essam elden sayed 2016-may

11
Essam Elden Mohamed Mustafa Address: Doha, Qatar Mobile: +974 70595045, E-mail: [email protected] Date: To, Dear Sir/ Madam, I have 16 years experience in civil engineering including 8 years international experience in the Middle East in areas Of EPC project execution & construction management, and presently seeking a challenging management role as Resident Engineer / Site Area Manager /Construction Manager/ Project Manager in a reputed organization in the EPC at Rail and or Petroleum /Oil & Gas/ Industries. I have NOC to transfer to other companies. Currently I am working as Project Manager (Jun 2014– until Now) with CEG International (Leading International Engineering Practice, Consultancy and Management), Doha, Qatar Also I was working as Senior Expert Engineer/ Civil Site Work Coordinator, with Building Systems Trading & Contracting WLL, Client: Sener Ingeniera Y Sistemas, Doha, Qatar, The Project was Light Rail Transit (LRT) project Lusail City. Phase 2B (Cut & Cover) and delivering phase (2C1A) With The Main client Qatari Diar Vinci Construction (QDVC) where my responsibilities included supervision on execution of projects and generating substantial effective technical & managerial inputs, as well as design concepts, detail engineering, procurement, construction and commissioning. My competencies include ability to work efficiently in demanding work environments, knowledge of latest software tools- expertise in project management, quality specifications, as well as Environmental Health and Safety standards, enhancing efficiency and productivity, and effective resource utilization. I am dedicated to the principles of quality, dedication, and continuous improvement. I am confident that with my experience and skills, I can effectively handle the project management functions for EPC, create significant differentiation, and contribute substantially to your organization’s success. The attached resume will give you details of my experience. I would appreciate an opportunity for an interview at your convenience. Thanking you for the time and consideration. Sincerely,

Upload: essam-moustafa

Post on 15-Jan-2017

180 views

Category:

Documents


4 download

TRANSCRIPT

Page 1: Essam Elden Sayed 2016-MAY

Essam Elden Mohamed MustafaAddress: Doha, QatarMobile: +974 70595045, E-mail: [email protected]

Date:

To,Dear Sir/ Madam,

I have 16 years experience in civil engineering including 8 years international experience in the Middle East in areasOf EPC project execution & construction management, and presently seeking a challenging management role as Resident Engineer / Site Area Manager /Construction Manager/ Project Manager in a reputed organization in the EPC at Rail and or Petroleum /Oil & Gas/ Industries.

I have NOC to transfer to other companies.

Currently I am working as Project Manager (Jun 2014– until Now) with CEG International (Leading International Engineering Practice, Consultancy and Management), Doha, Qatar

Also I was working as Senior Expert Engineer/ Civil Site Work Coordinator, with Building Systems Trading & Contracting WLL, Client: Sener Ingeniera Y Sistemas, Doha, Qatar, The Project was Light Rail Transit (LRT) project Lusail City. Phase 2B (Cut & Cover) and delivering phase (2C1A) With The Main client Qatari Diar Vinci Construction (QDVC) where my responsibilities included supervision on execution of projects and generating substantial effective technical & managerial inputs, as well as design concepts, detail engineering, procurement, construction and commissioning.

My competencies include ability to work efficiently in demanding work environments, knowledge of latest software tools- expertise in project management, quality specifications, as well as Environmental Health and Safety standards, enhancing efficiency and productivity, and effective resource utilization.

I am dedicated to the principles of quality, dedication, and continuous improvement. I am confident that with my experience and skills, I can effectively handle the project management functions for EPC, create significant differentiation, and contribute substantially to your organization’s success.

The attached resume will give you details of my experience. I would appreciate an opportunity for an interview at your convenience. Thanking you for the time and consideration.

Sincerely,

Essam Elden Mohamed Mustafa

Essam Elden Mohamed MoustafaAddress: Doha, Qatar

Page 2: Essam Elden Sayed 2016-MAY

Mobile: +974 70595045Email: [email protected]

Snapshot: A result oriented and competent civil engineering professional offering 16 years extensive experience, including 8 years international experience in the Middle East in EPC projects and Civil Engineering works largely in the Oil & Gas/ Petroleum industry. Seeking a challenging senior position as Section Manager / Civil Coordinator /Site Construction Manager/ Project Manager for medium sized projects & Deputy /Assistant Construction Manager for mega projects in a reputed Engineering, Procurement, & Construction (EPC) firm in the Rail and or Oil & Gas/ Petroleum sector

P R O F E S S I O N A L S Y N O P S I S _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Proven capability in supervising and implementing projects involving infrastructure, sewerage, drainage networks, pumping stations, surface groundwater, & storm water& lately in tunneling, stations, & viaduct work.

Demonstrated capability in accomplishing assigned tasks & managed administration & service building projects involving MEP, structural, fit outs, indoor & outdoor finishing work.

Proficiency in project planning & coordination, especially involving resource planning & optimization; Focus on achieving revenue and profitability objectives through effective project planning.

Flair for adopting modern construction technologies as well as innovative indigenous techniques to improve output and achieve ease of operations.

Demonstrated expertise in project management duties for execution of projects; Proven ability in adhering to quality norms throughout the development & implementation process.

Vast experience in contract management contracts finalization; Managerial skills with ability to take risks & achieve results.

Fair Engineering experience & expertisein surveying, estimation, and costing; Verifiable exposure to execution and supervision of buildings from zero level to hand over.

Deft in coordinating work with Clients, Architects, Consultants, & Vendors; Adept in working efficiently under stress & maintaining quality standards at work.

Hard working, reliable, & self-motivated with proven ability in leading site staff, developing team members with good communication and interpersonal skills, accomplishing set objectives within specified time deadlines.

Please check my directors recommendation in full profile on qa.linkedin.com/pub/essam-moustafa/49/8bb/a9/

C A R E E R M I L E S T O N E S _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ _CEG International (Leading International Engineering Practice, Consultancy and Management), Doha, Qatar(Among Qatar's leading multi-disciplinary consultancy services firms founded in 1975 executing prestigious projects not only in Qatar but also in MENA region)Project Manager /CM (March 2015– until Now)(Reported to the Project Director & having a reporting relationship with 6 Engineers) Job Profile: As Project Manager for CEG at Shaza Hotel FiveStar hotel (3B + G + M + 14 + P) at Old Salata Doha, Qatar

Page 3: Essam Elden Sayed 2016-MAY

Consultancy supervision to follow works Structure modlaing

1- Structure raft foundation 2- Structure retaining walls with flat slab for the three Bessmants 3- Structure flat slab (G + M )4- Structure 14 post tension slabs Plus penthouse

MEP seyestems

1. Mechanical Works

NO Item Work Description Equipment1 Plumbing Cold and Hot Water system Centralized Electric water heater

Transfer pumpBooster pumpCirculation pump for hot waterCirculation/filtration for Raw water and swimming poolConcrete water tank (basement), GRP on roof

2 Plumbing Drainage system Soil pipe systemWaste pipe systemVent pipe systemKitchen drainage pipe system to Grease trapStorm water system

3 Plumbing Irrigation Booster pump set

4 Fire Fighting Sprinkler system Electric, diesel and jockey pumpStand pipe system Fire hose reel, breeching inletFire Extinguisher Fire Extinguisher/fire blanketFM 200 Cylinder as per room wiseExtract hood system Cylinder chemical as per hood size

5 HVAC Chiller system Air cool chiller systemFCU for guest room/publicFAHU guest room and publicAir curtain where required

Exhaust system for guest, toilet, generator, electrical roomSmoke ventilation Jet vent and axial fanSplit AC unit for Help, server and security roomPressurized fan Staircase well

Page 4: Essam Elden Sayed 2016-MAY

Fresh air fan for Parking area

6 Elevator Passenger elevator B3 to PH floor (3 nos)Service and Fire elevator B3 to PH floor (2 nos)Valet parking elevator B3 to GF

2. Electrical Works include

NO Item Work Description1 Power System ( substation, LvRoom, Transformer)2 Small power (Distribution, sockets,)3 Earthing4 Lightning5 Lighting6 BMS including smart home

7 CCTV8 F.D.A.S9 Tel/ Data

10 Public address ( Announcement)11 Clock12 SMATV _______ IPTV13 UPS Emergency (Generator)14 Access control system ACS

CEG International (Leading International Engineering Practice, Consultancy and Management), Doha, Qatar(Among Qatar's leading multi-disciplinary consultancy services firms founded in 1975 executing prestigious projects not only in Qatar but also in MENA region)Resident Engineer (Jun 2014– March 2015)(Reported to the Project Manager & having a reporting relationship with 4 Engineers)

Job Profile: As Resident Engineer for CEG at Manateq Qatar (Economic zones) projects under JV with UCC, overseen key functions as per the defined Key Performance Objectives-

Reviewing Tender documents.

Reviewing Prequalification and vendor list.

Coordinate between the Project Management Consultants and Contractors

Reviewing risks and suggest corrective actions and preventive actions

Participate in coordination meeting and progress meetings

Monitoring quality assurance and quality control systems.

Review the project progress reports with periodic reporting on project performance.

Check and approve the progress payment, materials submittals and replying to transmittals.

Check and Coordinate IFC (issue for constructions) document

Building Systems Trading & Contracting WLL, Client: Sener Ingeniera Y Sistemas, Doha, Qatar

Page 5: Essam Elden Sayed 2016-MAY

(A Spanish firm handling LRT project with outsourcing contract to BSTC Company)Senior Expert Engineer/ Civil Site Work Coordinator (July 2010– July 2013)(Reported to the Project Manager/ Local Coordinator & had a reporting relationship with 6 Engineers)

Job Profile: As Senior Expert Engineer/ Civil Site Work Coordinator, supervised onsite work & solved site problems during implementation of prestigious Light Rail Transit (LRT) project in Lusail city with Key Performance Matrices- Supervising construction planning and controlling project schedules, detecting noticeable delay if any

in the schedule, and asking to remove all bottlenecks to meet the set goals with defined deadlines. Tracking project changes, updating site based on schedule as agreed with engineering & project

management. Following up construction according to the Qatar Construction specification (QCS) Following up on engineering field change request (FCR’S) as well as non-conformance reports (NCR’S) Organizing a weekly meeting, meeting agenda and minutes of meetings. Interfacing with stakeholders to overcome difficulties, sanctioning & scheduling materials delivery. Monitoring & strictly implementing safety assurance plans in construction. Following up all documents released by QDVC work being carryout on site and release it to the site

Engineers Collecting all performance data to prepare and analyse the monthly report Increasing communication between with agents, answer Inquiries coming from site according to client

methodology, and discussing with technical team for clarifications if any Making verbal observation on site and send the critical observation by emails to client QA/QC

department and distribution all concerned persons Advance reading of drawing to be familiar with the new structures to implement on site. Checking and reviewing drawings, method statements, & availability for project execution. Coordinating with electro mechanical team for movements according to schedule/ reschedule of

handover time Identifying critical activities in construction work, including staff requirements,& providing inputs for

statutory clearances Reviewing the quality records and as build documents to finally collect all data to prepare and submit

the monthly report to the top managementContributions: Introduced best practices in the work and successfully met the stringent quality standards. Instrumental in successfully handling Light Rail Transit (LRT) project Lusail City. Phase 2B (Cut & Cover)

and delivering phase (2C1A), in Qatar. Played a critical role in undertaking structural work of 14 Km tunnel structure works, 2 typical station, 1

untypical station and 4 grade station and part of viaduct to the client. Obtain satisfaction of the client Qatari Diar Vinci Construction (QDVC)

CEG International (Leading International Engineering Practice, Consultancy and Management), Doha, Qatar(Among Qatar's leading multi-disciplinary consultancy services firms founded in 1975 executing prestigious projects not only in Qatar but also in MENA region)

Resident Engineer (November 2009– March 2010)(Reported to the Project Manager)

Job Profile: As Resident Engineer, overseen key functions as per the defined Key Performance Objectives- Supervised construction and renovation of QNB Bank branches, Service and headquarter building. Ensured carrying out of all relevant works including Architecture, MEP, & finishing work in accordance

with the approved plan. Coordinated between the Project Management Consultants and Contractors Monitored quality assurance and quality control systems. Reviewed the project progress with periodic reporting on project performance. Approve the progress payment.

SNC Lavalin International, Mesaieed Industrial City, Doha, Qatar(A Canadian company)

Page 6: Essam Elden Sayed 2016-MAY

Construction Civil Engineer (December 2008–June 2009)(Reported to the Service Buildings & Infrastructure Superintendent)

Job Profile: As Construction Civil Engineer, had over all responsibility of smooth working right from planning, commencement of project, up to handover with quality and cost control as per the defined Key Performance Parameters- Supervised construction of 10 out of 34 units, service & administration buildings & carried out civil,

structural, MEP, and finishing work in accordance with the approved plan. Prepared short term schedule using MS Projects 2007. Strictly implemented safety assurance plans Domain Knowledge of zero accidents safety program as well as QCS. Attended coordination meetings to review schedules, pointed out problems or deficiency if any with

suggested Corrective measures. Established working relationship of Design/Field Engineering, opened lines of communication with

contractor, & Agreed on engineering deliverables. Coordinated with engineering on constructability & design issues as well as subcontract activities to

ensure materials, equipment, and quality comply with engineering design plans &specifications. Planned& recommended procedures for superintendents as per standard work process procedures

(SWPPs). Coordinated with contractors for construction operations & followed up engineering site queries &

change order. Works with customer's resident engineering and operating personnel to coordinate construction

activities. Implemented controls or variables affecting job progress to ensure engineering and procurement Provided timely delivery of drawings, materials, and equipment & ensured full utilization of corporate

programs Given site instructions for any modification and change orders according to any revised drawings. Liaised with client to understand requirements as per contractual agreements Overseen quantity surveying work administrated financial & contractual issues on variation order. Received daily performance reports, prepared MIS reports to measure variance& updated upper

management.Contributions: Made noteworthy contribution in executing construction of residential buildings, apartments, &

complexes Maintained a successful track record of satisfactory work and punctual delivery for QATALUM plant

project in Mesaieed Industrial city with contract value of US$ 500 Million Ensured complete satisfaction for Qatar Petroleum through timely delivery of requirements within

cost and quality parameters.Saudi Arabian Trading & Construction Co. (SATCO), Mesaieed Industrial City, QatarConstruction Civil Engineer (July 2007–October 2008)(Reported to the Construction Manager & led a team of 4 Engineers)

Job Profile: As Construction Civil Engineer, coordinated daily work activities as per defined Key Performance Indicators- Assigned construction staff including sub-contractors300 skilled & unskilled workers for project work. Interfaced between the construction automation plan and the project controls program at the jobsite. Followed up with sub-contractors & ensured compliance with project & sub contract requirements. Monitored project progress according to time schedule &followed up on civil work activities survey. Supervised excavation work, compaction, shuttering, reinforcement, as well as pouring concrete &

curing. Undertaken excavation for water, sewage, fire, and irrigation pipeline. Followed up MCCR & commissioning as well as fabrication and erection of P.R.V and C.P Supervised steel water tanks foundation, cable trench, and control room building work. Installed port cabins for the site office and all necessary parts (septic tank, water tanks, generators, AC

…act) Resource management to implement the project in accordance with the contract& quality assurance

plans

Page 7: Essam Elden Sayed 2016-MAY

Prepared civil & architecture methods statements, administrated financial and contractual issues as variation order as well as all necessary documents including estimates & change orders.

Implemented revisions of as built drawings up to end of project. Assisted in strictly implementing project safety & followed up commissioning progress with the QC

department Prepared relevant correspondences performance review reports for the Construction ManagerContributions: Initiated effective cost management steps leading to increased productivity, efficient management of

resources, and maximized cost savings for EPC project consisting of installation QATALUM Construction Village/ Camp, Mesaieed, for 10, 000 employees with 1000 prefab building accommodation, sewage treatment plant 4000 m3/ day, 14.2 MVA power plant, water tanks, irrigation tanks, infrastructure utilities (portable water & fire water system, Fire alarm system, & Telecommunication system) landscaping, recreation facilities, and roads with contract value US$ 100 Million Client: QATALUM (JV of Qatar Petroleum & Hydro), EPC Consultants: SNC Lavalin International

Ensured complete satisfaction for Qatar Petroleum & Hydro through timely delivery of requirements within cost and quality parameters

International office for Construction, Marsa Alm, Red Sea, EgyptConstruction Manager (October 2004– June 2007)(Reported to the Project Manager)

Job Profile: As Construction Manager, overseen project implementation as per the specific Key Performance Matrices-

Followed up with sub-contractors to ensure work as per project requirements & sub-contract agreement.

Administrated financial and contractual issues as variation order. Negotiated and corresponded with consultant, sub-contractor, an suppliers Coordinated sub contract activities to ensure compliance on materials, equipment, & quality with in

parameters of design plans & specifications. Monitored individual project progress to ensure completion in accordance with the project milestone. Contributions: Maintained a successful track record of satisfactory work and punctual delivery for 3000 m2commercial

building project consisting of 50 shops & 30 studio units with contract value of US$ 1,000,000

Sanbouk MISR Company, Gas Department, Egypt(An ISO 9001:2000 certified firm offering services in civil, steel structure, HVAC, electromechanical works, as well as supply & construct of all kinds of plumping & fire fighting, & supply/ fixing mechanical equipment)

Project Engineer (January 2000– September 2004)(Reported to the Project Manager)Job Profile: As Project Engineer, handled materials, equipment, & manpower for project execution as per the Key Performance Objectives-. Solved issues in accordance with construction obligations Ensured implementation of quality control and quality assurance through the project period Involved in activates in redesign some of structural elements in order to harmonize with the

encountered site condition and the latest architectural demands Negotiated and corresponded with consultant, sub-contractor an suppliers Prepared two weeks look ahead schedules well as reported progress of work done. Contributions: Effectively implemented all kinds of civil works including skid foundation for metering system and

compressor, cable trench and control room building, Gas pipe trench, electrical duct M.H., firefighting system, steel shade, warehouse, administration buildings, landscape, hard top floor, water tank, swimming pools, & villas

Instrumental in completing following projects- Natural Gas Station (Arabia Gas) at 1stAbas El Akkad Street, two pressure reduction stations (PRS) for national gas, residential buildings in new Cairo, water tanks, and swimming pool with total contracts value of US$ 2,000,000

Page 8: Essam Elden Sayed 2016-MAY

T R A I N I N G & D E V E L O P M E N T _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Undergone training & qualified as Certified Associated in Project Management, accredited by the

Project Management Institute, USA (2013) CAPM No. : 1621522 Undergone preparatory training for PMP Exam (Project Management Professional) from Institution of

Information Technology Incorporation (An ISO 9001 accredited training entity) (2009) 4 th addition and on 2013 the 5th addition

Attended training module on MS Project 2007, conducted by Information Technology Incorporation (An ISO 9001 accredited training entity) (2009)

Underwent HSE training programmers organized by CTJV, Hydro, Qatalum, & QDVC Completed Safety Officer with Basic First Aid & Firefighting training conducted by British Safety

Services BSS UK at Doha, Qatar (2008) Attended most of all kind of constructions exhibitions/ seminars/ workshops held in Qatar

E D U C A T I O N A L C R E D E N T I A L S _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Bachelor’s Degree in Science- Civil Engineering, Higher Technological Institute, Egypt (1999)

P R O F E S S I O N A L A F F I L I A T I O N S _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Member- Egyptian Syndicate of Engineers, ESE Egypt (2000) Registration No. 02107/ 22

P E R S O N A L D A T A _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Date of Birth: 9th February 1973 Languages Proficiency: Arabic & English Driving License: Holding valid Qatari driving license Nationality: Egyptian, Passport No.: A00903969, valid up to 14th August 2016

I T S K I L L S _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ _ _ _ _ _ _ Primavera 6.7 ,MS Office (Word, Excel, Power point, Outlook), AutoCAD 2012, Microsoft Project 2010,

Adobe Acrobat Pro, Mind Mapping Programs, Flow Chart Programs Aconex project collaboration (online) Mezzoteam Pro-sys collaborative work solution designed to organize (online)