ex stream eng design group corporate profile
DESCRIPTION
TRANSCRIPT
Hydro Power Projects Irrigation Projects including Lift Irrigation Schemes Thermal Power Plants Water Recourses Projects Water Supply Projects Outdoor Electrical Switchyards Gas Insulated Sub Stations Electrical Sub Stations
Energy Audit and modernization of Electricity Supply Installations.
Structural design of Civil & Mechanical installations.
Transmission Line Projects upto 400kV Capacity.
Pre bid & post bid services for bid preparation and analysis.
Preparation & Review of bid documents for package wise or EPC implementation of Projects.
Preparation & Review of Feasibility and Detail Project Reports for various projects.
Due-Diligence study of proposed and operating projects.
Financial analysis for Project implementation.
Formulation of Implementation and PPA agreements.
Assistance in carbon credit proposal processing of CDM projects
ExStream Engineering DESIGN GROUP, making a beginning way back in the year 1979 as a Consultancy Firm to
cater to the Design Engineering needs of small Civil Engineering and Electrical Engineering projects, has now
growth into a full fledged Consultancy Organization, providing its Design Engineering Consultancy services in
various fields of Engineering related to very large projects.
Content
Content
Sl. No. Description Page No.
1 Design Group – A Profile 1
2 ISO Certificate 4
3 Certificate of Consulting Engineers Association of India 5
4 Certificate of Incorporation 6
5 Empanelment with BHEL 7
6 Empanelment with Construction Industry Development
Council
8
7 Merger of M/s. Subhadra Consulting Engineers with M/s.
Design Group Project Consultants Pvt Ltd
9
8 Experience ‐ write up on Sample Projects 11
9 List of Project on Hand 26
10 Organization Structure
A. Panel of Consultants / Advisors 30
B. Technical Personnel 32
11 List of Project /Assignments Successfully Completed
A. Desk Study Report 34
B. Detailed Engineering of Projects 36
C. Preparation of Detailed Project Reports 43
D. Pre‐Feasibility Studies of Power Projects 50
E. Pre‐ Tender Services 59
F. Due Diligence Report 67
12 A few Certificates for Successfully Completed Projects 72
13 Brief Profile of Advisor / Consultants
a) Advisor
H.V. Eswaraiah, Hydro Power Projects 89
Shankar V. Nesargi, Wind Energy 90
P.R. Balasubramanian, Gas Based Power Plant 91
B.V Ramakrishnaiah, Gates & Penstocks 92
Balachandran. V, Engineering Geology 93
C.R. Venkatesh , Hydro Power Projects 94
Content
Sl. No. Description Page No.
M.C. Rangarajan, E & M Works 95
S. Ramanan, Hydro Power Projects 96
Umashankar, Steel Structure 97
Narayanan V, Transmission Line 98
Channakeshava C, Computer aided designs 99
Shridhar Prabhu, Legal Advisor, PPA 100
Srinath. N, Environmental Engineering 101
b) Consultants
C.S. Hebli, Chairman 102
B.L Lakshminarasimha, Chief Executive Officer 103
P.R Mallikarjuna, Executive Director (Design Head) 104
P.K. Rupangudi , Director (Gates, Dams design) 105
Chikkaguddappa Director (Project Development 106
Raghavendra Rao H, Director (Electrical Generation) 107
M.M. Reddy, Director (Transmission line,
Switchyard & Sub‐Station)
108
R .Vasudevan, Deputy Director (Water & Waste
Water)
109
U.R. Raghotham , Director (Tunnel and Dam design) 111
G. Penchalaiah, Irrigation Project – Investigation 112
Suryanarayana, Engineering Geology 113
K. T. Sreedhara, Deputy Director (Irrigation) 114
Achutha Narayana, Deputy Director (Hydro civil
design)
116
T.S Srinivasa, Deputy Director ‐‐Civil (Gas Based
Power Plant)
117
P Sudarshan Rao, Manager (Electrical Generation) 118
A Profile 1
1. DESIGN GROUP –A PROFILE
was established in 1979 to offer consultancy services for civil and electrical engineering
projects. Having completed over 100 prestigious and varied assignments in the last 5 years, DG is a leading consultancy firm, offering full‐fledged consultancy services
across various fields of engineering in India and Abroad.
Equipped to provide design consultancy on very large engineering projects, DG has been providing technical consultancy services to various organizations and
companies for planning, detailed design, and implementation of Hydel, thermal, and other power projects. These services include analysis of financial aspects, design
engineering for electrical installation of substations, switchyards and transmission lines, design engineering for civil engineering structures including large dams,
tunnels , canals, power canals, cross drainage works, surge tanks, penstock , and power houses. DG also provides services related to other civil engineering fields of
Irrigation, Water Supply, and Waste Water Treatment. DG, which has an annual turnover of over Rs.400 lakhs, provides consultancy
services required for the implementation of projects, right from concept to completion, commissioning, operation and maintenance, thereafter. DG’s services
have been utilized by Large Industrial Houses, Firms, and Independent Power Producers in India, and elsewhere, for the planning and design engineering of their
projects. In year 2004, DG was honored with an ISO 9001:2008 certification for its design engineering services and continues to hold the certification.
DG have entered into MOU/ JV with number of large institution to name a few
Messers: 1) WAPCO New Delhi.
2) ILF Consulting Engineer, Austria
DESIGN GROUP
A Profile 2
3) GEM Engineering Company Ltd., Uganda 4) IL&FS Ltd., Hyderabad
5) NihamShand Cape town South Africa 6) Land Mark Holding Ltd. Nairobi, Kenya
7) SSDC Damam KSA
DG has been empanelled in a few public sector undertakings. 1) BHEL for extending design engineering services in Hydro Power projects
2) Karnataka Neeravari Nigam Limited for engineering services for Water Resources Projects.
3) PFC consulting Limited, New Delhi for Power Projects.
Our clients include Messers 1) Nuclear Power Corporation Limited.
2) Gammon India Limited. 3) Fichtner Limited.
Corporate Office
A Profile 3
4) GMR Energy Limited. 5) ILFS Infra Limited.
6) WAPCO 7) NTPC
8) BHEL 9) Ritwik Energy Limited Hyderabad
10) Greenko Energy Limited Hyderabad 11) AMR Mitra JV Ltd., Hyderabad
More than 100 engineering software’s have been developed in house over a period
of 20 years. In addition, more than a dozen engineering design softwares have been acquired and are in use for day to day work .State of Art facilities have been created
to take up large Water Resources Projects.
Presently the major Detailed Engineering works on hand are
1. Balance of Plant for Hail‐2, Gas based Power Plant 2 x 55 / 70 MW at Hail in Saudi Arabia.
2. Balance Plant for Rafha Gas based 2 x 55/70 MW + 2 x 35 MW Power Plant at Rafha Saudi Arabia.
3. Two Irrigation Projects in Afghanistan namely
a. Machalgho Multipurpose Project, near Kabul b. Pashdan Multipurpose Project in Herat region.
4. 81 MW Tinget HEP in Himachal Pradesh, India. 5. 75 MW Trishuli Galachhi HEP in Nepal, India.
6. 25 MW Mahan‐3 HEP in Chhattisgarh, India. 7. 12 MW Gatambe HEP in Kandy Sri Lanka.
8. Balance of Plant for 32 MW wind mill under phase II near Chikkodi near Belgaum, Karnataka, India.
In addition 31 assignments are in different stages of implementation
A Profile 4
A Profile 5
A Profile 6
A Profile 7
A Profile 8
A Profile 9
A Profile 10
A Profile 11
8. EXPERIENCE IN DESIGN ENGINEERING OF A FEW IMPORTANT PROJECTS
8.1 Balance of Plant of Hail – 2 Power Plant
M/s. Alfanar one of the leading EPC contractors in Kingdom Saudi Arabia was awarded construction of Balance of Plant of Hail‐2 Gas based Power Plant by Saudi
Electric Company. M/s ILF Abu Dubai, UAE, were the principal consultants, M/s. DGPCPL was appointed as sub consultants by M/s. ILF for Detail Engineering and
to issue all construction drawings and designs for complete plan except GTG. Siemens were the GTG equipment suppliers.
This was a fast track project, involving issue of more than 600 drawings in a short
span of 4 months. The project was successfully commissioned on schedule in the month of July 2011. The assignment included interaction with clients / SEC (Owners) during approval stage.
The project comprised extension of Hail – 2 Power plant by adding 2 nos 55/70 MW
output Gas Turbine Generator sets to the existing 6 nos Gas Turbine Generators 132 kV GIS and 380 kV AIS. The extension project consisted of –
1. 132 kV, 220MVA Generator Transformer, 13.8kV / 4.16kV 15MVA unit
auxiliary transformers, 10 nos. service transformers, MV & LV Switchgears and other BOP.
2. Crude oil / Distillate oil fired Gas Turbine Generator units of 55/70MW output – 2nos.
3. Crude oil treatment and forwarding and distillate oil forwarding system for new units.
4. Associated piping, cabling & services
A Profile 12
The Engineering services for the project consisted of –
• Civil Engineering involving structural designs, Architectural layouts,
equipment foundations, for GTG Building, FOTP Building & Switchgear Building, etc,.
• Mechanical Engineering involving plant Layouts, piping, equipment sizing, fire fighting system, HVAC, etc,.
• Process Engineering involving overall process flow discussions, P & ID’s, etc,. • Electrical Engineering involving system studies, development of SLD’s,
equipment sizing, for transformers, MV & LV, Switchgears, DC & UPS Systems, Cable & inter connection schedules.
• IAC illumination Engineering involving interfacing new unit & BOP to existing CLR.
GTG Building under Construction
A Profile 13
8. 2 Sea Water Intake for PFBR Plant Systems:
Nuclear Power Corporation Limited, Kalpakkam, awarded Seawater Intake Cooling
Water System under ambitious plan of generating power through Plutonium Fast Breeder Reactor Project (PFBR) to M/s. Gammon India Limited. The major
components of the scheme were off‐shore intake shaft, on‐shore outlet shaft, and a submarine tunnel connecting the two structures at about 45m below sea level. M/s.
Design Group Project Consultants Pvt Limited, were involved in detailed engineering services for the sub marine tunnel and shafts. The project is since been
successfully completed.
The total length of the sub marine tunnel is 565m, Horse shoe shaped with 3600 mm dia finished diameter. The outer diameter varied from 4300mm to 4600mm,
thickness of lining adopted is 350mm in good rock and 500 thick RCC in inadequate rock cover region, using M‐45 grade cement concrete. The tunnel passes through
Charnockyte type II rock medium having modulas of elasticity is 0.46 to 3.34 x 106 tons per square meter. The poisons’ ratio adopted ranged between 0.14 to 0.25 in
A Profile 14
rock and 0.15 in concrete. The SBC of soil is 280 tonnes per sq. meter and strength of insitu rock is 75.60 Mpa.
As per report investigation report the dry density of rock is 2.66 to 2.99 gms per cubic centimeter. The tunnel was driven 45m below the sea level without any
geological surprises. The tunnel carries 29 cumecs of seawater required for cooling
Outlet Shaft as Viewed from Submarine Tunnel
Submarine Tunnel
A Profile 15
the PFBR Plant, with a bed gradient of 1 in 96.4. The density of Sea Water found to be 1.024 ton per cum.
In addition, inlet shaft (4250 / 5250 mm dia) and outlet shaft (6000 / 7000 mm dia)
were sunk in both ends with 500mm, thick cement concrete lining using M‐45 grade concrete.
8.3 Varahi Tail Race Mini Hydel Scheme:
River Varahi is an important West flowing river of Karnataka State with large
Hydel power potential. Power development in the Varahi Valley with an installed capacity of 239 MW consisting of 2 x 4.5 = 9 MW at Mani Dam Power House and 2 x
115= 230 MW at Varahi Underground Power House was completed by Karnataka Power Corporation Ltd. in the year 1989. The Varahi Tail Race Mini Hydel scheme
has been planned and engineered by Design Group for M/s. Sandur Power Co. Ltd. Varahi Tail Race Mini Hydel Scheme utilizes the tailrace discharges of Varahi
Underground Power house and the available level difference between the point of confluence of tailrace of Under round Power House with Varahi River and the FRL
of Varahi Irrigation Dam proposed downstream, for generation of power. The proposed scheme comprises of the construction of a diversion weir across Varahi
river just downstream of the confluence of tail race of VUGPH with Varahi River, a gravity type intake, a 2290m long, 7m dia horse shoe shaped head race tunnel, 22m
Dia simple type surge tank, 7m dia penstock tunnel, 3 Nos. steel penstocks and a power house with three standard vertical shaft type full Kaplan turbines of 7.5 MW capacity each under phase I and a tail race joining the Varahi River on its right flank.
Under Phase II, two more units of similar capacity have been added.
A Profile 16
View of Diversion Weir Structure with radial gates
Overview of Power House
Power House under Construction
A Profile 17
The cost of the project inclusive of escalation in costs during construction and
financial charges is placed at Rs. 13,439 lakhs. The project is under advance stage of completion and is to be commissioned during the year 2005.
Penstock Tunnel, Concrete Lining under Construction
22m dia Shaft
A Profile 18
8.4 AMR/ SHAMBURI Mini Hydel Scheme
M/s. AMR Power Pvt. Ltd. Implemented the 24 MW (5 x4.8 MW) Mini Hydel
Scheme across river Nethravathi, a major west flowing river in Karnataka. The design flood at the barrage is 11500 cumecs. The plant is situated 35 km from
Mangalore, a major costal city in west Karnataka. The project has a low head fluctuating between 3.95 m to 10.8 m. The rated head of the turbines is 7.31m,with a
large flow. The design discharges utilized for power draft is 78.47 cumecs per unit. The units are capable of running at 15% continuous overload. ‘S’ type Kaplan
turbine coupled to 4800 KW synchronous generator through the gear box are adopted. During the construction, another developer M/s. Rithwik Energy
Generation proposed a 24 MW capacity power plant on the other bank. After mutual discussion, it was agreed to utilize the existing facilities of M/s. AMR Power.
Thus, a power house accommodating 10 x 4.8 MW was planned and developed,
with a combined annual generation of 115.14 GWHr. The scheme comprises of, a barrage across river Nethravathi with 30 radial gates to safely pass the 11500 cumecs
flood, non‐overflow sections, a power block on the left bank, a surface power house, and a 95.86m x 32m x 2km long tail pool and channel. The water is led back to river.
A Profile 19
The power is evacuated to the nearest substation at Netlamanur, 15 km away, at 110 KV rating. The construction took 27 months and the plant was synchronized. DG
provided the design engineering services.
8.5 Modernisation of Shivanasamudram Power Channel.
Visveswaraiah Vidyut Nigam Limited (VVNL), a Public Sector Company, owned by earstwhile Karnataka Electricity Board, as a part of the Modernisation programme of
the existing Shivanasamudram Hydro Power Project, had proposed to increase the water carrying capacity of the power channel upto the Shivanasamudram Balancing
Reservoir and also increasing the live capacity of the Shivanasamudram Balancing Reservoir to cater to the increased needs of the power channel and also the increased
needs of the drinking water supply for Bangalore City. VVNL entrusted the work of planning for the improvements and the detailed engineering for the same to
Shivanasamudram Power Project is the earliest of the power projects constructed in India, way back in the year 1902, to supply electrical power to Kolar Gold Mines
situated 85 kms away.
Originally a 2000m long power channel connecting Shiva head works and the Shiva
Balancing Reservoir had been constructed with a central earthen divider wall and side slopes lined with stone pitching.
Divider wall under Construction
A Profile 20
The central divider wall was an earthen bund with stone pitching on the side slopes
the overall dimensions of the divider wall has been 3.7m at the top and 8.2m at the bottom.
Over a period of the last 100 years, the water carrying capacity of the channel had
been reduced to 22.6 cumecs, from the original capacity of 34 cumecs, due to silting, vegetation growth, etc. In order to increase the discharge carrying capacity of the
channel, the divider wall was replaced by a thin RCC dividing wall; the pitching of the side slopes was reset and covered with RCC lining. The vegetation growth was
completely removed. After modernization, discharge carrying capacity of the power channel has increased to 59.5 cumecs. The live capacity of Shiva Balancing Reservoir
has been substantially increased by desilting the reservoir and removal of weed growth. In addition, DG was asked to suggest simple method of desilting of the
Balancing Reservoir. A simple technique of using a shovel mounted on a raft made out of a battery of empty steel drums was suggested and used along with ejection of
the silt by a mud pump and a pipe line supported on empty floating drums, and taken to the shores.
8.6 Link Canal Mini Hydel Scheme:
Karnataka Irrigation Department, as a part of the modernization of K.R. Sagar project irrigation Canal System, took up the scheme to construct a link canal taking
off from the Visveswaraya canal before Hulikere tunnel and joining the Cauvery Branch canal near Peehalli at the 17th Mile (27.20 km) in Mandya District. At the tail
end of this link canal, there is a difference in level of about 8.3m between the bed of the link canal and the bed of the Cauvery branch canal and is negotiated by the
construction of a drop structure. Link Canal Mini Hydel Scheme was formulated to utilize the water flow of the link Canal and the head available at the drop at the end
of Link Canal, for power generation.
A Profile 21
Karnataka Irrigation Department, as a part of the modernization of K.R. Sagar
project irrigation Canal System, took up the scheme to construct a link canal taking off from the Visveswaraya canal before Hulikere tunnel and joining the Cauvery
Branch canal near Peehalli at the 17th Mile (27.20 km) in Mandya District. At the tail end of this link canal, there is a difference in level of about 8.3m between the bed of
the link canal and he bed of the Cauvery branch canal and is negotiated by the construction of a drop structure. Link Canal Mini Hydel Scheme was formulated to
utilize the water flow of the link Canal and the head available at the drop at the end of Link Canal, for power generation.
The scheme is simple with minimum civil engineering works. The civil engineering
components comprise of a 70m long approach channel, intake structure, gated bypass weir with provision of automatic falling shutters, surface power house, tail
channel leading the water back to the branch canal. The installed capacity of the scheme is 1500 kW, with one unit of Vertical full Kaplan Turbine and generator. The
View of Power House as seen from Downstream
A Profile 22
average annual energy generation is 10.10 GWHr. The cost of the scheme is Rs. 80 Million. The Project was completed in the year 2003 by the Developers M/s Graphite
India Ltd., Bangalore, The civil engineering works were contracted to M/s Mysore Construction Co., Bangalore. The Planning and Detailed Design Engineering was
handled by Design Group.
8.7 Captive Power Plant of 5.8 MW capacity at John Welch Research Centre, Whitefield, Bangalore for M/s General Electric:
Design Group was associated as a major leader for the Planning, Detailed Engineering and construction co‐ordination of the 5.8 MW Diesel Engine based
Overall view of DG Plant
Inside view of Generator Room
A Profile 23
Captive Thermal Station of the GE India Technology Centre at Bangalore, which has been completed on a time bound schedule of 6 months.
8.8 Windmill Power
M/s. Doddanavar Brothers, who have Plan to develop 100MW Wind Farm in
Chikkodi, Belgaum district of Karnataka, India, availed our technical support for Engineering of balance of a plant. Critical main equipment of capacity 10 x 1.5 MW
was sourced from M/s. Sinovel, China, while the rest was sourced locally.
DG assisted the developers by drafting technical specifications, preparing data sheets, floating tender for fabrication of towers, tower internals and electrical
right from 690 volts to the grid connection. In addition, assistance was extended for procurement activities. The Civil Raft Foundation drawings were provided
after detail designs, for local sub‐surface soil conditions. The entire assignment was completed in 9 months.
Foundation of Wind Mill
A Profile 24
1. DG designed 33 kV outdoor yard sub‐station at Wind farm, 33 kV transmission
line from Wind farm to pooling 33 / 110 kV sub‐station, 33 / 110 kV outdoor yard pooling station and 110 kV transmission line from pooling station to KPTCL
evacuating 110 kV sub‐station. 2. DG prepared technical specification for 33 kV substation at Wind farm, 33 kV
transmission line, 33 / 110 kV pooling station and floated enquiry for the procurement and scrutinized the Vendor offers and finalized the orders on
suppliers. 3. Vendor drawings and specification scrutinized. 4. Assisted in commissioning the sub‐station and transmission line.
The first batch of 10 x 1.5 MW has been commissioned. Under second stage 20 x
1.6 MW GE machines have been selected, the civil foundation is under construction.
8.9 Design of Vacuum Chambers
M/s. Hind High Vacuum Co. Pvt. Ltd., specializing in manufacture of Pressure
Vessels and Vacuum Chambers for defence, pharmaceuticals, and solar panels, entrusted to DG, design and preparation of fabrication drawings for a Robotic TIG
Wind Turbine Generator Hub
A Profile 25
Welding chamber of size 7m x 5m x 3m. The M.S. Vacuum Chamber is designed for negative pressure of 1 kg per sq.cm, with a rider that the defection of internal
structural members must be limited to 0.5 mm.
The chamber consists of a main chamber, a man entry/exit chamber, robot entry/ exit chambers, tool chambers, etc. The robotic arm moves on rails. The welding will be
carried out under Argon gas atmosphere. The chamber were analysed using NISA Software package and the analysis has been validated by Indian Institute of Science,
Bangalore, the pioneer research institute, by using ETAB software. The analysis, design, and fabrication drawings have been forwarded to M/s. Hind High Vacuum
Co. Pvt. Ltd. The fabrication of chamber is in advance state of complexion. The Robotic TIG Welding Chambers, when commissioned, will be one‐of‐its‐kind in the
world.
8.10 Design Group has been successfully providing pre‐tender and post‐tender services for various public sector undertakings and several private sector
undertakings, in as much as assessment of costs, detailed specifications of various items of work, conditions of contracts, tender documents, tender analysis and
reports leading to selection of construction and supply agencies as per time bound schedules and needs of clients.
Projects on Hand 26
Annexure – I
9. LIST OF PROJECTS ON HAND
A. POWER PROJECTS – DETAILED ENGINEERING
Sl. No.
Name of the Project Installed Capacity in MW
Project Cost in Rs. Lakhs
Clients
1. Lower UHL SHEP Project,
Himachal Pradesh. 13.00 9500 M/s. Trident Power Systems Ltd.,
Himachal Pradesh
2. Singatalur‐Huligudda Mini Hydel
Scheme, Karnataka‐ 18.00 6000 M/s..Tungabhadra Power Projects
Ltd., Bangalore.
3. Lambadug Hydro Electric Project,
Himachal Pradesh.
25.00 12250 M/s. Himachal Sorang Power Pvt.
Ltd, Shimla, Himachal Pradesh
4. Cauvery Small Hydel Project,
Karnataka.
24.00 13000 M/s. XS Hydro Energy Private Ltd.,
Bangalore
5. Huvinahedagi Mini Hydel
Scheme, Karnataka.
24.75 13500 M/s. XS Hydro Power Pvt. Ltd,
Bangalore
6. Agrahara MHSI & II, Karnataka. 1.475 700 Sarovara Energy Pvt Ltd.,
Bangalore.
7. Water Supply System for Bharathi
Cement Plant at Cuddapha,
Andhra Pradesh
Water
Supply
Scheme
‐ M/s. Bharathi Cement Corporation
Ltd Andhra Pradesh
8. Paudital Lassa Hydro‐Electric
Project, Himachal Pradesh.
24 19200 M/s. Greenko Hatkoti Energy Pvt
Ltd., Hyderabad.
9. Jeori Lower Mangalad SHPP,
Himachal Pradesh.
15 12000 M/s. Techology House (India) Pvt
Ltd., Hyderabad.
10. Nimishamba Mini Hydel Scheme,
Karnataka,
3 1700 M/s. Nimishamba Energy India
Private Ltd., Bangalore
11. Kollya Mini Hydel Scheme,
Karnataka.
24 19200 M/s. Kumaradhara Power Pvt Ltd
Bangalore
12. Chikkodi Windmill Project,
Karnataka.
100 6000 M/s.Doddanavar Brothers, Belgaum
13. Mahan Hydro Electric Project,
Chathisgard.
24 2000 M/s.Venika Hydro projects Pvt Ltd,
Bangalore
Projects on Hand 27
Sl. No. Name of the Project
Installed Capacity in MW
Project Cost in Rs. Lakhs
Clients
14. Trishuli Galchhi Hydro Electric
Project, Nepal.
75 80000 M/s. Siddhakali Power Pvt. Ltd.,
Nepal
15. Kukke 1 & 2 MHS, Karnataka. 24 14400 M/s. Kukke Hydro Projects Pvt Ltd,
Bangalore.
16. Anusha Mini Hydel Scheme,
Andhra Pradesh.
4 1600 M/s. Dhenu Hydro Pvt Ltd
Hyderabad
17. Navya Mini Hydel Scheme,
Andhra Pradesh.
2.60 1300 M/s. Mitra Energy Pvt Ltd
Hyderabad
18. Ramya MHS, Andhra Pradesh. 3.80 1900 M/s. Kurnool Energies Pvt Ltd
Hyderabad
19. Koilakunte Mini Hydel Scheme,
Andhra Pradesh.
12 M/s. Dhenu Hydro Power Private
Ltd., Hyderabad.
20. Halsur Diversion weir under
Shiggon lift Irrigation Scheme,
Savanur, Karnataka
400 M/s. Karnataka Neeravari Nigam
Ltd., Karnataka
21. River Water Intake Pump House
and Approach Bridge, Punjab.
2 X 270 300 M/s. GVK Ltd through M/s. Fichtner
Consulting Engineers (India) Pvt
Bangalore
22. Machalgho Multipurpose Project,
Machalgho, Afghanistan.
US $ 95
Million
M/s. Gulf Civil Engineering &
construction Co. Kabul, Afghanistan
23. Pashdan Irrigation Project, near
Heart, Afghanistan.
US $ 180 M/s. Hewadwal Group Afghanistan
24. Tinget‐2 Hydro Electric Project in
Himachal Pradesh
81 60000 M/s. AMR—Mitra JV, Hyderabad
25. Balance of Plant for Rafha Gas
based Power Plant, Saudi Arabia.
2 x 75 + 2 x
75
M/s. SSEM Riyadh through M/s. ILF
Abu Dhabi
26. Study Report on Gandak Canal
HEP in Valmikinagar, West
Champaran District, Bihar.
3 X 5 M/s. WAPCOS New Delhi
27. Detailed Design Engineering
services for Kurtha SHP in
Himachal Pradesh.
2 X 2.5 4000 M/s. Sahu Hydro Power Pvt Ltd., Hyderabad
28. Detailed Design Engineering
services for Kuril SHP in Himachal
Pradesh.
2 X 2.5 4000 M/s. Sahu Hydro Power Pvt Ltd., Hyderabad
Projects on Hand 28
Sl. No.
Name of the Project Installed Capacity in MW
Project Cost in Rs. Lakhs
Clients
29. Detailed Design Engineering
services for Chhoned SHP.
3 X 5 1200 M/s. Parvat Hydro Power Pvt Ltd., Hyderabad
30. Detailed Design Engineering
services for Sangam SHP Raichur,
Karnataka.
3 X 8 19200 M/s. Pavanganga Power Private
Ltd., Hyderabad.
31. Review Consultants for Umjaut
(70MW) & Umduma HEP (90MW)
in Meghalaya
160 100000 M/s ETA Star Ltd,. Dubai
B. SOLAR POWER PROJECTS – DETAILED PROJECT REPORT
Sl. No. Name of the Project
Installed Capacity in MW
Project Cost in Rs. Lakhs
Clients
1 Bellary Solar Power Project,
Karnataka.
5 7500 M/s.Vishrutha Power Pvt. Ltd.,
Bellary
2 Proposal to bring 10 TMC of Raw
water from Sakleshpura to
Chikkaballapur & Kolar District &
T.G. Halli
‐ ‐ M/s. Larsen & Toubro Limited,
Bangalore
C. PRE TENDER ENGINEERING SERVICES
Sl. No. Name of the Project
Installed Capacity in MW
Project Cost in Rs. Lakhs
Clients
1. Upper Narmada Irrigation Project
Madhya Pradesh – EPC Bid
Irrigation
Project
‐ M/s. Gammon India Ltd. Mumbai
2.
60MGD River water. Pipeline‐
73kms for VSNL Ltd, at Salboni in
West Bengal – EPC Bid
Water
Supply
‐ M/s. Gammon India Ltd. Mumbai
3. Agra Water Supply Project in Agra
– EPC Bid
Water
Supply
‐ M/s. Gammon India Ltd. Mumbai
4.
Raw water supply system for 4 x
300 MW Raigarh SKS Power
Generation (Chattisgarh) Ltd
Water
Supply
‐ M/s. Gammon India Ltd. Mumbai
Projects on Hand 29
D. PREPARATION OF TENDER DOCUMENT
Sl. No Name of the Project
Installed Capacity
in MW
Project Cost in
Rs. Lakhs
Clients
1. Dagmara HEP – Preparation of bid
document for Civil, E&M, H&M
Transmission Line Component
works
25 x 5 ‐ M/s. Bihar Electricity Board,
through M/s. WAPCOS
New Delhi.
E. OTHERS
Sl. No Name of the Project
Installed Capacity in
MW
Project Cost in Rs. Lakhs
Clients
1. Design and drawings of Electrical
System for Beneficiation Plant,
Bagalkot, Karnataka
Electrical
Distribution
‐ M/s. Doddanavar Nanjinzhao
Mining and Metallurgy (P) Ltd.,
Belgaum Karnataka.
2. Detailed Civil Engineering for Two
Transfer points. Tunnel in cut &
cover, Box Pulsing for coal
conveyor system for addition of 2 x
250 MW to Sikka Thermal Power
Plant in Jamnagar District Gujarat
Coal
Handling
System
‐ M/s. Multi Design Infra Works Pvt.
Ltd. Bangalore
3. Design of 35.58 MLD capacity
Sewage Treatment Plant under
UGD Scheme to Shimoga City
‐ ‐ M/s. GVPR
Panel of Consultants / Advisors 30
Annexure – II (A)
10. ORGANISATION STRUCTURE A. PANEL OF CONSULTANTS/ADVISORS
Sl. No. Name & Qualification Designation
1.
Sri C.S. Hebli
Director Technical (Retd),
Karnataka Power Corporation Ltd.
Bangalore.
Chairman &
Chief Consultant.
2. Sri H.V. Eswaraiah
Director Technical (Retd),
Karnataka Power Corporation Ltd.,
Bangalore.
Consultant –Hydro Civil
Designs.
3. Sri G.N. Yoganarasimhan,
Director (Retd),
WRTD, Rourke,
Bangalore.
Advisor‐Hydrology.
4. Sri. P.R. Balasubramanian,
CMD (Retd), FACT,
Triavaneore, Kerala.
Bangalore.
Advisor‐ Gas Based Power
Plant.
5. Dr. D.N. Seshagiri, PhD Harvard, USA.
Director (Retd),
Engineering Geology,
Geological Survey of India.
Advisor – Engineering Geology.
6. Sri.Vishwanath Balachandran,
Director General, GIS (Retd).
Chennai.
Advisor‐ Engineering
Geology.
7. Sri. Shankar Nesargi
Managing Director (Retd.)
VVNL, Bangalore.
Advisor ‐Wind Energy
8. Sri. C. R. Venkatesh
Executive Director (Retd.)
NHPC Ltd., New Delhi,
Bangalore.
Advisor ‐Hydro Power
Projects.
9. Sri. H. Rangarajan, B.Sc, B.E.
Executive Director(Retd),
KPCL, Bangalore.
Executive Director (Elec.)
Panel of Consultants / Advisors 31
Sl. No. Name & Qualification Designation
10. Sri B.V. Ramakrishnaiah,
Bangalore. Advisor – Gates.
11. Sri Srinath Anekal, ME (Civil), MS(Environment)
USA.
Bangalore.
Advisor‐Environment.
12. Sri. M. M. Kamath,
Chief Engineer (Retd),
NMPT, Mangalore.
Advisor – Marine Engineering.
13. Sanker Pradesh, M.Tech (Roorkee),
New Delhi. Consultant‐ Geology.
14. Sri. Thippeswamy
Chief Engineer (Retd.)
BWSSB, Bangalore.
Advisor –Water and Waste
Water System.
15. Sri. V. Suresh Kumar, M.Tech (Khargpur),
Bangalore.
Advisor – GIS
16. Sri V. Narayanan,
General Manager, SAE (I) Ltd (Retd),
Bangalore.
Advisor – Transmission
Lines.
17. Sri. Ramanan
Chief Engineer (Retd.)
NHPC Ltd., New Delhi,
Bangalore.
Consultant‐Hydro
18. Dr. Y. Lingaraju. Advisor ‐ Ground Water
19. Sri. Umashankara , B.E. (Civil)
Ex‐Mecon.
Advisor ‐Steel Structure.
20. Sri. G. Rajagopalan,
Director (Retd),
Engineering Geology,
Geological Survey of India, Chennai.
Consultant – Engineering
Geology
21. Sri. Krishnappa,
Financial Controller(Retd),
KPCL, Bangalore.
Advisor – Finance.
22. Sri. Sridhar Prabhu – Legal Adviser Advisor –PPA
23. Sri. Venkateshwar Rao
New Delhi. Consultant (Liaison)
24. Sri T.S. Somanathan, B.E. (Mech).
Foremerly NLPC Ltd., Advisor –Welding.
Technical Personnel 32
Annexure – II (B)
B. TECHNICAL PERSONNEL
Sl. No. Name & Qualification Designation
1 Sri C.S. Hebli, B.E(Hons) Chairman.
2 Sri B.L. Lakshminarasimha, Chief Executive Officer
B.Sc., B.E., M.E., MIE, AIV, MASCE.
3 Sri. P.R.Mallikarjuna Executive Director (Design Head)
M.E.(I.I.Sc.), MIE, MIWRS, MISEO.
4 Sri. Chikkaguddappa B.E. (Civil) Director (Project Development)
5 Sri. H.Raghavendra Rao B.E. (Elec) Director (Electrical Generation.)
6 Sri M.M. Reddy, B.E.(Elecl) Director (Electrical Power Evacuation)
7 Sri.P.K.Rupangudi, M.E. (Civil) Director (Gates, Dams design)
8 Sri.U.R.Raghotham, M.Tech. (Civil) Director (Tunnel and Dam design)
9 Sri.R.Vasudevan B.E. (Elec) Deputy Director (Water & Waste Water)
10 Sri.K.T.Sreedhara, B.Tech (Civil) Deputy Director (Irrigation)
11 Sri. Narayana Achutha Deputy Director (Hydro civil design) M.Tech, IIT Kanpur, (Hydraulics)
12 Sri.T.S.Srinivasa, B.E (Civil), M.E Deputy Director ‐‐Civil (Gas)
13 Sri.Sudarshan Rao B.E. (Elec) Manager (Electrical Generation)
14 Mr.Gangadar Pattanashetti Senior Design Engineer (Irrigation)
M.Tech, IIT Guwahati, (Water Resources)
15 Sri. Anantha Murthy, B.Sc AMIE (Civil)
General Manager (Civil Designs)
16 Ms.Kavitha.M, B.E, MBA Administrative Officer
17 Sri. R. Suryanarayana, M.Sc (Geology) Consultants (Engineering Geology)
18 Ms. Sneha Dandavathe., B.E.(Civil) Design Engineer (Hydrology)
19 Mr. K.V. Chandrakanth B.E. (Elec) Design Engineer (Elec.)
20 Mr. Vasanth Kumar B.E (Civil) Design Engineer (Project Planning)
21 Mr. Shivanand, B.E (Civil) Design Engineer (Water conductor system)
22 Mr. Pramod Kumar, B.E.(Civil) Design Engineer (Power House & Tail Race)
23 Mr. Lokesh B.E (Civil) Design Engineer (Dam Design)
24 Mr. Sudeendra, M.Tech (Structures) Design Engineer (Gas Power Plant)
Technical Personnel 33
Sl. No. Name & Qualification Designation
25 Mr. Mohan Kumar, M.Tech (Structures) Design Engineer (Gas Power Plant)
26 Mr. Puneeth. S, B.E(Elec) Design Engineer (Elec.)
27 Mr. Naveen V. B.E.(Mech) Piping Engineer (Mechanical)
28 Mr. Yoghesh K ,B.E.(Civil) Design Engineer (Planning)
29 Ms. Anusha Hegde K. B.E.(Elec) Design Engineer (Electrical)
30 Ms. Smitha Nagaraj B.E.(Elec) Design Engineer (Electrical)
31 Ms. Kumari Diptimayee, B.E.(Civil) Design Engineer (Irrigation)
32 Ms. Poonam U Jadhav, B.E (Civil) Design Engineer
33 Mr. Pradyumna K, B.E.(Civil) Design Engineer (Trainee)
34 Mr. Vinay M V B.E .(Civil) Design Engineer (Trainee)
35 Mr. Saravanan S Design Engineer (Hydro Civil)
36 Ms.Sunita G Galgali, B.E (Civil) Assistant Design Engineer
37 Sri Mahesh Desai Manager (Drawings‐ Section)
38 Mr.Prasanna.T CAD Engineer (Electrical)
39 Mr.M.Shashi Kumar Junior Design Engineer (Drawings)
40 Mr.Manthesh.M CAD Engineer (Mechanical Piping)
41 Mr.Praveen.S.Ladva CAD Operator (Civil)
42 Mr.Nagashetty S CAD Engineer (Hydro)
43 Mr.Sangashetty V Biradar CAD Operator (Gas Power Plant)
44 Mrs. Sharadhamma H CAD Engineer (Civil)
Office Support Staff:
45 Sri. Nagesh, S Officer / Manager / Accountant
46 Sri Suresh Accountant
47 Ms. Thara. R Receptionist
48 Mrs. Geetha N Personal Secretary
49 Sri. Ravi Kumar K Stenographer Cum Secretary
50 Ms. Sowmya A Personal Secretary
Desk Study Report 34
Annexure – III (A)
11. LIST OF PROJECT ASSIGNMENTS SUCCESSFULLY COMPLETED
A. Preparation of Desk Study Report on Hydro Power Projects self identified by DG to various IPP’s in Nepal and India.
Sl. No.
Name of the Project Installed Capacity in
MW
Project Cost in Rs. Lakhs
Year Clients
1. Jaleswar HEP, Nepal. 200.00 US $400
Million
2008 M/s. Maytas Infra Ltd.,
Hyderabad.
2. Taksindu HEP, Nepal. 270.00 US $540
Million
2008 M/s. Nandadevi Agro‐
Farms Pvt Ltd., Hyderabad.
3. Syar Khola ‘A’ HEP, Nepal 140.00 US $280
Million
2008 M/s. Dunagiri Pvt Ltd.,
Hyderabad.
4. Syar Khola ‘B’ HEP, Nepal. 360.00 US $720
Million
2008 M/s. Harmosha Pvt Ltd.,
Hyderabad.
5. Prok HEP, Nepal. 480.00 US $960
Million
2008 M/s. Nandadevi Pvt Ltd.,
Hyderabad.
6. Jogimara Trisuli HEP,
Nepal.
240.00 US $480
Million
2008 M/s. Haramosh Agro‐Farms
Pvt Ltd., Hyderabad.
7. Bihi HEP, Nepal. 270.00 US $540
Million
2008 M/s. Dunagiri Agro‐Farms
Pvt Ltd., Hyderabad.
8. Kappe HEP, Arunachal
Pradesh.
98.00 73900 2008 M/s. Hemavathy power &
light Pvt Ltd
9. Champung Pobe HEP,
Arunachal Pradesh.
140.00 105500 2008 M/s. Hemavathy power &
light Pvt Ltd, Bangalore.
10. Changlai HEP, Arunachal
Pradesh.
48.00 36200 2008 M/s. Hemavathy power &
light Pvt Ltd, Bangalore.
11. Braing pube HEP,
Arunachal Pradesh.
48.00 36200 2008 M/s. Hemavathy power &
light Pvt Ltd, Bangalore.
12. Pakke HEP, Arunachal
Pradesh.
70.00 52800 2008 M/s. Hemavathy power &
light Pvt Ltd, Bangalore.
13. Nargum HEP, Arunachal
Pradesh.
84.00 63300 2008 M/s. Hemavathy power &
light Pvt Ltd, Bangalore.
14. Chann Siang HEP
Arunachal Pradesh.
66.00 50557 2008 M/s. Hemavathy power &
light Pvt Ltd, Bangalore.
Desk Study Report 35
Sl. No.
Name of the Project Installed Capacity in
MW
Project Cost in Rs. Lakhs
Year Clients
15. Papu HEP Arunachal
Pradesh.
110.00 88000 2008 M/s. Hemavathy power &
light Pvt Ltd, Bangalore.
16. Arket Bazar HEP, Nepal. 110.00 US $220
Million
2007 M/s. Parasnath Greenlands
Pvt Ltd., Hyderabad.
17. Uiya HEP, Nepal. 105.00 US $210
Million
2007 M/s. Maytas Infra Ltd.,
Hyderabad.
18. Phillim HEP, Nepal. 150.00 US $300
Million
2007 M/s. MMS Steel & Power
Ltd.,Hyderabad.
19. Amras HEP, Nepal. 150.00 US $300
Million
2007 M/s. Maytas Properties Pvt
Ltd., Hyderabad.
20. Budhi Gandaki HEP,
Nepal.
600.00 US $1200
Million
2007 M/s. RVK Energy Pvt Ltd.,
Andhra Pradesh
Detailed Engineering – Completed 36
B. DETAILED ENGINEERING OF PROJECTS ‐ COMPLETED
Sl. No.
Name of the Project Installed Capacity in
MW
Project Cost in Rs. Lakhs
Year Clients
1. Balance of Plant for Hail‐2
Gas based Power Plant, Saudi
Arabia.
2 x55/75 2011 M/s. Alfanar Riyadh through
M/s. ILF Abu Dhabi
2. Computation of HFL,
elevation capacity of barrage,
design of barrage for Halasur
Barrage across Varada River
‐ Shiggaon Lift Irrigation
Scheme Dharwar District,
Karnataka
Irrigation 4000 2011 M/s. Karnataka Neeravari
Nigama Limited, Karnataka.
3. Detailed Analysis,Design
and Preparation of
Fabrication of TIG Welding
Chamber.
Mechanical 5200 2010 M/s. Hind High Vacuum Co.
Pvt. Ltd. Bangalore
4. Balance of civil works for
Horizonal Belt Filter Station
Building including
Equipment and Accessories
Foundation Cango.
— — 2010 M/s. Delkor Technik India
Pvt Ltd., Bangalore.
5. Al‐Gubrah Mobile SWRO
Plant Civil Design, Muscat.
— — 2010 M/s. ILF Abu Dhabi.
6. Dandavathi Reservoir
Irrigation Project Karnataka
Irrigation 10200 2009 M/s. Karnataka Neeravari
Nigam Ltd., Bangalore
7. Varahi Underground Power
House Stage‐II Karnataka.
2 x 215 2500 2009 M/s. Karnataka Power
Corporation Ltd., Bangalore
8. Energy Audit of Fiber Glass
Product Manufacturing
Units, Bangalore
Energy
Audit
60 2009 M/s. ICP(India) Private Ltd.,
Bangalore.
9. 35 MLD/STP for Shimoga
Town, Shimoga District,
Karnataka.
— — 2009 M/s. GVPRS Hyderabad.
Detailed Engineering – Completed 37
Sl. No.
Name of the Project Installed Capacity in
MW
Project Cost in Rs. Lakhs
Year Clients
10. Balance of civil works for 18
mtr dia x 3.0 SWD RCC tank
for thickener application.
— — 2009 M/s. Delkor Technik India
Pvt Ltd., Bangalore.
11. Detailed Engineering for
Transmission line including
Foundation Designs for the
20km, double circuit
transmission line connecting
Vajamangala 220kV station
to Kachakola 220kV station.
2009 Sharavathy Conductors Pvt
Ltd, Bangalore
12. 25 mtr dia x 3.0 SWD
130TPH capacity RCC tank
with tunnel and overflow
launder for thickener
application
— — 2009 M/s. Delkor Technik India
Pvt Ltd., Bangalore.
13. 100MW Wind Farm
development‐1phase
16.5MW Chikkodi Belgaum
District, Karnataka
10 x 1.65 10000 2009 M/s.Doddanavar Brothers,
Belgaum Karnataka
14. Energy Audit of steel
Fabrication Manufacturing
Unit, Bangalore.
Energy
Audit
50 2008 M/s. Goel Engineering
Private Ltd., Bangalore.
15. Design and Drawing for DM
Vessel.
— — 2008 M/s. Velath Engineering
Works, Sharjah UAE
16. Construction Water supply
for Kamalanga Thermal
Power Plant, Orissa.
3 x 350 450000 2008 M/s. GMR Energy Limited,
Bangalore
17. Somanamaradi Small Hydel
Project‐ Stage‐II, in Raichur
District, Karnataka.
1 x 6 1500 2007 M/s. Narayanapur Power
Co. Pvt. Ltd, Bangalore
18. Balance of civil works for
Design and Drawing for
Sulphur Storage Tank.
— — 2007 M/s. Velath Engineering
Works, Sharjah UAE
19. Design and Drawing of Flue
Gas Scrubber (V‐1507)
Vessel.
2007 M/s. Velath Engineering
Works, Sharjah UAE
Detailed Engineering – Completed 38
Sl. No.
Name of the Project Installed Capacity in
MW
Project Cost in Rs. Lakhs
Year Clients
20. Detailed Engineering for
Transmission line towers
including Foundation
Designs for 50kms of Hiriyur
– Kudithini 440kV
Transmission line.
— — 2007 Sharavathy Conductors Pvt
Ltd, Bangalore
21. Balance of E&M works for
Bhavani Barrage Hydro
Electric Project I.
2 x 5 3000 2007 M/s. Meclin Fabricators
Private Limited Chennai.
22. Balance of E&M works for
Bhavani Barrage Hydro
Electric Project II.
2 x 5 3000 2007 M/s. Sri Saravana
Engineering Works
company Pvt Ltd. Bhavani
Tamil Nadu
23. Construction of earthen
bund for Sarvaraja Sarovara
Reservoir near Cuddaph,
Chittur District, Andhra
Pradesh.
— — 2007 M/s. ECC‐‐CPPL Pvt Ltd.,
Hyderabad. through M/s.
SM Constructions Bangalore.
24. Shamburi MHS, Dakshina
Kannada District, Karnataka.
5 x 4.80 9726 2006 M/s.Rithwik Energy
Generation Pvt. Ltd.
Hyderabad.
25. Design and Drawing for
Natural Gas Storage (Buffer)
Pressure vessel.
— — 2006 M/s. Velath Engineering
Works, Sharjah UAE
26. Balance of Civil Works for 13
mtr dia x 3.0 SWD RCC tank
for thickener application.
— — 2006 M/s. Delkor Technik India
Pvt Ltd., Bangalore.
27. Balance of Civil Works for 4
x B35: 40V‐12G Genset Gas
Power Plant at Sudan.
— — 2006 M/s.Rolls‐Royce Energy
Systems India Pvt.Ltd.,
New Delhi
28. Detailed Engineering for
Transmission line Towers
including Foundation Design
for 132/66/11 kV Kolar Sub‐
Station works.
— — 2006 Sharavathy Conductors Pvt
Ltd, Bangalore
Detailed Engineering – Completed 39
Sl. No.
Name of the Project Installed Capacity in
MW
Project Cost in Rs. Lakhs
Year Clients
29. Perla Mini Hydel Scheme,
Dakshina Kannada District,
Karnataka.
5 x 4.80 9726 2005 M/s.AMR Power Pvt. Ltd.
Hyderabad.
30. Nagarjuna Sagar Tail Pond
Dam and Hydro Power
Station, Nalgonda, Andhra
Pradesh
2 x 25 42500 2005 M/s. STUP Consultants
Private Ltd., Bangalore
31. Construction of Gandikota
Dam across Pennar River,
Kadapa, Andhra Pradesh.
Irrigation 5500 2005 M/s. STUP Consultants
Private Ltd., Bangalore
32. Yakla Micro Hydel Scheme
in Dargeling West Bengal.
2 x 250 100 2005 M/s. Raj Kumar and
Company, Bangalore
33. Somanamaradi Small Hydel
Scheme, Raichur District,
Karnataka.
2 x 6 4800 2004 M/s. Narayanapur Power
Co. Pvt. Ltd., Bangalore
34. Hullahalla Mini Hydel
Scheme, Mandya District,
Karnataka.
3 x 4 4740 2004 M/s.Limbavali Power Pvt.
Ltd., Bangalore
35. Somavathi Mini Hydel
Scheme, Chickmagalur
District, Karnataka.
2 x 3 2746 2004 M/s.SRM Power Pvt. Ltd.
Bangalore
36. Gugal Small Hydel Scheme,
Gulbarga District, Karnataka.
4 x 2.5 4000 2004 M/s.SRS Energy Pvt. Ltd.
Bangalore
37. Design of Anchor Blocks for
Birkapilli HEP Turkey ( XLS
generation)
— — 2004 M/s. Quest‐GE‐Global
Engineering Development
Centre,Bangalore.
38. Koynad MHS, Kodagu
District, Karnataka.
2 x 2 1800 2004 M/s. Sadguru Saai Energies
Pvt. Ltd., Bangalore.
39. Design and Preparation of
GA drawings for following
tanks. Crude Oil Tank Slop
Crude Oil Tank Crude Oil /
Water Tank Product Water
Tank Fire Water Tank
Diesel Oil Tank.
Tank Farm 2004 M/s. Velath Engineering
Works Sharju, UAE.
Detailed Engineering – Completed 40
Sl. No.
Name of the Project Installed Capacity in
MW
Project Cost in Rs. Lakhs
Year Clients
40. 110 kV Switchyard extension
at Bellary Steels, Bellary
District, Karnataka.
Switchyard 100 2003 M/s. Bhowalaka Steels,
Bangalore, through LEG.
41. Pre‐Cast RCC Bridge over
Upper Tunga barrage across
River Tunga, Shimoga
District, Karnataka.
2003 M/s. Mysore construction Co
Ltd., Bangalore.
42. Architural and Structural
services for Construction of
Pediatric Ward at Kidwai
Memorial Institute of
Oncology – Honorary
Assignment
300 2003 M/s. Nandalal Mohan Lal
Jairani Kapur Charitable
Trust Bangalore.
43. Link Canal MHS 2001,
Mandya District, Karnataka.
1 x 1.5 700 2002 M/s.Graphite India Ltd.,
Bangalore.
44. Varahi Tail Race MHS,
Udupi District, Karnataka.
5 x 7.5 13439 2002 M/s. Sandur Power Co. Pvt.
Ltd., Bangalore.
45. Civil works for the proposed
132/33kV ODY at INDALCO.
— — 2002 M/s. ASEA Brown Boveri
Ltd., Bangalore.
46. 132 KV Switchyard
Capacitor Bank for HINLCO
Renukot.
Switchyard 2002 M/s. BHEL Bangalore.
47. 132 kV Switchyard near
Samayanallur, Madurai,
Tamil Nadu.
Switchyard 300 2001 M/s.Bharat Heavy Electricals
Ltd.
48. 110 kV Switchyard extension
connected with 128 MW DG
set installation for KSEB,
Kozikhode.
Switchyard 300 2001 M/s. BHEL, Bangalore,
through M/s.. MECON,
Bangalore
49. 110 KV Substation at
Navakarnataka Steels,
Bellary District, Karnataka.
Substation 2001 M/s. LEG Bangalore
50. 66 KV outdoor Switchyard
and Substation at NAL
Bangalore.
Switchyard 2001 M/s. GEPC Ltd., Bangalore
Detailed Engineering – Completed 41
Sl. No.
Name of the Project Installed Capacity in
MW
Project Cost in Rs. Lakhs
Year Clients
51. DG Plant at GE ITC Ltd.,
Whitefield, Bangalore
7.4 4000 2000 M/s. GEITC Ltd., Bangalore
52. Design of Supplying
Structures of 220kV Switch
yard for M/s. Nippon Denro
Ispat Ltd., Dolvi, Maharastra.
Switchyard 800 2000 M/s.. AEG‐NGEF Limited
Bangalore.
53. 110 kV Switchyard at
HINDALCO, Renukoot,
Uttar Pradesh.
Switchyard 250 2000 M/s. Bharat Heavy
Electricals Ltd. Bangalore.
54. Design of Supplying
Structures for the proposed
66 KV Outdoor Switchyard
at a very Cycles Ludhiana.
Switchyard 200 1999 M/s. Kirloskar Electric
Company Ltd., Bangalore.
55. Harangi HEP at Harangi
Dam, Kushalnagar District,
Karnataka
2 x 4.5 3200
1999 M/s. Sulzer Flovel Hydro
Ltd., Faridabad, Haryana.
56. Sheshadri Iyer MHS Mandya
District, Karnataka.
3 x 2 1200
1999 M/s. Atria Power
Corporation Limited,
Bangalore.
57. Remodeling of Shiva Power
Channel at
Shivanasamudram, Mandya
District, Karnataka.
— 1000
1998 M/s. Karnataka Power
Transmission Corporation
Ltd., Bangalore.
58. Dumkar Hydro‐Electric
Project at Leh, Ladakh, J&K
State.
3 x 1.5 300 1998 Chief Project Engineer,
Power Development
Corporation Ltd., Kargil,
J&K State.
60. Civil works for De‐Bottle
Neck Project MSDS‐4,
Electrical works of Bokaro
Steel Plant, Bihar.
— — 1995 M/s. NGEF Ltd., Bangalore
61. 110/33KV Switchyard and
Substation at Xeldem
Madgon Goa for Goa
Electricity Board.
Switchyard 300 1989 M/s. NGEF Ltd., Bangalore
Detailed Engineering – Completed 42
Sl. No.
Name of the Project Installed Capacity in
MW
Project Cost in Rs. Lakhs
Year Clients
62. 110 KV Outdoor Yard
Substation for M/s. Madras
Refineries Ltd., Manali
Chennai.
Switchyard 150 1988 M/s. NGEF Ltd., Bangalore
63. 132 KV Outdoor Yard and
Substation for M/s. Petrofills
Co‐operatives Ltd., Kalewar,
Gujrat.
Switchyard 200 1987 M/s. NGEF Ltd., Bangalore
Preparation of DPR 43
C. PREPARATION OF DETAILED PROJECT REPORTS
Sl. No
Name of the Project Installed Capacity in
MW
Project Cost in Rs. Lakhs
Year Clients
1.
Kukke Hydro Projects Stage
1 Dakshina Kannada
District, Karnataka
8 x 3
12714
2011
M/s. Kukke Hydro Projects
Pvt Ltd., Bangalore
2.
Kukke Hydro Projects Stage
2 Dakshina Kannada
District, Karnataka
4 x 3
7113
2011
M/s. Kukke Hydro Projects
Pvt Ltd., Bangalore
3.
Lower UHL, Mandi District,
Himachal Pradesh
2 x 7.5
9435
2011
M/s. Trident Power Systems
Pvt Ltd., Hyderabad
4.
Dananahalli MHS, Mandya
District, Karnataka
2 x 3
4750 2011 M/s. Punam power Pvt Ltd,
Bangalore.
5.
Feasibility Study on water
Supply lines for Bharathi
Cement Factory from
Saravaraju Sarovar De
Reservoir near Cuddaph
Andhra Pradesh.
2010 M/s.Bharathi Cement
Corporation Limited
Hyderabad
6.
Navya Mini Hydel Scheme
near Kurnool, Andhra
Pradesh
2 x 1.3 2281
2010 M/s. Mitra Energy Pvt Ltd
Hyderabad
7.
Augmentation of Water
Supply Scheme at Hutti
Gold Mines Raichur District,
Karnataka
— —
2010
M/s. Hutti Gold Mines Co
Ltd. Bangalore
8.
Kollaya MHS near
Kumaradhara Dakshina
Kannada District, Karnataka
6 x 4
12000
2010
M/s. Kumaradhara Power
Co.Pvt Ltd., Bangalore.
9.
Solar Power Plant at Bellary
District, Karnataka
5 x 1
600
2009
M/s. Vishrutha Power Pvt
Ltd., Bangalore
10.
Anusha Mini Hydel Scheme
near Kurnool, Andhra
Pradesh
2 x 1.9
2778
2009
M/s. Dhenu Hydro Pvt Ltd
Hyderabad
11. Ramya MHS near
Kurnool,Andhra Pradesh
2 x 2 2900
2009 M/s. Kurnool Energies Pvt
Ltd Hyderabad
Preparation of DPR 44
Sl. No
Name of the Project Installed Capacity in
MW
Project Cost in Rs. Lakhs
Year Clients
12. Kodekal Basaveshwara MHS
Near Narayanapur Dam,
Gulbarga District,
Karnataka.
2 x 5
4500
2009
M/s. Kodekal Basaveshwara
Power Generation Pvt
Ltd.,Bangalore
13.
Magundi MHS near
Magundi Village, Mudigere
Taluk, Chikkamangalur
District, Karnataka.
3 x 3
5200
2009
M/s. Shakuntalam Power
Pvt Ltd., Bangalore.
14.
Dabevadi MHS Uttara
Kannada District, Karnataka.
3 x 4
6271
2008
M/s.Dabevadi Hydel Power
Pvt. Ltd., Uttara Kannada
Karnataka.
15.
Yadekumari MHS Hassan
District, Karnataka.
2 x 10.5 8200
2008
M/s. Sri Maruthi Power Gen
India Pvt Ltd., Bangalore
16.
Devargaddi MHS, Uttara
Kannada District, Karnataka.
2 x 3
3000
2008
M/s.Baliyan Power Private
Limited
Bangalore.
17.
Perdur MHS, Dakshina
Kannada District, Karnataka.
2 x 3 3000 2008 M/s. Dishaa Power
Corporation Private Ltd.,
Bangalore.
18.
H. Malligeri MHS, near
Maddur branch canal,
Mandya District, Karnataka.
1 x 1 461 2007 M/s. Venika Green Power
Pvt Ltd., Bangalore.
19.
Hosamatha MHS, near
Hosamatha village Dakshina
Kannada District, Karnataka.
3 x 1.2 1807 2007 M/s.Vakkal Power
Corporation Ltd.,
Bangalore.
20.
Devarabetta MHS, Hassan
District, Karnataka.
2 x 6.5 3910 2007 M/s. Pinnacle Green Power
Pvt. Ltd., Bangalore.
21.
Addhole MHS, near Bisale
village, Hassan District,
Karnataka.
3 x 8 8676 2007 M/s. Trimurthy Power Pvt.
Ltd., Bangalore.
22. Hongadahalli Mini Hydel
Scheme, Hassan District,
Karnataka.
18.9
7200
2007
M/s. Sri. Maruthi Power
Gen India Pvt Ltd.,
Bangalore
23. Mallahalli MHS, near
Patla,Kodagu District,
Karnataka.
3 x 8.39
9778
2007
M/s. Nandini Power Co.
Bangalore Pvt. Ltd.,
Bangalore.
Preparation of DPR 45
Sl. No
Name of the Project Installed Capacity in
MW
Project Cost in Rs. Lakhs
Year Clients
24. Hathipathar MHS
Chathisgarh State.
2 x 6
7000
2007
M/s. Shasta Investment and
Initiation Company Pvt Ltd
Hyderabad.
25. Benchagaddi MHS,
Dakshina Kannada District,
Karnataka
12
6000
2007
M/s. Pusala Power
Company Pvt Ltd.,
Hyderabad.
26. Talthare MHS in Kodagu
District, Karnataka.
2 x 3.7
3000
2007
M/s. GM Property
Developers Pvt. Ltd,
Bangalore.
27. Kanchimane MHS, Shimoga
District, Karnataka
2 x 2
2000
2007
M/s. Sagar Power (Dandela)
Pvt. Ltd Hyderabad
28.
Tomabattu MHS, Shimoga
District, Karnataka.
2 x 2.5
2500
2007
M/s. Siddhi Vinayaka
Spechem (P) Ltd.,
Bangalore
29. Havinahedgi MHS,
Hospet,Bellary District,
Karnataka.
4 x 6
12000
2007
M/s. XS Power company
Pvt Ltd Hyderabad.
30. Construction of weir across
across River Nethravathi at
Thumbe for providing Water
Supply to Mangalore City
Mangalore District,
Karnataka.
2007
M/s. Mangalore City
Corporation, Mangalore.
31. Shamburi MHS, near
Shamburi / Kamthi Bazar
village Dakshina Kannada
District, Karnataka,
5 x 4.80 9733 2006 M/s. Rithwik Energy
Generation Pvt. Ltd.,
Hyderabad
32. Varahi MHS, near
Hosangadi village Udupi
District, Karnataka,
2 x 4.50 4926 2006 M/s. South Canara Electric
Power Ltd., Bangalore.
33. Handihalla MHS, Mandya
District, Karnataka.
3 x 8.25
12000 2006 M/s.Penna Cement
Industries (P) Ltd.,
Bangalore
34. Sorang HEP, near
Barakhamba village, Mandi
Himachal Pradesh
2 x 50
58600
2006
M/s. Himachal Sorang
Power Pvt. Ltd., Hyderabad
Preparation of DPR 46
Sl. No
Name of the Project Installed Capacity in
MW
Project Cost in Rs. Lakhs
Year Clients
35. Maranahalli MHS near
Maranahalli, Hassan District,
Karnataka.
3 x 4.70 5313 2006 M/s.Deepak Cables,
Bangalore.
36. Iggalur Barrage MHS, near
Iggalur village, Bangalore
District, Karnataka.
1 x1.50
861
2006
M/s. Saroj Energy Co. Pvt.
Ltd., Bangalore.
37. Adishakthi Maramma MHS,
Mandya District, Karnataka.
4 x 6
9600
2006 M/s. Pioneer Genco Private
Ltd., Hyderabad
38. Shalvi MHS Shimla District,
Himachal Pradesh State.
2 x 3.5
4859
2006
M/s. Oriental Structural
Engineers Pvt. Ltd., New
Delhi.
39.
Yatanur MHS, near
Gulbarga District Karnataka.
2 x 3 2000 2006 M/s. SKN Hydro Energy
Pvt Ltd.
40
Yatanur Mini Hydel Scheme,
Bijapur District, Karnataka.
2 x 2
1600
2005
M/s. SKN Hydro Energy
Pvt Ltd., Bangalore
41.
Kallaja MHS, near Kallaja
village Dakshina Kannada
District, Karnataka.
3 x 2.5 3943 2005 M/s.Srishti Power Pvt. Ltd.,
Bangalore.
42.
Kollya MHS, near Kollya /
Veeramangala village
Dakshina Kannada District,
Karnataka.
6 x 3 9671 2005 M/s.SNC Power
Corporation Pvt. Ltd.,
Bangalore
43.
Neerukatte MHS,
Neerukatte Village Dakshina
Kannada District, Karnataka.
4 x 3.75 8185 2005 M/s..Sagar Power
(Neerukatte) Ltd.,
Bangalore.
44.
Perla MHS, near Perla
village Dakshina Kannada
District, Karnataka.
5 x 4.80 9901 2005 M/s. AMR Power Pvt. Ltd.,
Bangalore
45. Durgadahalla MHS, near
Charmadi village Dakshina
Kannada District, Karnataka.
2 x 9 9377 2005 M/s. Corporate Hydro
Energy Pvt. Ltd.,
Hyderabad.
46. Dodda Betta MHS, Hassan
District, Karnataka.
3 x 7 7871 2005 M/s. Sanjeevini Power Pvt.
Ltd., Bangalore.
47. Somavathi MHS,
Chikkamangalur District,
Karnataka.
2 x 3 2746 2005 M/s. SRM Power Pvt. Lt.,
Bangalore.
Preparation of DPR 47
Sl. No
Name of the Project Installed Capacity in
MW
Project Cost in Rs. Lakhs
Year Clients
48. Astalakshmi MHS, near
Kumbaradi village,
Chikkamangalur District,
Karnataka.
2 x 3.5 1816 2005 M/s..Shankaranarayana
Power Enterprises Pvt Ltd.,
Bangalore.
49. Uyamballi MHS, near
Koggedoddi, Bangalore
District, Karnataka
2 x 5
5512
2005
M/s. SNS Power Project
Pvt., Bangalore.
50. Surlabi MHS in Somavarpet
Taluk, Kodagu District,
Karnataka
2 x 2
1600
2005
M/s. Core Green Hydro
Power India Pvt Ltd.,
Hyderabad
51. Gondi MHS near
Sidlipura,Tarikere Taluk
Chikkamangalur District,
Karnataka
2 x 1.5
1500
2005
M/s. Bhadragiri Power Pvt
Ltd., Bangalore.
52. Detailed Survey and
Investigation work, EIA
Study and Preparation of
DPR for following Projects.
a) Belliyur HEP
b) Neerukatte HEP
15
15
8200
8200
2005
2005
M/s. NTPC Hydro Ltd.,
Noid, NCR Delhi
53. Adahole MHS Phase 1 and 2
near Dakshina Kannada
District, Karnataka.
2 x 12.5
12500
2005
M/s. Trimurthi Power Pvt
Ltd., Bangalore.
54. Gugal Small Hydel Scheme,Gulbarga District, Karnataka.
3 x 3.34
4958
2004
M/s. SRS Energy Private Ltd., Bangalore.
55. Somanamaradi Small Hydel Project on Upper Krishna Right Bank Canal, Raichur
District, Karnataka.
4 x 6
9600 2004 M/s. Narayanapur Power Co. Pvt. Ltd., Bangalore
56. Baje MHS Udupi District, Karnataka.
3 x 1 1456 2004 M/s. Devar Power Pvt. Ltd., Bangalore.
58. Kadamane MHS‐II, Hassan District, Karnataka.
2 x 7.5 8500 2004 M/s.Nagarjuna Holdings (P) Ltd., Hyderabad.
59. Hullahalli MHS, near
Hullahalli/ Ramapura village, Mysore District, Karnataka.
2x1 800 2004 M/s.Karnataka Renewable
Energy Development Ltd., Bangalore.
Preparation of DPR 48
Sl. No
Name of the Project Installed Capacity in
MW
Project Cost in Rs. Lakhs
Year Clients
60.
Shivanasamudram MHS, Malavalli Taluk, Mandya District, Karnataka
1 x 1 452 2004 M/s.Vakkal Power Corporation Ltd., Bangalore.
61.
Chikkmandya MHS, Chikkmandya, Mandya District, Karnataka.
1 x 0.50 471 2004 M/s.Adichunchanagiri Energy Projects Pvt. Ltd.,
Mandya.
62. Hullahalla MHS, Dhanagere,
Mandya District, Karnataka.
3 x 4 4740 2004 M/s. Limbavali Power Pvt.
Ltd., Bangalore.
63.
Dinnekere MHS,
Chikkamangalur District,
Karnataka.
2 x 3
3000
2004
M/s. Vejetha Glazed Tiles
Industries, Hyderabad,
Andhra Pradesh.
64. Afzalpur MHS, near
Afzalpur,Gulbarga District,
Karnataka.
2 x 4
4520
2004
M/s. Jasper Energy Pvt Ltd.,
Bangalore
65.
Sonna MHS, near soma
villege Gulbarga District,
Karnataka.
2 x 3
3300
2004
M/s. Jasper Energy Pvt Ltd.,
Bangalore
66. Singatalur‐Huligudda MHS
near Thimmalapur village,
Bellary District, Karnataka
3 x 6
6000
2003
M/s. Tungabhadra Power
Co. Private Ltd., Bangalore.
67 Mannapitlu MHS, near Arambodi village Dakshina
Kannada District, Karnataka.
3 x 5 6320 2003 M/s.Bobba Power Projects,
Bangalore.
68. Mulibettu MHS, near
Mulibettu village Dakshina
Kannada District,Karnataka.
2 x 4.5
4282
2003
M/s.Mount Kailash Power
Projects Pvt. Ltd. Bangalore.
69.
Kilanjara MHS, near Kalladi
village Dakshina Kannada
District, Karnataka.
2 x 3 3052 2003 M/s.Phalguni Power
Projects‐1, Bangalore.
70.
Kolavur MHS., near Niralike
village Dakshina Kannada
District, Karnataka.
2 x 4.5
4368
2003
M/s.Phalguni Power
Projects‐2, Bangalore.
71.
Horiabbe MHS, near
Siddapur village Udupi
District, Karnataka.
2 x 3 2596 2003 M/s. S.K. Farms, Hubli.
Preparation of DPR 49
Sl. No
Name of the Project Installed Capacity in
MW
Project Cost in Rs. Lakhs
Year Clients
72. MGHE MHS Shimoga
District, Karnataka.
2 x 10 11500 2003 M/s.Suchindra Investment
& Financial Services,
Bangalore
73. Abilbiru MHS, Hassan
District, Karnataka.
2 x 3 2273 2003 M/s. South‐West Hydro
Power Pvt. Ltd., Bangalore.
74.
Somavathi MHS,
Chikkamangalur District,
Karnataka.
2 x 3 2698 2003 M/s. SRM Power Pvt. Lt.,
Bangalore.
75. Akkihebbal MHS, Mandya
District, Karnataka.
2 x 1.25
700
2002
M/s. Cauvery Hydro
Energy Ltd Bangalore
76.
Kadamane MHS‐I, Hassan
District, Karnataka.
2 x 4.5 5200 2001 M/s.Paschim Hydro Energy
(P) Ltd., Hyderabad.
77.
Kumudavati Mini Hydel
Scheme,Haveri District,
Karnataka.
2 x 0.250 361.98
2001
M/s. Krisri Power Tech Pvt
Ltd, Bellary Karnataka
78.
Keertihole MHS near
Kutupuzha village,Virajpet
Taluk, Kodugu District
Karnataka.
3 x 8
7200
2001
M/s. Subash Project &
Marketing Co Pvt Ltd.,
Bangalore,
79.
Hemavathi High Level
Canal MHP,Gorur, Hassan
District, Karnataka.
2 x 2 600
2000
M/s. Flax India Limited
Bangalore
80.
Hebbakawadi MHSMandya
District, Karnataka.
2 x 1
400 1999 M/s. Jayalakshmi Power Co
Private Ltd., Bangalore
81.
Maddur Canal MHSMandya
District, Karnataka.
2 x 1.5 500 1998 M/s. Khodays Ltd.,
Bangalore
82.
New Ganderbal Hydro Electric Project, near Jammu,
Jammu and Kashmir State
3 x 15
4000
1996
M/s. Chief Engineer PDC
J&K State. Through M/s.
THC New Delhi.
Pre‐Feasibility Study Report 50
D. PRE‐FEASIBILITY STUDIES OF POWER PROJECT
Sl.
No.
Name of the Project Installed
Capacity in MW
Project Cost
in Rs. Lakhs
Year Clients
1 Baje‐Hiriadka MHS, Udupi
District, Karnataka.
2 x 1.5
1425
2011
M/s. Aparimita Power
Ventures PVt Ltd.,
Bangalore
2 Gulisattenhalli MHS,
Hasan District, Karnataka.
2 x 2.5 3185
2011
M/s. Aparimita Power
Ventures PVt Ltd.,
Bangalore 3 Kuppahalli MHS, Mandya
District, Karnataka.
2 x 2 2123
2011
M/s. Aparimita Power
Ventures PVt Ltd.,
Bangalore 4 Bellur MHS, Dakshina
Kannada District,
Karnataka.
2 x 1.5
1500
2010
M/s. Muktar Power (India)
Private Ltd., Goa
5 Mundaja Hole MHS,
Dakshina Kannada
District, Karnataka.
2 x 1
1000
2010
M/s. Muktar Power (India)
Private Ltd., Goa
6 Ujre MHS, Dakshina
Kannada District,
Karnataka.
2 x 1.5
1500
2010
M/s. Muktar Power (India)
Private Ltd., Goa
7 Kumadvati MHS near
Anjanapura
Chnnarayapatna,
Karnataka.
2 x 1.5
1400
2010
M/s. Brigade Infra Pvt Ltd
Bangalore
8 Um‐Lunar SHEP,
Meghalaya Northeast
State.
2 x 12 20000 2009 M/s. Green Valliey
Industries Private Ltd.,
Kolkatha.
9 Gurkhi MHS, Belgaum
District, Karnataka.
3 x 6
9000 2009 M/s. Aditya Infrastructure
Hyderabad
10 Potli MHS, Belgaum
District, Karnataka.
3 x 6 9000 2009 M/s. Aditya Infrastructure
Hyderabad 11 Chagotkallu MHS, Raichur
District, Karnataka. 2
600 2009
M/s. Samvah Energy Pvt Ltd Bangalore
12 Hurley MHS Hassan District, Karnataka.
1 540 2009 M/s. Classic Group Pvt Ltd., Bangalore
13. Kangtangshiri HEP
Arunachal Pradesh.
2 x 17.5 20000 2008 M/s. Raajratna Metal
Industries, Hyderabad
Pre‐Feasibility Study Report 51
Sl. No.
Name of the Project Installed Capacity in
MW
Project Cost in Rs. Lakhs
Year Clients
14. Ropum HEP Arunachal
Pradesh.
40 32000 2008 M/s. Raajratna Metal
Industries, Hyderabad
15. Barpu HEP Arunachal
Pradesh.
135 111645
2008
M/s. Raajratna Metal
Industries, Hyderabad
16. Par HEP Arunachal
Pradesh
96 79400 2008 M/s. Par Infra Limited,
Hyderabad.
17. Dardu HEP Arunachal
Pradesh.
3 x 25 52000 2008 M/s. Dardu Power Pvt Ltd.,
Hyderabad.
18. Alavalli MHS Hassan
District Karnataka.
2 x2 1600 2008 M/s. Hotel Maruthi Pvt. Ltd.
Bangalore.
19. Pema Shelphu ‐ HEP.
Arunachal Pradesh.
97.5 61900 2008 M/s. Raajratna Energy
Holdings Pvt. Ltd.
Hyderabad.
20. Marwari HEP,
Uttarakhand State.
8 4000 2008 M/s. R.R. Construction &
Infrastructure India Pvt Ltd.
Hyderabad
21. Balganga‐II HEP.
Uttarakhand State.
7 3500 2008 M/s. R.R. Construction &
Infrastructure India Pvt Ltd.
Hyderabad
22. Doodh Ganga / Meena
HEP. Uttarakhand State.
6 3000 2008 M/s. R.R. Construction &
Infrastructure India Pvt Ltd.
Hyderabad
23. Bernigad HEP,
Uttarakhand State.
6.5 3300 2008 M/s. R.R. Construction &
Infrastructure India Pvt Ltd.
Hyderabad
24. Vijaya Nagar‐Rampur HEP
Uttarakhand State.
20 1000 2008 M/s. R.R. Construction &
Infrastructure India Pvt Ltd.
Hyderabad 25. Rampur‐Tilwari HEP
Uttarakhand State. 25 12500 2008 M/s. R.R. Construction &
Infrastructure India Pvt Ltd. Hyderabad
26. Madya Maheshwar HEP Uttarakhand State.
18 9000 2008 M/s. R.R. Construction & Infrastructure India Pvt Ltd.
Hyderabad 27. Kepjog Mini Hydel
Scheme,Jog, Shimoga
District Karnataka.
10 4800 2008 M/s. Vensai Power Projects Pvt Limited, Hyderabad
Pre‐Feasibility Study Report 52
Sl. No.
Name of the Project Installed Capacity in
MW
Project Cost in Rs. Lakhs
Year Clients
28. 35 MW Bio Mass Power
Plant near eggbough,
Leeds, U.K
35 US $ 700,000 2008 M/s. Dass Green Energy
Inc., Boston, USA.
29. Baipadi MHS, Dakshina
Kannada District,
Karnataka.
2 x 3 2682 2007 M/s. Srishti Power Pvt. Ltd.,
Bangalore.
30. Hemavathi Right Bank
Canal MHS Stage‐II.
Hassan District, Karnataka.
2 x 1
1350
2007
M/s. Sri Maruthi Power Gen
India Pvt. Ltd. Bangalore.
31. Kela Chavadi
MHS,Agumbe, Shimoga
District, Karnataka.
2 x 2
1200
2007
M/s. Delmon Energy Pvt.
Ltd. Bangalore.
32. Hosakambi MHS,Uttara
Kannada District,
Karnataka.
2 x 2
1200
2007
M/s. Mysore Mercantile Co.
Ltd. Bangalore.
33. Dugganballu MHS, Uttara
Kannada District,
Karnataka.
2 x 2.5
3141
2007
M/s. Mysore Mercantile Co.
Ltd. Bangalore.
34. Tombattu Hole MHS,
Shimoga District,
Karnataka.
1 x 2
1000
2007
M/s. Siddhi Vinayaka
Spechem Pvt Ltd.,
Bangalore
35. Bairekoppa MHS, Dharwar
District, Karnataka.
2 x 2.5
3320
2007
M/s. Mysore Mercantile Co.
Ltd. Bangalore.
36. Kalgodu MHS,
Chikkamagalur District,
Karnataka.
2 x 1
1080
2007
M/s. Saisri Power Projects &
System Pvt Ltd Bangalore
37. Sondahalla MHS, Uttara
Kannada District,
Karnataka.
2 x 3.5
2555 2007 M/s. Disha Power
Corporation Pvt Ltd
Bangalore
38. Kelasi MHS, Hubli‐
Dharwar District,
Karnataka.
2 x 2.5
3036
2007
M/s. Abletech Electro
Engineers Pvt Ltd Bangalore
39. Kallur B MHS, Gulbarga
District, Karnataka.
4 x 4
6181
2007
M/s. Jasper Energy Pvt Ltd.,
Bangalore
Pre‐Feasibility Study Report 53
Sl. No.
Name of the Project Installed Capacity in
MW
Project Cost in Rs. Lakhs
Year Clients
40. Gundiadka Small
Hydropower Project.
Dakshina Kannada
District, Karnataka.
5 1790 2007 M/s. Saileela Power Pvt.
Ltd. Bangalore
41. Kottanadka Mini Hydel
Scheme, Kodagu District,
Karnataka.
2 x 1 1200 2007 M/s. AMR Power Private
Ltd. Bangalore.
42. Kannadagal MHS,Uttara
Kannada District,
Karnataka.
2 x 12 13200 2007 M/s. Trident power Systems
Pvt Ltd., Hyderabad.
43. Illva MHS Uttara Kannada
District, Karnataka.
7.5 3771 2007 M/s. Sri Shankara Narayana
Power Corporation Pvt Ltd.,
Bangalore.
44. Kalgatta MHS Dakshina
Kannada District,
Karnataka
2 x 2.5 2800 2007 M/s. Samvah Energy Pvt
Ltd., Bangalore.
45. Kubjanadi MHS Udupi
District, Karnataka
2 x 2.5 1750 2007 M/s. PSR Hydro Energy Pvt
Ltd., Bangalore.
46. Manchikeri MHP Uttara
Kannada District,
Karnataka.
3 x 6 6210 2007 M/s. PSR Hydro Energy Pvt
Ltd
47. Kurkamane Mini Hydel
Scheme, Hassan District,
Karnataka.
24 8676 2006 M/s. Trimurthy Power Pvt.
Ltd. Bangalore.
48. Nanniru Halla, Shimoga
District, Karnataka
2 x 2 1800 2005 M/s. Pinnacle Renewable
Energy Pvt. Ltd., Bangalore.
49. Ulippu MHS, Udupi
District, Karnataka
2 x 6 5958 2005 M/s. NTPC Hydro Ltd.,
Noida.
50. Kallaja MHS, Udupi
District, Karnataka
2 x 3 2662 2005 M/s. Srishti Power Pvt. Ltd.,
Bangalore.
51. Devaragundi MHS, Udupi
District, Karnataka.
2 x 2 1814 2005 M/s. Astra Infrastructure
Pvt. Ltd., Secunderabad.
Pre‐Feasibility Study Report 54
Sl. No.
Name of the Project Installed Capacity in
MW
Project Cost in Rs. Lakhs
Year Clients
52. Horabele MHS, Udupi
District, Karnataka
1.00 3663 2005 M/s. Karnataka Renewable
Energy Development Ltd.,
Bangalore.
53. Biligere MHS, Udupi
District, Karnataka.
2 851 2005 M/s. Astra Infrastructure
Pvt. Ltd., Secunderabad.
54. Surlabi MHS, Dakshina
Kannada District,
Karnataka.
2 x 2 1932 2005 M/s.Karnataka Renewable
Energy Development Ltd.,
Bangalore., Bangalore. 55. Haraga Hole MHS,
Dakshina Kannada District, Karnataka.
2 x 1.5 1363 2005 M/s.Karnataka Renewable Energy Development Ltd.,
Bangalore.
56. Mukkodlu MHS Dakshina Kannada District, Karnataka.
1.50 681 2005 M/s.Karnataka Renewable Energy Development Ltd.,
Bangalore.
57. Sirangahalli MHS, Kodagu
District, Karnataka.
0.80 331 2005 M/s.Karnataka Renewable
Energy Development Ltd.,
Bangalore.
58. Bhadrakali Mini Hydel
Scheme, Kodagu District,
Karnataka.
0.70 344 2005 M/s.Karnataka Renewable
Energy Development Ltd.,
Bangalore.
59. Chapparahalla MHS Phase
I Karnataka. 2 x 7 4200 2005 M/s. Akasha Ganga Energy
Pvt. Ltd., Bangalore. 60. Chapparahalla MHS Phase
II Karnataka.
3 900 2005 M/s. Akasha Ganga Energy
Pvt. Ltd., Bangalore.
61. Katigudde MHS Kodagu
District, Karnataka.
2 915 2005 M/s. Delta Power Projects
Pvt. Ltd., Bangalore.
62. Murukannu MHS,
Sakeleshpura, Hassan
District, Karnataka.
2 x 5.5
4360
2004 M/s. Paschim Holdings
private Ltd., Hyderabad.
63. Balekallu MHS, Karnataka. 2 x 6 3720 2004 M/s. Paschim Holdings
private Ltd., Hyderabad.
64. Hulikal Hole MHS, Udupi
District, Karnataka.
2 x 2 1700 2004 M/s. Devar Power Pvt. Ltd.,
Bangalore.
65. Vuddigudda MHS,
Chickmagalore District,
Karnataka.
2 x 0.45 591 2004 M/s. Woodae Gooda Coffee
Estate Mercara, Kodagu
District Karnataka
Pre‐Feasibility Study Report 55
Sl. No.
Name of the Project Installed Capacity in
MW
Project Cost in Rs. Lakhs
Year Clients
66. Kadamane Mini Hydel
Scheme‐II, Sakeleshpura
Hassan District, Karnataka
2 x 5 4500 2004 M/s. Nagarjuna Holdings
Pvt Ltd., Hyderabad.
67. Durgadahallihalla Mini
Hydel Scheme, Karnataka.
3 x 6 7500 2004 M/s. Nagarjuna Holdings
Private Ltd., Hyderabad.
68. Koo Hole MHS, Madapura,
Kodagu District,Karnataka.
1 461 2004 M/s.Karnataka Renewable
Energy Development Ltd.,
Bangalore.
69. Napanda Hole MHS,
Garavale, Kodagu District,
Karnataka.
1 x 0.50 273 2004 M/s. Karnataka Renewable
Energy Development Ltd.,
Bangalore.
70. Sulugodu MHS –
Megaravalli, Hosanagara
Taluk, Shimoga District,
Karnataka
1 x 1 446 2004 M/s. Syed Ibrahim & Sons,
Shimoga.
71. Koynad MHS, Madikeri
Taluk, Kodagu Dakshina
Kannada District,
Karnataka.
2 x 1.75 1880 2004 M/s.Sadguru Sai Energies
Pvt. Ltd., Bangalore.
72. Beliyur MHS South
Kannada District,
Karnataka.
2 x 7.5 9736 2004 M/s. NTPC Hydro Ltd.,
Noida. NCR New Delhi.
73. Nirkatte MHS Dakshina
Kannada District,
Karnataka
3 x 5 7204 2004 M/s. NTPC Hydro Ltd.,
Noida. New Delhi
74. Dodda Betta MHS
Dakshina Kannada
District, Karnataka
74 19438 2004 M/s. NTPC Hydro Ltd.,
Noida. New Delhi
75. Kulkunda MHS Dakshina
Kannada District,
Karnataka
2 x 9.5 8260 2004 M/s. NTPC Hydro Ltd.,
Noida. New Delhi
76. Bhimanakallu MHS
Dakshina Kannada
District, Karnataka
3 x 4.5 6383 2004 M/s. NTPC Hydro Ltd.,
Noida. New Delhi
77. Kollya MHS Dakshina Kannada District, Karnataka
3 x 6 9348 2004 M/s. NTPC Hydro Ltd., Noida. New Delhi
Pre‐Feasibility Study Report 56
Sl. No.
Name of the Project Installed Capacity in
MW
Project Cost in Rs. Lakhs
Year Clients
78. Bajimane MHS Udupi
District, Karnataka
2 946 2004 M/s. Falcon Power Pvt. Ltd.,
Bangalore.
79. Devaragundi MHS,
Dharmasthala Dakshina
Kannada District,
Karnataka.
2 x 2
1814
2004
M/s. Aster Infrastructure
Pvt. Ltd. Hyderabad.
80. Ganadahalli MHP Mandya
District, Karnataka.
2 x 2.5
1915
2004
M/s. SMR power Pvt Ltd.,
Bangalore
81. Biligeri MHS, Madikeri,
Kodugu District,
Karnataka
2 x 1
851
2004
M/s. Aster Infrastructure
Pvt Ltd Hyderabad
82. Gulgal MHS, Gulbarga
District, Karnataka
3 x 3.3 3623 2004 M/s. SRS Energy Pvt Ltd.,
Bangalore
83. Kadamane Mini Hydel
Scheme‐I, Hassan District,
Karnataka.
2 x 3
3000
2003 M/s. Paschim Holdings
private Ltd., Hyderabad.
84. Hachinad Mini Hydel
Scheme, Kodagu District,
Karnataka.
2 x 1 1118 2003 M/s.Karnataka Renewable
Energy Development Ltd.,
Bangalore.
85. Uyamballi MHS, Bangalore
District, Karnataka.
2 x 5 3663 2003 M/s.Karnataka Renewable
Energy Development Ltd.,
Bangalore.
86. Abilbiru MHS,
Sakaleshpura Hassan
District, Karnataka
2 x 2.25 1350 2003 M/s. South West Hydro Pvt
Ltd., Bangalore.
87. Kunchikal Falls MHS,
Dakshina Kannada
District, Karnataka.
2 x 2.5 1500 2003 M/s. South Canara Electric
Co. Pvt. Ltd., Bangalore.
88. Hosangadi Mini Hydel
Scheme, Dakshina
Kannada District,
Karnataka
2 x 1.5 1230 2003 M/s.Hosangadi Hydro
Power Projects Ltd.,
Bangalore.
89. Upper Kaneri MHS, Uttara
Kannada District,
Karnataka.
2 x 5
3000
2003
M/s. Sree Swarna Energy
Ltd Hyderabad.
Pre‐Feasibility Study Report 57
Sl. No.
Name of the Project Installed Capacity in
MW
Project Cost in Rs. Lakhs
Year Clients
90. Dinnekere MHS,
Chikmagalur District,
Karnataka.
2 x 0.5
459
2003
M/s. Jasper Energy Pvt Ltd
Bangalore.
91. Mannapittlu Hydro‐Power
Projects Dakshina Kannada
District, Karnataka
3 x 3 4540 2003 M/s. Bobba Power Projects
Pvt Ltd., Bangalore
92. Debewadi MHS,
Chandryapatana, Hassan
District, Karnataka.
2 x 2.5 2569 2003 M/s. Aji Engineering
Bangalore.
93. Pre‐feasibility Report on
Wind Energy Farm near
Chitradurga, Karnataka.
10 x 0.5
2000
2002 M/s.Khoday Ltd.,
Bangalore.
94. KIOC L Tailings
Classification &
Distribution Project
2002 M/s. Roche Mining. (MPJV)
Melboune Au strlia
95. Dodda Halla Mini Hydel
Scheme, Chickmagalore
District, Karnataka.
3 x 6
900
2001 M/s. Klen & Marshall Ltd.,
Bangalore.
96. Singatalur‐Huligudda
MHS, Hospet, Bellary
District, Karnataka.
3 x 6
7200
2001 M/s. Reddy Veeranna & Co.,
Private Bangalore.
97. Horiabbe MHS, Udupi
District, Karnataka.
2 x1.5 +
1x0.5
1877 2001 M/s. S K Farm Pvt Ltd.,
Hubli
98. Hebbakawadi MH Sin
Mandya District,
Karnataka
3 x 1
600
2000 M/s. Gilda Investments &
Financing, Bangalore
99. Right Bank High Level
Canal MH Sat
Tungabhadra Dam,
Hospet, Bellary District,
Karnataka.
2 x 1.5
400
2000 M/s. Tungabhadra Power
Co. private Ltd., Bellary.
100. 2 x 5 MW Elaneeru Mini
Hydel Scheme, Dakshina
Kannada District,
Karnataka.
2 x 5
3600
2000 M/s. Nagarjuna Engineering
& Contracts Private Ltd.,
Hyderabad.
Pre‐Feasibility Study Report 58
Sl. No.
Name of the Project Installed Capacity in
MW
Project Cost in Rs. Lakhs
Year Clients
101. Elaneeru MHS
Chickmagalore District,
Karnataka.
2 x 3
3000
2000
M/s. Nagarjuna Engineering
& Corporation Co. Pvt Ltd.
Hyderabad.
102. Kabbinale Mini Hydel
Scheme, Dakshina
Kannada District,
Karnataka.
2 x 1
700
1999 M/s. Sanicons Engineering
& Contracts Pvt Ltd,
Bangalore.
103. Preparation of Executive
Summary report on
Kattepura MHS near
Kattepura village
Arakalgud, Hassan
District, Karnataka.
2 x 1 600 M/s. Bright Vidyut Co Pvt
Ltd., Bangalore
Pre‐Tender Services 59
E. PRE‐TENDER SERVICES
Sl. No.
Name of the Project Installed Capacity in
MW
Project Cost in Rs. Lakhs
Year Clients
1. Indrasagar Pollavaram
Multipurpose Project – A
project of National Interest.
Multipurpose
Project
450000 2011 M/s. ILFS Hyderabad.
2. Ghattaprabha HEP at
Ghattaprabha Dam, Karnataka
EPC bid
2 x 10 4000 2011 M/s. Megawin
Switchgear Pvt. Ltd., Salem Tamil Nadu.
3. Pre‐Tender service for Canal
Distribution network and
ancillary structures
preparation of GAD’s for
Bridges, Aqueducts, Siphons
etc.
Irrigation
Project — 2011 M/s. Associated
Engineering Consultants
& Analysts Pvt Ltd.,
Mumbai.
4. Balance of Plant for Rafha Gas
Based Power Plant, Kingdom
of Saudi Arabia.
400 — 2011 M/s. ILF Consulting
Engineers Abudabhi,
UAE
5. Balance of Plant for AL—Jong
of Gas Based Power Plant,
Kingdom of Saudi Arabia.
400 — 2011 M/s. ILF Consulting
Engineers Abudabhi,
UAE
6. Pre‐Tender Services for
Electro‐Mechanical Equipment
for Dumajorhi SHEP
2 x 7.5 — 2011 M/s. Megawin
Switchgear Pvt Ltd.,
Salem, Tamil Nadu.
7. Pre‐Tender Services for Balgad
SHEP, Uttarkhand State
3 x 6.6 — 2011 M/s. Simplex
Infrastructures Ltd.,
Mumbai.
8. Pre‐Tender Services for
Khutani SHEP Uttarkhand
State.
3 x 7 — 2011 M/s. Simplex
Infrastructures Ltd.,
Mumbai.
9. Pre‐Tender Services for
Seraghat SHEP Uttarkhand
State
3 x 3.7 — 2011 M/s. Simplex
Infrastructures Ltd.,
Mumbai.
10. Balance of Plant for Qassim
Gas Based Power Plant
Qassim Kingdom of Saudi
Arabia.
400 — 2010 M/s.ILF Consulting
Engineers Abudabhi,
UAE.
Pre‐Tender Services 60
Sl. No.
Name of the Project Installed Capacity in
MW
Project Cost in Rs. Lakhs
Year Clients
11. Balance of Plant for Tabouk‐2
Gas Based Power Plant
Tabouk, Kingdom of Saudi
Arabia.
2 x 70 — 2010 M/s.ILF Consulting
Engineers Abudabhi,
UAE.
12. Basanthpur and Saradih
Barrage, Janjgir District,
Chhattisgarh.
Irrigation
Project
— 2010 M/s. Simplex
Infrastructure Co Pvt
Ltd., Mumbai.
13. Kachchh Branch Canal and
Rewa Branch Canal‐ Gujarat.
Irrigation
Project
— 2010 M/s. Simplex
Infrastructure Co Pvt
Ltd., Mumbai.
14. Bheden ‐Jharsuguda Water
Supply, Orissa.
Water Supply — 2010 M/s. Simplex
Infrastructure Co Pvt
Ltd., Mumbai.
15. Bansagar‐1 SHEP, Mirzapur
District, Uttar Pradesh
9.5 4800 2010 M/s. Simplex
Infrastructure Co Pvt
Ltd., Mumbai.
16 Somavathi MHS 9 3000 2010 M/s.Velankeni
Renewable Energy Pvt
Ltd,.Bangalore.
17. Bandraun SHEP Lalitpur
District, Uttar Pradesh
14.0 MW — 2010 M/s. Simplex
Infrastructure Co Pvt
Ltd., Mumbai.
18. Condenser Cooling System for
2 x 300 MW EMCO TPP
Warror Maharashtra
2 x 300 — 2010 M/s.Gammon India Ltd.,
Mumbai
19. Plant Water System Package
for Kakrapara Atomic Power
Project 3 & 4 units Gujarat
2 x 700 2010 M/s.Gammon India Ltd.,
Mumbai.
20. Dhaulasidh HEP, Himachal
Pradesh.
40 MW 2000 2010 M/s.Design Group +
M/s.Feedback Ventures
(Joint Venture)
21. Kalisindh Dam Project in
Rajastan
Irrigation
Project
4000 2010 M/s.Simplex
Infrastructures Ltd.
Mumbai
Pre‐Tender Services 61
Sl. No.
Name of the Project Installed Capacity in
MW
Project Cost in Rs. Lakhs
Year Clients
23. Detail Construction
Methodology for Vishnugad‐
Pipalkoti HEP in Uttranchal.
— — 2010 M/s. Rithwik Projects
Pvt. Ltd. Hyderabad
24. Meja SHEP, Mirzapur District,
Uttar Pradesh.
9.00 — 2010 M/s. Simplex
Infrastructure Co Ltd.,
Mumbai.
25. Pre‐Tender Services for
Transportation of Water from
Mahanadi River at Cuttack to
Paradip for Paradip Refinery
at Orissa.
Water Supply 20000 2009 M/s. Gammon India Ltd.,
Mumbai
26. Pashdan Irrigation Project in
Afghanistan
Irrigation
Project
US $ 90
Million
2009 M/s.Hewadwal Group
Kabul, Afghanistan
27 Almar Irrigation Project in
Afghanistan
Irrigation
Project
US $ 190
Million
2009 M/s.Hewadwal Group
Kabul, Afghanistan
28. Shah‐wa‐Arus Irrigation and
Hydro Power Project in
Afghanistan
Irrigation
Project
US $ 45
Million
2009 M/s.Hewadwal Group
Kabul, Afghanistan
29. Sea Water Intake System for
Ultra Mega Power Project at
Krishnapatnam, Andhra
Pradesh.‐ 6 x 660 MW
Water Supply 1200 2009 M/s. Gammon India Ltd.
Mumbai
30. Raw Water Supply System for
Alumina Refinery Expansion
Project of M/s.Vedanta
Aluminium Limited at
Linjigarh in Kalahandi District
of Orissa.
Water Supply 2008 M/s. Gammon India Ltd.,
Mumbai
31. Upper Bhadra Irrigation Canal
Network System Package II
Irrigation
Project
2007 M/s. Gammon India Ltd.,
Mumbai
32. Upper Bhadra Irrigation
Project‐Package Numbers 1 &
3 Shimoga District, Karnataka.
Irrigation
Project
2007 M/s. Gammon India Ltd.,
Mumbai
Pre‐Tender Services 62
Sl. No.
Name of the Project Installed Capacity in
MW
Project Cost in Rs. Lakhs
Year Clients
33. Plant Water Supply Scheme at
JSW‐Vijaynagar Steel Plant at
Thoranagal, Bellary District,
Karnataka.
Water Supply — 2007 M/s. Gammon India Ltd.,
Mumbai.
34. Review of draft EPC for Penan
HEP, Sikkim India
4 x 70 10000 2007 M/s. Hemagiri Hydro
Energy Company Pvt
Ltd., New Delhi.
35. Left Bank of Indrasagar
(Pollavaram) HEP in
Anguluru Devapatnam
Mandal, East Godavari
District, Andhra Pradesh
Irrigation
Project
2006
M/s. Maytas Infra Pvt
Ltd., Hyderabad
36. Galeru Nagari Sulaja Sravanti
(GNSS) Flow Canal Project,
Phase‐I, Andhra Pradesh.
Irrigation
Project
— 2006 M/s. Maytas Infra Private
limited, Hyderabad.
37. Galeru Nagari Sulaja Sravanti
(GNSS) Flow Canal Project,
Phase‐II, Andhra Pradesh.
Irrigation
Project
— 2006 M/s. Maytas NCC JV
Private limited,
Hyderabad.
38. Galeru Nagari Sulaja Sravanti
Project Andhra Pradesh
Irrigation
Project
— 2006 M/s. Maytas Infra Private
limited, Hyderabad
39. Pre‐tender Services for
Velagonda Irrigation Project,
Nelagunda Dristrict Andhra
Pradesh.
Irrigation
Project
— 2005 M/s. Gammon India Ltd.,
Mumbai.
40. Assistance in REQ/RFQ/ Offer
for allotement of Badrinath
HEP near Badrinath,
Uttranchal State.
2 x 70 80000 2004 M/s. GMR Energy Ltd.,
Bangalore.
41. Pre‐Tender services for
Ainapur Lift Irrigation
Scheme.
Irrigation
Project
— 2003 M/s. Simplex
Infrastructures Ltd.
Mumbai
Pre‐Tender Services 63
Sl. No.
Name of the Project
Installed Capacity in
MW
Project Cost in Rs. Lakhs
Year
Clients
42. Pre‐Tender service for
Singatalur Lift Irrigation
Scheme, Karnataka.
Irrigation
Project
— 2003 M/s. Chinnanachinuthu
and Company Bangalore.
43. Water Processing Projects
Balance of Electrical Works
Water Supply — 2003 M/s. Movers (India ) Pvt
Ltd., Bangalore
44. Implementation of 3 x 5 MW
Canal head Power house on
Left Bank Canal of Indira
Sagar Project, Madhya
Pradesh.
3 x 5 9000 2003 M/s. SEW Constructions
Ltd., New Delhi.
45. Pre‐Tender Services for
Singatalur Lift Irrigation
Scheme ‐ 4 Packages.
Irrigation
Project
12000 2002 M/s. Engineers Projects
India Ltd., Chennai.
46. Pre‐Tender services 400/220
kV for connected civil works
of Switchyard at Nelamangala,
Bangalore for KEB, Bangalore.
Substation 1100 2002 M/s. ABB Ltd.,
Bangalore.
47. Bajemane MHS in Kodagu
District, Karnataka.
2 x 1.5 450 2002 M/s. Falcon Power Pvt
Ltd., Bangalore.
48. Pre‐Tender service for Greater
Aizawl water Supply scheme
Phase II
Water Supply 10000 2002 M/s. Johnson Eastern
Power Aizawl Mizoram.
49. Pre‐Tender service for
Singatalur Lift Irrigation
Scheme.
Irrigation
Project
— 2002 M/s. G.J Ferandez
Secunderbad Andhar
Pradesh.
50. Dam remodeling studies at
Lyka –Lake at Kudremekh
Iron Ore Co Ltd.,
— — 2002 M/s. Rochie Mining Mt
India Pvt Ltd., Cochin
Kerala State India
51. Pre‐Tender service for
Periyapatna Lift Irrigation
Scheme.
Irrigation
Project
1200
2001 M/s. NGEF Ltd.,
Bangalore
52 Pre‐Tender service for Balance
of Civil Works for Link Canal
MHS, Mandya District,
Karnataka.
1.5 150 2001 M/s. Mysore
Construction Co Pvt
Ltd., Bangalore.
Pre‐Tender Services 64
Sl. No.
Name of the Project Installed Capacity in
MW
Project Cost in Rs. Lakhs
Year Clients
53. Pre – Tender Services for DG
Captive Plants at Yemen.
a) Sana’s (Option 1)
b) Sana’s (Option 2 )
c) Hodaidah
d) Taiz
e) Aden
3 x 5
4 x 5
2 x 5
2 x 5
2 x 5
$ 40 Million. 2001 M/s. National Trading
Co Ltd., Yemen.
54. Pre‐Tender service for Cooling
Water System at
Ramagundam TPP, Andhra
Pradesh.
Water Supply — 2001 M/s. Mega Engineering
Enterprises, Hyderabad
55. Technical Apprisal report on
DPR of Dummagudem MHS
across river Godavari at
Dummagudam, Andhra
Pradesh.
10 2500 2001 M/s. PSM Spinng Ltd.,
Hyderabad
56. Pre‐Tender service for
Siraguppa MHS near
Kenchanagudam Village,
Siraguppa Taluk Bellary
District, Karnataka.
2 x 2.5 2000 2001 M/s. Krishi Power Tech
Pvt Ltd., Bellary,
Karnataka
57. Upper Bhadra Lift Irrigation
Scheme, Karnataka.
Irrigation
Project
— 2001 M/s. SNC, Bangalore.
58. Preparation of RFQ for
Thermal Power Plant at
Baroda for M/s. GPCL. Gujarat
500 22500 2000 M/s. Bay West Power &
Energy Pvt Ltd.,
Bangalore.
59. Pre‐Tender services for Co‐
generation Captive Power
Plant for M/s. Duncan
Industries Ltd., at Khanpur.
Uttar Pradesh.
75 30000 1999 M/s. Bay West Power &
Energy Pvt Ltd.,
Bangalore.
60. Chuzachen HEP in East
Sikkim State,
2 x 40 — 1999 M/s. Nagarjuna
Construction Co Ltd.,
Hyderabad.
Pre‐Tender Services 65
Sl. No.
Name of the Project Installed Capacity in
MW
Project Cost in Rs. Lakhs
Year Clients
61 Technical Evaluation Report
on Hemavathy LBC MHS,
Hemavathy river bed unit &
Varahi Tail Race Scheme.
— — 1999 M/s. Bhrouka Power
Corporation Ltd.,
Bangalore.
62 Pre‐Tender services for
Captive Power Plant at
Kapasan, Rajasthan for M/s.
HZL, Udaipur, Rajasthan.
60 28000 1998 M/s. Bay West Power &
Energy Pvt Ltd.,
Bangalore.
63 Pre‐Tender services for DG
Plant for Kerala State
Electricity Board. Kerala
40/60 24000 1998 M/s. Bay West Power &
Energy Pvt Ltd.,
Bangalore.
64 Pulichintala Irrigation Project,
Andhra Project.
Irrigation
Project
1200 1998 M/s. Gammon India Ltd.,
Mumbai.
65 Upper Tunga Canal Head
Regulator, Shimoga District,
Karnataka.
Irrigation
Project
4000 1998 M/s. Karnataka
Neeravari Nigam Ltd.,
Shimoga, Karnataka.
66 Pre‐bid services for Koilsagar
Lift Irrigation Scheme, Andhra
Pradesh.
Irrigation
Project
— 1998 M/s. Nagarjuna
Construction Co Ltd.,
Hyderabad.
67 Pre‐Tender services for 132 kV
Switchyard at Bidanasi, Orissa
for M/s. OPGC. Ltd.
Switchyard 670 1995 M/s. GEPC, Bangalore.
68 Pre‐Tender services for
connected Civil Works of Port
Yard Lighting at Chennai Port
for Ennore Coal Port Project.
Illumination 100 1995 M/s. GEPC, Bangalore.
69 Haliyal Lift Irrigation Scheme,
Karnataka.
Irrigation
Project
160 1995 M/s.Mysore Construction
Co., Bangalore.
70 Pre‐Tender services for
Substations for MSEB.
Maharashtra.
132 kV 900 1994 M/s. GEPC, Bangalore.
Pre‐Tender Services 66
Sl. No.
Name of the Project Installed Capacity in
MW
Project Cost in Rs. Lakhs
Year Clients
71 Pre‐Tender services for
connected civil works of
Substations at Meerut and
Mandola for PGID. New
Delhi.
400 kV/220
kV
600 1994 M/s. GEPC, Bangalore.
72 Bhima Lift Irrigation Project,
Gulbarga District, Karnataka.
Irrigation
Project
22000 M/s. Gammon India Ltd.,
Mumbai.
Due Diligence Report 67
F. Due Diligence Report‐Completed
Sl. No.
Name of the Project Installed Capacity in
MW
Project Cost in Rs. Lakhs
Year Clients
1 Technical Apprisal Report
for Palloli MHS –River
Gurpur.
2 x 2.5 2000 2011 M/s. Greenko Energies
Pvt Ltd., Hyderabad.
2 Technical Apprisal Report
for Alehalli MHS‐River
Bhadra
2 x 2.5 2000 2011 M/s. Greenko Energies
Pvt Ltd., Hyderabad.
3 Technical Apprisal Report
for Shiragola MHS‐River
Bhadra, Shimoga District,
Karnataka.
3 1500 2011 M/s. Greenko Energies
Pvt Ltd., Hyderabad.
4 Technical Apprisal Report
for Kuskal MHS –River
Bhadra, Shimoga District,
Karnataka.
2 x 2.5 2000 2011 M/s. Greenko Energies
Pvt Ltd., Hyderabad.
5 Technical Apprisal Report
for Jaladurga MHS‐River
Tunga, Hospet, Bellary
District, Karnataka.
3 1500 2011 M/s. Greenko Energies
Pvt Ltd., Hyderabad.
6 Technical Apprisal Report
for Kantamangala –River
Payaswini,Puttur District,
Karnataka.
4.5 22500 2011 M/s. Greenko Energies
Pvt Ltd., Hyderabad.
7 Updating of Financials DPR
for Magundi MHS
2 x 4.5 5200 2011 M/s. Continental Energy
Services Pvt Ltd.,
Hyderabad.
8 Concept report for Water
Recovery from Slime Pond
at JSW Hosepet, Bellary
District, Karnataka.
— — 2010 M/s. Kelsatek Solutions
Pvt Ltd., Bangalore.
9 Chunchi Doddi MHS,
Bangalore Rural District,
Karnataka.
3 x 3.559 4800 2010 M/s. Greenko Energies
Pvt Ltd., Hyderabad.
Due Diligence Report 68
Sl. No.
Name of the Project Installed Capacity in
MW
Project Cost in Rs. Lakhs
Year Clients
10 Bhadra Left Bank Canal
MHS, Shimoga District,
Karnataka.
1 x 1.5 1051 2010 M/s. Shree Matha
Vaishnavi Infra‐Build Pvt
Ltd., Mysore.
11 Jalkoti SHEP in Himachal
Pradesh.
2 x 6.25 10400 2010 M/s. Prajwal Energy Pvt
Ltd., Mumbai
12 Hemavathy MHS,
a) Left Bank Power
House
b) River Bed Power
House
Hassan District, Karnataka
4 x 4
2 x 4
8000
4000
2010 M/s. Greenko Energies
Pvt Ltd., Hyderabad.
13 Himani Chamunda SHEP
in Himachal Pradesh.
2 x 4.75 8000 2010 M/s. Prajwal Energy Pvt
Ltd., Mumbai
14 Dadupur MHS, near
Dadupur, Harayana.
4 x 4 6400 2010 M/s.Bhoruka Power
Corporation Pvt Ltd.,
Bangalore.
15 Techno‐Economical
Viability Study on DPR of
Dikku HEP, Nagaland.
165 110000 2010 M/s. Saraswathi Power
Co Ltd., Hyderabad.
16 Somavathi MHS,
Chikkamagalur District,
Karnataka.
2 x 3 2963.65 2010 M/s. Velankani
Renewable Energy Pvt
Ltd.,Bangalore.
17 Technical Review Report
for Chaya Bhagawati SHP,
Karnataka.
4 x 6 12000 2009 M/s.Bhoruka Power
Corporation Pvt Ltd.,
Bangalore.
18 Due Diligence report for
Sarju I MHS, Bageshwar
Uttarakhand.
7.5 5300 2009 M/s. Hemavathy Power
& Light Pvt Ltd.,
Bangalore.
19 Sarju II MHS, Bageshwar
Uttarakhand
15 10500 2009 M/s. Hemavathy Power
& Light Pvt Ltd.,
Bangalore.
20 Sarju III MHS, Bageshwar
Uttarakhand
10.5 7500 2009 M/s. Hemavathy Power
& Light Pvt Ltd.,
Bangalore.
Due Diligence Report 69
Sl. No.
Name of the Project Installed Capacity in
MW
Project Cost in Rs. Lakhs
Year Clients
21 Upper Sethi HEP, Nepal.
127 100000 2009 M/s. Venika Hydro
Projects Pvt. Ltd.,
Bangalore.
22 Upper Modi HEP, Nepal. 30 30000 2009 M/s Maytas Infra Ltd.,
Hyderabad.
23 Paudital Lassa SHP near
Roharu Town in Himachal
Pradesh.
24 12600 2008 M/s. Tulajaa Bhavani
Energy Projects Pvt Ltd.,
Mumbai.
24 Palor‐I MHS near village
Lana Palor Sangarh Taluk,
Simor District, Himachal
Pradesh
2 x 1.5 1300 2008 M/s. Tulajaa Bhavani
Energy Projects Pvt Ltd.,
Mumbai.
25 Palor‐II MHS near village
Lana Palor Sangarh Taluk,
Simor District, Himachal
Pradesh.
2 x 2.25 1306 2008 M/s. Tulajaa Bhavani
Energy Projects Pvt Ltd.,
Mumbai.
26 Gundiadka SHPP, Dakshin
Kannada District,
Karnataka.
2 x 3.5 1925 2007 M/s. Sun Technics Pvt
Ltd., Bangalore.
27 Burhi Gandaki HEP, Nepal 4 x 150 227618 2007 M/s. GMR Energy Ltd.,
New Delhi.
28 Augmentation of water
supply to Mangalore City.
Dakshina Kannada District,
Karnataka.
Water
Supply
3940 2007 M/s. Mangalore City
Corporation, Mangalore
Karnataka.
29 Kubjanadi MHS, near
Coondapura, Karnataka.
2 x 2 1600 2007 M/s.PSR Hydro Energy
Pvt. Ltd., Bangalore.
30 Marigundihole MHS, near
Kadaba, Chikkamagalur
District, Karnataka.
2 x 1.5 1250 2007 M/s.PSR Hydro Energy
Pvt. Ltd., Bangalore.
31 Venurhole MHS, near
Moodabidri, Dakshina
Kannada District Karnataka
2 x 2.5 2000 2007 M/s.PSR Hydro Energy
Pvt. Ltd., Bangalore.
32 Manchikere MHS, near
Yellapura,Uttara Kannada
District, Karnataka.
2 x 8.25 8000 2007 M/s.PSR Hydro Energy
Pvt. Ltd., Bangalore.
Due Diligence Report 70
Sl. No.
Name of the Project Installed Capacity in
MW
Project Cost in Rs. Lakhs
Year Clients
33 Techno‐Economical
viability Study for Hanol‐
Tiuni in Uttranchal.
100 60000 2007 M/s. Sunflag Iron and
Steel Co Ltd., New Delhi.
34 Baliyantrahole MHS,
Kodagu District, Karnataka.
2 x 1 800 2007 M/s.Kodagu Power Pvt.
Ltd., Bangalore.
35 Middle Kolab SHP, Orissa. 3 x 6 9000 2006 M/s.Meenahshi Power
Ltd., Hyderabad.
36 Review of Hydrology and
Power Potential for Dik‐
Chu HEP in Sikkim
2 x 48 80000 2006 M/s. Indu Projects Ltd.,
Hyderabad.
37 Samal HEP near Kule
village Angul District,
Orissa.
5 x 4 10000 2006 M/s.. KSK Energy
Ventures Ltd.,
Hyderabad.
38 Techno‐Economical
viability study for Bajoli
Holi Project near Holi
village, Himachal Pradesh.
180 108000 2006 M/s. Simplex
Infrastructures Ltd.,
Mumbai.
39 Techno‐Economical
viability study for Dibbin
HEP, Arunachal Pradesh.
95 60000 2006 M/s..Sunflag Iron & Steel
Co.Ltd., New Delhi
40 Kuthupuzha MHS in
Kodugu District,
Karnataka.
2 x 2 200 2005 M/s. Raphidiam Power
Supplies Pvt Ltd.,
Madikere
41 Technical appraisal on
Bharmour HEP in
Himachal Pradesh.
80 34700 2005 M/s. Nagarjuna Hydro
Energy Pvt Ltd.,
Hyderabad.
42 Preliminary Assessment of
Power Potential for
Machgunda MHS,
Shalipura Branch Canal 1 &
2, Karnataka.
650
600
200
200
2005 M/s. Rahmhita Power
Project Pvt Ltd.,
Hyderabad.
43 Kelagur MHS Kodagu
District, Karnataka.
2 x 2 1600 2005 M/s Karnataka Strips Pvt.
Ltd., Bangalore.
44 Study of Power Potential in
Netravati Basin Western
Ghats, Karnataka.
— — 2004 M/s. NTPC Hydro Ltd.,
Noida, NCR New Delhi.
Due Diligence Report 71
Sl. No.
Name of the Project Installed Capacity in
MW
Project Cost in Rs. Lakhs
Year Clients
45. Project Appraisal for 40MW
Biomass based Thermal
Power Plant in Andhra
Pradesh.
40 20000 2004 M/s. Alpha Energy
System Ltd., Chennai
Tamil Nadu.
46. Techno‐Economical
Viability Study on DPR
Jorthrang Loop HEP
Sikkim.
2 x 48 65000 2004 M/s. Nagarjuna hydro
Energy Pvt Ltd.,
Hyderabad.
Certificate 72
Certificate 73
Certificate 74
Certificate 75
Certificate 76
Certificate 77
Certificate 78
Certificate 79
Certificate 80
Certificate 81
Certificate 82
Certificate 83
Certificate 84
Certificate 85
Certificate 86
Certificate 87
Certificate 88
Advisor 89
13. Brief Profile of Advisors / Consultants
(a) Advisors
Mr. H.V. Eswaraiah, is retired from Karnataka Power Corporation Limited, working as
freelance Consultants for large Hydro Power Project. Design Group is availing his
technical expertise on implementation of Hydro Power Project related to contracts,
QAC, PMC etc.
Mr. H.V. Eswaraiah, after his Masters degree from renowned Indian Institute of Science,
had a brief stints as lecturer, worked in State Public Works Department before joining
Karnataka Power Corporation Limited, as Assistant Executive Engineer in the year 1971,
and retired as Technical Director in the year 1997. He has extensively dealt with all
aspects of Hydro Power Projects, starting from field investigation, preparation of PFR,
DPRs, Bid preparation, technical evaluation, award of work, as Executive Engineer, he
has worked on a 100m high Supa Concrete gravity Dam, achieved production level of
1000 cumecs per day of concreting production and laying in the design. At corporate
level, in charge of long term Power Project Planning, advising Managing Director, on
settlements of dispute and claims of contracts, direct monitoring of all Projects under
construction, procurement and movement of Coal, Cement and Steel. In his tenure, he
has handled 15 Hydro Power Projects including a Thermal and Wind Projects. He had
wide experience in dealing with World Bank Funded Projects.
After his retirements, he was appointed by NTPC for Koll dam (700 MW) as advisor. He
is also assisting Banks as Lender Engineers for various Mini Hydel Scheme funded by
Banks.
Advisor 90
Mr. Shankar V. Nesargi, B.E. (Mech), ME (WR), Joined Karnataka Power Corporation
Limited, as an Engineer in the year 1970 and retired as Managing Director of VVNL,
subsidiary Company of KPCL in the year 2005. As an Assistant Engineer handled
investigation works of Kali Hydro Electric Project ( 6 x 135 MW) including drift works.
Incharge Executive Engineer for construction, O & M of 4 x 210 MW
Raichur Thermal Power Plant, he had extensive explosure to Coal Plant, Railways, WTP,
Boiler, Turbines etc. During this period, he was elevated, as Superintending / Chief
Engineer. In the year 2003, he was appointed as Executive Director totally incharge of
Planning Infrastructure works of 4 x 350 MW, Bidadi Gas Based Power Plant, near
Bangalore. Subsequently, he was appointed, as Managing Director, Vishveswaraiah
Vidyuth Nigama Ltd., incharge of O & M, of 600 MW Hydro Power Project including R
& M works. During his tenure in KPCL, he has attended several National and
International Seminar and travel world wide.
After retirement he was a freelance consultant to various foreign Companies in Uganda,
Spain etc., traveled extensively in these countries as technical consultants.
Presently, he works as a Managing Director of DB Global Energy Limited, a Company
dedicated to Wind Power Generation as IPPs, executing 100 MW of Windfarm near
Belgaum, Karnataka.
Advisor 91
Mr. P.R. Balasubramanian, after obtaining Bachelor degree in Mechanical Engineer, had
one year training in Nuclear and Allied subjects in Bhabha Automic Research Centre,
Bombay. Thereafter, he was absorbed in the department worked for a decade in various
departments of BARC, before joining Engineers India Limited, New Delhi in the year
1978. Thereafter joined Gas Authority of India Limited and worked till 1990. He was
selected, as Director in Neyveli Lignite Corporation Ltd, in 1997. He was Chairman /
Managing Director of Fertiliser and chemicals, Travancore up to his retirement in the
year 2002.
He is a freelance consultant, presently independent Director of REC, India Rare Earth
Ltd., (Department of Atomic Energy).
His areas of expertise is overall Corporate Management of Large Organisations,
Development of Engineering Expertise in the Organisation, Conceptualising of Turn
Around strategies, over view the implementation of the Projects from Concept to
Commissioning, preparation of quality Project Reports, Proper appraising of the Project
Reports, Resolving Arbitration Issues etc., by applying the expertise and experience in
managing various projects in Nuclear Chemicals, Fine Chemicals, Petrochemicals,
Hydrocarbons, Gas Processing Plants, Cross Country Pipelines, Thermal power plants,
Fertilizer Complexes etc.
Advisor 92
Mr. B.V. Ramakrishnaiah, hydraulic Gates Consultants, was ranked 4th in Bachelor of
Engineer, and passed M.E. in distinction from India’s premier Institution namely Indian
Institute of Science, Bangalore, in the year 1964. He joined CW& PC, New Delhi, soon
after his Master degree in the year 1962, worked mainly in design and drawing of
Hydraulic Gates for Irrigation and Hydro Power Projects. In the year 1966 joined M/s.
Triveni Structurals Ltd., Naini, Allahabad, served over 13 years in the organization, as
Gates and Penstock design specialist. During his tenure, he has designed cylinder Gates
for Ramanaganga Project, which is only one of its kind in the country, operated by a 70
tonnes capacity Hydraulic hoist. Another gate operated by 650 tonnes capacity
Hydraulic hoist is designed, as High Pressure slide gates, for Baggi control works,
Sundernagar, Himachan Pradesh, High Pressure fixed wheel Penstock emergency gate
was designed for Beas Project, Punjab for a clear vent size of 10 feet x 21 feet, for a
design head of 110m. This gate carries a total load of 2160 tonnes which is transferred to
concrete through 12 wheels, 150 tonnes capacity hydraulic hoist operates the gate. Crest
radial gates for Itezhitezhi Dam, Zambia, has been designed which was vetted by
SWECC Swedan. Similarly, Batten outlet radial gates had been designed for Great
Reeha Power Project Tanzania.
He resigned M/s. Triveni Structurals Ltd., in the year 1979, to start his own consultancy
firm, where he has designed over 100 gates of various shapes and sizes. To name a few,
designed 18.288m x 17.145m spillway radial gates for Srisailam Hydro Electric Project in
Andhra Pradesh, first time spherical plain bearings were used for the Tirunion instead
of normal bronze bushes. Designed one of the tallest Penstock gate of size 6.75m x
15.75m in the country, for Lower Metur Project in Mettur Tamilnadu.
As regards Penstocks, Pipes, 2.743m dia for a static head of 405m was designed for
Kaufe Gorge HEP in Tambia Africa, 4.88m dia to withstand static head of 51.2m was
designed for Bowatena Power Project in Sri Lanka. He has distinction of designing
record breaking gate size and penstocks of large diameter in India. He is ranked as a top
class gate designer in India.
Advisor 93
Mr. V. Balachandran, is a retired, Deputy Director General and HOD GSI, Southern
Region. He is a freelance senior Geologist advising Design Group on Engineering
Geology for Large Hydro and Irrigation Projects in India and Abroad. Presently
pursuing his doctoral thesis in Osmania University.
Mr. V. Balachandran, after Masters’ degree in Geology joined Geology Survey of India in
the year 1971, as Junior Geologist and retired, as Deputy Director General and HOD,
GIS, Southern Region. Out of 36 years of experience in the fields of Geology, 30 years is
spent in Engineering Geology, involved in conducting Preliminary Investigation to post
construction stage, his services spread all over India, including Supervision and
guidance to Project Authorities. A few Projects where he was directly involved are :
facilitated smooth negotiation, Chibro Khodri Hydro Power Project tunnel between two
regional thrusts. Facilitated smooth negotiation of twin tunnels of Khan Hydel Scheme,
upto upper Siwalik incoherent sand rock with plethora of problems such as seepage,
collapse and daylighting of the tunnel. Selection of Dam site for 230m high rockfill dam
project which was under investigation for a protracted period (40 years). By identifying
source of seepage at Kadampari Pumped storage scheme, the energy generation was
substantially enhanced. Adopted hydraulic jacking of upper Kodayan tunnel and
suggested other remedial measure. Geological investigation was extensively carried at
MAPS Kalpakkam and Kundankulam for Nuclear Power Corporation Ltd., Extensive
field services were carried out with special reference to Seismological studies led to
clearance for Kundakulam Atomic Power Plant. Initiated studies on Korada Atomic
Power Plant and studies on Plutonium Fast Breeder Reactor Project under Madras
Nuclear Power Plant leading to clearance to the Project. Carried out Mega thrust
Tsunami Hazard studies in South India. Attended several National and International
seminars, and presented several technical papers, Traveller World Wide, including
undergoing training in Harza Engineering, USA and National Resources (Canada) and
Geological Survey of Canada at Vancouver Calgary and Ottawan Canada.
Advisor 94
C.R. Venkatesh B.E. (Civil), M.E. (Str), obtained first class with distinction in Masters’
degree, from the renowned Indian Institute of Science, Bangalore. He worked, as
lecturer in Engineering Colleges, Assistant Residential Officer, CWPRS (Poona, Scientist
Cement Research Institute of India, New Delhi, before joining National Hydro Power
Corporation Ltd., as Manager in the year 1981, worked till his retirement in the year
2004. During his tenure in NHPC Ltd., he has risen from the post of Manager upto
Executive Director. As a Chief Engineer, he was in charge of Dulhasti Hydro Power
Project (3 x 130 MW). As an Executive Director, Contract Division, managed all
procurement activities and Civil E & M Works Contracts. Under R & D wing, he has
evolved cost analysis of complicated works, suggested various means for cost cutting.
He was trained in detailed structural analysis of Chamber Concrete Dam in Canada; in
Sweden, under went Advanced International Hydro Power Develop Project; in
Germany / Netherland attended Advanced Management Development Training.
In India, under went specialized technical training in Reflection Photo elasticity and
strain gauge technique, Dam Safety, Geotechnical instrumentation etc. He has visited
number of Foreign Countries. Deputed to Pakistan, participated in technical discussions,
on Indus Watering Treatment. Had meeting with Arbitrators in connection with Internal
Arbitration Tribunal on Chamera HEP Contract disputes. He has 44 technical papers to
his credit. His research paper on De‐silting basin, won a special Certificate of merit by
Central Board of Irrigation and Power, New Delhi.
Since, his retirement, his services, as freelance consultant is being used by major Civil
Contractors for dispute redressal and Arbitration.
Advisor 95
Mr. M.C. Rangarajan, is a free lance Electrical Engineering Consultant for various
organisation including M/s. Design Group Project Consultants Pvt Ltd.
Mr. M.C. Rangarajan, after obtaining Bachelor of Engineer degree from Indian
Institute of Science, in the year 1969, joined Karnataka Power Corporation as
Electrical Engineer, and retired in the year 2005, after 36 years of rich in
experience Hydro Power generation. Important assignment to name as Design
and Layout of Hydro and Thermal Projects sizing of units, firming up of
technical specification, bid documents, bid processing, contract management,
project monitoring, inspection of components, Vendors Plant. He was involved
in construction of following Hydro Projects to name a few, Nagjhani (6 x 135
MW) Supa Dam Power House (2 x 50 MW), Gerusoppa Dam Power House (4 x
60 MW), Kadra Dam Power House (3 x 50 MW), and Kodasalli Dam Power
House (3 x 40 MW). In addition looked after O & M of Sharavathy HEP (1035
MW), Varahi underground Power House (230 MW), R & M works etc.
As a senior executive Chairman of Core group for Q & AC of EPC Contract for
500 MW Bellary Thermal Power Plant, Power Purchase agreement with State
level distribution Companies. He has presented several technical papers in
National and International Conference; visited difference type of Power Houses
and manufacturer units in India and Abroad.
Advisor 96
S. Ramanan, B.E. (Civil), worked in Karnataka Power Corporation Limited between 1975
to 1984, after a brief stinct, as lecture in NIE Mysore. Joined NHPC, in the year 1985, and
retired in the year 2009, as General Manager.
He had an exposure in all branches of Hydro Power Project, from Survey, Investigation,
Preparation of PFRs and DPRs, bid documents, to Civil designs, construction of HEPs.
He was past as GM Consulting and Bussiness Development Division, dealt with Tidal
Power Project, Infrastructure development in Andaman and Nicobar Island, Varzab
Power Plant in Tajikistan and raising of Dhankari dam in Port Blair, Andaman and
Nicobar Island. Till his retirement, he had handled over 5000 MW of Hydro Power
development in various capacities sparing across the length and breadth of India for 10
HEPs in total. He had a short stint in design and engineering of Power transmission line
in North East State. He is a freelance consultant advising various IPPs in
implementation of small Hydro Projects.
Advisor 97
Mr. Umashankar, is an advisor on design and drawing of large span roof trusses used in
Power Plants, and complicated heavily loaded structural steel works. Presently advisor
to Design Group.
Mr. Umashankar joined MECON Ltd., in the year 1973, as steel structural engineer and
retired in the year 2009, as Deputy General Manager. As a steel structural designer, he
was actively involved in design of Steel Plants of large capacity in India, such as Bokaro
Steel Plant (expansion) Bhilai steel plant (expansion, Titanium – Dioxide pigment plant
in Kerala, Defence Project – NSTL at Vizag A.P., Kudremukh Iron Ore Project, Essar
Steel Plant, at Hazira. Jindal Vijayanagar Steel Plant at Toranagallu, Karnataka, external
Coal handling system for TNEB at Chennai, Birla Copper expansion phase II. HGPL –
Expansion at Vizag A.P. Defence Project – Sea bird at Karwar, West Coasts of Karnataka,
Essar Integrated Steel Plant at Hazira. More than half million tones of Steel design and
fabrication of steel structure has been done under his guidance. He has been deputed to
foreign countries by MECON for inspection and fabrication in Countries like China,
Germany, Korea, he has also attended several work shops conducted in India and
Abroad.
Advisor 98
Mr. V. Narayanan, is a transmission line design and construction expert. Advisor to
Design Group on assignments pertaining to transmission lines, as and when required.
After his Bachelor degree in Civil Engineering, obtained Masters degree in Civil and
Hydraulic Engineering from India foremost Indian Institute of Science, Bangalore, in the
year 1963. soon after joined M/s. SAE (India) Ltd., as Design Engineer for transmission
Tower, Civil Foundation and other allied works. He has involved designs and drawings
for various voltages from 66 kV to 220 kV to many Electricity Boards in India.
Subsequently 1973 onwards assumed the change of Production Manager in M/s. SAE
Factory at Jabalpur. He was deputed to M/s. SAE, Milano, for being trained in their
works at Lecco, on production engineering, design and drawings, Testing Stations. In
the year 1978 was sent to Australia to acquaint with the working of Testing Station. At
Jabalpur Plant, made a commercially viable Testing Station in par with International
Testing Station. He was responsible for increasing the production capacity to 30,000 MT
per annum from 8000 MT. As a General Manager responsible for design and testing of
many 400 kV and 500 kV DC lines. After his retirement worked in several International
Companies, such as Zamul Steels, Daman, TNB Malaysia, Kulalanpur etc. He has wide
technical knowledge in Transmission lines from concept to commissioning.
Advisor 99
Mr. C. Channakeshava, Ph.D, is an freelance advisor to Design Group on Computer aided
Mathematical modeling for 3D complicated structures for carrying out precision analysis
and design of Dams etc.
Mr. C. Channakeshava, after his post graduation in M.E., from renowned Indian Institute of
Science, Bangalore, obtain his Ph.D in the same Institution in the year 1988. He was Post
Doctral Research Associates in University of Cincinnati Ohio, USA, Louisiana State
University, USA, extensively worked on Finite Element Method applied to Civil
Engineering works. He has illustrious academic background, topper in Universities in India
and Abroad.
In Bangalore, joined a reputed EMRC Software Company (USA) team to develop world
class NISA Software tool used extensively for Non‐linear analysis. His field of interests are
computational mechanics, Finite Element Analysis, Boundary Element Analysis, Analysis
and Design of RCC & Steel Structurals, Roads and Bridges, Computer Aided Design.
Advisor 100
Mr. Shridhar Prabhu, freelance Solicitor specialize in Energy Law Audit and Regulatory
Affairs and Compliance. Design Group is availing in services in PPA related matter.
Mr. Shridhar Prabhu, after obtaining degree in law, started practicing in High Court of
Karnataka, enrolled in Delhi Bar Council. As a specialist in Regulatory Appraise related
to energy, he was nominated, as Vice Chairman, Energy Committee of the Federation of
Karnataka Chamber of Commerce and Industries, Advisor to India Wind Turbine
Manufacturers Association. Advisor Renewable Energy Developer Association,
Karnataka (REDAK). Former State Council Member – IWPA, in addition during his
practice, he has represented India’s Wind Energy Sector, before the Supreme Court; first
and only representative of the Wind Energy Sector to represent before the Central
Electricity Regulatory Commission (CERC), New Delhi. Represented, on several
occasions, on behalf of IPP’s, he has argued before REC’S on fixation of Tariff,
standardization of PPA’s renewable Power Purchase obligations for Wind Project.
Envisaged a theme paper and chalked out action plans for NASDAQ listed IT Services
Company with a market capitalization of over US$ 30 Billion for Green Power
procurements in Southern States. Engaged for advisory and tariff filing by first ever
electric cooperative society and distribution license in Karnataka.
Advisor 101
Mr. Srinath N. Anekal, is a free lance advisor to various organizations, IPP’s developers
on environmental and sustainable Development Areas including climate change and
CDM aspects etc., Design Group seek his advice on specific field like Environmental
impact assessment, CDM due diligence and Environmental Protection project.
Mr. Srinath N. Anekal after obtaining Bachelor / Master degrees in Civil Engineer from
Bangalore University pursued higher studies in University of Florida, Gainsville, USA,
was awarded Master degrees in Environmental Engineering Science in the year 1993.
Under gone, short term course in Finance for Non‐finance Managers IIM Bangalore, ISO
14000 Environmental Management System CII India, hazardous waste management
operational practice, USA. He has traveled widely in USA, Inida, Banglaesh, Maruitius
and Mozambique. Where he worked extensively in the field of Environment, Energy
and Water. He demonstrated experience in conceptualizing, design, promoting and
implementing innovative projects in the area of waste minimization, clean Technologies,
Environmental protection, Urban Water Supply and sanitation, Renewable Energy and
clean Development Mechanism. He was with executing Agencies for implementing
reform oriented projects funded by world Bank, DflD, KfW, European Commission and
Danida. He has contributed to the development of country level strategies; especially on
mainstream new development concepts, through conduct and participation in seminars
and workshops and effective interaction with all stake holders in Government, Non‐
Governmental Organization and Private Sectors.
Consultant 102
(b) Consultants
Mr. C.S. Hebli, B.E. (Hons), after obtaining Bachelor degree in Civil Engineer with
distinction, joined Bombay public works Department, in the year 1954, worked as Junior
Engineer Planning Minor Irrigation Project, after reorganization of Karnataka state, his
services were lent to Hydro Electrical Civil Projects in the year 1959, as Assistant
Executive Engineer, involved in investigation and preparation of Bedthi, Aghanashini,
Mahadayi, Kalinadi (910 MW) Projects. HECP was converted into a dedicated power
generation company called Karnataka Power Corporation Limited, fully owned by
Government of Karnataka to execute. He raised from ranks upto first Technical Director
of the Company, retired in the year 1988 with 37 years of rich power project experience.
During his service, activity involved in Kalinadi HEP (910 mw), Sharavathi HEP (835
MW), Varahi HEP (239 MW). Raichur TPS (5 X 210 MW) from concept to completion,
involved in long term planning of Projects, Hydro policy in the state etc. After
retirement worked with Thapar Hydro Council, as consultant dealt with several Hydro
and Gas based Power Plant aggregating to 2000 MW, joined as Chairman, Design
Group Project Consultants Pvt Ltd., Company established in 1979, technically guiding
staff strength of 52 technocrates effectively involved in technical advise. Policy
decisions, Company affairs etc.
Consultant 103
Mr. B.L. Lakshminarasimha, B.Sc., B.E., M.E., M.I.E., F.I.V., M.A.S.C.E., after
obtaining Master degree in Civil Engineer from Birla Institute of
Technology, Pilani, premier educational Institution of India
(collaboration with M.I.T., USA,) after a short stint in Messers. Gerame
and Binny Limited, joined Karnataka Power Corporation Limited, as a Civil Engineer in
1975, resigned after 20 years of service, acquired technical knowledge in drafting of bid
documents for large Hydro Power Projects, interpretation of Contract Clauses, resolved
disputes, formulated schedule of rates, design of Surface Power House, framed structure
through 3 D modeling etc. Designed and constructed KPCL Corporate office building.
Assisted Company’s legal advisors in Arbitration proceeding/Contract disputes, in the
Court of Law etc Founder member Design Group, established in 1979. What turned out
to be one man show in 1979 has grown to a large consultancy firm of repute in India and
Abroad. Over 3 decades of existence, developed an exclusive team of dedicated
consultants having 40 years and above experience in Power and Irrigation Projects from
concept to completion.
Recently developed a dedicated team of engineers to extend design engineering services
in Water and Waste Water Treatment Plants. Successfully steered the company in
obtaining KEMA ISO Certification, maintained consistent profitability over the decades.
Executed number of Joint Venture Partnership in India and Abroad, such as CPRI,
WAPCOS, ILF, for implementation of Large Projects successfully, signed a few design
engineering assignment contract in neighbouring countries such as, Saudi Arabia,
Dubai, Muscat, Ghana, Nepal, Sri Lanka.
Consultant 104
Mr. P.R. Mallikarjuna, after obtaining M.E., from prestigious Indian
Institute of Science in the year 1969, worked in various capacities in a
Public Sector / Private Companies, before joining Karnataka Power
Corporation in the year 1971, as Group Engineer (AEE), and retired in
the year 2000 as Technical Director, with an illustrious career spanning 34 years in
various cadres. He was one of the Board of Directors of KPC Limited, for over 7 years,
after his retirement. During his tenure in the KPCL, he was the head of Design wing and
handled all major Hydro Projects, Thermal Power Plants from concept to
commissioning. Over 1200 MW of Power Projects has been investigated under his
guidance and about 2000 MW of Power Projects has been designed. Further, 900 MW of
Power Projects have been implemented under his guidance. He has attended several
National and International seminars, and contributed dozens of technical papers. After
his retirement, he was involved in the preparation of revised DPR for 12 X 80 MW Indira
Sagar Polavaram Hydro Electric Project in Andhra Pradesh, on behalf of Andhra
Pradesh Irrigation Department, including obtaining clearances from Central Electricity
Authorities, New Delhi. He was involved in detailed engineering of Nagarjuna Sagar
Tail Pond dam Power House (2 x 25 MW) and Varahi underground Power house – Stage
II (2 x 115 MW).
From 2008 onwards, he heads the Civil Design wing of DGPCPL and is responsible for
planning and design of Hydro Electric Projects and Large Irrigation Projects, etc.
Consultant 105
Mr. P.K. Rupangudi, after obtaining M.E., from prestigious University
College of Engineering, Bangalore in the year 1971 worked in State
Government Organisation, before joining Karnataka Power
Corporation in the year 1972 as Engineer and retired in the year 2004
as Chief Engineer with an illustrateous carrier spanning 32 years in
various cadres. During his tenure in the KPCL, he was head of Design wing consisting
of engineers of all discipline, handled all major Hydro, Thermal Power Plants from
concept to completion. Attended several National and International seminars, and
contributed several technical papers. He is member of Gate Committee since 1996,
formed by the Govt. of Karnataka for design, fabrication erection & commissioning of
prestigious Alamatti Dam Gates and hoists. Even to date, he is in the panel for
inspection of Hydromechanical works of the State Govt. Organisations. He was a faculty
member on the continuing education to the Engineers of the State, organized by The
Director, KERS – Mysore. He is the main author of History of Lingamakki & Talalakalale
dams, of Sharavati Hydel Scheme assigned to him by the Karnataka Power Corporation.
After his retirement, he was also involved in detailed engineering of Nagarjuna Sagar
tail pond Dam and Varahi underground Power House – Stage II (2 x 115 MW) and a
major weir for Lower Jurala H.E.P of Andhra Pradesh Power Generation Company.
From 2010 onwards he is associated with DG responsible for implementation of Hydro
Electric and Irrigation Projects.
Consultant 106
Mr. Chikkaguddappa (C.G. Appa), joined Design Group Project
Consultants Pvt Ltd., in 2005, as a Director Hydro Power Project
Planning and river basin study. He has travelled neighbouring
countries, to advice IPP’s on Planning of Hydro Power Project.
Mr. Chikkaguddappa (C.G. Appa), joined Karnataka Power Corporation Limited in the
year 1973, as an Engineer, raised to the level and retired in the year 2005, from
Corporation after 38 years of long services. From the day one, he was involved in river
basin development in the Corporation, identifying and Planning Hydro Power Projects
in entire length and breadth of Karnataka state. Mostly dealt with Investigation of
HEP’s like Shivana Samudhra seasonal scheme ( 4 x 270 MW), revision of DPR for Bedti
Stage I HEP, from 1984, as a Assistant Executive Engineer, he was involved in field data
collection for Hydrology, surface and sub‐surface details for preparation of DPR for
major HEP’s like MahadayI (318 MW), Cauvery Scheme (270 MW), Tamankal (800
MW), Almati Dam Power House (280 MW), (Mekedath 1400 MW), Kali stage – III (1200
MW) Bedsti stage II (400 MW), Aghanashini (600 MW), Gundiya High heads scheme
(400) conceived if, as a run of the river scheme, study proposed for Pumped storage
scheme at the existing Sharavathy complex (1000 MW) AND Kali Complex (1200 MW).
He was one of the Authorities in river basin studies in Karnataka. In addition, identified
and prepared DPR’s for Mini Hydel Scheme of less than 25 MW.
He joined Design Group Project Consultants Pvt Ltd., in the year 2005, responsible for
identifying and preparation of Desk Study Report for over 12,000 MW of Hydro Power
Projects in neighbouring Country Nepal.
Consultant 107
Mr. Raghavendra Rao H after obtaining BE degree in Electrical
Engineering from National Institute of Engineering, Mysore in the
yarer 1972 worked in Medium Voltage Switch Gear industry as
development and production Engineer till 1977 before joining
Karnataka Power Corporation Ltd, the premier organization carrying out design,
construction, operation and maintenance of power plants in the state of Karnataka,. He
retired as Superintendent Engineer (Electrical) from KPCL in the year 2006. During his
tenure in KPCL he worked in the areas of design, construction, testing and commissioning
and maintenance of Hydro and Thermal power plants mainly in the areas of Electrical
equipments and systems of power plants and the tenure included working at both power
plants and the corporate design office.
The specialized areas are control and protection and he was a member of Protection
committee of Southern Regional Electricity Board.
After joining DG in 2008 he is in charge of Engineering of Electro Mechanical systems of
Hydro and thermal power plants. He is an accredited energy auditor certified by Bureau of
Energy Efficiency, India.
Consultant 108
Mr. M.M. Reddy is expert in substation Layout and Electricals designs
from 33 kV upto 400 kV. His services are being used by Design Group in
substation segment of Electrical Engineering.
Mr. M.M. Reddy after obtaining Bachelors’ degree in Electrical Engineering from
Bangalore University, in the year 1968, worked in various capacities in various
organizations. He has worked in NGEF from 1968 to 1997 for 29 years and taken
voluntary retirement in the year 1997, as Divisional Manager. During his tenure in
NGEF, he was head of Sub‐station group and handled switchyards from 33 kV to 220 kV
from designing to commissioning of sub‐stations on EPC basis. Under his guidance,
about 600 MW outdoor Switchyard from 33 kV to 220 kV have been designed and
commissioned. He has undergone training in high voltage outdoor yard sub‐stations in
AEG – Telefunken, Germany for 6 months.
In May 1997, he joined M/s. Design Group Project consultant Pvt Ltd., and he is
responsible for designing of out door yard substation and transmission lines. He has
designed and commissioned various switchyards and transmission line for Hydro
Power Project, to name a few major Projects:
i) Varahi Tail Race (37 MW – 110 kV ODY)
ii) Narayanpur Project Phase – I and II (18 MW ‐ 66 kV ODY)
iii) Singatallur – Hulligudda (18 MW – 110 kV ODY)
He has designed and commissioned balance of equipment for 15 MW Windmill
Project.
Consultant 109
Mr R. Vasudevan is a water utility management specialist with over 40
years of experience in Design Construction & Operation of Water
utility services from the source to the consumer, presently full time
consultant of Design Group.
He is a 1971Batch Graduate in Electrical Engineering from Bangalore University. Joining
Bangalore Water Supply and Sewerage Board in the same year, he worked in various
capacities and retired as the Chief Engineer during 2010. He was involved in all the
major Projects of BWSSB which was supplying 135 MLD water to 1.5 Million residents of
Bangalore in 1971, and had become a giant utility by 2010 supplying over 900 MLD
water to over 7 Million residents.
He was associated in Cauvery water supply Scheme stage I to supply 135 MLD water
from River Cauvery, in establishing pipe fabrication and laying activities; Later in the
stage II of another 135 MLD Project he was in charge of Electrical system Design and
Construction; In the III stage which was a larger 270 MLD Project he was in charge of
complete Electrical and Hydro‐Mechanical components of the project from tendering to
completion. In the subsequent Stage IV‐Phase I Project which was with external funding,
He was responsible for total cross‐country steel pipeline of 1950mm Diameter and 90
Kilometers long, and later in the installation of Sewerage pumping stations and the
electrical Design and Construction of Seven Sewage treatment plants. In the last 5 years
of his service he was responsible for Securing ODA loan of INR 34000 Million from JICA
for Stage IV Phase II projects of 500 MLD, selection of project consultants, tendering
selection and award of contracts for all water supply components.
In the course of his service he has participated in various workshops and seminars on
pumps , cavitation, cross‐country pipeline design, water‐hammer studies and control,
water treatment, wastewater treatment and sludge disposal, project management,
Consultant 110
international contracts, leakage reduction and distribution improvement, flow
measurement, tariff structuring, urban planning , reuse and conservation, etc.
He led the Technical team which presented ‘Innovative Practices in Revenue
Management’ initiative by BWSSB to the Department of Urban Development and
Secured the First Prize in National Urban Water Awards, 2009, from the Hon’ble
President of India, in August 2009.
Vasudevan has designed pumping systems for several lift irrigation pumping systems,
electrical substations and surge protection to pipeline for the Consultancy Centre of
BWSSB from 1995 to 2007. Many such projects have been commissioned in the last 10
years and are in operation.
He also handled an assignment on ‘alternative methods of infrastructure finance by
Private Sector, Infrastructure Bonds, and developing Public‐Private Partnerships’ in
2009.
He also secured an MBA from ICFAI Dehradun with Finance as optional subject. On
retirement from Service he joined Design Group as Water Supply Consultant in
September 2010.
Consultant 111
Mr. U.R. Raghotham after obtaining M.Tech from Mysore University in
the year 1974 worked as design engineer with the architects M/s Karekar
and Sundaram for one year and joined Karnataka Power Corporation
Ltd., in 1975.
During the service in KPC Ltd., he has worked in the design team for Supa Dam for 5
years and then worked as AEE (Construction) in Supa Dam for 7 years starting from
foundation level of the spillway and power blocks to the completion of the Dam.
Further he was in charge of construction of Ghataprabha Power House. From 1989
onwards he worked in the design office as AEE and EE for the planning and design of
various Hydro Electric projects including Kadra dam and Sharavathi Tailrace Project.
Since 2003, he is working as a consultant and was involved in the design of Nagarjuna
Sagar Tail Pond Dam Project, Gandikota dam project, Lower Jurala project of Andhra
Pradesh, Varahi Underground Power House (2x115MW) and many other projects. He
was involved in the preparation of DPR for Indira Sagar Polavaram Hydro Electric
Project (960MW) and in obtaining clearance from CWC and CEA.
Advisor 112
Mr. G. Penchalaiah, after retirement works as free lance Consultants, for various
investigation agencies in flow monitoring in river regime pre‐construction Investigation
works in large Irrigation Projects. Design Group is utilizing his services for overseeing,
Fielding investigation works in large Irrigation Projects in India and Abroad.
Mr. G. Penchalaiah after his graduation in Civil Engineering from Sri. Venkateshwara
University in 1970, joined Central Water Commission, as Civil Engineer and retired in
the year 2007, as Director. He has vast experience in Water Resources Project Planning,
specially large Irrigation Project investigation, Hydrology, Computation of yield,
Development of Irrigation dam and associated Irrigation Networks, preparation of
Detailed Project Report. He was posted to various States in India, was familiar with
available yield in various river for Irrigation utilization to improve the Agricultural
Sector and Water Management. He was deputed to CEA, New Delhi, responsible for
design of structures and cost estimates for Thermal Power Project. He had made topo
map studies, interlinking river, water balance study, etc. As a Senior Engineer worked
on Indo‐Nepal Joint Projects, namely Pancheshwar Multipurpose Project, head quarter
at Kathmandu, Nepal. Involved in preparation of DPR, cost estimates, preparation of
Infrastructure Planning for major Power / Multipurpose Projects, such as Poornagiri,
Rupaligad etc.
Consultant 113
Mr. Suryanarayana, after his retirement on Deputy General Manager ‐ Geology from
Karnataka Power Corporation Limited, works as freelance Consultant. He is a part of
Design Group being extensively used his expertise in Engineering Geology in various
assignments undertaken, on job to job basis.
My. Suryanarayana, after obtaining Masters’ degree in Geological Science, joined
Karnataka Power Corporation Limited, as Junior Geologist and retired in the year 2007,
as Deputy General Manager – Geology. During his tenure, he was involved in most of
the Hydro Power Project implemented by Karnataka Power Corporation Limited in
Karnataka, to name a few Rammam HEP (120 MW), Rolep HEP (60 MW) and Chakung
Cha HEP (60 MW) all in Sikkim; 80 meter high Chakra Rock‐fill Dam: Varahi HEP (460
MW). Involved in preparation of DPR for Gundiya Hydel Scheme (400 MW),
Shivasamundram Seasonal Scheme (270 MW), Mekedatu Multipurpose Project (360
MW). He is also involved in ongoing Himagiri HEP (280 MW), Upper Tunga Irrigation
Project involved 4 km of tunneling etc. Apart from this, he has wide experience in
advising developers / IPPs in implementation of Mini Hydel Scheme of 25 MW and
below all over India.
Consultant 114
Mr. K.T.Sreedhara, after obtaining B.E (Civil), degree from Vikram
University, Ujjain, in the year 1970. worked as design Engineer in
M/s.P.V.Raj & Co. Consulting Engineers Hyderabad from January 1971
to November 1973. The works dealt in this period are Designs of Bridges
and Industrial Structures and Buildings. Then joined M/s. Karnataka
Power Corporation Ltd., a public sector undertaking of government of Karnataka on
28.11.1973 and worked Up to 31.01.2006 i.e. 32 years and 2 months in various capacities as
AE, AEE, EE, SE &finally retired as I/C Chief Engineer on superannuation from the
Karnataka Power Corporation service. During this tenure in KPCL worked in the civil
designs wing on the design of Gravity dam (concrete), Earthen dams, water conducting
System and in construction wing worked in Precision survey works at Varahi under ground
Power & Varahi Schemes and Sharavathi Schemes as AEE. As Executive Engineer worked
in the investigation of Power Project especially High Head Scheme and Mini Hydel
Schemes. Further worked in designs wing in the designs of Sarpady Barrage Hydro Electric
Project and consultancy work of Markandeya Dam Project, Kalasa & Bandurnala
Consultancy work. for KNNL.
Further in construction wing as Executive Engineer (Safety) at Raichur Thermal Power
Station Shakthinagar In addition to the Safety Engineering of Raichur Thermal Power
Station worked on deputation to KPCL civil designs wing involved in the investigation
work of Bridge cum Barrage Project across River Krishna near Gugal. for KBJNL As Super
Intending Engineer and further I/C chief Engineer (civil) of Raichur Thermal Power Station
(7X210 MW Installed Capacity as on 2006) involved in the civil maintenance works of the
Thermal Power Generation Station. After retirement on 31/1/2006 after serving 32 for years
with KPCL joined on 7/4/2006 as Consultant in M/s Subhadra Consulting Engineers who
are also Associate Consultants to M/s STUP consultants Pvt Ltd., Bangalore and worked up
to 31/3/2010. During this tenure as Associate Consultants to M/s STUP consultants Pvt Ltd.,
Bangalore involved in the Detailed Engineering of Nagarjunasagar Tail Pond dam ,
Consultant 115
Gandikota Dam and Lower Jurala Hydro Electric Project which are under construction,
Further involved in Preparation of revised DPR for Polavaram Hydro Electric Project with
12X80MW(960MW) Installed Capacity .
Currently from 1.4.2010 to till date working with Design Group Project Consultant Pvt Ltd.,
as Deputy Director (designs) in the planning, design of Hydro Power Projects and Irrigation
Project and other Structure
Active Member of the Professional Bodies like 1) Fellow of Institution of Engineer (India) 2)
Life Member of Indian Road Congress 3) Member of Indian Society for Hydraulics
Consultant 116
Mr. Achutha Narayana, after obtaining M.Tech from Prestigious Indian
Institute of Technology in the year 1996 and has since 15 years of
exclusive experience in design of various components of hydroelectric
Projects. He started his career in Design Group Project Consultants Pvt.
Ltd., Bangalore as Design Engineer (Civil) and was involved in Harangi
HEP (2x4.5MW) in Karnataka. He joined NHPC ltd., A Govt. of India Enterprise in year
1998 and was involved in Planning and Construction stage Design of Dhauliganga HEP
(4x70MW), Uttaranchal and Chamera‐III HEP (3x77MW), Himachal Pradesh. He was
associated with the preparation of DPR of Siyom HEP (1000MW), Arunachal Pradesh,
Dhauliganga Intermediate HEP, Uttaranchal, Tender stage Design Activities for Chamera‐III
HEP, Kishanganga HEP (3x110MW), J&K and Chutak HEP (4x11MW), Kargil, J&K He was
also involved in Pre‐feasibility reports of 7 projects in Arunachal Pradesh under “Prime
Minister 50000MW Initiative” totaling to 2581 MW. He was also associated with the
consultancy project of Katra – Laole KRCL Stretch of Prestigious Jammu‐Kashmir Rail Link
Project. He has also few technical papers presented in various National Seminars. He is a
member of Indian Society of Rock Mechanics and Tunneling Technology (ISMRTT) and
International Society for Rock Mechanics (ISRM) and Indian Hydropower Association
(INHA).
He joined TCE, Bangalore in 2007‐2008 and was associated with 100MW Augmentation of
Bhira Power station and Gokak SHEP.
Since later half of 2008, he is working as Deputy Director (Designs) in Design Group Project
Consultants Pvt. Ltd. and has been responsible for various construction stage Hydel
Projects, DPR’s and Pre‐tendering Services for various projects.
Consultant 117
Mr. T.S. Srinivasa, after obtaining M.E., from one of the noted Institution
PSG College of Technology, Coimbatore, Tamilnadu in the year 1987 and
B.E. from National Institute of Engineering College, Mysore, Karnataka
in the year 1984, worked in various capacities in a Public Sector/Private
companies. He has worked In Public sector Karnataka Urban Water
Supply & Drainage Board (KUWS&DB) from 1986 to 2006 for 21 years. He took voluntary
retirement from KUWS&DB and worked in private organizations such as M/s Secon as
Manager and Ms/ Jurong Infrastructure Ltd., as Principal Engineer (Infrastructure).
He was head of Design Wing while working with KUWS&DB, was involved in preparation
of many DPRs comprising of Planning, Design, Estimating, implementation of number of
water supply and sewerage schemes including Water treatment plants(WTPs) and Sewage
Treatment Plants(STPs)in urban areas of Karnataka State. He was involved with water
supply & sewerage schemes’ proposals to second major city in the state viz., Hubli‐Dharwar
city under World Bank Project. He was also involved with National River Conservation
Projects for prevention of river pollution in the state.
While working with M/s. Secon, he was involved with water supply and sewerage projects
in different towns of Libya country. While working with M/s. Jurong Infrastructure Ltd., he
was involved with Design and implementation of Infrastructure facilities such as roads,
water supply, sewerage, storm water drainage, Electrical & Communication facilities to a
number of town ship development projects including some of the SEZs.
From 2009 onwards he heads the Water Division of DGPCL responsible for implementing
water supply and sewerage projects. Presently he is involved with detail Civil Engineering
Design of Rafha gas based Power Plant Project in Saudi Arabia.
Consultant 118
Mr. P Sudarshan Rao, after obtaining B.E. (E&E) from Malnad College of
Engineering, Hassan (Mysore University) in 1987 worked in the same college
and Regional College of Education, Mysore as a Lecturer for a brief period
before joining KPCL in 1989.
He has more than 22 years of experience, as Assistant Executive Engineer in Karnataka Power
Corporation Limited, a State owned Public Sector Undertaking with dedication for Power
Generation to the State with ISO 9001 and ISO 14001 certification. He has experience in
Operation, Maintenance and Design wings of 210/250 MW coal based Thermal Power Plant.
He also has experience across domains like Inventory Management, Tendering, Tender
Evaluation, Study of various Control System drawings, Planning of Preventive and
Breakdown Maintenance of 210 MW Generator & Auxiliaries, Erection & Commissioning of
Power Transformers of capacities from 50MVA to 315 MVA, 6.6 kV & 415V Indoor Switchgear,
220kV & 400kV Outdoor Switchyard, and Station Battery System. He was also involved in
preparation of cable schedules, interconnection schedules and commissioning of 210 MW &
250MW coal fired thermal Units.
After joining DG in February 2011, he is the group lead of Electrical Design team carrying out
detail Engineering for gas based generating plants and hydro electric plants.