EXHIBIT LIST Reference No: HOC/00161 Petitioner: Staffordshire Showground Published to Collaboration Area: Thursday 05-Jul-2018 Page 1 of 19 No Exhibit Name Page 1 P1035 Location.pdf (P1035) 2 2 P1036 Construction.pdf (P1036) 3 3 P1037 Operation.pdf (P1037) 4 4 P1038 Noise Map.pdf (P1038) 5 5 P1039 Noise Tables.pdf (P1039) 6 - 8 6 P1040 Air Quality.pdf (P1040) 9 7 P1041 Engineering.pdf (P1041) 10 - 13 8 P1042 PAL 22052018.pdf (P1042) 14 - 15 9 P1043 PAL 21062018.pdf (P1043) 16 - 19 HOC/00161/0001

Upload: others

Post on 03-Jun-2020

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: EXHIBIT LIST - publications.parliament.uk · Hybrid Bill Limits Legend Phase 2a hybrid Bill alignment July 2017 Cutting Embankment HS2 L td ac e p nors ib l yf circumstances, which

EXHIBIT LISTReference No: HOC/00161Petitioner: Staffordshire ShowgroundPublished to Collaboration Area: Thursday 05-Jul-2018

Page 1 of 19

No Exhibit Name Page

1 P1035 Location.pdf (P1035) 2

2 P1036 Construction.pdf (P1036) 3

3 P1037 Operation.pdf (P1037) 4

4 P1038 Noise Map.pdf (P1038) 5

5 P1039 Noise Tables.pdf (P1039) 6 - 8

6 P1040 Air Quality.pdf (P1040) 9

7 P1041 Engineering.pdf (P1041) 10 - 13

8 P1042 PAL 22052018.pdf (P1042) 14 - 15

9 P1043 PAL 21062018.pdf (P1043) 16 - 19

HOC/00161/0001

Page 2: EXHIBIT LIST - publications.parliament.uk · Hybrid Bill Limits Legend Phase 2a hybrid Bill alignment July 2017 Cutting Embankment HS2 L td ac e p nors ib l yf circumstances, which

Within Lane

0 40 80 120 160Metres

Date: 05/07/18

Scale at A3: 1:4,750

A B C D E F G H I J

A B C D E F G H I J

10

9

8

7

6

5

4

3

2

1

10

9

8

7

6

5

4

3

2

1

High Speed TwoPetitioner Location Plan

Reference Drawing

BIRMINGHAM

CREWE

Petition number

PetitionerStaffordshire & Birmingham Agricultural Society

Stafford Showground Limited

P2A-000161 Doc Number: P2A-HS2-HY-MAP-A000-000175-P02

Indicative extent of petitioner(s) propertyHybrid Bill Limits

LegendPhase 2a hybrid Bill alignment July 2017

CuttingEmbankment

HS2 Ltd accept no responsibility for anycircumstances, which arise from thereproduction of this map after alteration,amendment or abbreviation or if it is issued inpart or issued incomplete in any way.

0 1Kilometres

Registered in England. Registration number 06791686. Registered office: 2 Snowhill Queensway Birmingham B4 6GA

© Crown copyright materia l is reproduced with the permission of Land Registry under de legated author ity from the Contro ller o fHMSO. This material was last updated in 2018 and may not becopied, distributed, sold or published without the formal perm issionof Land Registry. Only an official copy of a title p lan or reg isterobtained from the Land Registry may be used for legal or otherofficia l purposes.

© Crown copyright and database rights 2018OS 100049190

P1035 HOC/00161/0002

Page 3: EXHIBIT LIST - publications.parliament.uk · Hybrid Bill Limits Legend Phase 2a hybrid Bill alignment July 2017 Cutting Embankment HS2 L td ac e p nors ib l yf circumstances, which

130.0m13

0.0m

130.0

m130.0m

130.0m

130.0

m

130.0

m

120.0m

105.0

m

90.0m

130.0

m

120.0m

130.0

m

90.0m

130.0m

130.0m

120.0m

110.0m

130.0

m

110.0m

105.0m

135.0

m

135.0m

125.0

m

125.0

m

125.0m 125.0m

125.0m

125.0m

125.0m

125.0

m

125.0m

125.0m

125.0m

115.0m

115.0m

110.0m

110.0

m

110.0

m

115.0m

120.0m

130.0m

120.0m

120.0

m

115.0m

95.0m

100.0m

105.0m

110.0m

115.0m

115.0m

100.0m

110.0m

FP 6

FP 2

4

BW 19

FP 23

FP 4FP 4

FP 24

FP 7

FP 7

FP 0.1534

FP 5

FP 14

FP 8

FP 1

3

FP 23

BW 0.1628

FP 4

BW 12

FP 1

209+000

210+000

211+000

Drawn Checked Approved

Drawing No.

Date Scale Size

Rev.

DrawnRev Description

Project/Contract

Discipline/Function

ZoneLegends/Notes:

Drawing Title

Design Stage

Creator/Originator

Checked Con App HS2 App

Birmingham, B4 6GA

Queensway,

2 Snow Hill,

Registered office:

Registration No. 06791686

Registered in England

Scale with caution as distortion can occur.

Registry under delegated authority from the Controller of HMSO.

© Crown Copyright material is reproduced with the permission of Land

may be used for legal or other official purposes.

Only an official copy of a title plan or register obtained from the Land Registry

sold or published without the formal permission of Land Registry.

This material was last updated on 2017 and may not be copied, distributed,

Ordnance Survey Licence number 100049190

© Crown Copyright and database right 2017. All rights reserved.

or if it is issued in part or issued incompletely in any way.

the reproduction of this document after alteration, amendment or abbreviation

HS2 accepts no responsibility for any circumstances which arise from

Construction

A304/07/2018

DS

P00.12PT01-ARP-PT-DSK-000-000002-PET000161

Designs for Petition

Route Wide

Petitions

Ove Arup & Partners International Ltd

C861 Hybrid Bill Additional Provision 1 AP1

P00.1

Petition HOC 000161

TERH

CONSTRUCTION - AP1

HS2 Access road

Existing public right of way

during construction

Land potentially required

Compound

Borrow Pit

Petitioner's land

Indicative extent of

Rail alignment formation

Landscape earthworks

Engineering earthworks

Rail alignment

Temporary Material Stockpile Haul Road

Construction traffic route

Staffordshire and Birmingham Agricultural Society

Petitioner's property

FarmPark

Hopton

HA

NY

AR

DS L

AN

E

Tre

nt

Walk

ShowgroundCountyStaffordshire

BarracksStaffordMOD

HanyardsLower

Black Drive

RO

AD

WE

ST

ON

A518

Avenue

Spode

HILL LANE

WILMORE

LA

NE

HIL

L

HO

PT

ON

LANE

WITHIN

PoolsHopton

LANEH

OPTO

N

1:7500

P1036 HOC/00161/0003

Page 4: EXHIBIT LIST - publications.parliament.uk · Hybrid Bill Limits Legend Phase 2a hybrid Bill alignment July 2017 Cutting Embankment HS2 L td ac e p nors ib l yf circumstances, which

130.0m13

0.0m

130.0

m130.0m

130.0m

130.0

m

130.0

m

120.0m

105.0

m

90.0m

130.0

m

120.0m

130.0

m

90.0m

130.0m

130.0m

120.0m

110.0m

130.0

m

110.0m

105.0m

135.0

m

135.0m

125.0

m

125.0

m

125.0m 125.0m

125.0m

125.0m

125.0m

125.0

m

125.0m

125.0m

125.0m

115.0m

115.0m

110.0m

110.0

m

110.0

m

115.0m

120.0m

130.0m

120.0m

120.0

m

115.0m

95.0m

100.0m

105.0m

110.0m

115.0m

115.0m

100.0m

110.0m

FP 6

FP 2

4

BW 19

FP 23

FP 4FP 4

FP 24

FP 7

FP 7

FP 0.1534

FP 5

FP 14

FP 8

FP 1

3

FP 23

BW 0.1628

FP 4

BW 12

FP 1

Drawn Checked Approved

Drawing No.

Date Scale Size

Rev.

DrawnRev Description

Project/Contract

Discipline/Function

ZoneLegends/Notes:

Drawing Title

Design Stage

Creator/Originator

Checked Con App HS2 App

Birmingham, B4 6GA

Queensway,

2 Snow Hill,

Registered office:

Registration No. 06791686

Registered in England

Scale with caution as distortion can occur.

Registry under delegated authority from the Controller of HMSO.

© Crown Copyright material is reproduced with the permission of Land

may be used for legal or other official purposes.

Only an official copy of a title plan or register obtained from the Land Registry

sold or published without the formal permission of Land Registry.

This material was last updated on 2017 and may not be copied, distributed,

Ordnance Survey Licence number 100049190

© Crown Copyright and database right 2017. All rights reserved.

or if it is issued in part or issued incompletely in any way.

the reproduction of this document after alteration, amendment or abbreviation

HS2 accepts no responsibility for any circumstances which arise from

A304/07/2018

DS

Operation

P00.12PT01-ARP-PT-DSK-000-000003-PET000161

Designs for Petition

Route Wide

Petitions

Ove Arup & Partners International Ltd

C861 Hybrid Bill Additional Provision 1 AP1

P00.1

Petition HOC 000161

TERH

1:7500

OPERATION - AP1

Ditches - newGrassland habitat creation

HS2 Access road

(scrub / woodland)

Landscape mitigation planting

Rail alignment formation

Landscape earthworks

Engineering earthworks

Hedgerow habitat creation

Grassed areas

Existing public right of way

Rail alignment

Petitioner's land

Indicative extent of Staffordshire and Birmingham Agricultural Society

Petitioner's property

FarmPark

Hopton

HA

NY

AR

DS L

AN

E

Tre

nt

Walk

ShowgroundCountyStaffordshire

BarracksStaffordMOD

HanyardsLower

Black Drive

RO

AD

WE

ST

ON

A518

Avenue

Spode

HILL LANE

WILMORE

LA

NE

HIL

L

HO

PT

ON

LANE

WITHIN

PoolsHopton

LANEH

OPTO

N

P1037 HOC/00161/0004

Page 5: EXHIBIT LIST - publications.parliament.uk · Hybrid Bill Limits Legend Phase 2a hybrid Bill alignment July 2017 Cutting Embankment HS2 L td ac e p nors ib l yf circumstances, which

"

"

"

"

"

" " " "

"

"

Up to 13m

Up to 4m

Up to 14mUp to 7m

Up to 16m

Up to 4mUp to 5m Up to 6m

Up to 3m

Up to 4mUp to 8m

Up to 5m

Dl(

(

(

OSV02-C05/OSV02-N03OSV02-C06A518 WestonRoad Overbridge

B5066 SandonRoad Overbridge

210+000211+000

209+000 208+000

S TAFFOR DDIS TR ICT

Doc Number:2PT01-AR P-EV -MAP-000-132107-P03

© Crown copyright and database rights 2017.Ordnance S urvey Licence Num ber 100049190.

Date: 02/07/18

S cale at A3: 1:10,000

Map Nam e

Map Num ber

R egistered in England. R egistration num ber 06791686. R egistered office: 2 S nowhill, Q ueensway,Birm ingham B4 6G A.

HS 2 Ltd accept no responsibility for any circum stances, whicharise from the reproduction of this m ap after alteration,am endm ent or abbreviation or if it is issued in part or issuedincom plete in any way.

S V -02-107

+ R esidential buildings only* Labelled with total barrier height above rail level** HS 2 train only LpAFm ax + 2.5dB façade correction

0 100 200 300 400

Metres

ILegend - General features

R oute in bored tunnelR oute in cut and cover tunnelR oute on surfaceDepot, station, headhouse orportal buildingCom m unity area boundaryCounty boundaryDistrict/Borough boundaryPetition

Legend - Sound related featuresCom m itted developm ents - S V Only

Envisaged m itigation to avoid / reduce significant noiseLandscaping and/or fence barriers*Engineering e.g. cuttings (green tunnels separately m ark ed)

Envisaged m easures further reducing noise effects:Other environm ental e.g. landscapingEngineering e.g. cuttings1k m Airborne sound study area

G round-borne sound & vibration study area(residential and non-residential)G round-borne sound & vibration study area (highlysensitive non-residential)

! Airborne sound assessm ent location#* Airborne sound and vibration assessm ent location$+

G round-borne sound and/or vibration assessm entlocation

XWAirborne sound, ground-borne sound and vibrationassessm ent locationG round-borne noise or vibration impact+

5

10

9

8

7

6

4

3

2

1

A B C D E F G H I J

10

9

8

7

6

5

4

3

2

1

A B C D E F G H I J

Operational Noise and V ibration Impacts and Lik elyS ignificant Effects (with Assessm ent Locations) –Petition 161/ AP: 008: S taffordshire and Birm inghamAgricultural S ociety and S tafford S howground Lim ited

Com m unity Area 2:Colwich to Y arlet

Change in sound level (LpAeq,T day / night)Operational airborne sound im pacts at buildings+

Panel B

Major adverse (>10dB)Moderate adverse (5dB to 10dB)Minor adverse (3dB to 5dB)Negligible (-3dB to 3dB)Beneficial (<-3dB)

(Potential additional noise insulation (triggered bym axim um sound levels at night)1

lPotential additional noise insulation (triggered by W HONight Noise G uidelines Interim Target)1

DPotential noise insulation (triggered by NoiseInsulation R egulations 1996)1

Effect dependent on receptor and baseline.For further details see V olum e 5, AppendixS V 004. Lik ely significant effect indicated byOS V #-N#2

< 40 dB < 50 dB G enerally no adverse effect expected11 For further inform ation see V olum e 5 Appendix S V -001-0002 For details see relevant V olum e 5 Appendix S V -002-0X X

Effect dependent on sound level change(see Panel B) and significance criteria. Lik elysignificant effects on groups of dwellings andassociated facilities indicated by OS V #-C#2

Night-tim e LpAeq,T(T=23:00 to 07:00)

Daytim e LpAeq,T(T=07:00 to 23:00) Residential Non-residential

& quiet areas

Panel A Lik ely significant effect on dwellings indicated

by , or avoided by noise insulation( l D

HS2 (rail only) sound level LpAeq,T Potential noise effect1, 2

> 65 dB> 55 dB

50 to 65 dB40 to 55 dB

Change in sound level (LpAeq,T day / night)Operational airborne sound im pacts at buildings+

Panel B

Major adverse (>10dB)Moderate adverse (5dB to 10dB)Minor adverse (3dB to 5dB)Negligible (-3dB to 3dB)Beneficial (<-3dB)

(Potential additional noise insulation (triggered bym axim um sound levels at night)1

lPotential additional noise insulation (triggered by W HONight Noise G uidelines Interim Target)1

DPotential noise insulation (triggered by NoiseInsulation R egulations 1996)1

Effect dependent on receptor and baseline.For further details see V olum e 5, AppendixS V 004. Lik ely significant effect indicated byOS V #-N#2

< 40 dB < 50 dB G enerally no adverse effect expected11 For further inform ation see V olum e 5 Appendix S V -001-0002 For details see relevant V olum e 5 Appendix S V -002-0X X

Effect dependent on sound level change(see Panel B) and significance criteria. Lik elysignificant effects on groups of dwellings andassociated facilities indicated by OS V #-C#2

Night-tim e LpAeq,T(T=23:00 to 07:00)

Daytim e LpAeq,T(T=07:00 to 23:00) Residential Non-residential

& quiet areas

Panel A Lik ely significant effect on dwellings indicated

by , or avoided by noise insulation( l D

HS2 (rail only) sound level LpAeq,T Potential noise effect1, 2

> 65 dB> 55 dB

50 to 65 dB40 to 55 dB

Engineering earthwork s:Em bank m ent

CuttingLpAFm axexceeds60dB façade**

Non engineering earthwork s:Em bank m ent

Cutting

P1038 HOC/00161/0005

Page 6: EXHIBIT LIST - publications.parliament.uk · Hybrid Bill Limits Legend Phase 2a hybrid Bill alignment July 2017 Cutting Embankment HS2 L td ac e p nors ib l yf circumstances, which

Noise levels

1

P1039 (1) HOC/00161/0006

Page 7: EXHIBIT LIST - publications.parliament.uk · Hybrid Bill Limits Legend Phase 2a hybrid Bill alignment July 2017 Cutting Embankment HS2 L td ac e p nors ib l yf circumstances, which

Noise levels

2

P1039 (2) HOC/00161/0007

Page 8: EXHIBIT LIST - publications.parliament.uk · Hybrid Bill Limits Legend Phase 2a hybrid Bill alignment July 2017 Cutting Embankment HS2 L td ac e p nors ib l yf circumstances, which

3

P1039 (3) HOC/00161/0008

Page 9: EXHIBIT LIST - publications.parliament.uk · Hybrid Bill Limits Legend Phase 2a hybrid Bill alignment July 2017 Cutting Embankment HS2 L td ac e p nors ib l yf circumstances, which

Staffordshire County Showground: Air Quality and Dust

Controls within the draft Code of Construction Practise

• Emissions to the atmosphere will be controlled and managed during construction through the route-wide

implementation of the draft Code of Construction Practice (CoCP). The CoCP includes a range of mitigation measures

that are accepted by the Institute of Air Quality Management (IAQM) as being suitable to reduce impacts to as low a

level as is reasonably practicable.

Construction Dust

• With the application of the mitigation measures contained in the draft CoCP, no significant effects are anticipated

from these risks associated with the dust generating activities. The basis for this conclusion can be found in Volume

5: Appendix AQ-001-002, where the scale of dust emissions and the sensitivity of the area and receptors are fully

described.

P1040 HOC/00161/0009

Page 10: EXHIBIT LIST - publications.parliament.uk · Hybrid Bill Limits Legend Phase 2a hybrid Bill alignment July 2017 Cutting Embankment HS2 L td ac e p nors ib l yf circumstances, which

Access during construction• The existing access to the main Showground site

(access point P1) and the access to the western fieldoverflow parking (access point P6) will be lost to theProposed Scheme. New access roads will be providedas part of the Proposed Scheme.

• The P1 access is lost during construction of themainline earthworks. There will be no access at thispoint for approximately 6 months.

• The P6 access to the western overflow parking sitewould be lost due to construction of the new A518Weston Road overbridge and approach roads. Thepublic using the Showground would need to bediverted to other access points for a period ofapproximately 18 months.

• Works are proposed around the existing accesses atpoints P2 and P5. No severance is proposed andaccess at this point would be maintained using trafficmanagement.

P1041 (1) HOC/00161/0010

Page 11: EXHIBIT LIST - publications.parliament.uk · Hybrid Bill Limits Legend Phase 2a hybrid Bill alignment July 2017 Cutting Embankment HS2 L td ac e p nors ib l yf circumstances, which

Assurance – Access during Construction

Summary of assurances 1 to 3 offered in 22nd May letter, covering:

1. Not restricting pedestrian and vehicular access, so far as is reasonably

practicable;

2. Engaging with the Showground to discuss timing and nature of HS2 works,

anticipated to directly affect vehicular access;

3. Provision of temporary traffic direction signing.

P1041 (2) HOC/00161/0011

Page 12: EXHIBIT LIST - publications.parliament.uk · Hybrid Bill Limits Legend Phase 2a hybrid Bill alignment July 2017 Cutting Embankment HS2 L td ac e p nors ib l yf circumstances, which

The pedestrian underpass

• There is a pedestrian underpass linking access points P2 and P5.

• These access points would need minor modifications to tie into the

realigned A518 in order to provide a safe junction layout.

• In addition, there is likely to be a need for some access to the underpass,

which may temporarily impede pedestrian flow, for example, scaffolding to

inspect the condition of the structure prior to carrying out works.

• Any disruption would be discussed and agreed with the Showground and

planned for when the underpass is not in use (refer to Assurance 1 on letter

dated 21st June).

P1041 (3) HOC/00161/0012

Page 13: EXHIBIT LIST - publications.parliament.uk · Hybrid Bill Limits Legend Phase 2a hybrid Bill alignment July 2017 Cutting Embankment HS2 L td ac e p nors ib l yf circumstances, which

Land use - utilities

Plot 19: Diversion of an existing high voltage Western Power Distribution cable, which would be

severed by the HS2, and to maintain supply to the Showground and Park Farm.

Plots 42, AP1-14 and AP1-16: Diversion of a BT telecommunications service, which is severed by

HS2, to maintain service to Park Farm. This diversion would follow the new access road around

the southern side of the showground.

Plots 44, 46, 48: Utility works to an existing low voltage Western Power Distribution cable, which

would be severed by HS2 and the new access road.

Plot 37 is identified in the Bill for both utility works and environmental mitigation. This includes

both the BT and low voltage Western Power Distribution works identified above.

P1041 (4) HOC/00161/0013

Page 14: EXHIBIT LIST - publications.parliament.uk · Hybrid Bill Limits Legend Phase 2a hybrid Bill alignment July 2017 Cutting Embankment HS2 L td ac e p nors ib l yf circumstances, which

Ian McCulloch

Bircham Dyson Bell LLP

50 Broadway

London

SW1H 0BL

By e-mail: [email protected]

22 May 2018

Dear Mr McCulloch

HIGH SPEED RAIL (WEST MIDLANDS – CREWE) BILL – HOUSE OF COMMONS SELECT COMMITTEE:

PETITION P2A-000161 – STAFFORDSHIRE AND BIRMINGHAM AGRICULTURAL SOCIETY

I am writing to you in my capacity as the Director of Hybrid Bill Delivery at HS2 Ltd, which is acting on

behalf of the Promoter of the High Speed Rail (West Midlands-Crewe) Bill (‘the Bill’) currently before

Parliament. I understand that your client has a number of concerns about the impact of Phase 2A of

HS2 (known as ‘the Proposed Scheme’) and have submitted a petition on that basis against the Bill in

the House of Commons.

In relation to your clients’ requests relating to access, I am writing to you on behalf of the Secretary of

State for Transport, to offer your client the following assurance:

“In this assurance:

“the nominated undertaker” refers to the body or bodies appointed by the Secretary of State to

carry out the powers conferred under the Bill to construct and maintain the scheme. The

nominated undertaker may be HS2 Ltd, or it may be another body or bodies appointed to oversee

the construction and operation of Phase 2A;

“the Bill” means the High Speed Rail (West-Midlands) to Crewe Bill as deposited in the House of

Commons on 17 July 2017;

“the Staffordshire Showground” means the Staffordshire County Showground being the exhibition

and conference facilities owned and operated by the Staffordshire and Birmingham Agricultural

Society at the date of this assurance and situated on Weston Road, Stafford, ST18 0BD;

1. The Promoter will require the nominated undertaker in exercise of the Bill powers:

(a) not to restrict pedestrians and vehicles from accessing Staffordshire Showground, so far as is

reasonably practicable during the construction of HS2 works;

P1042 (1) HOC/00161/0014

Page 15: EXHIBIT LIST - publications.parliament.uk · Hybrid Bill Limits Legend Phase 2a hybrid Bill alignment July 2017 Cutting Embankment HS2 L td ac e p nors ib l yf circumstances, which

(b) engage with Staffordshire and Birmingham Agricultural Society to discuss the timing and nature

of HS2 works within the Staffordshire Showground site or those works within the immediate

vicinity of the Staffordshire Showground site which are anticipated to directly affect vehicular

access to the Staffordshire Showground site on event days (provided Staffordshire and

Birmingham Agricultural Society gives the nominated undertaker reasonable notice of such event

days in advance) so as to reduce, so far as is reasonably practicable, disturbance to Staffordshire

Showground and its operations;

(c) should HS2 works on event days (notified to the nominated undertaker) require alternative

temporary traffic direction signing to be installed by the nominated undertaker on the adopted

highway for pedestrian and vehicular access to and egress from the Staffordshire Showground, to

engage with Staffordshire and Birmingham Agricultural Society and the local highway authority

regarding the provision of such alternative temporary traffic direction signing.”

If accepted, the assurance set out above will be included in the Register of Undertakings and

Assurances, which is held by the Department for Transport. Drafts of the Register will be published

regularly during the passage of the Bill and it will be finalised after Royal Assent. A nominated

undertaker will be contractually obliged to comply with all relevant undertakings and assurances set

out in the Register. Further information on how the Secretary of State will ensure compliance with

assurances made by HS2 Ltd is set out in HS2 Phase 2A Information Paper B5, Compliance with

Undertakings and Assurances1.

If you have any queries please don’t hesitate to contact Kate Lawton, Petition Manager, on 020 7944

0790 and [email protected].

Yours sincerely

Oliver Bayne

Director, Hybrid Bill Delivery

High Speed Two (HS2) Limited

1 A copy can be found at https://www.gov.uk/government/publications/understanding-the-hybrid-bill-hs2-phase-2a-information-

papers

P1042 (2) HOC/00161/0015

Page 16: EXHIBIT LIST - publications.parliament.uk · Hybrid Bill Limits Legend Phase 2a hybrid Bill alignment July 2017 Cutting Embankment HS2 L td ac e p nors ib l yf circumstances, which

Ian McCulloch

Bircham Dyson Bell LLP

50 Broadway

London

SW1H 0BL

By e-mail: [email protected]

21 June 2018

Dear Mr McCulloch

HIGH SPEED RAIL (WEST MIDLANDS – CREWE) BILL – HOUSE OF COMMONS SELECT COMMITTEE:

PETITION HS2-P2A-000161 – STAFFORDSHIRE AND BIRMINGHAM AGRICULTURAL SOCIETY (SABS)

I am writing to you in my capacity as the Director of Hybrid Bill Delivery at HS2 Ltd, which is acting on

behalf of the Promoter of the High Speed Rail (West Midlands-Crewe) Bill (‘the Bill’) currently before

Parliament. I understand that your client has a number of concerns about the impact of Phase 2A of

HS2 (known as ‘the Proposed Scheme’) and have submitted a petition on that basis against the Bill in

the House of Commons.

Further to the meeting held with representatives of SABS, I am writing to you on behalf of the Secretary

of State for Transport to offer your client assurances on the following matters:

• SABS underpass

• LPG tanks

• Access off A518 Weston Road

• Provision of information

Assurance 1: SABS underpass

“Other than in unforeseen or emergency circumstances, the Promoter will require the nominated

undertaker in exercise of the Bill powers to use reasonable endeavours not to interrupt pedestrian use

of the underpass shown marked on the Plan on Event Days during the construction phase of HS2

Phase 2a.

In this assurance, ‘Event Days’ means the days as notified to HS2 Limited by the Petitioner in writing

and no less than 3 months in advance and lasting no longer than 5 days, unless agreed between the

Promoter and the Petitioner, where parking is required on the western side of the A518 and the

underpass is required for visitors to cross to the Showground for the purposes of the specified event.”

P1043 (1) HOC/00161/0016

Page 17: EXHIBIT LIST - publications.parliament.uk · Hybrid Bill Limits Legend Phase 2a hybrid Bill alignment July 2017 Cutting Embankment HS2 L td ac e p nors ib l yf circumstances, which

Assurance 2: LPG tanks

“1. Subject to 2 below, the Secretary of State will require the nominated undertaker to use reasonable

endeavours not to undertake any mitigation planting on the area occupied by the LPG Tanks or 5 meter

buffer area around the LNG Tanks as shown edged red on the Plan within plots 33 and 37 shown on

sheet 1-30.

2. The conditions referred to in 1 above are that this change:

• does not negatively impact the Promoter’s objective of seeking to achieve no net loss in

biodiversity;

• does not affect the landscape planting required to mitigate any significant visual effects

reported in the Environmental Statement;

• receives the consent of all relevant bodies and authorities;

• does not affect the Promoter’s compliance with any aspects of the Environmental Minimum

Requirements; and

• does not prejudice the safe, timely and economic delivery of HS2 Phase 2a.”

Assurance 3: Access off A518 Weston Road

“1. Subject to 2 below, during the detailed design of HS2 Phase 2a the Secretary of State will require the

nominated undertaker to engage with the Petitioner in relation to the design of the reconfigured

western access from Weston Road (Work No. 51B) as shown on the Plan to maximise the amount of

space for car parking available to Staffordshire County Showground so far as reasonably practicable.

2. Paragraph 1 above is subject to:

• any statutory approvals required from the Local Planning Authority and from the Local Highway

Authority under Schedule 4 to the Bill

• changes to the Bill made through any future Additional Provisions not being adversely affected

by this assurance;

• the proposal not affecting compliance with any aspect of the Environmental Minimum

Requirements by the Promoter;

• the proposal not requiring the acquisition of any land not provided for under the Bill or outside

of the Petitioner’s landownership; and

• the proposal not prejudicing the safe, timely and economic delivery of HS2 Phase 2a.”

Assurance 4: Provision of information

The Promoter would like to draw the Petitioner’s attention to the provisions included in the draft Code

of Construction Practice in relation to engagement and notice of works, in particular section 5.1.4, and

in addition is willing to offer the following assurance:

“The Promoter will keep the Petitioner informed of the progress of the Bill and of likely target dates for

construction of the HS2 Phase 2a project in the immediate area.”

If accepted, the assurances set out above will be included in the Register of Undertakings and

Assurances, which is held by the Department for Transport. Drafts of the Register will be published

regularly during the passage of the Bill and it will be finalised after Royal Assent. A nominated

undertaker will be contractually obliged to comply with all relevant undertakings and assurances set

out in the Register. Further information on how the Secretary of State will ensure compliance with

P1043 (2) HOC/00161/0017

Page 18: EXHIBIT LIST - publications.parliament.uk · Hybrid Bill Limits Legend Phase 2a hybrid Bill alignment July 2017 Cutting Embankment HS2 L td ac e p nors ib l yf circumstances, which

assurances made by HS2 Ltd is set out in HS2 Phase 2A Information Paper B5, Compliance with

Undertakings and Assurances1.

If you have any queries please don’t hesitate to contact Kate Lawton, Petition Manager, on 020 7944

0790 and [email protected].

Yours sincerely

Oliver Bayne

Director, Hybrid Bill Delivery

High Speed Two (HS2) Limited

1 A copy can be found at https://www.gov.uk/government/publications/understanding-the-hybrid-bill-hs2-phase-2a-information-

papers

P1043 (3) HOC/00161/0018

Page 19: EXHIBIT LIST - publications.parliament.uk · Hybrid Bill Limits Legend Phase 2a hybrid Bill alignment July 2017 Cutting Embankment HS2 L td ac e p nors ib l yf circumstances, which

PLAN – HS2 ASSURANCES TO STAFFORDSHIRE AND BIRMINGHAM AGRICULTURAL SOCIETY

P1043 (4) HOC/00161/0019