Facilities Master Plan
Carrier JohnsonJanuary 28, 2005
SAN DIEGO COLLEGE
1
Today’s Agenda
•Existing Conditions
•Guiding Principles
•Needs & Vision
Present:Facilities Master PlanandStrategy for PhasedImplementation
•Master Plan
•Implementation Strategy
•Next Steps
2
Design Team Task
•Incorporate Guiding Principles for Individual Programs & City CollegeCampus
•Evaluate & Identify Land Acquisition to Augment Growth
•Develop Strategy of Phased Implementation forNew Construction
Develop a Facilities Master PlanandStrategy for PhasedImplementation
3
Where We Are•Assess Existing Facilities & 1989Facilities Master Plan
•Faculty / Staff CommitteeSessions
•Establish Program Needs & Guiding Principles
•Develop Initial Facilities Master Plan Study
•Refine Facilities Master Plan
•Document Strategyfor Growth & Alteration
•Publish Final Facilities MasterPlan Document
•Approve UpdatedFacilities Master Plan
FinalDocumentationof Guiding Principles and Assessment Data &Development of the Facilities Master Plan
4
Existing Campus Conditions
5
ExistingCampus
•Infrastructure, Facilities & Accessibility Needs
•Growth Needs
•Limited Parking
•B Street Throughway
•Park Boulevard Frontage
•Connection to Downtown
•Mature Landscape
•Campus Identification
•Topography
C Street
Broadway
B Street
A Street
Par
k B
lvd
16th
Str
eet
6
Assessment ofExisting Conditions
•Design Team Assessmentof Construction, Systemsand Accessibility
•City College CommitteeAssessment, Recommendationsand Guiding Principles
PFH
H
P2
P1
P3
Centre City
E
I
B
M
D AT J
L
CR S
F2
F
Russ Blvd.
B Street
C Street
16th
Stre
et
Par
k B
lvd.
legendbuildings functioning wellbuildings requiring remodel/retrofit/reprogrammingbuildings to be evaluated for best use
Overflow Parking
7
Facilities Master PlanGuiding Principles
8
•Maintain a Collaborative Process•College Community & City
Agency Input
•Incorporate All Anticipated & Future Projects
•Project Design•Cluster Related Programs•Peripheral Parking•State-of-the-Art technology•Building Flexibility•Incorporate Sustainable Technology
•Campus Accessibility & Safety•Way-finding & Convenience•Sufficient & Convenient Parking•Identity & Community Outreach•Campus Pedestrian Circulation •Pedestrian & Vehicular Access Identity
•Embrace & Enhance a Collegial Environment
•“Unified Campus”•Attractive, Diverse Outdoor
Spaces•Welcoming Campus Gateways•Symbolic Presence & Strong Identity
•Link Campus Areas•“Bridge City Streets”
•Strategize Growth & Phasing•Minimize Construction Impacts•Avoid Instructional Space Loss
During Construction•Cluster Programs•Consider Long Term Growth
9
Identify Program Need
10
•Major Renovation•C Building Renovation•L Building Renovation•A Building Renovation•M Building Renovation•P Building Upgrade•Athletic Fields Renovation•T Building Upgrade•Seismic Upgrades
•Infrastructure•Technology Systems Access•TV Studio & Theatre Systems & Lighting•HVAC & Laboratory Exhaust Systems Upgrades
•Minor Renovation•Student Center Upgrade•Disability Access Upgrades•Classroom/Service Area Reconfiguration•Restroom Upgrades•Renovations Due to Damage & Use
Remodel & Renovation ProjectsProposition “S” & Non Proposition “S” Funded
11
•Proposition ‘S’ Funded Projects•Engineering Technology Building•Humanities Center•Business Technology Building•Vocational Technology Center•Structured Parking and Access•Instructional Visual Arts Center•Child Development Center
•Non Proposition ‘S’ Funded Projects•Fitness and Swimming Complex•Student Center•Pedestrian Walkways
New Construction Projects
12
•City College Project Subcommittee•Building & Program Reports•Guiding Principles
Establish Campus Vision
13
•Community Engagement
•Gateway Marquee Signage•“A” Street Front Door-Welcome•Park Boulevard Greenbelt•“B” Street Image•“C” Street Walkway•Russ Street •Campus Access Signage•Freeway Image
Campus Image•Campus Environment
•Major Gathering Places•Secondary Courtyards andGardens
•Landscape •Pedestrian Pathways•Lighting & Signage•Safety and Accessibility•Architectural Character
14
Campus Master PlanBalancing Program with Vision
15
South Area
Satellite Area
• Neighborhood Centers
• Way-finding/Accessibility
• Activate Internal &Peripheral Pathways
• Access Points &Community Connection
•Expansion & GrowthStrategy
Long Range Opportunity
Academic Neighborhoods
North Area
16
South Area
Satellite Area
•Acquire Land to AugmentExpansion & GrowthStrategy
Long Range Opportunity
North Area
Expansion & GrowthStrategy
17
Neighborhood Connections
B Street
C Street
Park
Blv
d.
15th
Str
eet
14th
Str
eet
13th
Str
eet
legendPhysical EducationStudent ServicesLearning ResourcesHumanities/Visual/Performing ArtsMath/Engineering/SciencesVocational ArtsFuture Campus Expansion
ACADEMIC NEIGHBORHOODS
• Neighborhood Centers
• Way-finding/Accessibility
• Activate Internal &Peripheral Pathways
• Access Points &Community Connection
• Expansion & GrowthStrategy
Academic Neighborhoods
16th
Str
eet
Russ Street
A Street
Broadway
17th
Str
eet
18
legendPhysical EducationStudent ServicesLearning ResourcesHumanities/Visual/Performing ArtsMath/Engineering/SciencesVocational ArtsFuture Campus Expansion
ACADEMIC NEIGHBORHOODS
• Neighborhood Centers
• Way-finding/Accessibility
• Activate Internal &Peripheral Pathways
• Access Points &Community Connection
• Expansion & GrowthStrategy
Academic Neighborhoods
Long Range Plan
B Street
C Street
Park
Blv
d.
15th
Str
eet
14th
Str
eet
13th
Str
eet
16th
Str
eet
Russ Street
A Street
Broadway
17th
Str
eet
19
legendPhysical EducationStudent ServicesLearning ResourcesHumanities/Visual/Performing ArtsMath/Engineering/SciencesVocational ArtsFuture Campus Expansion
ACADEMIC NEIGHBORHOODS
• Neighborhood Centers
• Way-finding/Accessibility
• Activate Internal &Peripheral Pathways
• Access Points &Community Connection
• Expansion & GrowthStrategy
Academic Neighborhoods
Long Range Plan
B Street
C Street
Park
Blv
d.
15th
Str
eet
14th
Str
eet
13th
Str
eet
16th
Str
eet
Russ Street
A Street
Broadway
17th
Str
eet
20
legendPhysical EducationStudent ServicesLearning ResourcesHumanities/Visual/Performing ArtsMath/Engineering/SciencesVocational ArtsFuture Campus Expansion
ACADEMIC NEIGHBORHOODS
• Neighborhood Centers
• Way-finding/Accessibility
• Activate Internal &Peripheral Pathways
• Access Points &Community Connection
• Expansion & GrowthStrategy
Academic Neighborhoods
Long Range Plan
B Street
C Street
Park
Blv
d.
15th
Str
eet
14th
Str
eet
13th
Str
eet
16th
Str
eet
Russ Street
A Street
Broadway
17th
Str
eet
21
legendPhysical EducationStudent ServicesLearning ResourcesHumanities/Visual/Performing ArtsMath/Engineering/SciencesVocational ArtsFuture Campus Expansion
ACADEMIC NEIGHBORHOODS
• Neighborhood Centers
• Way-finding/Accessibility
• Activate Internal &Peripheral Pathways
• Access Points &Community Connection
• Expansion & GrowthStrategy
Academic Neighborhoods
Long Range Plan
B Street
C Street
Park
Blv
d.
15th
Str
eet
14th
Str
eet
13th
Str
eet
16th
Str
eet
Russ Street
A Street
Broadway
17th
Str
eet
22
legendPhysical EducationStudent ServicesLearning ResourcesHumanities/Visual/Performing ArtsMath/Engineering/SciencesVocational ArtsFuture Campus Expansion
ACADEMIC NEIGHBORHOODS
• Neighborhood Centers
• Way-finding/Accessibility
• Activate Internal &Peripheral Pathways
• Access Points &Community Connection
• Expansion & GrowthStrategy
Academic Neighborhoods
Long Range Plan
B Street
C Street
Park
Blv
d.
15th
Str
eet
14th
Str
eet
13th
Str
eet
16th
Str
eet
Russ Street
A Street
Broadway
17th
Str
eet
23
legendPhysical EducationStudent ServicesLearning ResourcesHumanities/Visual/Performing ArtsMath/Engineering/SciencesVocational ArtsFuture Campus Expansion
ACADEMIC NEIGHBORHOODS
• Neighborhood Centers
• Way-finding/Accessibility
• Activate Internal &Peripheral Pathways
• Access Points &Community Connection
• Expansion & GrowthStrategy
Academic Neighborhoods
Long Range Plan
B Street
C Street
Park
Blv
d.
15th
Str
eet
14th
Str
eet
16th
Str
eet
Russ Street
A Street
Broadway
17th
Str
eet
13th
Str
eet
24
legendPhysical EducationStudent ServicesLearning ResourcesHumanities/Visual/Performing ArtsMath/Engineering/SciencesVocational ArtsFuture Campus Expansion
ACADEMIC NEIGHBORHOODS
• Neighborhood Centers
• Way-finding/Accessibility
• Activate Internal &Peripheral Pathways
• Access Points &Community Connection
• Expansion & GrowthStrategy
Academic Neighborhoods
Long Range Plan
B Street
C Street
Park
Blv
d.
15th
Str
eet
14th
Str
eet
16th
Str
eet
Russ Street
A Street
Broadway
17th
Str
eet
13th
Str
eet
25
Campus Master Plan
B Street
C Street
Park
Blv
d.
15th
Str
eet
14th
Str
eet
16th
Str
eet
Russ Street
A Street
Broadway
17th
Str
eet
13th
Str
eet
North Area
South Area
Embrace & Enhance a Collegial Environment
•Attractive, Diverse Outdoor Spaces•Welcoming Campus Gateways•Symbolic Presence & Strong Identity
Link Campus Areas
•“Bridge City Streets”
“A Unified Campus”
26
Campus Master Plan
Future Health and Exercise Sciences Program
Gymnasium
Aquatic Complex
Baseball Field
Softball Field Soccer Field
Overhead Pedestrian Walkway
Field House
Russ Street
Park B
lvd.
163
& 5
Fre
eway
Onr
amps
North Area
27
Campus Master Plan
Administration & Parking
Student Activities Center
Educational Technology Center
Student Services Admissions/Health
Dining
Classrooms & Faculty Offices
Classroom & Faculty Offices
Future Program & Parking
Sciences Labs
Engineering Technology & Physics
Parking
Parking Structure
Parking Structure
Student Success Center
AuditoriumTheater
Classroom & Theater Services
Humanities
Classrooms & Facilities
Business Technology Center
Future Program
Future Voc. ProgramLearning
Resource Center
Vocational Technology Center
Child Development Center
Future Program & Parking
Future Program
Campus Marquee
16th
Str
eet P
edes
tria
n Pr
omen
ade
Overhead Pedestrian Walkway
Parking Structure
B Street
C Street
Park
Blv
d.
15th
Str
eet
14th
Str
eet
16th
Str
eet
A Street
Broadway 17th
Str
eet
13th
Str
eet
Russ Street
South Area
28
Campus Master Plan
B Street
C Street
Park
Blv
d.
15th
Str
eet
14th
Str
eet
16th
Str
eet
Russ Street
A Street
Broadway
17th
Str
eet
13th
Str
eet
North Area
South Area“A Unified Campus”
29
Campus Master Plan
B Street
C Street
Park
Blv
d.
15th
Str
eet
14th
Str
eet
16th
Str
eet
Russ Street
A Street
Broadway
17th
Str
eet
Parking Strategy
4,500 “on campus”Structured Spaces
Parking Structure
Parking Below Building
30
Campus Master Plan
B Street
C Street
Park
Blv
d.
15th
Str
eet
14th
Str
eet
16th
Str
eet
Russ Street
A Street
Broadway
17th
Str
eet
13th
Str
eet
Campus Gateways & Pedestrian Access
Bus & Parking
Parking
Parking
Trolley & Bus
31
Campus Master Plan
•Campus Environment
•Pedestrian Pathways•Major Gathering Places•Secondary Courtyards
& Gardens•Landscape•Lighting & Signage•Safety and Accessibility•Architectural Character
Enhanced Crosswalk
Secondary Courtyard & Gardens
Major Gathering Space
Major Pedestrian Path
Park Boulevard Green
Campus Marquee
Campanile
32
Campus Marquee
Campus Master Plan
•Community Engagement
•Gateway Marquee Signage•Campus Access Signage•Park Boulevard Greenbelt•“A” Street Image•“B” Street Image•“C” Street Walkway•16 th Street Connection•15 th Street Image
B Street
C Street
Park
Blv
d.
15th
Str
eet
14th
Str
eet
Russ Street
A Street
Broadway
17th
Str
eet
13th
Str
eet
B Street Portal
Campanile
Welcome Center
Park Boulevard Identity
Freeway Identity
16th
Str
eet
33
Campus Master Plan
•Campus for 25,000 students
•Academic Neighborhoods
•Parking for 4,500 vehicles
•Consideration for Topography & Landscape
•Consideration forSafety and Accessibility
•3-4 Story Campus Buildings
•Phased Growth Plan
B Street
C Street
Park
Blv
d.
15th
Str
eet
14th
Str
eet
Russ Street
A Street
Broadway
17th
Str
eet
13th
Str
eet
16th
Str
eet
34
Implementation Strategy
35
Campus Master Plan
•New Construction Projects
•Remodel & Renovation Projects
•Clustering Academic Programs
•Land Acquisition
•Infrastructure Upgrades
•PHASED SCHEDULEOF WORK
legendPhysical EducationStudent ServicesLearning ResourcesHumanities/Visual/Performing ArtsMath/Engineering/SciencesVocational ArtsFuture Campus Expansion
ACADEMIC NEIGHBORHOODS
B Street
C Street
Park
Blv
d.
15th
Str
eet
14th
Str
eet
Russ Street
A Street
Broadway
17th
Str
eet
13th
Str
eet
16th
Str
eet
36
Phase 1 -Remodel & Renovation•Major Renovation
•C Building Renovation•L Building Renovation•A Building Renovation•M Building Renovation•P Building Upgrade•Athletic Fields Renovation•T Building Upgrade•Seismic Upgrades
•Infrastructure•Technology Systems •TV Studio & Theatre Systems •HVAC & Laboratory Systems
•Minor Renovation•Student Center Upgrade•Disability Access Upgrades•Classroom/Service Area•Restroom Upgrades•Usage Renovations
PFH
H
P2
P1
P3
Centre City
EIB
M
D AT
J
L
CR SF2
F
legendbuildings functioning wellbuildings requiring remodel/retrofit/reprogrammingbuildings to be evaluated for best use
Overflow Parking
B Street
C Street
Park
Blv
d.
15th
Str
eet
14th
Str
eet
Russ Street
A Street
Broadway
17th
Str
eet
13th
Str
eet
16th
Str
eet
37
Phase 1 –New Construction•Proposition ‘S’ Funded Projects
•Engineering Technology Building•Humanities Center•Business Technology Building•Vocational Technology Center•Structured Parking and Access•Instructional Visual Arts Center•Child Development Center
•Non Proposition ‘S’ FundedProjects
•Classroom Building•Walkways
legendPhase 1 BuildingsExisting BuildingsRenovated / Remodel
Overflow Parking
B Street
C Street
Park
Blv
d.
15th
Str
eet
14th
Str
eet
Russ Street
A Street
Broadway
17th
Str
eet
13th
Str
eet
16th
Str
eet
38
legendPhase 1 BuildingsExisting BuildingsRenovated / Remodel
Phase 1 –
Russ Blvd.
Centre City
New Gymnasium
P1
P2
Softball Field
Soccer Field
Admin
Field House
Temporary location 1 of modulars
39
legendPhase 1 BuildingsExisting BuildingsRenovated / Remodel
Admin
Educational Tech. Center
M Classroom
Dining
Classroom/ faculty office Classroom/
Faculty Office
Engineering Technology Center Physics
Surface Parking
Parking
Surface Parking
Student Success Center
Theater
Classroom/ Theater Services
Humanities
Classroom
Business Technology Center
Learning Resource Center
Vocational Tech. Center
Child Development Center
Campus Marquee
16th
Str
eet P
edes
tria
n Pr
omen
ade
Parking
Enhanced Pedestrian Walkways
Temporary location 2 of modulars
Surface Parking
Enhanced PedestrianWalkways
Phase 1 –
B Street
C Street
Park
Blv
d.
15th
Str
eet
14th
Str
eet
Russ Street
A Street
Broadway
17th
Str
eet
13th
Str
eet
16th
Str
eet
40
Phase 2 –New Construction•Future Projects
•Student Activities Center•Administration Building•Park Boulevard Overhead Walkway•Sciences Building•Structured Parking and Access•Walkways and Gathering Spaces•Theatre•Health and Exercise Science Building•Aquatics Complex•Baseball Field•Field House
legendPhase 1 BuildingsPhase 2 BuildingsExisting Buildings
Overflow Parking
B Street
C Street
Park
Blv
d.
15th
Str
eet
14th
Str
eet
Russ Street
A Street
Broadway
17th
Str
eet
13th
Str
eet
16th
Str
eet
41
Phase 2–
Gymnasium
Aquatic Complex
Baseball Field
Softball FieldSoccer Field
Admin
Field House
legendPhase 1 BuildingsPhase 2 BuildingsExisting Buildings
Future Health and Exercise Sciences Program
Overhead Pedestrian Walkway
Russ Blvd.42
legendPhase 1 BuildingsPhase 2 BuildingsExisting Buildings
Phase 2–
16th
Str
eet P
edes
tria
n Pr
omen
ade
Admin
Educational Tech. Center
Dining
Classroom/ faculty office
Engineering Technology Center Physics
Parking
ParkingSurface Parking
Student Success Center
Theater
Classroom/ Theater Services
Humanities
Classroom
Business Technology Center
Learning Resource Center
Vocational Tech. Center
Child Development Center
Campus Marquee
ParkingScience Labs
Student Services Admissions/Health
Student Activities Center
Overhead Pedestrian Walkway
Auditorium
Subterranean Parking
Subterranean Parking
Subterranean Parking
B Street
C Street
Park
Blv
d.
15th
Str
eet
14th
Str
eet
Russ Street
A Street
Broadway
17th
Str
eet
13th
Str
eet
16th
Str
eet
43
Phase 3 –New Construction•Future Projects
•Classroom and Faculty Office Buildings•Structured Parking and Access•Walkways and Gathering Spaces•Garfield High School Building
legendPhase 1 BuildingsPhase 2 Buildings
Existing BuildingsPhase 3 Buildings
Overflow Parking
B Street
C Street
Park
Blv
d.
15th
Str
eet
14th
Str
eet
Russ Street
A Street
Broadway
17th
Str
eet
13th
Str
eet
16th
Str
eet
44
Phase 3 –
legendPhase 1 BuildingsPhase 2 Buildings
Existing BuildingsPhase 3 Buildings
Russ Blvd.
New Gymnasium
Aquatic Complex
Baseball Field
Softball FieldSoccer Field
Admin
Field House
Overhead Pedestrian Walkway
45
Future Health and Exercise Sciences Program
Phase 3 –
16th
Str
eet P
edes
tria
n Pr
omen
ade
Admin
Educational Tech. Center
Dining
Classroom/ faculty office
Engineering Technology Center Physics
Parking
Parking
Student Success Center
Theater
Classroom/ Theater Services
Humanities
Classroom
Business Technology Center
Learning Resource Center
Vocational Tech. Center
Child Development Center
Campus Marquee
ParkingScience Labs
Student Services Admissions/Health
Student Activities Center
Overhead Pedestrian Walkway
Auditorium
Subterranean Parking
Subterranean Parking
Subterranean Parking
legendPhase 1 BuildingsPhase 2 Buildings
Existing BuildingsPhase 3 Buildings
Parking
Future Parking/ Program
Future Parking/ Program
Classroom/ faculty office
Future Program
Future Program
Future Program
B Street
C Street
Park
Blv
d.
15th
Str
eet
14th
Str
eet
Russ Street
A Street
Broadway
17th
Str
eet
13th
Str
eet
16th
Str
eet
46
Where We Go From Here
Development of a Facilities Master Plan
•Faculty / Staff Workshops
•Establish Program Needs & Principles
•Develop Facilities Master Plan Options
•Review & Evaluate
•Refine & Document
•Initiate Implementation