7/29/2008 1 Glenn Research Center at Lewis Field Extended Operation Testing of Stirling Convertors in Support of Stirling Radioisotope Power System Development 100 We class Stirling convertors began extended operation testing at NASA Glenn Research Center (GRC) in 2003 with a pair of Technology Demonstration Convertors (TDCs) operating in air. Currently, the number of convertors on extended operation test has grown to 12, including both TDCs and Advanced Stirling Convertors (ASCs) operating both in air and in thermal vacuum. Additional convertors and an electrically heated radioisotope generator will be put on test in the near future. This testing has provided data to support life and reliability estimates and the quality improvements and design changes that have been made to the convertor. The convertors operated 24/7 at the nominal amplitude and power levels. Performance data were recorded on an hourly basis. Techniques to monitor the convertors for change in internal operation included gas analysis, vibration measurements and acoustic emission measurements. This data provided a baseline for future comparison. This paper summarizes the results of over 145,000 hours of TDC testing and 40,000 hours of ASC testing and discusses trends in the data. Data shows the importance of improved materials, hermetic sealing, and quality processes in maintaining convertor performance over long life. brought to you by metadata, citation and similar papers at core.ac.uk provided by NASA Technical Report

Upload: others

Post on 24-Mar-2022

10 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Extended Operation Testing of Stirling Convertors in

7/29/2008

1

Glenn Research Center at Lewis Field

Extended Operation Testing of Stirling Convertorsin Support of Stirling Radioisotope Power System

Development

100 We class Stirling

convertors

began extended operation testing at NASA Glenn Research Center (GRC) in 2003 with a pair of Technology Demonstration Convertors

(TDCs) operating in air. Currently, the number of convertors

on extended operation test has grown to 12, including both TDCs

and Advanced Stirling

Convertors

(ASCs) operating both in air and in thermal vacuum. Additional convertors

and an electrically heated radioisotope generator will be put on test in the near future. This testing has provided data to support life and reliability estimates and the quality improvements and design changes that have been made to the convertor.

The convertors

operated 24/7 at the nominal amplitude and power levels. Performance data were recorded on an hourly basis. Techniques to monitor the convertors

for change in internal operation included gas analysis, vibration measurements and acoustic emission measurements. This data provided a baseline for future comparison.

This paper summarizes the results of over 145,000 hours of TDC testing and 40,000 hours of ASC testing and discusses trends in the data. Data shows the importance of improved materials, hermetic sealing, and quality processes in maintaining convertor

performance over long life.

https://ntrs.nasa.gov/search.jsp?R=20080047358 2019-08-30T05:50:17+00:00Z

brought to you by C

OR

EV

iew m

etadata, citation and similar papers at core.ac.uk

provided by NA

SA

Technical R

eports Server

Page 2: Extended Operation Testing of Stirling Convertors in

7/29/2008

2

Glenn Research Center at Lewis Field

Extended Operation Testing of Stirling Convertors in Support of Stirling Radioisotope Power System

Development

Edward J. Lewandowski, NASA Glenn Research CenterJeffrey G. Schreiber, NASA Glenn Research CenterScott D. Wilson, Sest, Inc.Salvatore M. Oriti, NASA Glenn Research CenterPeggy Cornell, NASA Glenn Research CenterNicholas Schifer, NASA Glenn Research Center

Presented at the 6th

International Energy Conversion Engineering Conference Cleveland, OhioJuly 28-30, 2008

Page 3: Extended Operation Testing of Stirling Convertors in

7/29/2008

3

Glenn Research Center at Lewis Field

Outline

Convertors under test•

Extended operation test system

Test sequence•

Test results to date

Page 4: Extended Operation Testing of Stirling Convertors in

7/29/2008

4

Glenn Research Center at Lewis Field

Introduction•

Convertors being developed for long duration missions of up to 14 years after 3 years of storage

Accelerated life tests cannot adequately quantify extended life characteristics of all components

Changes in performance characterized under nominal operation

Page 5: Extended Operation Testing of Stirling Convertors in

7/29/2008

5

Glenn Research Center at Lewis Field

Convertors under testConvertor Testing environment Nominal Thot & Tcold

°CHours to

date Status

TDC #13 In air 650/80 38,400 Ongoing testTDC #14 In air 650/80 38,400 Ongoing testTDC #5 Thermal vacuum 630/70 10,500 Test endedTDC #6 Thermal vacuum 630/70 10,400 Test ended

TDC #15 In air 650/80 24,600 Ongoing testTDC #16 In air 650/80 24,600 Ongoing testASC-0 #1 In air and thermal vacuum 645/72 11,000 Ongoing testASC-0 #2 In air and thermal vacuum 645/72 11,000 Ongoing testASC-0 #3 In air; launch simulation 650/90 6,700 Ongoing testASC-0 #4 In air; launch simulation 650/90 6,700 Ongoing testASC-1 #3 In air 850/90 1,800 Being repairedASC-1 #4 In air 850/90 1,800 Being repaired

ASC-1HS #1 In air and thermal vacuum; launch simulation 850/90 2,200 Ongoing testASC-1HS #2 In air and thermal vacuum; launch simulation 850/90 2,200 Ongoing test

ASRG-EU, with ASC-E #2 & #3 In air; environmental testing at LM 640/90 Future test

ASC-E #1 In air; launch simulation 650/90 Future testASC-E #4 In air; launch simulation 650/90 Future test

ASC-E2 #1 In air; launch simulation Future testASC-E2 #2 In air; launch simulation Future testASC-E2 #3 In air; launch simulation Future testASC-E2 #4 In air; launch simulation Future testASC-E3 #1 In air; launch simulation Future testASC-E3 #2 In air; launch simulation Future test

Page 6: Extended Operation Testing of Stirling Convertors in

7/29/2008

6

Glenn Research Center at Lewis Field

Extended operation test system•

Mounting

Heat source

Heat rejection

Controller

Page 7: Extended Operation Testing of Stirling Convertors in

7/29/2008

7

Glenn Research Center at Lewis Field

Instrumentation•

Heater voltage, current, and power•

Heat source temperature•

Hot-end temperature•

Cold-end temperature•

Cold-end coolant inlet and outlet temperatures

Cold-end coolant flow rates•

Pressure vessel temperature•

Alternator RMS voltage, RMS current, and power

Piston amplitudes•

Helium charge pressure•

Operating frequency

Record saved every hour•

24-hour buffer of two-second data

Page 8: Extended Operation Testing of Stirling Convertors in

7/29/2008

8

Glenn Research Center at Lewis Field

Instrumentation•

Heater voltage, current, and power•

Heat source temperature•

Hot-end temperature – high or low•

Cold-end temperature - high•

Cold-end coolant inlet and outlet temperatures

Cold-end coolant flow rates•

Pressure vessel temperature - high•

Alternator RMS voltage, RMS

current, and power

Piston amplitudes - high•

Helium charge pressure – high or low•

Operating frequency

Record saved every hour•

24-hour buffer of two-second data

Convertor Protection

Controlled shutdown when abnormal event detected

Uninterruptible Power Supply (UPS) for backup power

Backup generator

Failsafe protection circuit

Page 9: Extended Operation Testing of Stirling Convertors in

7/29/2008

9

Glenn Research Center at Lewis Field

Monitoring1.

Gas analysis –

monitor for organics

2.

Vibration monitoring –

change in displacer or piston amplitude or phasing

3.

Acoustic emissions –

change in acoustic signature

4.

Heater head creep –

submicron accuracy; 0.05 µm resolution

•Acoustic emissions sensor

Page 10: Extended Operation Testing of Stirling Convertors in

7/29/2008

10

Glenn Research Center at Lewis Field

Extended operation test sequence1. Instrumentation –

install thermocouples on the hot end and cold end

2. Installation –

add heat source, insulation, and other hardware3. Bake-out –

for non-hermetically sealed convertors, remove contaminants before operation

4. Thermal loss characterization –

characterize insulation heat loss to accurately calculate convertor efficiency

5. Low temperature check-out –

operate convertors at low temperature to verify sensor signals, piston amplitudes, convertor synchronization, cooling system, and other aspects of the test system

6. Full power demonstration –

document full power performance7. Extended operation8. Acceptance test and launch simulation vibration exposure9. Continued extended operation

Page 11: Extended Operation Testing of Stirling Convertors in

7/29/2008

11

Glenn Research Center at Lewis Field

Acceptance test and launch simulation vibration exposure

Convertors on extended operation to see operational and environmental profile similar to the actual mission

Workmanship test•

After 5,000 to 10,000 hours, perform Acceptance Vibration test

Launch simulation vibration exposure–

X, Y, and Z-axes for 1 minute in each axis–

Convertor operating during vibration–

8.70 grms

flight vibration profile, modified based on dynamic testing of ASRG-EU

Page 12: Extended Operation Testing of Stirling Convertors in

7/29/2008

12

Glenn Research Center at Lewis Field

Extended operation of TDCs #13 and #14•

38,400 hours (4.4 years) operation

Slight degradation in power and efficiency prior to 19,000 hours due to regenerator oxidation prior to hermetically sealing

Negligible change in performance since then•

Regular maintenance performed at 32,000 hours

0

10

20

30

40

50

60

70

80

0 10,000 20,000 30,000 40,000

Time, (hrs)

Pow

er O

utpu

t (W

)

TDC #13

TDC #14

0

5

10

15

20

25

30

35

40

0 10,000 20,000 30,000 40,000

Time, (hrs)

Effic

ienc

y (%

)

TDC #13

TDC #14

Page 13: Extended Operation Testing of Stirling Convertors in

7/29/2008

13

Glenn Research Center at Lewis Field

Extended operation of TDCs #15 and #16

24,600 hours (2.8 years) of operation•

Operated at reduced hot-end temperature prior to hermetically sealing at 4,400 hours

Slight decrease in power from 6,000 to 13,000 hours•

Recent performance unchanged

0

10

20

30

40

50

60

70

80

0 5,000 10,000 15,000 20,000 25,000 30,000

Time, (hrs)

Pow

er O

utpu

t (W

)

TDC #15

TDC #16

0

5

10

15

20

25

30

35

40

0 5,000 10,000 15,000 20,000 25,000 30,000

Time, (hrs)

Effic

ienc

y (%

)

TDC #15

TDC #16

Page 14: Extended Operation Testing of Stirling Convertors in

7/29/2008

14

Glenn Research Center at Lewis Field

Extended operation of TDC’s #5 and #6

First low-power convertors operated in thermal vacuum

10,016 hours between Nov. 2004 to Aug. 2006•

Steady operation; no degradation in performance

0

10

20

30

40

50

60

70

80

0 2,000 4,000 6,000 8,000 10,000

Time (hrs)

Pow

er O

utpu

t (W

)

TDC #5

TDC #6

0

5

10

15

20

25

30

35

40

0 2,000 4,000 6,000 8,000 10,000

Time (hrs)

Effic

ienc

y, %

TDC #5

TDC #6

Page 15: Extended Operation Testing of Stirling Convertors in

7/29/2008

15

Glenn Research Center at Lewis Field

Extended operation of ASC-0 #1 and #2•

11,000 hours, with first 600 hours in air followed by thermal vacuum operation

Hermetically sealed flanges•

Some potential degradation in performance in ASC-0 #1•

Change in ASC-0 #1 performance can affect ASC-0 #2 (Change in operating frequency through zener diode controller)

Near future: convertors will return to in-air operation•

Convertors were built prior to Sunpower implementing their Quality Assurance system

0

10

20

30

40

50

60

70

80

0 2,000 4,000 6,000 8,000 10,000 12,000Time (hrs)

Pow

er O

utpu

t (W

)

ASC-0 #1

ASC-0 #2

Page 16: Extended Operation Testing of Stirling Convertors in

7/29/2008

16

Glenn Research Center at Lewis Field

Extended operation of ASC-0 #3 and #4•

6,700 hours of in-air operation•

Gas analysis shows evolution of CO2 over the first 2,500 hours, then decrease in concentration

Not unexpected with adsorption from stainless steel and stainless steel-like materials

Gas analysis typical of other ASCs

0

10

20

30

40

50

60

70

80

0 1,000 2,000 3,000 4,000 5,000 6,000 7,000

Time (hrs)

Pow

er O

utpu

t (W

)

ASC-0 #3ASC-0 #4

0

5

10

15

20

25

30

35

40

0 1,000 2,000 3,000 4,000 5,000 6,000 7,000

Time (hrs)

Effic

ienc

y, %

ASC-0 #3ASC-0 #4

0

500

1000

1500

2000

2500

3000

0 1,000 2,000 3,000 4,000 5,000 6,000 7,000Full Temp Operation (hrs)

Con

cent

ratio

n (p

pm)

ASC-0 #3 CO2ASC-0 #4 CO2

Page 17: Extended Operation Testing of Stirling Convertors in

7/29/2008

17

Glenn Research Center at Lewis Field

Extended operation of ASC-1 #3 and #4•

Product of NASA NRA development, not intended for extended operation

Has 850 °C-capable MarM247 heater head•

Thermal loss characterization conducted under vacuum→

damage to displacer epoxy joint

epoxy joint would not be used in a long life convertor•

Designed with 9 o-ring seals•

Enclosure being added to surround pressure vessel o-rings with argon

Page 18: Extended Operation Testing of Stirling Convertors in

7/29/2008

18

Glenn Research Center at Lewis Field

Conclusion•

Extended operation of Stirling convertors providing valuable data to establish long life database of convertors

Over 185,000 hours of extended operation accumulated to date•

On track to operate 80,000 total hours in 2008 and well over 100,000 hours in 2009

Testing to continue, with convertors approaching

flight level quality processes in the near future

010,00020,000

30,00040,00050,00060,00070,000

80,00090,000

100,000

2003 2004 2005 2006 2007 2008*Year

Hou

rs

ASC convertorsTDC convertors

*projected

Page 19: Extended Operation Testing of Stirling Convertors in

7/29/2008

19

Glenn Research Center at Lewis Field

Acknowledgment

This work was funded through the NASA Science Mission Directorate. Any opinions, findings, and conclusions or recommendations expressed

in this article are those of the authors and do not necessarily reflect the views of the National Aeronautics and Space Administration.