Page 1: EUR PBN TF PBN ICAO HQ Activities Overview. page 2 PBN - Where are we now? Current PBN concept –Globally harmonized navigation specification based on

EUR PBN TF

PBN ICAO HQ Activities Overview

Page 2: EUR PBN TF PBN ICAO HQ Activities Overview. page 2 PBN - Where are we now? Current PBN concept –Globally harmonized navigation specification based on

page 2

PBN - Where are we now?

• Current PBN concept– Globally harmonized navigation specification based

on existing national or regional requirement– Objective: facilitation of standardization with the aim

to reduce cost, confusion and accelerate implementation

02 July 2012

Page 3: EUR PBN TF PBN ICAO HQ Activities Overview. page 2 PBN - Where are we now? Current PBN concept –Globally harmonized navigation specification based on

PBN - Where are we now?

• PBN concept developments– Builds on existing requirements– Adds new specifications to address operational

requirements– Curtails the proliferation of number of navigation

specifications

page 3

New Edition

• Updated PBN Manual (Advance copy):– 1st week of July 2012

02 July 2012

Page 4: EUR PBN TF PBN ICAO HQ Activities Overview. page 2 PBN - Where are we now? Current PBN concept –Globally harmonized navigation specification based on

PBN - Where are we now?

• Updated PBN Manual - highlights

• RNP 2– High continuity (typically oceanic/remote applications)– Low continuity (typically continental applications)

• RNP 0.3– Intended for slow moving aircraft

• Radius-to-fix (RF) (terminal and approach)• Fixed Radius Transitions (FRT) (en-route)• Advanced RNP (umbrella navigation specification)• High level ops approval guidance• Improved implementation process description

02 July 2012 page 4

Page 5: EUR PBN TF PBN ICAO HQ Activities Overview. page 2 PBN - Where are we now? Current PBN concept –Globally harmonized navigation specification based on

Advanced RNP

RNAV 1

RNAV 2

RNAV 5 RNP APCH

RNP 1

A-RNP

RNAV 10

RNP 4

RF legsParallel offsetRNAV holding

Optional Performance/Functionality

RNP ScalabilityRNP 2 oceanic/remote

Fixed Radius Transition (FRT)Time of Arrival Control

Barometric VNAV

Continental en-route: RNP 2,1Final approach: RNP 0.3

A-RNP + options

02 July 2012 page 5

Page 6: EUR PBN TF PBN ICAO HQ Activities Overview. page 2 PBN - Where are we now? Current PBN concept –Globally harmonized navigation specification based on

Just Published

page 6

Flight Validation

02 July 2012

Page 7: EUR PBN TF PBN ICAO HQ Activities Overview. page 2 PBN - Where are we now? Current PBN concept –Globally harmonized navigation specification based on

Validation Process

page 702 July 2012

Page 8: EUR PBN TF PBN ICAO HQ Activities Overview. page 2 PBN - Where are we now? Current PBN concept –Globally harmonized navigation specification based on

ATM / Airspace Planning and Design Support

• Continuous Climb Operations (CCO) Manual– Advance copy by July 2012

• PBN Airspace Concepts Manual– Advance copy by July 2012

• ilearn information/workshop package on PBN airspace design– August 2012

page 802 July 2012

Page 9: EUR PBN TF PBN ICAO HQ Activities Overview. page 2 PBN - Where are we now? Current PBN concept –Globally harmonized navigation specification based on

Flight Operations Support

• PBN Operations Approval Manual– Under review by PBN Operations Approval

Tiger Team– Advance copy by September 2012

• ilearn information/workshop package on PBN Operations Approval– September 2012

page 902 July 2012

Page 10: EUR PBN TF PBN ICAO HQ Activities Overview. page 2 PBN - Where are we now? Current PBN concept –Globally harmonized navigation specification based on

PBN General

• PBN Manual next edition– Advance copy July 2012

• ilearn information/workshop package on PBN overview– September 2012

• Online PBN implementation status tool– September 2012

page 1002 July 2012

Page 11: EUR PBN TF PBN ICAO HQ Activities Overview. page 2 PBN - Where are we now? Current PBN concept –Globally harmonized navigation specification based on

PBN General

• PBN Implementation toolkit addressing:– Executives– Regulators– ANSPs– Aircraft operators– Manufacturers

• September 2012

page 1102 July 2012

Page 12: EUR PBN TF PBN ICAO HQ Activities Overview. page 2 PBN - Where are we now? Current PBN concept –Globally harmonized navigation specification based on

PBN General

Instrument Flight Procedures (a summary)• Criteria to support new edition of PBN

Manual• Improved Baro-VNAV criteria• Helicopter criteria• Sample charts

– State Letter after IFPP/11

(December 2012)

page 1202 July 2012

Page 13: EUR PBN TF PBN ICAO HQ Activities Overview. page 2 PBN - Where are we now? Current PBN concept –Globally harmonized navigation specification based on

PBN General (Planning)

• ilearn information/workshop/training package on PBN for other domains – ATC– Pilots– Flight validation

• Endorsement programme for service providers

page 13

Planning

02 July 2012

Page 14: EUR PBN TF PBN ICAO HQ Activities Overview. page 2 PBN - Where are we now? Current PBN concept –Globally harmonized navigation specification based on

PBN General (Planning)

• Collision Risk Model for PBN obstacle clearance and air-to-air separation– Combined effort IFPP and SASP

• PBN Procedure Design Safety Assessment Manual

• Advanced RNP support document

page 14

Planning

02 July 2012

Page 15: EUR PBN TF PBN ICAO HQ Activities Overview. page 2 PBN - Where are we now? Current PBN concept –Globally harmonized navigation specification based on

Objectives• New PBN documentation information• Status of global implementation• Identify implementation issues and problems• Development of a global action plan to support

implementation • Plan to be presented to ANC/12