCS

Multi-machine Parallel Control Cabinet

Energy Management System

System Integration

Project Cases

04

06

08

10

12

13

14

15

Headquarter and R&D Base: ShenzhenManufactures & factories: Shenzhen, Suzhou, Dongguan, YanchengServices Partner: Russia, Vietnam, Brazil, Korea, Turkey, Ukraine, Pakistan, MalaysiaSales & Service Center: Beijing, Shanghai, Russia

ISO9001: 2015 ISO14001: 2004 OHSAS 18001: 2007

【Quality System】

【Honors】

Laboratory Qualification Approved by CNAS

National High-tech EnterprisesNational Science and Technology Progress Award

en.hopewind.comen.hopewind.com 0504

>> All-in-one Energy Storage System Solution- C&I Industry

Features Specifications

Product Principle

Model hopeQESS

Battery Data

Cell type LFP 3.2V/280Ah

Configuration of system 16S1P*13

Battery capacity (BOL) 186kWh

Battery voltage range 582.4V~748.8V

BMS communication interfaces 485

BMS communication protocols Modbus RTU

AC Data

Nominal AC power 80kW

Max. AC power 96kW

Max.THD of current <3% (at nominal power)

DC component <0.5% (at nominal power)

Nominal grid voltage 400V

Grid voltage range 360 ~ 440V

Power factor >0.99 (at nominal power)

Adjustable power factor -1~1

Nominal grid frequency 50Hz

Grid frequency range 45~55Hz

Isolation method Transformer optional

Nominal output voltage of off-grid 400V

Max.THD of off-grid output voltage < 3% (linear load)

Mechanical DataDimensions (W*H*D ) 1250*2030*1650

Weight (with / without battery) 2300kg

General Data

Degree of protection IP54

Operating temperature range -10 to 40°C

Relative humidity 0 ~ 95% (non-condensing)

Max. working altitude 2000m

Cooling concept of battery chamber Ventilation and Air Conditioning

Communication interfaces Ethernet

Communication protocols Modbus TCP

AC Contactor

AC SPD

Power Module

DC SwitchBAT+

BAT-

PE

Grid

Common Filter

Battery

DC Fuse

DC Contactor LC Filter

All-in-one solution for your C&I on-grid industry

IP54 Protectionand exquisite design for bussiness industry

Integration makes optimal system performance and lower cost

User friendly - Improve the equipment installation&maintenance

Modular LiFePO4 battery. flexible configuration

Integration and Flexibility

Low noise, lower than 60dB, friendly to user

Intelligent monitoring and faults record ensures faults location

Friendly and Smart

Support multi-machine direct parallel in AC side

Long-term overload operation with 1.2Pn, 1.4Pn overload in 60s

when operating off-grid with resistive load

Safty and Robustness

en.hopewind.comen.hopewind.com 0706

By adding the energy storage system in the power grid, it can realize peak load shifting, frequency and peak adjustment,

smooth the power generation and user side's energy as well as improve the quality of the power grid.

Specifically including:

1. Realize primary frequency modulation and secondary frequency modulation control, monitor load fluctuations in real time,

respond quickly to grid dispatching, improve grid frequency stability, and improve grid quality.

2. Improve the instability of the output power of wind power/photovoltaic power stations, especially the impact of transient

power on the power grid, thereby improving the power quality of new energy power stations and power grids.

3. Reduce the fluctuation instability of the user side power, smooth the power, improve the efficiency of user side energy, and

reduce the transformer capacity and the basic electricity cost of the user side.

4. According to the difference between the peak and lowest electricity prices, the PCS charges when the electricity price is low,

and discharges when the electricity price is high to obtain certain economic benefits.

>> Overview of Energy Storage System Application

Grid side, Generator side, User Side

The energy storage system includes an energy storage battery, a power conversion system (PCS), an energy management

system (EMS), and a battery management system (BMS).

Energy Storage System Block Diagram

The energy storage system can be combined with new energy power generation system (such as wind power and photovoltaic

power) and diesel generator system to form an off-grid or micro-grid system to solve the electricity demand of users in islands or

remote areas of power grids with unstable power supply. In the micro-grid system, the PCS needs to operate off-grid. For some

special load, the STS devices are required, which can realize automatic switching during the power failure and power restoration.

Off-grid/Micro-grid Application

In the above micro-grid system,

1. Select the capacity of the PCS according to the required power of the load. If the power of the load is large and multiple PCSs are

needed for expansion, the parallel control cabinet is required.

2. The isolation transformer can be placed independently on the outside or built in the PCS.

3. The off-grid PCS is used as a voltage source, and the constant AC output voltage is applied to the load PCS to absorbs energy from

the PV, and the excess is charged into the energy storage battery.

(1) When the power of the PV input port of the PCS is less than the AC output power, the energy storage battery begins to discharge;

(2) When the energy storage battery is discharged to a certain extent and may be difficult to support the load, the diesel is turned on,

and the PCS is switched from the off-grid operation to the simultaneous connection with the generator;

(3) When the power of the PV input is increased to above the load power, the diesel is turned off, and the PCS is automatically

switched to the off-grid operation.

PV Input

PV Input N#PV Combiner Box

1#PV Combiner Box

Energy Storage Battery Load

Grid

Diesel Generator

PV Inverter

PCS

Parallel Control

AC Cable

DC Cable

Comm. Cable

PV Input

en.hopewind.comen.hopewind.com 0908

>> Cabinet Type - AC/DC Bi-directional PCS

Certified by national standard, the max. efficiency is 99%.

Support power factor full range adjustment.

Support a variety of functions including off-grid, multi-machine

direct parallel, VSG, seamless switching on-grid and off-grid.

Support long-term operation with 1.1 times overload and short-

term operation with 1.2 times overload.

The time of switching charge mode and discharge mode is less

than 80ms, and the time of power corresponding is less than

60ms.

Features Specifications

Product Principle

Model hopePCS0300 hopePCS0500 hopePCS0630

DC Side ParametersDC Voltage Range 620V~850V 500V~850V 620V~850V

Max. DC Current 635A 1130A 1147A

AC Side Parameters

Charging and

Discharging on grid Mode

Rated Output Power 300kW 500kW 630kW

Max. Output Power 330kW 550kW 693kW

Rated Output Current 433A 902A 909A

Max. Output Current 476A 992A 1000A

Rated Grid Voltage 400V 320V 400V

Operating Voltage Range 320V~440V 256V~352V 320V~440V

Rated Grid Frequency 50Hz / 60Hz

Operating Frequency Range ±3Hz

THDi <3% (Rated Power)

DC Current Component <0.5% (Rated Output Current)

Power Factor 0.9 (inductive) ~ 0.9 (capacitive)

Off-grid Mode

Rated Output Power 300kW 500kW 630kW

Rated Output Voltage 400V 320V 400V

Rated Output Current 433A 902A 909A

Voltage Fluctuation Range <10%, linear load, 100% change

Output Voltage Distortion <3%, linear load

Rated Grid Frequency 50Hz / 60Hz

Voltage Regulation Accuracy <1%

System Parameters

Max. Efficiency 98.8% 98.9% 99.0DS%

Isolation Transformer with without

Standby Power Consumption <50W

Cooling Method Forced air cooling

Protection Level IP20

Operating Temperature Range -40℃ ~ +55℃ (Operation with derating above 40℃)

Storage Temperature Range -40℃~+70℃

Operating Altitude ① ≤6000m (Operation with derating above 2000m)

Relative Humidity 0% ~ 95%, no condensation

Communication RS485, Ethernet, CAN

Mechanical ParametersDimensions (W*H*D) (mm) ② 1020*2100*600 1000*2150*800

Weight (kg) <750 <1000

① Please contact HOPEWIND for application over 2000m altitude. ② Dimension excludes screws, locks, etc.

DC SPD

AC Contactor AC Switch

AC SPD

Power Module

LC FilterDC Switch

BAT+

BAT-

PE

PE

Grid

AC Fuse

Battery

DC Fuse D C

en.hopewind.comen.hopewind.com 1110

IP65 protection level, suitable for coastal areas with frequent typhoons.

Reduce direct parallel of battery, to lower the capacity difference

between battery strings years later.

Each group operating independently. Improve the equipment utilization

during maintenance, only the battery group under maintenance needs

to be powered off.

Low noise, lower than 60dB, friendly to user.

Can be installed full manually, special equipments such as forklift and

crane are not required.

Provide dedicated testing equipment to measure leakage current, to ensure the safety of system and

person.

Support multi-machine direct parallel in AC side.

Some models support long-term operation with 1.25 times overload, and operation with 1.4 times overload

in 60s when operating off-grid with resistive load.

Features

>> Outdoor Wall-mounted Type - AC/DC Bi-directional PCS

Product Principle

Specifications

Model hopePCS050 hopePCS060 hopePCS080

DC

Max. DC Power 61kW 73kW 114kW

Max.DC Volatge 900V

Max. DC Current 102A 122A 190A

DC Voltage Range Gird voltage*1.45 ~ 900V

DC voltage Ripple % 2%

AC

Rated Power 50kW 60kW 80kW

Max. Power 60kW 72kW 112kW

AC Connection M8 screw

Isolation No isolation

Q range 0~50 kvar 0~60 kvar 0~80 kvar

On-Grid

Rated Grid Voltage 440V

Grid Voltage Range 304V ~ 440V

Rated Grid Frequency 50Hz / 60Hz

Frequency range 47Hz ~ 53Hz / 57Hz ~ 63Hz

THD 3%

Power Factor -1 ~ 1

Switching T charge/discharge 60ms

Off-Grid

Rated Output Voltage 400V

Voltage Deviation ±2%

Voltage Unbalance 2%,Short time < 4%

THDu 3% (Without Load or resistive load )

Rated Output Frequency 50Hz

voltage transient range 10% (Load increases from 20% to 100%/decreases from 100% to 20% ( resistive/balanced load conditions)decrease from 100% to 20% in a short time)

Over-voltage Value Optional

Under-voltage Value Optional

Mechanical

Max. Efficiency 97.8% 98% 98.5%

Operation Temperature -40℃~+60℃

Operation Humidity 0%~100%

Noise 59dB

W*D*H 800*330*668mm

Weight <60kg

IP Protection IP65

Cooling Method Smart cooling

Insulation Resistance 1MΩ

Com

Interface Ethernet, 485

UI Interface LED display: charge/discharge, shutdown, standby, fault

Protocol modbus TCP / RTU

AC Contactor

AC SPD

Power Module

DC SwitchBAT+

BAT-

PE

Grid

Common Filter

Battery

DC Fuse

DC Contactor LC Filter

en.hopewind.comen.hopewind.com 1312

>> Multi-machine Parallel Control Cabinet

When more than 3 PCSs are operating in parallel in the same system, it is necessary to add the multi-machine parallel control

cabinet for unified coordination. A grid-connected control cabinet is designed to support up to 20 PCSs in parallel.

If the PCSs need to realize automatic on-grid/off-grid seamless switch at the same time, the STS control cabinet must be added,

and the parallel control cabinet and the STS cabinet can be integrated.

Synchronization with PCS, free from external interference, high signal stability.

Each PCS is independent, and one or more of them are accidental shutdown or power failure

maintenance, which does not affect the normal operation of other PCSs.

Fiber optic control, high communication speed and fast response.

Easy to add auxiliary function, can expand voltage detection and current detection modules as needed.

Rich interface resources, supporting up to 20 PCSs in parallel.

Simultaneously take power from AC and DC, the system is stable and reliable.

Features (Interface Description)

Product Principle

1#Transformer

PCS1-1

Parallel Control and STS Cabinet

2#Transformer

PCS1-2 PCS2-3 PCS2-4 PCS2-- PCS2-20

Comm. Cable

>> Energy Management System

Micro-grid energy management system (EMS) is in charge of the device status monitoring, energy management, statistical

report and other functions of the whole micro-grid system. The EMS is consisting of the micro-grid central controller (MGCC)

and the EMS server. The MGCC communicate with the energy store system, PV inverter system, diesel generator system and load

power supply system devices in the micro-grid under control, to obtain the real-time status of each system devices, manage

the energy of the devices according to energy management strategy, and issue the device starting/stopping command and

power setting command. As the host of MGCC, the EMS server monitoring the MGCC and devices status, to realize parameter

management, user management, statistical report functions; in the same time, the EMS server communicate with the higher

level host or grid dispatch system, to respond the dispatch of higher level energy management system.

Features

Support multiple OSs such as Windows and Linux, which can ensure the safety of power station control and

data.

The system is structured. The MGCC is in charge of short-term energy management strategy and device

communication. The EMS server is in charge of long-term energy management strategy.

Flexible configuration of system software and hardware, make the system stable and reliable. Can

configure fast and flexibly according to the actual project in a short deployment period.

Advanced and stable energy management strategy, which can maximum the use of the PV energy in the

system and the charging/discharging ability of stored energy; the switching of on-grid/off grid is quick and

the transition is stable.

Load management can optimize the load of system, to ensure the emergency power supply of system

never interrupts.

Friendly and intuitive monitoring software, which can display the status and faults of the devices in the

system intuitively.

Open system communication interface, which can be compatible with multiple devices using different

communication protocols from different manufacturer.

en.hopewind.comen.hopewind.com 1514

Features

System integration design is customized.

For container scheme, the size and functions (such

as on-grid, off-grid and seamless switching) is

customizable.

The battery specification and capacity can be

customized according to requirement.

Manhole

EMS

DC cablesconnecting inlets

PCS

H V

transformer

L V

transformer

Direction C

Direction B

Direction DFlush with the floorFlat plate

Direction A

High Voltage Cabinet

Low Voltage Cabinet

Manhole cover

>> System Integration

> Thermal Power Station Energy Storage Joint FM Project A, Changzhi 15MW/7.5MWh

> Grid-side Energy Storage Project, Henan 24MW/48MWh

> User-side Energy Storage Project B, Zhenjiang 20MW/200MWh

> U s e r - s i d e E n e r g y St o ra g e P r o j e c t , Guangzhou 6MW/50MWh

> User-side Energy Storage Project C, Zhenjiang 5MW/40MWh

> User-side Energy Storage Project, Beijing 1MW/8MWh

> User-side Energy Storage Project, Zhenjiang A 6MW/48MWh

> Thermal Power Station Energy Storage Joint FM Project B, Changzhi 9MW/4.5MWh

>> Project Cases

en.hopewind.com16

> Energy Storage and UPS Combined Project, Zhenjiang 800kW

> U s e r - s i d e E n e r g y St o ra g e P r o j e c t . Changzhou 250MW/1MWh

> PV Power Station Energy Storage Project, Burjan, Russia 4MW/8MWh

> Airport Energy Storage Power Station Project, Beijing 500MW/1.1MWh

> New Energy Power Generation Assorted Energy Storage Project, Korea 12MW/36MWh

> PV Power Station Energy Storage Mirco-grid Project

> User-side Energy Storage Project, Suzhou 250MW/1MWh

> Super Capacitor Energy Storage Project 800kW

禾望电气官方微信Hopewind Website

2021: hopewindAll rights reserved V4.1.1c

If there is any change in product size and parameters, they shall be subject to the latest actual product Hopewind Website

All rights reserved V4.1.1

B u i l d i n g 1 1, G u a n l o n g N o. 2 I n d u s t r y Pa r k , X i l i Town, Nanshan Distr ict , Shenzhen, China, 518055 Tel: +86-755-86026786, Shenzhen (Headquarters)

www.hopewind.com

+86-10-82193180, Beijing (Office) 400-8828-705, Hotline