european coal gasification projects - rite coal gasification projects futuregen workshop tokyo, 25th...
TRANSCRIPT
![Page 1: European Coal Gasification Projects - RITE Coal Gasification Projects FutureGen Workshop Tokyo, 25th February, 2008 Chris Higman SYNGAS CONSULTANTS LTD Overview • Operating IGCCs](https://reader031.vdocument.in/reader031/viewer/2022030418/5aa4571c7f8b9a7c1a8c022f/html5/thumbnails/1.jpg)
SYNGAS CONSULTANTS LTD
European Coal Gasification Projects
FutureGen WorkshopTokyo, 25th February, 2008
Chris Higman
![Page 2: European Coal Gasification Projects - RITE Coal Gasification Projects FutureGen Workshop Tokyo, 25th February, 2008 Chris Higman SYNGAS CONSULTANTS LTD Overview • Operating IGCCs](https://reader031.vdocument.in/reader031/viewer/2022030418/5aa4571c7f8b9a7c1a8c022f/html5/thumbnails/2.jpg)
SYNGAS CONSULTANTS LTD
Overview• Operating IGCCs in Europe
– Coal-based– Refinery-based
• Planned IGCCs in Europe– The Netherlands (Magnum)– Germany (RWE)– United Kingdom (Teesside, Hatfield, Killingholme)
• Issues requiring resolution• Conclusions
![Page 3: European Coal Gasification Projects - RITE Coal Gasification Projects FutureGen Workshop Tokyo, 25th February, 2008 Chris Higman SYNGAS CONSULTANTS LTD Overview • Operating IGCCs](https://reader031.vdocument.in/reader031/viewer/2022030418/5aa4571c7f8b9a7c1a8c022f/html5/thumbnails/3.jpg)
SYNGAS CONSULTANTS LTD
IGCC Activity in Europe
Vresova 400 MW
Puertollano 350 MW
Buggenum 250 MW
SVZ 70 MW
Operating, coal
Pernis 110 MW
Sannazzaro 250 MWapi 250 MW
Sarlux 550 MW
ISAB 500 MW
Operating, oil
RWE 450 MW
Teesside 800 MW
Killingholme360 MW
Magnum1250 MW
Hadfield 740 MW
Planned, coal
![Page 4: European Coal Gasification Projects - RITE Coal Gasification Projects FutureGen Workshop Tokyo, 25th February, 2008 Chris Higman SYNGAS CONSULTANTS LTD Overview • Operating IGCCs](https://reader031.vdocument.in/reader031/viewer/2022030418/5aa4571c7f8b9a7c1a8c022f/html5/thumbnails/4.jpg)
SYNGAS CONSULTANTS LTD
Other Large Gasification Plants
Leuna
Wesseling
Ludwigshafen
Operating
Gelsenkirchen
Lavradio
Brunsbüttel Planned/stopped
WilhelmshavenGdansk
Litwinov
![Page 5: European Coal Gasification Projects - RITE Coal Gasification Projects FutureGen Workshop Tokyo, 25th February, 2008 Chris Higman SYNGAS CONSULTANTS LTD Overview • Operating IGCCs](https://reader031.vdocument.in/reader031/viewer/2022030418/5aa4571c7f8b9a7c1a8c022f/html5/thumbnails/5.jpg)
SYNGAS CONSULTANTS LTD
Buggenum, Netherlands• IGCC: 253 MWe• Feed: 2000 t/d coal• Gasifier: Shell• GT: Siemens V94.2• Start up: 1994• Owner: Nuon Power
Source: Nuon
• Up to 30% (mass) biomass feed• Demo CO2 capture plant in
planning (30 000 t/a)
![Page 6: European Coal Gasification Projects - RITE Coal Gasification Projects FutureGen Workshop Tokyo, 25th February, 2008 Chris Higman SYNGAS CONSULTANTS LTD Overview • Operating IGCCs](https://reader031.vdocument.in/reader031/viewer/2022030418/5aa4571c7f8b9a7c1a8c022f/html5/thumbnails/6.jpg)
SYNGAS CONSULTANTS LTD
Puertollano, Spain• IGCC: 350 MWe• Feed: 2600 t/d
Coal, Petcoke• Gasifier: Prenflo• GT: Siemens V94.3• Start up: 1998• Owner : Elcogas
Source: Elcogas
• Demo CO2 capture plant in planning• Co-gasification of biomass planned• Biofuel planned
![Page 7: European Coal Gasification Projects - RITE Coal Gasification Projects FutureGen Workshop Tokyo, 25th February, 2008 Chris Higman SYNGAS CONSULTANTS LTD Overview • Operating IGCCs](https://reader031.vdocument.in/reader031/viewer/2022030418/5aa4571c7f8b9a7c1a8c022f/html5/thumbnails/7.jpg)
SYNGAS CONSULTANTS LTD
Vresova, Czech Republic• IGCC: 400 MWe• Feed: Lignite• Gasifiers: Lurgi type• GT: 2x GE 9E• Start up: 1968/1996• Owner: Sokolovska
Uhelna Source: Sokolovská uhelna AS
Siemens tar gasifier recently started up
![Page 8: European Coal Gasification Projects - RITE Coal Gasification Projects FutureGen Workshop Tokyo, 25th February, 2008 Chris Higman SYNGAS CONSULTANTS LTD Overview • Operating IGCCs](https://reader031.vdocument.in/reader031/viewer/2022030418/5aa4571c7f8b9a7c1a8c022f/html5/thumbnails/8.jpg)
SYNGAS CONSULTANTS LTD
Schwarze Pumpe, Germany• IGCC: 75 MWe
360 t/d MeOH• Feed: Lignite, Waste• Gasifiers: Lurgi type,
Siemens, BGL• GT: GE 6B• Start up: 1956/1984/2000
GT:1997• Owner: Sustec SVZ
Source: SVZ
• 2007: waste to methanol stopped for economic reasons
• Additional project to return Siemens gasifier to lignite feed
![Page 9: European Coal Gasification Projects - RITE Coal Gasification Projects FutureGen Workshop Tokyo, 25th February, 2008 Chris Higman SYNGAS CONSULTANTS LTD Overview • Operating IGCCs](https://reader031.vdocument.in/reader031/viewer/2022030418/5aa4571c7f8b9a7c1a8c022f/html5/thumbnails/9.jpg)
SYNGAS CONSULTANTS LTD
Sarlux, Italy• IGCC: 550 MWe
40000 Nm³/ H2
• Feed: 3560 t/d VVR• Gasifier: 3xGE• GT 3x GE 9E• Start up: 2000• Owner: Sarlux
Source: Sarlux
![Page 10: European Coal Gasification Projects - RITE Coal Gasification Projects FutureGen Workshop Tokyo, 25th February, 2008 Chris Higman SYNGAS CONSULTANTS LTD Overview • Operating IGCCs](https://reader031.vdocument.in/reader031/viewer/2022030418/5aa4571c7f8b9a7c1a8c022f/html5/thumbnails/10.jpg)
SYNGAS CONSULTANTS LTD
ISAB, Italy• IGCC: 512 MWe• Feed: 3168 t/d
Asphalt• Gasifier: 2 x GE• GT 2 x V94.2K• Start up: 2000• Owner: ISAB
Source: Preston
• Additional gasifier for H2 in planning
![Page 11: European Coal Gasification Projects - RITE Coal Gasification Projects FutureGen Workshop Tokyo, 25th February, 2008 Chris Higman SYNGAS CONSULTANTS LTD Overview • Operating IGCCs](https://reader031.vdocument.in/reader031/viewer/2022030418/5aa4571c7f8b9a7c1a8c022f/html5/thumbnails/11.jpg)
SYNGAS CONSULTANTS LTD
Falconara, Italy• IGCC: 250 MWe• Feed: 1560 t/d VVR• Gasifer: 2 x GE• GT Alstom 13E• Start up: 2001• Owner: api
Source: Spence
![Page 12: European Coal Gasification Projects - RITE Coal Gasification Projects FutureGen Workshop Tokyo, 25th February, 2008 Chris Higman SYNGAS CONSULTANTS LTD Overview • Operating IGCCs](https://reader031.vdocument.in/reader031/viewer/2022030418/5aa4571c7f8b9a7c1a8c022f/html5/thumbnails/12.jpg)
SYNGAS CONSULTANTS LTD
Sanazzaro, Italy• IGCC: 250 MWe
40 000 Nm³/h H2
• Feed: 1200 t/d VVR• Gasifier: 2 x Shell• GT: V94.2K• Start up: 2006• Owner: Eni R&M
Source: Camozzi et al.
![Page 13: European Coal Gasification Projects - RITE Coal Gasification Projects FutureGen Workshop Tokyo, 25th February, 2008 Chris Higman SYNGAS CONSULTANTS LTD Overview • Operating IGCCs](https://reader031.vdocument.in/reader031/viewer/2022030418/5aa4571c7f8b9a7c1a8c022f/html5/thumbnails/13.jpg)
SYNGAS CONSULTANTS LTD
Pernis, The Netherlands• IGCC. 110 MWe
285 t/d H2
• Feed: 1650 t/d VVR• Gasifier: 3 x Shell SGP• GT: 2 x GE 6B• Start up: 1997• Owner: Shell
Source: Shell
• ~ 1.1 MMt/a CO2 in hydrogen trains captured
• 325 000 t/a used for green-houses via 85 km pipeline
![Page 14: European Coal Gasification Projects - RITE Coal Gasification Projects FutureGen Workshop Tokyo, 25th February, 2008 Chris Higman SYNGAS CONSULTANTS LTD Overview • Operating IGCCs](https://reader031.vdocument.in/reader031/viewer/2022030418/5aa4571c7f8b9a7c1a8c022f/html5/thumbnails/14.jpg)
SYNGAS CONSULTANTS LTD
Wesseling, Germany• MeOH: 1000 t/d• Feed: 800 t/d VVR• Gasifier: Shell + GE• Start up: 1969/1980• Owner: Shell
Source: Lurgi
• was using gas from Berrenrath 660 t/d HTW coal gasifier
![Page 15: European Coal Gasification Projects - RITE Coal Gasification Projects FutureGen Workshop Tokyo, 25th February, 2008 Chris Higman SYNGAS CONSULTANTS LTD Overview • Operating IGCCs](https://reader031.vdocument.in/reader031/viewer/2022030418/5aa4571c7f8b9a7c1a8c022f/html5/thumbnails/15.jpg)
SYNGAS CONSULTANTS LTD
Gelsenkirchen, Germany• NH3 1200 t/d
MeOH 900 t/dH2 40000 Nm³/h
• Feed: 1560 t/d VVR• Gasifier: 4 x Shell• Start up: 1972• Owner: BP
Source: Lurgi
• Classic poly-generation with swing between NH3 and MeOH to suit markets
![Page 16: European Coal Gasification Projects - RITE Coal Gasification Projects FutureGen Workshop Tokyo, 25th February, 2008 Chris Higman SYNGAS CONSULTANTS LTD Overview • Operating IGCCs](https://reader031.vdocument.in/reader031/viewer/2022030418/5aa4571c7f8b9a7c1a8c022f/html5/thumbnails/16.jpg)
SYNGAS CONSULTANTS LTD
Brunsbüttel, Germany• Ammonia: ~2050 t/d
Urea: 1600 t/d• Feed: ~1900 t/d resid• Gasifier: 4 x SGP• Start up: 1978• Owner: Yara
Source: Lurgi
• 1.85 MMt/a CO2 captured in ammonia plant (equivalent to 300 MWe IGCC)
• ~ 400 000 CO2 used in urea plant. with compression to ~150 bar
![Page 17: European Coal Gasification Projects - RITE Coal Gasification Projects FutureGen Workshop Tokyo, 25th February, 2008 Chris Higman SYNGAS CONSULTANTS LTD Overview • Operating IGCCs](https://reader031.vdocument.in/reader031/viewer/2022030418/5aa4571c7f8b9a7c1a8c022f/html5/thumbnails/17.jpg)
SYNGAS CONSULTANTS LTD
Lavradio, Portugal• Ammonia: 900 t/d
Urea: 300 t/d• Feed: 800 t/d VR• Gasifier: 2 x Shell• Start up: 1984• Owner: CUF
Source: Lurgi
• 80 000 t/a CO2 to urea plant• 64 000 t/a CO2 sold to food
industry
![Page 18: European Coal Gasification Projects - RITE Coal Gasification Projects FutureGen Workshop Tokyo, 25th February, 2008 Chris Higman SYNGAS CONSULTANTS LTD Overview • Operating IGCCs](https://reader031.vdocument.in/reader031/viewer/2022030418/5aa4571c7f8b9a7c1a8c022f/html5/thumbnails/18.jpg)
SYNGAS CONSULTANTS LTD
Leuna, Germany• MeOH: 2090 t/d
H2 ~70000 Nm³/h• Feed: 2400 t/d VVR• Gasifier: 6 x SGP• Start up: 1985• Owner: Total
Source: Leuna
• ~1.6 MM t/a CO2 captured• 12 000 t/a CO2 supplied to EU
CO2-SINK demo sequestration project at Ketzin
![Page 19: European Coal Gasification Projects - RITE Coal Gasification Projects FutureGen Workshop Tokyo, 25th February, 2008 Chris Higman SYNGAS CONSULTANTS LTD Overview • Operating IGCCs](https://reader031.vdocument.in/reader031/viewer/2022030418/5aa4571c7f8b9a7c1a8c022f/html5/thumbnails/19.jpg)
SYNGAS CONSULTANTS LTD
Nuon Magnum, The Netherlands• IGCC: 750 MWe
NGCC: 450 MWe• Feed: Coal, Biomass,
Nat. Gas• Location: Eemshaven, NL• Gasifiers: 3 x Shell• Start up: 2011• Limit changes from Buggenum
to lessons learned
Source: Nuon
New, phased approach:• CCU for 2011
• GT order already placed• IGCC for 2012• Partial CO2 capture to start 2013
![Page 20: European Coal Gasification Projects - RITE Coal Gasification Projects FutureGen Workshop Tokyo, 25th February, 2008 Chris Higman SYNGAS CONSULTANTS LTD Overview • Operating IGCCs](https://reader031.vdocument.in/reader031/viewer/2022030418/5aa4571c7f8b9a7c1a8c022f/html5/thumbnails/20.jpg)
SYNGAS CONSULTANTS LTD
RWE, Germany• IGCC: 360 MWe• Feed: Lignite• Location: N/A• Start up: 2014• CCS: from start• CO2 2.3 MMt/a• Efficiency: Target 40% LHV• Storage: depleted gas
resevoirs or saline aquifers• Cost: €1bn (Q1/2006)
Source: RWE
• Efficiency 35-38.5%, working to improve
• Storage site approval planned for 2010
![Page 21: European Coal Gasification Projects - RITE Coal Gasification Projects FutureGen Workshop Tokyo, 25th February, 2008 Chris Higman SYNGAS CONSULTANTS LTD Overview • Operating IGCCs](https://reader031.vdocument.in/reader031/viewer/2022030418/5aa4571c7f8b9a7c1a8c022f/html5/thumbnails/21.jpg)
SYNGAS CONSULTANTS LTD
Centrica, Teesside, UK• IGCC: 800 MWe• Feed: Coal• Location: Teesside• Start up: 2012• CCS: from start• CO2: 5 MM t/a• Storage: EOR• Cost: £1.5 bn (7/2007)
• 85% CO2 capture
Source: Roddy
![Page 22: European Coal Gasification Projects - RITE Coal Gasification Projects FutureGen Workshop Tokyo, 25th February, 2008 Chris Higman SYNGAS CONSULTANTS LTD Overview • Operating IGCCs](https://reader031.vdocument.in/reader031/viewer/2022030418/5aa4571c7f8b9a7c1a8c022f/html5/thumbnails/22.jpg)
SYNGAS CONSULTANTS LTD
Powerfuel, Hatfield, UK• IGCC: 740 MWe• Feed: Local coal• Location: Hatfield, Yorks.• Start up:• CCS: from start• CO2: ~90% capture • Storage: EOR
Source: Powerfuel
• 2 x Shell water quench gasifiers• Permitting partially in place• FEED contract awarded
![Page 23: European Coal Gasification Projects - RITE Coal Gasification Projects FutureGen Workshop Tokyo, 25th February, 2008 Chris Higman SYNGAS CONSULTANTS LTD Overview • Operating IGCCs](https://reader031.vdocument.in/reader031/viewer/2022030418/5aa4571c7f8b9a7c1a8c022f/html5/thumbnails/23.jpg)
SYNGAS CONSULTANTS LTD
E.ON, Kilingholme, UK• IGCC: 360 MWe• Feed: Coal• Location: Killingholme• Start up: 2012/2013• CCS: from start• CO2: 2.5 MM t/a• Efficiency: >35% (LHV)• Storage: EOR
Source: E.ON
• Project stopped after details of UK “CCS competition”announced.
![Page 24: European Coal Gasification Projects - RITE Coal Gasification Projects FutureGen Workshop Tokyo, 25th February, 2008 Chris Higman SYNGAS CONSULTANTS LTD Overview • Operating IGCCs](https://reader031.vdocument.in/reader031/viewer/2022030418/5aa4571c7f8b9a7c1a8c022f/html5/thumbnails/24.jpg)
SYNGAS CONSULTANTS LTD
Issues requiring resolution
• Costs– Rapid CAPEX increases affecting projects in many
sectors– Who pays for CCS in a competetive power market?
• Legislation– Permitting storage– Permitting CO2 pipelines (standards)
![Page 25: European Coal Gasification Projects - RITE Coal Gasification Projects FutureGen Workshop Tokyo, 25th February, 2008 Chris Higman SYNGAS CONSULTANTS LTD Overview • Operating IGCCs](https://reader031.vdocument.in/reader031/viewer/2022030418/5aa4571c7f8b9a7c1a8c022f/html5/thumbnails/25.jpg)
SYNGAS CONSULTANTS LTD
Some Legislation Issues
• Political climate is generally favorable, but concrete steps are required, e.g. – European Trading Scheme phase 3 rules not yet known– London Protocol and OSPAR treaties amended to
facilitate CCS, but OSPAR still needs ratification– HSE rules (including CO2 specification) for land
transport– Long-term liability issues– Monitoring and verification requirements need defining
![Page 26: European Coal Gasification Projects - RITE Coal Gasification Projects FutureGen Workshop Tokyo, 25th February, 2008 Chris Higman SYNGAS CONSULTANTS LTD Overview • Operating IGCCs](https://reader031.vdocument.in/reader031/viewer/2022030418/5aa4571c7f8b9a7c1a8c022f/html5/thumbnails/26.jpg)
SYNGAS CONSULTANTS LTD
Conclusions
• Gasification well established in Europe –particularly in the refining sector
• There is already 2745 MWe IGCC capacity in Europe, of which 1075 MWe is coal-based
• New projects all aim for early CCS• BUT, uncertainties in
– Carbon pricing– Legislative framework
causing delays, project phasing and even stops