experience/ background · experience/ background •the project was to develop a new-build house...
TRANSCRIPT
DIT NZEB UPDATEColin BolgerDate 9th June 2017
Dublin | London | MullingarT: +353 4493 42518 | E: [email protected] | W: www.ors.ie |
EXPERIENCE/ BACKGROUND
•The project was to develop a new-build house required to achieve Part L and NZEB design compliance.
•The proposed NZEB standard is based on EU Commission Recommendation 2016/1318.
PROJECT
•Building Surveyor with ORS for 12 years
•A BER Auditor for SEAI for 8 years
•Postgraduate Cert. DAER DT774- 2017
www.ors.ie
Engineering a sustainable future
WORK-BASED PROJECT
- Former ghost estate
in Mullingar, Co. Westmeath
- 4 Bed Semi-detached
house 126 sq.m
- Natural Gas on site
- Currently at planning
PARTICULAR CHALLENGES • Are we designing for
compliance today for the life of the building?
www.ors.ie
Engineering a sustainable future
PARTICULAR CHALLENGES
• The fabric is coming close to the maximum for space demand
• Energy for Lighting is fixed, but accounts for 30-40% of energy demand
• Hot Water demands the biggest issue
www.ors.ie
Engineering a sustainable future
DIT NZEB UPDATEColin BolgerDate 9th June 2017
Dublin | London | MullingarT: +353 4493 42518 | E: [email protected] | W: www.ors.ie |
THANK YOU