    Appendix B

    ETAP Software

  • 8/18/2019 ETAB Software

    2/16

    Appendix C [ETAP SOFTWARE]

    5 Stars Hotel Page 425

    1. Select new to create a new project, the dialogue box at fi g(1) will appear, you

    have to enter the project name and select your unit system then press (OK),

    a er that a dialogue box will appear as shown at  fi g(2), you enter the user 

    name, password is optional if you need security at your project.

     fig (1)

     fig (2)

  • 8/18/2019 ETAB Software

    3/16

    Appendix C [ETAP SOFTWARE]

    5 Stars Hotel Page 426

    2.   A er press (OK), the main so  ware screen will appear at  fi g(3)

     fi g (3)

    3. Select different elements from software library, you can select (AC) elements as

    shown at fi g(6) such as power grid, generators, induc  on machines,

    synchronous machines and different types of loads also protective devices and 

    contactors, beside that it contains filters for harmonics and capacitor which

    helps you to do a power factor correction for a given system.

     Also it contains measuring elements such as voltmeters and ammeters, also it 

    contains current and potential transformers, and protective devices such as

    over current relay, reverse power relay, frequency relay and all you need for  protection.

    Library provides selection of (DC) elements such as dc machines, dc loads, UPS,

    inverters, battery chargers and buses.

  • 8/18/2019 ETAB Software

    4/16

    Appendix C [ETAP SOFTWARE]

    5 Stars Hotel Page 427

     fi g (4)

    4. Select items from library and drag them in the work sheet, and build your 

    system as shown at  fi g(5), here you are at “edit mode” 

     fi g (5)

    5. Use the button to make zoom in and increase the scale of diagram, also

    you can use the button to make zoom out to decrease the scale, so you can

    move freely through the diagram, also use to make auto scale which will 

    make all the diagram appear at work sheet, however it is very small as shown

    at fi g(5).

  • 8/18/2019 ETAB Software

    5/16

    Appendix C [ETAP SOFTWARE]

    5 Stars Hotel Page 428

    6. Enter data for each element of the network, for utility, double lift click on it at 

    the network, a window will appear, enters data on it at rating options. This

    data we obtain it from utility, you can see at fi g(6).

     fi g (6)

    7. For each transformer, enter primary and secondary voltages, also enter MVA

    ra ng (2 MVA), you change units from MVA to KVA by lift click of mouse on the

    button MVA, after that press on the button (Typical Z&X/R) to give you their 

    values automa cally according to standards. This shown in  fi g(7)

     fi g (7)

  • 8/18/2019 ETAB Software

    6/16

    Appendix C [ETAP SOFTWARE]

    5 Stars Hotel Page 429

    8. To enter data for buses, double click by mouse button on the bus then a window 

    will appear as shown at  fi g(8), you have to enter nominal voltage of bus in units

    of KV, you can also change its name like all components. you can also enter 

    values for minimum and maximum values for load diversity factors.

    For nominal bus voltage, enter it as 0.38 KV for low voltage buses, but for 

    medium voltage buses you have to enter it as 11 KV.

     fi g (8)

    9. To enter data for loads, this can be shown at  fi g(9), you can enter KW or KVA,

    also enter pf and the value of current will be calculated automatically.

     fi g (9)

  • 8/18/2019 ETAB Software

    7/16

    Appendix C [ETAP SOFTWARE]

    5 Stars Hotel Page 430

    10.To enter data for motors, double click on the selected motor, a window will 

    appear as shown at fi g(10), you have to enter data a  er you press ’Nameplate’ 

    button to open rating window for you, you can enter data in form of ‘HP’ or 

    ‘KW’ by one lift click on the button ‘ HP’, after a second window as shown at 

     fi g(11) will give you data of selected rating according to NEC, press the button(select) to fi ll other data of motor that isn’t completed at fi g(10), this can be

    shown at fi g(12) with complete data of motor according to manufacturing

    standards.

     fi g (10)

  • 8/18/2019 ETAB Software

    8/16

    Appendix C [ETAP SOFTWARE]

    5 Stars Hotel Page 431

     fi g (11)

     fi g (12)

  • 8/18/2019 ETAB Software

    9/16

    Appendix C [ETAP SOFTWARE]

    5 Stars Hotel Page 432

    11.At motors you can also select load type, such as fan load, pump load, closed 

    valve load, open valve load and many categories of loads, for example to select 

    load type for the previous motor, press on the button (Start Dev) at the previous

    window shown at  fi g(13), you can also enter the value of motor iner  a and 

    acceleration time at no load and at full load, press on the button ”Load Model Lib” as shown at  fi g(14), another window will appear and ask you to select your 

    load type from the sliding window and a graph of load will appear.

     fi g (13)

     fi g (14)

  • 8/18/2019 ETAB Software

    10/16

    Appendix C [ETAP SOFTWARE]

    5 Stars Hotel Page 433

    12.To enter data for lamped loads, double click on selected lamped load, a window 

    will appear as shown in  fi g(15), select “nameplate” then choose value of (KVA)

    or (MVA) as you prefer, then choose value of power factor in percentage.

     fi g(15)

    13.To enter data for cables, double click on the selected cable, a window will 

    appear as shown in fi g(16). Select length of cable, press on the bu on “Library” 

    another window will appear as shown in fi g(17). At this window you can select 

    size of your cable, system frequency and type of insulation.

     fi g (16)

  • 8/18/2019 ETAB Software

    11/16

    Appendix C [ETAP SOFTWARE]

    5 Stars Hotel Page 434

     fi g (17)

    14.There is another method if you didn’t find your desired cable in the program

    library at the window shown in fig(16), select cable length then press on the

    bu on “impedance” as shown in  fi g(18), then a window will appear you can

    enter cable impedance through that window. This is shown at  fi g(19).

     fig (18)

  • 8/18/2019 ETAB Software

    12/16

    Appendix C [ETAP SOFTWARE]

    5 Stars Hotel Page 435

     fig (19)

    15.The soft ware allows user to set load flow analysis, short circuit calculation,

    motor starting analysis, harmonic analysis, transient stability analysis, relay 

    coordination and DC calculations, this can be selected from icons as shown at 

     fi g(20).

     fig (20)

  • 8/18/2019 ETAB Software

    13/16

    Appendix C [ETAP SOFTWARE]

    5 Stars Hotel Page 436

    16.Select to perform the load flow analysis to find system flows such as KW,

    KVAR, KVA, current and power factor. This is shown at  fi g(21), here they are in

    terms of “kw + j kvar “ and value of bus voltage in percentage. Fig(21) shows

    sec  on at transformer 1.

     fig (21)

  • 8/18/2019 ETAB Software

    14/16

    Appendix C [ETAP SOFTWARE]

    5 Stars Hotel Page 437

    17.Press the button the window as shown at fi g(22) will appear which allow 

    you to select data that appears on the diagram after calculation of load flow.

    Now select “Amp” and “%Pf.” and press (OK).

     fig (22)

  • 8/18/2019 ETAB Software

    15/16

    Appendix C [ETAP SOFTWARE]

    5 Stars Hotel Page 438

    18.Press the button to detect if there are any warnings or alarms that will 

    happen, this can be shown at fi g(23), it will be helpful to determine if there are

    under voltage or over voltages through the network.

     fig (23)

    19.This values are acceptable and not represent any problems, but if you need to

    cancel them we can increase the value if secondary voltage by increasing

    tapping ratio, double click on the transformer, a window will appear as shown

    in fi g(24), increase tapping value from 0.38 Kv to 0.39 Kv, do it for the twotransformers.

     fig (24)

  • 8/18/2019 ETAB Software

    16/16

    Appendix C [ETAP SOFTWARE]

    5 Stars Hotel Page 439

    20.To perform short circuit calculation press on the icon different types of 

    calcula ons will appear as shown at fi g(25).

     fig (25)

    21.Bus 3 is selected to be the faulty bus at fi g(26).

     fi g(26)

    22. Press on the button to view all calculations or report, you can save it as pdf 

     format, or word format, some of “Report Manager” for calculations are shown

    at chapter of short circuit calculations.