Page 1: EXE UTIVE SUMMARY - Investment Property Queensland · EXE UTIVE SUMMARY The Regional Development Register (RDR) is the evidence required to reaffirm the Mackay-Isaac-Whitsunday region’s

www.mwredc.org.au 1 | P a g e

Page 2: EXE UTIVE SUMMARY - Investment Property Queensland · EXE UTIVE SUMMARY The Regional Development Register (RDR) is the evidence required to reaffirm the Mackay-Isaac-Whitsunday region’s

www.mwredc.org.au 2 | P a g e

EXECUTIVE SUMMARY

The Regional Development Register (RDR) is the evidence required to reaffirm the Mackay-Isaac-Whitsunday region’s place as the economic powerhouse of Queensland. This report highlights the region’s ability to sustain major changes in economic conditions and outperform other regions when faced with significant pressure, as seen in the Global Financial Crisis (GFC).

The success of a region is often determined by the number of tangible and visible developments under way. The Mackay-Isaac-Whitsunday region is a clear example of success, with construction of hundreds of new homes, multi-story hotel developments, road reconstructions and major industry developments.

However, the region is suffering from a major downturn in the economy. The impact of a high Australian Dollar and other factors outside the region’s control have had serious implications in terms of a retraction in the mining sector and the flow-on effects of job losses, business and revenue decline and withdrawal of projects.

Despite the challenges of the past twelve to eighteen months, the medium to long-term outlook for the Mackay-Isaac-Whitsunday is positive. The current construction activity is evidence of pre-planning and a rush to fill the demand for accommodation and facilities to meet the growing population.

This RDR highlights the focus on our region in terms of supporting our communities, and sustaining income from the resources and construction sectors. Our region injects into both the Queensland and national economy with more than $20billion in gross regional product (GRP).

The RDR highlights more than $110 Billion worth of development either planned or under way across our region and showcases the strong investment.

But the most significant figure is the amount $86 Billion under consideration (not started), which highlights the significant number of projects waiting to come on board, with $28 Billion of this in the mining sector alone.

The challenges within the economy have led to some nervousness among project proponents who have been additionally impacted by government decisions including the mining and royalties’ taxes.

An uncertain political climate has also had an impact on planning for major mining projects, which in turn has had a flow on effect to projects that would support these including rail and port.

However, the not started section also takes into account projects that have been in the conceptual stages and are now moving forward, ready to get under way. They have not reached the in progress section as yet, due to long lead times.

The focus on Clean Technology has increased investment in the agriculture sector thanks to a commitment by local business to develop industries and technology that support sugar and agriculture.

REDC believes the medium to long-term future is expected to be strong. This certainly evidenced by this RDR. We will continue to work with the community and industry leaders to ensure projects are progressed and provide the required benefits to the communities within the Mackay-Isaac-Whitsunday region.

Page 3: EXE UTIVE SUMMARY - Investment Property Queensland · EXE UTIVE SUMMARY The Regional Development Register (RDR) is the evidence required to reaffirm the Mackay-Isaac-Whitsunday region’s

www.mwredc.org.au 3 | P a g e

About the RDR

The Regional Development Register (RDR) is prepared twice each year by REDC in order to collate development projects, either planned or under-way, across the region. The information is used to monitor the impacts on the communities within the region, as well as guide investors and community leaders when planning for the future.

Changes to the RDR

REDC has amended the methodology in which data was collected for this RDR with more detailed primary communication with proponents leading to additional details and costing which were not outlined in previous reports.

These changes have led to an increase in the overall project cost where a lower cost would have been expected due to the economic impacts of the past twelve to eighteen months.

NB: The professional services category has been replaced with health and education categories in order to capture a more accurate value of developments across the public and community service sectors within the region. The use of the term n/a in this edition of the Regional Development Register has been injected to reflect the change over in categories.

About REDC

The Mackay-Isaac-Whitsunday Regional Economic Development Corporation (REDC) represents the business, government, and community interests of the three local government areas, which form the Mackay-Isaac-Whitsunday (MIW) region.

As the lead economic body supporting this region, REDC is committed to working with business, industry, government and investors to achieve the best possible result for this dynamic and vibrant region.

Acknowledgements

REDC would like to acknowledge those who have assisted us in the compilation of this important report.

Page 4: EXE UTIVE SUMMARY - Investment Property Queensland · EXE UTIVE SUMMARY The Regional Development Register (RDR) is the evidence required to reaffirm the Mackay-Isaac-Whitsunday region’s

www.mwredc.org.au 4 | P a g e

About the MIW Region

The MIW region consists of three local council areas, Mackay, Isaac and Whitsunday, boasting a relaxed,

subtropical climate, with an overall regional population of approximately 171,297.

The MIW region delivers a diverse industry environment which is strongly underpinned by one of the largest

coal mining deposits in Australia, supplying Queensland with

approximately half of all coal produced with three quarters of

the total value of coal exported via regional ports. The

agricultural sector is fortified by a diverse agricultural,

horticultural and a growing agribusiness industry and is one of

the largest contributors to sugar cane production in Australia.

The MIW region is the third largest economy in Queensland with a Gross Regional Product (GRP) of $20.6billion in 2011/2012.

Regional Development Overview

The forecast for potential growth across all industry

sectors in the MIW region is supported by over $19.9

billion of developments currently under construction

with a further $85.9 billion of developments under

consideration (not yet started).

A positive outcome for the Mackay LGA is the $5.5

billion value of short and long term accommodation

developments, including government affordable

housing initiatives currently in progress to meet a

critical accommodation shortage identified in 2012. A

further $1.5 billion of accommodation projects are

staged for development to meet future demand.

The Isaac LGA primarily supported by the mining

industry currently has over $8.0 billion of mining

construction and expansion developments in progress

with a further $26.0 billion of planned mining projects in

conceptual and approved stages for development supporting a potential strengthening and future

growth for the mining sector in the long term.

The current RDR has identified a total of $38 billion of proposed developments for the Whitsunday

LGA. Of significance is the $20.0 billion value identified for potential development and upgrades of

existing and new infrastructure including roads, rail, water and community facilities. A further $8.0

billion in port developments and expansions are currently under assessment to meet predicted

regional coal export expectations in the future.

Page 5: EXE UTIVE SUMMARY - Investment Property Queensland · EXE UTIVE SUMMARY The Regional Development Register (RDR) is the evidence required to reaffirm the Mackay-Isaac-Whitsunday region’s

www.mwredc.org.au 5 | P a g e

SUMMARY BY LGA

Local Government Area Not Started In Progress Completed Total Previous % Change

Mackay Regional Council $19,902.00 $9,207.20 $342.90 $29,452.10 $22,158.57 32.9%

Isaac Regional Council $27,275.50 $8,719.90 $4,209.50 $40,204.90 $45,903.60 -12.4%

Whitsunday Regional Council $38,729.20 $2,065.30 $14.70 $40,809.20 $30,351.90 34.5%

Mackay-Isaac-Whitsunday Region $85,906.70 $19,992.40 $4,567.10 $110,466.20 $98,414.07 12.2%

Page 6: EXE UTIVE SUMMARY - Investment Property Queensland · EXE UTIVE SUMMARY The Regional Development Register (RDR) is the evidence required to reaffirm the Mackay-Isaac-Whitsunday region’s

www.mwredc.org.au 6 | P a g e

SUMMARY BY CATEGORY

Category Not Started In Progress Completed Total Previous % Change

Agribusiness $547.50 $35.00 $136.00 $718.50 $245.00 193.3%

Community Facilities $561.10 $163.60 $16.20 $740.90 $540.20 37.2%

Construction $1,725.50 $5,595.02 $49.00 $7,369.70 $5,570.70 32.3%

Education $113.00 $58.00 $51.40 $222.40 n/a n/a

Energy $4,168.90 $3.00 $3.00 $4,174.90 $3,635.00 14.9%

Health $1.20 $409.00 $120.00 $530.20 n/a n/a

Manufacturing $5,062.00 $262.00 $935.00 $6,259.00 $6,232.00 0.4%

Marine $759.00 $750.00 $0.00 $1,509.00 $1,250.00 20.7%

Mining $27,953.00 $8,375.00 $3,228.00 $39,556.00 $44,081.00 -10.3%

Ports – Air $30.00 $0.00 $0.00 $30.00 $0.00 0.0%

Ports - Sea $25,880.00 $2,568.00 $0.00 $28,448.00 $20,508.00 38.7%

Rail $18,555.00 $20.00 $0.00 $18,575.00 $13,175.00 41.0%

Retail $103.50 $348.00 $0.00 $451.50 $431.00 4.8%

Roads $26.50 $799.30 $13.40 $839.20 $220.70 280.2%

Tourism $78.50 $113.00 $0.00 $191.50 $152.00 26.0%

Water & Waste $342.00 $493.30 $15.10 $850.40 $1,889.70 -55.0%

Total $85,906.70 $19,992.40 $4,567.10 $110,466.20 $98,414.07 12.2%

Page 7: EXE UTIVE SUMMARY - Investment Property Queensland · EXE UTIVE SUMMARY The Regional Development Register (RDR) is the evidence required to reaffirm the Mackay-Isaac-Whitsunday region’s

www.mwredc.org.au 7 | P a g e

REGISTER OF PROJECTS

Project Name Details Proponent Est. Cost Timing (est. start)

Status Local Govt.

AGRIBUSINESS

Citric Acid - Farleigh Mill

Plant utilising raw sugar and lime hydrate as feedstock, capacity of 45,000tpa.

Mackay Sugar Ltd

$115.0 Under Review

Not Started

Mackay Regional Council

Clermont Bio Diesel Plant

Development of a biofuel industry through the 'Clermont Bio-Industry Project'. The project purpose is to build upon the existing agricultural industry to create a new product and potentially transform Clermont's black carbon-based economy into one with a greener future.

Isaac Regional Council

$27.5 Not Started

Isaac Regional Council

Cogeneration - Farleigh Mill

Upgrade of 150 tonnes/hour HP steam builder, 38MW steam turbine generator, cooling tower and associated plant.

Mackay Sugar Ltd

$150.0 Under Review

Not Started

Mackay Regional Council

Cogeneration - Marian Mill

Upgrade of 150 tonnes/hour HP steam builder, 38MW steam turbine generator, cooling tower and associated plant.

Mackay Sugar Ltd

$145.0 Under Review

Not Started

Mackay Regional Council

Cogeneration Project Construction of a 38MW cogeneration plant at Racecourse Mill, Mackay. Mackay Sugar Ltd

$120.0 2010 Completed Mackay Regional Council

Page 8: EXE UTIVE SUMMARY - Investment Property Queensland · EXE UTIVE SUMMARY The Regional Development Register (RDR) is the evidence required to reaffirm the Mackay-Isaac-Whitsunday region’s

www.mwredc.org.au 8 | P a g e

Project Name Details Proponent Est. Cost Timing (est. start)

Status Local Govt.

Dysart Effluent Reuse

Proposed works enabling Dysart to expand in a structured, staged manner and improve the quality of sewerage collection, treatment, and final effluent reuse to meet the demands. Commencing third year of seven year project.

Isaac Regional Council / BMA

$35.0 2011 In Progress Isaac Regional Council

Efficiency Project

Upgrade Marian #3 boiler and bagasse out loading facilities, Marian. Mackay Sugar Ltd

$16.0 2012 Completed Mackay Regional Council

Ethanol Cellulosic Racecourse Mill Project

Caustic pre-treatment of bagasse/enzyme hydrolysis to produce glucose for fermentation at Racecourse Mill, Mackay.

Mackay Sugar Ltd

$50.0 Under Review

Not Started

Mackay Regional Council

Guthalungra Prawn Farm

Proposed development of 260 hectares of grow-out pounds, a seafood processing facility and support infrastructure. Production is estimated to be 2600Mtpa of prawns when fully operational.

Pacific Reef Fisheries Pty Ltd

$60.0 Under Review

Not Started

Whitsunday Regional Council

Renewable Energy Industrial Hub Racecourse Mill

Potential development of an industrial hub, close proximity to the Racecourse Mill and Bio Commodities Pilot Plant. Establish production facilities provided by mill steam and pilot plant for future product development and testing.

Mackay Sugar Ltd

$115.0 Under Review

Not Started

Mackay Regional Council

Page 9: EXE UTIVE SUMMARY - Investment Property Queensland · EXE UTIVE SUMMARY The Regional Development Register (RDR) is the evidence required to reaffirm the Mackay-Isaac-Whitsunday region’s

www.mwredc.org.au 9 | P a g e

Project Name Details Proponent Est. Cost Timing (est. start)

Status Local Govt.

COMMUNITY FACILITIES

Airlie Beach Community

Construction of Community, Event and Conference Facility, Airlie Beach. Lattitude Group

$500.0 Not Started

Whitsunday Regional Council

Airlie Beach Main Street Revitalisation

Development of main street includes replacement of existing lagoon car park with park area, dinghy basin, events lawn, new footpaths and alfresco dining area, Airlie Beach.

Whitsunday Regional Council

$17.0 2011 In Progress Whitsunday Regional Council

Big Shed Project Development of existing gymnastic facility and construction of new facility building, Snow Wright Court, Beaconsfield.

Toto Group $3.0 2013 Not Started

Mackay Regional Council

Botanic Gardens Upgrade

Redevelopment and upgrade of Mackay Botanic Gardens, including construction of an outdoor performance centre.

Mackay Regional Council

$16.7 2011 In Progress Mackay Regional Council

Bowen Water Park Construction of community water park at Bowen Front Beach. Whitsunday Regional Council

$1.5 2011 Completed Whitsunday Regional Council

Cyclone Shelter - Bowen

Construction of a category five cyclone shelter at Bowen State High School.

Queensland Government

$6.6 2012 Completed Whitsunday Regional Council

Page 10: EXE UTIVE SUMMARY - Investment Property Queensland · EXE UTIVE SUMMARY The Regional Development Register (RDR) is the evidence required to reaffirm the Mackay-Isaac-Whitsunday region’s

www.mwredc.org.au 10 | P a g e

Project Name Details Proponent Est. Cost Timing (est. start)

Status Local Govt.

Cyclone Shelter - Proserpine

Construction of a category five cyclone shelter at Proserpine State School.

Queensland Government

$6.6 2012 Completed Whitsunday Regional Council

Dysart Civic Centre and Library

Refurbishment of Dysart Civic Centre and construction of new library, Dysart.

Isaac Regional Council

$1.5 2012 Completed Isaac Regional Council

Good Shepherd Lodge Aged Care Kerrisdale

Aged care lifestyle facility. Stage 1, development of a 60 aged care beds, 26 one and two bedroom apartments and 18 two and three bedroom villas, situated on Norwood Parade, Beaconsfield. Stage 2, development of a living facility offering 24 hour medical attention and health care living options.

Good Shepherd Lodge

$30.0 2013 Not Started

Mackay Regional Council

Half Tide Beach Foreshore/Grendon Park Upgrade

Construction of playground and shelter facilities, including footpaths and landscaping of project area, Grendon Street, Sarina.

Mackay Regional Council

$2.1 2013 In Progress Mackay Regional Council

Mackay City Centre Public Realm Improvement Project

Refurbishment and improvements to Victoria and Wood Streets, including historic Pioneer shire building and adjoining parkland, pavements, interactive signage, new lighting, street furniture, shade structures and associated landscaping.

Mackay Regional Council

$18.6 2013 Not Started

Mackay Regional Council

Mackay Multi-Purpose Indoor Stadium

Construction of a new multi-purpose stadium and upgrade of existing amenities and office space, Candlestick Park Stadium, Mackay.

Mackay Basketball Building Committee

$6.4 2012 In Progress Mackay Regional Council

Page 11: EXE UTIVE SUMMARY - Investment Property Queensland · EXE UTIVE SUMMARY The Regional Development Register (RDR) is the evidence required to reaffirm the Mackay-Isaac-Whitsunday region’s

www.mwredc.org.au 11 | P a g e

Project Name Details Proponent Est. Cost Timing (est. start)

Status Local Govt.

Mackay Showgrounds Upgrade

Redevelopment of existing showground facilities, including construction of new Administration Centre, 4 new pavilions, 500 pavilion upstairs area and homestead. Stage 2 nearing completion.

Mackay Show Association

$29.0 2011 In Progress Mackay Regional Council

Middlemount Sport Precinct Development

Establishment of centralised sporting facility, including 8 rink synthetic bowls green, lighting, steel framed shade structure and shared clubhouse facility, Middlemount.

Isaac Regional Council

$1.0 Not Started

Isaac Regional Council

Moranbah Community Project

Upgrade to Moranbah Airport. Construction of accommodation village, upgrades to traffic infrastructure and redevelopment of town aquatic centre.

BHP Billiton Mitsubishi Alliance

$90.0 2013 In Progress Isaac Regional Council

Moranbah Youth Centre

Construction of youth centre facility in Moranbah. State Government Funded.

Isaac Regional Council

$8.0 Not Started

Isaac Regional Council

National Broadband Network Rollout 2013

Rollout of fibre optic cable to enable high speed broadband service to business and residential premises, areas include Mackay, East Mackay, South Mackay, Paget, West Mackay, Ooralea.

National Broadband Network

2012 In Progress Mackay Regional Council

National Broadband Network Rollout 2014

Rollout of fibre optic cable to enable high speed broadband service to business and residential premises, areas include Paget, West Mackay, OOralea and Hay Point. Completion of all listed areas 2014.

National Broadband Network

2013 Not Started

Mackay Regional Council

Pioneer Valley Riverside Park Upgrade

Development of riverfront park area, construction of new playground, outdoor education viewing area, sheltered bbq and picnic area and associated river view landscaping works.

Mackay Regional Council

$0.5 2013 Not Started

Mackay Regional Council

Page 12: EXE UTIVE SUMMARY - Investment Property Queensland · EXE UTIVE SUMMARY The Regional Development Register (RDR) is the evidence required to reaffirm the Mackay-Isaac-Whitsunday region’s

www.mwredc.org.au 12 | P a g e

Project Name Details Proponent Est. Cost Timing (est. start)

Status Local Govt.

Queensland Fire and Rescue Service Facilities

Construction and upgrade of new 'Queensland Fire and Rescue Service Facility' at Clermont and Dysart.

Qld Government

$1.9 2010 In Progress Isaac Regional Council

Whitsunday Botanical Gardens

Master planned design, development and cultivation of 7h area situated at Cannonvale Foreshore Reserve.

Whitsunday Regional Council

$0.5 2012 In Progress Whitsunday Regional Council

CONSTRUCTION

360 Bridge Road Development

Residential apartments, comprising of 65 two bedroom, 6 three bedroom and 5 one bedroom apartments. Ground floor retail, commercial and offices, Bridge Road, West Mackay.

Michael McEachern

$25.0 Not Started

Mackay Regional Council

Andergrove Lakes Master Planned Community Development

Residential and shopping community, 300 residential lots, retail, café and restaurant facilities. The development will progress through six stages, situated between Andergrove and Beaconsfield.

Andergrove Lakes Development

$200.0 2012 In Progress Mackay Regional Council

Andergrove Priority Development Area - Woodlands Estate

Residential 22h estate, 10h bush land reserve, 250 lots. Construction on Stage 1, 3, 4 and 5 completed. Works nearing completion on Stage 2, Andergrove.

Economic Development Queensland

$10.0 2011 In Progress Mackay Regional Council

Page 13: EXE UTIVE SUMMARY - Investment Property Queensland · EXE UTIVE SUMMARY The Regional Development Register (RDR) is the evidence required to reaffirm the Mackay-Isaac-Whitsunday region’s

www.mwredc.org.au 13 | P a g e

Project Name Details Proponent Est. Cost Timing (est. start)

Status Local Govt.

Anne Street Affordable Housing Project

Construction of Blue Gum Estate Roads and development of Anne Street subdivision for Affordable Housing, Nebo.

Isaac Regional Council

$5.6 2012 Completed Isaac Regional Council

Avalon Estate

Residential estate, Stage 4A & B completed, Stage 5 & 6, 108 lots currently under construction, Mackay-Bucasia Road, Bucasia.

Michael McEachern

$40.0 2013 In Progress Mackay Regional Council

Belmore Estate - Stage 1

Residential estate, fully serviced lots 680m2 to 1410m2 close to major shopping precinct, sporting venues and schools, Mt Pleasant. Stage 1 currently on offer.

FRACE Developments

2012 In Progress Mackay Regional Council

Blacks Beach Cove Residential Estate

Residential housing development, 850 lots, Blacks Beach. Stage 2A completed, Stages 4A, 4B and 7A now selling.

Toby Zaremba $60.0 2012 In Progress Mackay Regional Council

Blacks Beach Unit Development

Development of 33 three-bedroom units, lots 96, 97 & 101, Slater Avenue, Blacks Beach

Higheagle Pty Ltd

2012 In Progress Mackay Regional Council

Blue Gums Estate Nebo

Construction and upgrade of streets in Blue Gums Estate, Nebo. Isaac Regional Council

$2.0 2012 Completed Isaac Regional Council

Carlyle Apartments Construction of 10 level, 73 two-bedroom, dual-key apartments, option to split into one-bedroom apartments and one-bedroom hotel rooms, Carlyle Street, Mackay.

Geocal Group $25.0 2013 In Progress Mackay Regional Council

Page 14: EXE UTIVE SUMMARY - Investment Property Queensland · EXE UTIVE SUMMARY The Regional Development Register (RDR) is the evidence required to reaffirm the Mackay-Isaac-Whitsunday region’s

www.mwredc.org.au 14 | P a g e

Project Name Details Proponent Est. Cost Timing (est. start)

Status Local Govt.

Coleshill Estate Residential lifestyle estate, unserviced lots ranging from 2.0 acres to 3.6 acres, Coleshill Drive, Hay Point.

Rasmussen 2013 In Progress Mackay Regional Council

Driftwood Apartments

Residential beach front development, 4-5 level, 69 apartment resort style communal facility including pool and extensive landscaping, Mackay.

Highgate Management Pty Ltd

2013 In Progress Mackay Regional Council

East Point Apartments

Integrated development including an international standard 250 room hotel, apartment complex, resort villas, retirement village, shopping village, residential lots and cultural centre, Mackay.

Eastpoint Mackay Pty Ltd

$350.0 2013 Not Started

Mackay Regional Council

Eden Oceanfront Living

Modern residential development, comprising of 19 premium lots, 13 of which to be ocean side, Shoal Point Road, Shoal Point.

Pradella Completed Mackay Regional Council

Glenrowan Residential Estate

Residential estate, 350 lots providing relaxed country lifestyle with modern conveniences. Stages 1 to 4 completed. Stages 5 to 6, 37 lots currently under construction. Stages 8-12 approved for development, Mackay.

A.V. Jennings Mackay Pty Ltd

$63.0 2007 In Progress Mackay Regional Council

Horizons Mackay Apartment development, 63 two bedroom and 9 one bedroom apartments overlooking Pioneer River, Victoria Street, Mackay.

Mariner Bay Development

2012 Not Started

Mackay Regional Council

Inspire CBD Construction of mixed use commercial, retail and residential development, Mackay CBD.

Pointglen Developments

$180.0 2014 Not Started

Mackay Regional Council

Page 15: EXE UTIVE SUMMARY - Investment Property Queensland · EXE UTIVE SUMMARY The Regional Development Register (RDR) is the evidence required to reaffirm the Mackay-Isaac-Whitsunday region’s

www.mwredc.org.au 15 | P a g e

Project Name Details Proponent Est. Cost Timing (est. start)

Status Local Govt.

Isaac Affordable Housing Trust

Affordable units, apartments, duplex, triplex and housing developments. Nebo - 4xUnits, 6xDuplexes, 3xHouses. Moranbah - 15xUnits, 6xDuplexes, 6xTriplexes, 3xHouses. Clermont - 25xUnits, 3xApartments. Dysart - 4xDuplexes.

Isaac Regional Council

$6.0 2012 In Progress Isaac Regional Council

Kerrisdale Estate - Stage 2

Residential estate, house and land packages, north of Mackay. SHD Pty Ltd 2013 In Progress Mackay Regional Council

Kidston Cove Residential estate development, house and land packages, featuring double-storey homes, close proximity to Northern Beaches Shopping Centre, Rural View.

Michael McEachern

$7.0 2013 Completed Mackay Regional Council

Lagoons Estate Residential estate opposite Mackay Botanical Gardens. Stage 1 under construction, West Mackay.

Michael McEachern

$10.0 2013 Completed Mackay Regional Council

Latitude At Mackay Mixed use high rise development comprising of serviced apartments, commercial/retail tenancies and restaurant, Mackay.

RD Group Pty Ltd

2012 In Progress Mackay Regional Council

Mackay Central Development of a six level, 3360m2 extension, comprising of additional retail, commercial offices in upper level, all weather access structure to adjacent Mackay Grande Suites, Wood Street, Mackay CBD.

Cougar Developments

Not Started

Mackay Regional Council

Memorial Mews Apartments

Residential development, 22 town homes, substantial landscaping and civil works, Airlie Beach.

Lynter Group 2013 In Progress Whitsunday Regional Council

Page 16: EXE UTIVE SUMMARY - Investment Property Queensland · EXE UTIVE SUMMARY The Regional Development Register (RDR) is the evidence required to reaffirm the Mackay-Isaac-Whitsunday region’s

www.mwredc.org.au 16 | P a g e

Project Name Details Proponent Est. Cost Timing (est. start)

Status Local Govt.

Moranbah Priority Development Area

Bushlark Grove Residential Estate, 1218 hectare, 151 lot development, Goonyella Road, Moranbah.

Economic Development Queensland

$9.6 2010 Completed Isaac Regional Council

Mount Whitsunday Residential Estate

Residential estate, fully serviced 2601m2 to 5767m2 lots, including tennis court and golf facilities, Airlie Beach.

Reefscape Developments

2013 In Progress Whitsunday Regional Council

Nabilla Riverlink Residential Estate

Residential estate, 500 lots, ranging from 716m2 to 1400m2, Pioneer Valley. Stage 12 currently on offer.

Pointglen Developments

$550.0 2010 In Progress Mackay Regional Council

NB Services Construction of warehouse and office facilities suitable for professional and specialty services.

Gros-Dubois $2.8 2010 Completed Mackay Regional Council

Oceanside East Mackay Development

River mouth development, 4.13ha site, 2 level motel, 14 double storey beach houses, 29 townhouses and 3 commercial shops, East Mackay.

The Potter Group

$24.0 2012 In Progress Mackay Regional Council

Oceanview Residential Estate

Residential housing development, Mountneys Road, Sarina. Stage 1 and 2 on offer, Stage 3-4 approved for future development.

Mitula Properties

2013 In Progress Mackay Regional Council

Pacific Parks Estate

Nine stage development featuring a series of parkland corridors and green spaces, shared walk/bike paths and recreational facilities. Mix of medium and low density living options. Over 100 homes under construction or completed.

Pacific Property Developers

2007 In Progress Mackay Regional Council

Page 17: EXE UTIVE SUMMARY - Investment Property Queensland · EXE UTIVE SUMMARY The Regional Development Register (RDR) is the evidence required to reaffirm the Mackay-Isaac-Whitsunday region’s

www.mwredc.org.au 17 | P a g e

Project Name Details Proponent Est. Cost Timing (est. start)

Status Local Govt.

Pacific Sands Apartments

Apartment complex development situated east end of Gordon Street, Mackay CBD.

Honeycombe Developments

$25.0 Not Started

Mackay Regional Council

Paluma Valley Residential Estate

Limited release acreage home sites with ocean or valley views, ranging from 2 acres to 4 acres, development nearing completion.

PRD Realty In Progress Whitsunday Regional Council

Park Edge Apartments

Apartment development, 42 two and three bedroom apartments, situated in Northview.

Pointglen Developments

$23.5 2014 Not Started

Mackay Regional Council

Parklands Estate Mackay

Residential subdivision, staged refurbishment of three existing buildings and development of new buildings to accommodate a mix of residential, commercial and retail uses.

Cougar Developments & Rick Shelley

$102.0 2012 In Progress Mackay Regional Council

Pier, The Two residential towers of 8 and 5 levels, 52 luxury apartments featuring alfresco dining, pool area and boardwalk providing public access to Pioneer River.

Graham, David & Brian Caracciolo

$87.0 2014 Not Started

Mackay Regional Council

Pioneer Lakes Residential Estate

Master planned residential community designed around 5 interconnecting lakes, 525 large level lots ranging in size, including proposed day-care centre, parks and recreational facilities, Mirani.

Pioneer Lakes Pty Ltd

2009 In Progress Mackay Regional Council

Plantation Palms Residential Estate

Natural lifestyle residential development, 2000 lots with 60% of the land is set aside for natural landscape. Stage 3B underway.

Xcel Properties

$1,500.0 2007 In Progress Mackay Regional Council

Page 18: EXE UTIVE SUMMARY - Investment Property Queensland · EXE UTIVE SUMMARY The Regional Development Register (RDR) is the evidence required to reaffirm the Mackay-Isaac-Whitsunday region’s

www.mwredc.org.au 18 | P a g e

Project Name Details Proponent Est. Cost Timing (est. start)

Status Local Govt.

Premier Gardens Residential Estate

Residential estate, 112 hectares, ocean and rural views, close to schools, shops and major shopping centre. Stage 11 now selling.

Michael McEachern

$12.0 2012 Completed Mackay Regional Council

Premier Vista Residential Estate

Residential estate, 114 fully serviced lots, ranging in size from 617m2 to 1211m2, situated in Rural View, Northern Beaches.

Citymark Property Development

2011 In Progress Mackay Regional Council

Queens Bay Residential Estate

Residential housing estate, situated at Queens Bay, Bowen. Property Global Investments

2009 In Progress Whitsunday Regional Council

Raffia Precinct Residential Estate

Residential house and land packages, 445sqm to 800sqm lots, close to major shopping and school facilities, Northern Beaches.

Xcel Properties

2013 In Progress Mackay Regional Council

Regatta Waters Estate Whitsunday

Residential estate, 283.5 hectare house and land packages featuring golf and tennis court, resort pool, gymnasium, parks, walkways and specialty stores, Cannonvale.

Latitude Developments

$200.0 2013 In Progress Whitsunday Regional Council

Retreat Estate, The Residential estate, 152 Shoal Point Road, 20 lot beachfront subdivision, two 28 unit mid-rise apartment complexes, 152 Shoal Point Road, Shoal Point.

Riebri Pty Ltd Bonavista Pty Ltd

2012 In Progress Mackay Regional Council

Richmond Hills Residential Estate, 650 lots, ranging in size from 710m2 to1018m2. Stages 1 & 2 completed.

Pointglen Developments

$550.0 2012 In Progress Mackay Regional Council

Page 19: EXE UTIVE SUMMARY - Investment Property Queensland · EXE UTIVE SUMMARY The Regional Development Register (RDR) is the evidence required to reaffirm the Mackay-Isaac-Whitsunday region’s

www.mwredc.org.au 19 | P a g e

Project Name Details Proponent Est. Cost Timing (est. start)

Status Local Govt.

Rivermarque CBD Apartments

Development of an 8 level complex featuring 91 apartments, mix of one and two bedrooms, dual key on offer. Complex to include a pool, spa, barbecue area, gym, lobby, private parking and retail space.

Reed Constructions

$35.0 2013 In Progress Mackay Regional Council

Riviera Apartment Complex

Construction of a 10 level, 64 apartment complex, 1, 2 & 3 bedroom options. Featuring modern open-plan living, ocean and river views, Nelson Street, Mackay.

Honeycombe Developments

$26.0 2012 In Progress Mackay Regional Council

Seabreeze Residential Estate

Residential subdivision, Stage 1 & 2 completed, Stage 3 currently under development, Airlie Beach.

Seabreeze Estate Bowen

2012 In Progress Whitsunday Regional Council

Sentinel Office Block Development

Construction of a 3,600sqm, 2 level office complex with 80 capacity car park, Greenfields, Mt Pleasant.

Sentinel Property Group

$8.2 2013 In Progress Mackay Regional Council

Settlers Rise Residential Estate

Master planned staged residential development, 100 hectares, 400 lots, Settlers Rise, Mackay.

Cougar Developments

$120.0 2011 In Progress Mackay Regional Council

Shelley Sands Residential Estate

Residential 41 lot subdivision, comprising of 30 house lots, 10 duplex lots and 1 parkland lot, Airlie Beach.

RD Group Pty Ltd & Cougar Developments

Not Started

Whitsunday Regional Council

Shoal Point Waters Estate

Residential estate, high and low density precinct, 1000 lots, 604m2 to 855m2, beach side and rural aspects, Shoal Point.

Pointglen Developments

$1,200.0 2012 In Progress Mackay Regional Council

Page 20: EXE UTIVE SUMMARY - Investment Property Queensland · EXE UTIVE SUMMARY The Regional Development Register (RDR) is the evidence required to reaffirm the Mackay-Isaac-Whitsunday region’s

www.mwredc.org.au 20 | P a g e

Project Name Details Proponent Est. Cost Timing (est. start)

Status Local Govt.

State Government Building

Development of a 6 level, 7000sqm office building to accommodate 460 government employees, including 165 capacity car parks, Mackay CBD.

Verde Pty Ltd 2012 In Progress Mackay Regional Council

Town Beach Development

Mixed tourism and residential development including 266 units, 15 dwelling houses, bistro and associated retail, Mackay CBD.

Pointglen Developments

$200.0 2014 Not Started

Mackay Regional Council

Universal Self Storage Units

Self-storage facility, Stage 1 completed, Stage 2 commencing 2013. Pilot Group $4.0 2013 In Progress Mackay Regional Council

Valetta Gardens Residential Estate

Residential estate, 54 fully serviced lots, ranging from 400m2 to 600m2. Stage 6 currently under development, Glenella.

Cougar Developments

In Progress Mackay Regional Council

View Whitsunday Construction of stand-alone villas, 26 duplex apartments and 1 residential home site. Stage 2, development of 12 luxury home sites, Whitsunday.

MST Investment Corporation Ltd

$65.0 Not Started

Whitsunday Regional Council

WaterFront Landing Residential development, 9 level, 41 units, 2 level car park and ground-floor restaurant, views of Pioneer River, River Street, Mackay.

JD Dodds $70.0 2013 Not Started

Mackay Regional Council

Waters At Ooralea Master planned residential estate, 236 hectares. Stage 1 completed. Stage 2 currently under development with Stages 3 to 5 approved, Ooralea.

Cougar Developments

$80.0 2012 In Progress Mackay Regional Council

Page 21: EXE UTIVE SUMMARY - Investment Property Queensland · EXE UTIVE SUMMARY The Regional Development Register (RDR) is the evidence required to reaffirm the Mackay-Isaac-Whitsunday region’s

www.mwredc.org.au 21 | P a g e

Project Name Details Proponent Est. Cost Timing (est. start)

Status Local Govt.

Whisper Bay Ridge Residential development, 91 lots ranging in size from 700m2 to1 hectare, Whitsunday.

Xcel Properties

$10.0 2006 In Progress Whitsunday Regional Council

Whitsunday Breeze Estate

Residential estate, Stage 1 sold, Stage 2 currently under construction with future releases planned, Bowen.

LJ Hooker Bowen

$10.0 2012 In Progress Whitsunday Regional Council

Whitsunday Shores Residential estate, 669 lots including country club, retail precinct, retirement village and 18 hole golf course, Whitsunday.

Aspen Group/NPRG

$750.0 2006 In Progress Whitsunday Regional Council

Whitsunday Springs Resort Development

Mixed residential development, 2,500 mixed density dwellings, including apartments, hotel and golf course, Whitsunday.

Links Living Pty Ltd

$700.0 2009 Not Started

Whitsunday Regional Council

Whitsundays Cayman Estate

Residential subdivision, 33 lots situated in Cannonvale. Cayman Property Group

$22.0 2011 In Progress Whitsunday Regional Council

EDUCATION

Andergrove Child and Family Centre

Construction of a 50 place childcare placement facility, 'Closing the Gap Initiative'. Family community and support centre, Celeber Drive, Andergrove.

MCFC/Queensland Government

$4.5 2012 In Progress Mackay Regional Council

Page 22: EXE UTIVE SUMMARY - Investment Property Queensland · EXE UTIVE SUMMARY The Regional Development Register (RDR) is the evidence required to reaffirm the Mackay-Isaac-Whitsunday region’s

www.mwredc.org.au 22 | P a g e

Project Name Details Proponent Est. Cost Timing (est. start)

Status Local Govt.

CQUniversity Regional Sport Precinct

Multi-facility precinct catering for future growth in areas of sport and recreation in Mackay.

CQUniversity/MRC

$71.0 Not Started

Mackay Regional Council

Griffin Street Student Accommodation Facility

Refurbishment of a 32 bed complex, providing affordable student accommodation, Griffin Street, Mackay.

James Cook University

$2.6 2011 Completed Mackay Regional Council

Kidzplay & Learning Centre

Construction of a single storey 590sqm Child Care Centre, capacity to cater for 81 children, situated in Andergrove.

Kidz Play & Learning Centre

$2.0 2013 In Progress Mackay Regional Council

Mackay Engineering College Trade Training Centre

Engineering college for high school students, capacity to cater for 128 school-based apprentices and trainees.

DETA/ Commonwealth of Australia

$7.8 2012 Completed Mackay Regional Council

Mackay Northern Beaches State High School

Construction of new high school facility and infrastructure completed. Stage 2 underway, construction of a Senior Secondary precinct, Rosewood Drive, Rural View.

Education Queensland

$45.0 2011 In Progress Mackay Regional Council

Mater Hospital Clinical Training Facility

Construction and fit-out of a new 2 level clinical training facility at the Mater Hospital.

James Cook University

$3.6 2011 In Progress Mackay Regional Council

Sustainable Mining Automation and Robotic Technologies (SMART) Centre

Proposal to establish a centre of distinction on the Mackay CQUniversity campus, focusing on the opportunities and challenges presented by an automated future for the resource industry.

CQUniversity $42.0 2012 Not Started

Mackay Regional Council

Page 23: EXE UTIVE SUMMARY - Investment Property Queensland · EXE UTIVE SUMMARY The Regional Development Register (RDR) is the evidence required to reaffirm the Mackay-Isaac-Whitsunday region’s

www.mwredc.org.au 23 | P a g e

Project Name Details Proponent Est. Cost Timing (est. start)

Status Local Govt.

TAFE Trade Training Centre

Engineering college for apprentices and adult learners situated at Mackay CQUniversity Campus.

TAFE $41.0 2011 Completed Mackay Regional Council

Trade Training Centre Proserpine/Bowen/ Collinsville

Construction of a regional facility at Bowen State High School, including refurbishment of existing engineering facilities at Proserpine State High School. Each facility will include a training/workshop area.

Education Queensland

$2.9 2012 In Progress Whitsunday Regional Council

ENERGY

Abbot Point LNG-Phase 1

LNG plant at Abbot Point, modular liquefaction storage and export facility and associated 350km gas pipeline.

Energy World Corporation

$500.0 2015 Not Started

Whitsunday Regional Council

Abbot Point LNG-Phase 2

Construction of 550km gas pipeline linking phase 1 to Queensland Gas Highway.

Energy World Corporation

$1,000.0 2015 Not Started

Whitsunday Regional Council

Arrow's Bowen Gas Pipeline

A 500km pipeline transporting coal seam gas from the Bowen Basin to Liquefied Natural Gas (LNG) plant on Curtis Island, off Gladstone.

Arrow Energy Pty Ltd

$1,000.0 2017 Not Started

Whitsunday Regional Council

Arrow's Bowen Gas Project

Staged development of more than 6,600 coal seam gas wells near Arrow's existing Moranbah Gas Project, jointly owned by AGL Energy.

Arrow Energy Pty Ltd

$1,000.0 Not Started

Whitsunday Regional Council

Page 24: EXE UTIVE SUMMARY - Investment Property Queensland · EXE UTIVE SUMMARY The Regional Development Register (RDR) is the evidence required to reaffirm the Mackay-Isaac-Whitsunday region’s

www.mwredc.org.au 24 | P a g e

Project Name Details Proponent Est. Cost Timing (est. start)

Status Local Govt.

Blackwater & Norwich Park CSG Fields

Gas project with potential production minimum of 30Pjpa. Arrow Energy Pty Ltd

$400.0 2014 Not Started

Isaac Regional Council

Blackwater to Norwich Park Gas Pipeline

Construction of 95km gas pipeline between Blackwater and Norwich Park.

Arrow Energy Pty Ltd

$100.0 Under Review

Not Started

Isaac Regional Council

Bowen North - Strathmore Transmission Line

Build and install new 132kV line from Bowen North to Strathmore. Powerlink $3.0 2010 Completed Isaac Regional Council

Broadsound to Lilyvale

Augmentation of existing Broadsound to Lilyvale network to meet expected long-term electricity demand growth.

Powerlink Not Started

Isaac Regional Council

Collinsville Power Plant Re-Develop. Study

Study underway for redevelopment of Collinsville Power Plant from coal fired power station to hybrid solar thermal, solar photovoltaic and gas generated power station.

RATCH Australia Corporation

$2.5 Not Started

Whitsunday Regional Council

Collinsville Substation

Replacement of Collinsville Substation to ensure reliable supply of HV to North Queensland.

Powerlink 2012 In Progress Whitsunday Regional Council

Eagle Downs Switching Station

Construction of 132kv switching station located south-east of Moranbah. Powerlink 2013 In Progress Isaac Regional Council

Page 25: EXE UTIVE SUMMARY - Investment Property Queensland · EXE UTIVE SUMMARY The Regional Development Register (RDR) is the evidence required to reaffirm the Mackay-Isaac-Whitsunday region’s

www.mwredc.org.au 25 | P a g e

Project Name Details Proponent Est. Cost Timing (est. start)

Status Local Govt.

Galilee Basin Transmission Project

Staged expansion, construction of Surbiton Hill substation and installation of 2 new 132kv transmission lines.

Powerlink Not Started

Isaac Regional Council

Mackay Capacitor Bank

Installation of new 132kV capacitor bank, Mackay. Powerlink $4.0 Not Started

Mackay Regional Council

Moranbah Gas Project

Increase production capacity to 1000Tj per day across broader Bowen Basin to Northern Queensland Pipeline.

Arrow Energy Pty Ltd/AGL Energy Ltd

$160.0 Not Started

Isaac Regional Council

Moranbah Substation

Replacement of secondary systems and selected primary plant at the existing Moranbah Substation ensuring reliable supply of high voltage to Bowen Basin.

Energy Developments Ltd

Not Started

Isaac Regional Council

Northern Bowen Basin Reinforcement

Reinforcement of existing high voltage transmission network with construction of two new substations and new transmission lines. Seeking 'Ministerial Designation Approval'.

Powerlink Not Started

Isaac Regional Council

Ooralea Substation Concept structure plan for substation and associated power lines to overcome rapid load growth due to Paget and surrounding new residential estate, situated at Cowleys and Stotts Road intersection.

Ergon Energy 2016 Not Started

Mackay Regional Council

Pioneer Valley Capacitor Bank

Installation of new 132kV capacitor bank, Pioneer Valley. Powerlink $3.0 2012 In Progress Mackay Regional Council

Page 26: EXE UTIVE SUMMARY - Investment Property Queensland · EXE UTIVE SUMMARY The Regional Development Register (RDR) is the evidence required to reaffirm the Mackay-Isaac-Whitsunday region’s

www.mwredc.org.au 26 | P a g e

Project Name Details Proponent Est. Cost Timing (est. start)

Status Local Govt.

Pioneer Valley Transformer

Installation of new 100MVA 132/66kV transformer to replace existing transformer.

Powerlink 2012 In Progress Mackay Regional Council

Planella Substation Installation of new substation to increase capacity to 66kv, Planella. Ergon Energy $2.4 2014 Not Started

Mackay Regional Council

Proserpine Substation

Replacement of existing substation to ensure reliable supply of HV to North Queensland, Proserpine.

Powerlink 2015 Not Started

Whitsunday Regional Council

HEALTH

Bowen Hospital Renovations

Refurbishment of hospital including multi-purpose education room, chemotherapy chairs, refurbishment of emergency department, development of a clinical learning facility, multi-purpose area and co-location of allied health for acute care department, Bowen.

Queensland Health

$1.2 2013/2014 Not Started

Whitsunday Regional Council

Mackay Base Hospital Catheterisation Laboratory

Addition of a catheterisation laboratory, including imaging, diagnostic, angioplasty, stent and pacemaker surgery, Mackay.

Queensland Health

$2.0 2013 In Progress

Mackay Regional Council

Page 27: EXE UTIVE SUMMARY - Investment Property Queensland · EXE UTIVE SUMMARY The Regional Development Register (RDR) is the evidence required to reaffirm the Mackay-Isaac-Whitsunday region’s

www.mwredc.org.au 27 | P a g e

Project Name Details Proponent Est. Cost Timing (est. start)

Status Local Govt.

Mackay Base Hospital Redevelopment

Construction and development of a 3 level hospital with a capacity to accommodate 318 beds, including new Emergency and Outpatient Department, Renal Support Service, Day Oncology, Dental Service Unit, Birthing and Delivery Suites, Special Care Nursery and Intensive Care Unit, Mackay.

Queensland Health

$405.0 2009 In Progress

Mackay Regional Council

North Mackay Private Hospital

Refurbishment of the 42 bed, 2 theatre and gymnasium facility, including rendering, painting, new air conditioning, car parking area and landscaping. Potential uses for the facility include mental health and aged care, North Mackay.

Queensland Health

$120.0 2012 Completed

Mackay Regional Council

Sarina Hospital Rectification Works

Upgrade and improvements to fire protection sprinklers, hydrants, booster system, electrical upgrades to exist lights, emergency lights, switchboards and emergency generators, Sarina.

Queensland Health

$2.0 2013 In Progress

Mackay Regional Council

MANUFACTURING

Abbot Point State Development Area

Large scale 16,230h heavy industry development, supporting corridors and infrastructure for Abbot Point Port. Potential Burdekin to Abbot Point water pipeline, major fuel depot, multi-cargo facility. Upgrade and expansion of existing Newlands and Abbot Point linked railway, 2.75km jetty and coal handling facility.

Queensland Government

$5,000.0 2008 Not Started

Whitsunday Regional Council

Clermont Industrial Park

Development of 46.93h industrial area, lots ranging from 1672m2 to 9308m2, situated on Gregory Hwy and Clermont Connect Rd, Clermont.

Not Started

Isaac Regional Council

Page 28: EXE UTIVE SUMMARY - Investment Property Queensland · EXE UTIVE SUMMARY The Regional Development Register (RDR) is the evidence required to reaffirm the Mackay-Isaac-Whitsunday region’s

www.mwredc.org.au 28 | P a g e

Project Name Details Proponent Est. Cost Timing (est. start)

Status Local Govt.

Evo Business Centre Staged industrial development, 10 units, 580m2 to 860m2, incorporating warehouse, office and showroom spaces. High Intensity General Industry Zoning, Paget.

Winston Group

$12.0 2013 Not Started

Mackay Regional Council

Evolution Paget Industrial Park

Industrial development, 242,073sqm, 41 lots, flexible warehousing, office space including advanced specifications. High Impact Industry Zoning, Paget.

Mirvac & ICPS $200.0 2008 In Progress Mackay Regional Council

Industroplex Stage Five to Eight

Master planned industrial precinct, fully serviced lots from 2500sqm to 50,000sqm, Stages 5 to 8. High Impact Industry Zoning, Paget.

FKP Property Group

$40.0 2012 In Progress Mackay Regional Council

Komatsu Customer Service Facility

Staged development and upgrade of facility and assembly area with construction of a new customer support facility, Paget.

Komatsu Australia

$15.0 2013 In Progress Mackay Regional Council

Lyall Ford Industrial Development

Development of a small scale industrial estate, 15 lots, adjacent to MAC camp, Nebo.

Isaac Regional Council

Not Started

Isaac Regional Council

Moranbah 'Pony Club' Industrial Area

Development and release of 20 industrial lots. Light industrial zoning, north of Moranbah.

Isaac Regional Council

Not Started

Isaac Regional Council

Moranbah Ammonium Nitrate Plant

Construction of a 350,000tpa ammonia and ammonium nitrate plant for local coal seam gas resource, Moranbah.

Incitec Pivot Ltd

$935.0 2008 Completed Isaac Regional Council

Page 29: EXE UTIVE SUMMARY - Investment Property Queensland · EXE UTIVE SUMMARY The Regional Development Register (RDR) is the evidence required to reaffirm the Mackay-Isaac-Whitsunday region’s

www.mwredc.org.au 29 | P a g e

Project Name Details Proponent Est. Cost Timing (est. start)

Status Local Govt.

Moranbah Carbon Neutral Estate

Development of a carbon-neutral industrial estate, Moranbah. Isaac Regional Council

Not Started

Isaac Regional Council

Nebo Heavy Industrial Estate

Development of large-scale industrial estate incorporating engineering, manufacturing and fabrication businesses, Nebo.

Isaac Regional Council

Not Started

Isaac Regional Council

Nepean Mining Equipment Manufacturing Facility

Development of a 5.8 hectare mining equipment and manufacturing facility, dedicated to developing new mining technologies, mine training and safety programs, Mackay.

Nepean Mining

$50.0 Not Started

Mackay Regional Council

Rosella Industrial Area

Identified as next regional industrial estate, 713 hectare site accessible to Bruce Highway and nearby port facility, Mackay.

Queensland Government

Not Started

Mackay Regional Council

South Mackay Industrial Estate

Industrial development, 13 lots ranging 5000m2 to 3.5 hectares. High demand major industrial, Michelmore Street, South Mackay.

DSDIP $7.0 2008 In Progress Mackay Regional Council

MARINE

Bowen Marina Master planned development, including residential village, tavern, retail precinct, offices, floating berths and specialised marine industrial area. Currently under review by State Government and stakeholders for staged development, Bowen Marina.

Jag Marine Group & Asset Loan Co.

$450.0 Not Started

Whitsunday Regional Council

Page 30: EXE UTIVE SUMMARY - Investment Property Queensland · EXE UTIVE SUMMARY The Regional Development Register (RDR) is the evidence required to reaffirm the Mackay-Isaac-Whitsunday region’s

www.mwredc.org.au 30 | P a g e

Project Name Details Proponent Est. Cost Timing (est. start)

Status Local Govt.

Mackay Marina Expansion

Staged development and expansion including addition of 50 berths, Mackay Marina.

Port Binnili $8.0 2010 Not Started

Mackay Regional Council

Port Airlie Transit Terminal Development

Development of a 179 capacity car park located at southern section of port transit terminal, Airlie Beach Marina.

Port of Airlie $1.0 2013 Not Started

Whitsunday Regional Council

Port of Airlie Marina Development

Development of a 240 berth marina, ferry and cruise terminal, public boat ramp, pedestrian mall and village square, retail and commercial space, 140 resort apartments, 356 residential apartments and up to 14 detached homes, Airlie Beach Marina.

Meridien $750.0 In Progress Whitsunday Regional Council

Shute Harbour Marina Development

Supplementary EIS underway for downsizing of original planned development from 733 to 395 berth marina, The new plan also includes a retirement resort, hotel and community cyclone shelter, Airlie Beach.

Dandevco, Crossley, Eastcoast Civil

$300.0 2006 Not Started

Whitsunday Regional Council

MINING

Anthony Molybdenum Mine Project

O/C mine producing 5Mtpa molybdenum ore. Zamia Metals Ltd

$200.0 Not Started

Isaac Regional Council

Broadmeadow Coal Life Extension Project

U/G coal mine, 4.8Mtpa. Increase pumping and drainage capacity. Life expectancy of 21 years.

BHP Billiton Mitsubishi Alliance

$900.0 2013 Completed Isaac Regional Council

Page 31: EXE UTIVE SUMMARY - Investment Property Queensland · EXE UTIVE SUMMARY The Regional Development Register (RDR) is the evidence required to reaffirm the Mackay-Isaac-Whitsunday region’s

www.mwredc.org.au 31 | P a g e

Project Name Details Proponent Est. Cost Timing (est. start)

Status Local Govt.

Buffel Park Accommodation Village - Stage 1

Construction of 2000 bed accommodation village, including works at the sewerage and treatment plants, dining and recreational facility, first-aid and emergency services. Provision of accommodation for BMA Caval Ridge Mine.

BHP Billiton Mitsubishi Alliance

$155.0 In Progress Isaac Regional Council

Burton Coal Widening Project

O/C coal mine, 4.0Mtpa coking coal. Expansion via planned terraced mining method, including preparation and ancillary works for dams and drains.

Peabody Energy Ltd / Gloucestor Coal

$200.0 2012 Completed Isaac Regional Council

Byerwen Coal Project O/C coal mine, 10Mtpa premium hard coking and thermal coal. Export port APCT. Life expectancy of 50 years.

QCoal Ltd, JFE Steel Corp

$1,590.0 Not Started

Isaac Regional Council

Carmichael Coal Project

O/C and U/G integrated coal mine, 60Mtpa thermal coal. Construction of railway line connecting Goonyella rail system.

Adani Mining Ltd

$4,100.0 Not Started

Isaac Regional Council

Caval Ridge Coal Expansion

O/C coal mine, 5.5Mtpa quality hard coking coal. Development of existing mine site, CHPP and associated infrastructure. Export port DBCT. Life expectancy of 30 years.

BHP Billiton Mitsubishi Alliance

$4,200.0 2014 In Progress Isaac Regional Council

China Stone Coal Project

U/G and O/C integrated greenfield new mine, 60Mtpa ROM coal. Macmines Austasia Pty Ltd

$5,000.0 2017 Not Started

Isaac Regional Council

Page 32: EXE UTIVE SUMMARY - Investment Property Queensland · EXE UTIVE SUMMARY The Regional Development Register (RDR) is the evidence required to reaffirm the Mackay-Isaac-Whitsunday region’s

www.mwredc.org.au 32 | P a g e

Project Name Details Proponent Est. Cost Timing (est. start)

Status Local Govt.

Codrilla Coal Expansion

O/C coal mine, 3.2Mtpa PCI & thermal coal. Peabody Energy Ltd

$250.0 Deferred Not Started

Isaac Regional Council

Collinsville Coal Expansion

O/C coal mine, 6Mtpa coking and thermal coal. Expansion of existing mine site. Export port APCT.

Xstrata Coal Ltd

2013 Not Started

Whitsunday Regional Council

Daunia Coal Project O/C coal mine, 4.5Mtpa semi-hard coking and PCI coal. Upgrade of existing mine site, including CHPP and associated infrastructure. Life expectancy of 21 years.

BHP Billiton Mitsubishi Alliance

$1,600.0 2013 Completed Isaac Regional Council

Drake Coal Project O/C coal mine, 6Mtpa coking, thermal and ultra-low volatile coal. Export port APCT. Life expectancy of 30 years.

QCoal Ltd $350.0 2014 Not Started

Whitsunday Regional Council

Dysart East Coal Project

Integrated O/C and U/G coal mine, 4Mtpa coking coal. Bengal Coal Ltd

$450.0 2013 Not Started

Isaac Regional Council

Eagle Downs/Peak Downs East Coal Project

U/G coal mine, 4.5Mtpa hard coking coal. Construction of new mine site. Life expectancy of 47 years.

Aquila Resources/Vale Australia

$1,720.0 2013 In Progress Isaac Regional Council

Eaglefield/Denham Coal Expansion

O/C coal mine, 6.8Mtpa hard coking coal. Expansion of existing mine site. Peabody Energy Ltd

$1,400.0 2013 Not Started

Isaac Regional Council

Page 33: EXE UTIVE SUMMARY - Investment Property Queensland · EXE UTIVE SUMMARY The Regional Development Register (RDR) is the evidence required to reaffirm the Mackay-Isaac-Whitsunday region’s

www.mwredc.org.au 33 | P a g e

Project Name Details Proponent Est. Cost Timing (est. start)

Status Local Govt.

Eastern Creek Coal Mine Expansion

O/C coal mine. Expansion of existing mine. Life expectancy of 27 years. NCA JV/Xstrata Coal Ltd

Not Started

Whitsunday Regional Council

Ellensfield Coal Project

U/G coal mine, 5.5Mtpa coking and thermal coal. Construction of new mine site.

Vale Australia Ltd

$800.0 Not Started

Isaac Regional Council

Foxleigh Plains Coal Expansion

O/C coal mine, 3.2Mtpa high grade PCI coal. Extension of existing mine, infrastructure and industrial area. Export port DBCT. Life expectancy of 15 years.

Anglo American Metallurgical Coal Ltd

$180.0 2013 Not Started

Isaac Regional Council

Grosvenor Coal - Stage 1

U/G coal mine, 5.0Mtpa hard coking coal. Development of a greenfield mine site, construction of 10km conveyor to transport coal to Moranbah North CHPP, upgrade of existing CHPP. Life expectancy of 30 years.

Anglo American Metallurgical Coal Ltd

$1,650.0 2013 In Progress Isaac Regional Council

Grosvenor Coal Expansion - Stage 2

U/G coal mine, 6.0Mtpa hard coking coal. Expansion to existing mine site.

Anglo American Metallurgical Coal Ltd

$1,000.0 2017 Not Started

Isaac Regional Council

Grosvenor West Coal Project

O/C coal mine, west of Moranbah. Construction of new mine site. Carabella Resources Ltd

$500.0 2016 Not Started

Isaac Regional Council

Page 34: EXE UTIVE SUMMARY - Investment Property Queensland · EXE UTIVE SUMMARY The Regional Development Register (RDR) is the evidence required to reaffirm the Mackay-Isaac-Whitsunday region’s

www.mwredc.org.au 34 | P a g e

Project Name Details Proponent Est. Cost Timing (est. start)

Status Local Govt.

Isaac Plains Coal Expansion

O/C coal mine, 2.8Mtpa. Expansion to Isaac Plains south deposit. Aquila Resources/Vale Australia

$118.0 Completed Isaac Regional Council

Jax Coal Project O/C coal mine, 1.8Mtpa coking and thermal coal. QCoal Ltd $100.0 2013 Not Started

Whitsunday Regional Council

Lake Vermont Coal Expansion

O/C coal mine, 4.0Mtpa PCI and coking coal. Addition of plant and ancillary equipment in line with demand. Export ports Gladstone, DBCT and APCT.

Jellinbah Group

$200.0 2010 Not Started

Isaac Regional Council

Middlemount Coal Expansion

O/C coal mine, 3.6Mtpa PCI and coking coal. Upgrade of existing CHPP and TSF. Export port DBCT. Life expectancy of 19 years.

Peabody Energy Ltd/Gloucester Coal

$500.0 In Progress Isaac Regional Council

Millennium Coal Expansion

O/C coal mine, 7Mtpa coking and PCI coal. Expansion of existing mine site.

Peabody Energy Ltd

$270.0 Completed Isaac Regional Council

Moorvale Coal Expansion

O/C coal mine, 1.9Mtpa coking and PCI coal. Expansion of existing mine. Peabody Energy Ltd

$180.0 Not Started

Isaac Regional Council

Page 35: EXE UTIVE SUMMARY - Investment Property Queensland · EXE UTIVE SUMMARY The Regional Development Register (RDR) is the evidence required to reaffirm the Mackay-Isaac-Whitsunday region’s

www.mwredc.org.au 35 | P a g e

Project Name Details Proponent Est. Cost Timing (est. start)

Status Local Govt.

Moranbah South Coal Mine Project

U/G coal mine, 12Mtpa coking coal. Construction of new mine site. Life expectancy of 30 years.

Anglo American Metallurgical Coal/Exxaro Australia

$2,500.0 Not Started

Isaac Regional Council

Mt Carlton Copper-Gold-Silver Mine Project

O/C mine producing 120,000 Oz’s gold, 5,000tpa copper, 3 Oz’s t/a silver. Evolution Mining

$127.0 Not Started

Whitsunday Regional Council

New Lenton Coal Project

O/C coal mine, 1.5Mtpa coking and thermal coal. Construction of new mine site.

New Hope Corporation Ltd

$400.0 Not Started

Isaac Regional Council

Newlands Northern Coal Project

U/G coal mine, 7.5Mtpa thermal coal. Extension to existing mine site. NCA JV (Xstrata Coal Ltd 55%)

$140.0 2010 Completed Isaac Regional Council

North Goonyella Coal Expansion

U/G coal mine, 5.0Mtpa premium quality coking coal. Expansion of existing mine site Export port DBCT

Peabody Energy Ltd

$150.0 2013 In Progress Isaac Regional Council

Olive Downs North Coal Project

O/C coal mine, 1Mtpa coking and PCI coal. Construction of new mine site.

Peabody Energy Ltd

$20.0 Under Review

Not Started

Isaac Regional Council

Page 36: EXE UTIVE SUMMARY - Investment Property Queensland · EXE UTIVE SUMMARY The Regional Development Register (RDR) is the evidence required to reaffirm the Mackay-Isaac-Whitsunday region’s

www.mwredc.org.au 36 | P a g e

Project Name Details Proponent Est. Cost Timing (est. start)

Status Local Govt.

Peak Downs Coal Expansion

O/C coal mine, 9Mtpa to 11.5Mtpa hard coking coal. Expansion option may remain embedded within Caval Ridge Mine portfolio.

BHP Billiton Mitsubishi Alliance

$2,300.0 On Hold Not Started

Isaac Regional Council

Red Hill Coal Project U/G coal mine, 14Mtpa coking coal. BHP Billiton Mitsubishi Alliance

$2,200.0 Not Started

Isaac Regional Council

Saraji East Coal Project

U/G coal mine, 14Mtpa hard coking coal. Construction of new mine site. BHP Billiton Mitsubishi Alliance

$1,000.0 On Hold Not Started

Isaac Regional Council

Sarum Coal Mine Project

U/G and O/C coal mine, 6.5Mtpa thermal and coking coal. Construction of new mine site. Life expectancy of 30 years

Xstrata Coal Ltd, Sumicho, Itochu, ICRA

$1,000.0 2014 Not Started

Whitsunday Regional Council

Talwood Coal Project U/G coal mine, 3.6Mtpa PCI and thermal coal. Construction of new mine site.

Aquilla Resources Ltd

$800.0 2015 Not Started

Isaac Regional Council

Twin Hills Gold-Silver Underground

U/G mine producing 30,000oz pa. Mining trial planned. Evolution Mining Ltd

$6.0 Not Started

Isaac Regional Council

Willunga/Vermont East Coal Project

O/C coal mine, 3Mtpa PCI and thermal coal. Construction of new mine site.

Peabody Energy Ltd

$300.0 2015 Not Started

Isaac Regional Council

Page 37: EXE UTIVE SUMMARY - Investment Property Queensland · EXE UTIVE SUMMARY The Regional Development Register (RDR) is the evidence required to reaffirm the Mackay-Isaac-Whitsunday region’s

www.mwredc.org.au 37 | P a g e

Project Name Details Proponent Est. Cost Timing (est. start)

Status Local Govt.

Winchester South Coal Project

O/C coal mine, 4Mtpa thermal and coking coal. Construction of new mine site.

Rio Tinto Ltd $1,000.0 2016 Not Started

Isaac Regional Council

PORTS - AIR

Whitsunday Coast Airport Master Plan

Development of 430h airport site, increase existing runway from 2100m to 2400m.

Queensland Government

$30.0 2014 Not Started

Whitsunday Regional Council

PORTS - SEA

Abbot Point Capital Dredging Project

Dredging and offshore disposal of up to 3m m3 of sediment for T0, T2 and T3 terminals.

North Queensland Bulk Ports

$30.0 2014 Not Started

Whitsunday Regional Council

Abbot Point Coal Terminal Refurbishment

Refurbishment of coal terminal. Adani Mining Pty Ltd

$68.0 2013 In Progress Whitsunday Regional Council

Abbot Point Expansion (AP-X)

Construction of new terminals to service increased coal export capacity, includes potential sheltered berths.

Anglo American/ Northhub

$2,000.0 2017 Not Started

Whitsunday Regional Council

Page 38: EXE UTIVE SUMMARY - Investment Property Queensland · EXE UTIVE SUMMARY The Regional Development Register (RDR) is the evidence required to reaffirm the Mackay-Isaac-Whitsunday region’s

www.mwredc.org.au 38 | P a g e

Project Name Details Proponent Est. Cost Timing (est. start)

Status Local Govt.

Abbot Point Supporting Infrastructure

Construction of common use infrastructure at Abbot Point. NQBP engaging with port proponents for master planning requirements.

Port Proponents

$100.0 2014 Not Started

Whitsunday Regional Council

Abbot Point Terminal Expansion Project T0

Expansion of existing coal port facility to increase export capacity by 35Mtpa in initial stage.

Adani Mining Pty Ltd

$2,000.0 2014 Not Started

Whitsunday Regional Council

Abbot Point Terminal Expansion Project T2

New terminal at existing coal port facility to increase potential coal export capacity to 60Mtpa.

BHP Billiton $2,000.0 On Hold Not Started

Whitsunday Regional Council

Abbot Point Terminal Expansion Project T3

New terminal at existing coal port facility to increase potential coal export capacity to 60Mtpa.

GVK Hancock $2,000.0 2014 Not Started

Whitsunday Regional Council

Dalrymple Bay Coal Terminal 8X

Upgrading of existing stockyard rows, erecting vertical sided bunds. Construction of two additional berths, new off shore conveyor, two rail receivable loops and new stockyard. Pending DBCT Master Plan outcome, preference is to develop Dudgeon Point as new 'greenfield' terminal to avoid operational losses associated with further DBCT expansion.

DBCT Management Pty Ltd

$350.0 Awaiting approval by DBCT

users

Not Started

Mackay Regional Council

Dalrymple Bay Coal Terminal Master Plan

Construction of new bulk coal export facility at Dudgeon Point, approximately 4km north of DBCT, potential export capacity of up to 90Mtpa.

DBCT Management Pty Ltd/ Brookfield Company

$5,400.0 2016 Not Started

Mackay Regional Council

Page 39: EXE UTIVE SUMMARY - Investment Property Queensland · EXE UTIVE SUMMARY The Regional Development Register (RDR) is the evidence required to reaffirm the Mackay-Isaac-Whitsunday region’s

www.mwredc.org.au 39 | P a g e

Project Name Details Proponent Est. Cost Timing (est. start)

Status Local Govt.

Dudgeon Point Coal Terminal Development Project

Construction of two separate coal terminals, to be built in stages as required. Total coal export capacity of 180Mtpa. Development includes, 6 rail loops, large stockyards, 8 new offshore births, supporting infrastructure and 2 offshore wharves and jetties.

DPCT Management Pty Ltd/Adani Mining Pty Ltd

$12,000.0

2015 Not Started

Mackay Regional Council

Hay Point Coal Terminal Expansion (HPX3)

Construction of an offshore trestle and berth, onshore earthworks to transfer towers and surge bins to increase port capacity from 44Mtpa to 55Mtpa.

BHP Billiton Mitsubishi Alliance

$2,500.0 Awaiting approval by DBCT

users

In Progress Mackay Regional Council

RAIL

Alpha Coal Rail Project

Construction of a 495km railway corridor to transport processed coal from the Alpha coal mine to the Abbot Point Coal Terminal.

Hancock Prospecting Pty Ltd

$2,500.0 2012 Not Started

Whitsunday Regional Council

Central Qld Integrated Rail

Upgrades and deviations to the existing Newlands rail line, from Goonyella and Abbot Point, including 180 kilometres of new rail corridor from the Galilee Basin to the Newlands rail line.

Aurizon/GVK Hancock

$2,500.0 Not Started

Whitsunday Regional Council

China First Rail Network

Development of 490km of railway line, Galilee Basin to APCT, construction of two-berth export terminal at APCT.

Waratah Coal $1,970.0 2012 Not Started

Whitsunday Regional Council

Page 40: EXE UTIVE SUMMARY - Investment Property Queensland · EXE UTIVE SUMMARY The Regional Development Register (RDR) is the evidence required to reaffirm the Mackay-Isaac-Whitsunday region’s

www.mwredc.org.au 40 | P a g e

Project Name Details Proponent Est. Cost Timing (est. start)

Status Local Govt.

Goonyella Rail Expansion - Stage 1

Staged expansion and duplication of 7km track south of the DBCT and construction of Wotonga Feeder Station.

Aurizon $185.0 2011 Not Started

Mackay Regional Council

Goonyella to Abbot Point Rail Project

Dedicated 260km railway line for transportation of up to 60Mtpa of coal from existing, expanded and new mine sites.

BHP Billiton/ MetCoal Holdings

$4,000.0 On Hold Not Started

Whitsunday Regional Council

Nebo Train Maintenance Facility Expansion

The new facility will enable additional Pacific National’s coal trains to link central Queensland coal fields and the port. The project will include the construction of additional unit train maintenance and storage.

Pacific National

$20.0 2012 In Progress Isaac Regional Council

Project Iron Boomerang

Staged establishment of heavy gauge rail line from iron and steel smelting parks in Newman and Fortescue River Valley, Western Australia to Abbot Point Precinct, Bowen Queensland.

East West Line Parks Ltd

$7,400.0 2012 Not Started

Whitsunday Regional Council

RETAIL

Airlie Central Shopping Centre

Medium to large scale shopping centre, including six screen cinema, Woolworths Supermarket, specialty stores and car parking, Airlie Beach.

Queensland Trustee Investment Ltd

$3.5 2013 Not Started

Whitsunday Regional Council

Bunnings Warehouse Bucasia

Construction of a format hardware store and associated infrastructure, Holts Road, Bucasia.

Bunnings Warehouse

$25.0 2015 Not Started

Mackay Regional Council

Page 41: EXE UTIVE SUMMARY - Investment Property Queensland · EXE UTIVE SUMMARY The Regional Development Register (RDR) is the evidence required to reaffirm the Mackay-Isaac-Whitsunday region’s

www.mwredc.org.au 41 | P a g e

Project Name Details Proponent Est. Cost Timing (est. start)

Status Local Govt.

Bunnings Warehouse Paget

Construction of a 29,500sqm format hardware store and associated infrastructure, Paget.

Bunnings Warehouse

$25.0 2014 Not Started

Mackay Regional Council

Home Improvement Centre

Construction of bulk goods homemaker centre, Bucasia Road, Northern Beaches.

Lancini Group of Companies

$60.0 2011 In Progress Mackay Regional Council

Marian Town Centre Staged development of a 7.5h site, construction of Woolworths Supermarket and fuel station, 15 specialty stores, Mitre10 Hardware and a 280 capacity car park, including proposed 36 lot residential subdivision and commercial development, Anzac Avenue, Marian.

Tipalea Partners Pty Ltd

$38.0 2012 In Progress Mackay Regional Council

Mt Pleasant Shopping Centre Expansion Stage 1

Staged expansion to increase existing gross let table area to 37,732m2. Proposed extension to Coles Supermarket, specialty stores, discount department store, mini-major, kiosk, storage area, additional 235 capacity car park, covered bus and taxi set down area.

Colonial First State

$50.0 2013 Not Started

Mackay Regional Council

Northern Beaches Central Expansion Stages 3-4

Development of Northern Beaches Central Shopping Centre, 45,000sqm floor space, including discount department store, 2 supermarkets, specialty stores, childcare centre, community centre, office space, showrooms and 1,700 capacity car park, Northern Beaches.

Stockwell Building & Development

$250.0 2012 In Progress Mackay Regional Council

Northpoint Homemaker Centre Expansion

Planned expansion to existing 11,407sqm Homemaker Centre, located in the core Mackay bulky goods precinct, adjacent to large Harvey Norman owned store, other complementary retailers and a 358 capacity car park.

Sentinel Property Group

$3.5 2013 Not Started

Mackay Regional Council

Page 42: EXE UTIVE SUMMARY - Investment Property Queensland · EXE UTIVE SUMMARY The Regional Development Register (RDR) is the evidence required to reaffirm the Mackay-Isaac-Whitsunday region’s

www.mwredc.org.au 42 | P a g e

Project Name Details Proponent Est. Cost Timing (est. start)

Status Local Govt.

Sarina Beach Road Shopping Centre Expansion Stage 2

Expansion to existing centre including new Target Country and addition of 4 new specialty stores, Sarina Beach Road, Sarina.

Stockwell Building & Development

$25.0 2015 In Progress Mackay Regional Council

ROADS

Archibald Paradise Dual Lane Roundabout

Construction and works in progress, Archibald Street and Paradise Road roundabout.

Mackay Regional Council

$5.3 2012 In Progress Mackay Regional Council

Bridge/Paradise Intersection Upgrade

Design complete, Bridge Road and Paradise Road intersection. Mackay Regional Council

$7.5 2017 Not Started

Mackay Regional Council

Bruce Highway Overtaking Lanes/St Lawrence to Bowen

Construction of 18 overtaking lanes, Bruce Highway, between St Lawrence and Bowen.

Department of Transport & Main Roads

$47.8 2013 In Progress Whitsunday Regional Council

Bruce Highway/ Shakespeare Street/Showgrounds Intersection

Upgrade of existing intersection, Bruce Highway and Shakespeare Street intersection.

Department of Transport & Main Roads

$13.9 2013 In Progress Mackay Regional Council

Capella/Lime Street Upgrades

Design and upgrade of entrance precinct in Clermont, including pedestrian friendly environment, pavement and upgrade of storm water deficiencies.

Isaac Regional Council

$3.0 2013 Not Started

Isaac Regional Council

Page 43: EXE UTIVE SUMMARY - Investment Property Queensland · EXE UTIVE SUMMARY The Regional Development Register (RDR) is the evidence required to reaffirm the Mackay-Isaac-Whitsunday region’s

www.mwredc.org.au 43 | P a g e

Project Name Details Proponent Est. Cost Timing (est. start)

Status Local Govt.

Connors Road Project Reconstruction and construction works, including asphalt, concrete islands, installation of traffic lights to Archibald Street, Boundary Road, Farrellys Road and Connors Street intersection.

Mackay Regional Council

$26.0 2011 In Progress Mackay Regional Council

Conway/Davison Road Intersection Upgrade

Upgrade of existing intersection, Conway and Davison Roads, Whitsunday.

Whitsunday Regional Council/TMR

2013 In Progress Whitsunday Regional Council

Dysart Access Road Upgrade to16km existing road section, Dysart Access Road, Dysart. BHP Billiton Mitsubishi Alliance

2014 Not Started

Isaac Regional Council

Dysart Bridge Maintenance work on Golden Mile Road and widening of Stephens Creek Bridge, Dysart.

Isaac Regional Council

$2.0 Completed Isaac Regional Council

Dysart Bypass Widening of the Dysart Bypass Road and associated intersection, Dysart. Isaac Regional Council

$2.0 Completed Isaac Regional Council

Eton Range Upgrade Planning Study

Upgrade of Peak Downs Highway, 'black spot' area on Eton Range. Jointly funded by Federal and State Government.

Department of Transport & Main Roads

$13.5 2012 In Progress Mackay Regional Council

Farleigh/Habana Road Reconstruction

Reconstruction works to Farleigh and Habana Roads, Mackay. Mackay Regional Council

$2.5 2011 Completed Mackay Regional Council

Page 44: EXE UTIVE SUMMARY - Investment Property Queensland · EXE UTIVE SUMMARY The Regional Development Register (RDR) is the evidence required to reaffirm the Mackay-Isaac-Whitsunday region’s

www.mwredc.org.au 44 | P a g e

Project Name Details Proponent Est. Cost Timing (est. start)

Status Local Govt.

Huntley Road Upgrade

Identified Regional Road of Significance. TIDS funding secured for resurfacing of road.

Isaac Regional Council

$5.7 2011 Completed Isaac Regional Council

Keelys Road Drainage Upgrade

Upgrade and draining works. Mackay Regional Council

$1.2 2012 Completed Mackay Regional Council

Mackay Ring Road Planning study for the Mackay Ring Road. TMR $10.0 2012 In Progress Mackay Regional Council

Malcomson/Charles Hodge Intersection Upgrade

Design and planning completed. Mackay Regional Council

$2.2 2014 In Progress Mackay Regional Council

Malcomson/ Greenfields Intersection Upgrade

Design and planning commenced. Mackay Regional Council

$1.8 2012 Not Started

Mackay Regional Council

Milton Street Lane Upgrades

Design and planning commenced. Mackay Regional Council

$9.5 2012 Not Started

Mackay Regional Council

Milton/Boundary Intersection Upgrade

Upgrade to existing Milton Street and Boundary Road intersection. Mackay Regional Council

$3.2 2015 Not Started

Mackay Regional Council

Page 45: EXE UTIVE SUMMARY - Investment Property Queensland · EXE UTIVE SUMMARY The Regional Development Register (RDR) is the evidence required to reaffirm the Mackay-Isaac-Whitsunday region’s

www.mwredc.org.au 45 | P a g e

Project Name Details Proponent Est. Cost Timing (est. start)

Status Local Govt.

Moranbah Access Road Rehabilitation

Upgrade to 5.2km road section, Moranbah Access Road. Isaac Regional Council

$2.0 2012 In Progress Isaac Regional Council

Paradise Street Upgrade

Road upgrade to Paradise Street, George to Henman Streets. Mackay Regional Council

$7.8 2013 In Progress Mackay Regional Council

Peak Downs Highway Diversion Road

Road works underway on the Peak Downs Highway diversion road and Buffel Park Accommodation Village intersection, including activities on the north and south mine construction intersections.

BHP Billiton Mitsubishi Alliance

2013 In Progress Isaac Regional Council

Reconstructing Mackay/Whitsunday Region

Reconstruction of over 300kms of damaged sections of road across the Mackay/Isaac/Whitsunday regions under 'The Natural Disaster Relief and Recovery Arrangements' funded by Federal and State Governments.

TMR $612.0 2011 In Progress Mackay Regional Council

River & Nelson Street Roundabout

Rehabilitation works along River Street, Mangrove Road and Macalister Street, including full restoration of existing roundabout.

Mackay Regional Council

2013 In Progress Mackay Regional Council

Sandy Creek Bridge Upgrade

Upgrade of existing bridge, Sandy Creek. TMR $6.3 2013 In Progress Mackay Regional Council

Shakespeare Street Rehabilitation

Rehabilitation of existing pavement, Shakespeare Street, Mackay. Mackay Regional Council

$2.5 2012 In Progress Mackay Regional Council

Page 46: EXE UTIVE SUMMARY - Investment Property Queensland · EXE UTIVE SUMMARY The Regional Development Register (RDR) is the evidence required to reaffirm the Mackay-Isaac-Whitsunday region’s

www.mwredc.org.au 46 | P a g e

Project Name Details Proponent Est. Cost Timing (est. start)

Status Local Govt.

Southern Approach to Mackay

Duplication of the Bruce Highway between Bakers Creek and Mackay City Gates, including associated intersection upgrades.

TMR $50.0 2012 In Progress Mackay Regional Council

West Funnel Creek Bridge

Construction of a new two-lane bridge, restoration of East Funnel Creek Road to either side of bridge, West Funnel Creek, Sarina Range. Replacement of existing one-lane overpass.

Mackay Regional Council

$1.5 2013 Not Started

Mackay Regional Council

TOURISM

Black Rock Hotel Redevelopment

Development of a boutique hotel, 20 serviced apartments and outdoor dining facility, Bowen.

Marina Bay Developments

2009 Not Started

Whitsunday Regional Council

Bowen Motel Development

Development of a commercial, short-term, 32 unit motel, including Managers residence, Livingstone Street, Bowen.

Livingstone Street Holdings Pty Ltd

Not Started

Whitsunday Regional Council

Catalina Apartments Development of a 51 apartment complex, with 28 apartments pre-sold, 14-18 Sinclair Street, Bowen.

Pacific Centre $14.0 Not Started

Whitsunday Regional Council

Clarion Hotel Extension

Addition of 120 rooms to existing hotel, south side of hotel, Mackay. Clarion Hotel Mackay

$27.0 Not Started

Mackay Regional Council

Page 47: EXE UTIVE SUMMARY - Investment Property Queensland · EXE UTIVE SUMMARY The Regional Development Register (RDR) is the evidence required to reaffirm the Mackay-Isaac-Whitsunday region’s

www.mwredc.org.au 47 | P a g e

Project Name Details Proponent Est. Cost Timing (est. start)

Status Local Govt.

Clarion Hotel Extension

Addition of 50 rooms to existing hotel, north side, Mackay. Clarion Hotel Mackay Marina

$12.5 2007 Not Started

Mackay Regional Council

Gordon Street Motel Unit Project

Construction of a two level motel development, including Managers unit and pool, Gordon Street, Mackay.

The Potter Group

$8.0 2013 In Progress Mackay Regional Council

Gowake Cable Park Development of a cable water ski park, Lake Poco and Lake Grande, Andergrove Lakes Residential Estate, Andergrove.

Andergrove Lakes Development

$5.0 2012 In Progress Mackay Regional Council

Harrup Park Country Club Motel

Development of proposed 2 levels, 80 room accommodation and Managers residence, primarily for accommodating of sporting teams, situated at Kippen Street, South Mackay.

McDiarmid Investments Pty Ltd

$10.0 2013 In Progress Mackay Regional Council

Horseshoe Bay Resort Development

Development of 160 resort units, including resort restaurant, Horseshoe Bay, Whitsunday.

Horseshoe Bay Resort Development

Not Started

Whitsunday Regional Council

Mackay Marina Commercial Hub

Development of Mackay Marina, demolishing of old junior surf club to allow for the expansion of new 'commercial hub', Mackay Marina.

Port Binnli Developments

Not Started

Mackay Regional Council

Ozone Whitsundays Eco Resort

Development of a 63 luxury eco-villa resort, including conference centre, wedding pavilion, high rope course, tennis and volleyball courts, outdoor cinema, restaurant and fauna park, Whitsundays.

Wendy Bradley/Chris Weigand

$30.0 2012 In Progress Whitsunday Regional Council

Page 48: EXE UTIVE SUMMARY - Investment Property Queensland · EXE UTIVE SUMMARY The Regional Development Register (RDR) is the evidence required to reaffirm the Mackay-Isaac-Whitsunday region’s

www.mwredc.org.au 48 | P a g e

Project Name Details Proponent Est. Cost Timing (est. start)

Status Local Govt.

Pacific Sands Apartments

Development of a 9 levels, 57 room motel, ocean side, East Mackay. Honeycombe Property Group

$25.0 2012 Not Started

Mackay Regional Council

Samudra Resort Whitsundays

Development of 140 villa Balinese-style resort, including function room, restaurant, shops, office space, swimming pools, chapel, tavern and bottle shop, Whitsundays.

Stonewall Construction

$60.0 2010 In Progress Whitsunday Regional Council

WATER & WASTE

Dysart Effluent Reuse Planned construction, effluent reuse system, staged 4 year development, Dysart.

Isaac Regional Council

$35.0 In Progress Isaac Regional Council

Gorge Weir to Byerwen

Major pipeline initiative aimed at providing additional water supply to the mining sector in the northern Bowen Basin.

Sunwater $200.0 2012 Not Started

Isaac Regional Council

Kinchant Dam Safety Upgrade

Upgrade to ensure dam capacity safety with extreme rainfall events. Sunwater $30.0 2012 In Progress Mackay Regional Council

Mackay Water Treatment Plant

New water treatment plant, storage and trunk infrastructure to meet future growth in Mackay.

Mackay Regional Council

$100.0 2024 Not Started

Mackay Regional Council

Page 49: EXE UTIVE SUMMARY - Investment Property Queensland · EXE UTIVE SUMMARY The Regional Development Register (RDR) is the evidence required to reaffirm the Mackay-Isaac-Whitsunday region’s

www.mwredc.org.au 49 | P a g e

Project Name Details Proponent Est. Cost Timing (est. start)

Status Local Govt.

Mirani Water Treatment Plant

Construction of new water treatment plant at Mirani. Mackay Regional Council

$13.0 2013 In Progress Mackay Regional Council

Mirani Wastewater Treatment Plant Upgrade

Upgrade of waste water treatment plant to meet growth and environmental requirements in Mirani and Marian.

Mackay Regional Council

$10.0 2014 Not Started

Mackay Regional Council

Moranbah Pump Station

Construction of new pump station and sewerage treatment plant, Moranbah.

Isaac Regional Council

$1.6 2011 Completed Isaac Regional Council

Moranbah Sewerage Augmentation

Upgrade of existing sewerage treatment plant, Moranbah. Isaac Regional Council

$13.5 2010 Completed Isaac Regional Council

Sarina Waste Transfer Station

Construction of a new waste transfer station, Sarina. Mackay Regional Council

$3.2 2013 In Progress Mackay Regional Council

Sarina Wastewater Treatment Plant

Construction of a waste water treatment plant, pump station to meet growth and environmental requirements in Sarina.

Mackay Regional Council

$40.0 2011 In Progress Mackay Regional Council

Sewerage Pump Station Upgrade Program

Program of works to upgrade sewage pump stations throughout the Mackay Region to meet growth and increasing environmental standards.

Mackay Regional Council

$85.0 2011 In Progress Mackay Regional Council

Page 50: EXE UTIVE SUMMARY - Investment Property Queensland · EXE UTIVE SUMMARY The Regional Development Register (RDR) is the evidence required to reaffirm the Mackay-Isaac-Whitsunday region’s

www.mwredc.org.au 50 | P a g e

Project Name Details Proponent Est. Cost Timing (est. start)

Status Local Govt.

Shoal Point Reservoir Reservoir and trunk main infrastructure to service future growth in the area.

Mackay Regional Council

$7.0 2014 Not Started

Mackay Regional Council

Water for Bowen Improve reliability of urban water supplies in the Whitsunday region. Potential for a new pipeline system to extend the 'Water for Bowen' scheme 50km to Proserpine.

Sunwater $25.0 Under Review

Not Started

Whitsunday Regional Council

Water Main Replacement and Upgrade Program

Program of works to improve water distribution infrastructure, ensuring ongoing standard of service for future growth demands.

Mackay Regional Council

$35.0 2013 In Progress Mackay Regional Council

Western Corridor Raw Water Pipeline Project

Construction of a 20km pipeline, upgrade of 1.5km pipeline, 'Sunwater Burdekin Moranbah Terminal' and 'Moranbah Pump Station'. Replacement of existing BMA pipeline to south Moranbah operations.

BHP Billiton Mitsubishi Alliance

$155.0 2012 In Progress Isaac Regional Council

Whitsunday Sewerage Treatment Plants

Upgrade of Bowen Plant at Dalrymple Point to improve output quality, efficiency and aesthetics of the plant.

Whitsunday Regional Council

$51.8 2012 In Progress Whitsunday Regional Council

Whitsunday Water Treatment Infrastructure Project

Construction of a 16.5 mega litre plant in Bowen and 14.5 mega litre plant in Proserpine.

Whitsunday Regional Council

$45.3 2012 In Progress Whitsunday Regional Council

Page 51: EXE UTIVE SUMMARY - Investment Property Queensland · EXE UTIVE SUMMARY The Regional Development Register (RDR) is the evidence required to reaffirm the Mackay-Isaac-Whitsunday region’s

www.mwredc.org.au 51 | P a g e

Expression of Interest

The Regional Development Economic Corporation is committed to capturing and reporting accurate and current information on existing and future developments

within the Mackay, Isaac and Whitsunday region.

If you wish to register an existing or future development, update a project or edit any existing details currently on the RDR, please fill in relevant information in the

following table for consideration of inclusion in the Regional Economic Development Register, December 2013 publication.

Project Name Details Project Owner/s Est. Cost (millions) Est. Start-Finish Date Status

Registered or approved project name

A brief overview of development including location, purpose and brief description of construction details.

$ Not Started Concept Approved EIS Seeking Funding In Progress

Please forward submission by fax – (07) 4953 2677 or email [email protected]

Page 52: EXE UTIVE SUMMARY - Investment Property Queensland · EXE UTIVE SUMMARY The Regional Development Register (RDR) is the evidence required to reaffirm the Mackay-Isaac-Whitsunday region’s

www.mwredc.org.au 52 | P a g e

REDC - Regional Economic Development Corporation (Mackay-Isaac-Whitsunday)

Level 1, 36 Wellington Street, MACKAY QLD 4740

Phone: (07) 4953 2655 Fax: (07) 4953 2677

Email: [email protected]

Web: www.mwredc.org.au

DISCLAIMER: While every care has been taken in preparing this publication, the Regional Economic Development Corporation (MWREDC LIMITED) its officers, employees and agents accept no responsibility or liability (except by law cannot be excluded), for decisions or actions taken as a result of any data, information, inaccuracy, statement or advice, expressed or implied, contained within. To the best of our knowledge, the content was correct at the time of publishing.

GENERAL ADVICE WARNING: The information contained in this publication is general in nature, does not take into account your personal situation and should not be considered as advice. You should consider whether the information is appropriate to your needs, and where appropriate, seek professional advice.

COPYRIGHT: REDC owns copyright of the information contained in this publication. Information may

be printed or downloaded for personal use only. The information may not otherwise be reproduced

and must not be distributed or transmitted to any other person or used in any way without the

express approval of REDC.