exadata customer case studies - regist-event. · pdf filedatabase consolidation 2 years in...

57
Copyright © 2015, Oracle and/or its affiliates. All rights reserved. | Exadata customer case studies Regional and Global Subhash Guddad Senior Director, Systems Sales Consulting APAC

Upload: buiphuc

Post on 30-Jan-2018

225 views

Category:

Documents


5 download

TRANSCRIPT

Page 1: Exadata customer case studies - regist-event. · PDF fileDatabase Consolidation 2 Years in Production with Oracle Exadata Valeri Minkov 22.09.2016

Copyright © 2015, Oracle and/or its affiliates. All rights reserved. |

Exadata customer case studies Regional and Global

Subhash Guddad Senior Director, Systems Sales Consulting APAC

Page 2: Exadata customer case studies - regist-event. · PDF fileDatabase Consolidation 2 Years in Production with Oracle Exadata Valeri Minkov 22.09.2016

Copyright © 2015, Oracle and/or its affiliates. All rights reserved.

Customer Case Studies

Critical revenue generation applications at large telco

Extreme consolidation of Oracle and non-Oracle applications

High volume processing on Exadata

Extending Information Management with Exadata and BigData

1

2

3

2

4

Page 3: Exadata customer case studies - regist-event. · PDF fileDatabase Consolidation 2 Years in Production with Oracle Exadata Valeri Minkov 22.09.2016

Copyright © 2015, Oracle and/or its affiliates. All rights reserved. |

Database Consolidation with Oracle Exadata Large Telco, Philippines

Oracle Engineered Systems powered by Intel Xeon

Page 4: Exadata customer case studies - regist-event. · PDF fileDatabase Consolidation 2 Years in Production with Oracle Exadata Valeri Minkov 22.09.2016

Copyright © 2015, Oracle and/or its affiliates. All rights reserved.

Large telco in Asia

4

• Telco in top 2 in Philippines( By Subscriber Base)

• Revenues of around PHP126 Billion ( USD 2.5+ Billion)

• Supported by approximately 6,800 employees; with 1.08 million retailers, distributors, suppliers, and business partners nationwide, serving more than 55 million customers.

Page 5: Exadata customer case studies - regist-event. · PDF fileDatabase Consolidation 2 Years in Production with Oracle Exadata Valeri Minkov 22.09.2016

Copyright © 2015, Oracle and/or its affiliates. All rights reserved.

Project Environment – Project Good VIBES

April 6, 2017 5

OLTP Systems for Pre-Paid Promotions (NF), Service Management (SMP)

& SMS Gateway Processes (RT & AS )

Part of Tier 1 applications and supports Revenue Generation

Interfaces with Telco Network elements as well as IT Systems

Transactions : 30 million transactions per day

Page 6: Exadata customer case studies - regist-event. · PDF fileDatabase Consolidation 2 Years in Production with Oracle Exadata Valeri Minkov 22.09.2016

Copyright © 2015, Oracle and/or its affiliates. All rights reserved.

Project Objectives – Current Challenges

April 6, 2017 6

• Hardware End of Life • Limited Connection Distribution • No robust Disaster Recovery • Limited Real-time SMS Gateway Performance • Limitations on Number of Promos and Other Variables • Occasional Instability of the API Module due to performance issues

Page 7: Exadata customer case studies - regist-event. · PDF fileDatabase Consolidation 2 Years in Production with Oracle Exadata Valeri Minkov 22.09.2016

Copyright © 2015, Oracle and/or its affiliates. All rights reserved.

Project Objectives – Additional requirements

April 6, 2017 7

• Consolidate the databases(NF,RT,SMP,AS)

• Support 50% increase in transactions with enough buffer for spikes

• Deliver a robust DR Strategy

• Deliver a robust backup strategy

• Increase supporting service levels

• Connection pooling enhancements

Page 8: Exadata customer case studies - regist-event. · PDF fileDatabase Consolidation 2 Years in Production with Oracle Exadata Valeri Minkov 22.09.2016

Copyright © 2015, Oracle and/or its affiliates. All rights reserved.

Existing Infrastructure Landscape 2009-2015:

Current Database Server Specs ( 4 Databases) Prod DB

Quantity 11 Core Count(total) 56 Speed 2.0Ghz RAM(MB) 256GB Storage(External and Internal) 4TB CPU Utilization 73% Average Response Time 69 ms

Write IOPS 2878 Read IOPS 3717

Page 9: Exadata customer case studies - regist-event. · PDF fileDatabase Consolidation 2 Years in Production with Oracle Exadata Valeri Minkov 22.09.2016

Copyright © 2015, Oracle and/or its affiliates. All rights reserved.

Exadata Infrastructure Footprint

Exadata X5-2 Eighth Rack with 1 DB instance

Prod DB Quantity 1 Core Count(total) 18 Licenses None Speed 2.3Ghz RAM(MB) 512GB Storage(External and Internal)

22 TB

CPU 40% Response Time 0.4 ms Write IOPS 4854 Read IOPS 7386

Key Components as Part of Discovery Process • AWR Snapshots & AWR • Workload Information • DR Requirements • Migration Strategy • Backup Strategy • Operations Requirements

Page 10: Exadata customer case studies - regist-event. · PDF fileDatabase Consolidation 2 Years in Production with Oracle Exadata Valeri Minkov 22.09.2016

Copyright © 2015, Oracle and/or its affiliates. All rights reserved.

Exadata Deployment

10

Page 11: Exadata customer case studies - regist-event. · PDF fileDatabase Consolidation 2 Years in Production with Oracle Exadata Valeri Minkov 22.09.2016

Copyright © 2015, Oracle and/or its affiliates. All rights reserved.

What did we Learn during the Deployment

Sizing Parameters ( as on 2nd March 2015)

Expected Provided

DB Cores 18 Enabled 18 (Available 36 )

Storage (TB) 12 30

IOPS 20,000 Flash IOPS: 518,000/288,000 (Read/Write) Disk IOPS: 3500

Flash Storage (TB) 0 9.6

Workload Analysis During Stress Testing • Flash Enabled for Reads (Write Through by default) based on database workload

(Read:Write @ 80:20 or 70:30) • AWR Miner showed Read:Write @ 30:70 – Write intensive • First volume testing did not show any IO issues – May not be a correct

representation of Production • Enabling Flash Write Back will ensure Flash are also used for Writes • Application VMs were causing connection & Performance Bottlenecks

Page 12: Exadata customer case studies - regist-event. · PDF fileDatabase Consolidation 2 Years in Production with Oracle Exadata Valeri Minkov 22.09.2016

Copyright © 2015, Oracle and/or its affiliates. All rights reserved.

Exadata For OLTP

April 6, 2017 12

Schema Consolidation of 4 Databases: NF,RT,SMP,AS • Production : ~ Schema Consolidation of 4 Databases to a single

database

• DR: ~ Created a DR environment using Active Data Guard • OLTP databases

Page 13: Exadata customer case studies - regist-event. · PDF fileDatabase Consolidation 2 Years in Production with Oracle Exadata Valeri Minkov 22.09.2016

Copyright © 2015, Oracle and/or its affiliates. All rights reserved.

Leveraging Exadata for performance

April 6, 2017 13

Performance gains of 2x – 2.5x

50% increase in supporting transaction volumes

Use Write-Back Flash Cache to handle write intensive operations

Faster backup to ZFS through Infiniband

Page 14: Exadata customer case studies - regist-event. · PDF fileDatabase Consolidation 2 Years in Production with Oracle Exadata Valeri Minkov 22.09.2016

Copyright © 2015, Oracle and/or its affiliates. All rights reserved.

Migration

April 6, 2017 14

• Consolidation planning • Database load compatibility analysis • Setup appropriate resources – parameters, limits

• Migration to Exadata using Golden Gate

• Leveraged on ZFS for storing the Golden Gate trail files

• Test it out – connectivity, test with application and volume testing for

performance validation

Page 15: Exadata customer case studies - regist-event. · PDF fileDatabase Consolidation 2 Years in Production with Oracle Exadata Valeri Minkov 22.09.2016

Copyright © 2015, Oracle and/or its affiliates. All rights reserved.

Considerations

April 6, 2017 15

• Coordinate downtime – Maximum 6 hours of downtime for cut-over

• Risk Mitigation: Parallel run before cut-over • Security isolation

• DC-DR Drill before go-live

Page 16: Exadata customer case studies - regist-event. · PDF fileDatabase Consolidation 2 Years in Production with Oracle Exadata Valeri Minkov 22.09.2016

Database Consolidation 2 Years in Production with

Oracle Exadata

Valeri Minkov 22.09.2016

Page 17: Exadata customer case studies - regist-event. · PDF fileDatabase Consolidation 2 Years in Production with Oracle Exadata Valeri Minkov 22.09.2016

We are going strong.

•CHF 8,224 m

•operating income (sales)

•CHF 823 m

•operating profit (EBIT)

•CHF 645 m

•Group profit

•CHF 437 m

•investments

(fully self-financed)

•2,172 m

•addressed letters (15 million consignments/day)

•115.2 m

•parcels

•CHF 114.9 bn

•PostFinance customer assets

•145.6 m

•PostBus passengers •(Switzerland)

Post CH AG | 22.09.2016 | v01.00 | public | Database Consolidation. 2 Years in Production with Oracle Exadata. | Valeri Minkov IT234 17

Page 18: Exadata customer case studies - regist-event. · PDF fileDatabase Consolidation 2 Years in Production with Oracle Exadata Valeri Minkov 22.09.2016

By employing top-quality staff, we can excel.

Post CH AG | 22.09.2016 | v01.00 | public | Database Consolidation. 2 Years in Production with Oracle Exadata. | Valeri Minkov IT234

• More than 62,000 people from over 140 nations work for Swiss Post in more than 100 different professions.

• Swiss Post trains over 2,000 apprentices in 15 professions and is one of the most popular training companies in Switzerland.

• Employees benefit from: …talent management …a wide range of training options in Switzerland …flexible working time models …workplace health management

18

Page 19: Exadata customer case studies - regist-event. · PDF fileDatabase Consolidation 2 Years in Production with Oracle Exadata Valeri Minkov 22.09.2016

nonSAP and SAP Database Consolidation with Oracle Exadata

– Target Plattform

– Configuration

– Migration

Contents

2 Years in Production with Oracle Exadata

– Organisation

– Conclusion and Benefit

Post CH AG | 22.09.2016 | v01.00 | public | Database Consolidation. 2 Years in Production with Oracle Exadata. | Valeri Minkov IT234 19

Page 20: Exadata customer case studies - regist-event. · PDF fileDatabase Consolidation 2 Years in Production with Oracle Exadata Valeri Minkov 22.09.2016

3 x Half Rack Oracle Exadata Database Machine X4-2

Configuration per Half Rack for nonSAP Platform:

– 4 Computing Nodes, 8 x 12 CPU Cores and 2 TB RAM

– 4 Cell Nodes active, 12.8 TB Flash Cache

– 4 Nodes RAC One “admin managed”

– Data Guard for HA and DR

Expansion Configuration per Half Rack for SAP Platform:

– 2 Computing Nodes X5-2, 4 x 18 Cores and 1.5 TB RAM

– 3 Cell Nodes active, 9.6 TB Flash Cache

– 2 Nodes RAC “admin managed” for HA

nonSAP and SAP Database Consolidation with Oracle Exadata Target Platform

Post CH AG | 22.09.2016 | v01.00 | public | Database Consolidation. 2 Years in Production with Oracle Exadata. | Valeri Minkov IT234 20

Page 21: Exadata customer case studies - regist-event. · PDF fileDatabase Consolidation 2 Years in Production with Oracle Exadata Valeri Minkov 22.09.2016

nonSAP and SAP Database Consolidation with Oracle Exadata Target Platform

DC1 Room2 DC2 Room1DC1 Room1

19 DB nonSAP Active Data GuardMaxPerformance &

MaxProtection

High AvailabilityHZ01HE02HE01

65 DB nonSAP Active Data GuardMaxPerformance &

MaxProtection

Disaster Recovery

150m 120km

185 DB nonSAP 187 DB nonSAP34 DB SAP

201 DB nonSAP51 DB SAP

252 DBs Consolidated

252 Databases Consolidated

Post CH AG | 22.09.2016 | v01.00 | public | Database Consolidation. 2 Years in Production with Oracle Exadata. | Valeri Minkov IT234 21

Page 22: Exadata customer case studies - regist-event. · PDF fileDatabase Consolidation 2 Years in Production with Oracle Exadata Valeri Minkov 22.09.2016

– CPU Resource Management, Instance Caging

• CPU Thread Overbooking 1 : 3.5

• CPU Utilization 55% - 65% on all Computing Nodes

– Cell Parameter

• flashCacheMode: WriteBack

• flashCacheCompress: TRUE

• iormplan: basic

– HCC for DSS ( Compression Rate 1 : 17 )

– Databases Dev, Test, Int, Prod, DSS, OLTP and GP

nonSAP and SAP Database Consolidation with Oracle Exadata Configuration

Post CH AG | 22.09.2016 | v01.00 | public | Database Consolidation. 2 Years in Production with Oracle Exadata. | Valeri Minkov IT234 22

Page 23: Exadata customer case studies - regist-event. · PDF fileDatabase Consolidation 2 Years in Production with Oracle Exadata Valeri Minkov 22.09.2016

nonSAP and SAP Database Migration in Numbers

– Migration 1 : 1 of 452 nonSAP Databases 11gR2

– Migration 1 : 1 of 85 SAP Databases 11gR2

– Coordination and Change of 146 Services

– Reduction of 92 dedicated and 30 virtualized Linux Servers

– Reduction of 39 dedicated and 12 virtualized Windows Servers

– Reduction of 300 TB SAN Storage

nonSAP and SAP Database Consolidation with Oracle Exadata Migration

Post CH AG | 22.09.2016 | v01.00 | public | Database Consolidation. 2 Years in Production with Oracle Exadata. | Valeri Minkov IT234 23

Page 24: Exadata customer case studies - regist-event. · PDF fileDatabase Consolidation 2 Years in Production with Oracle Exadata Valeri Minkov 22.09.2016

Migration Project nonSAP Databases

nonSAP and SAP Database Consolidation with Oracle Exadata Migration

Q4 2013

Q1 2014

Q2 2014

Q3 2014

Q4 2014

Q1 2015

Q2 2015

POC Exadata X3-2

Purchase and Setup 3 x Half Rack Exadata X4-2

Start Migration to Exadata

End Migration to Exadata

Post CH AG | 22.09.2016 | v01.00 | public | Database Consolidation. 2 Years in Production with Oracle Exadata. | Valeri Minkov IT234 24

Page 25: Exadata customer case studies - regist-event. · PDF fileDatabase Consolidation 2 Years in Production with Oracle Exadata Valeri Minkov 22.09.2016

Migration Project SAP Databases

nonSAP and SAP Database Consolidation with Oracle Exadata Migration

Q4 2015

Q1 2016

Q2 2016

Q3 2016

Q4 2016

POC Exadata X4-2 for SAP

Purchase and Setup 4 x X5-2 Computing Nodes

Start Migration to Exadata

End Migration to Exadata

Post CH AG | 22.09.2016 | v01.00 | public | Database Consolidation. 2 Years in Production with Oracle Exadata. | Valeri Minkov IT234 25

Page 26: Exadata customer case studies - regist-event. · PDF fileDatabase Consolidation 2 Years in Production with Oracle Exadata Valeri Minkov 22.09.2016

Unified Engineered Systems and Database Admin Team with Skills:

– 60% DBA, 15% Linux OS, 15% Network, 10% Storage

Team Tasks

– Operation of Oracle ES and Exadata Platform

– Operation of Oracle Databases on Exadata, ODA, Linux and Windows

• 658 Databases on ES and Linux

• 217 Databases on Windows

– Backup, Monitoring and Capacity Management

2 Years in Production with Oracle Exadata Organization

Post CH AG | 22.09.2016 | v01.00 | public | Database Consolidation. 2 Years in Production with Oracle Exadata. | Valeri Minkov IT234 26

Page 27: Exadata customer case studies - regist-event. · PDF fileDatabase Consolidation 2 Years in Production with Oracle Exadata Valeri Minkov 22.09.2016

2 Years in Production with Oracle Exadata Conclusion and Benefit

Before After Benefit

Infrastructure Infrastructure Infrastructure

480 nonSAP databases on 100 phys. and 30 virt. servers 573 nonSAP databases on 3 Exadata x4-2 Half Rack Higher consolidation density resulting in higher manageability

96 SAP databases on 47 dedicated and 15 virtualized servers 85 SAP databases on 2 Exadata x5-2 Quarter Rack Higher consolidation density resulting in higher manageability

Database platform “ self engineered” Full engineered, HA and performant Exadata DB Platform Cost savings for engineering

More then 10 hardware and software vendors One vendor Significan savings of time and effort due to one vendor model

300 TB of SAN storage No need of additional storage Cost savings for additional storage

Operations Operations Operations

Several database service failures, heterogeneous infrastructure Standardized environment resulting in reduction of failures Better Stability

Many teams involved for troubleshooting One OS, one vendor model allows rapid resolution to issues Single point of accountability

Expensive patch and upgrade procedures Consistent patch and update process Lower maintenance efforts, fewer outages

Operation of 85 databases per DBA Operation of more then 125 Databases per DBA Cost savings

Post CH AG | 22.09.2016 | v01.00 | public | Database Consolidation. 2 Years in Production with Oracle Exadata. | Valeri Minkov IT234 27

Page 28: Exadata customer case studies - regist-event. · PDF fileDatabase Consolidation 2 Years in Production with Oracle Exadata Valeri Minkov 22.09.2016
Page 29: Exadata customer case studies - regist-event. · PDF fileDatabase Consolidation 2 Years in Production with Oracle Exadata Valeri Minkov 22.09.2016

New York Stock Exchange Oracle Exadata – Our Journey

Ajit Singh, Director, Data Technology Platforms

Page 30: Exadata customer case studies - regist-event. · PDF fileDatabase Consolidation 2 Years in Production with Oracle Exadata Valeri Minkov 22.09.2016

New York stock exchange (NYSE) and Intercontinental exchange (ICE)

NYSE - world’s largest stock exchange by market capitalization ($28 trillion)

NYSE is owned by Intercontinental Exchange (ICE) - Architects of the world’s markets

11 exchanges, 7 clearing houses 12,000 + listed contracts and securities

Diverse markets span futures & options on interest rates, commodities, indexes and FX, as well as equities and equity options.

We transact on average in <200 mics.

30

Page 31: Exadata customer case studies - regist-event. · PDF fileDatabase Consolidation 2 Years in Production with Oracle Exadata Valeri Minkov 22.09.2016

DATA ENVIRONMENT

April 6, 2017 31

Data volume: ~50-60 billion transactions per day (at peak)

Data size: ~ 15 TB of data per day (at peak)

All data for equities, ETFs, options markets and the feed to the street

Data for trading system latency, other markets

Data services responsible for managing all the data and data platforms including Exadata

31

Page 32: Exadata customer case studies - regist-event. · PDF fileDatabase Consolidation 2 Years in Production with Oracle Exadata Valeri Minkov 22.09.2016

Oracle database environment on Exadata

32

Oracle - primary transactional database platform supporting all NYSE businesses

OLTP and Data Mart environments - 250+ databases, over 500 instances

Total database size - 350+ TB

Daily transaction volume - ~1000 million transactions

Large transactional databases: ~10-20 TB databases generating about ~ 300 GB of log per day

Large Data Mart: >100 TB in size (after HCC compression for historical data)

Page 33: Exadata customer case studies - regist-event. · PDF fileDatabase Consolidation 2 Years in Production with Oracle Exadata Valeri Minkov 22.09.2016

CONSOLIDATION TO EXADATA

2004: 2006: 2014:

17 Exadata – 12 for NYSE

33

Page 34: Exadata customer case studies - regist-event. · PDF fileDatabase Consolidation 2 Years in Production with Oracle Exadata Valeri Minkov 22.09.2016

34

Page 35: Exadata customer case studies - regist-event. · PDF fileDatabase Consolidation 2 Years in Production with Oracle Exadata Valeri Minkov 22.09.2016

NYSE Exadata footprint

35

Page 36: Exadata customer case studies - regist-event. · PDF fileDatabase Consolidation 2 Years in Production with Oracle Exadata Valeri Minkov 22.09.2016

EXADATA FOR CONSOLIDATION

April 6, 2017 36

Some examples: Dev: ~60 databases consolidated on a full rack of X3-2 with an average size of 1.6 TB QA: ~70 QA consolidated on to a full rack of X3-2

with an average size of 2 TB

Prod: ~ 50 databases consolidated on a full rack of X3-2 with an average size of 9.5 TB Mix of OLTP and data marts

36

Page 37: Exadata customer case studies - regist-event. · PDF fileDatabase Consolidation 2 Years in Production with Oracle Exadata Valeri Minkov 22.09.2016

Benefits - Leveraging Exadata for performance

37

Performance gains of 2x – 25x

Trade Reports database – 180,000 messages/sec - ~ 50% increase in processing speed

For the same application, completion time decreased by 66%

Data Mart - daily transactions of 2 TB applied to standby in real-time

Data Loads – processing times decreased by 50%

Data Mart – hybrid columnar compression - 4X compression gain vs ACO. 15-16X compression achieved on raw data using HCC

Full Backup time of a ~150 TB data mart reduced by 85% (over Infiniband switches)

Utilize SmartScan capabilities

Page 38: Exadata customer case studies - regist-event. · PDF fileDatabase Consolidation 2 Years in Production with Oracle Exadata Valeri Minkov 22.09.2016

CONSIDERATIONS

April 6, 2017 38

Coordinate downtime

Risk Mitigation: Manage capacity Oracle Homes – 2 Load Isolation Instance caging, IORM deployed to manage resources consolidated

Security isolation

Rolling upgrades of databases

Rolling Exadata bundle patches – cell servers, components, compute nodes and clusterware

Observe utilization Re-evaluate database parameters

Page 39: Exadata customer case studies - regist-event. · PDF fileDatabase Consolidation 2 Years in Production with Oracle Exadata Valeri Minkov 22.09.2016

Reduced time to market

Platform as a service

Database as a service

Reduced cost Hardware, licensing operations

BENEFITS OF CONSOLIDATION

Page 40: Exadata customer case studies - regist-event. · PDF fileDatabase Consolidation 2 Years in Production with Oracle Exadata Valeri Minkov 22.09.2016

Gurinder SIDHU, I&A CoE Leader, EnergyAustralia

Gaurav SINGH, Solution Architect, EnergyAustralia

Analytics at EnergyAustralia: Building an IM Platform in the Age of Big Data

ORACLE OPEN WORLD2016

Page 41: Exadata customer case studies - regist-event. · PDF fileDatabase Consolidation 2 Years in Production with Oracle Exadata Valeri Minkov 22.09.2016

Agenda

Who is EnergyAustralia

Transforming our Business

Strategic Analysis

Strategy to Execution

Technology Stack

Architecture

Benefits & Lessons Learnt

Page 42: Exadata customer case studies - regist-event. · PDF fileDatabase Consolidation 2 Years in Production with Oracle Exadata Valeri Minkov 22.09.2016

Who is EnergyAustralia EnergyAustralia invests in energy generation and retailing

Own and operate a multibillion dollar portfolio supplying the world’s longest interconnected power grid

One of Australia's largest and most experienced energy retailers, servicing over 2.6 million households and businesses across Australia

Page 43: Exadata customer case studies - regist-event. · PDF fileDatabase Consolidation 2 Years in Production with Oracle Exadata Valeri Minkov 22.09.2016

Transforming our Business Energy Australia needs to implement effective Information Management (IM)

This IM strategy defines the capabilities,

governance, operating models, people, technology and processes for IM to support the business

Implementation of strong enterprise IM is an essential and central prerequisite for meeting current and future business goals

Business strategy execution requires much

better information management

Current information solutions need to be

enhanced

Market disruption is driving change

Information demand is

increasing in scope, detail and

importance

Page 44: Exadata customer case studies - regist-event. · PDF fileDatabase Consolidation 2 Years in Production with Oracle Exadata Valeri Minkov 22.09.2016

Complexity Information Management is complex and hard to manage

Data domains

Multiple technologies

Operational and Analytical Architecture

Business needs

Page 45: Exadata customer case studies - regist-event. · PDF fileDatabase Consolidation 2 Years in Production with Oracle Exadata Valeri Minkov 22.09.2016

Strategic Analysis EnergyAustralia required enterprise governance, capabilities, solutions and technology that support the business effectively

Enterprise governance

Information & analytics capability

Architecture & technology

…relate to three areas of change Current capability…

Information Management Investment

The bar for adequate IM capability has been

raised

Page 46: Exadata customer case studies - regist-event. · PDF fileDatabase Consolidation 2 Years in Production with Oracle Exadata Valeri Minkov 22.09.2016

Strategy to Execution – Energy Australia IM Program To deliver on the big idea an enterprise wide program, one which would provide measurable benefits to the business needed to be

commissioned.

Enterprise wide foundation

Capability Uplift

Business Outcomes

Measure the impact Maximise the return on investment

Build architecture and technology engine

Enable business insight generation

Establish enterprise information governance

Enable I&A CoE driven collaboration

Esta

blis

h t

he

fou

nd

ati

on

s, b

uild

ou

t ca

pa

bili

ty a

nd

d

eliv

er b

usi

nes

s o

utc

om

es

Page 47: Exadata customer case studies - regist-event. · PDF fileDatabase Consolidation 2 Years in Production with Oracle Exadata Valeri Minkov 22.09.2016

Energy Australia IM – Information Governance A unified governance approach was implemented to give confidence around the data we hold as a company

Information Working Group - Meter

Information Working Group - Customer

System Owners Information Stewards

Executive Sponsorship

Executive Sponsor

Information Governance Council

Information Architect

Information Governance Leads

Information Owners

Customer Meter

Customer Meter

Information Governance components

Page 48: Exadata customer case studies - regist-event. · PDF fileDatabase Consolidation 2 Years in Production with Oracle Exadata Valeri Minkov 22.09.2016

Energy Australia IM – Execution Methodology The Information & Analytics Centre of Excellence consolidates, standardises and greatly improves the IM capability for EA. It

becomes the supplier of choice for quality information content and delivery.

EA IT

Working groups

Information and Analytics Centre of Excellence

Business Units

Information Governance Council

GOVERNANCE AND CONTROL

CAPABILITY AND SOLUTION

IMPROVEMENT AND KNOWLEDGE

DEMAND AND USAGE

Page 49: Exadata customer case studies - regist-event. · PDF fileDatabase Consolidation 2 Years in Production with Oracle Exadata Valeri Minkov 22.09.2016

Energy Australia IM – Technology Stack A Hadoop Augmented Data Warehouse architecture was proposed after evaluating 6 different alternatives

Metadata Management

High Performance Data Warehouse RDBMS

Hadoop Distribution

Data Quality Platform

Source Systems

Reporting & Analytic

Tools

Data Integration Platform

Page 50: Exadata customer case studies - regist-event. · PDF fileDatabase Consolidation 2 Years in Production with Oracle Exadata Valeri Minkov 22.09.2016

Platform Selection A cross functional project team was formed to determine the IM requirements landscape to ultimately drive the RFP selection

process.

Vendor Qualifications Experience, Financial Data, Compliance & Lawful Operations, Credentials, Quality, Risk Management &

Assurance, Partnerships with other vendors, Product Offerings & References, Product R&D, Product Development, Agreement

Lifecycle Costs Pricing, Software licensing, Annual Support costs,

Training costs, Implementation costs, other project related costs, Professional services labour rates

Support Support model, KPIs/SLAs, Software

Maintenance

Solution Delivery Implementation approach, Training

Technology Ingestion, Storage, Processing, Access, Deployment & Administration mechanisms required for diverse content.

Accessibility, Availability, Integrity, Maintainability, Performance, Reliability, Security

Page 51: Exadata customer case studies - regist-event. · PDF fileDatabase Consolidation 2 Years in Production with Oracle Exadata Valeri Minkov 22.09.2016

Innovate and Execute The ability to incubate and discover and provide a robust platform for critical analytics and reporting

EXECUTION

INNOVATIONIngestionEngines

EnterpriseModelled Data

Raw Data FunctionalModelled Data

Enterprise Data Hub

Data Discovery Hub

Batch Script SQL NoSQL Stream Search Others

INSIGHTS

CertifiedStructured & Unstructured Data

Batch Script SQL NoSQL Stream Search Others

OPPORTUNITIES

Uncertified Structured & Unstructured Data

Page 52: Exadata customer case studies - regist-event. · PDF fileDatabase Consolidation 2 Years in Production with Oracle Exadata Valeri Minkov 22.09.2016

Technical Architecture The Oracle Big Data Solution provided the ideal architecture to realise insights and drive business opportunities

Page 53: Exadata customer case studies - regist-event. · PDF fileDatabase Consolidation 2 Years in Production with Oracle Exadata Valeri Minkov 22.09.2016

High Availability Architecture The solution has is required to service a number of applications and users and is setup as an Active/Passive system with fast

failover

Page 54: Exadata customer case studies - regist-event. · PDF fileDatabase Consolidation 2 Years in Production with Oracle Exadata Valeri Minkov 22.09.2016

Database Architecture Energy Australia’s database design is very closely aligned to the Oracle Reference Architecture

Page 55: Exadata customer case studies - regist-event. · PDF fileDatabase Consolidation 2 Years in Production with Oracle Exadata Valeri Minkov 22.09.2016

Integration Architecture The Oracle Big Data Solution integrates into EnergyAustralia’s existing systems

INFORMATION MANAGEMENT PLATFORM

MM CustomerOnline Request

HTTPS

LegendLegend

WebService SOAP Call

Secure FTPFile Transfer

Employee Access

TCP/IP ChangeCapture

EXADATA X5-2

DA

TA

BA

SE

IN-M

EM

OR

YE

XA

DA

TA

BIG DATA APPLIANCE

AP

PL

IAN

CE

BIG

DA

TA

GOLDEN

GATE

DIGITAL PLATFORM

ENERGY

AUSTRALIA

WEBSITE

HTTPS

HANSEN KINETIC

AXWAY

SFTP

SFTP

INFRA

TCP/IP

TCP/IP

TCP/IP

CAMPAIGN

MANAGEMENT

SDR GATE

KEEPER

CC&B

ENERGY

AUSTRALIA

STAFF

AXWAY

SFTP

SFTP

SFTP SFTP

ORACLE

CRM on

DEMAND

iDB

ODI

API

HTTPS

MASS

MARKET

CUSTOMERS

API

SOAP

SFTP

Page 56: Exadata customer case studies - regist-event. · PDF fileDatabase Consolidation 2 Years in Production with Oracle Exadata Valeri Minkov 22.09.2016

Tools and Techniques The tools available in the Oracle Big Data Solution will be vital for delivering the analytical use cases

Use Case Technology Used

Information Governance Oracle Enterprise Data Quality (EDQ) Oracle Enterprise Metadata Manager (OEMM)

Campaign Management Oracle Enterprise Data Quality (EDQ) Address Validation Server Oracle Data Integrator (ODI)

Customer Bill Forecasting APACHE Spark APACHE Hbase APACHE Flume Oracle Big Data Discovery (BDD) Oracle Big Data SQL (BDSQL) Oracle Golden Gate

Energy Market Analysis R MATLAB Oracle Big Data Discovery (BDD) Oracle R Advanced Analytics for Hadoop (ORAAH)

Power of Choice APACHE HIVE Oracle Data Integrator (ODI) Oracle Big Data SQL (BDSQL)

Page 57: Exadata customer case studies - regist-event. · PDF fileDatabase Consolidation 2 Years in Production with Oracle Exadata Valeri Minkov 22.09.2016

Business Benefits Implementing the Oracle Big Data Solution allows EnergyAustralia to reap real benefits