ez boosttm system with bmqe booster pump, tank, pressure ... ez boost system... · 232 shaft seal...
TRANSCRIPT
EZ BoostTM System with BMQE Booster Pump,Tank, Pressure Sensor, and Controller
Product Guide EZ Boost™ System
DWS Product Guide 8-09.indd 11 8/18/2009 2:32:32 PM
Product Guide Page No.
Generaldata 13
Productrange 14
Materialsofconstruction 15
Typekey 15
15BMQEperformancecurves 16
22BMQEperformancecurves 17
30BMQEperformancecurves 18
Dimensions,weightsandelectricaldata 19
Dimensionalsketch 19
Technicaldata-BMQEpump 20
Technicaldata-EZBoostcontroller 21
Accessories 22
EZBoostQuickGuide 23
EZBoostSystemDiagram 23
EZBoostPre-Installation 24
ParallelOperation 25
Contents EZ BoostTM System
12
DWS Product Guide 8-09.indd 12 8/18/2009 2:32:33 PM
EZ BOOST SYSTEM
IntroductionTherearemanyapplicationswithinwatersupplywhereitisnecessarytoincreasethesystempressure.TheGrundfosEZBoostsystemistheoptimumsolutionforapplicationsrequiring:•Seallesspumps
•Quietoperationand/or
•Maintenance-freeoperation.
TheEZBoostsystemoffersthefollowingfeatures:
•Dry-runningprotection
•Highefficiencyofpumpandmotor
•Excellentwearresistance
•Softstarter
•Overvoltageandundervoltageprotection
•Overloadprotection
•Overtemperatureprotection.
•Variablespeed
•Electroniccontrolandcommunication.
Applications•Pressureboosting.
•Watertreatment.
Pumped liquidsThin, non-explosive liquids not containing abrasive par-ticlesor fibers. The liquidmustnotbeable toattack thepumpmaterialschemicallyormechanically.
Should thedensityand/orviscosityof thepumped liquidexceed thedensityand/or viscosityofwater, please con-tactGrundfos.
BMQE PumpThe pumps used for The Grundfos EZ Boost system aremodified SQE submersible pumps. The EZ Boost BMQEpump is an SQE pumpwith anMSE 3motor. Pump andmotorarecenteredinthe4”stainlesssteelsleeve.
BMQEpumpsare suitable forbothcontinuousand inter-mittentoperationforavarietyofpressureboostingappli-cations.
BMQE MotorTheMSE3motorsarebasedonstate-of-the-arttechnologywithin permanent magnets (PMmotor), which accountsfor the high motor efficiencies. In addition, the motorshaveabuilt-inelectronicunitwitha frequencyconverterforvariablefrequencyandsoftstarting.
Product Guide EZ BoostTM System
TheMSE3motors featureshighefficiencywithinawideload range. The high and flat efficiency curve of the PMmotor enables the same motor to cover a wide powerrange as opposed to conventional ACmotors. For BMQEpumps,thismeansfewermotorvariants.
EZ Boost ControllerTheBMQEpumpfeaturesvariablespeedwhichisofferedthroughfrequencycontrolviatheEZBoostcontroller.Asaconsequence,thepumpcanbesettooperateinanydutypoint intherangebetweentheminimumandmaximumperformancecurvesofthepump.EachBMQEpumpmustbeconnectedtoitsownEZBoostcontroller.
ItisalsopossibletooperatetheBMQEwithoutanEZBoostcontroller,thoughthefeaturesofferedwillbefewer.
Operating conditionsFlow: Max.39USGPM(8.9m3/h)
Head: Max.300ft(91.4m)
Temperature: Max.95°F(35°C)
Operatingpressure: Max.347PSI(23bar)
Inletpressure: Min.8PSI(0.55bar)
Sound-pressurelevel: ThesoundpressureleveloftheBMQE is lower than 74 db[A] at a distance of 3 feet (1meter).
It is recommended by Grundfos that the pump be installed with sound and vibration dampening equipment such as flexible piping adapters and anti-vibration mounting. The pump should not be mounted in or adjacent to living quar-ters. The pump can also be wrapped with sound- proofing insulation to reduce noise (see page 16, EZ Boost System Diagram).
BMQE Pump Sectional Drawing
Pos.1. Sleeve 5. SQEpump2. Dischargeconnection 6. Cableentry3. Suctionconnection 7. Centeringdevice4. MSE3motor 8. Airventscrew
6
2
5 4 7
31
8
13
DWS Product Guide 8-09.indd 13 8/18/2009 2:32:33 PM
Performance range, 60 Hz
Product range
Range BMQE 15 BMQE 22 BMQE 30
Nominalflowrate[USGPM(m3/h)] 15(3.4) 22(5.0) 30(6.8)
Temperaturerange +32to+95°F(0to+35°C)
Maximuminletpressure[PSI(bar)]
Maximumworkingpressure[PSI(bar)]
217(15)
347(23)
Maximumefficiency[%] 57 62 60
Flowrange[USGPM(m3/h)] 0to19(4.3) 0to33(7.5) 0to39(8.8)
Maximumpumppressure[ft(m/PSI)] 300(91.4)/130 290(88.4)/125 208(63.4)/90
Pipeconnection 1.25”NPTinlet/1”NPTdischarge
Product Guide EZ BoostTM System
0 5 10 15 20 25 30 35 Q [US GPM]
0
40
80
120
160
200
240
280
[ft]H
0
20
40
60
80
100
120
P[psi]
0 1 2 3 4 5 6 7 8 9 Q [m³/h]
0
20
40
60
80
H[m]
30 BMQE 05B-90
22 BMQE 05B-120
15 BMQE 05A-110
15 BMQE 07B-180
22 BMQE 05A-80
22 BMQE 10C-190
30 BMQE 10C-130
TK
0131
0133
04
14
DWS Product Guide 8-09.indd 14 8/18/2009 2:32:33 PM
Materials BMQ
SleevePos. Description Material AISI
90 Sleeve Stainlesssteel 316
91 Flange Stainlesssteel 304
92 CableentryStainlesssteel/FKM
304
93 Airventscrew Stainlesssteel 304
94 O-ring FKM
PumpPos. Description Material AISI
1 Valvecasing Polyamide/PVDF
1a Dischargechamber Stainlesssteel 304
1d O-ring NBRrubber
3 Valveseat NBRrubber
4a Emptychamber Polyamide/PVDF
6 Topbearing NBRrubber
7 Neckring Polyamide/PVDF
7a Lockring Stainlesssteel 310
7b Neckringretainer Polyamide/PVDF 310
9b Emptychamber Polyamide/PVDF
9c Bottomchamber Polyamide/PVDF
13ImpellerwithTCbear-ing
Polyamide/PVDF
14Suctioninterconnector
Polyamide/PVDF
14a Ring Stainlesssteel 304
16 Shaftwithcoupling Stainlesssteel 304
30 Cone Polyamide/PVDF
32 Guidevanes Polyamide/PVDF
39 Spring Stainlesssteel 316LN
55 Pumpsleeve Stainlesssteel 316
64 Primingscrew Polyamide/PVDF
70 Valveguide Polyamide/PVDF
86 Lipseal NBRrubber
87 Conecomplete Polyamide/PVDF
MotorPos. Description Material AISI
201 Stator Stainlesssteel 304
202 Rotor Stainlesssteel 304
202a Stopring PP
202b Filter Polyester
203 Thrustbearing Carbon
205 Radialbearing Ceramic/TC
220 Motorcablewithplug EPR
222a Fillingplug NBRrubber
224 O-ring FKM
225 Topcover PPS
232 Shaftseal NBRrubber
Type keyExample 22 BMQ E 05B 120
RatedflowinUSGPM
EZBoostpump
ElectronicallycontrolledpumpviaEZBoostcontroller
MotorHP
Headinfeetatratedflow
Product Guide EZ BoostTM System
1d
7a
1
70
2
39
3
1a
55
16
30
8687
6418
18b
18a
6
4a
9b
32
13
9c
7
14
14a
7b
9293
91
94
90
202a
202
202b
222a
232
203
224
205
225
201
220
233
15
DWS Product Guide 8-09.indd 15 8/18/2009 2:32:34 PM
Product Guide EZ BoostTM System
0 2 4 6 8 10 12 14 16 18 Q [US GPM]
0
50
100
150
200
250
300
[ft]H
0
20
40
60
80
100
120
140
P[psi]
0
20
40
60
80
100
H[m]
0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 Q [m³/h]
15 BMQE60 Hz
07B-180 (5-stage)
05A-110 (3-stage)
0 2 4 6 8 10 12 14 16 18 Q [US GPM]
0.0
0.1
0.2
0.3
[hp]P2
0
20
40
60
[%]Eta
0.0
0.1
0.2
P2[kW]
P2
Eta
TK
0130
9833
04
16
DWS Product Guide 8-09.indd 16 8/18/2009 2:32:34 PM
Product Guide EZ BoostTM System
0 5 10 15 20 25 30 Q [US GPM]
0
50
100
150
200
250
300
[ft]H
0
20
40
60
80
100
120
140
P[psi]
0
20
40
60
80
100
H[m]
0 1 2 3 4 5 6 7 Q [m³/h]
05A-80 (2-stage)
05B-120 (3stage)
10C-190 (5-stage)
0 5 10 15 20 25 30 Q [US GPM]
0.0
0.2
0.4
0.6
[hp]P2
0
20
40
60
[%]Eta
0
0
0
P2[kW]
P2
Eta
TK
0130
9933
04
17
DWS Product Guide 8-09.indd 17 8/18/2009 2:32:34 PM
Product Guide EZ BoostTM System
0 5 10 15 20 25 30 35 Q [US GPM]
0
20
40
60
80
100
120
140
160
180
200
220
[ft]H
0
10
20
30
40
50
60
70
80
90
P[psi]
0 1 2 3 4 5 6 7 8 9 Q [m³/h]
0
10
20
30
40
50
60
70
H[m]
05B-90 (2-stage)
10C-130 (3-stage)
0 5 10 15 20 25 30 35 Q [US GPM]
0.0
0.2
0.4
0.6
[hp]P2
0
20
40
60
[%]Eta
0
0
0
P2[kW]
P2
Eta
TK
0131
0033
04
18
DWS Product Guide 8-09.indd 18 8/18/2009 2:32:34 PM
Product Guide EZ BoostTM System
ModelMaterialnumber
Max. motor output[P2] Rated
Voltage
Rated current
[A]
Locked rotorcurrent
[A]
Shipping weight[lb (kg)]
Shippingvolume
[ft3 (m3)]hp kW
15BMQE05A-110 91128524 0.845 0.63 110-115 9.2 11.1 26(11.8)
0.9(0.025)
22BMQE05A-80 91128527 0.845 0.63 110-115 7.8 11.1 26(11.8)
15BMQE05A-110 91128525 0.845 0.63 200-240 4.6 5.0 26(11.8)
15BMQE07B-180 91128526 1.408 1.05 200-240 7.1 8.0 29(13.2)
22BMQE05A-80 91128528 0.845 0.63 200-240 3.9 5.0 26(11.8)
22BMQE05B-120 91128529 1.408 1.05 200-240 5.6 8.0 29(13.2)
22BMQE10C-190 91128530 2.320 1.73 200-240 9.9 11.1 31(14.1)
30BMQE05B-90 91128531 1.408 1.05 200-240 6.0 8.0 31(14.1)
30BMQE10C-130 91128533 2.320 1.73 200-240 9.5 11.1 31(14.1)
Weights and electrical data
43.3"/1100
Cableentry
Airventscrew
0.8"/20.5
ø4.
6"/1
16
ø3.
5"/8
8.9
1.25"NPT
1.0"NPT
Dimensional sketch [in/mm]
19
DWS Product Guide 8-09.indd 19 8/18/2009 2:32:35 PM
Product Guide EZ BoostTM System
Main power supply to pump 1 x 200-240 V –10%/+6%, 60 Hz1 x 110-115 V –10%/+6%, 60 Hz
Starting Soft starting.
Stopping SoftstoppingwhenstoppedbytheEZBoostcontroller
Run-uptime Maximum:2seconds.Nolimitationtothenumberofstarts/stopsperhour.
Motorprotection Builtintothepump.Protectionagainst:DryrunningOvervoltageandundervoltage230Vcutsoutat<150Vand>280V115Vcutsoutat<75Vand>150VOverloadOvertemperature
Soundpressurelevel Thesoundpressurelevelis<74db[A]atadistanceof3feet(1meter).It is recommended by Grundfos that the pump be installed with sound and vibration dampening equipment such as; flexible piping adapters and anti-vibration mounting. The pump should not be mounted in or adjacent to living quarters. The pump can also be wrapped with sound proofing insulation to reduce noise. (See page 16, EZ Boost System Diagram.)
Resetfunction BMQEpumpscanberesetviaEZBoostcontroller.
Powerfactor PF=1.
Operationviagenerator ItisrecommendedthatthegeneratoroutputisequaltothemotorinputpowerP1[kW]plus50%;min.P1+10%,however.
Pipeconnection 1.25”NPTinlet/1”NPTdischarge.
Strainer Holesofthestrainer:ø0.09”(2.3mm)
Marking ULListed,CE(SQEPumpwithMSE3motoronly)
Technical data - BMQE pump
20
DWS Product Guide 8-09.indd 20 8/18/2009 2:32:35 PM
Product Guide EZ BoostTM System
EZ Boost ControllerThe EZ Boost controller is a control and communicationunitespeciallydevelopedfortheBMQEboosterpumps inconstantpressureapplications.
TheEZBoostcontrollerprovides:
• FullcontroloftheBMQEpumps
• Two-waycommunicationwiththeBMQEpumps
• Possibilityofadjustingthepressure
• Alarmindication(LED)whenserviceisneeded
• The possibility of starting, stopping and resetting the pumpsimplybymeansofapush-button
TheEZBoostcontrollercommunicateswiththepumpviapower linecommunication,meaningthatnoextracablesarerequiredbetweentheEZBoostcontrollerandtheBMQEpump.
TheEZBoostcontroller featuresthefollowing indications(seedrawingbelow):1. Flowindicator
2. Systempressuresetting
3. SystemON/OFF
4. Buttonlockindicator
5. Dry-runningindicator
6. Serviceneededincaseof:
–Nocontacttopump –Overvoltage –Undervoltage –Speedreduction –Overtemperature –Overload –Sensordefective
TheEZBoostcontroller incorporatesexternalsignal inputforpressure sensorandapumpstatus relay forusewithdevisesdependantonpumpstatus.
Voltage 1x100-240V–10%/+6%,60Hz
Powerconsumption
5W
Currentconsumption
Maximum130mA
Enclosureclass NEMA3R(IP55)
Ambienttemperature
Inoperation:-22to+122°F(-30to+50°C)duringstorage:-22to+140°F(-30to+60°C)
Relativeairhumidity
95%
PumpcableMaximumlengthbetweenEZBoostcontrol-lerandpump:650ft(198m).
Back-upfuse Maximum:16A
Marking ULListed,CE
Load Max.100mA
2 3
4
1
5
6
Powersupplyentry
Submersibledropcableentry
Pressuresensorentry
9 3/15 in. (232 mm) 4 1/2 in. (114 mm)
7 11
/16
in. (
195
mm
)
21
DWS Product Guide 8-09.indd 21 8/18/2009 2:32:35 PM
Product Guide EZ BoostTM System
Accessories
EZ Boost constant pressure kit
Description Rating Materialnumber
EZBoostcontrollerandpressuresensor 40to100PSIsettingrange 91128636
EZ Boost controller
Description Rating Materialnumber
EZBoostcontroller 40to100PSIsettingrange 91121987
Sensor
Description Rating Materialnumber
PressuresensorkitforEZBoostcontroller 0to120PSI,1/2”NPT 96437852
Diaphragm tank
DutyrangePre-chargepressure: 40PSIMax.operatingpressure: 150PSIMax.liquidtemperature: 200°F
MaterialsLiner: PolypropyleneConnection: Lead-freebrassTank: Stainlesssteel,AISI304
DescriptionG
connectionD
[in(mm)]H
[in(mm)]Weight[lbs(kg)]
Materialnumber
Diaphragmtank,2gallon
3/4”NPT 8(203) 12.63(321) 5(2.3) 91121984
G
D
H
22
DWS Product Guide 8-09.indd 22 8/18/2009 2:32:36 PM
Product Guide EZ BoostTM System
EZ Boost Quick GuideEZ Boost Quick Selection GuideExample:1. Themaximumdemandis15GPM(3.4m3/h).
2. Thepressurerequiredis70PSIsystempressure atthetapsinthebuilding.
3. Thenormalminimuminletpressure(e.g.city pressure)is20PSI.
4. Theadditionalboostrequiredis50PSIat15GPM (3.4m3/h).
5. Selecta15BMQE05A-110.
EZ Boost System DiagramTheEZBoostConstantPressureSystemshouldconsistof:
Pos.1. EZBoostBMQEpump
2. EZBoostcontroller
3. Diaphragmtank (recommendedsize2U.S.gallons(8liter)/130psi)
Additional(boost)pressurerequired
5 10 15 20 25 30 35 39Flowrequiredingallonsperminute(GPM)
inPSI908070605040302010
15 BMQE 05A-11015 BMQE 05A-110
30 BMQE 05B-9030 BMQE 05B-90
30 BMQE 10C-13030 BMQE 10C-130
22 BMQE 10C-19022 BMQE 10C-190
22 BMQE 05B-12022 BMQE 05B-120
22 BMQE 05A-8022 BMQE 05A-80
15 BMQE 07B-18015 BMQE 07B-180
4. Pressuresensor
5. Mountingbrackets
6. Flexconnector
23
DWS Product Guide 8-09.indd 23 8/18/2009 2:32:36 PM
PRE-INSTALLATION
A guide to the EZ Boost SystemThe EZ Boost Constant Pressure System automaticallybalances water surges and equalizes flow and pressureaccording to consumption. In other words, the systemmaintains a constant water pressure in spite of varyingwater consumption. The pressure is registered bymeansof the pressure sensor and transmitted to the controller.ThecontrolleradjuststheEZBoostBMQEpumpperform-anceaccordingly.TheEZBoostConstantPressureSystemfeatures:
• Quickandeasyinstallation:ready-to-usesystem requiringminimumspace
• Highuserconvenience:constantpressureregardlessof waterconsumption
• Easilyadjustablepressurelevel:pushbuttoncontrol
• Continuouscontrolandmonitoringofpumpoperation
• Integrateddry-runningprotection
• Integratedoverloadprotection
• Integratedprotectionagainstovervoltageandunder voltage
• Softstartsystem
FunctionWhena tap isopened, thepressure in the tankwill starttodrop.Thesystemmaintainsaconstantpressurewithinthemaximumpumpperformanceinspiteofvaryingwaterconsumption.
Thepressureisregisteredbymeansofthepressuresensor,which transmits a signal to the controller. The controlleradjusts the pump performance accordingly to maintainconstantpressurebychangingthepumpspeed.
Atlowflowthepressurewilldropslowly.Whenthepres-sureinthetankis7PSIbelowthesetpoint,thepumpwillstart.When the pressure is 7 PSI above the setpoint, thepumpwillstop.
EventhoughtheEZBoostcontrolleriscontrollingthepres-surewithin±3PSI,largerpressurevariationsmayoccurinthe system. If the consumption is suddenly changed, e.g.if a tap is opened, the water must start flowing beforethe pressure can bemade constant again. Such dynamicvariations depend on the pipe work, but, typically, theywillliebetween7and14PSI.Ifthedesiredconsumptionishigherthanthequantitythepumpisabletodeliveratthedesiredpressure, thepressure follows thepumpcurveasillustratedinthefarrightoffig.1.
Fig.1
At largeflowrates,thepressurewilldropquicklyandthepumpwill start immediatelyandmaintainconstantpres-sure.Whenthesystemisrunning,theEZBoostcontrollermakessmalladjustmentstothepressuretodetectwhetherthereisconsumption.Ifthereisnone,thepumpwillsimplyrefillthetankandstopafterafewseconds.
Pressure
Flow
A
Stop+7PSI
Start-7PSI
Controlling±3PSI
Dynamicvariations±7PSI
GPM0.8
A=Pressuresetting
Product Guide EZ BoostTM System
24
DWS Product Guide 8-09.indd 24 8/18/2009 2:32:37 PM
1
2
Air escape valve
Diaphragm tank
EZ Boost controller
Isolation valve
Pressure gauge
Pressure sensor
BMQE pumps connected in parallelWhen connecting BMQE pumps in parallel as shown infig.5,a separate EZ Boost controller must be used on each BMQE. Set the pressure on one BMQE 10 PSI lower thantheother.
For BMQE pumps connected in parallel, mounted aboveeach other, it is recommended to connect the pipes asshowninfig.5.ThislayoutensuresthattheBMQEpumpsarefilledwithwaterbeforestarting.
Fig.5 BoosterunitwithtwoBMQEpumps connectedinparallel,mountedaboveeach other.
Notes:• AllBMQEmodulesaresuppliedwithanon-return
valve.
• BMQEmodulesconnectedinparallelmayalsobe installedvertically.
• Asventingproblemsmayariseinsuchinstallations,itis advisabletoinstallsuitableairventdevices.
• TheBMQEshouldbepositionedwiththedischargeand airventatthetopwheninstalledvertically.
• WhenthemaximumflowforBMQEpumpsinparallel will exceed 35 GPM, a 4-gallon or two 2-gallon dia- phragmtank(s)shouldbeused.
Product Guide EZ BoostTM System
25
DWS Product Guide 8-09.indd 25 8/18/2009 2:32:37 PM
Grundfos — a world-wide supplierGrundfos offers an efficient world-wide service network. Experienced service technicians and all necessary spare parts are available at short notice in all corners of the world.
Being responsible is our foundation
Thinking ahead makes it possible
Innovation is the essence
GRUNDFOS Canada Inc.2941 Brighton RoadOakville, Ontario L6H 6C9 CanadaTelephone: 905 829 9533Fax: 905 829 9512
Bombas GRUNDFOS de Mexico S.A. de C.V.Boulevard TLC #15 Parque Stiva Aeropuerto Apodaca, N.L. Mexico 66600 Telephone: 52 81 8144 4000Fax: 52 81 8144 4010
GRUNDFOS Pumps Corporation17100 West 118th TerraceOlathe, Kansas 66061Telephone: 913 227 3400Fax: 913 227 3500
www.grundfos.com
GRUNDFOS EZ BOOST™ SYSTEM
Reliable, economical pressure boosting for smaller buildings
• medical offices
• restaurants
• homes
• condos
• irrigation
• grocery
Pressure boosting made EZ
L-EZ-SL-001 3/06 (US)Subject to alterations
However, R. L. Feezer Construction Inc. solves this
problem with Grundfos EZ Boost. According to Gen-
eral Manager Rusty George, “Traditional tank sizes
are dictated because the pressure boosting pump
has to be mounted inside the tank, requiring a large
tank. With EZ Boost’s external installation, we have
many more options for tank selection, so now we
use a round tank that is easier to install, costs less,
and eliminates expensive rework of door jambs.” The
result was a savings to the homeowner in terms of
the cost of the tank and labor.
CASE STORYLuxury home application
Submitted by
Rusty George, General Manager
R.L. Feezer Construction Inc.
Sykesville, Maryland
Central Maryland illustrates a common problem
when it comes to water pressure for larger homes.
The water level in the area’s 6” rock wells is very deep,
and the yields are inadequate to pump from the well
direct to housing fixtures. Therefore a holding tank
becomes necessary. Often the only place to install a
holding tank is in the basement – particularly in the
North East where sub-zero temperatures are common
during winter.
Installing a 600 - 1000 gallon holding tank in a base-
ment presents another problem….how to get a large
32” wide X 62” long X 62” tall, rectangular holding
tank down a flight of stairs that, halfway, turns left at
a landing and through a 30” doorway. Since the tank
is larger than the door’s opening size, the door’s frame
must be widened to fit the unruly holding tank.
To choose the appropriate EZ-Boost system for your application is simple. 1. Determine how much pressure you need at a given flow.2. Find-out how much pressure you have available (inlet pressure).3. Select a pump from the chart that gives you the difference.
Example: Need 15 gpm with a total pressure of 60 psi. My line pressure is 20 psi, therefore Ineed a boost of 40 psi.The correct selection would be a Model 22 BMQE 05A-80.
Additional (boost) pressure required
5 10 15 20 25 30 35 39Flow required in gallons per minute (GPM)
in PSI908070605040302010
15 BMQE 07B-180
15 BMQE 05A-110
22 BMQE 05A-80
22 BMQE 05B-120
22 BMQE 10C-190
30 BMQE 10C-130
30 BMQE 05B-90
EZ Boost Quick Sizing GuideChoosing the appropriate EZ Boost pump for your application is simple:
1. Determine how much pressure you need at your maximum flow.
2. Find out how much pressure you have available (minimum inlet pressure).
3. Select a pump from the chart that gives you the difference.
Example: I need maximum 15 gpm with a total pressure of 60 psi.
My minimum inlet pressure available is 20 psi, so I need a boost of 40 psi.
The correct selection would be a Model 15 BMQE 05A-110.
Typical EZ Boost residential installation
With EZ Boost there are more tank options
LEZSL001_EZBoostBroch_0306.indd 1 7/26/2006 4:42:21 PM
EZ Boost System solves low water pressureIf your problem is low water pressure, Grundfos EZ
Boost is your solution. Grundfos EZ Boost provides
constant water pressure – even while multiple taps
are on, and is perfect for large residential & light
commercial pressure boosting applications:
• medical offices • restaurants • homes
• condos • irrigation • grocery
• plus many other boosting applications
Grundfos’ EZ Boost is a complete pressure boosting
system that includes pump, controller, tank, mount-
ing brackets, and pressure sensor. Its high-quality
construction and rugged design ensures low-main-
tenance and trouble free operation. EZ Boost can be
installed just about anywhere; it is simple to install
and simple to operate. Additionally, it is competitive-
ly priced when compared to other pressure boosting
alternatives.
Grundfos EZ Boost features:
> Maintenance-free
• Seal-less and self-cooling
> Dry-run protection
• Protects the pump from damage if
the water supply runs dry
> Standard home outlet voltages (single phase)
• All models available in 230 volt and
some models available in 115 volt
> Soft-start
• Prevents water hammer in pipes and
stress on the pump (also minimizes
flickering lights)
> Over voltage and under voltage protection
• Slows or stops the pump to protect the
motor during unstable voltage conditions
> Many installation options:
• Wall-mounted • Framed-in
• In-ground • Equipment build-on
• Portable devices
EZ BOOST ™ SYSTEM
Performance curves
0 5 10 15 20 25 30 35 Q [US GPM]
0
40
80
120
160
200
240
280
[ft]H
0
20
40
60
80
100
120
P[psi]
TK
01 3
100
4801
15 BMQE 07B-180
15 BMQE 05A-110
22 BMQE 10C-190
22 BMQE 05B-120
22 BMQE 05A-80
30 BMQE 10C-130
30 BMQE 05B-90
BMQE60 Hz
Technical data
6
2
5 4 7
31
8Flow: Max. 40 gpm (9 m3/h)Head: Max 300 ft./130 psi (91 m)Fluid temperature: Max. 95°F (35°C)Ambient temperature: Min. 32°F (0°C)Operating pressure: Max. 145 psiInlet pressure: Min. 8 psi Max. limited by operating pressureOperating setpoint: 40 to 100 psi (in 10 psi increments)Sound pressure level: < 74 dB(A) at a distance of 3 ft. (1 m) from the pump. Note: Sound-sensitive installations may require insulation.
Pos.1. Sleeve2. Discharge connection3. Suction connection4. Submersible motor
5. Submersible pump6. Cable entry7. Centering device8. Air vent screw
Wes recommended the Grundfos EZ Boost System
model 22BMQE10-190 which, fortunately, he had in
stock.
On Wednesday morning, Wes stopped by the res-
taurant and found it packed with customers. When
it was convenient he discussed the situation with
the owner who was delighted with the Grundfos EZ
Boost System.
This EZ Boost System
boosted water pressure
from the city’s main from
20 psi to the 60 psi needed
for this restaurant’s soda
fountains and toilets.
Ice cream restaurant application
Submitted by
Wes Blumenauer, CEO
The Blumenauer Corporation
Ocoee, Florida
Wes received a phone call late on a Monday after-
noon from a desperate plumber looking for a pump
to solve a water pressure problem at a Friendly’s Ice
Cream Restaurant in Clermont, Florida.
The first problem was the city’s water main could
only supply 20 PSI to the restaurant. The plumber
said at least 60 PSI was required to operate the soda
machines and flush the toilets.
The second problem was that the restaurant was
slated to open on Wednesday morning – meaning
a solution had to be found, installed and properly
operating in one day!
CASE STORY
Doctor’s offices
With an existing office space, flexible installation options are a welcome advantage. Small offices like this one may not have much mechanical space. The solution: The EZ Boost System was installed above the lay-in ceiling.
Most pumps would be too noisy for this type of installation but not the EZ Boost System. Its variable frequency drive operation is smooth and quiet.
The pressurized diaphragm tank can sit horizontally and the pump is installed inline with the piping system.
APPLICATIONS
Laundry
The EZ Boost System can make it possible to run multiple fixtures without loss in pressure. Compact, clean installation and quiet opera-tion make EZ Boost a perfect choice for laundry applications.
MRI facilities
An MRI facility might need extra pressure to cool the MRI machine. Even with space at a premium, the EZ Boost has been installed in a space as small as a janitor’s closet.
Condominiums
For multiple housing units, EZ Boost can be installed in parallel (each pump must be connected its own controller. Pumps can be installed either horizontally or vertically.
Luxury homes
Comfort and convenience for luxury homes...with an EZ Boost System in place, an upstairs bathroom or shower can have the same water pressure as downstairs. Filling the pool... while taking a bath...while running the dishwasher! is no longer a problem.
BMQE Pump
Pressure Sensor
Diaphragm Tank
2
3
4
1 5 66
EZ Boost System Typical Application
4. Pressure sensor5. Mounting brackets (included with pump)
6. Flex connector
Pos.1. EZ Boost BMQE pump2. EZ Boost controller3. Diaphragm tank (recommended size 2 US gallons/130 psi)
Installation above ceiling and closeup view
LEZSL001_EZBoostBroch_0306.indd 2 7/26/2006 4:42:28 PM