expected outcomes for our 2-day consultation consensus on the data & assumptions driving the...
TRANSCRIPT
EXPECTED OUTCOMES EXPECTED OUTCOMES for our 2-Day Consultationfor our 2-Day Consultation
Consensus on the data & assumptions driving the church ministries.Consensus on the data & assumptions driving the church ministries.Consensus on the facility challenge points.Consensus on the facility challenge points.Development of a schematic master plan (of attack) to address the issues.Development of a schematic master plan (of attack) to address the issues.Adoption of a next step. Adoption of a next step.
Why Are We Here Why Are We Here Today?Today?
Matthew 28:19-20 (NKJV)Matthew 28:19-20 (NKJV)
19 Go therefore and make disciples of 19 Go therefore and make disciples of all the nations, baptizing them in the all the nations, baptizing them in the name of the Father and of the Son name of the Father and of the Son and of the Holy Spirit, 20 teaching and of the Holy Spirit, 20 teaching them to observe all things that I have them to observe all things that I have commanded you; and lo, I am with commanded you; and lo, I am with you always, even to the end of the you always, even to the end of the age."age."
Why Have Buildings At Why Have Buildings At All?All?
Matthew 28:19-20 (NKJV)Matthew 28:19-20 (NKJV)
19 Go therefore and 19 Go therefore and make disciples make disciples of of all the nations, all the nations, baptizing them baptizing them in the in the name of the Father and of the Son name of the Father and of the Son and of the Holy Spirit, 20 and of the Holy Spirit, 20 teaching teaching them them to observe all things that I have to observe all things that I have commanded you; and lo, I am with commanded you; and lo, I am with you always, even to the end of the you always, even to the end of the age."age."
Why Have Buildings At Why Have Buildings At All?All?
A dull axe requires great A dull axe requires great strength; be wisestrength; be wise and sharpen and sharpen
the blade!the blade! Ecclesiastes 10:10Ecclesiastes 10:10
Buildings are the Buildings are the toolstools we use to carry we use to carry out our mission as a out our mission as a
church.church.
Growth SpaceGrowth Space
•Worship – Worship – 80%80%•Education – Education – 80%80%•ParkingParking
•AdministrativeAdministrative•Choir Choir RehearsalRehearsal•FellowshipFellowship•RecreationRecreation•StorageStorage
This space is required for a church to be missional
How Do We Know Which How Do We Know Which “Roofs to Uncover” First?“Roofs to Uncover” First?
Support SpaceSupport Space
Growth Balance ProfileGrowth Balance ProfileActual Capacit
y
WorshipWorship 185185 320+320+3030
53%53%
Sunday SchoolSunday School 168168 567567 30%30%
ParkingParking 111111 176(5176(56)6)
SS/Worship SS/Worship RatioRatio
60%60%
Annual GivingAnnual Giving $292,63$292,6300
Giving Per SS Giving Per SS AttenderAttender
$1,742$1,742
Second Baptist Church Bowling Second Baptist Church Bowling Green, MOGreen, MO
Worship ProfileWorship Profile
Avg. Attend.
Capacity @ 80%
%Full
8:00am8:00am 100100 256256 39%
10:45am10:45am 190190 256256 74%
CapacityCapacity Sanctuary = 29 Pews at 10 persons/pew =290 people Choir = 30 chairs
Two Services Full @ 150% of Capacity Two Services Full @ 150% of Capacity = 480 = 480
Second Baptist Church Bowling Green, Second Baptist Church Bowling Green, MOMO
Sunday School BalancedSunday School Balancedfor 2 Full Worship Servicesfor 2 Full Worship Services
Target % of Total
Need RoomFor
Now Have Room For
Additional
SFNeeded
PreschoolPreschool 15%15% 5454 3232 770770
ChildrenChildren 15%15% 5454 8080 --
YouthYouth 15%15% 5454 185185 --
AdultAdult 55%55% 198198 250250 --
SS Attendance = 75% of Worship = 360SS Attendance = 75% of Worship = 360
Second Baptist Church Bowling Green, Second Baptist Church Bowling Green, MOMO
Current Current CampusCampus
Second Baptist Second Baptist Church, Bowling Church, Bowling
Green, MOGreen, MOSite CapacitySite Capacity1.5 acres @ 125 1.5 acres @ 125 people per acre people per acre
= = 188 people188 people
With borrowed With borrowed parking = parking = 260 people260 people
Project Phasing Project Phasing RecommendationsRecommendationsPHASE I – Stay and GrowPHASE I – Stay and Grow•Critical Issues – Parking and PreschoolCritical Issues – Parking and Preschool
PHASE II – Stay and PolishPHASE II – Stay and Polish•Critical Issues – Access & ConnectionsCritical Issues – Access & Connections
•PHASE III – Go and GrowPHASE III – Go and Grow•Critical Issues – Sale of Property and Critical Issues – Sale of Property and Purchase of New PropertyPurchase of New Property
PHASE I - Stay & GrowPHASE I - Stay & Grow
Ia – Begin Aggressive Parking Ia – Begin Aggressive Parking EducationEducationIb – Develop New Parking on Ib – Develop New Parking on northeast propertynortheast propertyIc – Purchase up to 1.2 adjacent Ic – Purchase up to 1.2 adjacent acres for parking developmentacres for parking developmentId – Expand preschool spaces and Id – Expand preschool spaces and create dedicated preschool hallway create dedicated preschool hallway by relocating adultsby relocating adults
Member ParkingMember Parking
New Member & New Member & Guest ParkingGuest Parking
Special Special Needs ParkingNeeds Parking
Member ParkingMember Parking
Current Current CampusCampus
Second Baptist Second Baptist Church, Bowling Church, Bowling
Green, MOGreen, MOParking Parking OverviewOverview
•Current Spaces = Current Spaces = 61 (110 people)61 (110 people)•With borrowed With borrowed parking = 101 parking = 101 Spaces (182 Spaces (182 people)people)•With Phase I = 144 With Phase I = 144 spaces (260 people)spaces (260 people)•For full balance = For full balance = Purchase 1.2 acresPurchase 1.2 acres
1.2 Acre PurchaseNeeded to support
2 full worship services
PP PP
PP
PP
PP
Dedicated Dedicated Preschool HallwayPreschool Hallway
*Adults Relocated Upstairs above Sanctuary & Into Youth Room(s)*Adults Relocated Upstairs above Sanctuary & Into Youth Room(s)
PHASE I Budget - Stay & PHASE I Budget - Stay & GrowGrow
Est. Const. Cost
Contingency Total
Ia – Parking Ed. *Budgeted expenses for signage and printing
Ib – New NE Pkng
$50,000 $5,000 $55,000
Ic – Purchase 1.2 Adjacent Acres
Market Price
Id – Reallocate space for more preschool SS
None
TOTAL PHASE I
$55,000
PHASE II - Stay & PolishPHASE II - Stay & Polish
IIa – Create east-west access via IIa – Create east-west access via stairs/walksstairs/walksIIb – Develop Founder’s Fellowship IIb – Develop Founder’s Fellowship PlazaPlazaIIc – Develop Founder’s Fellowship IIc – Develop Founder’s Fellowship PavilionPavilionIId – Build north bi-level connection IId – Build north bi-level connection between sanctuary and educationbetween sanctuary and education
WastedWastedSpaceSpace
Ph
ase
2a
Ph
ase
2a P
hase
2b
Ph
ase
2b
Ph
ase
2c
Ph
ase
2c
Phase 2dPhase 2d
South ElevationSecond Baptist Church, Bowling Green, MO
South ElevationSecond Baptist Church, Bowling Green, MO
PHASE II Budget - Stay & PHASE II Budget - Stay & PolishPolish
Est. Const. Cost
Contingency Total
IIa – Ped. Access
$12,500 $2,500(1) $15,000
IIb – Plaza $10,000 $2,500(2) $12,500
IIc – Pavilion $15,000 $2,500(3) $17,500
IId – Building Connector
$125,000 $25,000(4) $150,000
Notes:(1)Does not include optional lift in sanctuary or design fees(2)Includes plaza furniture and fountain(3)Does not include furniture or design fees(4)Includes contingency , design, engineering, permitting & demolition.
TOTAL PHASE II
$195,000
PHASE III – Go & GrowPHASE III – Go & Grow
IIIa – Locate and Purchase minimum IIIa – Locate and Purchase minimum 15 acre tract for relocation15 acre tract for relocationIIIb – Develop Comprehensive IIIb – Develop Comprehensive Master Plan of DevelopmentMaster Plan of DevelopmentIIIc – Begin Capital Fund Raising for IIIc – Begin Capital Fund Raising for Phase IPhase IIIId – Market existing propertyIIId – Market existing propertyIIIe – Begin construction on Phase IIIIe – Begin construction on Phase I
PHASE III – Go & GrowPHASE III – Go & GrowOrder of Magnitudes (Phase I)Order of Magnitudes (Phase I)•Land Purchase – 15 acre minimum = $150,000•Worship Space for 450 (Phase I) @ 20sf per person = $1,500,000•Education/Support for Phase I Only = $3,000,000•Site Development Costs (Pro-ratas, utilities, etc.) = $50,000•Soft Costs (Planning, contingencies, design, engineering, site paving, utilities, furnishings, permitting, etc.) = $1,125,000
Initial Order of Magnitude to Relocate to Phase I = $5,825,000*
Pronounce as “somewhere below $10,000,000”
Step 1Step 1Authorize LifeWay to Authorize LifeWay to
Complete Complete Presentation PackagePresentation Package
Artist’s Artist’s Renderings Renderings
Typical Fee = Typical Fee = $2,000$2,000
Step 2Step 2Capital Fund Capital Fund RaisingRaising• Retain ConsultantRetain Consultant• Choose team Choose team • Conduct campaignConduct campaign
Step 3Step 3Development of Development of Construction Construction DocumentsDocuments•Call LifeWay to develop Call LifeWay to develop plans and specifications plans and specifications •Electrical EngineeringElectrical Engineering•Mechanical EngineeringMechanical Engineering•Plumbing EngineeringPlumbing Engineering
Step 4Step 4ConstructionConstruction• Obtain permitsObtain permits• Authorize Authorize constructionconstruction
““You cannot stay where you You cannot stay where you are, and go with God.” are, and go with God.”
Henry BlackabyHenry Blackaby
QQuestion uestion && AAnswernswer
© 2009 LifeWay Christian Resources
One LifeWay PlazaOne LifeWay Plaza
Nashville, TN 37234-0168Nashville, TN 37234-0168
(615) 251-2466(615) 251-2466
[email protected]@gmail.comom