essex property trust 2019 - loopnet · santee passage will offer a wide cross section of l.a.’s...
TRANSCRIPT
Essex Property Trust 2019
TASTER
Santee Passage is a new food hall in DTLA's Fashion District, at the corner of Los Angeles Street and 7th Street.
The project is currently under construction for a targeted late-2019 opening.
22019 | Essex Property Trust | Santee Passage
Tabl
e of
Con
tent
s
Project Overview
Passageway ViewCourtyard ViewBuilding 700 Entry ViewBuilding 718 Entry ViewExterior SignageMediaTeam
Comprehensive Description
Site + HistoryLos Angeles Street ViewSite PlanCreative ConceptsTarget Tenants + Customers700 Los Angeles StreetBuilding 700 Plan718 Los Angeles StreetBuilding 718 PlanCourtyard + AlleywayLandscape ConceptLandscape PlanFountain Design
Technical Information
Typical 700 Tenant SpaceTypical 718 Tenant SpaceDesign CriteriaTenant Development ScheduleWork Letter
1.0
56789
1011
2.0
13141516171819202122232425
3.0
2728293637
32019 | Essex Property Trust | Santee Passage
Pro
ject
Ove
rvie
w
1.
0
Pas
sage
way
Vie
w
Santee Passage’s 23,000 square feet is divided between two historic buildings on either side of a narrow pedestrian passageway—hence the name. Santee Passage will welcome the public as a single and unified destination, even as the two buildings have their own distinctive history and personality.
The two buildings, with entrances at 700 and 718 Los Angeles Street, will be unified through architecture, design, and leasing strategy.
52019 | Essex Property Trust | Santee Passage
Cou
rtya
rd V
iew
Santee Passage’s street-facing facade hides an extraordinary architectural surprise: a park-like courtyard. This outdoor space is open to the sky but protected from street noise and grit. The courtyard is accessible from both buildings and will provide outdoor common-area seating and a gathering place for the neighborhood. With a raised stage
at one end, string lighting, and a shaded fountain, the courtyard can also be used for future programming, such as pop-ups, picnics, food festivals, performances, and special open-air dinners.
The courtyard at Santee Passage will be an urban oasis in the heart of DTLA’s Fashion District.
62019 | Essex Property Trust | Santee Passage
Santee Passage will have stalls for up to 19 vendors. Offerings will include prepared food and sociable beverages such as coffee, beer and wine, and cocktails. (The project is being entitled for multiple Type 41 ABC licenses for beer and wine, as well as two Type 47 licenses for full bar.) Stalls are being delivered to tenants at approximately
80% completion, including stubbed-out utilities, venting ducts, and drains. A “work letter” included below will provide further details. Two stalls in Building 700 are ducted for live-fire cooking, such as a wood-burning pizza oven or a mesquite grill.
Stalls at Santee Passage range in size from under 250 sf to over 900 sf, along with a couple of smaller grab-and-go kiosks.
Bui
ldin
g 70
0 E
ntry
Vie
w
72019 | Essex Property Trust | Santee Passage
Bui
ldin
g 71
8 E
ntry
Vie
w
Santee Passage will offer a wide cross section of L.A.’s varied and exciting food culture. Targeted vendors include a range of cuisines and categories such as tacos, noodles, sandwiches, bowls, craft beer and natural wine, frozen desserts, sweet baked goods, BBQ (whether it hails from Texas or Thailand), salads, juice, bagels, dumplings, and so on. These are just examples. But they reflect the reality of L.A. food, one that Santee Passage embraces. When we say “the best food in its category” we understand that
an inexpensive street taco and a pricey plate of handmade pasta both can—and do—represent “the best of LA food.” Santee Passage will offer an accessible, democratic variety of food to meet the needs of the Fashion District and DTLA.
At Santee Passage, food makes the neighborhood.
The creative strategy at Santee Passage is to bring together a community of food vendors who represent the best of L.A. chefs and entrepreneurs.
82019 | Essex Property Trust | Santee Passage
1 West ElevationScale: 3/32”=1’-0”
Corner of S. Los Angeles St. and 7th Street
7th Street
A1: Blade Sign Identi�cationMetal sign with combination of painted and neon graphics
Size of sign will t footprintof existing sign
12
9
10 2
8 4
11 1
7 5
3
6
2 Detail: Blade SignScale: 3/8”=1’-0” 3 Side View: Blade Sign
Scale: 3/8”=1’-0”
White neon letters anddetail. Neon letters sit inside the reverse channel letter.
Drop shadow painted red
Red reverse channelletters painted redinside
Painted or �ashingneon arrows
Apx. 16’-0” AFF
Apx. 12’-0” AFF
Santee PassageExterior Facade Preferred
airspaceDateApril 2, 2018
ClientEssex Property Trust11911 NE 1st St, Ste B212 Bellevue, WA 98005
ProjectSantee CourtLos Angeles, CA
ArchitectStudioneleven Long Beach, CA
SubmissionPhase 4: Design Development
PageG-01A
Airspace Design IncBrooklyn, NYwww.airspace.nyc Final for Sign-o�
Ext
erio
r S
igna
ge
92019 | Essex Property Trust | Santee Passage
Med
ia
@santeepassage
@santee-passage
santeepassage.com
102019 | Essex Property Trust | Santee Passage
Essex Property Trust
Project Managers and LeasingMike Injayan: [email protected], Nam Trang: [email protected]
Construction ManagerColin Cramer: [email protected]
Essex Property Trust is a publicly-traded real estate investment trust. Its owns approximately 250 apartment complexes on the West Coast, from San Diego to Seattle, with a total of over 60,000 residential units. In DTLA, Essex buildings include the P&E Lofts and Santee Court, adjacent to Santee Passage. Santee Passage is the first food hall from Essex. The company is committed to this substantial long-term investment to create a signature amenity for its DTLA tenants and to lead the way with economic redevelopment in the Fashion District, one of the DTLA’s fastest changing neighborhoods. Leasing is by Essex project managers Mike Injayan and Nam Trang. Onsite construction management is by Colin Cramer.
Studio One Eleven
Alan Pullman: [email protected], Matt Wister: [email protected]
Studio One Eleven is dedicated to the revitalization and enhancement of urban areas through an integrated practice of architecture, landscape and urban design. The Studio is focused on mixed-use infill, hospitality, urban revitalization, planning, and community projects that create vibrant communities, while remaining rooted in the principles of smart growth and long-term sustainability. Located in Downtown Los Angeles and Long Beach, our studio deeply understands the needs of the community and focuses on thoughtful design of incremental and implementable interventions that favor re-use and community supported improvements. While committed to architectural solutions that represent contemporary buildings of our time, our designs are not predicated by a singular language but are inspired through the careful assessment of the program and place where they stand. We believe that the best way to enhance or create the future of a place is to respect and understand its past patterns and precedents. We utilize community feedback and engagement to inform our approach to all projects, ensuring the development meets the needs of the end-user.We understand how to create environments which are attractive to guests, residents and retailers alike. Each project is a collaborative effort. Working closely with our clients, we seek to discover a project’s full potential through creative design, effective communication and positive working relationships. Designing for the lowest possible impact on the environment is the foundation for all of our work. Sustainability is integral to our creative process and we design to the highest degree preferred by our clients.
TASTER
Kevin West: [email protected]
Taster LLC is responsible for creative strategy and tenanting strategy at Santee Passage. Taster principal Kevin West and Joseph Shuldiner were formerly co-creative directors of Grand Central Market in DTLA during its revitalization from 2012–2017. Additional Taster clients include Gusto 54 Restaurant Group, Summer Ops, House of Blues, Campbell’s Soup Company, and the DTLA Donut Festival at Union Station. Te
am
ADDITIONAL CONSULTANTS
Identity and SignageAirspaceairspace.nyc
Marketing, media, and social mediaBread & Butter PR: [email protected] breadandbutterpr.com
Entitlements and ABCVeronica Becerra: [email protected]
General ContractorSTS ConstructionJed Edson: [email protected]
Kitchen DesignInteractive Restaurant ConsultingGregg Golem: [email protected]
LightingOculusoculuslightstudio.com
112019 | Essex Property Trust | Santee Passage
Com
preh
ensi
ve D
escr
iptio
n 2.
0
Site
+ H
isto
rySantee Passage, at the corner of Los Angeles Street and 7th Street, comprises two historic buildings, an architecturally notable central courtyard surrounded by mid-rise apartments, and a wide pedestrian alleyway that links the courtyard to the cul-de-sac of Santee Street. The site sits just north of the Fashion District and west of the Flower District. The transformed shopping district around the Ace Hotel is a five-minute walk.
The site's history stretches back nearly 100 years to the early days of downtown's garment district. The building once operated by the George S. Bailey Hat Company factory now houses Santee Court Apartments, and the ground floor of the Brownstein-Lewis Company building, once a Stronghold overalls factory, holds the modest food court currently at 718 Los Angeles Street. Building 700, with its landmarked Art Deco facade, has operated as a department store and drugstore.
The two buildings front the open-air courtyard and protect it from the noise and grit of the street. With its narrow entry points leading to an open interior plaza, Santee Passage is an urban oasis, a neighborhood secret to make your own.
Building 700
Building 718Courtyard
Fountain
132019 | Essex Property Trust | Santee Passage
Los
Ang
eles
Str
eet
View
142019 | Essex Property Trust | Santee Passage
Site
Pla
n
LEASING OFFICE
T
T
T
T
T
LOS ANGELES STREET7TH
STR
EE
T
TRASH FUTURE PROPOSED BUILDING BY OTHERS
SEAT COUNT
BLDG 700 326
BLDG 718 265
COURTYARD 77
BLDG 718 BLDG 700
COURTYARD
SCALE 1/32” = 1’-0”0 16 32 648
SAN
TEE
PASS
AGE
718 ENTRY
700 ENTRY
700 ENTRY
152019 | Essex Property Trust | Santee Passage
Cre
ativ
e C
once
pts
Central Gathering PlaceSantee Court aspires to be the heart of the district—a neighborhood social hub. The site’s F&B program, as well as its design, encourage visitors to interact with the space in flexible ways. Some will grab a quick bite on the run, others will settle in to meet with colleagues, still others will join friends there for a night out. Food is the attraction, but the adventure and discovery of an authentic social experience is what draws people back.
Urban OasisSantee Court offers an unexpected break from downtown’s dense urban setting. Multiple entryways bring visitors into an enclosed central courtyard, which feels like a restful vest- pocket park protected from the loud street.
Word of MouthSantee Court belongs to the neighborhood, and the foundation of its success will be locals who discover the place and adopt it as their own. When they spread the story of Santee Court through their networks, the audience will grow. Media buzz and visitors from outside the neighborhood will follow naturally.
Morning to MidnightSantee Court will open for coffee and stay open until last call. Food offerings will cover every hour in between: breakfast, lunch, happy hour, dinner, and late- night. Santee Court will also accommodate the mid-morning and mid- afternoon crowd that comes to work, to meet, or simply to socialize with friends.
DemocraticThe food hall at Santee Court is a neighborhood amenity, not a stylized fantasy to tantalize Yelpers, journalists, and other elite “foodies.” Vendors will represent the creativity of the Los Angeles food scene and appeal to the social and economic diversity of a downtown audience. Successful vendors will have an authentic culinary identity and a voice to communicate their passion with the public.
Local AlliancesThe residents of Santee Court, nearby buildings, and the surrounding districts are crucial allies. They will be engaged enthusiastically with programming of community interest, such as movie screenings, pop- up dinners, musical performances, and public conversations.
Sustainable by DesignSantee Court will adopt current best practices for energy efficiency and waste disposal. Progressive pilot programs, such as zero- waste initiatives, will be reviewed for financial viability.
162019 | Essex Property Trust | Santee Passage
Tenant ConceptsThe tenants for Santee Court will offer prepared food, sociable beverages (coffee, beer, wine, cocktails), and lively conversation at their counters and bars. In other words, Santee Court is a place to go eat and drink; it is not intended to be a market hall for grocery shopping. Vendors whose primary offering is raw ingredients (such as a butcher, greengrocer, or fish monger) are not currently part of the tenant plan. It is possible that some vendor categories, such as an upscale deli, might offer meals-to- go or a few select pantry staples or fresh items including fruit, cheese, and bagged salad greens. However, even in that special case, prepared food would be the basis of the vendor’s business plan and concept identity. The legacy bodega on the courtyard will continue to offer quick- grab essentials for the kitchen, as well as beer, wine, and other necessaries for apartment dwellers.
Target Customers• Local loft dwellers and young professionals • Freelancers and self- employed creatives• Showroom owners, fashion entrepreneurs, and fashionistas • District workers—at all income levels• Visitors to the Flower District and • Fashion District (aka, bargain hunters and destination shoppers) • FIDM students• Ace Hotel denizens• Cool hunters, foodies, Yelpers
Target Vendors• Service Styles: counter service, "chef casual," QSR, grab & go
• Culinary Styles: Fourth- wave coffee, new- style tacos, healthy bowls, noodles, Asian/Indian QSR, better burgers, creative salads, sandwiches, Mediterranean (falafel/kababs), fancy deli, seafood, ice cream/frozen desserts, tea/matcha, baked goods, craft beer, wine, full bar
• Anchor Tenant, Building 700: full- service bar with strong food offerings
• Anchor Tenant, Building 718: iconic coffee bar
• Existing Legacy Tenants: Pizza Hut, Bronze Aussie, Brunch, courtyard bodega, Subway
Targ
et T
enan
ts +
Cus
tom
ers
172019 | Essex Property Trust | Santee Passage
Building 700, at the corner of Los Angeles Street and 7th Street, is the larger of Santee Court’s two parcels. The plan for its adaptive reuse envisions twelve stalls, from 300 to 587 square feet, and three small grab- and-go kiosks, 81 to 275 square feet. Windows along Los Angeles Street and 7th Street provide views into the space and connect the interior to the busy street life. The building has four access points: at the street corner, midway along its Los Angeles Street facade, on the passageway, and onto the courtyard.
Inside, the stalls and kiosks will be open to public view, giving vendors the opportunity to leverage the “theater of the kitchen” to attract visitors and advertise food offerings. Stall D—an anchor location that will set the tone for the overall project and the distinct personality of Building 700— occupies a prime spot facing Los Angeles Street. It will have ample counter seating, additional window- bench seating nearby, and the option to expand into the adjacent stall for additional kitchen capabilities. The ideal concept for this space will leverage location and visibility to draw in visitors. Offerings must include crowd- pleasing food for lunch service but also transition smoothly into cocktail hour and dinner. The stall’s location also potentially allows for late- night operation hours. Only an experienced vendor with established credentials and a proven following will pass the vetting process for this space.
The remaining spaces in 700 offer a range of sizes and layouts, adaptable any number of culinary styles that can be prepared within the relatively tight market- hall footprint. Smaller stalls provide an opportunity to take chances on promising but unproven startups.
The tenant mix in 700 will lean towards concepts geared for lunchtime, afternoon, and evening.
For instance, Stall A, just inside the corner entrance, would be ideal for ice cream or paletas. Stall I, which is easily accessible to common- area indoor seating and the courtyard, would be well placed for craft beer.
In keeping with Building 700’s intended tenanting, the design elements are somewhat more polished than in 718—more “evening”—while keeping still within the overall design guidelines with respect to the site’s urban location and industrial past.
A limited amount of additional dry and cold storage space, at the rear of the building, will be available for lease.
700 S. Los Angeles St – Circa 1913.
700
Los
Ang
eles
Str
eet
182019 | Essex Property Trust | Santee Passage
Bui
ldin
g 70
0 P
lan
Food Vendor
Restrooms
Common Area
Operations
Service
SCALE 1/16” = 1’-0”0 8 16 324
9 7 5 4 3 28 6 1
A
B
C
D
E
F
G
192019 | Essex Property Trust | Santee Passage
Compared to 700, 718 has a relatively narrow frontage on Los Angeles Street but is more visible from the passageway. Building 718 also has a stronger visual and physical connection to the courtyard. Its entryways are on Los Angeles Street, at two points along the passageway, and via a wide elevated patio that overlooks the courtyard. Current plans show seven rentable spaces, although the largest, almost 1400 square feet and comprising both a bar and a coffee bar, will likely need to be split between two vendors.
Stalls in Building 718 align with the south wall and have enclosed kitchens behind a unified line of service counters. Four are significantly larger than anything in Building 700, with between 800 and 1279 square feet, making them suitable for high- volume concepts where functionality and storage space is more important than kitchen theater. The two smallest stalls, around 250 square feet each, benefit from being near doorways, although food- prep options will be limited because vented hoods are not planned.
The anchor for Building 718 will be Stall G overlooking the courtyard, whether occupied by one vendor or two. Its extensive counter seating at two bars, outdoor access, and the calm atmosphere of the courtyard are prime assets. The smaller bar is perfectly sized for in- the- round coffee service. Placing the coffee bar in the courtyard is a strategic decision to draw morning visitors into the heart of the project and define Building 718 as the social hub Santee Court’s daytime clientele. A long library table inside (wired to the hilt with electrical outlets and USB plugs) will provide mobile-office space for laptop creatives, remote workers, and FDIM students. These “shoulder hour” users (mid- morning and mid- afternoon) work and take meetings on the fly. They will contribute to Santee Court’s identity as a neighborhood gathering place and provide addition sales during traditionally quiet mid- morning and mid-afternoon hours.
The larger bar in Stall G, with its long narrow counter, could be a happy- hour gathering place as a wine bar or mescal bar. Given the large number of upstairs residential units with windows on the courtyard, however, noise concerns should limit operating hours in the courtyard.
The factors that distinguish Building 718—its large enclosed kitchens, spaces for “shoulder hour” guests to linger, and nighttime noise concerns—explain our strategy to define 718 as the preferred location for daytime concepts.
In keeping with the building’s factory past—and its potential as a modern- day flexible workplace for the mobile freelancer’s laptop life—the design for 718 is somewhat more industrial with plainer finishes.
718
Los
Ang
eles
Str
eet
From the corner of Olive and 7th Street, looking east down 7th Street – Circa 1913.
202019 | Essex Property Trust | Santee Passage
Food Vendor
Restrooms
Common Area
Operations
Service
SCALE 1/16” = 1’-0”0 8 16 324
5 4 3 2 1
A
B
C
D
E
F
G
H Bui
ldin
g 71
8 P
lan
212019 | Essex Property Trust | Santee Passage
The courtyard connects to Santee Street via an underutilized but potentially charming alleyway that also provides residents access to the dog park. Along the way, it passes the mosaic fountain, firepit area, and shade trees before it tunnels through an apartment building to emerge at Santee Street. The alleyway represents an opportunity. Properly activated, it could evoke urban revitalization and the renewal of a post- industrial neighborhood—somewhat reminiscent of Soho in the 1980s.
Cou
rtya
rd +
Alle
yway
222019 | Essex Property Trust | Santee Passage
Land
scap
e C
once
pt
JANITOR112 SF
GRAB-N-GO KIOSK B142 SF
VENDOR I [C]515 SF
VENDOR H [C]389 SF
VENDOR G [C]422 SF
VENDOR K [C]300 SF
GRAB-N-GO KIOSK A81 SF
VENDOR J [C]290 SF
UTENSILS & TRASHGRAB-N-GO KIOSK C
227 SF
SKYLIGHTS ABOVE
1 2 3 4 5 6 7
12 13 14 15 16 17
18 19 20 21 22 23 24
8 9 10 11
28
25
29
26
30
27
42
39
43
40
44
41
56
53
57
54
58
55
70
67
71
68
72
69
35
31
36
32
49
45
50
46
63
59
64
60
77
73
78
74
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
106 105 104 103 102 101 100107
108
109
110
111
112
113 121 120 119122
123
124
125
126
127
128
129
130
131
132133
276 277
275280
279278290 291
289294
293292
303304
271
272273274281282
283
284285
286287288295296
297
298299
300301302
305 306
308307
309 310
312311
317 318
320319
313 314
316315
321 322
324323
325 326
328327
NOT IN SCOPE
LOS ANGELES AVE.
VENDOR E(PIZZA HUT)
1,279 SF
VENDOR D800 SF
VENDOR C800 SF
VENDOR B940 SF
VENDOR A236 SF
VENDOR G1383 SF
PATIO711 SF
VENDOR F267 SF
MEN'SRESTROOM
WOMEN'SRESTROOM
ELECTRICJANITOR
COFFEE BAR
UTE
NSIL
S &
TRASH
DRIN
KIN
GFO
UN
TAIN
KIOSK
251 252
253 254
247 248
249 250
243 244
245 246
255
256
242241240239238237236
1 2 3 4
5 6 7 8 9 10
11
12
13 36
38
35
37
40
42
39
41
44
46
43
45
47
48
49
50
51
53
52
54
79
81
80
82
99
101
100
102
118
119
120
121
96
98
95
97
107
108
105
106
103
104
84
86
83
85
88
90
87
89
92
94
91
93
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
257
258
259
260
261
262
263
180
181
182
183
184
122
124
123
125
126
128
127
129
130
132
131
133
134
136
135
137
138
140
139
141
164 165 166 167
162 163160 161
146 147144 145142 143
148 149
150 151
152 153 156 157
158 159154 155
234 235232 233
208 209
210 211
204
205
206
207
174
175
178
179
176
177
172
173
185 186 187 188 190 191 192 193 194 195 196 197 198 199 200 201 202 203
55 56
57 58
59 60
61 62
63 64
65 66
67 68
69 70
71 72
73 74
75 76
77 78
109
110
111
112
113
114
115
116
117
168 169 170 171
212 213
214 215
216 217
218 219
220 221
222 223
228 229
230 231
224 225
226 227
1/32" = 1'-0"
FOUNTAIN COURTYARD
STAGEDOG PARK
CORNELL BLDG. ECKHARDT BLDG. GRETHER & GRETHER BLDG. BROWNSTEIN-LEWIS
BLDG.
BAILEY HAT BLDG.
SANTEE BLDG.
30' 60’0 15’
232019 | Essex Property Trust | Santee Passage
Land
scap
e P
lan
NOT IN SCOPE
(E) MECH.CHASE
NOT IN SCOPE.
POTENTIALFUTURETENANT
(1,715 SF)
EXISTING BUILDING716 S LOS ANGELES
(THE BAILEY HATBUILDING)
EXISTING BUILDING722 S LOS ANGELES
(THE BROWNSTEIN-LOUIS BUILDING)
EXISTING BUILDING714 S LOS ANGELES
(THE CONNELBUILDING)
EXISTING BUILDING716 S LOS ANGELES
(THE BAILEY HATBUILDING)
EXISTING BUILDING743 SANTEE ST(THE SANTEE
BUILDING)
EXISTING BUILDING722 S LOS ANGELES
(THE BROWNSTEIN-LOUIS BUILDING)
EXISTINGBUILDING
743 SANTEE ST(THE SANTEE
BUILDING)TRASHROOM
SANTEE ST.
LOS ANGELES ST.
7TH S
T.
EXISTINGADJACENTPARKING
AREA
EXISTING BUILDING730 LOS ANGELES ST
(GRETHER & GRETHER LOFTS)
EXISTING BUILDING738 LOS ANGELES ST
(THE ECKHARDT BLDG)
EXISTING BUILDING738 LOS ANGELES ST
(THE ECKHARDT BLDG)
EXISTING BUILDING746 LOS ANGELES ST(THE CORNELL BLDG)
EXISTINGTRANSFORMER
ENCLOSURE
LEASING OFFICE
SANTEE MARKETRESIDENT ENTRY
T
T
T
T
T
T
T
T
T T
T
BAILEY HAT BLDG.
SANTEE BLDG.
30' 60’0 15’
242019 | Essex Property Trust | Santee Passage
Foun
tain
Des
ign
252019 | Essex Property Trust | Santee Passage
Tech
nica
l Inf
orm
atio
n
3.
0
TYPICAL 700 TENANT PLAN
24"
1A
1A
ELEVATION 1A
3
KEYNOTES
Menu Board allotted area. Hanging Signage should fit within a 2'-0" sq area. Signage should be internally illuminated. Signage should not be mounted below 10'-0" AFF or above 12'-0" AFF.
Hanging Signage to be mounted at far left or far right of the tenant space. Side to be determined by approach from entrance. Signage to hang no more than 24" from edge of tenant space.
Signage
1
2
3
GENERAL NOTES
1. Additional signage beyond tenant lease line. Subject to review.
2. Additional signage beyond lease guidelines subject to review by landlord/architect for approval.
3. Subject to review by landlord/architect for approval.
SECTION 1A
12'-0
" M
IN.
10-0
" M
AX
.
24"
LEVEL 10' - 0"
LEVEL 2+16' - 0"
2
SCALE 1/4” = 1’-0”0 2 4 81
Typi
cal 7
00 T
enan
t S
pace
272019 | Essex Property Trust | Santee Passage
1A
TYPICAL 718 TENANT PLAN
1A
24"
2'-6"
ELEVATION 1A
SCALE 1/4” = 1’-0”0 2 4 81
SECTION 1A
10'-0
" M
IN.
LEVEL 10' - 0"
LEVEL 2+16' - 0"
KEYNOTES
Bulkhead Tenant Signage to not exceed 11'-0" wide by 6'-0" high.
Menu Board allotted area. Flag-mounted Signage should fit within a 2'-0" sq area. Signage should be internally illuminated. Signage should not be mounted below 10'-0" AFF or above 12'-0" AFF.
Flag-mounted Signage to be always justified and mounted at west side of tenant space to favor entry/flow from Los Angeles Street.
Signage
2
3
4
GENERAL NOTES
1. Additional signage beyond tenant lease line. Subject to review.
2. Additional signage beyond lease guidelines subject to review by landlord/architect for approval.
3. Subject to review by landlord/architect for approval.
12'-0
" M
IN.
4
3
2
1
1
Typi
cal 7
18 T
enan
t S
pace
282019 | Essex Property Trust | Santee Passage
Des
ign
Cri
teri
a: F
inis
hes
292019 | Essex Property Trust | Santee Passage
APPROPRIATE TENANT COUNTER FINISHES
Sealed wood
Concrete
Stone basalt Stone marble Treated metal
Corian solid surface Quartz
INAPPROPRIATE TENANT COUNTER FINISHES
Vibrant color
Plastic laminate Stainless steel Tile
Des
ign
Cri
teri
a: F
inis
hes
302019 | Essex Property Trust | Santee Passage
Des
ign
Cri
teri
a: F
inis
hes
APPROPRIATE BAR DIE FINISHES
Sealed Wood
Concrete board
Tile Treated metal finish
Metal meshDecorative brick Decorative pre-fabricated panel
312019 | Essex Property Trust | Santee Passage
Des
ign
Cri
teri
a: F
inis
hes
INAPPROPRIATE BAR DIE FINISHES
Stainless steel
FRP
Vibrant color Vibrant color
Plaster Plastic laminate
322019 | Essex Property Trust | Santee Passage
Des
ign
Cri
teri
a: S
eatin
g
APPROPRIATE TENANT SEATING
332019 | Essex Property Trust | Santee Passage
Des
ign
Cri
teri
a: S
igna
ge
TENANT SIGNAGE CRITERIA: BUILDING 700
342019 | Essex Property Trust | Santee Passage
Des
ign
Cri
teri
a: S
igna
ge
TENANT SIGNAGE CRITERIA: BUILDING 718
352019 | Essex Property Trust | Santee Passage
Santee Passage - Tenant Improvement Conceptual Schedule
1 Architectural Schematic Design, includes conceptual kitchen layout: within 45 days
2 Arch. / MEP Construction Document Development: within 45 days
3 Kitchen Base Plan Development: within 45 days (in tandem with arch. CD’s)
4 Submit all Plan Documents to Essex for owner Review: 1-2 days
5 LA County Health Dept. Submittal First Review: 4 weeks (21 business days for review)
6 Building Department Submittal / Permit: 2 months
7 Address LA County Health Dept./ Building Department Corrections: 1-2 weeks (assumes approval on resubmittal)
8 Construction Phase: 2-3 months
Month 7 Month 8 Month 9Month 1 Month 2 Month 3 Month 4 Month 5 Month 6
Tena
nt D
evel
opm
ent S
ched
ule
362019 | Essex Property Trust | Santee Passage
Building 700: Work Letter
LANDLORD'S WORK
1. Floor Slab The existing floor slab shall consist of exposed concrete floor, level, clean and broom swept suitable for acceptance of sealer or Tenant flooring/finish. 2. Perimeter, Exterior Walls and Interior Demising Partitions All building perimeter exterior walls shall be exposed finish and/or 5/8” painted gypsum board. Non- rated interior demising partitions shall be constructed to the minimum standards dictated by the governing code or authority including insulation and 5/8” type drywall, fire taped. All interior demising walls shall be non-rated, constructed with metal studs and extended to 9-10ft above finish floor with metal studs/bracing extending to the concrete floor above. Areas of demising walls located behind Landlord provided kitchen plumbing fixtures shall be provided with clean, non-porous light colored finish acceptable to the Health Department and governing codes.
3. Ceiling Open ceiling, restored and in good condition with underside of upper level floor structure exposed/painted. 4. Doors If not existing, all required new base building exit doors shall be glazed aluminum storefront doors with panic hardware and closer as required by code. 5. Glass + Glazing Storefront per base building design and governmental approvals. 6. Heating, Ventilating + Air Conditioning (HVAC) HVAC system plenum and distribution throughout the Premises, approx. 1 ton per 200sf. HVAC units shall be sized and zoned to accommodate a cooling load to meet or exceed efficiency requirements of Title 24 energy efficiency standards. Duct detectors shall be installed per code. The HVAC distribution shall be by Landlord, HVAC system maintenance will be by Landlord.
7. Kitchen Hood Exhaust Commercial kitchen ductwork distributed to Tenant space and wrapped with 2-hour protection within the space, routing to the roof area shall be providedby Landlord. Grease exhaust ventilation system designed to capacities outlined below, commercial kitchen hoods and connection to Landlord provided ductwork to be provided by Tenant:
• Vendor S 1015 CFM 6’x4’6” Type 1 STD Hood • Vendor T 2250 CFM 10’x4’6” Type 1 STD Hood• Vendor U 2250 CFM 10’x4’6” Type 1 STD Hood• Vendor O 1125 CFM 6’x4’6” Type 1 STD Hood• Vendor R 2250 CFM 10’x4’6” Type 1 STD Hood W
ork
Lette
r: La
ndlo
rd's
Bui
ldou
t
• Vendor Q 2250 CFM 10’x4’6” Type 1 STD Hood• Vendor N 2250 CFM 10’x4’6” Type 1 STD Hood• Vendor M 2250 CFM 10’x4’6” Type 1 STD Hood• Vendor L 2250 CFM 10’x4’6” Type 1 STD Hood• Vendor J 2250 CFM 10’x4’6” Type 1 STD Hood
8. Wood Fired Kitchen Hood Exhaust Commercial kitchen ductwork for wood-fired ovens, ducted / wrapped with 2-hour protection within the space and routed to the roof area shall be provided by Landlord. Wood-fired hood exhaust ventilation system designed to capacities outlined below, commercial kitchen hoods and connection to Landlord provided ductwork to be provided by Tenant:
• Vendor S 1505 CFM 6’x4’6” Type 1 Wood Fire Hood (Final location TBD)• Vendor O 870 CFM 4’10”x4’10” Type 1 Wood Fire Hood (Final location TBD)
9. Fire Suppression Systems Fire suppression system for kitchen hoods shall be installed by Tenant and tied to the building fire alarm system as required by local code jurisdictions, blank junction box shall be provided at ceiling by Landlord.
10. Fire Sprinklers Per base building requirements, code, and pursuant to Landlord’s plans for open floor plan and open ceiling in Premises. Modifications to fire sprinkler system due to Tenant’s improvement plans shall be performed at Tenant’s cost.
11. Plumbing One and one-half inch (1.5”) domestic water-line, 30 total fixture units available (11 taken with Landlord provided fixtures in tenant space). Grease waste connection provided for tenant beneath floor slab, 15 grease waste fixture units available (11 grease waste fixture units taken with Landlord provided fixtures in tenant space) and installation/connection to grease interceptor provided by Landlord (which may serve more than one tenant). An additional 3” sanitary connection below the floor slab of each space shall be provided, 15 fixture units will be available for tenants to tie-in non-grease waste fixtures. One (1) 3” vent to accommodate 30 fixture units shall be provided at each space for any additional sanitary loads and the grease waste loads in Tenant’s design. Cold and hot water shall be provided, piped up and connected to fixtures provided by Landlord. Two (2) 199 BTU water heaters shall be provided for each Tenant space located in the mezzanine area. Gas for each Tenant space will be provided with a stub below the floor slab for future gas appliances not to exceed 700 CFH / 700,00 BTU.
12. Restrooms New men’s and women’s ADA compliant and fully functioning restrooms shared with other ground level building tenants shall be provided.
372019 | Essex Property Trust | Santee Passage
13. Utilities All permanent utility services to the Premises, including operational phone/data infrastructure and conduit , water, gas, electricity, and public sewer, will not be separately metered to the Tenant space by meters or sub-meters (or other measuring devices).
14. Electrical Electrical panel with 150 amps capacity, three phase, 4-wire, 120/208V with main breaker only and stubbed to Tenant space with 1-1/2” conduit.
15. Tele-com Empty 3/4” conduit from Tenant space to common distribution point, main telephone backboard shall be provided by Landlord.
16. Shared Common Areas Shared common area dry storage, walk-in refrigeration unit, and dishwashing scullery are provided for Tenant’s use by Landlord. Spaces shall be designated by Landlord. Common area seating shall be provided by Landlord, additional counter seating may be provided by Tenant at Tenant’s cost and mutually acceptable (including basic fixtures and lighting placement) to Landlord and Tenant. 17. Signage Tenant shall pay for all signs and installation thereof, subject to Landlord’s sign criteria and Landlord’s reasonable approval.
18. Lighting Landlord to provide lighting for the Premises with open floor plan in common areas, compatible with open ceiling plan. Improvements to lighting within Tenant’s area shall be at Tenant’s cost and at subject Landlord’s Approval (including basic fixtures and lighting placement) to Landlord and Tenant. 19. Fire Alarm Exit signage with horns and strobe lights as required by code for base building.
TENANT'S WORK 1. The work to be done by Tenant shall include, but not be limited to, the purchase and/or performance of the following: • Electrical panel circuit breakers (bolt-on only), fuses, wiring, and fixtures beyond that provided by
Landlord;
• Additional lighting and signage within Tenant space beyond that provided by Landlord subject to Landlord approval;
• Revisions to Landlord’s demising wall(s) dividing the Premises from that of adjacent lease space;
• Tenant’s interior partitions including finishing, electrical wiring, and connections within the Premises subject to Landlord approval
• Kitchen equipment including cook line and prep area counter(s) etc.;
• Modifications to base building fire sprinklers and fire alarm as required to accommodate Tenant’s improvements;
• Interior painting and other finishes;
• Tenant’s sales and dining counter including seating;
• Store fixtures and furnishings;
• Plumbing fixtures additions and/or relocation within the Tenant area beyond Landlord furnished base building;
• Fire extinguishers per local fire authority;
• Telephone and CATV service to the Premises;
• Any HVAC equipment beyond that provided by Landlord;
2. Tenant shall provide adequate isolation and drainage around and under all coolers, freezers, and other food service equipment to provide for elimination of condensation on any building surface. This is the Tenant’s responsibility. If a condensation problem occurs, it shall be Tenant’s sole responsibility for corrective action to satisfy the Landlord.
3. All kitchen areas shall have a Landlord-approved waterproof membrane between the structural floor and the finish floor, extending 4” up each wall.
4. Tenant to use Landlord approved contractor for any modifications to building fire alarm and fire sprinkler systems.
5. Miscellaneous: All work undertaken by Tenant shall be at Tenant’s expense and shall not damage the building or any part thereof. Prior to any floor penetration concrete scanning will be performed to avoid existing rebar or conduit at Tenant’s expense. Any floor penetration shall be sealed by Landlord’s approved contractor and shall be performed only after Landlord has given consent, which consent shall in part be conditioned upon Tenant’s approved plans, including materials acceptable to Landlord. Tenant shall also be responsible for obtaining and paying for professional inspections of any structural work and/or mechanical work (including, without limitation, any roof work or concrete work) as required by Landlord.
Wor
k Le
tter:
Tena
nt's
Wor
k
382019 | Essex Property Trust | Santee Passage
For leasing opportunities, please contact: [email protected] media and press inquiries, please contact: [email protected]