EVALUATING OPTIONS FOR PRC-027-1 COMPLIANCE Joe Perez, P.E. Founder - Protection Engineer [email protected] SynchroGrid Nathan Thomas, Ph.D Software Architect [email protected] SynchroGrid Presented at the 72 nd Annual Texas A&M Conference for Protective Engineers Luke Hankins, EIT Protection Engineer [email protected] SynchroGrid

Upload: others

Post on 27-Jun-2020

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: EVALUATING OPTIONS FOR PRC-027-1 COMPLIANCE · PRC-027-1 • Dates: R1: October 1, 2020 R1. Process to develop relay settings R1.1 Process review short circuit model before settings

EVALUATING OPTIONS FOR PRC-027-1 COMPLIANCE

Joe Perez, P.E.Founder - Protection Engineer

[email protected]

Nathan Thomas, Ph.DSoftware Architect

[email protected]

Presented at the 72nd AnnualTexas A&M Conference for Protective Engineers

Luke Hankins, EITProtection Engineer

[email protected]

Page 2: EVALUATING OPTIONS FOR PRC-027-1 COMPLIANCE · PRC-027-1 • Dates: R1: October 1, 2020 R1. Process to develop relay settings R1.1 Process review short circuit model before settings

Presentation Outline• Introduction

• PRC-027-1 Requirements

• Establishing a Setting Development Process per R1 Manual Process Automated Process

• Break

• Establishing a Wide Area Coordination Process per R2 Manual Process Automated Process

• Conclusions

2

Page 3: EVALUATING OPTIONS FOR PRC-027-1 COMPLIANCE · PRC-027-1 • Dates: R1: October 1, 2020 R1. Process to develop relay settings R1.1 Process review short circuit model before settings

IntroductionSynchroGrid is a Texas-based company that offers electric utilities professional innovative solutions in a wide range of services related to relaying in the generation, transmission, and distribution areas.• Located in College Station, TX

• Employs 15 at the College Station office including Electrical and Software Engineers

• Customers: Oncor Electric, NRG, LCRA, BTU, Cross Texas, Entergy, Sharyland Utilities, Pattern Energy, and others

3

Page 4: EVALUATING OPTIONS FOR PRC-027-1 COMPLIANCE · PRC-027-1 • Dates: R1: October 1, 2020 R1. Process to develop relay settings R1.1 Process review short circuit model before settings

IntroductionCore Focus• Protection & Control for Transmission and Generation:

Relay and Panel Design Relay Setting Development (Primary Product) Relay Setting Coordination Studies (Primary Product) Third Party Review of Relay Settings Automation of System Protection Processes

• NERC: Compliance Verification (Relay settings and PRC compliance go hand in hand):

- PRC-002, PRC-019, PRC-023, PRC-024, PRC-025, PRC-026, PRC-027, etc.

NERC Mis-Operation Analyses Reporting Achieving Simplicity in System Protection is a bedrock of our services

4

Page 5: EVALUATING OPTIONS FOR PRC-027-1 COMPLIANCE · PRC-027-1 • Dates: R1: October 1, 2020 R1. Process to develop relay settings R1.1 Process review short circuit model before settings

PRC-027-1• Purpose: “To maintain the coordination of protection systems installed to

detect and isolate faults on BES elements, such that those protective systems operate in the intended sequence during faults.”

R1: Establish a process for developing new and revised settings.Process shall include: R1.1 Review of short circuit model before settings are developedR1.2 Review of protection settingsR1.3 Communication with interconnecting utilities prior to setting implementation

R2: Perform a protection system coordination study:Option 1: Wide Area Coordination Study every six yearsOption 2: Establish a fault base comparison baseline and perform a study every

time the current exceeds 15%Option 3: Use a combination of above

R3: Apply R1

5

Page 6: EVALUATING OPTIONS FOR PRC-027-1 COMPLIANCE · PRC-027-1 • Dates: R1: October 1, 2020 R1. Process to develop relay settings R1.1 Process review short circuit model before settings

PRC-027-1• Dates: R1: October 1, 2020

R1. Process to develop relay settingsR1.1 Process review short circuit model before settings are developedR1.2 Process to review new developed protection settingsR1.3 Process to communicate with interconnecting utilities prior to setting

implementation

R2: Six years after October 1, 2020Option 1: Wide Area Coordination Study every six yearsOption 2: Establish a fault base comparison baseline and perform a study every

time the current exceeds 15%Option 3: Use a combination of above

6

Page 7: EVALUATING OPTIONS FOR PRC-027-1 COMPLIANCE · PRC-027-1 • Dates: R1: October 1, 2020 R1. Process to develop relay settings R1.1 Process review short circuit model before settings

PRC-027-1• Challenges to utilities

Perform periodic reviews of entire system relay settings Coordination studies

Requires in-depth examination of short circuit case information Enormous undertaking

Field settings might not be in current relay setting database ASPEN database, PowerBase, etc.

Implementing processes might require more resources and external expertise

Time consuming, laborious, expensive Adds immense task to already depleted staff Learning curve to accept new process

7

Page 8: EVALUATING OPTIONS FOR PRC-027-1 COMPLIANCE · PRC-027-1 • Dates: R1: October 1, 2020 R1. Process to develop relay settings R1.1 Process review short circuit model before settings

PRC-027-1• Considerations for R1.

Implement time and cost efficient processes. This could be: Automation of relay setting calculations Automation of relay setting reports Automation of NERC related reports Application of relay and calculation setting templates

Eliminate processes with a lot of data entry Copy and Paste

Choose software solutions that can communicate bi-directionally with short circuit and relay databases ASPEN/CAPE-PowerBase-SARA

Good processes will keep engineers happy and therefore retain talent

8

Page 9: EVALUATING OPTIONS FOR PRC-027-1 COMPLIANCE · PRC-027-1 • Dates: R1: October 1, 2020 R1. Process to develop relay settings R1.1 Process review short circuit model before settings

PRC-027-1

- A solid process must be implemented whether it is manual or automated

9

Page 10: EVALUATING OPTIONS FOR PRC-027-1 COMPLIANCE · PRC-027-1 • Dates: R1: October 1, 2020 R1. Process to develop relay settings R1.1 Process review short circuit model before settings

R1. Relay Setting Development ProcessA good, solid process contains:

• Accurate model• Well defined protection philosophy• Solid set of relay native file templates• Solid set of calculation sheet

templates• Rigorous review process

10

Relay Development

Process

-Accurate model

- Well established protection philosophy

- Solid set of native file templates

- Rigorous review

process

- Solid set of calculation templates

Page 11: EVALUATING OPTIONS FOR PRC-027-1 COMPLIANCE · PRC-027-1 • Dates: R1: October 1, 2020 R1. Process to develop relay settings R1.1 Process review short circuit model before settings

R1. Relay Setting Development ProcessAccurate Model

• Identify where the accurate data resides Drawings, reports, databases, etc.

• Update short circuit case through data sharing: Line database repository Relay database repository - PowerBase Short circuit case repository – ASPEN/CAPE

• Fix issues as needed before settings are developed.

11

Relay Development

Process

-Accurate model

- Well established protection philosophy

- Solid set of native file templates

- Rigorous review

process

- Solid set of calculation templates

Page 12: EVALUATING OPTIONS FOR PRC-027-1 COMPLIANCE · PRC-027-1 • Dates: R1: October 1, 2020 R1. Process to develop relay settings R1.1 Process review short circuit model before settings

R1. Relay Setting Development ProcessWell Established Protection Philosophy

• Specific details on how settings are supposed to be calculated 50/51, 21, 87T, 87B, 87L, etc. Communication schemes: POTT, DCB

• Outline special cases ReclosingWind interconnections Nuclear interconnections

• Must integrate NERC Compliance PRC-023, PRC-027 PRC-019, PRC-024, PRC-025, Limiters

12

Relay Development

Process

-Accurate model

- Well established protection philosophy

- Solid set of native file templates

- Rigorous review

process

- Solid set of calculation templates

Page 13: EVALUATING OPTIONS FOR PRC-027-1 COMPLIANCE · PRC-027-1 • Dates: R1: October 1, 2020 R1. Process to develop relay settings R1.1 Process review short circuit model before settings

R1. Relay Setting Development ProcessSolid Set of Native File Templates

• Relay files with preconfigured settings Most settings are preconfigured Enables: 21-1, 21-2, 21-3, no reclosing or BF Protection logic

• Reduces development time by > 50%• Reduces human errors• Allows uniformity and consistency

across the system• Create templates per protection

scheme POTT DCB

13

Relay Development

Process

-Accurate model

- Well established protection philosophy

- Solid set of native file templates

- Rigorous review

process

- Solid set of calculation templates

Page 14: EVALUATING OPTIONS FOR PRC-027-1 COMPLIANCE · PRC-027-1 • Dates: R1: October 1, 2020 R1. Process to develop relay settings R1.1 Process review short circuit model before settings

R1. Relay Setting Development ProcessSolid Set of Calculation Templates

• Contains all equations as stated by the protection philosophy Zone 1= 80% *Zpl*Base-ohms*(CTR/PTR) SOFT = 50%*Close-in Fault/CTR 51G = 80%*line-end fault

• Implements uniformity across the system

• Avoid engineers making multiple calculation sheets per philosophy

• Reduces human errors

14

Relay Development

Process

-Accurate model

- Well established protection philosophy

- Solid set of native file templates

- Rigorous review

process

- Solid set of calculation templates

Page 15: EVALUATING OPTIONS FOR PRC-027-1 COMPLIANCE · PRC-027-1 • Dates: R1: October 1, 2020 R1. Process to develop relay settings R1.1 Process review short circuit model before settings

R1. Relay Setting Development ProcessSolid Set of Calculation Templates

• Template mediumsMathcad ExcelWord Intelligent templates through automation

• Challenges Time consuming Right expertise needed Continuous maintenance

• Mathcad, Word and Excel templates can introduce errors through copy/paste process

15

Relay Development

Process

-Accurate model

- Well established protection philosophy

- Solid set of native file templates

- Rigorous review

process

- Solid set of calculation templates

Page 16: EVALUATING OPTIONS FOR PRC-027-1 COMPLIANCE · PRC-027-1 • Dates: R1: October 1, 2020 R1. Process to develop relay settings R1.1 Process review short circuit model before settings

R1. Relay Setting Development ProcessRigorous Review Process

• Employ a peer-peer review process Separate engineer Limit input from original engineer

• Uncover errorsModel Calculations Faults Settings

• Time consuming• Use automation programs as

reviewers Faster Reliable Accurate

16

Relay Development

Process

-Accurate model

- Well established protection philosophy

- Solid set of native file templates

- Rigorous review

process

- Solid set of calculation templates

Page 17: EVALUATING OPTIONS FOR PRC-027-1 COMPLIANCE · PRC-027-1 • Dates: R1: October 1, 2020 R1. Process to develop relay settings R1.1 Process review short circuit model before settings

USING AUTOMATION TO DEVELOP AND REVIEW RELAY SETTINGSPRC-027-1 Requirement 1

17

Page 18: EVALUATING OPTIONS FOR PRC-027-1 COMPLIANCE · PRC-027-1 • Dates: R1: October 1, 2020 R1. Process to develop relay settings R1.1 Process review short circuit model before settings

Why Automate?• Bi-directional communication relay data repositories short circuit programs

• Provides intelligent setting calculation templates Stores protection philosophy Applies template to any transmission

configuration

• Automates NERC Compliance Reports• PRC-023-1

• Uniformly applies protection philosophy on every project

18

Page 19: EVALUATING OPTIONS FOR PRC-027-1 COMPLIANCE · PRC-027-1 • Dates: R1: October 1, 2020 R1. Process to develop relay settings R1.1 Process review short circuit model before settings

Why Automate?• Provides smooth and efficient

processMinimum manual data gathering No copy and paste steps

• Reduces development time Medium complex applications >60%

• Eliminates copy/paste errors ASPEN-Excel/Mathcad-RDB-Reports

• Assures integrity and quality of final results Data is not polluted

• Keeps engineers engaged and not frustrated with broken processes

19

Page 20: EVALUATING OPTIONS FOR PRC-027-1 COMPLIANCE · PRC-027-1 • Dates: R1: October 1, 2020 R1. Process to develop relay settings R1.1 Process review short circuit model before settings

Relay Setting Development Simplified Process - Automation

20

Collect Data

ASPEN/CAPE

Relay Setting File

Data • Primary Line Impedance• Source, Remote, and Tap Lines• Auto & Distribution XFMRs

Fault Simulation• Closed-In• Line-End• Contingencies

SARAIntelligent Template Template Application

Export Feature

Bi-directional

Data Repositories

Page 21: EVALUATING OPTIONS FOR PRC-027-1 COMPLIANCE · PRC-027-1 • Dates: R1: October 1, 2020 R1. Process to develop relay settings R1.1 Process review short circuit model before settings

Template Comparison• Excel Sheet• Mathcad File• Word Document• SARA Intelligent template

21

Substation A 138kV

Relay

Substation B 138kV

Page 22: EVALUATING OPTIONS FOR PRC-027-1 COMPLIANCE · PRC-027-1 • Dates: R1: October 1, 2020 R1. Process to develop relay settings R1.1 Process review short circuit model before settings

Excel Sheet Template22

Page 23: EVALUATING OPTIONS FOR PRC-027-1 COMPLIANCE · PRC-027-1 • Dates: R1: October 1, 2020 R1. Process to develop relay settings R1.1 Process review short circuit model before settings

Mathcad File Template

23

Page 24: EVALUATING OPTIONS FOR PRC-027-1 COMPLIANCE · PRC-027-1 • Dates: R1: October 1, 2020 R1. Process to develop relay settings R1.1 Process review short circuit model before settings

Intelligent Template

24

Page 25: EVALUATING OPTIONS FOR PRC-027-1 COMPLIANCE · PRC-027-1 • Dates: R1: October 1, 2020 R1. Process to develop relay settings R1.1 Process review short circuit model before settings

LIVE DEMOPRC-027-1 Requirement 1

25

Page 26: EVALUATING OPTIONS FOR PRC-027-1 COMPLIANCE · PRC-027-1 • Dates: R1: October 1, 2020 R1. Process to develop relay settings R1.1 Process review short circuit model before settings

PRC-027-1• Purpose: “To maintain the coordination of protection systems installed to

detect and isolate faults on BES elements, such that those protective systems operate in the intended sequence during faults.”

R2: Perform a protection system coordination study:Option 1: Wide Area Coordination Study every six yearsOption 2: Establish a fault base comparison baseline and perform a study every

time the current exceeds 15%Option 3: Use a combination of above

21 Distance Elements 50 Instantaneous Overcurrent 51 Time Overcurrent

26

Page 27: EVALUATING OPTIONS FOR PRC-027-1 COMPLIANCE · PRC-027-1 • Dates: R1: October 1, 2020 R1. Process to develop relay settings R1.1 Process review short circuit model before settings

R2. Wide Area Coordination StudyPurpose:

• Uncover hidden errors within the protection system• Evaluate relays so they operate as intended• Evaluate relay response due to changes in the system over time• Avoid mis-operations

27

Page 28: EVALUATING OPTIONS FOR PRC-027-1 COMPLIANCE · PRC-027-1 • Dates: R1: October 1, 2020 R1. Process to develop relay settings R1.1 Process review short circuit model before settings

R2. Wide Area Coordination StudyChallenges:

• Entire model needs to be validated Ratings Impedances Topology

• Data located in different places or databases Folders Field relays Databases - PowerBase

• Requires high amount of resourcesProper expertise and personnel

28

Page 29: EVALUATING OPTIONS FOR PRC-027-1 COMPLIANCE · PRC-027-1 • Dates: R1: October 1, 2020 R1. Process to develop relay settings R1.1 Process review short circuit model before settings

R2. Wide Area Coordination StudyChallenges:

• Engineer must create a system to manage massive amounts of data Relay reaches Relay mis-operations Violation methodology- reaches, CTI, etc.

• Engineer must also organize, classify and resolve issues manually Number of relays overreaching Number of relays not properly tripping Number of relays fixed

29

Page 30: EVALUATING OPTIONS FOR PRC-027-1 COMPLIANCE · PRC-027-1 • Dates: R1: October 1, 2020 R1. Process to develop relay settings R1.1 Process review short circuit model before settings

R2. Wide Area Coordination StudyPreliminary considerations:

• Select a data management system Acquiring, storing, and maintaining data Common platform – multiple users Revision tracking Drawings, settings files, Excel sheets File folder structure

• Determine boundaries of the study 345kV 138kV

• System LoadingWinter/summer cases Infrequent local generation

• Determine relays to be studied 21P, 21G, 50P, 50G, etc. Pilot schemes not required

30

Page 31: EVALUATING OPTIONS FOR PRC-027-1 COMPLIANCE · PRC-027-1 • Dates: R1: October 1, 2020 R1. Process to develop relay settings R1.1 Process review short circuit model before settings

R2. Wide Area Coordination StudyCoordination Process:

• Verify and sanitize model• Select coordination criteria for the study• Run coordination analysis• Receive and organize all violations• Resolve violations

31

Relay Coordination

Process

-Verify and Sanitize

Model - Select Criteria

- Run Screening

Analysis

- Resolve Violations

- Receive and Organize

Violations

Page 32: EVALUATING OPTIONS FOR PRC-027-1 COMPLIANCE · PRC-027-1 • Dates: R1: October 1, 2020 R1. Process to develop relay settings R1.1 Process review short circuit model before settings

R2. Wide Area Coordination StudyVerify Model:

• Topology must be up to date New lines, transformers, reactors, capacitors,

generators, etc. Auto-transformers must be correctly modeled Y-Y-D

• Element characteristics Impedances, mutual coupling, ratings

• Relay groups PTs, CTs must match field settings Primary and Backup relays Turn off relays that are no longer installed

• Minimize work through data sharing: Line database repository Relay database repository - PowerBase Short circuit case repository – ASPEN/CAPE

32

Relay Coordination

Process

-Verify and Sanitize

Model - Select Criteria

- Run Screening

Analysis

- Resolve Violations

- Receive and Organize

Violations

Page 33: EVALUATING OPTIONS FOR PRC-027-1 COMPLIANCE · PRC-027-1 • Dates: R1: October 1, 2020 R1. Process to develop relay settings R1.1 Process review short circuit model before settings

R2. Wide Area Coordination StudyEstablish coordination criteria:

• Evaluate sensitivity and selectivity • Establish acceptable ranges Min and max reach 60 ≤ Zone 1 ≤ 85Min and max reach 105 ≤ Zone 2 ≤ 150Min CTI = 20 cycles

• Fault test criteria - L-G, PP, 3PG Primary, source, and remote lines Tap lines Low side of distribution transformer

• Contingencies N-1, N-2 Lines, autotransformers, nearest generator, etc.

33

Relay Coordination

Process

-Verify and Sanitize

Model - Select Criteria

- Run Screening

Analysis

- Resolve Violations

- Receive and Organize

Violations

Page 34: EVALUATING OPTIONS FOR PRC-027-1 COMPLIANCE · PRC-027-1 • Dates: R1: October 1, 2020 R1. Process to develop relay settings R1.1 Process review short circuit model before settings

R2. Wide Area Coordination StudyEstablish coordination criteria:

• Implement violation criteria• High violation Relay trips for an out-of-zone fault before primary

equipment trips 21P, 21G, 50P, 50G elements trips for remote bus faults

• Medium violation Relay will trip for an out-of-order fault before primary

equipment trips Zone 2 trips at the same time as zone 1 51G element trips before Zone 2

• Low Violation Relay trips in the proper order but below the minimum

CTI Zone 2 overreaches remote Zone 1

34

Relay Coordination

Process

-Verify and Sanitize

Model - Select Criteria

- Run Screening

Analysis

- Resolve Violations

- Receive and Organize

Violations

Page 35: EVALUATING OPTIONS FOR PRC-027-1 COMPLIANCE · PRC-027-1 • Dates: R1: October 1, 2020 R1. Process to develop relay settings R1.1 Process review short circuit model before settings

R2. Wide Area Coordination StudyRun screening analysis:

• Divide system into subsets• 138kV• 345kV• Use transformers as dividers

• Run primary and secondary relays independently SEL-421 Primary SEL-311C Secondary

• Sensitivity checks• No contingency• N-1 - Infeed• Generation in or out

35

Relay Coordination

Process

-Verify and Sanitize

Model - Select Criteria

- Run Screening

Analysis

- Resolve Violations

- Receive and Organize

Violations

Page 36: EVALUATING OPTIONS FOR PRC-027-1 COMPLIANCE · PRC-027-1 • Dates: R1: October 1, 2020 R1. Process to develop relay settings R1.1 Process review short circuit model before settings

R2. Wide Area Coordination StudyRun screening analysis:

• First coordinate the distance elements Zone 1 Zone 2 Zone 3 reverse

• Then coordinate overcurrent elements 50P, 50G 51P, 51G

• Achieves selectivity and security between primary and backup elements Avoids conflicts

36

Relay Coordination

Process

-Verify and Sanitize

Model - Select Criteria

- Run Screening

Analysis

- Resolve Violations

- Receive and Organize

Violations

Page 37: EVALUATING OPTIONS FOR PRC-027-1 COMPLIANCE · PRC-027-1 • Dates: R1: October 1, 2020 R1. Process to develop relay settings R1.1 Process review short circuit model before settings

R2. Wide Area Coordination StudyReceive and organize violations:

• Short circuit results Large Text file Hundreds of lines unmanageable

• Create study templates Import data into Excel

• Managing data Laborious Error prone Time consuming

• Use automation to streamline and simplify the process

37

Relay Coordination

Process

-Verify and Sanitize

Model - Select Criteria

- Run Screening

Analysis

- Resolve Violations

- Receive and Organize

Violations

Page 38: EVALUATING OPTIONS FOR PRC-027-1 COMPLIANCE · PRC-027-1 • Dates: R1: October 1, 2020 R1. Process to develop relay settings R1.1 Process review short circuit model before settings

R2. Wide Area Coordination StudyReceive and organize violations:

• Organize data by levels Substation Terminal Primary relay – backup relay Violation level

Under-reach Over-reach

Violation type High Medium Low

38

Relay Coordination

Process

-Verify and Sanitize

Model - Select Criteria

- Run Screening

Analysis

- Resolve Violations

- Receive and Organize

Violations

Page 39: EVALUATING OPTIONS FOR PRC-027-1 COMPLIANCE · PRC-027-1 • Dates: R1: October 1, 2020 R1. Process to develop relay settings R1.1 Process review short circuit model before settings

R2. Wide Area Coordination StudyResolve violations:

• Resolve reach issues first Zone 1 Zone 2 Zone 3 Reverse

• Resolve distance CTIs Phase Ground

• Resolve time-overcurrent CTIs 51P 51G

39

Relay Coordination

Process

-Verify and Sanitize

Model - Select Criteria

- Run Screening

Analysis

- Resolve Violations

- Receive and Organize

Violations

Page 40: EVALUATING OPTIONS FOR PRC-027-1 COMPLIANCE · PRC-027-1 • Dates: R1: October 1, 2020 R1. Process to develop relay settings R1.1 Process review short circuit model before settings

R2. Wide Area Coordination StudyResolve violations:

• Infeed effects Zone 2 could over-reach shortest remote line zone 1 N-1 contingency sweep

• Breaker failure backup Zone 4 should reach all the way to longest remote line

for a line end fault

• Perform forward and backward coordination Backwards coordination = backup relays are properly

backing up protected line of interest Forward coordination = local relay is properly backing

remote terminals

40

Relay Coordination

Process

-Verify and Sanitize

Model - Select Criteria

- Run Screening

Analysis

- Resolve Violations

- Receive and Organize

Violations

Page 41: EVALUATING OPTIONS FOR PRC-027-1 COMPLIANCE · PRC-027-1 • Dates: R1: October 1, 2020 R1. Process to develop relay settings R1.1 Process review short circuit model before settings

USING AUTOMATION TO PERFORM WIDE AREA COORDINATIONPRC-027-1 Requirement 2

41

Page 42: EVALUATING OPTIONS FOR PRC-027-1 COMPLIANCE · PRC-027-1 • Dates: R1: October 1, 2020 R1. Process to develop relay settings R1.1 Process review short circuit model before settings

Why Automate?• Automatic model sanitation

• PT, CT, • False positives - Zero impedance lines

• Model verification by bi-directional communication relay data repositories short circuit programs

• Provides medium to create intelligent coordination templates Programmable reach ranges Zone 1 Zone 2 Zone 3 Phase overcurrent Ground overcurrent

42

Page 43: EVALUATING OPTIONS FOR PRC-027-1 COMPLIANCE · PRC-027-1 • Dates: R1: October 1, 2020 R1. Process to develop relay settings R1.1 Process review short circuit model before settings

Why Automate?• Provides management system No need for spreadsheets Data is automatically organized

• Automatic data categorization by Overreach Underreach High, medium, and low

• Bi-directional communication New settings are immediately verified Checks if new settings caused issues

• Provides log system Keeps track of changes being made

43

Page 44: EVALUATING OPTIONS FOR PRC-027-1 COMPLIANCE · PRC-027-1 • Dates: R1: October 1, 2020 R1. Process to develop relay settings R1.1 Process review short circuit model before settings

Relay Setting Development Simplified Process - Automation

44

Data Repositories

Collect Data

Short Circuit Program

Relay Setting File

Data • Primary Line• Source, Remote, and

Tap Lines• Auto & Distribution

XFMRs

Fault Simulation• Strongest

Source Removed

• Contingencies

SARATemplate Creation

Verify Model

Export Feature

Bi-Directional

Template Application

Receive Violations

Resolve Violations

Page 45: EVALUATING OPTIONS FOR PRC-027-1 COMPLIANCE · PRC-027-1 • Dates: R1: October 1, 2020 R1. Process to develop relay settings R1.1 Process review short circuit model before settings

Select Reach Criteria Zone 145

Page 46: EVALUATING OPTIONS FOR PRC-027-1 COMPLIANCE · PRC-027-1 • Dates: R1: October 1, 2020 R1. Process to develop relay settings R1.1 Process review short circuit model before settings

Multiple Coordination Studies46

Page 47: EVALUATING OPTIONS FOR PRC-027-1 COMPLIANCE · PRC-027-1 • Dates: R1: October 1, 2020 R1. Process to develop relay settings R1.1 Process review short circuit model before settings

Data Organization47

Page 48: EVALUATING OPTIONS FOR PRC-027-1 COMPLIANCE · PRC-027-1 • Dates: R1: October 1, 2020 R1. Process to develop relay settings R1.1 Process review short circuit model before settings

Forward Coordination48

Page 49: EVALUATING OPTIONS FOR PRC-027-1 COMPLIANCE · PRC-027-1 • Dates: R1: October 1, 2020 R1. Process to develop relay settings R1.1 Process review short circuit model before settings

Wide Area Coordination Results

49

Page 50: EVALUATING OPTIONS FOR PRC-027-1 COMPLIANCE · PRC-027-1 • Dates: R1: October 1, 2020 R1. Process to develop relay settings R1.1 Process review short circuit model before settings

Simplified PRC-027-1 Process• PRC-027-1 compliance process can be simplified and improved

by advances in software.

• Our streamlined framework builds upon our previous work to provide a customizable process for relay settings development, meeting the requirement for R1.

• We’ve extended the framework to address R2, providing a process that aids in model verification as well as enabling flexibility in coordination study specification and productivity in violation resolution.

• Continued emphasis on copy/paste removal. Mission critical data should not be manually transmitted.

50

Page 51: EVALUATING OPTIONS FOR PRC-027-1 COMPLIANCE · PRC-027-1 • Dates: R1: October 1, 2020 R1. Process to develop relay settings R1.1 Process review short circuit model before settings

LIVE DEMOPRC-027-1 Requirement 2

51

Page 52: EVALUATING OPTIONS FOR PRC-027-1 COMPLIANCE · PRC-027-1 • Dates: R1: October 1, 2020 R1. Process to develop relay settings R1.1 Process review short circuit model before settings

Thank You