excellent partner technical solutions · 2018-10-16 · solution request? opu approval required for...
TRANSCRIPT
©Petroliam Nasional Berhad (PETRONAS) 2017 1
myExperts Instruction Guide 1
Excellent Partner Technical Solutions
Transforming the Way We Deliver Technical SolutionsInstruction Guide (By Role Function)
Time Write PD&T/Upstream Exp/CoESolution Management
Resource Management
• Searching for a Solution Request
• Raising a Solution Request
• Resource Assignment• Manhours Assignment
• Steps to submit/ modify and approve Time Write
©Petroliam Nasional Berhad (PETRONAS) 2017 2
myExperts Offerings 2
The 6 Integrated Module in myExperts
1. Portfolio Management 4. Time Write
5. Billing Advise
On-the-go time writing that is convenient enabling timely submissions
Standardized Solution Catalogue and Category for user selection
Provide live resource availability update for deployment and mobilization
Automated billing reducing the time to process billing after work has been performed
Feedback and rating for ongoing services and resources, allowing
Centralize and capture planned technical solutions and activities from OPU as the basis to raise request for manpower
2. Solution Management
3. Resource Management 6. Closure and Feedback
This instruction guide consist the following module:• Solution Management• Resource Management• Time Write
A one-stop platform to deliver Technical Solutions across PETRONAS
©Petroliam Nasional Berhad (PETRONAS) 2017 3
myExperts Instruction Guide 3
Requestor (OPU)
Approver(OPU)
DisciplineHead
Technical Manager
Lead Resource
Raising a Solution Request1. How do I search and
submit a Solution Request?2. How do I browse for a
Solution Request and submit it?
3. How do I modify/delete my Solution Request?
OPU Approval Required for Unbudgeted Request1. How do I approve or reject
a Solution Request?2. How do I approve or reject
a MoM Submission?
Endorsement and Assign TM1. How do I endorse a
Solution Request and assigned it to a technical manager?
Accept and Resource Assignment1. How do I accept or revert a
Solution Request?2. How do I assign roles/resources?3. How do I raise a change request?
MoM Submission Required1. How do I submit a MoM?2. How do I modify a rejected MoM?
Time Write1. How do I timewrite?2. How do I modify my timesheet?3. How do I approve/reject
timesheet?
Resource/Time Writer/
Reviewer
1
2
3
4
5
6For Upstream
For CoE
For PD&T
Requestor (OPU)
Initiate Request
Approver(OPU)
Approve Request
Discipline Head
Endorse RequestAssign to TM
Technical Manager
Assign Resource
Lead Resource
Submit Scope of Work
Resource
Time Write
Final Report*
Click on the hyperlink to navigate
to the step-by-step instruction
1 2 3 4 5 6
©Petroliam Nasional Berhad (PETRONAS) 2017 4
myExperts Overview 4
Submit Approve Submit Approve
Center of Excellence (CoE)
Hold for Discussion
OR OR
Hold for Discussion
Requestor ApproverDiscipline
HeadTechnical Manager
Lead Resource
Approver
Initiate Request
MoMSubmission Required
MoMApproval
Requested
1 2 3 4 5 6
Roles
RequestModification
Action
Action Button
Endorsement and Assign
TM
Resource Assignment
Required
Assign Resource
Endorse and Assign
TM
Approval Required
(for unbudgeted)
Operating Unit (OPU)Operating Unit (OPU)
Email Notification
• Requestor• Approver
• Requestor• Approver• COE Discipline
Head
• Requestor• Approver• COE Lead
Resource
Pending MoMModification
• Planned Request: Under this category, all solution requests raised are based on the up-front budget allocation to COEs agreed during P4R exercise. For GTS solutions, planned requests refer to the Retainer Work Plan that has been established on yearly-basis. The list of work plans is available with OPU Focal Person.
• Unplanned / Unbudgeted Request: Under this category, all solution requests raised are as per ad-hoc type of requests. However, the user still needs to obtain the budget approval from user’s LoA prior to raising requests.
OR OR
Hold for Discussion
Revert
Solution & Resource Management
©Petroliam Nasional Berhad (PETRONAS) 2017 5
Decision
Solution & Resource Management Process & Status Flow (Unbudgeted)
Start Submit Request
Draft
Pending Approval
Approve the Request
Pending Approval
Pending Endorsement
Hold for Discussion
Pending Approval
Pending Request Modification
Accept
Pending Acceptance
Revert
Pending Acceptance
Pending Re-Endorsement
MoM Submission Required
Pending MoM Submission
Pending MoM Approval
MoM Approval Required
Pending MoM Approval
Active
Hold for Discussion
Pending MOM Approval
Pending MoM Modification
Endorse and Assign TM
Pending Endorsement
Pending Acceptance
Hold for Discussion
Pending Endorsement/ Pending Ren-Endorsement
Pending Request Modification
Decision
Decision
Pending Mobilization
Add Role and Manhours
Pending MoM Submission
Decision
Action Required
Initial Status
Next Status
Legend
MoM Modification Required
Pending MOM Modification
Pending MoM Approval
C
B
Closure and Feedback
Change Request (if required)
Requestor (OPU)
Approver (OPU)
Discipline Head
Technical Manager
Lead Resource
Resource can Start
Time Write
• Applies for non-catalogue solution only.• For catalogue solution, status will change to
Active upon acceptance and role assignment.
Submit
Approve Reject
Endorse Reject
Approve Reject
Submit
Approve Reject
Modify and Resubmit Request or
Delete Request
Pending Request Modification
Delete
A
Click to go to home menu
©Petroliam Nasional Berhad (PETRONAS) 2017 6
Solution & Resource Management Process & Status Flow (Budgeted)
Start Submit Request
Draft
Pending Endorsement
Accept
Pending Acceptance
Revert
Pending Acceptance
Pending Re-Endorsement
MoM Submission Required
Pending MoM Submission
Pending MoM Approval
MoM Approval Required
Pending MoM Approval
Active
Hold for Discussion
Pending MOM Approval
Pending MoM Modification
Endorse and Assign TM
Pending Endorsement
Pending Acceptance
Hold for Discussion
Pending Endorsement/ Pending Ren-Endorsement
Pending Request Modification
Decision
Decision
Pending Mobilization
Add Role and Manhours
Pending MoM Submission
Decision
Action Required
Initial Status
Next Status
Legend
MoM Modification Required
Pending MOM Modification
Pending MoM Approval
C
B
Closure and Feedback
Change Request (if required)
Requestor (OPU)
Approver (OPU)
Discipline Head
Technical Manager
Lead Resource
• Applies for non-catalogue solution only.• For catalogue solution, status will change to
Active upon acceptance and role assignment.
Submit
Endorse Reject
Approve Reject
Submit
Approve Reject
Modify and Resubmit Request or
Delete Request
Pending Request Modification
Delete
Resource can Start
Time Write
A
Click to go to home menu
©Petroliam Nasional Berhad (PETRONAS) 2017 7
Decision
Time WriteProcess & Status Flow
Time Sheet Submission
Draft
Submitted
Approve the Time Sheet
Submitted
Approved
Reject the Time Sheet
Submitted
Rejected
Action Required
Initial Status
Next Status
Legend
A
Resource to Start Time Write
Reviewer
Time Writer
Adjustment Required
• Upstream and PD&T employees seconded
to Upstream: 21st of each month
• PD&T: Last day of each month
• Upstream and PD&T employees seconded to
Upstream: 25th of each month
• PD&T: 3rd of the following month
Scenario 1: Submission of time sheet and flow for adjustment made to a rejected timesheet before the deadline.
Reviewer
Time WriterResubmission of Time Sheet
Rejected
Submitted
Approve the Time Sheet
Submitted
Approved
Scenario 2: Flow for adjustment made to an approved timesheet after the deadline (within the last 1 month only)
Reject the Time Sheet
Submitted
Rejected
Offline:Inform Reviewer
• For any time writing changes submitted
before deadline, it will be reflected as a
submission for the current cycle period for
review.
• For any changes made after deadline, the
values will be considered as adjustments
submitted for approval in the subsequent
cycle period (see Adjustment Tab in the
subsequent cycle period).
Submit
Approve Reject
Reject Submit Adjustment
Click to go to home menu
©Petroliam Nasional Berhad (PETRONAS) 2017 8
Solution & Resource Management Process & Status Flow (Change Request)
Initiate Change Request- Add Role and Manhours
- Or Edit Role and Manhours
Active
Pending Change Request Acceptance
Action Required
Initial Status
Next Status
Legend
B
Change Request
Decision
Approve the Change Request
Pending Change Request Acceptance
Active
Reject the Change Request
Pending Change Request Acceptance
Active
C Closure and Feedback
Approver (OPU)
Technical Manager
A New Resource added to start Time Write
Approve Change Request Reject Change Request
Submit
Click to go to home menu
©Petroliam Nasional Berhad (PETRONAS) 2017 9
Decision
Closure (Final Report) and Feedback Process & Status Flow
Final Report Submission
Active
Pending TM Final Report Approval
Approve the Final Report
Pending TM Final Report Approval
Pending OPU Final Report Approval
Hold for Discussion
Pending TM Final Report Approval
Pending Final Report Modification
Approve the Final Report
Pending OPU Final Report Approval
Pending Feedback
Decision
Action Required
Initial Status
Next Status
Legend
Hold for Discussion
Pending OPU Final Report Approval
Pending Final Report Modification
Provide feedback and add feedback providers
Pending Feedback
Pending Feedback Acknowledgement
Acknowledge the feedback from OPU
Pending Feedback Acknowledgement
Close
Decision
Hold for Discussion
Pending Feedback Acknowledgement
Pending Feedback
End
C
Closure and Feedback
Requestor (OPU)
Approver (OPU)
Technical Manager
Lead Resource
Force closure after 30 days
Force c
losu
re a
fter
30
days
Force closure after 30 days
Note: System will auto close the request after 30 days from the final report approved date by OPU Approver
Submit
Approve Reject
Approve Reject
Submit
Approve Reject
Click to go to home menu
©Petroliam Nasional Berhad (PETRONAS) 2017 10
Technical Manager
Accept and Resource Assignment1. How do I accept or revert a
Solution Request?2. How do I assign roles/resources?3. How do I raise a change request?
myExperts Instruction Guide 10
Approver(OPU)
DisciplineHead
Lead Resource
OPU Approval Required1. How do I approve or reject
a Solution Request?2. How do I approve or reject
a Pending MoM?
Endorsement and Assign TM1. How do I endorse a
Solution Request and assigned it to a technical manager?
MoM Submission Required1. How do I submit a MoM?
Time Write1. How do I timewrite?2. How do I modify my timesheet?
Submit a Final Report1. How do I submit a Final Report?
Resource/Time Writer
Requestor (OPU)
Raising a Solution Request1. How do I search and
submit a Solution Request?2. How do I browse for a
Solution Request and submit it?
3. How do I modify my Solution Request?
Requestor (OPU)
Initiate Request
Approver(OPU)
Approve Request
Discipline Head
Endorse RequestAssign to TM
Technical Manager
Assign Resource
Lead Resource
Submit Scope of Work
Resource
Time Write
Final Report*
©Petroliam Nasional Berhad (PETRONAS) 2017 11
Click the Add to Cart button to navigate to My Cart page.
How do I search and submit a Solution Request? 11Requestor
OPU
Log in to myExperts at https://myexperts.petronas.com1
In the Search Engine tab, type in the Solution Request
Title and click the Search button to proceed.
2
3 The listing of the service will be shown in the Result page.
Click View More to read the description of the service.
4
6 Click on the tick box of the Solution Request to proceed
and expand the section.
To proceed with the service, click the Add to Cart button.
A notification will be prompted upon adding item to the cart.
5
1
2
3
4
6
5
Click to go to home menu
©Petroliam Nasional Berhad (PETRONAS) 2017 12
12Requestor
OPU
Fill in the required information.7 8 To proceed with the service, check the Terms & Condition
tick box.
9 Click Submit to submit the request. A notification message
will be prompted for confirmation of submission. Click Yes.
10 Upon successful completion, a confirmation message will be
prompted.
7
89
9
10
End
How do I search and submit a Solution Request?
Requestor to indicate whether the package is budgeted by selecting the relevant radio button.
If the package is unbudgeted, the request will be directed to an OPU approver priorto endorsement by relevant Discipline Head.
Requestor may attach supporting documents totaling up to 20 files with maximum size of 5MB per file.
If the request is project related, select the project name from the drop down menu.
If requesting on behalf of others, ensure the original requestor’s information is input at ‘Requestor Details’ section.
Ensure that the correct Charge Code is being selected.
Click on the ‘v’ icon to expand the section and viewthe detailed information.
Click to go to home menu
©Petroliam Nasional Berhad (PETRONAS) 2017 13
To select the Solution, click the Add to Cart button. A
notification will be prompted that an item have been added
to your cart. Click the cart icon to navigate to My Cart page.
How do I browse for a Solution Request and submit it? 13Requestor
OPU
Log in to myExperts at https://myexperts.petronas.com1
Click the Browse Menu, to search for Solutions. 2
3 Select the required Business Stream (Upstream, Downstream
or PD&T) and select the required Solution from the drop
down list.
4
7 Check the tick box of the Solution Request to proceed
and expand the section.
A list of recommended Technical Solutions will be filtered out.
6
1
2
3
4
7
6
5 Click the Solution Title to view more information on the
package.
5
Note: Requestor may add multiple packages to the cart.
Click to go to home menu
©Petroliam Nasional Berhad (PETRONAS) 2017 14
Requestor OPU
Fill in the required information.8 9 To proceed with the service, check the Terms & Condition
tick box.
10 Click Submit to submit the request. A notification message
will be prompted for confirmation of submission. Click Yes.
11 Upon successful completion, requestor will be directed to the
Confirmation of Request page to view the confirmed
request submission that has been recorded on the system.
8
910
11
14
End
How do I browse for a Solution Request and submit it?
Requestor to indicate whether the package is budgeted by selecting the relevant radio button.
If the package is unbudgeted, the request will be directed to an OPU approver priorto endorsement by relevant Discipline Head.
Requestor may attach supporting documents totaling up to 20 files with maximum size of 5MB per file.
If the request is project related, select the project name from the drop down menu.
If requesting on behalf of others, ensure the original requestor’s information is input at ‘Requestor Details’ section.
Ensure that the correct Charge Code is being selected.
10
Click on the ‘v’ icon to expand the section and viewthe detailed information.
Click to go to home menu
©Petroliam Nasional Berhad (PETRONAS) 2017 15
How do I modify my Solution Request? 15
Click on the My Request Tracker > Action Center tab on
myExperts Homepage.
1
1
From the drop down menu, select As Requestor. A list of items that are pending requestor actions are displayed.
2
2
In the Request Status field, click the Pending Request Modification link to view the details.
3
3
Requestor OPU
In the event a Solution Request have been rejected or put on hold for discussion by the OPU Approver, the requestor is required to modify the Solution Request accordingly.
Status: Pending Request Modification
Review the comments in the remarks column and modify the required action. Tick the T&C box and click the Submitbutton.
4
To delete the Solution Request, click the Delete button.5
54
Please amend the end date of the solution request.
End
Modify the Solution Request based on the remarks provided by the OPU Approver.
Click to go to home menu
©Petroliam Nasional Berhad (PETRONAS) 2017 16
Requestor (OPU)
Raising a Solution Request1. How do I search for a
Solution Request?2. How do I modify my
Solution Request?
Technical Manager
Accept and Resource Assignment1. How do I accept or revert a
Solution Request?2. How do I assign roles/resources?3. How do I raise a change request?
myExperts Instruction Guide 16
DisciplineHead
Lead Resource
Endorsement and Assign TM1. How do I endorse a
Solution Request and assigned it to a technical manager?
MoM Submission Required1. How do I submit a MoM?
Time Write1. How do I timewrite?2. How do I modify my timesheet?
Submit a Final Report1. How do I submit a Final Report?
Resource/Time Writer
Approver(OPU)
Pending Approval
Pending MoM Approval
OPU Approval Required for Unbudgeted Request1. How do I approve or reject
a Solution Request?2. How do I approve or reject
a MoM Submission?
Requestor (OPU)
Initiate Request
Approver(OPU)
Approve Request
Discipline Head
Endorse RequestAssign to TM
Technical Manager
Assign Resource
Lead Resource
Submit Scope of Work
Resource
Time Write
Final Report*
©Petroliam Nasional Berhad (PETRONAS) 2017 17
How do I approve or reject a Solution Request? 17Approver
OPU
Click on the My Request Tracker > Action Center tab on
myExperts Homepage.
1
1
From the drop down menu, select As Approver. A list of items that are pending approval are displayed.
2
2
In the Request Status field, click the Pending Approval link to view the details.
Note: Use the sort function to sort request by age.
Review the Solution Request by expanding the information tabs.
3
4
To approve the Solution Request, click the Approve button. Else, to reject the request, click the Hold for Discussion button.
5
3
4
5
Click to go to home menu
©Petroliam Nasional Berhad (PETRONAS) 2017 18
How do I approve or reject a Solution Request? 18Approver
OPU
Upon clicking the Approve button, a notification will be
prompted for approval to confirm the following:
6
1
2
7 Upon clicking the Hold for Discussion button, a notification
will be prompted for remarks:
Click to go to home menu
End
6
7
©Petroliam Nasional Berhad (PETRONAS) 2017 19
How do I approve or reject a MoM submission? 19Approver
OPU
Click on the My Request Tracker > Action Center tab on
myExperts Homepage.
1
1
From the drop down menu, select As Approver. A list of items that are pending approval are displayed.
2
2
In the Request Status field, click the Pending MoM Approval link to view the details.
3
Review the MoM Submission by expanding the MoM Information tabs.
4
3
4
5
To approve the MoM, click the Approve button. Else, to reject the request, click the Hold for Discussion button.
5
Click to go to home menuEnd
©Petroliam Nasional Berhad (PETRONAS) 2017 20
Approver(OPU)
OPU Approval Required1. How do I approve or reject
a Solution Request?2. How do I approve or reject
a Pending MoM?
Requestor (OPU)
Raising a Solution Request1. How do I search for a
Solution Request?2. How do I modify my
Solution Request?
Technical Manager
Accept and Resource Assignment1. How do I accept or revert a
Solution Request?2. How do I assign roles/resources?3. How do I raise a change request?
myExperts Instruction Guide 20
Lead Resource
MoM Submission Required1. How do I submit a MoM?
Time Write1. How do I timewrite?2. How do I modify my timesheet?
Submit a Final Report1. How do I submit a Final Report?
Resource/Time Writer
DisciplineHead
Pending Endorsement
Pending Re-Endorsement
Endorsement and Assign TM1. How do I endorse a
Solution Request and assigned it to a technical manager?
Click to go to home menu
Requestor (OPU)
Initiate Request
Approver(OPU)
Approve Request
Discipline Head
Endorse RequestAssign to TM
Technical Manager
Assign Resource
Lead Resource
Submit Scope of Work
Resource
Time Write
Final Report*
©Petroliam Nasional Berhad (PETRONAS) 2017 21
How do I endorse Solution Request and assign a TM? 21Discipline
Head
Click on the My Request Tracker > Action Center tab on
myExperts Homepage.
1
1
From the drop down menu, select As Discipline Head. A list of items that are pending approval are displayed.
2
2
In the Request Status field, click the Pending Endorsement or Pending Re-Endorsement link to view the details.
3
To endorse the Solution Request, click the Endorse button. Else, to reject the request, click the Hold for Discussion button and the request will be reverted back to the requestor.
5
3
4
5
Review the Solution Request by expanding the Informationtabs.
4
Upon endorsing, a pop-up box will be prompted. Select the
technical manager from the drop-down menu and click
Confirm.
6
Click to go to home menuEnd
Note: Discipline Head will also be able to view all Solution Request and pending action items of technical managers under his purview. He may also be able to complete the action on behalf.
©Petroliam Nasional Berhad (PETRONAS) 2017 22
myExperts Instruction Guide 22
Requestor (OPU)
Approver(OPU)
DisciplineHead
Lead Resource
Raising a Solution Request1. How do I search for a
Solution Request?2. How do I modify my
Solution Request?
OPU Approval Required1. How do I approve or reject
a Solution Request?2. How do I approve or reject
a Pending MoM?
Endorsement and Assign TM1. How do I endorse a
Solution Request and assigned it to a technical manager?
MoM Submission Required1. How do I submit a MoM?
Time Write1. How do I timewrite?2. How do I modify my timesheet?
Submit a Final Report1. How do I submit a Final Report?
Resource/Time Writer
Technical Manager
Pending Acceptance
Pending Mobilization
Accept and Resource Assignment1. How do I accept or revert a
Solution Request?2. How do I assign roles/resources?3. How do I raise a change request?
Requestor (OPU)
Initiate Request
Approver(OPU)
Approve Request
Discipline Head
Endorse RequestAssign to TM
Technical Manager
Assign Resource
Lead Resource
Submit Scope of Work
Resource
Time Write
Final Report*
©Petroliam Nasional Berhad (PETRONAS) 2017 23
How do I accept or revert a Solution Request? 23Technical Manager
Click on the My Request Tracker > Action Center tab on
myExperts Homepage.
1
1
From the drop down menu, select As Technical Manager. A list of items that are pending TM’s acceptance and approval are displayed.
2
2
In the Request Status field, click the Pending Acceptance link to view the details.
Review the Solution Request by expanding the information tabs.
3To accept the request, click the Accept button. Click the Proceed button and go to How do I assign roles and resources? (step 4).
4
Or to revert the request, click the Revert button.
5
3
4
56
Enter remarks for reverting the request and click on the Submit button.
6
6 (a)
The request will be routed to Discipline Head for re-endorsement and re-assignment of a different Technical Manager.
Click to go to home menuEnd
©Petroliam Nasional Berhad (PETRONAS) 2017 24
How do I assign roles and resources? 24Technical Manager
Click on the My Request Tracker > Action Center tab on
myExperts Homepage.
1
1
From the drop down menu, select As Technical Manager. A list of items that are pending TM’s acceptance and approval are displayed.
2
2
In the Request Status field, click the Pending Mobilization link to view the details.
Review the Solution Request by expanding the information tabs and click the Continue button.
3Select the Start and End Date of the Solution Request.
4
To add team members or resources, click the Add Role button. To edit an existing resource, click the Edit button.
5
3
5
6
6
Upon accepting a Solution Request, the status will change from
Pending Acceptance to Pending Mobilization. Technical Managers
will now be able to add roles and resources.
To add a known resources, click the Search by Name tab and key in the name of the known resource and click the Search button. Or;
7
Click to go to home menu
©Petroliam Nasional Berhad (PETRONAS) 2017 25
How do I assign roles and resources? 25Technical Manager
Key in the relevant resource information required (role, job grade, location) and click the View Recommendation to view resources that match the criteria.
8
To select the resource, click the Select button. The new resource will be added under the Team Members section.
10
12 Click the Proceed button to continue to the Resource Loading Page.
8
Click the View button to view the e-CV of the resources.9
9
10
9
Specify whether the new resource is a lead resource/ alternate TM/ non-critical role.
11
11
Click to go to home menu
©Petroliam Nasional Berhad (PETRONAS) 2017 26
How do I assign roles and resources? 26Technical Manager
On the Resource Loading Page, select the rate and key in the required man hours of the resource.
12 Click on the Mobilize button.A confirmation message will be prompted for confirmation on the resource mobilization.
14
Click the View button to view the resource’s daily loading.The estimated man hours and cost will be displayed. If required, amend the man hours.
13
Click the View button to view the resource’s daily loading.The estimated man hours and cost will be displayed. If required, amend the man hours. Then, click Proceed.
12 13
14
Click to go to home menu
13
The new resource added will be displayed in the resource information tab. Once he has been assigned under the technical manager, the resource will be able to time write in myExperts with the Technical Manager as the reviewer.
15
©Petroliam Nasional Berhad (PETRONAS) 2017 27
How do I assign roles and resources? 27Technical Manager
View the resource assignment summary.16 To modify team members or resources;17
Click to go to home menu
End
Resource Assignment Summary:Total number of position, vacant, filled, Pending Mobilize.
The summary include name of1. Lead Resource name2. Lead TM and Alternate TM
Add Role button:To enable TM to add more resources
Delete button: To remove Roleswithout resource
Replace button:To replace resource with the same roles/position. Once resource be replaced, TM or Alternate TM need to mobilize again the new resource.
Tips: This function is enable due to maintain the same number position as per MPP in Project.
16
17
Edit button: To modify resource information
©Petroliam Nasional Berhad (PETRONAS) 2017 28
How do I raise a Change Request? 28Technical Manager
Click on the My Request Tracker > Request Tracker tab
on myExperts Homepage.
1
1
In the Request Tracker page, search and select the Solution Request that requires modification.
2
In the Request Status field, click the Active link to view the details.
Review the Solution Request by expanding the information tabs.
3To raise a Change Request (outside project budget or project timeline), click the Add Change Request button.
4
6
3
4
65
To add a new resources or edit a resource that is within project budget and timeline, click the Continue button to proceed.
5
Click to go to home menu
©Petroliam Nasional Berhad (PETRONAS) 2017 29
How do I raise a Change Request? 29Technical Manager
To raise Change Request, complete the following actions and the click the Proceed button:• Fill in the Change Description column• Select the Change Reason:
- Expected closeout date extended- Higher Cost- Expected closeout date extended and Higher Cost
• Select the Expected Closeout Date• Others
7
8
7
To add new resource, click the Add Role button. Proceed to the next step: How do I assign roles and resources?
9
To extend the current resource, select the resource and click the Edit button.
8
8
Click the Edit button.i. Amend the Role or End Date of the resource.ii. Click the Confirm button.
8(i)
Key in the new Rate and Manhours and click Proceed.10
9
10
Click to go to home menu
©Petroliam Nasional Berhad (PETRONAS) 2017 30
How do I raise a Change Request? 30Technical Manager
The following field are required to be updated: • Scope of Work• Deliverables • Cost section• Attachment
11
Click the Submit Change Request button to submit the Change Request to OPU/ Asset Approver.
12
11
12
Click to go to home menu
©Petroliam Nasional Berhad (PETRONAS) 2017 31
Technical Manager
Accept and Resource Assignment1. How do I accept or revert a
Solution Request?2. How do I assign roles/resources?3. How do I raise a change request?
myExperts Instruction Guide 31
Requestor (OPU)
Approver(OPU)
DisciplineHead
Raising a Solution Request1. How do I search for a
Solution Request?2. How do I modify my
Solution Request?
OPU Approval Required1. How do I approve or reject
a Solution Request?2. How do I approve or reject
a Pending MoM?
Endorsement and Assign TM1. How do I endorse a
Solution Request and assigned it to a technical manager?
Time Write1. How do I timewrite?2. How do I modify my timesheet?
Submit a Final Report1. How do I submit a Final Report?
Resource/Time Writer
Lead Resource
Pending MoM Submission
Pending MoM Modification
MoM Submission Required1. How do I submit a MoM?2. How do I modify a rejected MoM?
©Petroliam Nasional Berhad (PETRONAS) 2017 32
How do I submit a MoM? 32Lead
Resource
Click on the My Request Tracker > Action Center tab on
myExperts Homepage.
1
1
From the drop down menu, select As Lead Resource. A list of items that are pending Lead Resource’s action are displayed.
2
2
In the Request Status field, click the Pending MoM Submission link to view the details.
Review the Solution Request by expanding the information tabs then click Continue.
3
4
3
The following field are required to be updated: • Scope of Work• Deliverables • Cost section• Attachment
5
Click the Submit button to submit the MoM to OPU/ Asset Approver.
6
5
6
Click to go to home menu
©Petroliam Nasional Berhad (PETRONAS) 2017 33
How do I modify a rejected MoM? 33Lead
Resource
Click on the My Request Tracker > Action Center tab on
myExperts Homepage.
1
1
From the drop down menu, select As Lead Resource. A list of items that are pending Lead Resource’s action are displayed.
2
2
In the Request Status field, click the Pending MoM Modification link to view the details.
Review the Solution Request by expanding the information tabs then click Continue.
3
4
3
The following field are required to be updated: • Scope of Work• Deliverables • Cost section• Attachment
5
Click the Submit button to submit the MoM to OPU/ Asset Approver.
6
5
6
Pending MoM Modification
Click to go to home menu
©Petroliam Nasional Berhad (PETRONAS) 2017 34
Lead Resource
MoM Submission Required1. How do I submit a MoM?
Technical Manager
Accept and Resource Assignment1. How do I accept or revert a
Solution Request?2. How do I assign roles/resources?3. How do I raise a change request?
myExperts Instruction Guide 34
Requestor (OPU)
Approver(OPU)
DisciplineHead
Raising a Solution Request1. How do I search for a
Solution Request?2. How do I modify my
Solution Request?
OPU Approval Required1. How do I approve or reject
a Solution Request?2. How do I approve or reject
a Pending MoM?
Endorsement and Assign TM1. How do I endorse a
Solution Request and assigned it to a technical manager?
Resource/Time Writer/
Reviewer
For PD&T Resources
For Upstream Exploration and CoE
Time Write1. How do I timewrite?2. How do I modify my timesheet?3. How do I approve/reject
timesheet?
Submit a Final Report1. How do I submit a Final Report?
©Petroliam Nasional Berhad (PETRONAS) 2017 35
How do I time write? 35Resource/
Time Writer
Click on the Time Write > As Time Writer menu on the
myExperts Homepage.
1
1
Select the current cycle period.2
Select the Assignment, Role, Charge Code and Location
from the drop down menu.
3
4
To submit the recorded hours, click the Submit button. The status will change to Submitted.
7
2
3 4
5
7
For Manpower Supply Contract (MSC) resources that requiresto key in their Over Time (OT) hours, use thefunction.
6
For PD&T Resources
Click to go to home menu
To save the recorded hours and resume later, click the Savebutton. The recorded hours will be displayed in the ‘TOTAL’ column.
5
Enter the working hours of the assignment for each selecteddate. Standard working hours is 8 hours per day.
i. Click on the date (from the assignment that requiresto input OT hours) and click the Add/Remove OTbutton. An Add Over Time box will be prompted.Insert the Over Time Hours and Click Save &Close.
ii. The Over Time Hours will be indicated in thefluorescent blue box, under the normal workinghours.
iii. To update or remove the Over Time Hours, click thedate and click on the Add/Remove OT Button. TheAdd Over Time box will be prompted. Click theUpdate or Remove button.
6View the summary table to see the total hours that have been keyed in for the time write period.
© 2017 Petroliam Nasional Berhad (PETRONAS) 36
How do I modify my timesheet if it has been rejected ? 36Resource/
Time Writer
Click on the Time Write > As Time Writer menu on the
myExperts Homepage.
1
1
Select the current cycle period.2
Scroll down the page until you see rejected comments.3
Refill the required manhours for the rejected assignment. 4
2
5
Click Save button to save the recorded hours and Submit
button to submit the recorded hours for the month.
5
3
4
For PD&T Resources
Click to go to home menu
Test 123 – Execution Phase
Rejected
© 2017 Petroliam Nasional Berhad (PETRONAS) 37
Add new record Click the Add new record button to add more line to the assignment list.
PDF Review Click the PDF Review button to download the timesheet in PDF format.
Prior Month BalancePMB(hr)
The total man-hours assigned to the resource/user for the particular technical solution/project.
Current Month ActualCMB(hr)
Total man-hours recorded for the month.
X Delete the time write record for the particular assignment.
Enter comment by date. Select the date from the drop down menu. Enter the comment in the space provided. Click ‘Save’ button to save the comment by date.
View the details of the assignment i.e. Request Description, Project Name, Reviewer, Duration and comments recorded by date.
Click to go to home menu
Information 37Resource/
Time Writer
For PD&T Resources
© 2017 Petroliam Nasional Berhad (PETRONAS) 38
How do I approve or reject a time sheet? 38Reviewer
Log in to myExperts at https://myexperts.petronas.com1
Click on the Time Write menu and select As Reviewer.2
3 The name of Time Writers/ Resources under you purview will
be listed in the table below. Select the Cycle Period and
expand the SR by clicking the icon.
4 Tick the checkbox next to the Resource Name and view the
time write information.
1
2
3
5 To approve the timesheet, click the Approve button. Else, to
reject, click the Reject button.
For PD&T Resources
5
4
Click to go to home menu
© 2017 Petroliam Nasional Berhad (PETRONAS) 39
How do I time write (and add charge code?) 39Resource/
Time Writer
Click on the Time Write > As Time Writer menu on the
myExperts Homepage.
1
1
Select the current cycle period.2
Select the Assignment, Role, Charge Code and Location
from the drop down menu.
3
5
To submit the recorded hours, click the Submit button. The status will change to Submitted.
8
2
3
4
5
A confirmation message will be prompted to confirm the addition of the charge code to your assignment list. You are then required to contact PETRONAS ICT Service Desk or your Project Control Focal person to properly assign yourself in the assignment for future time writing.
7
Exploration
Enter the working hours of the assignment for each day of
the month (i.e standard 8 hours per day except Friday).
4
To add a new charge code under your assignment, click on the Add Charge Code button.
Select the Charge Code from the dropdown list and click on the Create button.Please note that all active charge code will be displayed in the drop down list. If you are unable to find the charge code, kindly contact ICT Service Deck.
6
To save the recorded hours and resume later, click the Savebutton. The recorded hours will be displayed in the ‘TOTAL’ column.
9
6
7
8 9
Click to go to home menu
© 2017 Petroliam Nasional Berhad (PETRONAS) 40
How do I modify my timesheet if it has been rejected ? 40Resource/
Time Writer
Click on the Time Write > As Time Writer menu on the
myExperts Homepage.
1
1
Select the current cycle period.2
Scroll down the page until you see the rejected comments.3
Refill the required manhours for the rejected assignment. 4
2
3
Click Save button to save the recorded hours and Submit
button to submit the recorded hours for the month.
5
3
4
Exploration
Assignment 123
Click to go to home menu
© 2017 Petroliam Nasional Berhad (PETRONAS) 41
How do I approve or reject a time sheet? 41Reviewer
Log in to myExperts at https://myexperts.petronas.com1
Click on the Time Write menu and select As Reviewer.2
3 The name of Time Writers/ Resources under you purview will
be listed in the table below. Select the Cycle Period and
expand the SR by clicking the icon.
4 Tick the checkbox next to the Resource Name and view the
time write information.
1
2
3
5 To approve the timesheet, click the Approve button. Else, to
reject, click the Reject button.
5
4
Exploration
Click to go to home menu
© 2017 Petroliam Nasional Berhad (PETRONAS) 42
Information 42
Add new record Click the Add new record button to add more line to the assignment list.
PDF Review Click the PDF Review button to view the timesheet in PDF format.
Prior Month BalancePMB(hr)
The total man-hours assigned to the resource/user for the particular technical solution/project.
Current Month ActualCMB(hr)
Total man-hours recorded for the month.
X Delete the time write record for the particular assignment.
Enter comment by date. Select the date from the drop down menu. Enter the comment in the space provided. Click ‘Save’ button to save the comment by date.
View the details of the assignment i.e. Request Description, Project Name, Reviewer, Duration and comments recorded by date.
Resource/ Time Writer
Exploration
Click to go to home menu
© 2017 Petroliam Nasional Berhad (PETRONAS) 43
What do I need to do if I can’t find my Assignment or Charge Code? 43
Click on the Request List menu on the myExperts Homepage.1
1
Type in the required Solution Request Title or Solution Request Number and click the Search button.
2
Click on the SR Title listed out in the Request List. 3
4
2
For example: Type in “SK 407” in the SR Title and select the relevant SR Title from the drop down list.
3
You will only be able to time write in myExperts providing
that your name is under the Resource Information tab for
that Solution Request.
4
If you are unable to find your name, please reach out to the
focal person (in the next slide) or reach out to PET-ICT
Service Desk for it to be investigate and mapped accordingly.
Click to go to home menu
Exploration
©Petroliam Nasional Berhad (PETRONAS) 2017 44
How do I Time Write in myExperts? 44Time Writer
Log in to myExperts at https://myexperts.petronas.com1
Click on the Time Write menu and select As Time Writer
(Upstream CoE).
2
3 To time write, drag and drop the selected assignment (from
the left side of the calendar view) on to the selected date in
the calendar. An Event Notification Form will be prompted.
Alternatively, click a date on the calendar to prompt the
Event Notification Form.
4
5 Upon completion of the form, click the Save & Submit button to submit the assignment.
In the Event Notification Form, fill in the required
information. Refer to the next slides for more information.
Grey colour indicates previous month cycle
Orange colour indicates end date of submission
2
1
3
4
5
Upstream CoE
Click to go to home menu
©Petroliam Nasional Berhad (PETRONAS) 2017 45
How do I Time Write in myExperts? 45Time Writer
Event Description and Action Required
Title Selected SR Title will be auto populated by default.
Assignment Selected Assignment will be auto populated by default.
Role Select the role assignment from the drop-down list.
Charge Code Select the charge code from the drop-down list.
Location Select the location from the drop-down list.
Activity Select the main activity from the drop-down list.
Category 1Select the first level of time write category from the drop-down list. The listing is based on the input selected from the ‘Activity’ field.
Category 2 Select the second level of time write category from the drop-down list. The listing is based on the input selected from the ‘Category 1’ field.
Category 3Select the third level of time write category from the drop-down list. The listing is based on the input selected from the ‘Category 2’ field.
Category 4Select the forth level of time write category from the drop-down list. The listing is based on the input selected from the ‘Category 3’ field.
Category 5Select the fifth level of time write category from the drop-down list. The listing is based on the input selected from the ‘Category 4’ field.
Start Date Select the Start Date of the assignment using the date/time picker.
End Date Select the End Date of the assignment using the date/time picker.
Note:
i. Please tick the All Day checkbox to add the assignment for multiple days.
ii. The system will not allow time writers to input more than 12 hours per day for any selected assignment.
Upstream CoE
Click to go to home menu
©Petroliam Nasional Berhad (PETRONAS) 2017 46
How do I Modify my Time Sheet? 46Time Writer
Log in to myExperts at https://myexperts.petronas.com1
Click on the Time Write menu and select As Time Writer
(Upstream CoE).
2
3 From the calendar, double click on the Assignments that
have been rejected by reviewer and requires modification or
adjustment. This is indicated by the color.
4
5 To resubmit the assignment, click the Save & Submit button. Else, to delete the assignment, click the Delete button.
In the Event Notification Form, edit the required
information.
EXP/20180801/101925
Pale orange colour indicates time write have been rejected
EXP/20180801/101333
Pale green colour indicates time write have been approved
2
1
3
4
5
Upstream CoE
Click to go to home menu
©Petroliam Nasional Berhad (PETRONAS) 2017 47
How do I approve or reject a time sheet? 47Reviewer
Log in to myExperts at https://myexperts.petronas.com1
Click on the Time Write menu and select As Reviewer
(Upstream CoE).
2
3 The name of Time Writers/ Resources under you purview will
be listed in the table below. Select the resources name and
view their time sheet prior to approving or rejecting it.
4 To search for a particular resource or cycle, use the search
function by filtering Cycle Period, SR Number, Status, Charge
Code and SR Title. Click the Search button to proceed.
1
2
3
5 To approve the timesheet, click the Approve button. Else, to
reject, click the Reject button.
4
5
Upstream CoE
Click to go to home menu
©Petroliam Nasional Berhad (PETRONAS) 2017 48
Experiencing Issues? 48
+603-2331 3333
PETRONAS ICT Service Desk via myGenie+
Contact Us
If you are experiencing any technical issues or require further assistance, please contact us at: