export of stoa energy of sr utilities during the year 2006-07
DESCRIPTION
EXPORT OF STOA ENERGY OF SR UTILITIES DURING THE YEAR 2006-07. IMPORT OF STOA ENERGY OF SR UTILITIES DURING THE YEAR 2006-07. CHARGES COLLECTED BY RLDCs DURING THE YEAR 2006-07. EXPORT OF STOA ENERGY OF SR UTILITIES DURING THE YEAR 2006-07. - PowerPoint PPT PresentationTRANSCRIPT
INJECTING UTILITY STATE EXPORT (MU)
TNEB TAMILNADU 673
KPTCL KARNATAKA 205
KSEB KERALA 1792
APPCC ANDHRA PRADESH 426
JINDAL KARNATAKA 274
KPCL KARNATAKA 593
JSWEL KARNATAKA 1058
BSES KERALA 54
RGCCPP TAMILNADU 882
USWL KARNATAKA 42
GSML KARNATAKA 41
EXPORT OF STOA ENERGY OF SR UTILITIESDURING THE YEAR 2006-07
INJECTING UTILITY STATE EXPORT (MU)
TNEB TAMILNADU 1653
BESCOM KARNATAKA 3
APPCC ANDHRA PRADESH 446
IMPORT OF STOA ENERGY OF SR UTILITIESDURING THE YEAR 2006-07
RLDCPROCESSING FEE
In lakhs of Rs.RLDC Charges in lakhs of Rs.
CTU Charges in Crores of Rs.
NRLDC 178.05 775.08 110.98
SRLDC 35.85 76.17 25.11
ERLDC 5.65 52.38 1.89
NERLDC 5.85 47.73 1.13
WRLDC 97.7 510.93 71.48
CHARGES COLLECTED BY RLDCsDURING THE YEAR 2006-07
0
200
400
600
800
1000
1200
1400
1600
1800
KP
TC
L
KS
EB
AP
PC
C
JIN
DA
L
KP
CL
JS
WE
L
BS
ES
RG
CC
PP
US
WL
GS
ML
EXPORT OF STOA ENERGY OF SR UTILITIES
DURING THE YEAR 2006-07
DETAILS OF REGION WISE STOA TRANSACTIONS IN 2006-07
3286
1747
570131 119
10877
9493
2100
632346
0
2000
4000
6000
8000
10000
12000
NR WR SR ER NER
No.Of Transactions Energy Approved in MU
0
5000
10000
15000
20000
25000
30000
35000
40000
1999-2000 2000-2001 2001-2002 2002-2003 2003-2004 2004-2005 2005-2006 2006-07
Years --->
To
tal M
U D
uri
ng
Th
e Y
ea
r --
->
IR Energy Exchanges
Growth Of Inter Regional Energy Exchanges
Inter regionalPower exchanges
have increasedmanifold
UI IN SR (FOR 2006-07)
• TOTAL UI TURNOVER :- 2,761 MU
• TOTAL UI AMOUNT DISBURSED:- 941.5 CR
• AVG WEEKLY TRANSACTION:- 52 MU
• AVG WEEKLY UI AMOUNT DISBURSED:- 17.8 CR
AP KAR KER TN PONDY
Total UI exported(-) /
Imported(+) in MUs
-1046 628 -194 -56 -68
Total amount paid in Crores
Rs.-391 238 -118 39 -32
SUMMARY OF UI (FOR 2006-07)
PROCESSING FEE COLLECTED BY RLDCs IN THE YEAR 2006-07
178.05
35.85
97.7
5.65 5.850
20
40
60
80
100
120
140
160
180
200
NRLDC SRLDC ERLDC NERLDC WRLDC
Name of the RLDC
Am
ou
nt
in l
akh
s o
f R
s.RLDC CHARGES COLLECTED BY RLDCs
IN THE YEAR 2006-07
775.08
76.17
510.93
47.7352.380
100
200
300
400
500
600
700
800
900
NRLDC SRLDC ERLDC NERLDC WRLDC
Name of the RLDC
Am
ou
nt
in l
akh
s o
f R
s.
CTU CHARGES IN STOA COLLECTED BY RLDCs IN THE YEAR 2006-07
11098
2511
7148
1131890
2000
4000
6000
8000
10000
12000
NRLDC SRLDC ERLDC NERLDC WRLDC
Name of the RLDC
Am
ou
nt
in l
akh
s o
f R
s.
NR-ER
SR-ERWR-SR
ER-NEREASTERN
REGION
SOUTHERN
REGION
WESTERN
REGION
NORTHERN
REGION
NORTH-EASTERN REGION
SHORT TERM OPEN ACCESS(STOA) RATES
WR-ER
843
(3.5)
647
(2.7)
594
(2.5)
357
(1.5)
1909 (8.0
)
1311 (5.5)
600
(2.5
)
667 (2.8)
620 (2.6)370 (1.5)
WR-N
R
Notes: i) The indicated STOA Rates are in Rs./MW/Day.
ii) The figures shown in bracket reflect the
STOA Rates in Paise/Unit.
SRLDC, BANGALORE
APRIL 2007
928
(3.9)
UI PRICE CURVE : EXISTING
0
50
100
150
200
250
300
350
400
450
500
550
600
650
700
750
800
48.
7
48.
8
48.
9
49
49.
1
49.
2
49.
3
49.
4
49.
5
49.
6
49.
7
49.
8
49.
9
50
50.
1
50.
2
50.
3
50.
4
50.
5
50.
6
50.
7
50.
8
50.
9
51
FREQUENCY IN HZ
UI
PR
ICE
KNEE POINT210
345
745
KNEE POINT
SHOW TABLE HIDE TABLE
FREQ
UI PRICE EXISTING
48.7 74548.8 74548.9 74549 745
49.1 66549.2 58549.3 50549.4 42549.5 34549.6 30049.7 25549.8 21049.9 18050 150
50.1 12050.2 9050.3 6050.4 3050.5 050.6 050.7 050.8 050.9 051 0
30 Ps
45 Ps
80 Ps
AVAILABILITY TARIFF(ABT)
(a) CAPACITY CHARGE
(b) ENERGY CHARGE
(c) ADJUSTMENT FOR DEVIATIONS (UI CHARGE)
(a) = a function of Ex-bus MW availability of power plant for the day
declared before the day starts x SEB’s % share.
(b) = MWh for the day as per ex=bus drawl schedule for the SEB
finalized before the day starts x Energy charge rate
(c) =Σ(Actual energy interchange in a 15 min time block – scheduled energy
interchange for the time block) x UI rate for the time block.
TOTAL PAYMENT FOR THE DAY = (a) + (b)± ( c)
DAY AHEAD SCHEDULING
• Schedules are made for each 15 minute time
block wise on day ahead basis i.e. 96 time
blocks in a day.
• Participating agencies are ISGS and States.
• Bilaterals/STOAs are also included in the
preparation of schedules.
• RLDC prepares and coordinates the schedules.
• On the day of operation the schedules can be
revised with prior intimation i.e. 4 to 6 time
blocks.
TIME TABLE FOR EXCHANGE OF INFORMATION IN RESPECT OF SCHEDULING
By 10.00 hrs. ISGSs shall advise SRLDC the Station-wise MW and MWh capabilities
By 1100 Hrs. SRLDC shall advise the States / Beneficiaries the Station wise MW & MWh entitlements.
By 1500 hrs. SLDCs/ Beneficiaries shall communicate the Station-wise requisitions and details of bilateral exchanges to SRLDC.
By 1700 hrs. SRLDC shall convey the ex-power plant despatch schedule to each ISGS and net drawal schedule to each State / Beneficiary. The details of unrequisitioned surpluses shall also be intimated.
By2200 hrs. ISGSs / States / Beneficiaries shall inform the modifications, if any, for incorporating in the final schedule
By 2300 hrs. SRLDC shall issue the final despatch and drawal schedule.
BY 10: 00 HRS
ISGSs shall advise SRLDC the Station-wise
MW and MWh capabilities
Back
SAMPLE DC SHEET
BY 11: 00 HRS
Back
SRLDC shall advise the States / Beneficiaries the
Station wise MW & MWh entitlements.
SAMPLEENT. OF STATES
BY 15: 00 HRS
SLDCs/ Beneficiaries shall communicate the
Station-wise requisitions and details of
bilateral exchanges to SRLDC.
Back
SAMPLEREQ. OF STATES
BY 17: 00 HRS
SRLDC shall convey the ex-power plant despatch schedule to each ISGS
SRLDC shall convey the net drawal schedule to each State / Beneficiary
The details of unrequisitioned surpluses shall also be intimated.
Back
SAMPLESCHD OF STATES
SAMPLESCHD OF ISGS
ISGSs / States / Beneficiaries shall
inform the modifications, if any, for
incorporating in the final schedule
Back
BY 23 00HRS
SRLDC shall issue the final ex-power plant despatch schedule to each ISGS
SRLDC shall issue the final net drawal schedule to each State / Beneficiary
Back
SAMPLESCHD OF STATES
SAMPLESCHD OF ISGS