facilities construction costs · 2020. 11. 25. · issn 1540-6202 isbn 978-1-950656-56-1 brian...

9
Facilities Construction Costs with RSMeans data 2021 36 th annual edition Copyright The Gordian Group, Inc. 2021

Upload: others

Post on 24-Aug-2021

8 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Facilities Construction Costs · 2020. 11. 25. · ISSN 1540-6202 ISBN 978-1-950656-56-1 Brian Adams, Senior Editor Facilities Construction Costs with RSMeans data Gordian’s authors,

Facilities Construction Costs with RSMeans data

202136th annual edition

Copyright The Gordian Group, Inc. 2021

Page 2: Facilities Construction Costs · 2020. 11. 25. · ISSN 1540-6202 ISBN 978-1-950656-56-1 Brian Adams, Senior Editor Facilities Construction Costs with RSMeans data Gordian’s authors,

202136th annual edition

$949.00 per copy (in United States)Price is subject to change without prior notice.0201

RSMeans data from GordianConstruction Publishers & Consultants1099 Hingham Street, Suite 201Rockland, MA 02370United States of America1.800.448.8182RSMeans.com

Copyright 2020 by The Gordian Group Inc.All rights reserved.Cover photo © iStock.com/rsaulyte

Printed in the United States of AmericaISSN 1540-6202ISBN 978-1-950656-56-1

Brian Adams, Senior Editor

Facilities Construction Costs with RSMeans data

Gordian’s authors, editors, and engineers apply diligence and judgment in locating and using reliable sources for the information published. However, Gordian makes no express or implied warranty or guarantee in connection with the content of the information contained herein, including the accuracy, correctness, value, suffi ciency, or completeness of the data, methods, and other information contained herein. Gordian makes no express or implied warranty of merchantability or fi tness for a particular purpose. Gordian shall have no liability to any customer or third party for any loss, expense, or damage, including consequential, incidental, special, or punitive damage, including lost profi ts or lost revenue, caused directly or indirectly by any error or omission, or arising out of, or in connection with, the information contained herein. For the purposes of this paragraph, “Gordian” shall include The Gordian Group, Inc., and its divisions, subsidiaries, successors, parent companies, and their employees, partners, principals, agents and representatives, and any third-party providers or sources of information or data. Gordian grants the purchaser of this publication limited license to use the cost data

contained herein for purchaser’s internal business purposes in connection with construction estimating and related work. The publication, and all cost data contained herein, may not be reproduced, integrated into any software or computer program, developed into a database or other electronic compilation, stored in an information storage or retrieval system, or transmitted or distributed to anyone in any form or by any means, electronic or mechanical, including photocopying or scanning, without prior written permission of Gordian. This publication is subject to protection under copyright law, trade secret law and other intellectual property laws of the United States, Canada and other jurisdictions. Gordian and its affi liates exclusively own and retain all rights, title and interest in and to this publication and the cost data contained herein including, without limitation, all copyright, patent, trademark and trade secret rights. Except for the limited license contained herein, your purchase of this publication does not grant you any intellectual property rights in the publication or the cost data.

Vice President, DataTim Duggan

Vice President, ProductTed Kail

Product ManagerJason Jordan

Principal EngineerBob Mewis

Engineers: Architectural Divisions1, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 41Matthew Doheny, ManagerSam BabbittSergeleen EdouardRichard Goldin

Scott KellerThomas Lane

Engineers: Civil Divisions and Wages2, 31, 32, 33, 34, 35, 44, 46Derrick Hale, PE, ManagerChristopher BabbittStephen BellMichael LynchElisa MelloDavid Yazbek

Engineers: Mechanical, Electrical, Plumbing & Conveying Divisions14, 21, 22, 23, 25, 26, 27, 28, 48Joseph Kelble, ManagerBrian Adams

Michelle CurranAntonio D’AulerioThomas LyonsJake MacDonald

Contributing EngineersJohn Melin, PE, ManagerPaul CowanBarry HutchinsonGerard Lafond, PEMatthew Sorrentino

Technical Project LeadKevin Souza

Production Debra Panarelli, ManagerJonathan ForgitSharon LarsenSheryl RoseJanice Thalin

Data Quality Joseph Ingargiola, ManagerDavid ByarsAudrey ConsidineEllen D’Amico

Cover DesignBlaire Collins

InnovationRay Diwakar, Vice PresidentKedar GaikwadTodd GlowacSrini NarlaJoseph Woughter

Copyright The Gordian Group, Inc. 2021

Page 3: Facilities Construction Costs · 2020. 11. 25. · ISSN 1540-6202 ISBN 978-1-950656-56-1 Brian Adams, Senior Editor Facilities Construction Costs with RSMeans data Gordian’s authors,

iii

Foreword ivHow the Cost Data Is Built: An Overview vEstimating with RSMeans data: Unit Prices viiHow to Use the Cost Data: The Details ixUnit Price Section 1RSMeans data: Unit Prices—How They Work 4Assemblies Section 1269RSMeans data: Assemblies—How They Work 1272Reference Section 1375

Construction Equipment Rental Costs 1377Crew Listings 1389Historical Cost Indexes 1425City Cost Indexes 1426Location Factors 1469Reference Tables 1475Change Orders 1552Project Costs 1555Abbreviations 1560

Index 1564Other Data and Services 1617Labor Trade Rates includingOverhead & Profit Inside Back Cover

Table of Contents

Copyright The Gordian Group, Inc. 2021

Page 4: Facilities Construction Costs · 2020. 11. 25. · ISSN 1540-6202 ISBN 978-1-950656-56-1 Brian Adams, Senior Editor Facilities Construction Costs with RSMeans data Gordian’s authors,

1

Unit Price Section

General Requirements01 11 Summary of Work .............................. 1001 21 Allowances .......................................... 1101 31 Project Management

and Coordination ................................ 1301 32 Construction Progress

Documentation ................................... 1501 41 Regulatory Requirements .................. 1501 45 Quality Control .................................. 1501 51 Temporary Utilities ............................ 1701 52 Construction Facilities ....................... 1701 54 Construction Aids .............................. 1801 55 Vehicular Access and Parking ........... 2301 56 Temporary Barriers and Enclosures .. 2301 57 Temporary Controls ........................... 2501 58 Project Identification .......................... 2601 66 Product Storage and Handling

Requirements ...................................... 2601 71 Examination and Preparation ............ 2601 74 Cleaning and Waste Management .... 2601 76 Protecting Installed Construction ..... 2601 91 Commissioning ................................... 2701 93 Facility Maintenance .......................... 27

Existing Conditions02 21 Surveys ................................................ 4002 31 Geophysical Investigations ................ 4002 32 Geotechnical Investigations .............. 4002 41 Demolition .......................................... 4102 42 Removal and Diversion

of Construction Materials ................. 5802 43 Structure Moving ................................ 6102 58 Snow Control ...................................... 6102 65 Underground Storage

Tank Removal ..................................... 6102 81 Transportation and Disposal of

Hazardous Materials ........................... 6202 82 Asbestos Remediation ........................ 6202 83 Lead Remediation ............................... 6602 87 Biohazard Remediation ...................... 68

Concrete03 01 Maintenance of Concrete .................. 7403 05 Common Work Results

for Concrete ........................................ 8003 11 Concrete Forming ............................... 8203 15 Concrete Accessories ......................... 9103 21 Reinforcement Bars ............................ 9903 22 Fabric and Grid Reinforcing .............. 10403 23 Stressed Tendon Reinforcing ............. 10503 24 Fibrous Reinforcing ............................ 10603 30 Cast-In-Place Concrete ....................... 10703 31 Structural Concrete ............................ 10903 35 Concrete Finishing ............................. 11203 37 Specialty Placed Concrete ................. 11503 39 Concrete Curing ................................. 11503 41 Precast Structural Concrete ............... 11603 45 Precast Architectural Concrete ......... 11803 47 Site-Cast Concrete .............................. 11803 48 Precast Concrete Specialties .............. 11903 51 Cast Roof Decks ................................. 11903 52 Lightweight Concrete

Roof Insulation ................................... 11903 53 Concrete Topping ............................... 12003 54 Cast Underlayment ............................ 12003 62 Non-Shrink Grouting ......................... 12003 63 Epoxy Grouting ................................... 12103 81 Concrete Cutting ................................ 12103 82 Concrete Boring .................................. 122

Masonry04 01 Maintenance of Masonry ................... 12604 05 Common Work Results

for Masonry ......................................... 12704 21 Clay Unit Masonry ............................. 13304 22 Concrete Unit Masonry ..................... 13804 23 Glass Unit Masonry ........................... 145

04 24 Adobe Unit Masonry .......................... 14604 25 Unit Masonry Panels .......................... 14604 27 Multiple-Wythe Unit Masonry ......... 14704 41 Dry-Placed Stone ................................ 14704 43 Stone Masonry .................................... 14804 51 Flue Liner Masonry ............................ 15204 54 Refractory Brick Masonry .................. 15204 57 Masonry Fireplaces ............................. 15304 71 Manufactured Brick Masonry ............ 15304 72 Cast Stone Masonry ........................... 15304 73 Manufactured Stone Masonry ........... 154

Metals05 01 Maintenance of Metals ...................... 15605 05 Common Work Results for Metals ... 15605 12 Structural Steel Framing .................... 16405 14 Structural Aluminum Framing ......... 17105 15 Wire Rope Assemblies ....................... 17105 21 Steel Joist Framing .............................. 17405 31 Steel Decking ...................................... 17705 35 Raceway Decking Assemblies ........... 17905 41 Structural Metal Stud Framing ......... 17905 42 Cold-Formed Metal Joist Framing .... 18305 44 Cold-Formed Metal Trusses .............. 18905 51 Metal Stairs ......................................... 19005 52 Metal Railings ..................................... 19105 53 Metal Gratings .................................... 19305 54 Metal Floor Plates .............................. 19505 55 Metal Stair Treads and Nosings ........ 19605 56 Metal Castings .................................... 19705 58 Formed Metal Fabrications ................ 19705 71 Decorative Metal Stairs ..................... 19905 73 Decorative Metal Railings ................. 20005 75 Decorative Formed Metal .................. 200

Wood, Plastics & Composites06 05 Common Work Results for Wood,

Plastics, and Composites ................... 20206 11 Wood Framing ..................................... 20906 12 Structural Panels ................................ 21906 13 Heavy Timber Construction ............. 22006 15 Wood Decking ..................................... 22006 16 Sheathing ............................................. 22106 17 Shop-Fabricated Structural Wood ...... 22406 18 Glued-Laminated Construction ........ 22406 22 Millwork .............................................. 22506 25 Prefinished Paneling ........................... 23706 26 Board Paneling .................................... 23806 43 Wood Stairs and Railings ................... 23806 44 Ornamental Woodwork ..................... 24106 48 Wood Frames ....................................... 24206 49 Wood Screens and Exterior Wood

Shutters ................................................ 24306 51 Structural Plastic Shapes and Plates . 24406 52 Plastic Structural Assemblies ............ 24506 63 Plastic Railings ................................... 24606 65 Plastic Trim ......................................... 24606 73 Composite Decking ............................ 24706 81 Composite Railings ............................ 248

Thermal & Moisture Protection07 01 Operation and Maint. of Thermal

and Moisture Protection .................... 25007 05 Common Work Results for Thermal

and Moisture Protection .................... 25107 11 Dampproofing ..................................... 25207 12 Built-up Bituminous Waterproofing .. 25207 13 Sheet Waterproofing ........................... 25307 16 Cementitious and Reactive

Waterproofing ...................................... 25307 17 Bentonite Waterproofing .................... 25407 19 Water Repellents ................................. 25407 21 Thermal Insulation ............................. 25407 22 Roof and Deck Insulation .................. 25807 24 Exterior Insulation and

Finish Systems .................................... 26007 25 Weather Barriers ................................. 261

07 26 Vapor Retarders ................................... 26107 27 Air Barriers .......................................... 26107 31 Shingles and Shakes ........................... 26207 32 Roof Tiles ............................................ 26407 33 Natural Roof Coverings ..................... 26507 41 Roof Panels .......................................... 26507 42 Wall Panels .......................................... 26707 44 Faced Panels ........................................ 26807 46 Siding ................................................... 26907 51 Built-Up Bituminous Roofing ............ 27207 52 Modified Bituminous

Membrane Roofing ............................. 27407 53 Elastomeric Membrane Roofing ........ 27407 54 Thermoplastic Membrane Roofing ... 27507 55 Protected Membrane Roofing ............ 27607 56 Fluid-Applied Roofing ........................ 27607 57 Coated Foamed Roofing ..................... 27707 58 Roll Roofing ........................................ 27707 61 Sheet Metal Roofing ........................... 27707 62 Sheet Metal Flashing and Trim ......... 27807 65 Flexible Flashing ................................. 27807 71 Roof Specialties ................................... 28107 72 Roof Accessories ................................. 28607 76 Roof Pavers .......................................... 28707 81 Applied Fireproofing ........................... 28707 84 Firestopping ......................................... 28807 91 Preformed Joint Seals ......................... 29007 92 Joint Sealants ...................................... 29107 95 Expansion Control .............................. 292

Openings08 01 Operation and Maintenance

of Openings ......................................... 29408 05 Common Work Results

for Openings ........................................ 29508 11 Metal Doors and Frames .................... 29708 12 Metal Frames ...................................... 29808 13 Metal Doors ........................................ 30108 14 Wood Doors ......................................... 30408 16 Composite Doors ................................ 31208 17 Integrated Door

Opening Assemblies ........................... 31208 31 Access Doors and Panels ................... 31408 32 Sliding Glass Doors ............................ 31608 33 Coiling Doors and Grilles .................. 31708 34 Special Function Doors ...................... 31808 36 Panel Doors ......................................... 32108 38 Traffic Doors ....................................... 32208 41 Entrances and Storefronts .................. 32308 42 Entrances ............................................. 32508 43 Storefronts ........................................... 32508 44 Curtain Wall and

Glazed Assemblies ............................. 32608 45 Translucent Wall and

Roof Assemblies ................................. 32708 51 Metal Windows ................................... 32708 52 Wood Windows ................................... 32908 53 Plastic Windows ................................. 33408 54 Composite Windows .......................... 33708 56 Special Function Windows ................ 33708 61 Roof Windows ..................................... 33708 62 Unit Skylights ..................................... 33808 63 Metal-Framed Skylights ..................... 33808 71 Door Hardware ................................... 33908 75 Window Hardware .............................. 35308 79 Hardware Accessories ........................ 35408 81 Glass Glazing ...................................... 35508 83 Mirrors ................................................. 35708 84 Plastic Glazing .................................... 35808 85 Glazing Accessories ............................ 35808 87 Glazing Surface Films ........................ 35908 88 Special Function Glazing ................... 36008 91 Louvers ................................................ 36208 95 Vents .................................................... 364

Sect. No. Page Sect. No. Page Sect. No. PageTable of Contents

Copyright The Gordian Group, Inc. 2021

Page 5: Facilities Construction Costs · 2020. 11. 25. · ISSN 1540-6202 ISBN 978-1-950656-56-1 Brian Adams, Senior Editor Facilities Construction Costs with RSMeans data Gordian’s authors,

2

Finishes09 01 Maintenance of Finishes .................... 36609 05 Common Work Results

for Finishes .......................................... 36909 21 Plaster and Gypsum

Board Assemblies ................................ 37109 22 Supports for Plaster and

Gypsum Board .................................... 37309 23 Gypsum Plastering ............................. 37809 24 Cement Plastering .............................. 37909 25 Other Plastering .................................. 37909 26 Veneer Plastering ................................ 38009 28 Backing Boards and Underlayments . 38009 29 Gypsum Board .................................... 38109 30 Tiling .................................................... 38509 31 Thin-Set Tiling .................................... 38509 32 Mortar-Bed Tiling ............................... 38709 34 Waterproofing-Membrane Tiling ....... 38809 35 Chemical-Resistant Tiling ................. 38809 51 Acoustical Ceilings ............................ 38909 53 Acoustical Ceiling Suspension

Assemblies .......................................... 39009 54 Specialty Ceilings ............................... 39109 57 Special Function Ceilings .................. 39209 61 Flooring Treatment ............................. 39209 62 Specialty Flooring ............................... 39309 63 Masonry Flooring ................................ 39309 64 Wood Flooring ..................................... 39409 65 Resilient Flooring ............................... 39609 66 Terrazzo Flooring ................................ 39909 67 Fluid-Applied Flooring ....................... 40109 68 Carpeting ............................................. 40209 69 Access Flooring ................................... 40309 72 Wall Coverings .................................... 40409 74 Flexible Wood Sheets ......................... 40509 77 Special Wall Surfacing ........................ 40609 81 Acoustic Insulation ............................ 40709 84 Acoustic Room Components ............ 40709 91 Painting ................................................ 40809 93 Staining and Transparent Finishing .. 42109 96 High-Performance Coatings .............. 42109 97 Special Coatings .................................. 423

Specialties10 05 Common Work Results

for Specialties ...................................... 42810 11 Visual Display Units .......................... 42810 13 Directories ........................................... 43110 14 Signage ................................................. 43210 17 Telephone Specialties ......................... 43510 21 Compartments and Cubicles ............. 43510 22 Partitions ............................................. 43910 26 Wall and Door Protection .................. 44310 28 Toilet, Bath, and Laundry

Accessories .......................................... 44410 31 Manufactured Fireplaces .................... 44710 32 Fireplace Specialties ........................... 44810 35 Stoves ................................................... 44910 43 Emergency Aid Specialties ................ 44910 44 Fire Protection Specialties ................. 44910 51 Lockers ................................................. 45010 55 Postal Specialties ................................ 45210 56 Storage Assemblies ............................. 45310 57 Wardrobe and Closet Specialties ....... 45310 73 Protective Covers ............................... 45410 74 Manufactured Exterior Specialties .... 45510 75 Flagpoles .............................................. 45610 86 Security Mirrors and Domes ............. 45710 88 Scales ................................................... 457

Equipment11 05 Common Work Results

for Equipment ..................................... 46011 11 Vehicle Service Equipment ................ 46211 12 Parking Control Equipment .............. 46211 13 Loading Dock Equipment .................. 46311 14 Pedestrian Control Equipment .......... 464

11 21 Retail and Service Equipment ........... 46511 22 Banking Equipment ............................ 46611 30 Residential Equipment ....................... 46811 32 Unit Kitchens ...................................... 47011 41 Foodservice Storage Equipment ........ 47011 42 Food Preparation Equipment ............. 47211 43 Food Delivery Carts and Conveyors . 47311 44 Food Cooking Equipment .................. 47311 46 Food Dispensing Equipment .............. 47411 48 Foodservice Cleaning and Disposal

Equipment ........................................... 47511 52 Audio-Visual Equipment .................... 47611 53 Laboratory Equipment ....................... 47711 57 Vocational Shop Equipment .............. 47811 61 Broadcast, Theater, and

Stage Equipment ................................. 47911 62 Musical Equipment ............................ 47911 66 Athletic Equipment ............................ 48011 67 Recreational Equipment .................... 48111 68 Play Field Equipment

and Structures ..................................... 48211 71 Medical Sterilizing Equipment .......... 48411 72 Examination and

Treatment Equipment ........................ 48411 73 Patient Care Equipment .................... 48411 74 Dental Equipment .............................. 48511 76 Operating Room Equipment .............. 48611 77 Radiology Equipment ......................... 48611 78 Mortuary Equipment .......................... 48611 81 Facility Maintenance Equipment ...... 48711 82 Facility Solid Waste

Handling Equipment .......................... 48711 91 Religious Equipment .......................... 48811 92 Agricultural Equipment ..................... 48911 97 Security Equipment ............................ 49011 98 Detention Equipment ......................... 490

Furnishings12 05 Common Work Results

for Furnishings .................................... 49212 12 Wall Decorations ................................ 49312 21 Window Blinds .................................... 49312 22 Curtains and Drapes ........................... 49412 23 Interior Shutters .................................. 49712 24 Window Shades ................................... 49712 32 Manufactured Wood Casework ......... 49812 35 Specialty Casework ............................ 50012 36 Countertops ......................................... 50212 43 Portable Lamps ................................... 50412 45 Bedroom Furnishings ......................... 50512 46 Furnishing Accessories ...................... 50612 48 Rugs and Mats .................................... 50612 51 Office Furniture .................................. 50712 52 Seating ................................................. 51012 54 Hospitality Furniture ......................... 51112 55 Detention Furniture ........................... 51912 56 Institutional Furniture ....................... 51912 59 Systems Furniture .............................. 52212 61 Fixed Audience Seating ...................... 52412 63 Stadium and Arena Seating ............... 52412 67 Pews and Benches ............................... 52412 92 Interior Planters and

Artificial Plants ................................... 52412 93 Interior Public Space Furnishings ..... 528

Special Construction13 05 Common Work Results for Special

Construction ....................................... 53213 11 Swimming Pools ................................. 53513 17 Tubs and Pools .................................... 53713 18 Ice Rinks .............................................. 53713 21 Controlled Environment Rooms ....... 53813 24 Special Activity Rooms ...................... 54013 28 Athletic and Recreational Special

Construction ....................................... 54013 31 Fabric Structures ................................. 54113 33 Geodesic Structures ............................ 54213 34 Fabricated Engineered Structures ...... 543

13 36 Towers ................................................. 54913 42 Building Modules ................................ 54913 47 Facility Protection .............................. 54913 48 Sound, Vibration, and

Seismic Control .................................. 55013 49 Radiation Protection .......................... 55013 53 Meteorological Instrumentation ....... 552

Conveying Equipment14 05 Common Work Results

for Conveying Equipment .................. 55414 11 Manual Dumbwaiters ........................ 55414 12 Electric Dumbwaiters ........................ 55514 21 Electric Traction Elevators ................ 55514 24 Hydraulic Elevators ............................ 55614 27 Custom Elevator Cabs and Doors ..... 55714 28 Elevator Equipment and Controls .... 55814 31 Escalators ............................................. 55914 32 Moving Walks ..................................... 56014 42 Wheelchair Lifts .................................. 56014 45 Vehicle Lifts ........................................ 56014 91 Facility Chutes .................................... 56114 92 Pneumatic Tube Systems .................. 561

Fire Suppression21 05 Common Work Results for Fire

Suppression ......................................... 56421 11 Facility Fire-Suppression

Water-Service Piping .......................... 56521 12 Fire-Suppression Standpipes .............. 57221 13 Fire-Suppression Sprinkler Systems .. 57621 21 Carbon-Dioxide Fire-Extinguishing

Systems ................................................ 57921 22 Clean-Agent Fire-Extinguishing

Systems ................................................ 57921 31 Centrifugal Fire Pumps ...................... 580

Plumbing22 01 Operation and Maintenance

of Plumbing ......................................... 58422 05 Common Work Results

for Plumbing ....................................... 58522 07 Plumbing Insulation ........................... 60622 11 Facility Water Distribution ............... 62222 12 Facility Potable-Water

Storage Tanks ...................................... 70322 13 Facility Sanitary Sewerage ................. 70422 14 Facility Storm Drainage ..................... 71922 15 General Service Compressed-Air

Systems ................................................ 72222 31 Domestic Water Softeners ................. 72422 32 Domestic Water Filtration

Equipment ........................................... 72422 33 Electric Domestic Water Heaters ...... 72522 34 Fuel-Fired Domestic Water Heaters .. 72722 35 Domestic Water Heat Exchangers .... 72822 41 Residential Plumbing Fixtures .......... 72922 42 Commercial Plumbing Fixtures ........ 73522 43 Healthcare Plumbing Fixtures ........... 74022 45 Emergency Plumbing Fixtures .......... 74122 46 Security Plumbing Fixtures ............... 74222 47 Drinking Fountains and

Water Coolers ..................................... 74322 51 Swimming Pool Plumbing Systems .. 74522 52 Fountain Plumbing Systems .............. 74522 62 Vacuum Systems for Laboratory

and Healthcare Facilities ................... 74622 63 Gas Systems for Laboratory and

Healthcare Facilities ........................... 74722 66 Chemical-Waste Systems for Lab.

and Healthcare Facilities ................... 750Heating Ventilation Air Conditioning

23 05 Common Work Results for HVAC ... 75623 07 HVAC Insulation ................................ 76723 09 Instrumentation and

Control for HVAC .............................. 76923 11 Facility Fuel Piping ............................. 77423 12 Facility Fuel Pumps ............................ 77723 13

Table of Contents (cont.)Sect. No. Page Sect. No. Page Sect. No. Page

Copyright The Gordian Group, Inc. 2021

Page 6: Facilities Construction Costs · 2020. 11. 25. · ISSN 1540-6202 ISBN 978-1-950656-56-1 Brian Adams, Senior Editor Facilities Construction Costs with RSMeans data Gordian’s authors,

3

Facility Fuel-Storage Tanks ............... 77723 21 Hydronic Piping and Pumps .............. 78023 22 Steam and Condensate

Piping and Pumps ............................... 79023 23 Refrigerant Piping ............................... 79123 31 HVAC Ducts and Casings ................. 79423 33 Air Duct Accessories .......................... 80623 34 HVAC Fans .......................................... 81223 35 Special Exhaust Systems .................... 81823 36 Air Terminal Units ............................. 82023 37 Air Outlets and Inlets ........................ 82123 38 Ventilation Hoods ............................... 82923 41 Particulate Air Filtration ................... 83023 42 Gas-Phase Air Filtration .................... 83023 43 Electronic Air Cleaners ...................... 83023 51 Breechings, Chimneys, and Stacks ... 83123 52 Heating Boilers .................................... 83823 54 Furnaces ............................................... 84523 55 Fuel-Fired Heaters .............................. 84723 56 Solar Energy Heating Equipment ...... 84923 57 Heat Exchangers for HVAC ............... 85223 61 Refrigerant Compressors .................... 85323 62 Packaged Compressor

and Condenser Units .......................... 85423 63 Refrigerant Condensers ...................... 85423 64 Packaged Water Chillers .................... 85623 65 Cooling Towers ................................... 85923 72 Air-to-Air Energy Recovery

Equipment ........................................... 86023 73 Indoor Central-Station

Air-Handling Units ............................. 86123 74 Packaged Outdoor HVAC

Equipment ........................................... 86123 76 Evaporative Air-Cooling Equipment . 86423 81 Decentralized Unitary HVAC

Equipment ........................................... 86723 82 Convection Heating and

Cooling Units ...................................... 87123 83 Radiant Heating Units ....................... 87723 84 Humidity Control Equipment ........... 883

Electrical26 01 Operation and Maintenance

of Electrical Systems .......................... 88626 05 Common Work Results

for Electrical ........................................ 88726 09 Instrumentation and Control for

Electrical Systems .............................. 99326 12 Medium-Voltage Transformers .......... 99426 13 Medium-Voltage Switchgear .............. 99526 22 Low-Voltage Transformers ................. 99626 24 Switchboards and Panelboards ........ 100026 25 Low-Voltage Enclosed

Bus Assemblies ................................. 102426 27 Low-Voltage Distribution

Equipment ......................................... 104426 28 Low-Voltage Circuit Protective

Devices .............................................. 106126 29 Low-Voltage Controllers .................. 106626 31 Photovoltaic Collectors .................... 106926 32 Packaged Generator Assemblies ..... 107026 33 Battery Equipment ............................ 107126 35 Power Filters and Conditioners ....... 107126 36 Transfer Switches ............................. 107426 41 Facility Lightning Protection .......... 107526 51 Interior Lighting ................................ 107726 52 Safety Lighting .................................. 108526 54 Classified Location Lighting ............ 108526 55 Special Purpose Lighting .................. 108626 56 Exterior Lighting ............................... 108726 61 Lighting Systems and Accessories .. 109126 71 Electrical Machines .......................... 1095

Communications27 01 Operation and Maintenance of

Communications Systems ............... 110027 05 Common Work Results for

Communications .............................. 110027 11 Communications Equipment

Room Fittings ................................... 110127 13 Communications Backbone

Cabling ............................................... 110227 15 Communications Horizontal

Cabling ............................................... 110327 21 Data Communications Network

Equipment ......................................... 110727 32 Voice Communications Terminal

Equipment ......................................... 110727 41 Audio-Video Systems ....................... 110727 42 Electronic Digital Systems .............. 110827 51 Distributed Audio-Video

Communications Systems ............... 110827 52 Healthcare Communications and

Monitoring Systems ......................... 110927 53 Distributed Systems ......................... 1109

Electronic Safety & Security28 01 Operation and Maint. of Electronic

Safety and Security ........................... 111228 05 Common Work Results for

Electronic Safety and Security ........ 111228 15 Access Control Hardware Devices .111228 18 Security Access Detection

Equipment ......................................... 111328 23 Video Management System ............. 111428 31 Intrusion Detection .......................... 111528 33 Security Monitoring and Control .... 111528 41 Radiation Detection and Alarm ...... 111628 42 Gas Detection and Alarm ................ 111628 46 Fire Detection and Alarm ................ 111628 47 Mass Notification ............................. 111728 52 Detention Security Systems ............ 1118

Earthwork31 05 Common Work Results

for Earthwork .................................... 112031 06 Schedules for Earthwork .................. 112031 11 Clearing and Grubbing ..................... 112131 13 Selective Tree and Shrub Removal

and Trimming ................................... 112131 14 Earth Stripping and Stockpiling ...... 112231 22 Grading .............................................. 112331 23 Excavation and Fill ........................... 112331 25 Erosion and Sedimentation

Controls ............................................. 114531 31 Soil Treatment .................................. 114531 32 Soil Stabilization ............................... 114531 33 Rock Stabilization ............................ 114631 36 Gabions .............................................. 114731 37 Riprap ................................................. 114731 41 Shoring ............................................... 114731 43 Concrete Raising .............................. 114831 45 Vibroflotation and Densification .... 114931 46 Needle Beams .................................... 114931 48 Underpinning .................................... 114931 52 Cofferdams ........................................ 114931 56 Slurry Walls ....................................... 115031 62 Driven Piles ....................................... 115131 63 Bored Piles ......................................... 1153

Exterior Improvements32 01 Operation and Maintenance

of Exterior Improvements ................ 115832 06 Schedules for Exterior

Improvements ................................... 116832 11 Base Courses ..................................... 116932 12 Flexible Paving .................................. 1170

32 13 Rigid Paving ...................................... 117332 14 Unit Paving ....................................... 117432 16 Curbs, Gutters, Sidewalks, and

Driveways .......................................... 117532 17 Paving Specialties ............................. 117632 18 Athletic and Recreational

Surfacing ............................................ 117832 31 Fences and Gates .............................. 117932 32 Retaining Walls ................................. 118832 33 Site Furnishings ................................ 119132 34 Fabricated Bridges ............................. 119232 84 Planting Irrigation ............................ 119232 91 Planting Preparation ......................... 119432 92 Turf and Grasses ............................... 119632 93 Plants ................................................. 119732 94 Planting Accessories ......................... 120032 96 Transplanting .................................... 1201

Utilities33 01 Operation and Maintenance

of Utilities ......................................... 120433 05 Common Work Results

for Utilities ........................................ 121033 11 Groundwater Sources ....................... 121233 14 Water Utility Transmission and

Distribution ....................................... 121433 16 Water Utility Storage Tanks ............ 122333 31 Sanitary Sewerage Piping ................. 122433 34 Onsite Wastewater Disposal ............ 122633 41 Subdrainage ....................................... 122733 42 Stormwater Conveyance .................. 122833 52 Hydrocarbon Transmission and

Distribution ....................................... 123433 59 Hydrocarbon Utility Metering ........ 123633 61 Hydronic Energy Distribution ......... 123733 63 Steam Energy Distribution .............. 123833 71 Electrical Utility Transmission and

Distribution ....................................... 124133 81 Communications Structures ........... 1244

Transportation34 01 Operation and Maintenance of

Transportation ................................... 124634 11 Rail Tracks ........................................ 124634 41 Roadway Signaling and Control

Equipment ......................................... 124734 43 Airfield Signaling and Control

Equipment ......................................... 124734 71 Roadway Construction .................... 124834 72 Railway Construction ...................... 124934 77 Transportation Equipment ............... 1250

Waterway & Marine35 22 Hydraulic Gates ................................ 125235 24 Dredging ............................................ 125335 31 Shoreline Protection ......................... 125435 51 Floating Construction ...................... 1254

Material Processing & Handling Equipment41 21 Conveyors .......................................... 125641 22 Cranes and Hoists ............................ 1256

Pollution Control Equipment44 11 Particulate Control Equipment ....... 1260

Water and Wastewater Equipment46 07 Packaged Water and Wastewater

Treatment Equipment ...................... 126446 23 Grit Removal And Handling

Equipment ......................................... 126446 25 Oil and Grease Separation and

Removal Equipment ......................... 1265Electrical Power Generation Equipment

48 15 Wind Energy Electrical PowerGeneration Equipment ..................... 1268

Table of Contents (cont.)Sect. No. Page Sect. No. Page Sect. No. Page

Copyright The Gordian Group, Inc. 2021

Page 7: Facilities Construction Costs · 2020. 11. 25. · ISSN 1540-6202 ISBN 978-1-950656-56-1 Brian Adams, Senior Editor Facilities Construction Costs with RSMeans data Gordian’s authors,

Assemblies Section

1269

A SUBSTRUCTURE

A1010 Standard FoundationsA1010 110 Strip Footings .............................................................................1278A1010 260 Column Footing in Existing Building ......................................1279

A1020 Special FoundationsA1020 810 Equipment Foundations ............................................................1280

B SHELL

B1010 Floor ConstructionB1010 310 Mezzanine Addition to Existing Building, Slab Form Deck .1282B1010 320 Mezzanine Addition to Existing Build., Composite Deck ....1283B1010 710 Steel Beam Fireproofing ............................................................1284B1010 720 Steel Column Fireproofing ........................................................1286

B2010 Exterior WallsB2010 143 Masonry Restoration - Cleaning ..............................................1288

B2020 Exterior WindowsB2020 108 Vinyl Clad Windows ..................................................................1289

B3010 Roof CoveringsB3010 120 Single Ply Membrane ................................................................1290

C INTERIORS

C1010 PartitionsC1010 124 Drywall Partitions/Wood Stud Framing ..................................1292C1010 128 Drywall Components ................................................................1293

C1020 Interior DoorsC1020 114 Metal Door/Metal Frame ..........................................................1294C1020 310 Hardware ....................................................................................1296

C3010 Wall FinishesC3010 230 Paint & Covering .......................................................................1297

C3020 Floor FinishesC3020 410 Tile & Covering .........................................................................1298

C3030 Ceiling FinishesC3030 105 Plaster Ceilings ..........................................................................1299

D SERVICES

D1010 Elevators and LiftsD1010 140 Traction Geared Elevators ........................................................1302

D1020 Escalators and Moving WalksD1020 110 Moving Stairs .............................................................................1303D1020 210 Moving Walks ............................................................................1303

D2010 Plumbing FixturesD2010 110 Water Closet Systems ...............................................................1304D2010 210 Urinal Systems ...........................................................................1305D2010 310 Lavatory Systems .......................................................................1306

D2010 410 Kitchen Sink Systems ...............................................................1307D2010 510 Bathtub Systems ........................................................................1308D2010 610 Group Wash Fountain Systems ................................................1309D2010 710 Shower Systems .........................................................................1310D2010 820 Water Cooler Systems ...............................................................1311D2010 920 Two Fixture Bathroom, Two Wall Plumbing ..........................1312D2010 922 Two Fixture Bathroom, One Wall Plumbing ..........................1312

D3030 Cooling Generating SystemsD3030 110 Chilled Water, Air Cooled Condenser Systems ......................1313D3030 115 Chilled Water, Cooling Tower Systems ..................................1314

D3050 Terminal & Package UnitsD3050 150 Rooftop Single Zone Unit Systems ..........................................1315D3050 155 Rooftop Multizone Unit Systems ............................................1316D3050 160 Self-contained, Water Cooled Unit Systems ...........................1317D3050 165 Self-contained, Air Cooled Unit Systems ...............................1318D3050 170 Split Systems With Air Cooled Condensing Units ................1319D3050 190 Computer Room Cooling Units ...............................................1320

D4010 SprinklersD4010 310 Dry Pipe Sprinkler Systems ......................................................1321D4010 350 Preaction Sprinkler Systems .....................................................1324D4010 370 Deluge Sprinkler Systems .........................................................1327D4010 390 On-off Multicycle Sprinkler Systems ......................................1330D4010 410 Wet Pipe Sprinkler Systems ......................................................1333

D4020 StandpipesD4020 310 Wet Standpipe Risers, Class I ...................................................1336

Wet Standpipe Risers, Class II ..................................................1336Wet Standpipe Risers, Class III .................................................1337

D4020 330 Dry Standpipe Risers, Class I ...................................................1338Dry Standpipe Risers, Class II ..................................................1338Dry Standpipe Risers, Class III .................................................1339

D4020 410 Fire Hose Equipment .................................................................1340

D4090 Other Fire Protection SystemsD4090 910 Fire Suppression Unit Components .........................................1342D4090 920 FM200 Systems ..........................................................................1342

D5010 Electrical Service/DistributionD5010 120 Overhead Electric Service, 3 Phase - 4 Wire ...........................1343D5010 130 Underground Electric Service ...................................................1345D5010 250 Panelboard ..................................................................................1347

D5020 Lighting and Branch WiringD5020 115 Receptacles, Floor ......................................................................1349D5020 145 Motor Installation ......................................................................1350D5020 208 Fluorescent Fixtures (by Type) ..................................................1352D5020 210 Fluorescent Fixtures (by Wattage) ............................................1353

D5030 Communications and SecurityD5030 310 Telephone Systems ....................................................................1354D5030 810 Security & Detection Systems .................................................1355D5030 910 Communication & Alarm Systems .........................................1356

Table of ContentsTable No. Page Table No. Page

Copyright The Gordian Group, Inc. 2021

Page 8: Facilities Construction Costs · 2020. 11. 25. · ISSN 1540-6202 ISBN 978-1-950656-56-1 Brian Adams, Senior Editor Facilities Construction Costs with RSMeans data Gordian’s authors,

1271

D5090 Other Electrical SystemsD5090 480 Energy Monitoring Systems ......................................................1358

E EQUIPMENT & FURNISHINGS

E2020 Moveable FurnishingsE2020 410 Work Station - Manager ............................................................1360

G BUILDING SITEWORK

G1030 Site EarthworkG1030 805 Trenching Common Earth ........................................................1366G1030 806 Trenching Loam & Sandy Clay ................................................1367G1030 807 Trenching Sand & Gravel .........................................................1369

G2020 Parking LotsG2020 220 Parking Lots ...............................................................................1371

G2030 Pedestrian PavingG2030 110 Bituminous Sidewalks ...............................................................1372G2030 120 Concrete Sidewalks ...................................................................1372G2030 150 Brick & Tile Plazas ....................................................................1372

G4020 Site LightingG4020 210 Light Pole (Installed) ..................................................................1373

Table of ContentsTable No. Page Table No. Page

Copyright The Gordian Group, Inc. 2021

Page 9: Facilities Construction Costs · 2020. 11. 25. · ISSN 1540-6202 ISBN 978-1-950656-56-1 Brian Adams, Senior Editor Facilities Construction Costs with RSMeans data Gordian’s authors,

1375

All the reference information is in one section,making it easy to find what you need to know. . . and easy to use the data set on a daily basis.This section is visually identified by a verticalblack bar on the page edges.In this Reference Section, we’ve includedEquipment Rental Costs, a listing of rental andoperating costs; Crew Listings, a full listingof all crews and equipment, and their costs;Historical Cost Indexes for cost comparisonsover time; City Cost Indexes and LocationFactors for adjusting costs to the region youare in; Reference Tables, where you will findexplanations, estimating information andprocedures, or technical data; Change Orders,information on pricing changes to contractdocuments; and an explanation of all theAbbreviations in the data set.

Table of ContentsConstruction EquipmentRental Costs 1377

Crew Listings 1389

Historical Cost Indexes 1425

City Cost Indexes 1426

Location Factors 1469

Reference Tables 1475R01 General Requirements........................ 1475R02 Existing Conditions ............................ 1493R03 Concrete............................................... 1496R04 Masonry ............................................... 1500R05 Metals .................................................. 1502R06 Wood, Plastics & Composites ........... 1509R07 Thermal & Moisture Protection ....... 1509R08 Openings.............................................. 1510R09 Finishes ................................................ 1512R13 Special Construction .......................... 1513R14 Conveying Equipment........................ 1514R21 Fire Suppression.................................. 1515

Reference Tables (cont.)

R22 Plumbing ............................................. 1519R23 Heating, Ventilating &

Air Conditioning................................. 1527R26 Electrical .............................................. 1537R27 Communications ................................ 1547R31 Earthwork ............................................ 1549R32 Exterior Improvements....................... 1550R33 Utilities................................................ 1550R34 Transportation..................................... 1551

Change Orders 1552

Project Costs 1555

Abbreviations 1560

ReferenceSection

Copyright The Gordian Group, Inc. 2021