exhibit c guaranteed maximum price to the continuing ...eagendatoc.brevardschools.org/07-27-2017...
TRANSCRIPT
![Page 1: EXHIBIT C GUARANTEED MAXIMUM PRICE TO THE CONTINUING ...eagendatoc.brevardschools.org/07-27-2017 Special Board Meeting o… · bid submitted by P&A is within 12% of the A/E estimated](https://reader033.vdocument.in/reader033/viewer/2022042323/5f0d59647e708231d439e8ec/html5/thumbnails/1.jpg)
Exhibit C- Project Assignment Page 1 of 4
EXHIBIT C
GUARANTEED MAXIMUM PRICE
TO THE CONTINUING CONTRACT FOR
CONSTRUCTION MANAGEMENT SERVICES/RFQ #14-Q-009-KR
BY AND BETWEEN
THE SCHOOL BOARD OF BREVARD COUNTY, FLORIDA
2700 Judge Fran Jamieson Way
Viera, Florida 32940-6601
Phone: (321) 631-1911
Fax: (321) 633-4646
AND
GILBANE BUILDING COMPANY
FOR THE CONSTRUCTION OF:
SCHOOL: Jackson Middle School
PROJECT: Roof Rehabilitation
![Page 2: EXHIBIT C GUARANTEED MAXIMUM PRICE TO THE CONTINUING ...eagendatoc.brevardschools.org/07-27-2017 Special Board Meeting o… · bid submitted by P&A is within 12% of the A/E estimated](https://reader033.vdocument.in/reader033/viewer/2022042323/5f0d59647e708231d439e8ec/html5/thumbnails/2.jpg)
Exhibit C- Project Assignment Page 2 of 4
ARTICLE 1. GUARANTEED MAXIMUM PRICE (GMP)
1.1.1 Guaranteed Maximum Price (GMP): Construction Managerguarantees that it shall not exceed a
Guaranteed Maximum Price (GMP) of Six Hundred Four Thousand, Three Hundred Eighty-Five
Dollars ($604,385.00) for the identified Sub-Project.
1.2 Basis of the GMP:
1.2.1 Construction Documents: The Scope of Work for the GMP shall be as defined in the
Construction Documents, prepared by Gale Associates, Inc., titled Roof Rehabilitation
Jackson Middle School and dated March 20, 2017.
1.2.2 List of Contract Documents attached as Exhibit C-1.
1.2.3 Exceptions, Clarifications and Exclusions: The Scope of Work defined in the Contract
Documents shall be modified and/or clarified as shown in attached Exhibit C-2.
1.2.4 Truth-In-Negotiation: The Construction Manager certifies that the wage rates and other
factual unit costs supporting the compensation are accurate, complete and current at the
time of execution of each Sub-Project of which this certificate is a part. The original price
and any additions thereto shall be adjusted to exclude any significant sums by which the
Owner determines the Sub-Project amount was increased due to inaccurate, incomplete or
non-current wage rates and other factual unit costs and that such original Sub-Project
adjustments shall be made within one year following the end of the Agreement.
ARTICLE 2. PROJECT TIME
2.1 Substantial Completion Date: Substantial Completion of the Work as defined in Article 6.1.2 of the
General Conditions to the Continuing Contract for Construction Management Services shall be
achieved by September 29, 2017.
2.2 Final Completion Date: Final Completion for the Work as defined in Article 6.1.3 of the General
Conditions to the Continuing Contract for Construction Management Services shall be achieved by
December 24, 2017.
2.3 Project Schedule: Attached to this Amendment will be a schedule identifying the above noted
completion times and intermediate milestone dates estimated for the Project. The proposed
schedule shall be integrated into the Construction Manager's CPM Schedule upon approval of its
Guaranteed Maximum Price Amendment.
ARTICLE 3. CONSTRUCTION MANAGEMENT FEE
3.1 Construction ManagerFee: The Construction Management Fee for the Project shall be either a ☒
Lump Sum or ☐Not-To-Exceed Fee (Check Correct Type – Reference Sub-Project Work Request
(Exhibit B) which identifies the Fee type) of Twenty-Seven Thousand, Three Hundred Five Dollars
($27,305.00).
![Page 3: EXHIBIT C GUARANTEED MAXIMUM PRICE TO THE CONTINUING ...eagendatoc.brevardschools.org/07-27-2017 Special Board Meeting o… · bid submitted by P&A is within 12% of the A/E estimated](https://reader033.vdocument.in/reader033/viewer/2022042323/5f0d59647e708231d439e8ec/html5/thumbnails/3.jpg)
Exhibit C- Project Assignment Page 3 of 4
ARTICLE 4. REIMBURSABLE GENERAL CONDITIONS COSTS
4.1 General Conditions: General Conditions costs for the Project shall not exceed Fourteen Thousand,
Eight Hundred Five Dollars ($14,805.00). General Conditions costs for this contract are for
insurances and bonds only. General Condition costs shall be in compliance with the General
Conditions to the Construction Management Contract (Exhibit A) and are identified in the
attached document, prepared by the Construction Manager titled Jackson MS Roof Rehabilitation
Project Construction Services Proposal and dated June 27, 2017.
ARTICLE 5. LIQUIDATED DAMAGES
5.1 Substantial Completion: Construction Manager shall pay Owner One Thousand Dollars ($1,000.00)
as liquidated damages for each day that Substantial Completion extends beyond the Substantial
Completion Date.
5.2 Final Completion: Construction Manager shall pay Owner Five Hundred Dollars ($500.00) as
liquidated damages for each day that Final Completion extends beyond the Final Completion Date.
ARTICLE 6. PROJECT REPRESENTATIVES
6.1 Owner’s Representative: Owner designates the individual listed below as its Owner’s
Representative to provide direct interface with Construction Manager with respect to Owner’s
responsibilities:
Art Johnson, Owner’s Project Manager.
6.2 Construction Manager's Representative: Construction Manager designates the individual listed
below as its Construction Manager's Representative to provide direct interface with Owner with
respect to Construction Manager's responsibilities:
Eric Dodson, Construction Manager's Project Manager.
(REMAINDER OF PAGE INTENTIONALLY LEFT BLANK)
![Page 4: EXHIBIT C GUARANTEED MAXIMUM PRICE TO THE CONTINUING ...eagendatoc.brevardschools.org/07-27-2017 Special Board Meeting o… · bid submitted by P&A is within 12% of the A/E estimated](https://reader033.vdocument.in/reader033/viewer/2022042323/5f0d59647e708231d439e8ec/html5/thumbnails/4.jpg)
![Page 5: EXHIBIT C GUARANTEED MAXIMUM PRICE TO THE CONTINUING ...eagendatoc.brevardschools.org/07-27-2017 Special Board Meeting o… · bid submitted by P&A is within 12% of the A/E estimated](https://reader033.vdocument.in/reader033/viewer/2022042323/5f0d59647e708231d439e8ec/html5/thumbnails/5.jpg)
Exhibit C-1 – List of Contract Documents Page 1 of 1
EXHIBIT C-1
CONTINUING CONTRACT FOR CONSTRUCTION MANAGEMENT SERVICES FOR CONSTRUCTION PROJECTS NOT TO EXCEED $2,000,000 &
FOR STUDIES WITH A FEE NOT TO EXCEED $200,000 OR AS ALLOWED BY SCHOOL BOARD POLICY
RFQ #14-Q-009-KR
THE SCHOOL BOARD OF BREVARD COUNTY, FLORIDA
Date: June 28, 2017
Project Name/Number: Roof Rehabilitation
Project Location(s): Jackson Middle School
LIST OF CONTRACT DOCUMENTS Number Title Date See drawing list attached to Gilbane Building Company proposal dated June 27, 2017.
![Page 6: EXHIBIT C GUARANTEED MAXIMUM PRICE TO THE CONTINUING ...eagendatoc.brevardschools.org/07-27-2017 Special Board Meeting o… · bid submitted by P&A is within 12% of the A/E estimated](https://reader033.vdocument.in/reader033/viewer/2022042323/5f0d59647e708231d439e8ec/html5/thumbnails/6.jpg)
Exhibit C-2 – Exceptions, Clarifications and Exclusions Page 1 of 1
EXHIBIT C-2
CONTINUING CONTRACT FOR CONSTRUCTION MANAGEMENT SERVICES FOR CONSTRUCTION PROJECTS NOT TO EXCEED $2,000,000 &
FOR STUDIES WITH A FEE NOT TO EXCEED $200,000 OR AS ALLOWED BY SCHOOL BOARD POLICY
RFQ #14-Q-009-KR
THE SCHOOL BOARD OF BREVARD COUNTY, FLORIDA
Date: June 28, 2017
Project Name/Number: Roof Rehabilitation
Project Location(s): Jackson Middle School
EXCEPTIONS, CLARIFICATIONS AND EXCLUSIONS TO CONTRACT DOCUMENTS.
See exceptions/clarifications/exclusions list attached to Gilbane Building Company proposal dated June 27, 2017.
![Page 7: EXHIBIT C GUARANTEED MAXIMUM PRICE TO THE CONTINUING ...eagendatoc.brevardschools.org/07-27-2017 Special Board Meeting o… · bid submitted by P&A is within 12% of the A/E estimated](https://reader033.vdocument.in/reader033/viewer/2022042323/5f0d59647e708231d439e8ec/html5/thumbnails/7.jpg)
Gilbane Building Company | 315 E. Robinson Street, Suite 680, FL 32801 | Tel: 407.541.5904 | Fax: 407.541-5930
June 27, 2017
School Board of Brevard County
1254 S. Rockledge Ave.
Rockledge, Florida 32955
Attention: Art Johnson
Re: Jackson MS Roof Rehabilitation Project
Subject: Construction Services Proposal
Mr. Johnson:
The Gilbane Building Company is pleased to submit our Construction Services proposal for the Jackson MS Roof
Rehabilitation Project in Titusville, Florida. Our fee proposal is based on approval by the Brevard Public School Board at
the July 11th 2017 Board meeting and a Substantial Completion date of September 29th, 2017. This Proposal in the
amount of $604,385 includes a Guaranteed Maximum Price (GMP) consisting of the following:
1) Trade Costs with the associated bids received as backup
2) Allowances for any items in which bids were not received
3) Bond, insurance, and Builder’s Risk costs
4) A 5% project contingency
5) CM fee based on 5% of construction value
We appreciate the opportunity to participate in this endeavor. Please contact me should you have any questions or
require clarification of any of these costs.
Respectfully submitted,
Eric H Dodson Jr
Project Executive
![Page 8: EXHIBIT C GUARANTEED MAXIMUM PRICE TO THE CONTINUING ...eagendatoc.brevardschools.org/07-27-2017 Special Board Meeting o… · bid submitted by P&A is within 12% of the A/E estimated](https://reader033.vdocument.in/reader033/viewer/2022042323/5f0d59647e708231d439e8ec/html5/thumbnails/8.jpg)
EXHIBIT B - SUB-PROJECT WORK REQUEST Page 1 of 1
EXHIBIT B
SUB-PROJECT WORK REQUEST
CONSTRUCTION MANAGEMENT CONTRACT FOR MINOR PROJECTS UNDER $2,000,000.00
THE SCHOOL BOARD OF BREVARD COUNTY, FLORIDA RFP # 14-Q-009-KR
Issue Date: June 27, 2017
Work Request Due Date: Andrew Jackson Middle School
Project Name/Number: Roof Rehabilitation
Project Location(s):1515 Knox McRae Dr, Titusville FL 32870
Project Schedule: Work to Commence on July 17, 2017; Substantial Completion September 29,
2017
Proposal Requested Pre-Construction � GMP � Study �
Construction Management Fee Lump Sum � NTE �
General Conditions Lump Sum � NTE �
Pre-Construction Compensation Lump Sum � NTE �
Performance/Payment Bond Required YES � NO �
Prof. Liability Insurance Required YES � NO �
Instructions to Contractors: Identified below you will find the proposed Scope of Work for the above referenced Project. In addition to this document, Drawings and Specifications may also be provided as noted below which establishes the full Design/Construction Documents. The Work includes, but is not limited to the following:
Roof Rehabilitation LIST OF DESIGN DOCUMENTS PROVIDED (Date 03/20/17)
See Exhibit C-1 DISTRICT REPRESENTATIVE CONTACT INFORMATION: Printed Name: Arthur Johnson Title: Project Manager Department: Facilities Phone/Fax Number: 321-633-3580 x 13062 Email Address: [email protected]
![Page 9: EXHIBIT C GUARANTEED MAXIMUM PRICE TO THE CONTINUING ...eagendatoc.brevardschools.org/07-27-2017 Special Board Meeting o… · bid submitted by P&A is within 12% of the A/E estimated](https://reader033.vdocument.in/reader033/viewer/2022042323/5f0d59647e708231d439e8ec/html5/thumbnails/9.jpg)
Gale Associates, Inc. 160 N. Westmonte Drive, Suite1200 | Altamonte Springs, FL 32714 P 407.599.7031 F 407.599.7077 www.galeassociates.com
June 26, 2017 Mr. Arthur Johnson Project Manager BPC Facilities Department 1254 S. Florida Avenue Rockledge, FL 32955 Re: Andrew Jackson Middle School Building 19 – Roof Rehabilitation Gale JN: 678068 Dear Mr. Johnson: On April 18, 2017, a bid from P&A Roofing and Sheet Metal (P&A) in the amount of $525,000.00, was received by Gilbane Building Company for the above‐referenced project for Brevard Public Schools. Gale’s preliminary cost estimate prepared 03/20/2017, estimated a construction cost of $594,880.00. The low bid submitted by P&A is within 12% of the A/E estimated budget. Subsequent to the bid received from P&A Roofing & Sheet Metal, Gale met with Gilbane, and P&A personnel on June 21, 2017 to review the bid against the design documents. Based on the review, P&A has shown that they understand the scope of work identified in Gale’s design documents and have included the necessary costs associated with performing the roof renovation services except for the cost associated with verifying the operation of the lighting protection system once removed to perform the roofing work and then reinstalled. The cost for lighting protection verification will be provided to Gilbane. In addition to the lighting protection verification GALE will be providing additional detailing for the replacement of the penthouse framing and roofing system, and deck enclosure details for anticipated removal of three (3) roof top HVAC units. Gale’s preliminary construction cost for replacement of the penthouse framing and roofing system is estimated at $7,500.00 and the deck enclosure scope of work is estimated at $3,000.00. Based on Gales bid analysis and discussions with Gilbane and P&A, it is our opinion that P&A has made a good faith effort to submit a competitive bid, as defined in the design documents. Therefore, GALE is recommending that the bid submitted by P&A be accepted and that Brevard Public Schools enter into a contract with P&A Roofing & Sheet Metal for the roof rehabilitation of Andrew Jackson Middle School. Sincerely yours, GALE ASSOCIATES, INC. Tony B. Robinson, RRC, BECxP, LEED®AP Associate Cc: file
![Page 10: EXHIBIT C GUARANTEED MAXIMUM PRICE TO THE CONTINUING ...eagendatoc.brevardschools.org/07-27-2017 Special Board Meeting o… · bid submitted by P&A is within 12% of the A/E estimated](https://reader033.vdocument.in/reader033/viewer/2022042323/5f0d59647e708231d439e8ec/html5/thumbnails/10.jpg)
Date: June 27, 2107
Owner: Brevard County Schools 27,052 A/E: Gale
Section Description Est. Unit GMP GMP
Qty Estimate %/Total 06/27/07
01000 General Conditions (construction phase)
Personnel cost (cost is covered in the main project GMP) covered in 1 ls
Division 1 Total
07000 ROOFING
P&A Roofing 1 ls $535,500 88.60%
Division 07 Total $535,500 88.60%
Subtotal $535,500 88.60%
Project Facilities (cost is covered in the main GMP) 1 ls
Project Ins (GL, WC CDI & Builders Risk) $10,603 1.75%
Fee $27,305 4.52%
Payment & Performance Bond $4,202 0.70%
Construction Contingency $26,775 4.43%
Total Amount $604,385 100.00%
5%
0.70%
BPS - Jackson MS Roof Rehabilitation
Titusville, FL
GMP Detailed Cost Breakdown
1.98%
5.00%
![Page 11: EXHIBIT C GUARANTEED MAXIMUM PRICE TO THE CONTINUING ...eagendatoc.brevardschools.org/07-27-2017 Special Board Meeting o… · bid submitted by P&A is within 12% of the A/E estimated](https://reader033.vdocument.in/reader033/viewer/2022042323/5f0d59647e708231d439e8ec/html5/thumbnails/11.jpg)
Bid Evaluation and Scope Review SummaryLEGEND
Base Bid Alternates
Y - Item included in Base Bid; Does not sum in Total A - Accepted Alternate; Sums in Total
N - Item not included in Base Bid; Does not Sum in Total R - Rejected Alternate; Does not Sum in Total
B - Breakout number, not included in Base Bid; Sums in Total
P - Plug number, not included in Base Bid; Sums in Total
BPS Jackson MS Roof Rehabilitation P & A Roofing Springer Peterson Sutter Roofing Bel-Mac Roofing
Titusville FL Mark Rooney Daniel Boatwright Tom York Ryan Upchurch
07A - Roofing 407 650-9541 863 665-1163 407 367-4500 321 639-5940
Sharon Logan
Spec Scope Item Description
525,000$ Declined to Bid Declined to Bid Declined to Bid
1
2 Labor, Material & Equip for Roofing Work Y
3 Demolition Including Dumpsters Y
4 Removal of Existing Built-up Roofing to Lightweight Y
5 Removal of Wall Flashings, Curb Flashing and Gravel Stops Y
6 F&I Vented Base Sheet Over Existing Lightweight Y
7 F&I PolyIso Insulation Over Vented Base Sheet Y
8 F&I Mechanically Fastened Dens Deck Y
9 F&I Asphalt Primer Over Dens Deck Y
10 F&I SSF 180 & SSF 180 FR GR Y
11 Y
12 Y
13 F&I Retro-drain Inserts Y
14 F&I SA Flshing Per Addendum 1 Y
15 F&I Aluminum Metal Fascia and Cover Y
16 F&I SS SP-1 Joint Sealant Y
17
Removal & Reinstallation of Lightning Protection System as
Required Including Pre-test For Functionality Y
18 Powerwash Existing Skylights Y
19 F&I Sealer to Skylights Y
20 Hoisting of Material to Roof Level Y
21 Responsibility for Roof Work to Allow for Positive Drainage Y
22 Hoisting and handling of materials Y
23 Expansion Joints as Required Y
24 Replace Damaged Deteriorated Lightweight (Allowance) N $12.00/SQFT
25 Asbestos Removal N
26 Sales Tax Y
27 Payment & Performance Bond (not required - CDI) N
28 2 yr Contractor's Warranty Y
29 20 yr NDL Manufacturers Warranty Roof Areas A2 & D Y
30 10 yr NDL Manufacturers Warranty For remaining Areas Y
31 Allowance To Replace Penthouse Roof Structure & Re-roof P 10,500$
32
33
34
35
36
37
38
39
40
41
42
43
44
45 Total Adjustments ("B" and "P") -$ 10,500$ -$ -$ -$ -$ -$ -$
46 Base Bid with Adjustments -$ 535,500$ -$ -$ -$ -$ -$ -$ -$
47 MBE/DBE
48 ALTERNATES
49 1
50 2
51 3
52 4
53 5
54 6
55
56 Total ACCEPTED Alternates ("A") -$ -$ -$ -$ -$ -$ -$ -$ -$
57 Total Base Bid including ACCEPTED Alternates -$ 535,500$ -$ -$ -$ -$ -$ -$ -$
TOTAL EXPOSURE P 10,500$
BASE BID
Evaluator -
Job Name -
QuanitiesLocation -
Bid Package -
<<Do not insert rows below this cell. Formulas will not adjust.
<<Do not insert rows below this cell. Formulas will not adjust.
F&I Wall, Vent Curbs, Expansion Joint, Goose Neck, Pitch Pan and
Roof Drain Flashings
Page 1 of 1
Filename - BPS Jackson MS Reroof GMP Bid Tabs and Summary 6.22.17
Report Print - 6/27/2017, 7:13 AM
B - Sub Bid/Breakout
P - Gilbane Plug
Y/N - Included/Excluded in Base Bid Scope
![Page 12: EXHIBIT C GUARANTEED MAXIMUM PRICE TO THE CONTINUING ...eagendatoc.brevardschools.org/07-27-2017 Special Board Meeting o… · bid submitted by P&A is within 12% of the A/E estimated](https://reader033.vdocument.in/reader033/viewer/2022042323/5f0d59647e708231d439e8ec/html5/thumbnails/12.jpg)
April 18, 2017
Gilbane Building Company
Re: Andrew Jackson Middle School
Roof Rehabilitation Proposal Page 1 of 3
Titusville, FL
Dear Sharon,
We are pleased to offer the following Proposal for your consideration. We propose to
accomplish the following.
Our interpretation of The Site Visit along with our Scope of Work, Descriptions and
Qualifications below represent the basis for the following Proposal.
Roof Areas:
Roof Areas A2 & B: Approximately 37,700 Sq. Ft.
Remaining Roof Areas: Approximately 58,000 Sq. Ft.
Scope of Work at Flat Roof Areas A2 & B:
Remove existing built-up roofing, down to the existing lightweight insulated concrete
decking, all wall flashings, curb flashings, gravel stop, and haul all debris away in
dumpster provided by P&A Roofing and Sheet Metal Inc.
Furnish and Install Soprema Sopra 4897 vented base sheet over existing lightweight
concrete, loose laid.
Furnish and Install 1.6” Polyisocyanurate insulation loosed laid over base sheet.
Furnish and Install ½” DensDeck mechanically attached into existing metal deck
below lightweight concrete per Gale Associates07220-3/3.4.
Furnish and apply Elastocol 500 asphalt primer over DensDeck and allow to dry.
Torch apply One (1) Ply of Soprema Sopralene Flam 180 and One (1) Soprema
Sopralene Flam 180 FR GR.
Flash all walls, vent pipes, curbs, expansion joints, goose necks, pitch pans and drains
per Gale Associates recommendations dated March 20, 2017.
Furnish and Install OMG Hercules Retro-Drain Inserts.
Furnish and Install Soprema Alsan Flashing with embedded scrim per addendum #1
Furnish and Install .040 aluminum Metal-Era metal fascia /cover per A-505/2
![Page 13: EXHIBIT C GUARANTEED MAXIMUM PRICE TO THE CONTINUING ...eagendatoc.brevardschools.org/07-27-2017 Special Board Meeting o… · bid submitted by P&A is within 12% of the A/E estimated](https://reader033.vdocument.in/reader033/viewer/2022042323/5f0d59647e708231d439e8ec/html5/thumbnails/13.jpg)
Page 2 of 3
Andrew Jackson Middle School
Roof Rehabilitation Proposal
April 18, 2017
Scope of Work at Flat Roof remaining areas:
Remove all loose debris from remaining roof areas, haul all debris away.
Furnish and Install One (1) Ply of Sopralene 180 FR GR set in Soprema Colply
Adhesive over existing roof.
Flash all walls, vent pipes, curbs, expansion joints, goose necks, pitch pans and drains
per Gale Associates recommendations dated March 20, 2017.
Furnish and Install OMG Hercules Retro-Drain Inserts.
Furnish and Install Soprema Alsan Flashing with embedded scrim per addendum #1
Furnish and Install .040 aluminum Metal-Era metal fascia /cover per A-505/2
Furnish and Install Soprema Sopramastic SP-1 Joint sealant per A-501/1, 2, and 5.
Power wash existing skylights.
Furnish and Install Sikalastic Decothane Clearglaze polyurethane sealer to skylights.
All of the above can be accomplished for the Budget Sum of ……………… $525,000.00
(Five Hundred Twenty Five Thousand Dollars)
We qualify the following:
We exclude the Removal of any Curbs, and infilling openings of the roof.
We have included the cost for engineering test.
We have included the cost for permitting.
The cost for repairing any deteriorated Lightweight Concrete Decking will be an
additional cost of $12.00 per square foot extra.
We exclude independent testing from any third party.
We shall furnish a 20 Year NDL manufacturer’s warranty along with our 2 Year
contractor’s guarantee for Roof Areas A2 & B.
We shall furnish a 10 Year NDL manufacturer’s warranty along with our 2 Year
contractor’s guarantee for Remaining Roof Areas.
![Page 14: EXHIBIT C GUARANTEED MAXIMUM PRICE TO THE CONTINUING ...eagendatoc.brevardschools.org/07-27-2017 Special Board Meeting o… · bid submitted by P&A is within 12% of the A/E estimated](https://reader033.vdocument.in/reader033/viewer/2022042323/5f0d59647e708231d439e8ec/html5/thumbnails/14.jpg)
Page 3 of 3
Andrew Jackson Middle School
Roof Rehabilitation Proposal
April 18, 2017
Payment and Performance Bonds are not included. If required, please add 1.2% of the
amount of the Base Bid.
All work will be performed by experienced mechanics, fully covered with the proper
amounts of workmen's compensation and general liability insurance's.
This proposal is based upon today’s Roofing and Sheet Metal material prices. The
Industry is currently experiencing price volatility in Roofing and Sheet Metal products.
Because firm prices cannot be obtained from suppliers for an extended period of time,
prices are subject to change. If there is an increase in the price paid for Roofing and Sheet
Metal products, the amount of this proposal/contract shall be similarly increased to reflect
the increase costs to obtain the materials.
Should P&A Roofing and Sheet Metal Inc. be the successful bidder on this project, we
reserve the right to negotiate the terms and scope of the Sub Contract Agreement.
We exclude any labor or material unless it has been specifically mentioned in this
proposal.
Sincerely,
P&A ROOFING AND SHEET METAL INC.
Mark Roney
Project Estimator
![Page 15: EXHIBIT C GUARANTEED MAXIMUM PRICE TO THE CONTINUING ...eagendatoc.brevardschools.org/07-27-2017 Special Board Meeting o… · bid submitted by P&A is within 12% of the A/E estimated](https://reader033.vdocument.in/reader033/viewer/2022042323/5f0d59647e708231d439e8ec/html5/thumbnails/15.jpg)
Exhibit C-1 Enumeration of the
Contract Documents
BPS Andrew Jackson Middle School
Item Description of Item Original Date of
Issue
SPECIFICATIONS 3/30/2017
00 00 10 Table of Contents 3/30/2017
01 10 00 Summary of Work 3/30/2017
01 22 00 Unit Prices 3/30/2017
01 33 00 Submittals & Shop Drawings 3/30/2017
01 40 00 Quality Requirements 3/30/2017
01 50 00 Temporary Facilities and Controls 3/30/2017
01 60 00 Product Requirements 3/30/2017
01 65 00 Product Delivery Requirements 3/30/2017
01 73 10 Cutting and Patching 3/30/2017
01 77 00 Closeout Procedures 3/30/2017
02 41 19 Selective Demolition 3/30/2017
03 52 20 Composite Concrete Deck Repair 3/30/2017
3/30/2017
3/30/2017
06 10 00 Rough Carpentry 3/30/2017
07 22 00 Roof & Deck Insulation 3/30/2017
07 52 16 Modified Bituminous Membrane Roofing 3/30/2017
07 60 00 Flashing and Sheet Metal 3/30/2017
3/30/2017
09 93 10 Skylight Coating 3/30/2017
3/30/2017
3/30/2017
3/30/2017
3/30/2017
3/30/2017
3/30/2017
Division 16 - Electrical - Not Used 3/30/2017
DRAWING LOG
Item Description of Item Original Date of
Issue
G-001 Cover Sheet 3/30/2017
G-002 Standard Abbreviations, Legend, Symbols & General Notes 3/30/2017
A-101 Overall Roof Plan Existing Conditions 3/30/2017
A-102 Roof Area A (Partial) B & H New Construction 3/30/2017
A-103 Roof Area A (Partial) C & G New Construction 3/30/2017
A-104 Roof Area D, E and F New Construction 3/30/2017
A-301 Roof System Cross Sections Exist Conditions & New
Construction
3/30/2017
A-501 Details 3/30/2017
A-502 Details 3/30/2017
A-503 Details 3/30/2017
A-504 Details 3/30/2017
A-505 Details 3/30/2017
Addendum No. 1
Item Description of Item Original Date of
Issue
Summary 4/17/2017A-102 Roof Area A (Partial) B & H New Construction 4/17/2017A-103 Roof Area A (Partial) C & G New Construction 4/17/2017
A-104 Roof Area D, E and F New Construction 4/17/2017
A-502 Details 4/17/2017
Division 00 - Procurement and Contracting Requirements
Division 1 - General Requirements
Division 2 - Existing Conditions
Division 3 - Concrete
Division 4 - Masonry - Not Used
Division 5 - Metals - Not Used
Division 6 - Wood, Plastics, and Composites
Division 12 - Furnishings - Not Used
Division 13 - Special Construction - Not Used
Division 14 - Conveying Equipment - Not used
Division 15 - Mechanical - Not Used
Division 7 - Thermal and Moisture Protection
Division 8 - Openings - Not Used
Division 9 - Finishes
Division 10 - Specialties - Not Used
Division 11 - Equipment - Not Used
![Page 16: EXHIBIT C GUARANTEED MAXIMUM PRICE TO THE CONTINUING ...eagendatoc.brevardschools.org/07-27-2017 Special Board Meeting o… · bid submitted by P&A is within 12% of the A/E estimated](https://reader033.vdocument.in/reader033/viewer/2022042323/5f0d59647e708231d439e8ec/html5/thumbnails/16.jpg)
The following is a summary of all qualifications and assumptions.
1. No guarantee exists on any single line item within the GMP, and savings on a particular line item may be
transferred to cover overruns of another line item except general conditions.
2. We have assumed the cost of the following items are to be paid by the owner and are not included in this
proposal.
a. Impact or special assessment fees
b. Furniture, Fixtures & Equipment
c. Utility and power company fees and charges.
d. Security and watchmen during construction if required.
e. Removal and/or handling of asbestos, contaminated or hazardous materials.
3. Changes to the contract scope will not be annotated on shop drawings or submittals without first being
issued through the contract document change process.
4. With the exception of the items specifically identified in this proposal, repairs to existing systems beyond
the point of connection of the new work have not been included. We have not included any warranty of
existing equipment. We have not included code required upgrades to existing installations, equipment, &
systems not shown on drawings.
5. We have assumed that all work performed by the Owner, i.e. asbestos abatement, will be completed in
accordance with the overall project schedule. In the event it is not, the overall project duration and cost
will be increased in accordance with the terms and conditions included in the contract agreement.
6. We have not included any costs for utility fees for power, water, sewer, or any other utility usage during
the course of construction or any other time thereof.
7. A pre-test will be done on the existing lightning protection system. If deemed not operable, the cost to
repair and/or replace will be additional.
8. The condition of the existing lightweight concrete substrate is unknown. If the existing lightweight
concrete needs to be patched or replaced the cost for this work shall be additional. The unit cost to repair
or replace will be at $12.00/sqft.
9. We have not included any costs for permits.
10. We have excluded any removal or abatement of any asbestos, mold, or other contaminated, hazardous or
toxic substances.
11. No third party testing is included with the exception of the lightning protection pre-test.
12. Fee will be added to contingency use. Fee will be included in underruns such as buyout savings from
allowances or unspent general conditions and transferred to contingency.
![Page 17: EXHIBIT C GUARANTEED MAXIMUM PRICE TO THE CONTINUING ...eagendatoc.brevardschools.org/07-27-2017 Special Board Meeting o… · bid submitted by P&A is within 12% of the A/E estimated](https://reader033.vdocument.in/reader033/viewer/2022042323/5f0d59647e708231d439e8ec/html5/thumbnails/17.jpg)
13. Gilbane Building Company and its subcontractors shall not be held responsible for any mold, mildew or
Algae growth attributable to past or present water intrusion.