    CAMBrIDGE CITY hALL ANNExCAMBRIDGE, MA

    Client Cit of Cambridge, MA

    Cmpletin 2004

    Cst $9.87 million

    Size 33,216 square feet

    Certied LEED Gold Ra

    ing

    Awads

    Sustainable Buildings IndustrCouncilFirst Place Exemplar SustainableBuilding Award 2006

    Massachusetts HistoricalCommissionPreservation Award 2005

    Environmental Design &ConstructionExcellence in Design Award FinalisGovernment Categor 2005

    Build New England Award,Associated General Contractors 20

    Cambridge Historical CommissionPreservation Award 2004

    Massachusetts Municipal AssociatiInnovation Award 2004

    Building Design & ConstructionInnovation Award 2004

    Cit Hall Annex at 57 Inman Street houses man of Cambridges most public ofces,

    including the Arts Council Galler and ofce, Parking and Trafc Department, and the

    Communit Development Department (an ofce with substantial communit interface).

    Complete renovation of this 1871 building represents a comprehensive response to sev-

    eral pressing program needs. The design utilized the U.S. Green Building Councils LEED

    Guidelines (Leadership in Energ & Environmental Design) to achieve a Gold rating for

    this project. These goals have prompted an approach that includes operable windows

    and an inux of natural light to ever ofce and work station as well as a number of

    other sustainable design choices. The new design provides a welcoming entr and lob-

    b, clear circulation and signage, efcient ofces and general laout, mold decontami-

    nation, code upgrades including handicapped accessibilit throughout, and separate en-

    trance for the Animal Commission which vaccinates pets and houses stra animals.

  • 8/8/2019 Example 4 1

    2/5

  • 8/8/2019 Example 4 1

    3/5

    LExINGToN DEPArTMENT oF PUBLIC WorkSLEXINGTON, MASSACHUSETTS

    Client Town of Lexington, MA

    Cmpletin 2008

    Cst TBD

    Size 75,000 square feet new

    construction on a 9.6 acre site

    LEED Silver Rating G

    This new complex is the rst municipal project under the towns new sustainable design

    initiative. The project will house the towns Department of Public Works administration,

    engineering and operations divisions as well as municipal ofces for the Town Facilities

    group, and will utilize sustainable design principals to maximize dalighting, good indoor

    air qualit and reduced energ costs for the town. Additionall, sited adjacent to the

    Minuteman Bikewa and the North Lexington Brook and located on a bus roadwa in

    a residential neighborhood, the site design features ecological restoration and sustain-

    able stormwater management strategies as well as low maintenance, indigenous plants

    landscape design. The programming and planning for this facilit was a joint effort of

    our design team. The collaborative effort of design and engineering results in this new

    model for municipal facilities.

  • 8/8/2019 Example 4 1

    4/5

    ChArLESToWN PoLICE STATIoNBOSTON, MASSACHUSETTS

    Client Cit of Boston, MA

    Cmpletin 2008

    Cst $6.85 million

    Size 19,200 square feet

    new construction

    Part of the Cits Green Building Initiative, this new district police station incorporates

    sustainable design strategies for energ efcienc and health environments. The build-

    ing program includes administrative and work areas, a lock-up facilit, maintenance

    garage, a communit meeting room and Communit Service ofce. Transparenc and

    communit access are major concepts in the building design.

  • 8/8/2019 Example 4 1

    5/5

    STorEr ENGINEErING BUILDINGMASSACHUSETTS MARITIME ACADEMy

    Client Division of Capital

    Asset Management

    Commonwealth of

    Massachusetts

    Cmpletin 2004

    Cst $7,431,000

    Size 26,000 sf addition, 29,90

    sf existing renovations

    Awads

    2007 DCAM Awards for

    Excellence Program, Design +

    Construction Winner

    The Storer Building houses engineering laboratories and classrooms used to train cadets

    about marine mechanical, electrical, and power generation sstems. The original facil-

    it dates to the 1960s and was inadequate for teaching the current curriculum. Among

    other design challenges, the facilit is located in high risk tidal ood zone A-13. This

    means walls and door openings the rst four feet above grade must be watertight, and

    all building materials must be stable in the presence of water. The new addition utiliz -

    es a three-stor atrium that connects to the existing building and allows natural light

    to enter existing laboratories that would have been obscured with a conventional addi-

    tion. The ground oor of the atrium is a pedestrian street connecting the campus parade

    ground and residential complex to the Harrington Building, the main administrative and

    classroom building at the Academ. The new 26,000 square foot addition includes class-

    rooms and facult ofces, an expanded electrical laborator, and labs for turbines and

    boilers, uids and thermodnamics, refrigeration, meteorolog, and marine safet. The

    existing facilit was upgraded to meet accessibilit and life safet requirements.