Execution of Complex Engineering & Capital Projects: Nuclear New Build, Waste and Spent Fuel Management, Decommissioning of Nuclear Facilities ROSATOM Rosatom Engineering & Construction Division Dmitri Vysotski Head of Strategy, NIAEP-ASE Director, Global Strategy Integration, NUKEM Technologies State Corporation “ROSATOM” STATE ATOMIC ENERGY CORPORATION “ROSATOM” Nuclear Africa 2014 Congress March 18-20, 2014 Midrand, South Africa

Upload: others

Post on 07-Jul-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Execution of Complex Engineering & Capital Projects ... Vysotski - ASE-… · Recent NPP EPC projects The content of this presentation is for discussion purposes only, shall not be

Execution of Complex Engineering & Capital Projects:

Nuclear New Build, Waste and Spent Fuel

Management, Decommissioning of Nuclear Facilities

ROSATOM

Rosatom Engineering & Construction Division

Dmitri Vysotski

Head of Strategy, NIAEP-ASE

Director, Global Strategy Integration, NUKEM Technologies

State Corporation “ROSATOM”

STATE ATOMIC ENERGY CORPORATION “ROSATOM”

Nuclear Africa 2014 Congress

March 18-20, 2014

Midrand, South Africa

Page 2: Execution of Complex Engineering & Capital Projects ... Vysotski - ASE-… · Recent NPP EPC projects The content of this presentation is for discussion purposes only, shall not be

2

NIAEP-ASE - Engineering & Construction Business of

the State Atomic Energy Corporation ‘Rosatom’

Uranium

production

Uranium

enrichment

Fuel

fabrication

NPP Design,

Engineering

and Construction

Electricity

generation

Power equipment

manufacturing

Services and

modernization

Anniversary of

Russian Nuclear

Industry

2010

The content of this presentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to NIAEP-ASE and its affiliated companies.

NIAEP-ASE disclaims all responsibility for any and all mistakes, quality and completeness of the information.

NIAEP-ASE

Page 3: Execution of Complex Engineering & Capital Projects ... Vysotski - ASE-… · Recent NPP EPC projects The content of this presentation is for discussion purposes only, shall not be

NPP Design,

Engineering,

Construction,

Modernization

NIAEP-ASE GROUP

TPP Design,

Engineering,

Construction,

Modernization

Waste & Spent Fuel

Management,

Decommissioning

SMR, Research

Reactors &

Scientific Centers

Oil, Gas &

Petrochemical

facilities

Project

Management

Consulting (PMC)

Services

The content of this presentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to NIAEP-ASE and its affiliated companies. NIAEP-ASE disclaims all responsibility for any

and all mistakes, quality and completeness of the information.

NIAEP-ASE has a diversified business portfolio –

nuclear and non-nuclear businesses

3

Page 4: Execution of Complex Engineering & Capital Projects ... Vysotski - ASE-… · Recent NPP EPC projects The content of this presentation is for discussion purposes only, shall not be

Businesses, competences and performance highlights

The content of this presentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to NIAEP-ASE and its affiliated companies. NIAEP-ASE disclaims all responsibility for any

and all mistakes, quality and completeness of the information.

Catalogue of NPP Power Products – UNICEM: systematic global information base for suppliers

Innovative project management system – Multi-D: construction of complex facilities

Own Engineering Center,

Multi-D and PM Education &

Learning Center

Full scope of services: EPC,

EPC(m), PMC

30% of worldwide NPP

construction market

Revenues - 2 billion USD, over

20% - non-nuclear business

Over 20 units in simultaneous

design and construction

Offices in 15 countries, 7000

employees

4

Decommissioning

Construction

Project management

Technical project

Working documentation

Procurement

Civil construc

tion

Project managem

ent

Licenc ing

Radia tion

protec tion

Procurement

Dismantling

O&M

Maintenance

services

Service Engineer-

ing Training

Engine ering

Commissioning

Technical

Concept

Page 5: Execution of Complex Engineering & Capital Projects ... Vysotski - ASE-… · Recent NPP EPC projects The content of this presentation is for discussion purposes only, shall not be

5

Key NIAEP-ASE / NUKEM projects worldwide

The content of this presentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to NIAEP-ASE and its affiliated companies.

NIAEP-ASE disclaims all responsibility for any and all mistakes, quality and completeness of the information.

Country NPP Back-end

projects

(selected

projects

Armenia 1 +

Bangladesh 2

Belarus 2

Bulgaria +

China 2 +

Czech Republic +

France +

Germany +

Hungary 2 +

India 3

Italy +

Japan +

Lithuania +

Romania +

Russia 6 +

Slovakia +

South Africa +

Turkey 4

UK +

Ukraine 2 +

France

China

India

Turkey

Ukraine

Hungary

Bangladesh

Vietnam

2

Belarus

South

Africa

Russia

Lithuania

Germany

Italy Bulgaria

2

4

3

6

3

2

2

2 2

Czech Rep.

Romania

Slovakia

Construction of NPP (in progress or in preparation)

Construction of TPP (reference or in progress)

Project in Backend (reference or in progress)

United Kingdom

Japan

Armenia 1

Page 6: Execution of Complex Engineering & Capital Projects ... Vysotski - ASE-… · Recent NPP EPC projects The content of this presentation is for discussion purposes only, shall not be

Recent NPP EPC projects

The content of this presentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to Rosatom and its affiliated companies. Rosatom disclaims all responsibility for any and all

mistakes, quality and completeness of the information. 6

Russia, Rostov NPP, Unit 2

1000 MW, 2009

China, Tianwan NPP, Unit 1-2

2*1000 MW, 2006-2007

Iran, Busher NPP, Unit 1

1000 MW, 2011-2013

India, Kundankulam NPP, Units 1-2,

2*1000 MW, 2013 +

Page 7: Execution of Complex Engineering & Capital Projects ... Vysotski - ASE-… · Recent NPP EPC projects The content of this presentation is for discussion purposes only, shall not be

Complex engineering and construction processes are

managed by Multi-D technology of NIAEP-ASE

4D Materials

5D Schedule of Works

3D Design

6D Labor force

+ 7D non-labor resources (machinery, equipment);

+ 8D - construction costs

+ 9D - …

▪ Visual modeling of construction works

▪ Development of organizational and

technological documentation

▪ Verification of contractual

construction schedule

▪ Creation of project documentation

structure

▪ Management of equipment and

materials delivery terms

▪ Estimation of construction project’s

budget

▪ Verification of construction norms

The content of this presentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to NIAEP-ASE and its affiliated companies. NIAEP-ASE disclaims all responsibility for any

and all mistakes, quality and completeness of the information.

Multi-D is an innovative technology of construction management for a complex industrial object

7 7

Page 8: Execution of Complex Engineering & Capital Projects ... Vysotski - ASE-… · Recent NPP EPC projects The content of this presentation is for discussion purposes only, shall not be

United Nuclear Industry Catalogue of Power Engineering

Companies Products (UNICEM) – a systematic, easy-to-use

information base of NIAEP-ASE

The content of this presentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to NIAEP-ASE and its affiliated companies. NIAEP-ASE disclaims all responsibility for any

and all mistakes, quality and completeness of the information.

NIAEP-ASE

E-catalogue:

engineering and design 3D models

system of standards for the equipment information on equipment class and coding

industry-based guidelines

technical documents

Customer

Engineering Company

Equipment manufacturers

Nuclear Plant Operator

Cost

Delivery time

Manufacturers

Specifications

Drawings and 3D- models

Certificates, Licenses

Financial documents

Operations manual

Drawings

Instructions

Specs, so forth

Specifications

Certificates,

Licenses

Evaluation of the info

Initial Specs

Appropriate equivalent & similar items

Info on the design requirements

Operation record history

The product’s documentation

Info on the product

E-catalogue functional applications*

8 8

* the E-catalogue can be found at www.eoncom.niaep.ru

Page 9: Execution of Complex Engineering & Capital Projects ... Vysotski - ASE-… · Recent NPP EPC projects The content of this presentation is for discussion purposes only, shall not be

9

PMC services are offered by NIAEP-ASE to support an owner

in complex project implementation

NIAEP-ASE PMC services

▪ Control and supervision of

engineering activity on behalf of

the owner (choice of technology

solution, master plan, layout,

selection of equipment and

materials, etc.)

▪ Manage communication between

designer and manufacturer,

approval of technical documentation

for equipment

▪ Assistance in efficient

procurement and monitoring

manufacturing and delivery

▪ Proper monitoring of construction,

erection and commissioning

operations including: resource

planning for construction operation;

scope distribution between

contractors; monitoring of construction

progress; participating in planning and

implementation of commissioning

operations

▪ Review and acceptance of the

detailed design documentation

with respect to design solutions, as

well as cost estimates

Construction

site

Designer

Contractors/sub

contractors of

construction

PMC

Owner Approval of

equipment

parameters and

engineering

solutions

1

5

3

2

4

3

1

2

3

4

5

Approval of design

(including order

specifications for

equipment and

materials)

Work planning

and

performance

Manufacturing

and shipping Procurement

Construction

supervision Delivery

Technical

drawings

The content of this presentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to Rosatom and its affiliated companies. Rosatom disclaims all responsibility for any and all

mistakes, quality and completeness of the information. 9 The content of this presentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to NIAEP-ASE and its affiliated companies. NIAEP-ASE disclaims all responsibility for any

and all mistakes, quality and completeness of the information. 9

Page 10: Execution of Complex Engineering & Capital Projects ... Vysotski - ASE-… · Recent NPP EPC projects The content of this presentation is for discussion purposes only, shall not be

10

Opportunities and challenges in waste/spent fuel

management and decommissioning market

•UK

•Germany

•Japan

•Russia

•Eastern Europe France

• South Africa

• Italy

•China

•Others

Priority country markets Global challenges & trends

• Response to industry challenges in key decommissioning markets – Germany, Japan and UK

• Strengthening presence in historical markets in South Africa, Central and Eastern European markets, China

• Propose innovative models to clients, ig. financing and BFOO options

The content of this presentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to NIAEP-ASE and its affiliated companies. NIAEP-ASE disclaims all responsibility for any and all

mistakes, quality and completeness of the information.

“No defined work packages, we need companies, who identify our problems and provide solutions"

Executive of a German nuclear utility

Demand for service providers that can develop solutions

1

"Market players need to work on their local presence"

Executive of NDA (UK)

Teaming & local presence as prerequisites for success

3

"Japanese know-how in decommissioning should be enhanced by incorporating overseas players' experience"

Executive of a Japanese nuclear utility

Openness for international expertise

Adherence to timeframe & budget as the biggest challenge in decommissioning

2

"Clients require minimum lead time and assured delivery"

Executive of a equipment manuf-rer

4

10 10

Page 11: Execution of Complex Engineering & Capital Projects ... Vysotski - ASE-… · Recent NPP EPC projects The content of this presentation is for discussion purposes only, shall not be

Solutions for Waste/Spent Fuel Management and

Decommissioning

The content of this presentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to Rosatom and its affiliated companies. Rosatom disclaims all responsibility for any

and all mistakes, quality and completeness of the information.

Remediation

NIAEP-ASE & NUKEM Technologies provide integrated offer

in Back-end and Decommissioning

11 11

Page 12: Execution of Complex Engineering & Capital Projects ... Vysotski - ASE-… · Recent NPP EPC projects The content of this presentation is for discussion purposes only, shall not be

1 2 3 4 5 6

NIAEP-ASE / NUKEM’s comprehensive offering of

solutions for Waste and Spent Fuel Management: EPC,

BFOO

Build Finance

Own Operate

BFOO of facilities

providing customers with

solutions – not just

products or facilities!

12 The content of this presentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to NIAEP-ASE and its affiliated companies. NIAEP-ASE disclaims all responsibility for any

and all mistakes, quality and completeness of the information.

SF Storage or Waste

Management Company

Kozloduy NPP, Bulgaria

Spent Fuel Storage

Turn-key construction of

storage

Delivery of casks

Ignalina NPP, Lithuania

Waste Treatment Center

Turn-key construction of

waste treatment complex

for solid radioactive waste

Page 13: Execution of Complex Engineering & Capital Projects ... Vysotski - ASE-… · Recent NPP EPC projects The content of this presentation is for discussion purposes only, shall not be

1 2 3 4 5 6 13

Market insights of South Africa:

demand for complex engineering projects in nuclear

Key Nuclear Industry Segments:

NPP New Build:

• Significant CAPEX

• Re-birth of the Industry

• Largest country’s infrastructure initiative with positive impact on economy and social sphere

Spent Fuel Handling: • Demand is urgent for

solving Spent Fuel issues of existing NPP units;

• A facility can be planned to take care of new NPP units (modular approach)

Characteristics / Market insights

• Government commitment for nuclear future is strong

• Plans for installation of 9600 MWe, ready for operating in 2024 ff.

• Construction of PBMR has been cancelled

• Programme for new build of Dedicated Isotope Production Reactor (DIPR)

Market framework

• Major segments: New build of NPPs, Waste and Spent Fuel handling

• Major players:

• ESKOM as biggest energy supplier

• NECSA operator of Safari-1 reactor, Vaalputs site, Safari-2 is expected

SA Nuclear Industry has ambitious New Build Plans and also needs to solve

issues with Spent Fuel and Nuclear Waste

The content of this presentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to NIAEP-ASE and its affiliated companies. NIAEP-ASE disclaims all responsibility for any

and all mistakes, quality and completeness of the information.

Page 14: Execution of Complex Engineering & Capital Projects ... Vysotski - ASE-… · Recent NPP EPC projects The content of this presentation is for discussion purposes only, shall not be

1 2 3 4 5 6

NIAEP-ASE/NUKEM have a proven track record for

activities in South Africa

NUKEM has a proven track record for activities in South Africa

PBMR (Pty) Ltd., Project Pelindaba, South Africa

Basic and detail design of the fuel production processes

Detail design for the recycling of effluents and uranium resulting from

scrap material

Professional services for the procurement support and supervision of

construction and commissioning activities for the PBMR Fuel Plan

Local supply chain management

Delivery of Castor casks for ESKOM via former subsidiary GNB

Framework contract with NECSA

Waste package requirements for LLW / ILW

Information on drummed waste

Low Level Solid Waste conditioning options

Assessment of measures necessary for final disposal at Vaalputs

Memorandum of Understanding between NECSA, NIAEP-ASE, NIAEP-

ASE

Provision of “Technical Concept” for DIPR/SAFARI II within ROSATOM

consortium with NIKIET and NIAEP-ASE

The content of this presentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to NIAEP-ASE and its affiliated companies. NIAEP-ASE disclaims all responsibility for any

and all mistakes, quality and completeness of the information.

. 14

Page 15: Execution of Complex Engineering & Capital Projects ... Vysotski - ASE-… · Recent NPP EPC projects The content of this presentation is for discussion purposes only, shall not be

1 2 3 4 5 6

Possible Areas for Cooperation in Complex Engineering

& Capital Projects

15 The content of this presentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to NIAEP-ASE and its affiliated companies. NIAEP-ASE disclaims all responsibility for any

and all mistakes, quality and completeness of the information.

EPC, EPC (m) within the

Nuclear New Build

Project Management

Consulting and Execution

Support (Nuclear and non-

nuclear facilities)

EPC, EPC (m) within the

Non-nuclear New Build

Solutions for Waste and

Spent Fuel Management,

(EPC, and flexible BFOO

approaches)

EPC, EPC (m) within the

Nuclear New Build

Project Management

Consulting and Execution

Support (Nuclear and Non-

nuclear facilities)

EPC, EPC (m) within the

Non-nuclear

Solutions for Waste and

Spent Fuel Management,

(EPC, and flexible BFOO

approaches)

1 2

3 4

Page 16: Execution of Complex Engineering & Capital Projects ... Vysotski - ASE-… · Recent NPP EPC projects The content of this presentation is for discussion purposes only, shall not be

1 2 3 4 5 6

THANK YOU!

16 The content of this presentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to NIAEP-ASE and its affiliated companies. NIAEP-ASE disclaims all responsibility for any

and all mistakes, quality and completeness of the information.

Dmitry Vysotski Head of Strategy, ASE-NIAEP /

Director, Global Integration, NUKEM Technologies

e-mail: [email protected]

[email protected]

tel.: +49-6023-1339