Page 1: European Strategic Energy Technology Plan (SET-Plan) · SET Plan measures Steering Group Steer the implementation of the SET-Plan European Industrial Initiatives (wind, solar, bioenergy,

European Strategic Energy Technology Plan (SET-Plan)

EHA-Meeting

22 June 2010

Page 2: European Strategic Energy Technology Plan (SET-Plan) · SET Plan measures Steering Group Steer the implementation of the SET-Plan European Industrial Initiatives (wind, solar, bioenergy,

SET Plan measures

Steering GroupSteer the implementation of the SET-Plan

European Industrial Initiatives

(wind, solar, bioenergy, CCS, grids, fission)

EERAEU Research

Alliance

mo

nit

or

rep

ort

ad

vis

e

Support the

work of

SETISInformation

System

EUAEnergy

Research Platform

mo

nit

or

rep

ort

Resources fina

ncia

l an

d h

um

an

International c

oo

pe

ratio

n

Page 3: European Strategic Energy Technology Plan (SET-Plan) · SET Plan measures Steering Group Steer the implementation of the SET-Plan European Industrial Initiatives (wind, solar, bioenergy,

European Industrial Initiatives

European Industrial Initiatives:

European Wind Initiative

Solar Europe Initiative

Bio-energy Europe Initiative

European Electricity Grid Initiative

European CO2 capture, transport and storage initiative

Sustainable fission initiative (Gen IV)

Smart Cities (new)

On-going initiatives:

Fuel cells and hydrogen (JTI)

Fusion (ITER)

Page 4: European Strategic Energy Technology Plan (SET-Plan) · SET Plan measures Steering Group Steer the implementation of the SET-Plan European Industrial Initiatives (wind, solar, bioenergy,

Launched the first four EIIs (3 June 2010)

Wind, Solar, CCS and Electricity Grids EIIs

Joint Statement supported by the public (EC, MS) and private

side (relevant industry)

All parties committed to support:

- Technology Roadmaps 2010-2020

- Implementation Plans 2010-2012

- Light and non-bureaucratic governance structure

European Industrial Initiatives

Page 5: European Strategic Energy Technology Plan (SET-Plan) · SET Plan measures Steering Group Steer the implementation of the SET-Plan European Industrial Initiatives (wind, solar, bioenergy,

Sustainable Nuclear and Bioenergy EIIs

Launch foreseen at the SET Plan Conference in Brussels, 15-

16 November 2010, under the Belgian Presidency

Smart Cities EII in the phase of developing the concept

Taking stock during the SET Plan Conference in Brussels, 15-

16 November 2010, under the Belgian Presidency

Launch foreseen in 2011

European Industrial Initiatives

Page 6: European Strategic Energy Technology Plan (SET-Plan) · SET Plan measures Steering Group Steer the implementation of the SET-Plan European Industrial Initiatives (wind, solar, bioenergy,

Technology Roadmaps (1)

Technological objectives Concrete action plans Estimated

investments needed for the period 2010-2020 to achieve:

Up to 20% of the EU electricity produced by wind energy

Up to 15% of the EU electricity produced by solar energy

50% of networks operate along “smart principle” effectively matching supply

and demand

At least 14% of the EU energy mix from cost-competitive, sustainable bio-

energy

CCS technologies become cost-competitive within a carbon-pricing environment

by 2020-2025

First Generation-IV nuclear reactor prototypes in operation by 2020, allowing

commercial deployment by 2040

25 to 30 European cities will be at the forefront of the transition to a low carbon

economy

Page 7: European Strategic Energy Technology Plan (SET-Plan) · SET Plan measures Steering Group Steer the implementation of the SET-Plan European Industrial Initiatives (wind, solar, bioenergy,

New

turbines

and

components

Grid

integration

Enable

wind

deployment

Offshore

components

Wind resources assessment :

5–10 measurement campaigns

Spatial Planning :

Development of Spatial Planning instruments

Statistical forecast distribution on wind

speed and energy production

Implementation of

additional testing facilities and demo

R&D Programme focused on new turbines designs and use of new materials

Testing facilities and demo

Demonstration of a optimised logistic

strategy

Results of the public acceptance analysis

2010 2012 2015 2017 2020

EU spatial Planning implemented

Development & testing of new

substructures

Demonstration of mass manufacturing

processes and procedure for substructures

Two operational sites

Demonstration with wind farm as virtual power plant:

Demonstration of long distance HVDC

Offshore flexibility connection to at least 2 countries

Demonstration of multi terminal offshore solutions

Publication of an EU 27 MS Wind Atlas

Standardised harbours to service

the next generation of wind turbine

Implementation of testing facilities

and demo for new turbines,

components, manufacturing

processes

Large scale turbine prototype

4 prototypes of new substructures

Development & testing

of a large scale turbine

prototype (10 – 20 MW)

Technology Roadmaps (2)E

xa

mp

le o

f the

Win

d E

II

Page 8: European Strategic Energy Technology Plan (SET-Plan) · SET Plan measures Steering Group Steer the implementation of the SET-Plan European Industrial Initiatives (wind, solar, bioenergy,

Implementation Plans 2010 – 2012 of the Electricity Grids, Solar, Wind and CCS available

Coordination between the Electricity Grids Initiative other EIIs

to ensure:

1. All necessary new requirements concerning grid integration of low-

carbon energy sources are addressed

2. RD&D activity overlaps between the initiatives are minimized

Coordination with Solar and Wind Initiatives

Cooperation launched with other initiatives (Storage,

Electric Car, Smart Buildings)

Implementation Plans 2010 - 2012

Page 9: European Strategic Energy Technology Plan (SET-Plan) · SET Plan measures Steering Group Steer the implementation of the SET-Plan European Industrial Initiatives (wind, solar, bioenergy,

Light and non-bureaucratic governance

EII governance: three levels of intervention:

Orientation level - SET-Plan Steering Group

Planning and programming level - EII Team

Implementation and operational level – in which activities

and projects are carried out

Governance Architecture (1)

Page 10: European Strategic Energy Technology Plan (SET-Plan) · SET Plan measures Steering Group Steer the implementation of the SET-Plan European Industrial Initiatives (wind, solar, bioenergy,

STEERING GROUPEC - chair

all MS and observer countries + EIB

Supported by SETIS

Ori

en

tati

on

level

Imp

lem

en

tati

on

an

d

op

era

tio

nal

level

Pla

nn

ing

an

d

pro

gra

mm

ing

level EII TEAM*

Industry representatives

Committed Countries

EC

Financing Community (e.g.EIB)

RTD Community (e.g. EERA)

Endorses IP &

indicates

availability of

programming

instruments

and budgets

Proposes IP

EU: Framework Programmes

MS: National Programmes

NER300

EERA etc

Industry: co-financing

1 2

3Implements according

to existing funding rules

and procedures

Actions / Projects

Reports on

the progress

of the actions

4

5

Reports on

the IP

progress

Actions / Projects

* One EII Team

per Initiative

Governance Architecture (2)

Page 11: European Strategic Energy Technology Plan (SET-Plan) · SET Plan measures Steering Group Steer the implementation of the SET-Plan European Industrial Initiatives (wind, solar, bioenergy,

Open to MSs, companies and research institutions of

all sizes

Each financing actor decides on its own contribution

and modalities, in accordance with own rules and

procedures

Based on available instruments

Governance Architecture (3)

Page 12: European Strategic Energy Technology Plan (SET-Plan) · SET Plan measures Steering Group Steer the implementation of the SET-Plan European Industrial Initiatives (wind, solar, bioenergy,

Available instruments

Public funding partners

Project typology Instruments

EC High EU added value FP, CIP-IEE

EC and MSLarge projects, EU

added value, shared interests

FP (ERA-NET+), coordinated calls, Art

185…

MS and MSLocalised shared

interests

NER300, ad-hoc arrangements, EERA

etc

MSSupporting domestic

industry

national programmes,

NER300, structural funds

EIB Large projectsEIB loans, RSFF,

guarantees, equity

Common EU Roadmap

and

Implementation Plan

Common EU reporting, monitoring

and assessment – KPIs

'public (MS)-public

(EC)-private

partnerships' with

a variable

geometry, open

architecture

share objectives,

planning,

monitoring and

reporting tools

and

implementation

instruments

Page 13: European Strategic Energy Technology Plan (SET-Plan) · SET Plan measures Steering Group Steer the implementation of the SET-Plan European Industrial Initiatives (wind, solar, bioenergy,

Initiative by a number of leading research institutes (October

2008):

Total annual turnover approx 1,300 M€

Over 10,000 scientists

Aim: accelerate development of new energy technologies through

Joint Programmes (JPs):

Strengthen, expand and optimise research capabilities

Harmonisation of national and EC programme

Decrease fragmentation

Launch of the first 4 JPs in June 2010 on PV, Smart Grids, CCS and

geothermal

European Energy Research Alliance

Page 14: European Strategic Energy Technology Plan (SET-Plan) · SET Plan measures Steering Group Steer the implementation of the SET-Plan European Industrial Initiatives (wind, solar, bioenergy,

Strong EU institutional support : Adoption of two documents related to the Communication “Investing in the development of low carbon technologies (SET-Plan)“ - COM(2009)519:

1. European Parliament Resolution - 11 March 2010

2. Energy Council Conclusions - 12 March 2010

support the implementation of the SET Plan

support the TRs 2010-2020 as the basis to move forward

collectively

underline the growing importance of international cooperation

But we need a shared effort from EU, MSs, Industry and financial community to successfully implement them

Conclusion

Page 15: European Strategic Energy Technology Plan (SET-Plan) · SET Plan measures Steering Group Steer the implementation of the SET-Plan European Industrial Initiatives (wind, solar, bioenergy,

Thank you for your attention

Page 16: European Strategic Energy Technology Plan (SET-Plan) · SET Plan measures Steering Group Steer the implementation of the SET-Plan European Industrial Initiatives (wind, solar, bioenergy,

ETS NER 300 (1)

NER 300 decision:

adopted on 2 February 2010 by Climate Change Committee

final adoption expected in May 2010.

Two calls:

1st call 200 m EUA (award decision by 31/12/2011)

2nd call 100 m EUA (award decision by 31/12/2012)

Two types of portfolio:

CCS: 8 plants

RES: 34 project (9 bio-energy, 5 CSP, 3 PV, 6 wind, 4 geothermal, 3 ocean, 1 hydro, 3 smart grids)

Geographical balance:

1 ≤ x ≤ 3 projects per MS (not incl. trans-boundary projects)

Page 17: European Strategic Energy Technology Plan (SET-Plan) · SET Plan measures Steering Group Steer the implementation of the SET-Plan European Industrial Initiatives (wind, solar, bioenergy,

ETS NER 300 (2)

NER300 Cost financing

NER 300 can finance up to 50% of relevant costs

= extra investment costs + extra operating costs – extra operating benefits

Remaining 50 % financed by promoter, MS concerned (incl. use of SF) or both

NER300 can be combined with SF, EEPR and RSFF.

Page 18: European Strategic Energy Technology Plan (SET-Plan) · SET Plan measures Steering Group Steer the implementation of the SET-Plan European Industrial Initiatives (wind, solar, bioenergy,

MS

Evaluates eligibility criteria

& decides on possible co-

financing

Promoter

Submits proposal

Performs financial & technical analysisPrepares ranking & makes recommendations

Re-consults

EC

Confirms interest

Award decision(approved by CCC)

EIB

Doesn’t forward it

Decides to forward proposal

ETS NER 300 (3)

1

2

3

4

5

6

7

8

Page 19: European Strategic Energy Technology Plan (SET-Plan) · SET Plan measures Steering Group Steer the implementation of the SET-Plan European Industrial Initiatives (wind, solar, bioenergy,

Provisional timeframe :

By end of May 2010 Formal adoption by EC

June 2010-Oct 2010 Call for proposals - submission of

relevant project proposals to MS

Oct 2010-Dec 2010 Eligibility check of proposals by MS

and submission to EIB

Jan 2011- June 2011 Technical and Financial viability

check by EIB , ranking of projects by EIB

July 2011-Dec 2011 Submission to Climate Change

Committee for opinion

Final award decision by Dec 2011 by European Commission

ETS NER 300 (4)