example ivr-valve.doc
TRANSCRIPT
-
7/27/2019 example IVR-valve.doc
1/8
:IN-FO-107:02
Inspection Visit Report
Client : POWER CONTROL CO. Office : SGS ZARAGOZAVR No.:RV376122_WO4073/03
Project : Sirri Island SeaWater InjectionProject & Treatment Project
Job File No.: 376122JV IO No. :
Invitation Letter No. :
Main Order No.: 4359-GN-IN-MR-004 Supplier: RINGO VALVULASS.L.
Order Status :
Sub Order No.: 12-1533 Rev.05Sub Supplier : Sub Order Status :
Inspection Date : 17,18.10.2013 Inspection Place: RINGO VALVULAS S.L.C/ROMERO 6, POL.IND. EMPRESARIUM50720 - ZARAGOZA
1) Material inspected (material identification)
ITEM TAG RATING DESCRIPTION QTY
1 02-SDV-4321 PN25 Butterfly valve 18 PN 25 LUG 1
2 02-XV-4323 PN25 Butterfly valve 2 PN 25 LUG 1
3 02-XV-4324 PN25 Butterfly valve 2 PN 25 LUG 1
TOTAL 3
Note: At the time of inspection valves were not marked; only identified by item marked with indelible until
properly marked.
2) Scope of inspection
Testing (As per PPI-4073 Revision 0)
o Hydrostatic shell, leakage and functional test -10% per type of valve.o Data dossier review
3) Applicable documents
- PPI-4073 Revision 0
- Valves list.
- Inspection Notification No. WO 4073-1 rev. 0
his IR does not relieve the supplier of their responsibility to comply with clients requirements to supply the item(s) concerned in full compliance withhe requirements of their purchase order / pro forma invoice specifications.
his document is issued by the Company under its General Conditions of Service accessible at http://www.sgs.com/terms_and_conditions.htm. Attentions drawn to the limitation of liability, indemnification and jurisdiction issues defined therein.
http://www.sgs.com/terms_and_conditions.htmhttp://www.sgs.com/terms_and_conditions.htmhttp://www.sgs.com/terms_and_conditions.htm -
7/27/2019 example IVR-valve.doc
2/8
:IN-FO-107:02
Main order No.: 4359-GN-IN-MR-004 JV IO No.: Pages: 2 of 8
Job file No.: 376122 Visit Report No.:RV376122_WO4073/03
4) Instruments used
See.p.5 for details depending on each inspection activity
5)Inspection performed
5.1TEST WITNESSING (10%)
5.1.1 Test observation: HYDROSTATIC SHELL TEST
ITEM TAG Activity performed (description) QuantityReference document for
results (ref.n / date)
1 02-SDV-4321
Witnessing of Hydrostatic test on
body under a pressure of 25 bar
during 300. Type of fluid: Water
No visible leakage observed for the
duration of the test
1
Test results available in
Ringo Test Report, dated
18.10.2013 (hereto attached)
2 02-XV-4323
Witnessing of Hydrostatic test on
body under a pressure of 25 bar
during 15. Type of fluid: Water
No visible leakage observed for the
duration of the test
1
Test results available in
Ringo Test Report, dated
18.10.2013 (hereto attached)
Instruments used:
Instrument
(Description)Serial N
Gauge RV-222
Calibration certificates reviewed (Ref.N, date):
o Certificate No. 12/110303 (RV-222) dd. 20.11.2012
(Calibration Certificates available upon request)
5.1.2 Test observation: SEAT TEST
his IR does not relieve the supplier of their responsibility to comply with clients requirements to supply the item(s) concerned in full compliance withhe requirements of their purchase order / pro forma invoice specifications.
his document is issued by the Company under its General Conditions of Service accessible at http://www.sgs.com/terms_and_conditions.htm. Attentions drawn to the limitation of liability, indemnification and jurisdiction issues defined therein.
http://www.sgs.com/terms_and_conditions.htmhttp://www.sgs.com/terms_and_conditions.htmhttp://www.sgs.com/terms_and_conditions.htm -
7/27/2019 example IVR-valve.doc
3/8
:IN-FO-107:02
Main order No.: 4359-GN-IN-MR-004 JV IO No.: Pages: 3 of 8
Job file No.: 376122 Visit Report No.:RV376122_WO4073/03
ITEM TAG Activity performed (description) QuantityReference document for
results (ref.n / date)
1 02-SDV-4321
Witnessing of Hydrostatic test on
seat with water under a pressure of
19 bar, and with air under a pressure
of 6 bar during 120.
1
Test results available in
Ringo Test Report, dated
18.10.2013 (hereto attached)
2 02-XV-4323
Witnessing of Hydrostatic test on
seat with water under a pressure of
19 bar, and with air under a pressure
of 6 bar during 15.
1
Test results available in
Ringo Test Report, dated18.10.2013 (hereto attached)
Instruments used:
Instrument
(Description)Serial N
Gauge RV-45
Gauge RV-222
Calibration certificates reviewed (Ref.N, date):
o Certificate No. 13/106358 (RV-45) dd. 31.07.2013
o Certificate No. 12/110303 (RV-222) dd. 21.11.2012
(Calibration Certificates available upon request)
5.1.3 Test observation: FUNCTIONAL TEST
ITEM TAG Activity performed (description) QuantityReference document for
results (ref.n / date)
1 02-SDV-4321
Functional test performed under our
presence. Time to open: 16 ;Time
to close: 9 . *Remark
1
Test results available in
Ringo Test Report, dated
18.10.2013 (hereto attached)
2 02-XV-4323
Functional test performed under our
presence. Time to open: 1.5; time to
close: 1,5. *Remark
1
Test results available in
Ringo Test Report, dated
18.10.2013 (hereto attached)
his IR does not relieve the supplier of their responsibility to comply with clients requirements to supply the item(s) concerned in full compliance withhe requirements of their purchase order / pro forma invoice specifications.
his document is issued by the Company under its General Conditions of Service accessible at http://www.sgs.com/terms_and_conditions.htm. Attentions drawn to the limitation of liability, indemnification and jurisdiction issues defined therein.
http://www.sgs.com/terms_and_conditions.htmhttp://www.sgs.com/terms_and_conditions.htmhttp://www.sgs.com/terms_and_conditions.htm -
7/27/2019 example IVR-valve.doc
4/8
:IN-FO-107:02
Main order No.: 4359-GN-IN-MR-004 JV IO No.: Pages: 4 of 8
Job file No.: 376122 Visit Report No.:RV376122_WO4073/03
*Remark: Due to test bench characteristics, this functional test is performed with no pressure as there is not enough
place to allow the disc movement till a 100% open position. For this reason, the functional test is performed out of the
test bench.
5.2 DATA DOSSIER REVIEW
Suppliers Data Dossier No. WO-4073/2 with the following documents has been reviewed dated on 17,18.10.2013:
o Compliance certificate
o Material Certificates
o Test reports
o Assembly drawings
o Dimensional Inspection Report and Final Control Certificate
o Quality Plan
6) Non Conformances (if any)
None
7) Further operation- Issuance of IRN
8) Conclusion
As per findings, requested scope of inspection and document review, the inspection results aresatisfactory.
9) Attachments
his IR does not relieve the supplier of their responsibility to comply with clients requirements to supply the item(s) concerned in full compliance withhe requirements of their purchase order / pro forma invoice specifications.
his document is issued by the Company under its General Conditions of Service accessible at http://www.sgs.com/terms_and_conditions.htm. Attentions drawn to the limitation of liability, indemnification and jurisdiction issues defined therein.
http://www.sgs.com/terms_and_conditions.htmhttp://www.sgs.com/terms_and_conditions.htmhttp://www.sgs.com/terms_and_conditions.htm -
7/27/2019 example IVR-valve.doc
5/8
:IN-FO-107:02
Main order No.: 4359-GN-IN-MR-004 JV IO No.: Pages: 5 of 8
Job file No.: 376122 Visit Report No.:RV376122_WO4073/03
Documents obtained from the Supplier:
Test Report
Data dossier
10) Photos
his IR does not relieve the supplier of their responsibility to comply with clients requirements to supply the item(s) concerned in full compliance withhe requirements of their purchase order / pro forma invoice specifications.
his document is issued by the Company under its General Conditions of Service accessible at http://www.sgs.com/terms_and_conditions.htm. Attentions drawn to the limitation of liability, indemnification and jurisdiction issues defined therein.
http://www.sgs.com/terms_and_conditions.htmhttp://www.sgs.com/terms_and_conditions.htmhttp://www.sgs.com/terms_and_conditions.htm -
7/27/2019 example IVR-valve.doc
6/8
:IN-FO-107:02
Main order No.: 4359-GN-IN-MR-004 JV IO No.: Pages: 6 of 8
Job file No.: 376122 Visit Report No.:RV376122_WO4073/03
his IR does not relieve the supplier of their responsibility to comply with clients requirements to supply the item(s) concerned in full compliance withhe requirements of their purchase order / pro forma invoice specifications.
his document is issued by the Company under its General Conditions of Service accessible at http://www.sgs.com/terms_and_conditions.htm. Attentions drawn to the limitation of liability, indemnification and jurisdiction issues defined therein.
http://www.sgs.com/terms_and_conditions.htmhttp://www.sgs.com/terms_and_conditions.htmhttp://www.sgs.com/terms_and_conditions.htm -
7/27/2019 example IVR-valve.doc
7/8
:IN-FO-107:02
Main order No.: 4359-GN-IN-MR-004 JV IO No.: Pages: 7 of 8
Job file No.: 376122 Visit Report No.:RV376122_WO4073/03
his IR does not relieve the supplier of their responsibility to comply with clients requirements to supply the item(s) concerned in full compliance withhe requirements of their purchase order / pro forma invoice specifications.
his document is issued by the Company under its General Conditions of Service accessible at http://www.sgs.com/terms_and_conditions.htm. Attentions drawn to the limitation of liability, indemnification and jurisdiction issues defined therein.
http://www.sgs.com/terms_and_conditions.htmhttp://www.sgs.com/terms_and_conditions.htmhttp://www.sgs.com/terms_and_conditions.htm -
7/27/2019 example IVR-valve.doc
8/8
:IN-FO-107:02
Main order No.: 4359-GN-IN-MR-004 JV IO No.: Pages: 8 of 8
Job file No.: 376122 Visit Report No.:RV376122_WO4073/03
Approved By: Inspector's signature:
Daniel Gargallo
SGS INSPECTOR
his IR does not relieve the supplier of their responsibility to comply with clients requirements to supply the item(s) concerned in full compliance withhe requirements of their purchase order / pro forma invoice specifications.
his document is issued by the Company under its General Conditions of Service accessible at http://www.sgs.com/terms_and_conditions.htm. Attentions drawn to the limitation of liability, indemnification and jurisdiction issues defined therein.
http://www.sgs.com/terms_and_conditions.htmhttp://www.sgs.com/terms_and_conditions.htmhttp://www.sgs.com/terms_and_conditions.htm