  • 7/28/2019 Est of Chute Fall on Kuwa Branch Canal

    1/28

    1 2 3 4 5 6

    CH: 14.750 CH: 6.150 CH: 0.175 CH: 7.276 CH: 7.426 CH: 0.150

    S.No Description Unit Qtty Qtty Qtty Qtty Qtty Qtty

    1 EW

    Hard Soil Cum 213.877 127.180 104.694 27.856 65.695 23.385

    Soft Rock Cum 427.754 254.360 209.387 55.712 131.390 46.770

    Hard Rock Cum 1497.141 890.261 732.855 194.991 459.864 163.695

    2 Sub Structure

    P.C.C Cum

    M 15 Conc Cum 69.274 54.847 49.206 11.517 17.662 7.168

    3 Super Structure

    M 15 Cum 481.066 320.681 268.667 90.622 198.421 55.556

    M 20 Cum

    M 25 Cum

    4 Wearing Coat M Cum 8.405 6.397 9.122 2.163 2.992 0.714

    5 HYSD Steel Kg

  • 7/28/2019 Est of Chute Fall on Kuwa Branch Canal

    2/28

    7 8 9 10 11 12 13

    CH: 1.113 CH: 2.137 CH: 0.200 CH: 0.625 CH: 0.735 CH: 0.893 CH: 0.450

    Qtty Qtty Qtty Qtty Qtty Qtty Qtty

    53.824 46.243 25.771 20.824 20.109 20.081 17.236 766.775

    107.648 92.486 51.543 41.648 40.217 40.163 34.471 1533.551

    376.769 323.701 180.399 145.768 140.760 140.570 120.650 5367.427

    14.031 13.543 7.721 6.640 6.959 6.959 6.502 272.027

    155.410 187.566 63.491 46.860 55.092 55.088 50.036 2028.557

    1.105 1.589 0.849 0.759 0.719 0.713 0.660 36.187

    TOTALS

  • 7/28/2019 Est of Chute Fall on Kuwa Branch Canal

    3/28

    Top Bottom

    in mts in mts in mts in mts in mts

    1.00 Earth work in Excavation

    A Excavation

    U/S wing returns 2.00 182.69 179.66 4.25 1.94 3.03

    Body wall (2 - 2) to (3 - 3) 2.00 182.69 177.46 4.71 2.93 5.23

    2.00 182.69 177.25 4.71 2.93 5.44

    2.00 182.69 173.05 4.71 2.93 9.64

    2.00 182.69 170.99 4.71 2.93 11.70

    At Cistern 1.00 182.69 171.37 2.51 1.60 11.32

    1.00 182.69 171.37 2.50 1.60 11.32

    1.00 182.69 171.37 2.50 1.60 11.32

    1.00 182.69 171.37 2.50 1.60 11.32

    1.00 182.69 171.37 2.50 1.60 11.32

    D/S wing returns 2.00 182.69 170.99 14.24 2.94 11.70

    Hard SoilSoft Rock

    Hard Rock

    2.00 Earth Filling

    3.00 CC-M15 in Foundation

    U/s Wing and Return (sec1-1) Base 2.00 179.96 179.66 1.99 1.94 0.30

    U/s Wing and Return (sec1-1) Base 2.00 179.96 179.66 2.26 1.94 0.30

    Body Wall Sec (2-2), sec(3-3) 2.00 4.00 177.76 177.46 4.71 2.93 0.30

    At Cistern 1.00 171.67 171.37 2.51 1.60 0.30

    1.00 171.67 171.37 2.50 1.60 0.30

    1.00 171.67 171.37 2.50 1.60 0.30

    1.00 171.67 171.37 2.50 1.60 0.30

    1.00 171.67 171.37 2.50 1.60 0.30D/s Cut off wall 1.00 170.99 170.69 0.38 1.60 0.30

    D/S wing returns 2.00 171.29 170.99 14.24 2.94 0.30

    4.00 CC- M15 Super Structure

    U/s Wing and Return (sec1-1) Trapezoidal 2.00 182.69 179.96 4.10 1.07 2.73

    182.69 177.76

    181.59 177.76

    Body Wall (sec2-2, sec3-3) 2.00 1.00 175.69 171.29 4.41 1.57 4.40

    D/s Wing and Return (sec1-1) Trapezoidal 2.00 175.69 171.29 14.39 1.57 4.40Apron at crest 1.00 180.19 179.96 4.00 2.40 0.23

    apron at chute portion 1.00 180.49 171.67 28.89 1.60 0.23

    apron at end sill triangular portion 1.00 173.34 171.67 1.60

    DeductionChute Block 1.00 3.00 171.98 171.37 -0.30 0.37 0.61

    Basin Block 1.00 2.00 172.30 171.37 -0.30 0.48 0.93

    5.00 CC -M 20

    Wearing Coat 1.00 171.67 171.52 35.02 1.60 0.15

    Unit No LEVEL Length Width Depth /

    Height

    1.574.412.00

    2.79

    Name of the Project : Indira Sagar Project Canal-Phase IIIKUWA BRACH CANAL

    7.0 M CHUTE FALL AT KM 14.750 KM

    Body Wall (sec2-2, sec3-3) 3.00 4.38

    DETAILED MEAS

    S. NO DESCRIPTION

  • 7/28/2019 Est of Chute Fall on Kuwa Branch Canal

    4/28

    in Cum

    49.93

    144.35

    150.01

    266.07

    322.79

    45.35

    45.26

    45.26

    45.26

    45.26

    979.24

    2138.77

    213.88 cum427.75 cum

    1497.14 cum

    1497.14 cum

    2.32

    2.63

    33.12

    1.18

    1.18

    1.18

    1.18

    1.180.18

    25.12

    69.27 cum

    23.93

    60.67

    198.592.16

    10.40

    4.46

    -0.20

    -0.27

    481.07 cum

    8.41 cum

    Quantity

    181.33

    Remarks

    REMENTS

  • 7/28/2019 Est of Chute Fall on Kuwa Branch Canal

    5/28

    Top Bottom

    in mts in mts in mts in mts in mts

    1.00 Earth work in Excavation

    A Excavation

    U/S wing returns 2.00 196.29 193.26 4.25 1.94 3.03

    Body wall (2 - 2) to (3 - 3) 2.00 196.29 191.76 3.31 2.62 4.53

    2.00 196.29 190.25 3.31 2.62 6.04

    2.00 196.29 188.75 3.31 2.62 7.54

    2.00 196.29 187.39 3.31 2.62 8.90

    At Cistern 1.00 196.29 187.24 2.97 1.60 9.04

    1.00 196.29 187.47 2.50 1.60 8.82

    1.00 196.29 187.67 2.50 1.60 8.62

    1.00 196.29 187.87 2.50 1.60 8.41

    D/S wing returns 2.00 196.29 187.39 12.39 2.76 8.90

    Hard Soil

    Soft RockHard Rock

    2.00 Earth Filling

    3.00 CC-M15 in Foundation

    U/s Wing and Return (sec1-1) Base 2.00 193.56 193.26 1.99 1.94 0.30

    U/s Wing and Return (sec1-1) Base 2.00 193.56 193.26 2.26 1.94 0.30

    Body Wall Sec (2-2), sec(3-3) 2.00 4.00 192.06 191.76 3.31 2.62 0.30

    At Cistern 1.00 188.07 187.24 2.97 1.60 0.83

    1.00 188.07 187.47 2.50 1.60 0.60

    1.00 188.07 187.67 2.50 1.60 0.40

    1.00 188.07 187.87 2.50 1.60 0.20

    D/s Cut off wall 1.00 187.39 187.47 0.38 1.60 -0.08

    D/s Wing MinSection (sec 4-4) 2.00 187.69 187.39 12.39 2.76 0.30

    4.00 CC- M15 Super Structure

    U/s Wing and Return (sec1-1) Trapezoidal 2.00 196.29 193.56 4.10 1.07 2.72

    196.29 192.06

    195.54 192.06

    Body Wall (sec2-2, sec3-3) 2.00 1.00 191.79 187.69 3.01 1.41 4.10

    D/s Wing and Return (sec1-1) Trapezoidal 2.00 191.79 187.69 12.54 1.48 4.10Apron at crest 1.00 193.79 193.56 4.00 2.40 0.23

    apron at chute portion 1.00 194.09 188.07 21.19 1.60 0.23

    apron at end sill triangular portion 1.00 189.44 188.07 1.60

    Deduction

    Chute Block 1.00 2.00 188.44 187.24 -0.30 0.37 1.20

    Basin Block 1.00 2.00 188.74 187.47 -0.30 0.50 1.26

    5.00 CC -M 20

    Wearing Coat 1.00 188.07 187.92 26.65 1.60 0.15

    Name of the Project : Indira Sagar Project Canal-Phase IIIKUWA BRACH CANAL

    4.50M CHUTE FALL AT KM 6.150KM

    DETAILED MEAS

    S. NO DESCRIPTION LEVEL Length

    3.01 1.41 3.85

    1.88

    Width Depth /

    Height

    Body Wall (sec2-2, sec3-3) 2.00 3.00

    Unit No

  • 7/28/2019 Est of Chute Fall on Kuwa Branch Canal

    6/28

    in Cum

    49.93

    78.42

    104.47

    130.53

    153.98

    42.98

    35.26

    34.46

    33.66

    608.11

    1271.80

    127.18 cum

    254.36 cum890.26 cum

    890.26 cum

    2.32

    2.63

    20.77

    3.92

    2.38

    1.58

    0.78

    -0.05

    20.5154.85 cum

    23.93

    34.70

    151.942.16

    7.63

    3.00

    -0.27

    -0.38320.68 cum

    6.40 cum

    REMENTS

    97.97

    Quantity Remarks

  • 7/28/2019 Est of Chute Fall on Kuwa Branch Canal

    7/28

    Top Bottom

    in mts in mts in mts in mts in mts

    1.00 Earth work in Excavation

    A Excavation

    U/S wing returns 2.00 207.09 203.86 4.54 2.06 3.22

    Body wall (2 - 2) to (3 - 3) 2.00 207.09 202.71 2.61 2.58 4.38

    2.00 207.09 201.55 2.61 2.58 5.54

    2.00 207.09 200.40 2.61 2.58 6.69

    2.00 207.09 199.39 2.61 2.58 7.69

    At Cistern 1.00 207.09 199.41 2.32 2.70 7.68

    1.00 207.09 199.59 2.00 2.70 7.50

    1.00 207.09 199.76 2.00 2.70 7.33

    1.00 207.09 199.96 3.00 2.70 7.13

    1.00 207.09 199.41 0.23 2.70 7.68

    D/S wing returns 2.00 207.09 199.39 11.54 2.64 7.69

    Hard SoilSoft Rock

    Hard Rock

    2.00 Earth Filling

    3.00 CC-M15 in Foundation

    U/s Wing and Return (sec1-1) Base 2.00 204.16 203.86 1.99 2.06 0.30

    U/s Wing and Return (sec1-1) Base 2.00 204.16 203.86 2.55 2.06 0.30

    Body Wall Sec (2-2), sec(3-3) 2.00 4.00 203.01 202.71 2.61 2.58 0.30

    At Cistern 1.00 200.07 199.41 2.32 2.70 0.66

    1.00 200.07 199.59 2.00 2.70 0.48

    1.00 200.07 199.76 2.00 2.70 0.31

    1.00 200.07 199.96 3.00 2.70 0.11

    D/s Cut off wall 1.00 199.39 199.41 0.23 2.70 -0.02D/s Wing MinSection (sec 4-4) 2.00 199.69 199.39 11.54 2.64 0.30

    4.00 CC- M15 Super Structure

    U/s Wing and Return (sec1-1) Trapezoidal 2.00 207.09 204.16 4.39 1.13 2.93

    207.09 203.01

    206.51 203.01

    Body Wall (sec2-2, sec3-3) 2.00 1.00 203.59 199.69 2.31 1.39 3.90

    D/s Win and Return sec1-1 Tra ezoidal 2.00 203.59 199.69 11.39 1.42 3.90Apron at crest 1.00 204.39 204.16 5.40 2.70 0.23

    apron at chute portion 1.00 204.69 200.07 17.66 2.70 0.23

    apron at end sill triangular portion 1.00 201.04 200.07 2.70

    Deduction

    Chute Block 1.00 4.00 200.44 199.41 -0.30 0.37 1.03Basin Block 1.00 3.00 200.70 199.59 -0.30 0.50 1.11

    5.00 CC -M 20

    Wearing Coat 1.00 200.07 199.92 22.52 2.70 0.15

    3.00

    Width Depth /

    Height

    Body Wall (sec2-2, sec3-3) 2.00

    DESCRIPTION

    0.94

    Length

    2.31 1.39 3.79

    Name of the Project : Indira Sagar Project Canal-Phase IIIKUWA BRACH CANAL

    3.50 M CHUTE FALL AT KM 0.175KM

    DETAILED MEAS

    S. NO No LEVELUnit

  • 7/28/2019 Est of Chute Fall on Kuwa Branch Canal

    8/28

    in Cum

    60.33

    58.99

    74.54

    90.10

    103.63

    48.08

    40.47

    39.56

    57.71

    4.66

    468.87

    1046.94

    104.69 cum209.39 cum

    732.86 cum

    732.86 cum

    2.46

    3.15

    16.16

    4.10

    2.57

    1.65

    0.85

    -0.0118.28

    49.21 cum

    29.02

    25.01

    125.993.28

    10.73

    2.54

    -0.46-0.50

    268.67 cum

    9.12 cum

    Quantity Remarks

    73.04

    REMENTS

  • 7/28/2019 Est of Chute Fall on Kuwa Branch Canal

    9/28

    Top Bottom

    in mts in mts in mts in mts in mts

    1.00 Earth work in Excavation

    A Excavation

    U/S wing returns 2.00 193.12 191.20 2.38 1.27 1.93

    Body wall (2 - 2) to (3 - 3) 2.00 193.12 190.16 2.67 1.74 2.96

    2.00 193.12 189.13 2.67 1.74 3.99

    2.00 193.12 188.10 2.67 1.74 5.02

    2.00 193.12 187.22 2.67 1.74 5.91

    At Cistern 1.00 193.12 187.32 1.62 0.80 5.81

    1.00 193.12 187.44 1.62 0.80 5.69

    1.00 193.12 187.57 1.62 0.80 5.56

    1.00 193.12 187.69 1.62 0.80 5.44

    D/S wing returns 1.00 193.12 187.22 6.61 1.86 5.91

    Hard Soil

    Soft RockHard Rock

    2.00 Earth Filling

    3.00 CC-M15 in Foundation

    U/s Wing and Return (sec1-1) Base 2.00 191.35 191.20 2.38 1.27 0.15

    Body Wall Sec (2-2), sec(3-3) 2.00 4.00 190.31 190.16 2.67 1.74 0.15

    At Cistern 1.00 187.74 187.32 1.62 0.80 0.43

    1.00 187.74 187.44 1.62 0.80 0.31

    1.00 187.74 187.57 1.62 0.80 0.18

    1.00 187.74 187.69 1.62 0.80 0.06

    D/s Cut off wall 1.00 187.22 186.47 0.23 0.80 0.75

    D/s Wing MinSection (sec 4-4) 2.00 187.37 187.22 6.61 1.86 0.15

    4.00 CC- M15 Super Structure

    U/s Wing and Return (sec1-1) Trapezoidal 2.00 193.12 191.35 2.23 0.69 1.78

    193.12 190.31

    192.60 190.31

    D/s Wing and Return (sec1-1) Trapezoidal 2.00 190.12 187.37 8.83 0.98 2.76Apron at crest 1.00 191.57 191.35 2.90 2.10 0.23

    apron at chute portion 1.00 191.87 187.74 13.73 0.80 0.23

    apron at end sill triangular portion 1.00 188.72 187.74 0.80

    Deduction

    Chute Block 1.00 2.00 187.95 187.32 -0.30 0.37 0.63

    Basin Block 1.00 1.00 188.13 187.44 -0.30 0.50 0.70

    5.00 CC -M 20

    Wearing Coat 1.00 187.74 187.59 18.03 0.80 0.15

    0.96

    Width Depth /

    Height

    LEVEL

    Name of the Project : Indira Sagar Project Canal-Phase IIIKUWA BRACH CANAL

    3.50 M CHUTE FALL AT KM 7.276 KM ON D1

    DETAILED MEAS

    S. NO Unit No

    2.55Body Wall (sec2-2, sec3-3) 2.00 0.92

    DESCRIPTION Length

    3.00 2.37

  • 7/28/2019 Est of Chute Fall on Kuwa Branch Canal

    10/28

    in Cum

    11.62

    27.35

    36.90

    46.44

    54.61

    7.50

    7.35

    7.18

    7.02

    72.60

    278.56

    27.86 cum

    55.71 cum194.99 cum

    194.99 cum

    0.91

    5.55

    0.55

    0.39

    0.23

    0.07

    0.13

    3.69

    11.52 cum

    5.42

    47.651.37

    2.47

    0.77

    -0.14

    -0.10

    90.62 cum

    2.16 cum

    Quantity

    REMENTS

    33.19

    Remarks

  • 7/28/2019 Est of Chute Fall on Kuwa Branch Canal

    11/28

    Top Bottom

    in mts in mts in mts in mts in mts

    1.00 Earth work in Excavation

    A Excavation

    U/S wing returns 2.00 189.97 188.05 2.38 1.27 1.93

    Body wall (2 - 2) to (3 - 3) 2.00 189.97 186.45 3.59 1.99 3.52

    2.00 189.97 184.86 3.59 1.99 5.12

    2.00 189.97 183.26 3.59 1.99 6.71

    2.00 189.97 181.82 3.59 1.99 8.16

    At Cistern 1.00 189.97 181.60 2.00 0.80 8.38

    1.00 189.97 181.76 2.00 0.80 8.22

    1.00 189.97 181.92 2.00 0.80 8.06

    1.00 189.97 182.09 2.28 0.80 7.88

    D/S wing returns 2.00 189.97 181.82 8.43 1.86 8.16

    Hard Soil

    Soft RockHard Rock

    2.00 Earth Filling

    3.00 CC-M15 in Foundation

    U/s Wing and Return (sec1-1) Base 2.00 188.20 188.05 2.38 1.27 0.15

    Body Wall Sec (2-2), sec(3-3) 2.00 4.00 186.60 186.45 3.59 1.99 0.15

    At Cistern 1.00 182.34 181.60 2.00 0.80 0.75

    1.00 182.34 181.76 2.00 0.80 0.59

    1.00 182.34 181.92 2.00 0.80 0.43

    1.00 182.34 182.09 2.28 0.80 0.26

    D/s Cut off wall 1.00 181.82 180.67 0.23 0.80 1.15

    D/s Wing MinSection (sec 4-4) 2.00 181.97 181.82 8.43 1.86 0.15

    4.00 CC- M15 Super Structure

    U/s Wing and Return (sec1-1) Trapezoidal 2.00 189.97 188.20 2.23 0.69 1.78

    189.97 186.60

    189.17 186.60

    D/s Wing and Return (sec1-1) Trapezoidal 2.00 184.97 181.97 11.57 1.81 3.01Apron at crest 1.00 188.42 188.20 2.90 2.10 0.23

    apron at chute portion 1.00 188.72 182.34 20.09 0.80 0.23

    apron at end sill triangular portion 1.00 183.57 182.34 0.80

    Deduction

    Chute Block 1.00 2.00 182.51 181.60 -0.30 0.37 0.92

    Basin Block 1.00 1.00 182.72 181.76 -0.30 0.50 0.96

    5.00 CC -M 20

    Wearing Coat 1.00 182.34 182.19 24.94 0.80 0.15

    Width Depth /

    Height

    Body Wall (sec2-2, sec3-3) 2.00 1.05

    DESCRIPTION

    1.51

    LEVEL Length

    3.00 3.29 2.97

    Name of the Project : Indira Sagar Project Canal-Phase IIIKUWA BRACH CANAL

    5.00 M CHUTE FALL AT KM 7.426KM ON D1

    DETAILED MEAS

    S. NO Unit No

  • 7/28/2019 Est of Chute Fall on Kuwa Branch Canal

    12/28

    in Cum

    11.62

    50.29

    73.08

    95.87

    116.52

    13.40

    13.14

    12.89

    14.38

    255.74

    656.95

    65.69 cum

    131.39 cum459.86 cum

    459.86 cum

    0.91

    8.57

    1.19

    0.94

    0.68

    0.47

    0.21

    4.70

    17.66 cum

    5.42

    125.861.37

    3.62

    1.21

    -0.20

    -0.14

    198.42 cum

    2.99 cum

    Quantity Remarks

    61.30

    REMENTS

  • 7/28/2019 Est of Chute Fall on Kuwa Branch Canal

    13/28

    Top Bottom

    in mts in mts in mts in mts in mts

    1.00 Earth work in Excavation

    A Excavation

    U/S wing returns 2.00 188.12 186.85 1.34 0.88 1.28

    Body wall (2 - 2) to (3 - 3) 2.00 188.12 185.49 2.52 1.50 2.64

    2.00 188.12 184.13 2.52 1.50 4.00

    2.00 188.12 182.77 2.52 1.50 5.36

    2.00 188.12 181.56 2.52 1.50 6.57

    At Cistern 1.00 188.12 181.67 1.00 0.25 6.46

    1.00 188.12 181.75 1.00 0.25 6.38

    1.00 188.12 181.84 1.00 0.25 6.29

    1.00 188.12 181.93 1.58 0.25 6.20

    D/S wing returns 2.00 188.12 181.56 4.73 1.35 6.57

    Hard Soil

    Soft RockHard Rock

    2.00 Earth Filling

    3.00 CC-M15 in Foundation

    U/s Wing and Return (sec1-1) Base 2.00 187.00 186.85 1.34 0.88 0.15

    Body Wall Sec (2-2), sec(3-3) 2.00 4.00 185.64 185.49 2.52 1.50 0.15

    At Cistern 1.00 182.08 181.67 1.00 0.25 0.42

    1.00 182.08 181.75 1.00 0.25 0.34

    1.00 182.08 181.84 1.00 0.25 0.25

    1.00 182.08 181.93 1.58 0.25 0.16

    D/s Cut off wall 1.00 181.56 180.37 0.23 0.25 1.19

    D/s Wing MinSection (sec 4-4) 2.00 181.71 181.56 4.73 1.35 0.15

    4.00 CC- M15 Super Structure

    U/s Wing and Return (sec1-1) Trapezoidal 2.00 188.12 187.00 1.19 0.49 1.13

    188.12 185.64

    187.44 185.64

    D/s Wing and Return (sec1-1) Trapezoidal 2.00 183.62 181.71 6.80 1.15 1.92Apron at crest 1.00 187.22 187.00 1.38 2.10 0.23

    apron at chute portion 1.00 187.52 182.08 14.45 0.25 0.23

    apron at end sill triangular portion 1.00 182.87 182.08 0.25

    Deduction

    Chute Block 1.00 2.00 182.14 181.67 -0.30 0.33 0.48

    Basin Block 1.00 1.00 182.26 181.75 -0.30 0.13 0.51

    5.00 CC -M 20

    Wearing Coat 1.00 182.08 181.93 19.03 0.25 0.15

    Name of the Project : Indira Sagar Project Canal-Phase IIIKUWA BRACH CANAL

    4.50 M CHUTE FALL AT KM 0.150 KM ON D2

    DETAILED MEAS

    S. NO Unit No

    0.62

    LEVEL Length

    3.00 2.22 2.15

    Width Depth /

    Height

    Body Wall (sec2-2, sec3-3) 2.00 0.80

    DESCRIPTION

  • 7/28/2019 Est of Chute Fall on Kuwa Branch Canal

    14/28

    in Cum

    3.01

    19.85

    30.10

    40.35

    49.47

    1.61

    1.59

    1.57

    2.45

    83.84

    233.85

    23.39 cum

    46.77 cum163.70 cum

    163.70 cum

    0.35

    4.52

    0.10

    0.08

    0.06

    0.06

    0.07

    1.92

    7.17 cum

    1.31

    29.950.65

    0.81

    0.16

    -0.09

    -0.02

    55.56 cum

    0.71 cum

    REMENTS

    Quantity Remarks

    22.79

  • 7/28/2019 Est of Chute Fall on Kuwa Branch Canal

    15/28

    Top Bottom

    in mts in mts in mts in mts in mts

    1.00 Earth work in Excavation

    A Excavation

    U/S wing returns 2.00 182.71 181.23 1.67 1.00 1.48

    Body wall (2 - 2) to (3 - 3) 2.00 182.71 179.59 3.59 1.74 3.12

    2.00 182.71 177.94 3.59 1.74 4.77

    2.00 182.71 176.30 3.59 1.74 6.41

    2.00 182.71 174.80 3.59 1.74 7.91

    At Cistern 1.00 182.71 174.60 2.00 0.30 8.11

    1.00 182.71 174.75 2.00 0.30 7.96

    1.00 182.71 175.00 2.00 0.30 7.71

    D/S wing returns 2.00 182.71 174.80 8.22 1.86 7.91

    Hard Soil

    Soft Rock

    Hard Rock

    2.00 Earth Filling

    3.00 CC-M15 in Foundation

    U/s Wing and Return (sec1-1) Base 2.00 181.38 181.23 1.67 1.00 0.15

    Body Wall Sec (2-2), sec(3-3) 2.00 4.00 179.74 179.59 3.59 1.74 0.15

    At Cistern 1.00 175.33 174.60 2.00 0.30 0.73

    1.00 175.33 174.75 2.00 0.30 0.58

    1.00 175.33 175.00 2.00 0.30 0.33

    1.00 175.33 175.07 2.07 0.30 0.26

    1.00 175.33 175.07 3.07 0.30 0.26

    D/s Cut off wall 1.00 174.80 173.61 0.23 0.30 1.20

    D/s Wing MinSection (sec 4-4) 2.00 174.95 174.80 8.22 1.86 0.15

    4.00 CC- M15 Super Structure

    U/s Wing and Return (sec1-1) Trapezoidal 2.00 182.71 181.38 1.52 0.65 1.33

    182.71 179.74

    181.88 179.74

    D/s Wing and Return (sec1-1) Trapezoidal 2.00 177.71 174.95 11.36 1.66 2.76Apron at crest 1.00 181.61 181.38 1.73 1.43 0.23

    apron at chute portion 1.00 181.91 175.33 19.92 0.30 0.23

    apron at end sill triangular portion 1.00 176.76 175.33 0.30

    Deduction

    Chute Block 1.00 1.00 175.49 174.60 -0.30 0.16 0.89

    Basin Block 1.00 1.00 175.33 174.75 -0.30 0.27 0.57

    5.00 CC -M 20

    Wearing Coat 1.00 175.33 175.18 24.55 0.30 0.15

    Name of the Project : Indira Sagar Project Canal-Phase IIIKUWA BRACH CANAL

    5.00 M CHUTE FALL AT KM 1.133KM ON D5

    DETAILED MEAS

    S. NO Unit No

    2.04

    LEVEL Length

    3.00 3.29 2.56

    Width Depth /

    Height

    Body Wall (sec2-2, sec3-3) 2.00 0.92

    DESCRIPTION

  • 7/28/2019 Est of Chute Fall on Kuwa Branch Canal

    16/28

    in Cum

    4.91

    38.98

    59.53

    80.08

    98.76

    4.86

    4.77

    4.62

    241.72

    538.24

    53.82 cum

    107.65 cum

    376.77 cum

    376.77 cum

    0.50

    7.50

    0.44

    0.35

    0.20

    0.16

    0.23

    0.08

    4.59

    14.03 cum

    2.61

    103.910.55

    1.34

    0.61

    -0.04

    -0.05

    155.41 cum

    1.10 cum

    REMENTS

    Quantity Remarks

    46.47

  • 7/28/2019 Est of Chute Fall on Kuwa Branch Canal

    17/28

    Top Bottom

    in mts in mts in mts in mts in mts

    1.00 Earth work in Excavation

    A Excavation

    U/S wing returns 2.00 189.25 187.33 2.38 1.27 1.93

    Body wall (2 - 2) to (3 - 3) 2.00 189.25 186.15 2.67 1.80 3.11

    2.00 189.25 184.96 2.67 1.80 4.29

    2.00 189.25 183.78 2.67 1.80 5.47

    2.00 189.25 182.75 2.67 1.80 6.51

    At Cistern 1.00 189.25 182.74 2.00 0.50 6.52

    1.00 189.25 182.88 2.00 0.50 6.38

    1.00 189.25 183.02 2.00 0.50 6.24

    1.00 189.25 183.15 2.14 0.50 6.11

    D/S wing returns 2.00 189.25 182.75 8.29 2.22 6.51

    Hard Soil

    Soft RockHard Rock

    2.00 Earth Filling

    3.00 CC-M15 in Foundation

    U/s Wing and Return (sec1-1) Base 2.00 187.48 187.33 2.38 1.27 0.15

    Body Wall Sec (2-2), sec(3-3) 2.00 4.00 186.30 186.15 2.67 1.80 0.15

    At Cistern 1.00 183.27 182.74 2.00 0.50 0.54

    1.00 183.27 182.88 2.00 0.50 0.40

    1.00 183.27 183.02 2.00 0.50 0.26

    1.00 183.27 183.15 2.14 0.50 0.13

    D/s Cut off wall 1.00 182.75 182.35 0.23 0.50 0.40

    D/s Wing MinSection (sec 4-4) 2.00 182.90 182.75 8.29 2.22 0.15

    4.00 CC- M15 Super Structure

    U/s Wing and Return (sec1-1) Trapezoidal 2.00 189.25 187.48 2.23 0.69 1.78

    189.25 186.30

    188.66 186.30

    D/s Wing and Return (sec1-1) Trapezoidal 2.00 186.25 182.90 10.50 2.02 3.36Apron at crest 1.00 187.70 187.48 2.60 2.10 0.23

    apron at chute portion 1.00 188.00 183.27 15.55 0.50 0.23

    apron at end sill triangular portion 1.00 184.85 183.27 0.50

    Deduction

    Chute Block 1.00 1.00 183.63 182.74 -0.35 0.35 0.89

    Basin Block 1.00 1.00 183.85 182.88 -0.41 0.41 0.98

    5.00 CC -M 20

    Wearing Coat 1.00 183.27 183.12 21.18 0.50 0.15

    Name of the Project : Indira Sagar Project Canal-Phase IIIKUWA BRACH CANAL

    3.00 M CHUTE FALL AT KM 2.137 KM ON M-3 D-1

    DETAILED MEAS

    S. NO Unit No

    2.50

    LEVEL Length

    3.00 2.37 2.66

    Width Depth /

    Height

    Body Wall (sec2-2, sec3-3) 2.00 0.95

    DESCRIPTION

  • 7/28/2019 Est of Chute Fall on Kuwa Branch Canal

    18/28

    in Cum

    11.62

    29.81

    41.16

    52.50

    62.41

    6.52

    6.38

    6.24

    6.52

    239.29

    462.43

    46.24 cum

    92.49 cum323.70 cum

    323.70 cum

    0.91

    5.76

    0.54

    0.40

    0.26

    0.13

    0.04

    5.52

    13.54 cum

    5.42

    142.321.23

    1.75

    1.25

    -0.11

    -0.16

    187.57 cum

    1.59 cum

    REMENTS

    Quantity Remarks

    35.88

  • 7/28/2019 Est of Chute Fall on Kuwa Branch Canal

    19/28

    Top Bottom

    in mts in mts in mts in mts in mts

    1.00 Earth work in Excavation

    A Excavation

    U/S wing returns 2.00 170.45 169.19 1.34 0.88 1.26

    Body wall (2 - 2) to (3 - 3) 2.00 170.45 167.79 2.52 1.51 2.65

    2.00 170.45 166.40 2.52 1.51 4.05

    2.00 170.45 165.00 2.52 1.51 5.45

    2.00 170.45 163.75 2.52 1.51 6.69

    At Cistern 1.00 170.45 163.82 1.00 0.30 6.63

    1.00 170.45 163.90 1.00 0.30 6.54

    1.00 170.45 163.99 1.00 0.30 6.45

    1.00 170.45 164.08 2.11 0.30 6.36

    D/S wing returns 2.00 170.45 163.75 5.26 1.44 6.69

    Hard Soil

    Soft RockHard Rock

    2.00 Earth Filling

    3.00 CC-M15 in Foundation

    U/s Wing and Return (sec1-1) Base 2.00 169.34 169.19 1.34 0.88 0.15

    Body Wall Sec (2-2), sec(3-3) 2.00 4.00 167.94 167.79 2.52 1.51 0.15

    At Cistern 1.00 164.28 163.82 1.00 0.30 0.46

    1.00 164.28 163.90 1.00 0.30 0.38

    1.00 164.28 163.99 1.00 0.30 0.29

    1.00 164.28 164.08 2.11 0.30 0.20

    D/s Cut off wall 1.00 163.75 162.72 0.23 0.30 1.04

    D/s Wing MinSection (sec 4-4) 2.00 163.90 163.75 5.26 1.44 0.15

    4.00 CC- M15 Super Structure

    U/s Wing and Return (sec1-1) Trapezoidal 2.00 170.47 169.34 1.19 0.49 1.13

    170.47 167.94

    169.77 167.94

    D/s Wing and Return (sec1-1) Trapezoidal 2.00 165.97 163.90 7.33 1.24 2.07Apron at crest 1.00 169.57 169.34 1.49 1.13 0.23

    apron at chute portion 1.00 169.87 164.28 15.64 0.30 0.23

    apron at end sill triangular portion 1.00 165.22 164.28 0.30

    Deduction

    Chute Block 1.00 2.00 164.35 163.82 -0.35 0.39 0.53

    Basin Block 1.00 1.00 164.48 163.90 -0.60 0.60 0.58

    5.00 CC -M 20

    Wearing Coat 1.00 164.28 164.13 18.87 0.30 0.15

    Name of the Project : Indira Sagar Project Canal-Phase IIIKUWA BRACH CANAL

    4.50 M CHUTE FALL AT KM0.200 KM ON M-5 D-10

    DETAILED MEAS

    S. NO Unit No

    0.88

    LEVEL Length

    3.00 2.22 2.17

    Width Depth /

    Height

    Body Wall (sec2-2, sec3-3) 2.00 0.81

    DESCRIPTION

  • 7/28/2019 Est of Chute Fall on Kuwa Branch Canal

    20/28

    in Cum

    2.97

    20.18

    30.82

    41.45

    50.95

    1.99

    1.96

    1.94

    4.03

    101.42

    257.71

    25.77 cum

    51.54 cum180.40 cum

    180.40 cum

    0.35

    4.57

    0.14

    0.11

    0.09

    0.12

    0.07

    2.27

    7.72 cum

    1.31

    37.540.38

    1.06

    0.27

    -0.14

    -0.21

    63.49 cum

    0.85 cum

    REMENTS

    Quantity Remarks

    23.29

  • 7/28/2019 Est of Chute Fall on Kuwa Branch Canal

    21/28

    Top Bottom

    in mts in mts in mts in mts in mts

    1.00 Earth work in Excavation

    A Excavation

    U/S wing returns 2.00 167.95 166.68 1.34 0.88 1.28

    Body wall (2 - 2) to (3 - 3) 2.00 167.95 165.36 2.52 1.48 2.60

    2.00 167.95 164.03 2.52 1.48 3.92

    2.00 167.95 162.71 2.52 1.48 5.24

    2.00 167.95 161.54 2.52 1.48 6.41

    At Cistern 1.00 167.95 161.71 1.00 0.30 6.24

    1.00 167.95 161.81 1.00 0.30 6.14

    1.00 167.95 161.90 1.76 0.30 6.05

    D/S wing returns 2.00 167.95 161.54 3.91 1.26 6.41

    Hard Soil

    Soft Rock

    Hard Rock

    2.00 Earth Filling

    3.00 CC-M15 in Foundation

    U/s Wing and Return (sec1-1) Base 2.00 166.83 166.68 1.34 0.88 0.15

    Body Wall Sec (2-2), sec(3-3) 2.00 4.00 165.51 165.36 2.52 1.48 0.15

    At Cistern 1.00 162.06 161.71 1.00 0.30 0.36

    1.00 162.06 161.81 1.00 0.30 0.26

    1.00 162.06 161.90 1.76 0.30 0.17

    D/s Cut off wall 1.00 161.54 160.40 0.23 0.30 1.14

    D/s Wing MinSection (sec 4-4) 2.00 161.69 161.54 3.91 1.26 0.15

    4.00 CC- M15 Super Structure

    U/s Wing and Return (sec1-1) Trapezoidal 2.00 167.95 166.83 1.19 0.49 1.13

    167.95 165.51

    167.29 165.51

    D/s Wing and Return (sec1-1) Trapezoidal 2.00 163.45 161.69 5.98 1.06 1.76Apron at crest 1.00 167.05 166.83 1.49 1.13 0.23

    apron at chute portion 1.00 167.35 162.06 14.31 0.30 0.23

    apron at end sill triangular portion 1.00 162.70 162.06 0.30

    Deduction

    Chute Block 1.00 4.00 162.10 161.71 -0.35 0.39 0.40

    Basin Block 1.00 2.00 162.20 161.81 -0.60 0.60 0.39

    5.00 CC -M 20

    Wearing Coat 1.00 162.06 161.91 16.86 0.30 0.15

    Width Depth /

    Height

    Body Wall (sec2-2, sec3-3) 2.00 0.79

    DESCRIPTION

    0.41

    LEVEL Length

    3.00 2.22 2.12

    Name of the Project : Indira Sagar Project Canal-Phase IIIKUWA BRACH CANAL

    4.50 M CHUTE FALL AT KM0.625 KM ON M-4 D-10

    DETAILED MEAS

    S. NO Unit No

  • 7/28/2019 Est of Chute Fall on Kuwa Branch Canal

    22/28

    in Cum

    3.01

    19.31

    29.14

    38.97

    47.69

    1.87

    1.84

    3.20

    63.21

    208.24

    20.82 cum

    41.65 cum

    145.77 cum

    145.77 cum

    0.35

    4.46

    0.11

    0.08

    0.09

    0.08

    1.48

    6.64 cum

    1.31

    22.380.38

    0.97

    0.12

    -0.22

    -0.28

    46.86 cum

    0.76 cum

    Quantity Remarks

    22.20

    REMENTS

  • 7/28/2019 Est of Chute Fall on Kuwa Branch Canal

    23/28

    Top Bottom

    in mts in mts in mts in mts in mts

    1.00 Earth work in Excavation

    A Excavation

    U/S wing returns 2.00 176.62 175.29 1.54 0.91 1.33

    Body wall (2 - 2) to (3 - 3) 2.00 176.62 174.18 2.52 1.41 2.44

    2.00 176.62 173.07 2.52 1.41 3.55

    2.00 176.62 171.96 2.52 1.41 4.66

    2.00 176.62 171.00 2.52 1.41 5.62

    At Cistern 1.00 176.62 171.21 1.00 0.30 5.41

    1.00 176.62 171.29 1.00 0.30 5.33

    1.00 176.62 171.38 1.00 0.30 5.24

    1.00 176.62 171.46 1.66 0.30 5.16

    D/S wing returns 2.00 176.62 171.00 4.81 1.38 5.62

    Hard Soil

    Soft RockHard Rock

    2.00 Earth Filling

    3.00 CC-M15 in Foundation

    U/s Wing and Return (sec1-1) Base 2.00 175.44 175.29 1.54 0.91 0.15

    Body Wall Sec (2-2), sec(3-3) 2.00 4.00 174.33 174.18 2.52 1.41 0.15

    At Cistern 1.00 171.53 171.21 1.00 0.30 0.32

    1.00 171.53 171.29 1.00 0.30 0.24

    1.00 171.53 171.38 1.00 0.30 0.15

    1.00 171.53 171.46 1.66 0.30 0.07

    D/s Cut off wall 1.00 171.00 170.37 0.23 0.30 0.63

    D/s Wing MinSection (sec 4-4) 2.00 171.15 171.00 4.81 1.38 0.15

    4.00 CC- M15 Super Structure

    U/s Wing and Return (sec1-1) Trapezoidal 2.00 176.62 175.44 1.39 0.51 1.18

    176.62 174.33

    176.06 174.33

    D/s Wing and Return (sec1-1) Trapezoidal 2.00 173.12 171.15 6.88 1.18 1.97Apron at crest 1.00 175.67 175.44 1.50 1.20 0.23

    apron at chute portion 1.00 175.97 171.53 13.01 0.30 0.23

    apron at end sill triangular portion 1.00 172.32 171.53 0.30

    Deduction

    Chute Block 1.00 2.00 171.61 171.21 -0.35 0.29 0.40

    Basin Block 1.00 1.00 171.72 171.29 -0.60 0.15 0.43

    5.00 CC -M 20

    Wearing Coat 1.00 171.53 171.38 15.97 0.30 0.15

    Width Depth /

    Height

    Body Wall (sec2-2, sec3-3) 2.00 0.76

    DESCRIPTION

    0.62

    LEVEL Length

    3.00 2.22 2.01

    Name of the Project : Indira Sagar Project Canal-Phase IIIKUWA BRACH CANAL

    3.50 M CHUTE FALL AT KM0.735 KM ON SM-3-M-3-D-1

    DETAILED MEAS

    S. NO Unit No

  • 7/28/2019 Est of Chute Fall on Kuwa Branch Canal

    24/28

    in Cum

    3.71

    17.30

    25.19

    33.08

    39.90

    1.62

    1.60

    1.57

    2.57

    74.54

    201.09

    20.11 cum

    40.22 cum140.76 cum

    140.76 cum

    0.42

    4.26

    0.09

    0.07

    0.04

    0.03

    0.04

    1.99

    6.96 cum

    1.65

    31.910.41

    0.88

    0.19

    -0.08

    -0.04

    55.09 cum

    0.72 cum

    Quantity Remarks

    20.19

    REMENTS

  • 7/28/2019 Est of Chute Fall on Kuwa Branch Canal

    25/28

    Top Bottom

    in mts in mts in mts in mts in mts

    1.00 Earth work in Excavation

    A Excavation

    U/S wing returns 2.00 170.80 169.47 1.54 0.91 1.33

    Body wall (2 - 2) to (3 - 3) 2.00 170.80 168.36 2.52 1.41 2.44

    2.00 170.80 167.25 2.52 1.41 3.55

    2.00 170.80 166.14 2.52 1.41 4.66

    2.00 170.80 165.18 2.52 1.41 5.62

    At Cistern 1.00 170.80 165.59 1.00 0.30 5.21

    1.00 170.80 165.67 1.00 0.30 5.13

    1.00 170.80 165.76 1.00 0.30 5.04

    1.00 170.80 165.84 1.66 0.30 4.96

    D/S wing returns 2.00 170.80 165.18 4.81 1.38 5.62

    Hard Soil

    Soft RockHard Rock

    2.00 Earth Filling

    3.00 CC-M15 in Foundation

    U/s Wing and Return (sec1-1) Base 2.00 169.62 169.47 1.54 0.91 0.15

    Body Wall Sec (2-2), sec(3-3) 2.00 4.00 168.51 168.36 2.52 1.41 0.15

    At Cistern 1.00 165.90 165.59 1.00 0.30 0.32

    1.00 165.90 165.67 1.00 0.30 0.24

    1.00 165.90 165.76 1.00 0.30 0.15

    1.00 165.90 165.84 1.66 0.30 0.07

    D/s Cut off wall 1.00 165.18 164.55 0.23 0.30 0.63

    D/s Wing MinSection (sec 4-4) 2.00 165.33 165.18 4.81 1.38 0.15

    4.00 CC- M15 Super Structure

    U/s Wing and Return (sec1-1) Trapezoidal 2.00 170.80 169.62 1.39 0.51 1.18

    170.80 168.51

    170.24 168.51

    D/s Wing and Return (sec1-1) Trapezoidal 2.00 167.30 165.33 6.88 1.18 1.97Apron at crest 1.00 169.85 169.62 1.50 1.20 0.23

    apron at chute portion 1.00 170.15 165.90 13.31 0.30 0.23

    apron at end sill triangular portion 1.00 166.50 165.90 0.30

    Deduction

    Chute Block 1.00 2.00 165.79 165.59 -0.35 0.29 0.20

    Basin Block 1.00 1.00 165.90 165.67 -0.60 0.15 0.24

    5.00 CC -M 20

    Wearing Coat 1.00 165.90 165.75 15.84 0.30 0.15

    Width Depth /

    Height

    Body Wall (sec2-2, sec3-3) 2.00 0.76

    DESCRIPTION

    0.36

    LEVEL Length

    3.00 2.22 2.01

    Name of the Project : Indira Sagar Project Canal-Phase IIIKUWA BRACH CANAL

    3.50 M CHUTE FALL AT KM 0.893 KM ON SM-3-M-3-D-1

    DETAILED MEAS

    S. NO Unit No

  • 7/28/2019 Est of Chute Fall on Kuwa Branch Canal

    26/28

    in Cum

    3.71

    17.30

    25.19

    33.08

    39.90

    1.56

    1.54

    1.51

    2.47

    74.54

    200.81

    20.08 cum

    40.16 cum140.57 cum

    140.57 cum

    0.42

    4.26

    0.09

    0.07

    0.04

    0.03

    0.04

    1.99

    6.96 cum

    1.65

    31.910.41

    0.90

    0.11

    -0.04

    -0.02

    55.09 cum

    0.71 cum

    Quantity Remarks

    20.19

    REMENTS

  • 7/28/2019 Est of Chute Fall on Kuwa Branch Canal

    27/28

    Top Bottom

    in mts in mts in mts in mts in mts

    1.00 Earth work in Excavation

    A Excavation

    U/S wing returns 2.00 168.15 166.87 1.34 0.88 1.28

    Body wall (2 - 2) to (3 - 3) 2.00 168.15 165.89 2.52 1.33 2.26

    2.00 168.15 164.90 2.52 1.33 3.25

    2.00 168.15 163.92 2.52 1.33 4.23

    2.00 168.15 163.08 2.52 1.33 5.07

    At Cistern 1.00 168.15 163.34 1.00 0.30 4.81

    1.00 168.15 163.41 1.00 0.30 4.74

    1.00 168.15 163.49 1.00 0.30 4.66

    1.00 168.15 163.57 1.54 0.30 4.58

    D/S wing returns 2.00 168.15 163.08 4.69 1.35 5.07

    Hard Soil

    Soft RockHard Rock

    2.00 Earth Filling

    3.00 CC-M15 in Foundation

    U/s Wing and Return (sec1-1) Base 2.00 167.02 166.87 1.34 0.88 0.15

    Body Wall Sec (2-2), sec(3-3) 2.00 4.00 166.04 165.89 2.52 1.33 0.15

    At Cistern 1.00 163.61 163.34 1.00 0.30 0.27

    1.00 163.61 163.41 1.00 0.30 0.20

    1.00 163.61 163.49 1.00 0.30 0.12

    1.00 163.61 163.57 1.54 0.30 0.04

    D/s Cut off wall 1.00 163.08 162.30 0.23 0.30 0.79

    D/s Wing MinSection (sec 4-4) 2.00 163.23 163.08 4.69 1.35 0.15

    4.00 CC- M15 Super Structure

    U/s Wing and Return (sec1-1) Trapezoidal 2.00 168.15 167.02 1.19 0.49 1.13

    168.15 166.04

    167.65 166.04

    D/s Wing and Return (sec1-1) Trapezoidal 2.00 165.15 163.23 6.76 1.15 1.92Apron at crest 1.00 167.25 167.02 1.43 1.13 0.23

    apron at chute portion 1.00 167.55 163.61 11.77 0.30 0.23

    apron at end sill triangular portion 1.00 164.40 163.61 0.30

    Deduction

    Chute Block 1.00 2.00 163.69 163.34 -0.35 0.19 0.35

    Basin Block 1.00 1.00 163.81 163.41 -0.60 0.16 0.40

    5.00 CC -M 20

    Wearing Coat 1.00 163.61 163.46 14.66 0.30 0.15

    Width Depth /

    Height

    Body Wall (sec2-2, sec3-3) 2.00 0.71

    DESCRIPTION

    0.62

    LEVEL Length

    3.00 2.22 1.86

    Name of the Project : Indira Sagar Project Canal-Phase IIIKUWA BRACH CANAL

    3.00 M CHUTE FALL AT KM 0.450 KM ON M-7-D-1

    DETAILED MEAS

    S. NO Unit No

  • 7/28/2019 Est of Chute Fall on Kuwa Branch Canal

    28/28

    in Cum

    3.01

    15.09

    21.67

    28.25

    33.82

    1.44

    1.42

    1.40

    2.11

    64.14

    172.36

    17.24 cum

    34.47 cum120.65 cum

    120.65 cum

    0.35

    4.01

    0.08

    0.06

    0.03

    0.02

    0.05

    1.90

    6.50 cum

    1.31

    29.770.36

    0.79

    0.19

    -0.05

    -0.04

    50.04 cum

    0.66 cum

    Quantity Remarks

    17.69

    REMENTS