european rpas steering group first meeting 6 july 2012

28
European RPAS Steering Group First Meeting 6 July 2012

Upload: alanna-herrod

Post on 31-Mar-2015

216 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: European RPAS Steering Group First Meeting 6 July 2012

European RPAS Steering Group

First Meeting6 July 2012

Page 2: European RPAS Steering Group First Meeting 6 July 2012

Agenda

Welcome and opening  

1.Outcome of the UAS Panel Process

2.Objectives and description of the ERSG

3.Structure and main content of the Roadmap

4.Roadmap definition working arrangements.

5.Adoption of the Terms of Reference

6.Preliminary discussion on the Roadmap and contribution from the ERSG members

AOB

2

Page 3: European RPAS Steering Group First Meeting 6 July 2012

22 Objectives and description of the ERSGObjectives and description of the ERSG

3

11 Outcome of the UAS Panel ProcessOutcome of the UAS Panel Process

33 Structure and main content of the RoadmapStructure and main content of the Roadmap

44 Roadmap definition working arrangements.Roadmap definition working arrangements.

3

Page 4: European RPAS Steering Group First Meeting 6 July 2012

The UAS Panel Process

• Consultation process made of 5 workshops Industry and Market (UVSI)

Air space Insertion and Radio Frequencies (ECTL)

Safety (EASA)

Societal Dimension (Prof. Roma)

R&D (EDA)

• Discussion Papers and Conclusions available at http://ec.europa.eu/enterprise/sectors/aerospace/uas/index_en.htm

4

Page 5: European RPAS Steering Group First Meeting 6 July 2012

Commission Staff Working Paper

• EC will issue a SWPSummarizing the conclusions of the UAS Panel Process

Providing a common understanding on the issues at stake and the actions needed

To be issued in July

5

Page 6: European RPAS Steering Group First Meeting 6 July 2012

Conclusions of the UAS Panel

• Great potential justifying EC supportActive contribution from industry

Important civil applications & market potential (jobs & growth)

• Barriers identifiedAir Traffic Insertion is urgent and complex

Others like insurance, privacy, public acceptance

6

Page 7: European RPAS Steering Group First Meeting 6 July 2012

Conclusions of the UAS Panel (2)

• Call for an initiative led by the European Commission to reinforce coordination between all European actors,

to identify a common roadmap toward a progressive insertion,

to "institutionalise" the process.

7

Page 8: European RPAS Steering Group First Meeting 6 July 2012

Commission follow-up to UAS Panel

Setting-up a European RPAS Steering GroupERSG

to provide a framework to enhance the coordination of the activities necessary

to achieve the initial safe insertion of all type of RPAS into the European air traffic progressively from 2016

to contribute to the development of harmonized rules for all RPAS in Europe, including for those with a take-off mass below 150kg currently falling under national competency.

8

Page 9: European RPAS Steering Group First Meeting 6 July 2012

22 Objectives and description of the ERSGObjectives and description of the ERSG

9

11 Outcome of the UAS Panel ProcessOutcome of the UAS Panel Process

33 Structure and main content of the RoadmapStructure and main content of the Roadmap

44 Roadmap definition working arrangements.Roadmap definition working arrangements.

9

Page 10: European RPAS Steering Group First Meeting 6 July 2012

Objective of the ERSG

"Foster the development of civil RPAS by planning and coordinating all the activities necessary to achieve the initial safe insertion of RPAS into the European air traffic by 2016" (ToR p2)

Objective to be achieved by

Identifying all the activities to be performed to reach the objective

Coordinating the activities and contributions of all stakeholders in the most efficient way

Monitoring the progress towards the objective

10

Page 11: European RPAS Steering Group First Meeting 6 July 2012

ERSG working method (1)

"The ERSG will be responsible for developing and monitoring the implementation of a comprehensive Roadmap setting the milestones, the distribution of tasks among the stakeholders and the timing for the insertion of RPAS in the European airspace" (ToR p2)

The Roadmap will be the main tool of the ERSG:

The ERSG will adopt the Roadmap and its periodical updates.

Doing so, each organisation will commit his organisation to the tasks agreed in the Roadmap.

The ERSG will also be the place where to solve any potential issue concerning the definition and implementation of the Roadmap.

11

Page 12: European RPAS Steering Group First Meeting 6 July 2012

ERSG working method (2)

"The ERSG will be responsible for developing and monitoring the implementation of a comprehensive Roadmap setting the milestones, the distribution of tasks among the stakeholders and the timing for the insertion of RPAS in the European airspace" (ToR p2)

The ERSG will set-up appropriate working arrangements to

establish and update periodically the Roadmap;

ensure a proper monitoring of the work linked to its implementation.

12

Page 13: European RPAS Steering Group First Meeting 6 July 2012

Condition for success

"The success of this initiative will heavily depend on the commitment of all organisations and industries involved, to cooperate in achieving the objectives set by the ERSG and their willingness to contribute with own resources and technical expertise to the work necessary to reach RPAS ATI" within the agreed timeline (ToR p2)

Commitment of each member to

contribute to the work with own resources and expertise

coordinate its activities with the others

comply with the agreed decisions adopted in the roadmap

13

Page 14: European RPAS Steering Group First Meeting 6 July 2012

Membership of the ERSG

"The European RPAS Steering Group is composed of organisations/groups representing the main European stakeholders involved in RPAS, experts in the area and the relevant Commission services. (ToR p3)

Coordination process based on the good-will and trust of participants (cfr "Open Method of Coordination")

Need to involve representatives of the main organisations involved in the work (regulatory, research, etc) to be performed to achieve RPAS ATI

Open to additional participation if deemed necessary (research centres?)

14

Page 15: European RPAS Steering Group First Meeting 6 July 2012

Additional objectives

The ERSG could have additional objectives if found useful, like

maintaining an overall coordination with international bodies like FAA

????

15

Page 16: European RPAS Steering Group First Meeting 6 July 2012

22 Objectives and description of the ERSGObjectives and description of the ERSG

16

11 Outcome of the UAS Panel ProcessOutcome of the UAS Panel Process

33 Structure and main content of the RoadmapStructure and main content of the Roadmap

44 Roadmap definition working arrangements.Roadmap definition working arrangements.

16

Page 17: European RPAS Steering Group First Meeting 6 July 2012

Structure of the Roadmap (1)

One Roadmap with 3 areas of activities well-coordinated

Regulatory

Research and development

Complementary measures Liability / insurance Privacy/ data protection Public perception

17

Page 18: European RPAS Steering Group First Meeting 6 July 2012

Structure of the Roadmap (2)

… and 2 level of detailsan overall vision

Providing a complete high level planning tool, towards full insertion of all type of RPAS

Setting priorities and intermediate milestones Identifying quick wins Missing in Europe until now

A detailed rolling work plan for each of the 3 areas Allowing close coordination of all activities Over the next 2/3 years To be updated on a yearly basis 18

Page 19: European RPAS Steering Group First Meeting 6 July 2012

Content of the Roadmap (1)

The Regulatory work plan should include

A detailed planning of all the regulatory deliverables to be developed with the contribution of the relevant stakeholders (Eurocontrol, EUROCAE, JARUS) under EASA's leadership

Including all activities needed to put in place common rules for RPAS > 150 kg and Make available harmonized rules for RPAS < 150 kg

19

Page 20: European RPAS Steering Group First Meeting 6 July 2012

Content of the Roadmap (2)

The R&D work plan should includeA detailed technology development plan coordinated

with the regulatory work

Proposals on the required instruments to implement the R&D effort

In order to assess the possibility to support some of this work through the Horizon 2020, EC needs

by September ? : a clear indication concerning the preferred R&D instrument (stand-alone JTI, SESAR extension, open calls, etc)

by October ? a first priority list of technology developments?

20

Page 21: European RPAS Steering Group First Meeting 6 July 2012

Content of the Roadmap (3)

The work plan on complementary measuresShould analyse and provide recommendations on issues

linked to Liability / insurance Privacy : data protection

Should propose measures to increase public acceptance of RPAS

21

Page 22: European RPAS Steering Group First Meeting 6 July 2012

Deadlines

The following deadlines are proposed:A first issue of the Roadmap should be available by end

of the year

A more detailed version developed in the course of 2013

Then the roadmap should be updated on a yearly basis.

22

Page 23: European RPAS Steering Group First Meeting 6 July 2012

22 Objectives and description of the ERSGObjectives and description of the ERSG

23

11 Outcome of the UAS Panel ProcessOutcome of the UAS Panel Process

33 Structure and main content of the RoadmapStructure and main content of the Roadmap

44 Roadmap preparationRoadmap preparation

23

Page 24: European RPAS Steering Group First Meeting 6 July 2012

Basic principles

The following rules drive the preparation of the Roadmap

Every ERSG member is free to contribute to each of the 3 areas of the Roadmap

Each ERSG member is expected to contribute in areas where he has prominent competency

Inputs from other sources may also be included when relevant (research centres, ULTRA project)

24

Page 25: European RPAS Steering Group First Meeting 6 July 2012

Working arangements

• Proposed working arrangementsThe ERSG will appoint 3 rapporteurs (1 per area)

The ERSG members are invited to nominate experts from their organisation in any of the 3 area to work with the rapporteur

Rapporteurs will deliver the draft roadmap to an Integration Team (EC + Rapporteurs)

The Integration Team will ensure completeness and coordination of the roadmap deliver it to the ERSG for adoption

25

Page 26: European RPAS Steering Group First Meeting 6 July 2012

ERSG

Experts(R&D)

Raporteur

Experts(Regulation & RF)

Raporteur

Experts(Complementary

measures)

Raporteur

Director MOVE

Deputy – DirectorGeneral ENTR

Roadmap Integration Team

ROADMAP

ENTR D4 MOVE E2 MOVE E3 RTD H3

RTDEASAECTLEDAESAASD UVSI ad-hoc expert

EUROCAESESARJARUSECAC

Other services26

Page 27: European RPAS Steering Group First Meeting 6 July 2012

Nominations (1)

• Proposed Rapporteurs

Regulatory

EASA: Filippo Tomasello

R&D

SESAR JU: Michael Standar

Complementary measures

Professor Alfredo Roma

27

Page 28: European RPAS Steering Group First Meeting 6 July 2012

Nominations (2)

• Members of the Working Groups

Each members of the ERSG are invited to nominate experts to at least one WG.

The coordinates of the nominated experts should be sent at [email protected] before 18 July.

28