Page 1: Execution you can trust · Carlos Sandoval Commercial VP Gabriel García Onshore Construction VP Domingo Chin Offshore Construction VP Samuel Ronquillo HSEQ & Innovation VP Sergio

ARENDAL

Execution you can trust

March, 2016

Page 2: Execution you can trust · Carlos Sandoval Commercial VP Gabriel García Onshore Construction VP Domingo Chin Offshore Construction VP Samuel Ronquillo HSEQ & Innovation VP Sergio

COMPANY OVERVIEW

MANAGEMENT TEAM

ONGOING PROJECTS

INDEX

OUR EXPERIENCE

Page 3: Execution you can trust · Carlos Sandoval Commercial VP Gabriel García Onshore Construction VP Domingo Chin Offshore Construction VP Samuel Ronquillo HSEQ & Innovation VP Sergio

Company

Overview

Page 4: Execution you can trust · Carlos Sandoval Commercial VP Gabriel García Onshore Construction VP Domingo Chin Offshore Construction VP Samuel Ronquillo HSEQ & Innovation VP Sergio

COMPANY OVERVIEW

Arendal is a company

specialized in solution design

based in Monterrey, founded in

1995 with a solid corporate

governance.

One of the most important

Mexican EPC Companies with an

exceptional track record as well as

vast experience in complex

projects for oil and gas,

infrastructure, and power.

Specialized in the development

of energy projects with presence

in all oil & gas value chain:

Upstream, Midstream, Onshore/

Offshore and Downstream

100 + Projects executed

throughout Mexico since its

inception, all of them finished on time

and within budget scopes. Access to

innovative construction methods and

focus on efficiency and last

generation equipment

UPSTREAMArendal provides services throughout the energy sector,

based on its high capabilities of execution of complex

projects.

Experience in the development of infrastructure investment

projects such as the construction of a Federal penitentiary

in Mexico.

Page 5: Execution you can trust · Carlos Sandoval Commercial VP Gabriel García Onshore Construction VP Domingo Chin Offshore Construction VP Samuel Ronquillo HSEQ & Innovation VP Sergio

ONSHORE Production facilities of oil

and gas

OFFSHORE IMR (Inspection,

Maintenance & Repair)

Subsea pipeline

construction

Shore approaches

Specialized diving

Offshore topside works

UPSTREAM

Compression Stations

Pumping Stations

Directional Drilling

(HDD)

Gas pipelines

Oil pipelines

Water pipelines

Storage tanks

MIDSTREAM

Refining

Petrochemical

DOWNSTREAM

Penitentiaries

Hospitals

Civil Works

Water treatment

plants

INFRASTRUCTUREPOWER

GENERATION

Generation plants

Transmission and

substations

— BUSINESS SEGMENTSCOMPANY OVERVIEW

Page 6: Execution you can trust · Carlos Sandoval Commercial VP Gabriel García Onshore Construction VP Domingo Chin Offshore Construction VP Samuel Ronquillo HSEQ & Innovation VP Sergio

Management Team

Page 7: Execution you can trust · Carlos Sandoval Commercial VP Gabriel García Onshore Construction VP Domingo Chin Offshore Construction VP Samuel Ronquillo HSEQ & Innovation VP Sergio

Carlos Sandoval

Commercial VP

Gabriel García

Onshore Construction VP

Domingo Chin

Offshore Construction VP

Samuel Ronquillo

HSEQ & Innovation VP

Sergio Cavuoto

Proposal VP

Adrián García Pons

Co-President

Jesús García Pons

Co-President

Jesús García Vázquez

Chairman of the Board

Page 8: Execution you can trust · Carlos Sandoval Commercial VP Gabriel García Onshore Construction VP Domingo Chin Offshore Construction VP Samuel Ronquillo HSEQ & Innovation VP Sergio

Establishment of the Codes of Conduct

COMPONENTS

CORPORATE GOVERNANCE

Shareholders

BoardManagement

Team

Inform regularly

Supervise

Institutionalizing best practices in formal and

structured processes, policies and procedures that

clearly establish empowerment and authority limits

(the rules)

Represent a mechanism of check and balances in

ArendalAnalyzing our risks and the industry risks and define the

action plan for mitigation or elimination

Page 9: Execution you can trust · Carlos Sandoval Commercial VP Gabriel García Onshore Construction VP Domingo Chin Offshore Construction VP Samuel Ronquillo HSEQ & Innovation VP Sergio

Ongoing

Projects

Page 10: Execution you can trust · Carlos Sandoval Commercial VP Gabriel García Onshore Construction VP Domingo Chin Offshore Construction VP Samuel Ronquillo HSEQ & Innovation VP Sergio

ONGOING PROJECTS (BACKLOG)

UPSTREAM MIDSTREAM DOWNSTREAM

PROJECT

DESCRIPTION

PARTNER

CLIENT

LAKACH RAMONES II NTEULTRA LOW

SULFUR DIESEL

• EPC• Gas gathering

plant• 450 MMSCF

• $200 MMUSD

• PEMEX

• EPC• Gas pipeline• 42” x 452 km

• $ 1,000 MMUSD

• Odebrecht

• Techint

• PEMEX

• AMEC FW

• Revamp Plants: 4 Plants

• New construction: 3 plants

• OSBL• $ 1,100 MMUSD

• TAG Pipelines

ATASTA

• PC• Gas processing

plant reconfiguration

• $40 MMUSD

RAMAL TULA MORELOS MINATITLÁN

• EPC• Plant Modernization

• $ 116 MMUSD

• PEMEX

• Construction• Gas pipeline• 30” x 15 km

• $ 31 MMUSD

• Bonatti

• Morelos EPC• ATCO• PEMEX

• Construction• Gas pipeline• 30” x 171 km

• $ 97 MMUSD

ACTUAL

PROGRESS• 31% • 2%• 99% • 85%• 100%• 90%• 98%

Page 11: Execution you can trust · Carlos Sandoval Commercial VP Gabriel García Onshore Construction VP Domingo Chin Offshore Construction VP Samuel Ronquillo HSEQ & Innovation VP Sergio

Our Experience

Page 12: Execution you can trust · Carlos Sandoval Commercial VP Gabriel García Onshore Construction VP Domingo Chin Offshore Construction VP Samuel Ronquillo HSEQ & Innovation VP Sergio

Diesel with 15PPM

of sulphur dioxide

3 HDDARENDAL EXPERIENCE— PLANTS

Ultra Low

Sulphur Diesel

Plant Salina Cruz

Client: Pemex

500 MMSCFDGas Collection

Station Lakach

Client: Pemex

30,250

BPD

Catalytic

Reforming Plant

Minatitlán

Client: Pemex

Atasta Gas

Plant

Client: Pemex

450

MMSCFD

Combined Cycle

Power Plant

Cantarell

Client: LINDE

70

Mw

543

Mw

Combined Cycle

Power Plant

Valladolid III

Client: Mitsui, Calpaine, Toshiba

540

Mw

Client: ABB

Combined Cycle

Power Plant

Monterrey II

Combined Cycle

Power Plant

Rosarito III

Client: ABB

584

Mw

EPC

Turbogenerator

SalamancaClient: Pemex

22

Mw

POWER GENERATION

OIL & GAS

13,000

hp.

Compressor Station

Los Algodones 580

MMSCFD

Client: Bajanorte

6,130

hp.

Compressor

Station Mayakan

300 MMSCFD

Client: Energía Mayakan

7,000

hp.

Compressor

Station Rosarito

212 MMSCFD

Client: TGN-Sempra

123,000

hp.

2 Compressor

Stations Los

Ramones II Norte

Client: TAG Pipelines

COMPRESSOR STATIONS

Page 13: Execution you can trust · Carlos Sandoval Commercial VP Gabriel García Onshore Construction VP Domingo Chin Offshore Construction VP Samuel Ronquillo HSEQ & Innovation VP Sergio

3 HDD

EXECUTION YOU CAN TRUST

Gas Pipeline

Los Ramones

II NorteClient: TAG Pipelines

42” x 452

km

30” x 15

kmGas Pipeline

Ramal-Tula

Client: ATCO

30” x 160 km

Client: Enagas

Gas Pipeline

Morelos 30” x 80 km

Client: Gaz de France

Gas Pipeline

Mayakan36” x 27

kmClient: Pemex

Gas Pipeline

Trinidad/Cact

us

Internal

Distribution

Head PipelineClient: Pemex

36” 16” x 54

km

Oil-Gas

Pipeline

Luna/Oxiacaq

ueClient: Pemex

18” x 56

km

Client: Pemex

Oil Pipeline

Oxicaque48” x 12

km

Client: API Altamira

Gas Pipeline

Altamira

48” x 1.3

km

Client: Pemex

Line

Construction

TMDB

Gas Pipeline

Burgos-Monterrey

(GLP)Client: TDF

12” x 180

km

30” x 130

km

Kinder

Morgan

PipelineClient: Kinder Morgan

6” x 6.8

km

Client: Pemex

Nitrogen

Pipelines

ARENDAL EXPERIENCE— PIPELINES

Infrastructure

Construction

SL-7Client: Pemex

20” x 28

km

Page 14: Execution you can trust · Carlos Sandoval Commercial VP Gabriel García Onshore Construction VP Domingo Chin Offshore Construction VP Samuel Ronquillo HSEQ & Innovation VP Sergio

• “La Trinidad”: 1,633 meters

• Samaria River : 1,065 meters

• Villahermosa – Cárdenas Highway : 942

meters

• Carrizal: 552 meters

• Mona (Reg. Line + Alternate line): 1,609

meters

• San Juan River (Reg. Line + Alternate

line): 1,149 meters

• Mezcalapa River (Reg. Line + Alternate

line): 814 meters

Cactus Project

36”x 11,409

• Ixhuatlan: 1,170 meters

• Coatzacoalcos – Carretera

Villahermosa : 1,662 meters

• Marine: 1,520 meters

• La Sierra River : 455 meters

• La Sierra Creek: 450 meters

• Teapa River : 430 meters

• Tepate River : 459.6 meters

• Teapa River : 515 meters

• Pichucalco River : 1,000 meters

• San Juan River : 780 meters

• Cabezones River : 700 meters

10 HDD

Saline Water Project

30”x 4,3523 HDD

Mayakan

30”x 3,309.66 HDD

Los Ramones II Nte

42”x 1,480 2 HDD

EXECUTION YOU CAN TRUST

ARENDAL EXPERIENCE— HDD

Page 15: Execution you can trust · Carlos Sandoval Commercial VP Gabriel García Onshore Construction VP Domingo Chin Offshore Construction VP Samuel Ronquillo HSEQ & Innovation VP Sergio

3 HDD

EXECUTION YOU CAN TRUST

Ayatsil Lines 4&9

(2 pipelines)

Client: Pemex

20” & 10”

x 8.3 km

20” x 46

kmAyatsil Line 7

Oil Pipeline

Client: Pemex

8” x 12

km

Client: Pemex

Taratunich

Gas Pipeline

20” x 7.8

km

Client: Pemex

Onel Pipeline 8” x 11.4

km

Client: Pemex

Batab Pipeline

Kuil Pipeline

Client: Pemex

20” x 3.5

km

20” x 14

kmXanab -

Yaxche

Client: Pemex

20-24” x

24 km

Client: Pemex

Kumaza - J

(5 pipes)

12-24” x

10 km

Client: Pemex

Kumaza - F

(6 pipes)

10-24” x

30 km

Client: Pemex

Costero - May

(4 pipes)

Kuil Oil

Pipeline

Client: Pemex

20” x 3.5

km

20” x 28

km

Saline Water

Pipeline

Client: Pemex

24” HDPE

Client: Pemex

Marine

Diffuser

ARENDAL EXPERIENCE— OFFSHORE

Page 16: Execution you can trust · Carlos Sandoval Commercial VP Gabriel García Onshore Construction VP Domingo Chin Offshore Construction VP Samuel Ronquillo HSEQ & Innovation VP Sergio

3 HDD

EXECUTION YOU CAN TRUST

ARENDAL EXPERIENCE— OFFSHORE

TEXAS TOBALA

Positioning System: DP2

Length Overall: 102.7m

Breadth: 19.5m

Diving System: Saturation (15)

Hyperbaric Boat

Main Crane: 133 ton

Auxiliary Crane: 48 ton

Accommodation: 96 persons

Deck Space: 2,132 m2

Helideck: Sirkorsky S-76/61

Page 17: Execution you can trust · Carlos Sandoval Commercial VP Gabriel García Onshore Construction VP Domingo Chin Offshore Construction VP Samuel Ronquillo HSEQ & Innovation VP Sergio

“Campus” design style

5 modules for medium and low security

Used land area: 86 hectares

Capacity for 2,500 inmates and 1,500 guards

95,500 m2 of construction

3 HDD

FEDERAL PENITENTIARY 2,500 inmates

MAIN FACTS

EXECUTION YOU CAN TRUST

ARENDAL EXPERIENCE— INFRASTRUCTURE

WATER TREATMENT PLANT 20,000 BPD

MAIN FACTS

Procurement and construction of a wastewater treatment

plan

20,000 BPD capacity for water injection wells

Located in The Sierra Madre mountains

Page 18: Execution you can trust · Carlos Sandoval Commercial VP Gabriel García Onshore Construction VP Domingo Chin Offshore Construction VP Samuel Ronquillo HSEQ & Innovation VP Sergio

VOLUNTEERING

GREEN PROGRAM

SPECIALIZED TRAINING CENTER

We work closely with

our clients to attend

community needs during

the project execution.

As part of our

HESQ system, we

enable environmental

crews that take care

of the living species

found in the project

area.

LOCATION: Salina Cruz, Oaxaca, México

(ULSD Project)

DESCRIPTION: Training center

specialized in welding discipline, supported

by the AWS (American Welding Society).

We, Arendal, believe that by providing

training and career opportunities, we give the

communities the ability to generate income in

a sustainable manner.

SOCIAL RESPONSIBILITY

Page 19: Execution you can trust · Carlos Sandoval Commercial VP Gabriel García Onshore Construction VP Domingo Chin Offshore Construction VP Samuel Ronquillo HSEQ & Innovation VP Sergio

ENVIRONMENTAL HEALTH AND

SAFETY MANAGEMENT

SYSTEM

Safety

induction

program

Wildlife: rescue &

relocalization

Restitution of

endemic species

Control & storage

of dangerous or

hazardous material

Continuing

Education

CERTIFICATIONS

Continuous improvement,

customer satisfaction, effective

documentation & production

qualityCreate a culture of

“care & concern”

Zero incident

OBJECTIVES

*LTI May 2016/May 2015

HSEQ SYSTEM

Internal safety &

environmental campaigns

Page 20: Execution you can trust · Carlos Sandoval Commercial VP Gabriel García Onshore Construction VP Domingo Chin Offshore Construction VP Samuel Ronquillo HSEQ & Innovation VP Sergio

PERFORMANCE 2016

*LTI May 2016/May 2015

TRIR: Total Recordable Incidents Rate

HSEQ SYSTEM

0.00

0.50

1.00

1.50

2.00

2.50

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

TRIR 2016

TRIR

2016 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

Hours worked 384,520 344,829 368,996 283,138 313,690 378,982 491,121 659,470 647,715 614,689 727,961 586,620

Number of OSHA Recordable Incidents

3 2 2 2 2 5 4 10 9 7 7 4

Total Hours Worked 384,520 729,349 1,098,345 1,381,483 1,695,173 2,074,155 2,565,276 3,224,746 3,872,461 4,487,150 5,215,111 5,801,731

Total Number of OSHA Recordable Incidents

3 5 7 9 11 16 20 30 39 46 53 57

TRIR 1.56 1.37 1.27 1.30 1.30 1.54 1.56 1.86 2.01 2.05 2.03 1.96

Page 21: Execution you can trust · Carlos Sandoval Commercial VP Gabriel García Onshore Construction VP Domingo Chin Offshore Construction VP Samuel Ronquillo HSEQ & Innovation VP Sergio

WE BUILD

TRUST.www.arendal.com.mx

Cd. de México

Commercial Offices

+52 (55) 5262.3400

Central OfficesMonterrey +52 (81) 8154.1100

[email protected]/arendalmx