For ADA (Americans with Disabilities Act) or Civil Rights Title VI accommodations, translation/interpretation services, or more information, call 503-731-4128, TTY 800-735-2900 or Oregon Relay Service 7-1-1. Si desea obtener información sobre este proyecto traducida al español, sírvase llamar al 503-731-4128. Если вы хотите, чтобы информация об этом проекте была переведена на русский язык, пожалуйста, звоните по телефону 503-731-4128. 如果您想瞭解這個項目翻譯成 繁體中文 的相關資訊, 請致電 (503) 731-4128. 如果您想了解这个项目翻译成 简体中文 的相关信息,请致电 503-731-4128. 이 프로젝트에 관한 한국어로 된 자료 신청방법 전화: 503-731-4128. Nếu quý vị muốn thông tin về dự án này được dịch sang tiếng Việt, xin gọi 503-731-4128. EXPLORE OUR ONLINE OPEN HOUSE The Oregon Department of Transportation (ODOT) is working to make Outer SE Powell Boulevard a safer place for everyone. The project stretches between SE 99th Avenue (I-205) and the Portland/Gresham city limits just east of SE 174th Avenue. Safety improvements will reduce the frequency and severity of crashes and help people walking, biking, rolling, or driving to share the road with fewer conflicts. Construction nearly complete: SE 122nd Avenue to SE 136th Avenue Design underway: I-205 to SE 122nd Avenue and SE 136th Avenue to just east of SE 174th Avenue (the Portland/Gresham city limits) See inside to learn more! 123 NW Flanders Street Portland, Oregon 97209 LEARN MORE AT OUR ONLINE OPEN HOUSE! Through October 18, 2020 Explore our online open house to learn more about the work already completed along SE Powell Boulevard and the work underway that will make the corridor safer for all users, including: Major intersection improvements New sidewalks and bike lanes Enhanced pedestrians crossings tinyurl.com/OuterPowell

Upload: others

Post on 16-Oct-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: EXPLORE OUR ONLINE OPEN HOUSE LEARN MORE AT OUR … Documents/OPTSP_Fa… · EXPLORE OUR ONLINE OPEN HOUSE The Oregon Department of Transportation (ODOT) is working to make Outer

For ADA (Americans with Disabilities Act) or Civil Rights Title VI accommodations, translation/interpretation services, or more information, call 503-731-4128, TTY 800-735-2900 or Oregon Relay Service 7-1-1.

Si desea obtener información sobre este proyecto traducida al español, sírvase llamar al 503-731-4128.

Если вы хотите, чтобы информация об этом проекте была переведена на русский язык, пожалуйста, звоните по телефону 503-731-4128.

如果您想瞭解這個項目翻譯成 繁體中文 的相關資訊,請致電 (503) 731-4128. 如果您想了解这个项目翻译成 简体中文 的相关信息,请致电 503-731-4128.

이 프로젝트에 관한 한국어로 된 자료 신청방법 전화: 503-731-4128.

Nếu quý vị muốn thông tin về dự án này được dịch sang tiếng Việt, xin gọi 503-731-4128.

EXPLORE OUR ONLINE OPEN HOUSEThe Oregon Department of Transportation (ODOT) is working to make Outer SE Powell Boulevard a safer place for everyone. The project stretches between SE 99th Avenue (I-205) and the Portland/Gresham city limits just east of SE 174th Avenue. Safety improvements will reduce the frequency and severity of crashes and help people walking, biking, rolling, or driving to share the road with fewer conflicts.• Construction nearly complete: SE 122nd Avenue to SE 136th Avenue• Design underway: I-205 to SE 122nd Avenue and SE 136th Avenue to just east of SE 174th Avenue (the Portland/Gresham

city limits)

See inside to learn more!

123 NW Flanders StreetPortland, Oregon 97209

LEARN MORE AT OUR ONLINE OPEN HOUSE!Through October 18, 2020Explore our online open house to learn more about the work already completed along SE Powell Boulevard and the work underway that will make the corridor safer for all users, including:• Major intersection improvements• New sidewalks and bike lanes• Enhanced pedestrians crossings

tinyurl.com/OuterPowell

Page 2: EXPLORE OUR ONLINE OPEN HOUSE LEARN MORE AT OUR … Documents/OPTSP_Fa… · EXPLORE OUR ONLINE OPEN HOUSE The Oregon Department of Transportation (ODOT) is working to make Outer

FALL 2020

Recently constructed improvements on SE Powell Boulevard at SE 136th Avenue.

Illustration of sidewalk-level bike lane.

CONTACT US Hope Estes, Community Affairs Coordinator, 503.731.4812, [email protected], www.OuterPowellSafety.org.

CONSTRUCTION NEARLY COMPLETE!FROM SE 122ND AVENUE TO SE 136TH AVENUEODOT thanks you for your patience and cooperation while we constructed improvements between SE 122nd Avenue and SE 136th Avenue. We are excited to announce that construction is nearly done. In the coming months you will see the finishing touches, including things like rapid flashing beacons at crosswalks, new lighting and signals at a few remaining locations, and landscaping.

DESIGN UNDERWAY FROM SE 99TH AVENUE TO SE 122ND AVENUE AND SE 136TH AVENUE TO SE 174TH AVENUE Design work is now underway for the remaining sections of Outer SE Powell Boulevard. Sidewalks, bike lanes and center turn lanes are some of the safety improvements being designed through the entire corridor. ODOT is designing the remainder of the corridor to be consistent with the improvements completed in Phase 1. ODOT will finish the design in fall 2022 and construction will begin in early 2023.

Do you live, work or own property on SE Powell Boulevard between SE 99th Avenue and SE 122nd Avenue, or between SE 136th Avenue and just east of SE 174th Avenue? If so, we will keep you informed about what to expect during construction as we know more. If you own property along SE Powell Boulevard in these areas, a right of way agent will contact you if any changes to your property are needed. We encourage you to sign up for project emails by visiting our website, www.OuterPowellSafety.org.

WHAT THE FUTURE ROAD WILL LOOK LIKE

THROUGHTHROUGH MEDIAN/TURN BIKEBIKE

WESTBOUND EASTBOUND

SIDEWALK/PLANTER

SIDEWALK/PLANTER

An example of what the majority of the road will look like when complete. It will vary throughout the project area depending on the needs and constraints.

ONLINE OPEN HOUSELive through October 18, 2020

tinyurl.com/OuterPowell