Experience in Closed Anaerobic Digesters Operation
for POME Biogas Harnessing Under CDM Project
By
Ir. RM Subbiah and Tuan Haji Alui Ahmad
Green & Smart Sdn. Bhd.www.greens.com.my
![Page 2: Experience in Closed Anaerobic Digesters Operation for POME Biogas Harnessing Under CDM Project By Ir. RM Subbiah and Tuan Haji Alui Ahmad Green & Smart](https://reader036.vdocument.in/reader036/viewer/2022062421/56649c855503460f9493c73e/html5/thumbnails/2.jpg)
Anaerobic Technology (no air required for microbial survival)
![Page 3: Experience in Closed Anaerobic Digesters Operation for POME Biogas Harnessing Under CDM Project By Ir. RM Subbiah and Tuan Haji Alui Ahmad Green & Smart](https://reader036.vdocument.in/reader036/viewer/2022062421/56649c855503460f9493c73e/html5/thumbnails/3.jpg)
Traditionally used A.D. types in
POME treatment• Deep open tanks• Deep lagoons
(Biogas released to atmosphere, GHG)
![Page 4: Experience in Closed Anaerobic Digesters Operation for POME Biogas Harnessing Under CDM Project By Ir. RM Subbiah and Tuan Haji Alui Ahmad Green & Smart](https://reader036.vdocument.in/reader036/viewer/2022062421/56649c855503460f9493c73e/html5/thumbnails/4.jpg)
OPEN TANKOPEN TANK
![Page 5: Experience in Closed Anaerobic Digesters Operation for POME Biogas Harnessing Under CDM Project By Ir. RM Subbiah and Tuan Haji Alui Ahmad Green & Smart](https://reader036.vdocument.in/reader036/viewer/2022062421/56649c855503460f9493c73e/html5/thumbnails/5.jpg)
GHG contribute to global warming
POME Biogas contains 45% to 80% methane, which has 21 times higher global warming potential than CO2
![Page 6: Experience in Closed Anaerobic Digesters Operation for POME Biogas Harnessing Under CDM Project By Ir. RM Subbiah and Tuan Haji Alui Ahmad Green & Smart](https://reader036.vdocument.in/reader036/viewer/2022062421/56649c855503460f9493c73e/html5/thumbnails/6.jpg)
New AD types used for
POME treatment based on
“Clean Development Mechanism” (CDM) principles
• Closed lagoon with covering• Closed tanks with stirring
(Biogas harnessed)
![Page 7: Experience in Closed Anaerobic Digesters Operation for POME Biogas Harnessing Under CDM Project By Ir. RM Subbiah and Tuan Haji Alui Ahmad Green & Smart](https://reader036.vdocument.in/reader036/viewer/2022062421/56649c855503460f9493c73e/html5/thumbnails/7.jpg)
CLOSED LAGOONCLOSED LAGOON
![Page 8: Experience in Closed Anaerobic Digesters Operation for POME Biogas Harnessing Under CDM Project By Ir. RM Subbiah and Tuan Haji Alui Ahmad Green & Smart](https://reader036.vdocument.in/reader036/viewer/2022062421/56649c855503460f9493c73e/html5/thumbnails/8.jpg)
Completely Stirred Tank (CST)System
Stir the tank content by:
•Using biogas itself•Using stirrers•Using pumps
![Page 9: Experience in Closed Anaerobic Digesters Operation for POME Biogas Harnessing Under CDM Project By Ir. RM Subbiah and Tuan Haji Alui Ahmad Green & Smart](https://reader036.vdocument.in/reader036/viewer/2022062421/56649c855503460f9493c73e/html5/thumbnails/9.jpg)
POME – MAS TM
Palm Oil Mill Effluent – Mesophilic Anaerobic System
Temperature range 320C – 400C
![Page 10: Experience in Closed Anaerobic Digesters Operation for POME Biogas Harnessing Under CDM Project By Ir. RM Subbiah and Tuan Haji Alui Ahmad Green & Smart](https://reader036.vdocument.in/reader036/viewer/2022062421/56649c855503460f9493c73e/html5/thumbnails/10.jpg)
POME-MASTM System
![Page 11: Experience in Closed Anaerobic Digesters Operation for POME Biogas Harnessing Under CDM Project By Ir. RM Subbiah and Tuan Haji Alui Ahmad Green & Smart](https://reader036.vdocument.in/reader036/viewer/2022062421/56649c855503460f9493c73e/html5/thumbnails/11.jpg)
System used in 4 Palm Oil MillsTotal digesters : 12
Sizes:1700m3, 2200m3, 3600m3, 5800m3
![Page 12: Experience in Closed Anaerobic Digesters Operation for POME Biogas Harnessing Under CDM Project By Ir. RM Subbiah and Tuan Haji Alui Ahmad Green & Smart](https://reader036.vdocument.in/reader036/viewer/2022062421/56649c855503460f9493c73e/html5/thumbnails/12.jpg)
![Page 13: Experience in Closed Anaerobic Digesters Operation for POME Biogas Harnessing Under CDM Project By Ir. RM Subbiah and Tuan Haji Alui Ahmad Green & Smart](https://reader036.vdocument.in/reader036/viewer/2022062421/56649c855503460f9493c73e/html5/thumbnails/13.jpg)
ResultsResults COD Reduction Efficiency COD Reduction Efficiency
All Digesters Design Mill 1 Mill 2
COD Inlet
(mg/L)55000
Range
42700 – 65940
Mean
55349
Range
26500 - 151700
Mean
54577
COD Outlet (mg/L)
5000
Range
2585 – 4537
Mean
3721
Range
2832 – 7690
Mean
4421COD
Reduction90% 93.22% 90.10%
Feed Quantity m3/day 120 288
![Page 14: Experience in Closed Anaerobic Digesters Operation for POME Biogas Harnessing Under CDM Project By Ir. RM Subbiah and Tuan Haji Alui Ahmad Green & Smart](https://reader036.vdocument.in/reader036/viewer/2022062421/56649c855503460f9493c73e/html5/thumbnails/14.jpg)
Graph Showing Typical Results On Daily BasisGraph Showing Typical Results On Daily BasisFigure 1: 1700 m3 Anaerobic Digester Monitoring Results
![Page 15: Experience in Closed Anaerobic Digesters Operation for POME Biogas Harnessing Under CDM Project By Ir. RM Subbiah and Tuan Haji Alui Ahmad Green & Smart](https://reader036.vdocument.in/reader036/viewer/2022062421/56649c855503460f9493c73e/html5/thumbnails/15.jpg)
Figure 2: 3600 m3 Anaerobic Digester Monitoring Results
![Page 16: Experience in Closed Anaerobic Digesters Operation for POME Biogas Harnessing Under CDM Project By Ir. RM Subbiah and Tuan Haji Alui Ahmad Green & Smart](https://reader036.vdocument.in/reader036/viewer/2022062421/56649c855503460f9493c73e/html5/thumbnails/16.jpg)
Reactors are running sustainably for more than 12 months
Longest running > 24 months
![Page 17: Experience in Closed Anaerobic Digesters Operation for POME Biogas Harnessing Under CDM Project By Ir. RM Subbiah and Tuan Haji Alui Ahmad Green & Smart](https://reader036.vdocument.in/reader036/viewer/2022062421/56649c855503460f9493c73e/html5/thumbnails/17.jpg)
Biogas production depends on• Effluent flow rate• Incoming COD value• Effluent temperature
![Page 18: Experience in Closed Anaerobic Digesters Operation for POME Biogas Harnessing Under CDM Project By Ir. RM Subbiah and Tuan Haji Alui Ahmad Green & Smart](https://reader036.vdocument.in/reader036/viewer/2022062421/56649c855503460f9493c73e/html5/thumbnails/18.jpg)
Typical ValuesTypical Values
Mill production: 40T FFB/HrPOME: 24m3/Hr
Incoming COD total: 55,000 mg/lCOD reduction efficiency in the digester: 92%
Methane production: 425m3/hrBiogas at 60% CH4 content: 708m3/Hr
Theoretical power generation potential: 1274kW-1558kW
![Page 19: Experience in Closed Anaerobic Digesters Operation for POME Biogas Harnessing Under CDM Project By Ir. RM Subbiah and Tuan Haji Alui Ahmad Green & Smart](https://reader036.vdocument.in/reader036/viewer/2022062421/56649c855503460f9493c73e/html5/thumbnails/19.jpg)
COD reduction values measured in POME-MASTM
varies from 90% to 95%
![Page 20: Experience in Closed Anaerobic Digesters Operation for POME Biogas Harnessing Under CDM Project By Ir. RM Subbiah and Tuan Haji Alui Ahmad Green & Smart](https://reader036.vdocument.in/reader036/viewer/2022062421/56649c855503460f9493c73e/html5/thumbnails/20.jpg)
CH4 (Methane) values measured in POME-MASTM
varies from 60% to 75%
![Page 21: Experience in Closed Anaerobic Digesters Operation for POME Biogas Harnessing Under CDM Project By Ir. RM Subbiah and Tuan Haji Alui Ahmad Green & Smart](https://reader036.vdocument.in/reader036/viewer/2022062421/56649c855503460f9493c73e/html5/thumbnails/21.jpg)
BIOGAS PRODUCTION AT DIFFERENT COD REDUCTION EFFICIENCIES & DIFFERENT METHANE CONTENT
Mill capacity FFB m3/hr 40
Effluent Flow rate m3/hr 24
Inlet COD Mg/l 55 000
COD reduction efficiency see table
Assumption : Running on full load on above capacity1 kg COD reduction gives 0.35m3 Methane
Biogas Production at different methane
concentration
Biogas Production at different COD reduction % (m3/hr)
75% 80% 85% 90% 95%
At 55 % 630 672 714 756 798
At 60 % 578 616 655 693 732
At 65 % 533 569 604 640 675At 70 % 495 528 561 594 627
![Page 22: Experience in Closed Anaerobic Digesters Operation for POME Biogas Harnessing Under CDM Project By Ir. RM Subbiah and Tuan Haji Alui Ahmad Green & Smart](https://reader036.vdocument.in/reader036/viewer/2022062421/56649c855503460f9493c73e/html5/thumbnails/22.jpg)
ESTIMATED ELECTRICITY PRODUCTION
Electricity Production
COD reduction efficiency 75% 80% 85% 90% 95%
Biogas Production at 60% methane concentration 578 616 655 693 732
Potential electrical power at 2kW* hr/m3 of biogas
(kWh)1156 1232 1310 1386 1464
* Can vary from 1.8kW to 2.3kW per m3 of biogas based on generator efficiency
![Page 23: Experience in Closed Anaerobic Digesters Operation for POME Biogas Harnessing Under CDM Project By Ir. RM Subbiah and Tuan Haji Alui Ahmad Green & Smart](https://reader036.vdocument.in/reader036/viewer/2022062421/56649c855503460f9493c73e/html5/thumbnails/23.jpg)
Efficiency Difference - Commercial Value
Every 5% difference in gas production means extra 500,000 kWh/year
@ RM 0.30/kWh = RM 150,000For 21 years SREP feed in tariff difference in
revenue = RM 3.15million
![Page 24: Experience in Closed Anaerobic Digesters Operation for POME Biogas Harnessing Under CDM Project By Ir. RM Subbiah and Tuan Haji Alui Ahmad Green & Smart](https://reader036.vdocument.in/reader036/viewer/2022062421/56649c855503460f9493c73e/html5/thumbnails/24.jpg)
Flare
CDM compliant GREEN-FLARETM
Exhaust temperature set 6100C maintained at 610 + 30C
Gas retention time about 0.86 seconds
![Page 25: Experience in Closed Anaerobic Digesters Operation for POME Biogas Harnessing Under CDM Project By Ir. RM Subbiah and Tuan Haji Alui Ahmad Green & Smart](https://reader036.vdocument.in/reader036/viewer/2022062421/56649c855503460f9493c73e/html5/thumbnails/25.jpg)
![Page 26: Experience in Closed Anaerobic Digesters Operation for POME Biogas Harnessing Under CDM Project By Ir. RM Subbiah and Tuan Haji Alui Ahmad Green & Smart](https://reader036.vdocument.in/reader036/viewer/2022062421/56649c855503460f9493c73e/html5/thumbnails/26.jpg)
![Page 27: Experience in Closed Anaerobic Digesters Operation for POME Biogas Harnessing Under CDM Project By Ir. RM Subbiah and Tuan Haji Alui Ahmad Green & Smart](https://reader036.vdocument.in/reader036/viewer/2022062421/56649c855503460f9493c73e/html5/thumbnails/27.jpg)
Conclusion
• POME-MASTM system gives high COD reduction efficiency > 90%• Takes shock loads
• CH4 contents 60% to 75% in Biogas
• Runs in sustainable manner either on continuous or batch feed mode • GREEN-FLARETM (CDM compliant closed flare)
maintains same set exhaust temperature for different gas flows
![Page 28: Experience in Closed Anaerobic Digesters Operation for POME Biogas Harnessing Under CDM Project By Ir. RM Subbiah and Tuan Haji Alui Ahmad Green & Smart](https://reader036.vdocument.in/reader036/viewer/2022062421/56649c855503460f9493c73e/html5/thumbnails/28.jpg)
Thank You