eventful times demand innovative solutions -...

42
Eventful times ... ... demand innovative solutions “Optimize productivity in manufacturing companies” 2013-01-17

Upload: dodien

Post on 13-Apr-2018

217 views

Category:

Documents


3 download

TRANSCRIPT

Eventful times ...

... demand innovative solutions

“Optimize productivity in manufacturing companies”

2013-01-17

Agenda

• Introduction of the company Industrie Informatik

• Solution cronetwork: overview

• Technology and interfaces

• Benefits for our customer

The company

• Founded 1991 in Linz, Austria

• Core business: system software for industrial

applications

• Sites in Austria, Germany and China

• Technology partners to SAP, ORACLE, Microsoft

• 300 installations in Europe as well as in China

• Annual growth 15 %

• Success factors :

» Satisfied customers

» Continuity

» concentration on core business

» use of standard IT

International structure

Linz

Kenzingen

China

Singapore

ItalySpain

Belgium Germany

Slovakia

Hungary

Czech Republic

Switzerland

Netherlands

Austria

Shanghai

Mexico

USA

France

national and international customers

Industrie Informatik sites in Linz (Austria), Kenzingen (Germany) and Shanghai (China)

ERP - System

scheduling board

- Parallel scheduling of machines, personnel and tools

- Transparency and on-time delivery in production through complete integration

with plant data, machine data and time & attendance

- Cost reduction via optimization of machine utilization, e.g., via setup

optimization, reduction of cycle time, ….

scheduling board

- Scheduling of order networks forward & backward

- Determining realistic delivery dates for customer orders

- APS advanced planning functionality considering stock and purchase orders

scheduling board

purchase orders

2 Bauteile2 components

end product

- Highest acceptance due to parameterizable functionality on PC

terminals

- Integration of logic for plant data, machine data and time & attendance

- Utilization as production information system via simple connection to

CAD, QM, CNC

- Basis for KPI‘s and reporting

plant data

Individually configurable layout

Display configurable

key indicators

Configurable content of

machine status and operation

Applications

- Simple overview

of current machine status

at work centers

- Key indicators

at a glance (e.g., OEE)

- Easy transition

to detailed information

(e.g., feedback list)

Foreman level (monitor)

Application

- Simple overview

of machine status

(disruption / production

over time

Machines grouped

in a tree structure

Analyze disruptions

based on color in time bar

to easily detect patterns

Color assigned to each

disruption reason

Hide/display subtrees

to focus on most relevant data

Foreman level (tachograph)

Colors indicate

current operation status

Extensive selection options

Display detailed

information

for operations

Order management

Applications

- Creation and processing of

orders

- Status overview per order

- Status per operation

- Documentation of all

feedbacks

Employee level (terminal)Function selection

via configurable

function buttons

Work center selection

Current employee

information

at terminal

MDC information

(e.g., status,

disruption reason)

Applications

- Employee identification

- Start of operation

- End of operation

- Disruption reason

- Modern, standardized connection technology lets you

connect any production machine

- Rapid ROI through early down-time information and

transparency via failure and down time reasons

- Increased utility for users through interaction with plant

data collection and scheduling board and through

visual representation

machine data

machine data driversignal processing

signal capture

OPC

project e.g. SCADA,

Engel plugin or

customer development

field bus module

Adam 6000 Series

communication via TCP/IP

manual

status collection

(html via http)

trigger

Oracle

database server

Oracle

application server

logicmonitoring of

clock ratesvalidation

plant data collection with integrated

machine data capture

cronetwork machine data

process data

Process data like pressure,

temperature... can be

linked with the work orders

- Highly automated calculation of time models and

bonuses

- Cost savings through decentralized time scheduling

and management

- Integration with scheduling board and plant data,

e.g., overtime for orders

time & attendance

personnel scheduling

100% integration in fine

scheduling of orders

Available employees

per shift

Scheduled orders /

required employees1 employee too

few scheduled

2 employees too

many scheduled

- Evaluation of entries of plant data and project time

according to time models for time & attendance

- correct data for recalculation e.g., removing breaks

from order times, generation of overhead stamps in

the gaps between order stamps

- Identification of incorrect stampings

evaluation

- Access control with time zones and room

assignments per employee

- Definition of authorization groups, terminal groups

und time profiles

- Communication with terminals

access

KPIs

Key Performance Indicators

Increase profitability with a control

instrument that meets the demands

of practice

KPIs let you measure and control

performance and economy

- Production (machine-related)

- failure frequency

- duration of failure

- scrap quantities

- scrap factor

- OEE (overall equipment effectiveness)

- Human resources (related to persons or groups)

- number of employees present

- amount of overtime

- vacation time

- number of erroneous entries

- Scheduling, logistics, project time

- throughput time

- WIP

- Systems engineering

- degree of utilization of database

Sample KPIs

for cronetwork MES

detailed

in brief

Integration into the cronetwork

product line

cronet work leistungsabrechnungcronet work leistungsabrechnung

Produktivität

Gemeinkostenanteil

Abwesenheitsanteil

Manuelle Qualitätszahl

20% 20%10%10%

Produktivität

Gemeinkostenanteil

Abwesenheitsanteil

Manuelle Qualitätszahl

20% 20%10%10%

40%

OEE Monat –DREH001

40%

OEE Monat –DREH001

X %

X %

100% 140%

20%

25%

Prämiensatz

Leistungsgrad

(=Zeitgrad)

0%120%

cronetwork production info

operative data

at event level

cronetwork employee services

cronetwork

messaging

cronetwork incentive paycronetwork kpi cockpit

Configurate a customized

dashboard with charts, pivot

tables and tachographs from a

variety of prefabricated and

self-made reports

Comfortable drill down

functionality for quick access

to detailed information

Intuitive operation enables easy

adaptation of reports to new

requirements

Management Level Dashboard

Management Level pixelperfect

reporting

define reports, using word

with plug in

define once day & time

for automatically start of

report

define receiver of report

• Integration of all cronetwork® modules

• No internal interfaces

• 100% Web capability of all cronetwork® modules

• Easy to install

• Economical operation

• Installed worldwide

• Unicode / UTF 8

• Simple possibilities to translate texts

• Release capability

• Free update annually included in maintenance agreement

• New features included in maintenance agreement

• Release capability of customer-specific extensions included in

maintenance agreement

cronetwork© Technology

SAP-Zertifikat

Industrie Informatik is the

first MES producer

to be certified as

„Powered by SAP

NetWeaverTM“

overview

Rapid prototyping • Is an efficient method for project introduction

• Enables quick acquisition of know-how

• Ensures correct documentation of customer system

Mouse click takes

you to master dataMouse click takes

you to assignments

The use of a MES (Manufacturing Execution System)

in addition to an ERP like SAP brings a lot of

benefits, e.g.:

• shorter throughput times

• increased productivity

• transparency of production processes (online)

• prompt and holistic data collection

• flexibility via paperless production control

• rapid reaction to process changes

• reduction of waiting and transport times for materials

• early detection of schedule deviations

Goal Value Note

a. Better machine

utilization

5% Improved productivity on bottleneck machines amounts to 5% of annual machine production

b. Reduction of

throughput time

> 2% of

sales

Reduced throughput time from 30 to 29 days for 200

employees yields savings of 500,000 €

c. Reduction of work

in progress

25% value

of work in

progress

Unplanned work in progress takes up space,

increases throughput times, and raises location and

transportation costs as well as financing costs

d. Improved order

handling &

delivery reliability

2% of sales Increased attractiveness and customer satisfaction;

costs of special projects, overtime, … earlier receipt

of payment

e. Support of

production and

engineering

Soft fact,

not

quantifiable

Prerequisite for the functioning of ERP and

production control systems; remedy of weak points,

support of continuous improvement process

Source: VDI seminar manual on closely coupled shop floor control

Economy computation I

Goal Value Note

f. Improvement of information flow

2–4% of sales

Avoid erroneous communication (deadline monitoring, inquiries from sales, creation & distribution of unnecessary vouchers)

g. Quality management

& process reliability

5% of

sales

Expected error rate of 15% can be reduced by one

third

h. Support of

evaluation and

certification

1% of

sales

Availability of data for controlling, certification,

documentation, audits

i. Personnel work time

documentation

20–30% of

costs of

personnel

office

Meets prerequisites for flexible work time (annual

work time models, requirement-oriented capacity);

production and evaluation of vouchers becomes

unnecessary.

Source: VDI seminar manual on closely coupled shop floor control

Economy computation II

Sinter Group

Miba Sintermetall AG

Christian Döller, Tool shop

Production scheduling and plant data / machine data 100% in cronetwork

~ 18,000 production orders per year + 450 %

~ 170,000 operations per year + 447 %

~ 240,000 feedback reports per year + 480 %

No increase in administrative personnel!

Scheduling & control at the Tool shop

situation after implementation of

Benefits for customer

Results of introducing cronetwork® MES

• Reduction of throughput times from 6 to 3 weeks

• WIP inventory cut in half

• Number of simultaneous orders from 300 to 600

• Number of simultaneousoperations from 2000 to 4800

• Double flexibility and increased quality despite cost savings

[email protected]

summary

- is a powerful MES

- complements and improves an ERP

- employs most modern technologies and is Web capable

- gives a high transparency “what is going on at the shop floor !”

- increases efficiency of production

- saves you money

Eventful times ...

... demand innovative solutions

2013-01-17