Expected Layout for Project Management Elements Title Content Check Section 1 Identifying a Client and initial Ideas Identify a client Identify the client’s needs/ideas Check this is suitable with Claire Sambrook –before progressing Fill in a client form and return to Claire Sambrook Section 2 Scoping The Project (Project Feasibility) Meeting the client Identifying clients previous multimedia experience Understanding the breadth and depth of the project Two interviews: Developing a questionnaire (First Level) Developing a questionnaire (Second Level) (Initial costing) * not required in this instance Section 3 Proposal (Project Initiation) A formal document but short document – making and impact quickly and clearly Include: General introduction summarising section 1 from the information given by your client Statement of what the client wants Statement of what the users require/gain from this project Description of the resources required Section 4 Project Management Methods and Tools (Detailed Project Specification) Work breakdown and schedule (Gantt Chart) Gantt Charts Needs / SWOT analysis Risk Assessment (Contracts) * not required in this instance (Costs) * not required in this instance – you may want to indicate the potential costs

Upload: claire-sambrook

Post on 04-Jun-2018

219 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: expected layout.pdf

8/14/2019 expected layout.pdf

http://slidepdf.com/reader/full/expected-layoutpdf 1/2

Expected Layout for Project Management Elements

Title Content Check

Section 1 Identifying a Clientand initial Ideas

• Identify a client

•Identify the client’s needs/ideas

• Check this is suitable with Claire Sambrook –before progressing

• Fill in a client form and return to Claire Sambrook 

Section 2Scoping The Project

(Project Feasibility)

• Meeting the client

• Identifying clients previous multimedia experience

• Understanding the breadth and depth of the project

Two interviews:• Developing a questionnaire (First Level)

• Developing a questionnaire (Second Level)

(Initial costing) * not required in this instance

Section 3 Proposal (ProjectInitiation)

A formal document but short document – making and impact quickly andclearly

Include:• General introduction summarising section 1 from the information

given by your client

• Statement of what the client wants

• Statement of what the users require/gain from this project

• Description of the resources required

Section 4 Project Management

Methods and Tools(Detailed ProjectSpecification)

• Work breakdown and schedule (Gantt Chart)

• Gantt Charts

• Needs / SWOT analysis

• Risk Assessment

(Contracts) * not required in this instance

(Costs) * not required in this instance – you may want to indicate thepotential costs

Page 2: expected layout.pdf

8/14/2019 expected layout.pdf

http://slidepdf.com/reader/full/expected-layoutpdf 2/2

Section 5Asset Production Selecting the correct media

• Sourcing the media – where will it come from

• Interface design – storyboards, design drawings, Flowcharts

• Lots of visual examples – colours, fonts, styles

Section 6 Project Development   • Learning software or equipment

• Production Phase

• Creating the artefact

Section

7

Project Delivery

(monitoring progressand control)

• Review the project with you client

• Ensure the project is running to plan

• Check your assumption made earlier are still valid

Section 8 Testing   • Usability testing

• Any errors or admissions

• Correcting faults

• Does the artefact meet the needs of the client and user

Section

9

Signing Off theproject

(post implementationreview)

• Agreeing the final project artefact with your client and ensuring itmeets the needs of the client and the user