EUFORIA FP7-INFRASTRUCTURES-2007-1, Grant 211804
JRA3, SA1, SA2 & SA3 parallel session
23 January 2008
Kick-Off Meeting
21-24 January 2008
Goteborg (Sweden)
![Page 2: EUFORIA FP7-INFRASTRUCTURES-2007-1, Grant 211804 JRA3, SA1, SA2 & SA3 parallel session 23 January 2008 Kick-Off Meeting 21-24 January 2008 Goteborg (Sweden)](https://reader036.vdocument.in/reader036/viewer/2022082613/5697c0121a28abf838ccc032/html5/thumbnails/2.jpg)
EUFORIA FP7-INFRASTRUCTURES-2007-1, Grant 211804
Summary Architecture: several issues
1st issue: Portal
Integrate Kepler and all the ITM applications in Migrating Desktop
Migrating Desktop is running on the user’s desktop => Kepler and the others are running on the user infrastructure => must be launched as a batch on the gateway
Non java applications (Matlab, IDL, …) must be launched through VNC (performance??)
MD could run interactive jobs (2 ssh channels) but not available for the Kepler part running on the “gateway”
=> loose the benefits from MD
If not used, a web portal must be developed
Actions:
Must be investigated more deeply (1 month)
Distribute the “ITM Web portal requirements” document
![Page 3: EUFORIA FP7-INFRASTRUCTURES-2007-1, Grant 211804 JRA3, SA1, SA2 & SA3 parallel session 23 January 2008 Kick-Off Meeting 21-24 January 2008 Goteborg (Sweden)](https://reader036.vdocument.in/reader036/viewer/2022082613/5697c0121a28abf838ccc032/html5/thumbnails/3.jpg)
EUFORIA FP7-INFRASTRUCTURES-2007-1, Grant 211804
Summary Architecture: several issues
2nd issue: Data communication
Access to external data from the codes running on the GRID/HPC
ITM data server: consistent plasma + fusion device state (stored in the gateway memory during the simulation)
Investigate biomedical + EuroVO_AIDA project + …
Could use fast FTP as a backup
3rd issue: Jobs launching:
Interactive jobs: jobs are running for a long duration
loop on many time steps: communication with Kepler at each time step
only the batch mode is available => simulations will be less efficient
Actions:
Less urgent but must be investigated as early as possible