  • Fabrication Progress for LHC Superconducting Crab Cavities April 17, 2015
  • Slide 2
  • Outer conductor halves 4 halves in QA 2 Double Quarter-Wave
  • Slide 3
  • 3 Top cake pans 2 in QA Double Quarter-Wave
  • Slide 4
  • 4 Bottom cake pans 2 in QA
  • Slide 5
  • Double Quarter-Wave 5 Cake pan assemblies
  • Slide 6
  • 6 Bowls Complete Ready for NbTi tuner attachment welds Double Quarter-Wave
  • Slide 7
  • 7 Cake pan & bowl stackup Double Quarter-Wave
  • Slide 8
  • 8 Outer conductor halves 4 in QA RF Dipole
  • Slide 9
  • 9 Small HOM Box Side Port 2 in QA (4 halves)
  • Slide 10
  • 10 End cap: Niobium stamping in progress RF Dipole
  • Slide 11
  • 11 FPC & HOM Box Port Halves Waiting for finalization of end cap prototype RF Dipolecopper prototypes
  • Slide 12
  • 12 Bowl: Machined copper for stackup RF Dipolecopper prototypes
  • Slide 13
  • 13 Stiffener: Machined for stackup RF Dipolecopper prototypes
  • Slide 14
  • 14 Bowl Stiffener Outer Conductor