facilities design & constructionrmp-public.ucsd.edu/fdc/bid results/p4l-172 humanities...west...
TRANSCRIPT
FACILITIES DESIGN & CONSTRUCTION
SEALED BID NO.: 1000524379 /P4L-172 DATE: 1/24/17
PROJECT: HUMANITIES AND SOCIAL SCIENCES TIME: 2:00 P.M.AIR HANDLER REPLACEMENT
PROJECT DELIVERY METHOD: BID BUILD ESTIMATED CONSTRUCTION COST: $1,800,000
CONTRACTOR'S NAMECITY - TIME REC'D BID
HELIX Mechanical
San Diego, CA / 1:47PMJACKSON & BLANC
San Diego, CA / 1:48PMALPHA Mechanical
San Diego, CA / 2:00pm
Alternate No. 1 - Provide new sheet metal duct, duct insulation and all other associated appurtenances. Refer to Mechanical Drawing M202 for More Information.
Aternate No. 2 - Temporary Cooling/Heating: Provide a cost breakout for temporary cooling as referred to on the Title Sheet drawings, T-1.
$1,139,788
$1,208,550 $1 X 10
$10
$10 $1,177,060
$1,212,360
$1 X 10 $10 $1,241,198
-$35,000$3,500
$92,400$9,000
$108,900$18,750
Alternate 2Alternate 1 TOTALLUMP SUM BASE BID
$1,084,700
DAILY RATE OF COMPENSATIONX 10 MULTIPLIER
$1 X 10
HUMANITIES AND SOCIAL SCIENCE AIR HANDLER REPLACEMENT UNIVERSITY OF CALIFORNIA, SAN DIEGO
Project No.: 1000524379/P4L-172
9.0 LIST OF SUBCONTRACTORS
BIDDING COMPANY'S NAME: A-l phCI
Bidder will use Subcontractors for the Werle
Yes :i_ No
If "yes,· provide in the spaces below (a) the name, the location of the place of business, and the California contractor license number of each subcontractor who will perform work or labor or render service to the prime contractor in or about the construction of the work or improvement, or a subcontractor licensed by the state of California who, under subcontract to the prime contractor, specially fabricates and installs a portion of the work or improvement according to detailed drawings contained in the plans and specifications, in an amount in excess of one-half of 1 percent of the prime contractor's total bid, (b) the portion of the work which will be done by each subcontractor. The prime contractor shall list only one subcontractor for each such portion as is defined by the prime contractor in its bid.
Portion of the Work Activity
(e.g. electrical, mechanical, concrete)
Fire Detection & Alann System
Manufacturer of Air Handling Units
Manufacturer of Medium Voltage Cable
MGC han \a:. L \ n ~' >lah o()
Demo\\ii of'
Po~'(\" T~+- ~\:,Q\Qn~
J lrrc. vol+qC\G ek:t.W1 J.fV Pre, 'Corrho\5
April 29, 2015 LF/BF/MP-BF
Subcontractor Name of Business Location of Business License No.
(City)
JJj 0\terprises Bc!ondtdoJ C.t\ B'<b2J (oCi -Honta,r
(~we') San 1) l~O > c.J\ -n/A.. 9x.MJUJ l <f
(Q. . E. ~) ~ 1Aeopi Cl\- - - n/~ ~cot-+hc'r«l
..._/
'(>6 {p"''"'O 2.. 1 nsvlatJ on CoY-o C\Q .l C-A Ro~ecnQ):.
rnn6nU t;=t (!.qt1on c..A- "bl-t 2.2 =r l ~ . .,/ 0~ostruchon t"$<!Pn d \do \ Cl\- Co4-Y2..03 l?alanc.c.
.f\ffi"2.rl Q.Q San Mar~; CJ\ 9'-f1 =f o.~ fQ lnoMP~fl .
E'lec.-tn c~ .~£\luiloCl' ~rncQJ.J\q CA- Cf If =t 2-4 co Alh1reo ~'i 'Pcwa.q / U 4ct'f O::t"l
../ -
(Note: Add additional pages if required.)
5 Bid Fonn
Revised December22, 2016-Addendum 1
HUMANITIES AND SOCIAL SCIENCE AIR HANDLER REPLACEMENT UNIVERSITY OF CALIFORNIA, SAN DIEGO
Project No.: 1000524379/P4L-172
10.0 LIST OF CHANGES IN SUBCONTRACTORS DUE TO ALTERNATES
BIDDING coMPANv·s NAME: A-Jpha Mcchan\U:Jl J I (\e, ·
The information below must be provided for all changes in first-tier Subcontractors if University selects Alternates. List changes in Subcontractors only for those portions of the Work valued in excess of one-half of 1 t f . t t r' t t I b"d oercen o prime con rac o s o a I .
Subcontractor Alternate Portion of the Work Name Location License No.
No. Activity (City) (e.g. electrical,
-- mechanical, - - - - --concrete)
Fire Detection &.Alann Svstem Manufacturer of Air Handling Units Manufacturer of Medium Voltage Cable
"-... ~ ~ JVA ~ 0/,.
~,<j.._,{ "" ........... ~~ ~ ~ ~ -
(Note: Add additional pages if required.)
April 29, 2015 LF/BF/MP-BF 6
Bid Fonn Revised December22, 2016-Addendum 1
HUMANITIES AND SOCIAL SCIENCE AIR HANDLER REPLACEMENT UNIVERSITY OF CALIFORNIA, SAN DIEGO
Project No.: 1000524379/P4L-172
9.0 LIST OF SUBCONTRACTORS
BIDDING COMPANY'S NAME: Helix Mechanical, Inc
Bidder will use Subcontractors for the Work:
Yes___!_ No
If "yes,· provide in the spaces below (a) the name, the location of the place of business, and the California contractor license number of each subcontractor who will perform work or labor or render service to the prime contractor in or about the construction of the work or improvement, or a subcontractor licensed by the state of California who, under subcontract to the prime contractor, specially fabricates and installs a portion of the work or improvement according to detailed drawings contained in the plans and specifications, in an amount in excess of one-half of 1 percent of the prime contractor's total bid, (b) the portion of the work which will be done by each subcontractor. The prime contractor shall list only one subcontractor for each such portion as is defined by the prime contractor in its bid.
Portion of the Work Activity
(e.g. electrical, mechanical, concrete}
Fire Detection & Alarm System
Manufacturer of Air Handling Units
Manufacturer of Medium Voltage Cable
Concrete
Demolitlon
Structural Steel
Roofing
Electric
Controls
Insulation
Crane
TAB
Temp Facilities
April 29, 2015 LF/BF/MP-BF
Subcontractor Name of Business Location of Business License No.
(City)
West Coast Fire & Integration Costa Mesa, CA 989173
Huntair Tualatln, OR
NIA
Benco Concrete Inc. Chula Vista, CA 937969
So Cal Building & Restoration San Diego, CA 1003205
Coastline Steel & Construction Alpine, CA 931601
Sylvester Roofing Company Escondido, CA 516696
Laser Electric Escondido, CA 513888
JCI San Diego, CA 022445
CMI El Cajon, CA 965569
Bob's Crane Service Lakeside, CA 971800
Balance America San Marcos, CA 947703
Diamond Envir. Services San Diego, CA
(Note: Add additional pages if required.)
5 Bid Form
Revised December22, 2016-Addendum 1
HUMANITIES AND SOCIAL SCIENCE AIR HANDLER REPLACEMENT UNIVERSITY OF CALIFORNIA, SAN DIEGO
Project No.: 1000524379/P4L-172
10.0 LIST OF CHANGES IN SUBCONTRACTORS DUE TO ALTERNATES
BIDDING COMPANY'S NAME: Helix Mechanical.Inc
The information below must be provided for all changes in first-tier Subcontractors if University selects Alternates. List changes in Subcontractors only for those portions of the Work valued in excess of one-half of 1 f . r' I 'd percent o prime contracto s tota b1
Subcontractor Alternate
No.
1
2
3
4
5
6
7
8
9
10
11
12
April29,2015 LF/BF/MP-BF
Portion of the Work Name Location License No. Activity (City)
(e.g. electrical, mechanical,
concrete) Fire Detection & Alann Svstem West Coast Fire & Integration Costa Mesa, CA 989173 Manufacturer of Air Handling Units Huntair Tualatin, OR Manufacturer of Medium Voltage Cable NIA
Concrete Bence Concrete Inc. Chula Vista, CA 937969
Demolition So Cal Building & Restoration San Diego, CA 1003205
Structual Steel Coastiine Steel & Construction Alpine, CA 931601
Roofing Sylvester Roofing Company Escondido, CA 516696
Electric Laser Electric Escondido, CA 513868
Controls JCI San Diego, CA 022445
Insulation CMI El Cajon, CA 965569
Crane Bob's Crane Service Lakeside, CA 971800
TAB Balance America San Marcos, CA 94no3
Temp Facilities Diamond Envir. Services San Diego, CA
(Note: Add additional pages if required.)
6 Bid Fonn
Revised December22, 2016-Addendum 1
I . HUMANITIES AND SOCIAL SCIENCE AIR HANDLER REPLACEMENT UNIVERSITY OF CALIFORNIA, SAN DIEGO
9.0 LIST OF SUBCONTRACTORS
BIDDING COMPANY'S NAME: JA-c.U-Sa,.-, ~ °8Lt-nc...
Bidder will use Subcontractors for the Work:
Yes A._ No
Project No.: 1000524379/P4L-172
If "yes," provide in the spaces below (a) the name, the location of the place of business, and the California contractor license number of each subcontractor who will perform work or labor or render service to the prime contractor in or about the construction of the work or improvement, or a subcontractor licensed by the state of California who, un_9er subcontract to tile R[ime contractor, specially fabricates and installs a portfOno f the work or improvement according to detailed drawings contained in the plans and specifications, in an amount in excess of one-half of 1 percent of the prime contractor's total bid, (b) the portion of the work which will be done by each subcontractor. The prime contractor shall list only one subcontractor for each such portion as is defined by the prime contractor in its bid.
Portion of the Work Activity
(e.g. electrical, mechanical, concrete)
Fire Detection & Alarm System
Manufacturer of Air Handling Units
Manufacturer of Medium Voltage Cable
c d l'H/ .. C. .. l·f
t>""'.t'~'.::>~
"'oo~~ ~ . et~cJ.rt tA-~
~bt. ~ ..... trots E"IV J .J ltr ff()I""
S /,,vJu~/IL ~kel.
P4.J ~tnl-c
April29, 2015 LF/BF/MP-BF
Subcontractor Name of Business Location of Business License No.
(City)
wt~~I- r-·vc.. t-C'osk,. /1'1U'A-- .1:1'~ qf'il, J
;.N,-..J..A-tr s~~·~ #hJ
J.1/A-- #I~ HIA-
ht'4th-O ..... tl L ·rowA-"i JC,f,'{G, f
<; '1 L "LJ /c.,r (l....,~ t:sw,.o\,.n~ ~If- ~ 9(, ,
(,. 4-S IF f'l.. I:! 5 {.D.11 I) o.-0 .::> 5"11888 1fj!f1"'"~ en«;; fow~ 'i t:j '1 () -, 'i
PC/ ~c.. .... b.es () '1?~'19f
W~(~C/T ~"" "D"efo t8 31 '8 ()'f
~' ~lt-\o,\b 1- ?owA-'11 ~(pt. ""e
(Note: Add additional pages if required.)
5 Bid Form
Revised December 22, 2016 -Addendum 1
•.
HUMANITIES AND SOCIAL SCIENCE AIR HANDLER REPLACEMENT UNIVERSITY OF CALIFORNIA, SAN DIEGO
Project No.: 1000524379/P4L-172
10.0 LIST OF CHANGES IN SUBCONTRACTORS DUE TO ALTERNATES
BIDDING COMPANY'S NAME: 'JA.-lJ(.Son ~ U~C..
The information below must be provided for all changes in first-tier Subcontractors if University selects Alternates. List changes in Subcontractors only for those portions of the Work valued in excess of one-half of 1 percent of prime contractor's total bid.
Subcontractor Alternate Portion of the Work Name Location License No.
No. Activity {City) (e:g: electrical,
__ mechanical, -concrete)
Fire Detection & Alarm 5.+m.c. Wtt1-- ~-Hot ~·t". Svstem ......
-~, .
Manufacturer of Air 54-Mlf ~ - II.:? (;t,.,,,, Handling Units ~ ff'<-
Manufacturer of /.//4 Medium Voltage Cable
{Note: Add additional pages if required .)
April 29, 2015 LF/BF/MP-BF 6
Bid Form Revised December 22, 2016-Addendum 1