f/5 status & planning
DESCRIPTION
f/5 Status & Planning. Results of MMIRS first light run Planning for first science campaign 2010b campaign planning & pre-allocation 2011 planning. Magellan SAC•Pasadena•13/14 Mar 2010•ASz. Magellan SAC•Pasadena•13/14 Mar 2010•ASz. Magellan SAC•Pasadena•13/14 Mar 2010•ASz. - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: f/5 Status & Planning](https://reader035.vdocument.in/reader035/viewer/2022062500/56815168550346895dbf9a6d/html5/thumbnails/1.jpg)
f/5 Status & Planning
• Results of MMIRS first light run• Planning for first science campaign• 2010b campaign planning & pre-allocation• 2011 planning
Magellan SAC•Pasadena•13/14 Mar 2010•ASzMagellan SAC•Pasadena•13/14 Mar 2010•ASz
![Page 2: f/5 Status & Planning](https://reader035.vdocument.in/reader035/viewer/2022062500/56815168550346895dbf9a6d/html5/thumbnails/2.jpg)
MMIRS First Light Run
• Imaging results• Long slit results• Lack of multislit results• Flexure problem• Baffle problem
Magellan SAC•Pasadena•13/14 Mar 2010•ASzMagellan SAC•Pasadena•13/14 Mar 2010•ASz
![Page 3: f/5 Status & Planning](https://reader035.vdocument.in/reader035/viewer/2022062500/56815168550346895dbf9a6d/html5/thumbnails/3.jpg)
Imaging and Longslit Observations
• Imaging demonstrated successfully• Several longslit observations done• Still being analyzed• Weather late in run not good … spectroscopic observations curtailed.
Magellan SAC•Pasadena•13/14 Mar 2010•ASzMagellan SAC•Pasadena•13/14 Mar 2010•ASz
Tarantula Nebula J,H,K pseudocolor – 0.4” seeing
![Page 4: f/5 Status & Planning](https://reader035.vdocument.in/reader035/viewer/2022062500/56815168550346895dbf9a6d/html5/thumbnails/4.jpg)
Multislit Spectroscopy
• Poor weather prevented demonstration multislit capability• MMIRS has operated successfully in multislit mode on MMT
Magellan SAC•Pasadena•13/14 Mar 2010•ASzMagellan SAC•Pasadena•13/14 Mar 2010•ASz
![Page 5: f/5 Status & Planning](https://reader035.vdocument.in/reader035/viewer/2022062500/56815168550346895dbf9a6d/html5/thumbnails/5.jpg)
Flexure Problem
… is not a (flexure) problem.
Magellan SAC•Pasadena•13/14 Mar 2010•ASzMagellan SAC•Pasadena•13/14 Mar 2010•ASz
![Page 6: f/5 Status & Planning](https://reader035.vdocument.in/reader035/viewer/2022062500/56815168550346895dbf9a6d/html5/thumbnails/6.jpg)
Baffle Problem
• MMIRS is somewhat underbaffled• Light leak – problem for K band obs• Have designed and built a new deployable baffle to correct this
Magellan SAC•Pasadena•13/14 Mar 2010•ASzMagellan SAC•Pasadena•13/14 Mar 2010•ASz
![Page 7: f/5 Status & Planning](https://reader035.vdocument.in/reader035/viewer/2022062500/56815168550346895dbf9a6d/html5/thumbnails/7.jpg)
Planning for First Science Campaign
• Staffing• Slitmasks• Deployable baffle• New grism
Magellan SAC•Pasadena•13/14 Mar 2010•ASzMagellan SAC•Pasadena•13/14 Mar 2010•ASz
![Page 8: f/5 Status & Planning](https://reader035.vdocument.in/reader035/viewer/2022062500/56815168550346895dbf9a6d/html5/thumbnails/8.jpg)
2010a f/5 Staffing
• f/5 run 24 March - 3 May• SAO team members already at LCO installing new grism and deployable baffle• SAO f/5 team presence from start of run until 23 April• Osip & Postdocs to cover last week w/support from V. Suc• Schedule “soft” due to irregularity of transportation
Magellan SAC•Pasadena•13/14 Mar 2010•ASzMagellan SAC•Pasadena•13/14 Mar 2010•ASz
![Page 9: f/5 Status & Planning](https://reader035.vdocument.in/reader035/viewer/2022062500/56815168550346895dbf9a6d/html5/thumbnails/9.jpg)
Slitmask Production
• 2010a masks produced with by SAO staff• Would like to retire this responsibility – mask design and fabrication• xfitmask software nearly ready for general use• instructions on use @:
http://www.cfa.harvard.edu/wiki/mmti/MMTI/MMIRS/ObsManual/MMIRS+Mask+Making
• Requires SAO network access• Only competent vendor for mask we are aware of is:
PhotoMachining Inc.4 Industrial Park DrivePelham, NH. 0307P.:603-882-9944; F.:603-886-8844
Magellan SAC•Pasadena•13/14 Mar 2010•ASzMagellan SAC•Pasadena•13/14 Mar 2010•ASz
![Page 10: f/5 Status & Planning](https://reader035.vdocument.in/reader035/viewer/2022062500/56815168550346895dbf9a6d/html5/thumbnails/10.jpg)
Deployable Baffle
• f/5 team currently installing deployable baffle in LCO clean room• Also installing J-Band grism
• HK available• H & K for 2010b
Magellan SAC•Pasadena•13/14 Mar 2010•ASzMagellan SAC•Pasadena•13/14 Mar 2010•ASz
![Page 11: f/5 Status & Planning](https://reader035.vdocument.in/reader035/viewer/2022062500/56815168550346895dbf9a6d/html5/thumbnails/11.jpg)
2010b Campaign Planning
Magellan SAC•Pasadena•13/14 Mar 2010•ASzMagellan SAC•Pasadena•13/14 Mar 2010•ASz
• Slit masks production• Pre-allocation?• Staffing/support
![Page 12: f/5 Status & Planning](https://reader035.vdocument.in/reader035/viewer/2022062500/56815168550346895dbf9a6d/html5/thumbnails/12.jpg)
Slit Mask Production for 2010b
• 2010a masks produced & procurments arranged by SAO • Do not want this to remain the status quo
• xfitmask is maturing demo➥• Have responsive, competent vendor• Issues:• CfA network access to use xfitmask• Procurement processing• Finding other mask suppliers
• CTIO? LCO?
Magellan SAC•Pasadena•13/14 Mar 2010•ASzMagellan SAC•Pasadena•13/14 Mar 2010•ASz
![Page 13: f/5 Status & Planning](https://reader035.vdocument.in/reader035/viewer/2022062500/56815168550346895dbf9a6d/html5/thumbnails/13.jpg)
Pre-Allocation of Observing Blocks
Ian?
Magellan SAC•Pasadena•13/14 Mar 2010•ASzMagellan SAC•Pasadena•13/14 Mar 2010•ASz
![Page 14: f/5 Status & Planning](https://reader035.vdocument.in/reader035/viewer/2022062500/56815168550346895dbf9a6d/html5/thumbnails/14.jpg)
Staffing/Support in 2010b
From B. McLeodAndy,
For now, I would like to avoid the weeks of Aug15-28 for starting a MMIRS runif possible.
We're in the process of planning our summer activities, and depending onhow this pans out I may be able to return the week of Aug 15 to the mix,which would be week 1 of a bright run. (Full moon is Aug 24). I hope toknow more in the next week or so.
Brian
Magellan SAC•Pasadena•13/14 Mar 2010•ASzMagellan SAC•Pasadena•13/14 Mar 2010•ASz
• ASz, JR & BMcL will spend ~1 month each support 2010a run this is onerous⇨• However:• Ops software under intense development• Experience base is broadening• ASz & BMcL will supervise startup of MMIRS & Megacam, but expecting to off-load observing support
![Page 15: f/5 Status & Planning](https://reader035.vdocument.in/reader035/viewer/2022062500/56815168550346895dbf9a6d/html5/thumbnails/15.jpg)
2011 Planning
• How long will MMIRS & MegaCam stay at LCO?• Oversubscription for Magellan swelled by availability of f/5 instrumentation• Would like to provide uninterrupted access for continuing programs• Was some slight bruising during MMIRS shipping • Operations are becoming increasingly regularized• Moving to MMT (and back to LCO) requires significant software effort• Consider AO gating departure of MMIRS and Megacam• Will probably be at MMT 2+ years
Magellan SAC•Pasadena•13/14 Mar 2010•ASzMagellan SAC•Pasadena•13/14 Mar 2010•ASz
![Page 16: f/5 Status & Planning](https://reader035.vdocument.in/reader035/viewer/2022062500/56815168550346895dbf9a6d/html5/thumbnails/16.jpg)
A Declaration of War?
Magellan SAC•Pasadena•13/14 Mar 2010•ASzMagellan SAC•Pasadena•13/14 Mar 2010•ASz
![Page 17: f/5 Status & Planning](https://reader035.vdocument.in/reader035/viewer/2022062500/56815168550346895dbf9a6d/html5/thumbnails/17.jpg)
Port Plan
Magellan SAC•Pasadena•13/14 Mar 2010•ASzMagellan SAC•Pasadena•13/14 Mar 2010•ASz
What is our message to the Council?