DIT NZEB UPDATE Colin Bolger Date 9 th June 2017 Dublin | London | Mullingar T: +353 4493 42518 | E: [email protected] | W: www.ors.ie | EXPERIENCE/ BACKGROUND The project was to develop a new-build house required to achieve Part L and NZEB design compliance. The proposed NZEB standard is based on EU Commission Recommendation 2016/1318. PROJECT Building Surveyor with ORS for 12 years A BER Auditor for SEAI for 8 years Postgraduate Cert. DAER DT774- 2017

Upload: others

Post on 28-Jul-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: EXPERIENCE/ BACKGROUND · EXPERIENCE/ BACKGROUND •The project was to develop a new-build house required to achieve Part L and NZEB design compliance. •The proposed NZEB standard

DIT NZEB UPDATEColin BolgerDate 9th June 2017

Dublin | London | MullingarT: +353 4493 42518 | E: [email protected] | W: www.ors.ie |

EXPERIENCE/ BACKGROUND

•The project was to develop a new-build house required to achieve Part L and NZEB design compliance.

•The proposed NZEB standard is based on EU Commission Recommendation 2016/1318.

PROJECT

•Building Surveyor with ORS for 12 years

•A BER Auditor for SEAI for 8 years

•Postgraduate Cert. DAER DT774- 2017

Page 2: EXPERIENCE/ BACKGROUND · EXPERIENCE/ BACKGROUND •The project was to develop a new-build house required to achieve Part L and NZEB design compliance. •The proposed NZEB standard

www.ors.ie

Engineering a sustainable future

WORK-BASED PROJECT

- Former ghost estate

in Mullingar, Co. Westmeath

- 4 Bed Semi-detached

house 126 sq.m

- Natural Gas on site

- Currently at planning

Page 3: EXPERIENCE/ BACKGROUND · EXPERIENCE/ BACKGROUND •The project was to develop a new-build house required to achieve Part L and NZEB design compliance. •The proposed NZEB standard

PARTICULAR CHALLENGES • Are we designing for

compliance today for the life of the building?

www.ors.ie

Engineering a sustainable future

Page 4: EXPERIENCE/ BACKGROUND · EXPERIENCE/ BACKGROUND •The project was to develop a new-build house required to achieve Part L and NZEB design compliance. •The proposed NZEB standard

PARTICULAR CHALLENGES

• The fabric is coming close to the maximum for space demand

• Energy for Lighting is fixed, but accounts for 30-40% of energy demand

• Hot Water demands the biggest issue

www.ors.ie

Engineering a sustainable future

Page 5: EXPERIENCE/ BACKGROUND · EXPERIENCE/ BACKGROUND •The project was to develop a new-build house required to achieve Part L and NZEB design compliance. •The proposed NZEB standard