eurocontrol centralised services – cs 2 – 4dpp frank brenner director general 3 september 2013

7
EUROCONTROL Centralised Services – CS 2 – 4DPP Frank Brenner Director General 3 September 2013

Upload: ethan-campbell

Post on 27-Mar-2015

213 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: EUROCONTROL Centralised Services – CS 2 – 4DPP Frank Brenner Director General 3 September 2013

EUROCONTROL

Centralised Services – CS 2 – 4DPP

Frank BrennerDirector General

3 September 2013

Page 2: EUROCONTROL Centralised Services – CS 2 – 4DPP Frank Brenner Director General 3 September 2013

EUROCONTROL Centralised Services 2

Why do we need Centralised Services?

Europe needs to be competitive again!

a more competitive European ATM is an important enabler for a more competitive European Aviation environment

The goal to be achieved: controlled flight hour for significant less cost (one controlled flight hour in the US currently costs around half of what it does in Europe) – see the US/Europe Comparison of ATM-related Operational Performance

Page 3: EUROCONTROL Centralised Services – CS 2 – 4DPP Frank Brenner Director General 3 September 2013

EUROCONTROL Centralised Services 3EUROCONTROL Centralised Services 3

Page 4: EUROCONTROL Centralised Services – CS 2 – 4DPP Frank Brenner Director General 3 September 2013

EUROCONTROL Centralised Services 4EUROCONTROL Centralised Services 4

Centralised Service 2

4D Trajectory Flight Profile Calculationfor planningpurposes service(4DPP)

Page 5: EUROCONTROL Centralised Services – CS 2 – 4DPP Frank Brenner Director General 3 September 2013

EUROCONTROL Centralised Services 5

4 D Trajectory Flight Profile Calculation forPlanning Purposes Service (4DPP)

Provide a central reference for the 4D Trajectory Profile for all ATM planning activities with an increased accuracy, allowing reduction of buffers around airspace occupancy, reducing under- / over delivery.

Centrally processed 4D trajectory.

Distribute the calculation to the ANSPs/Centres.

Making full use of existing sector capacities.

Technology exists already in some Member States.

Replaces EUROCONTROL/NM legacy system.

Supports fostering of innovative technologies - as this will be the first centralised 4 D Trajectory system in the world.

Page 6: EUROCONTROL Centralised Services – CS 2 – 4DPP Frank Brenner Director General 3 September 2013

EUROCONTROL Centralised Services 6EUROCONTROL Centralised Services 6

Page 7: EUROCONTROL Centralised Services – CS 2 – 4DPP Frank Brenner Director General 3 September 2013

EUROCONTROL

Centralised Services – CS 2 – 4DPP

Frank BrennerDirector General

3 September 2013