Facilities Services
Leadership Team Meeting October 21, 2015
Communicate
Clarify
Request Input (EOC Exam)
Purpose
Sales Surtax Priority List
Maintenance Reorganization
Capital Funding for Facilities
Agenda
Facilities Services
Capital Capital
#1
Sales Surtax Priority List
Maintenance Reorganization
Capital Funding for Facilities
Agenda
Sales Surtax Facilities Renewal 33 Categories / Condition Code 1 – 5
Funded: 17 “Mission Critical” Categories in
Condition Code 1 13 Categories in Condition Code 2
$156,970,000
Sales Surtax
Safety & Code Deficiencies = $7,020,000
Mechanical Systems = $106,765,000
Building Envelope = $21,125,000
Electrical Systems = $18,151,000
Site Utility Systems = $3,909,000
Sales Surtax Funded
1. Safety and Building Code Deficiency Corrections (Condition Code 1 & 2 Funded) 2. ADA Code Deficiency Correction (Condition Code 1 & 2 Funded) 3. Fire Alarm System Renewal (Condition Code 1 & 2 Funded) 4. Central Mechanical Plant Renewal (Condition Code 1 & 2 Funded) 5. Cooling and Heating Control System Renewal (Condition Code 1 & 2 Funded) 6. Air Conditioning and Air Distribution Equipment Renewal (Condition Code 1 & 2 Funded) 7. Roofing System Renewal (Condition Code 1 & 2 Funded) 8. Exterior Building Wall Finish System Renewal (Condition Code 1 & 2 Funded) 9. Exterior Door/Window/Louver System Renewal (Condition Code 1 & 2 Funded) 10. Building Water and Sanitary Piping System Renewal (Condition Code 1 & 2 Funded) 11. Water Heating System Renewal (Condition Code 1 & 2 Funded) 12. Electrical Supply System (Transf., Switchgear, Wiring) Renewal (Condition Code 1 & 2 Funded) 13. Electrical Distribution System Renewal (Condition Code 1 & 2 Funded) 14. Electrical Components (Lightning Prot., Intercom, Gen.) Renewal (Condition Code 1 Funded) 15. Interior and Exterior Lighting Equipment Renewal (Condition Code 1 Funded) 16. Air Supply and Exhaust System Renewal (Condition Code 1 Funded) 17. Site Utility Systems (Gas, Electric, Storm, Water, Sanitary) Renewal (Condition Code 1 Funded)
Sales Surtax
18. Site Improvements (Parking, Paving, Walks, Signage) Renewal 19. Site Facilities (Pavilions, Athletic/Playfields, Concessions) Renewal 20. Restroom Fixtures Renewal 21. Plumbing Systems General (Custodial, Labs, Roof Drains, Water Fountains) 22. Interior Door Assembly Renewal 23. Restroom Finishes and Accessories Renewal 24. Building Cabinetry Renewal 25. Interior Specialties (Lockers, Theater Equip., Audit. Seating, Bleachers) Renewal 26. Interior Wall Finishes Renewal 27. Interior Ceiling Renewal 28. Flooring System Renewal 29. Interior Signage Renewal 30. Interior Stair System Renewal 31. Indoor/Outdoor Pool Renewal 32. Building Foundation System Renewal 33. Building Structural System Renewal
Not Funded
#2
Determining Priorities
Active Project Extension 25Campus Wide FCI - Sales Surtax Work 20Campus Wide FCI - All work Identified 15Work Performed During 7 Year Plan 10
Age of Facility 5Energy Usage 3
Safety/Code System FCI - Sales Surtax Work 7Mechanical System FCI - Sales Surtax Work 6Building Envelope FCI - Sales Surtax Work 4Electrical System FCI - Sales Surtax Work 3
Site Utility FCI - Sales Surtax Work 2
Facility
System
Priorities FacilityName
Facility Renwal Attachment F
Amount
Cumulative Amount
Year 1 Through June
30, 2016
Year 2 Through June
30, 2017
Year 3 Through June
30, 2018
Year 4 Through June
30, 2019
Year 5 Through June
30, 2020
Year 6 Through June
30, 2021
Ocean Breeze Elementary 1,364,555$ 1,364,555$ 1,364,555$ Cape View Elementary 1,634,684$ 2,999,239$ 1,634,684$
Delaura Middle 2,805,242$ 5,804,481$ 2,805,242$ Audubon Elementary 1,953,767$ 7,758,248$ 1,953,767$ Andersen Elementary 3,558,232$ 11,316,480$ 3,558,232$
Jefferson Middle 3,450,294$ 14,766,774$ 3,450,294$ Roosevelt Elementary 2,933,932$ 17,700,706$ 2,933,932$ Sea Park Elementary 1,984,193$ 19,684,899$ 1,984,193$ Tropical Elementary 2,727,964$ 22,412,863$ 2,727,964$ Palm Bay Elementary 1,869,739$ 24,282,603$ 1,869,739$ Discovery Elementary 2,532,815$ 26,815,418$ 2,532,815$ Oak Park Elementary 1,373,147$ 28,188,564$ 1,373,147$
Saturn Elementary 4,323,156$ 32,511,721$ 4,323,156$ Melbourne High 6,981,134$ 39,492,854$ 6,981,134$
Sabal Elementary 2,070,752$ 41,563,607$ 2,070,752$ Hoover Middle 3,331,788$ 44,895,395$ 3,331,788$
Turner Elementary 1,506,976$ 46,402,371$ 1,506,976$ Fairglen Elementary 3,012,925$ 49,415,296$ 3,012,925$ Apollo Elementary 1,907,957$ 51,323,253$ 1,907,957$ McLarty Stadium 152,950$ 51,476,203$ 152,950$
Stone Middle 5,745,259$ 57,221,462$ 5,745,259$ Pinewood Elementary 1,110,752$ 58,332,214$ 1,110,752$
West Melbourne Elementary 1,537,158$ 59,869,372$ 1,537,158$ Jackson Middle 3,160,594$ 63,029,966$ 3,160,594$
Sherwood Elementary 1,998,765$ 65,028,731$ 1,998,765$ Kennedy Middle 2,499,070$ 67,527,801$ 2,499,070$
Croton Elementary 1,669,459$ 69,197,260$ 1,669,459$ Southwest Middle 3,353,906$ 72,551,166$ 3,353,906$
Rockledge High 3,535,384$ 76,086,550$ 3,535,384$ Williams Elementary 1,622,769$ 77,709,319$ 1,622,769$
Lewis Carroll Elementary 1,706,760$ 79,416,079$ 1,706,760$ Cocoa High 4,646,551$ 84,062,631$ 4,646,551$
Mid-South Area Support 1,581,604$ 85,644,235$ 1,581,604$ Mila Elementary 1,524,078$ 87,168,313$ 1,524,078$
Golfview Elementary 712,144$ 87,880,457$ 712,144$ Creel Elementary 1,850,969$ 89,731,426$ 1,850,969$
Coquina Elementary 1,665,714$ 91,397,140$ 1,665,714$ Holland Elementary 3,700,953$ 95,098,092$ 3,700,953$ Lockmar Elementary 1,864,637$ 96,962,729$ 1,864,637$
Johnson Middle 3,366,491$ 100,329,221$ 3,366,491$ University Park Elementary 1,268,676$ 101,597,897$ 1,268,676$
Madison Middle 1,132,669$ 102,730,566$ 1,132,669$ Stevenson Elementary 826,040$ 103,556,606$ 826,040$ Roy Allen Elementary 924,149$ 104,480,755$ 924,149$
Quest Elementary 812,620$ 105,293,375$ 812,620$ Eau Gallie High 1,808,929$ 107,102,304$ 1,808,929$
Gemini Elementary 635,497$ 107,737,801$ 635,497$ Endeavour Elementary 1,006,173$ 108,743,973$ 1,006,173$
Port Malabar Elementary 1,658,628$ 110,402,601$ 1,658,628$ South Lake Education Center 1,716,159$ 112,118,761$ 1,716,159$
Indialantic Elementary 1,036,830$ 113,155,591$ 1,036,830$ Surfside Elementary 1,004,632$ 114,160,222$ 1,004,632$ Atlantis Elementary 1,324,195$ 115,484,418$ 1,324,195$
Clearlake Education Center 1,252,958$ 116,737,376$ 1,252,958$ Harbor City Elementary 924,507$ 117,661,883$ 924,507$ Westside Elementary 1,120,519$ 118,782,402$ 1,120,519$
520 Compound 1,082,676$ 119,865,078$ 1,082,676$ McNair Magnet 541,349$ 120,406,427$ 541,349$ Whispering Hills 758,098$ 121,164,526$ 758,098$
Cambridge Elementary 363,421$ 121,527,946$ 363,421$ Longleaf Elementary 1,165,315$ 122,693,261$ 1,165,315$
Edgewood Jr./Sr. High 407,257$ 123,100,519$ 407,257$ Freedom 7 Elementary 144,998$ 123,245,516$ 144,998$ Meadowlane Primary 1,959,710$ 125,205,226$ 1,959,710$
Space Coast Jr./Sr. High 1,357,503$ 126,562,729$ 1,357,503$ Suntree Elementary 1,921,108$ 128,483,837$ 1,921,108$ Jupiter Elementary 720,994$ 129,204,832$ 720,994$
Gardendale 847,440$ 130,052,272$ 847,440$ Manatee Elementary 834,432$ 130,886,704$ 834,432$
Challenger 7 351,848$ 131,238,551$ 351,848$ Titusville High School 1,688,471$ 132,927,022$ 1,688,471$
Riviera Elementary 339,563$ 133,266,586$ 339,563$ Cuyler 323,279$ 133,589,865$ 323,279$
North Area Transportation 456,837$ 134,046,702$ 456,837$ Merritt Island 1,472,577$ 135,519,279$ 1,472,577$
Columbia Elementary 199,660$ 135,718,939$ 199,660$ Central Middle 544,091$ 136,263,029$ 544,091$
Cocoa Beach Jr./Sr. High 1,485,441$ 137,748,470$ 1,485,441$ Palm Bay High 1,333,521$ 139,081,991$ 1,333,521$
South Area Head Start 9,600$ 139,091,591$ 9,600$ Satellite High 1,273,070$ 140,364,661$ 1,273,070$
Imperial Estates Elementary 864,586$ 141,229,247$ 864,586$ McAuliffe Elementary 989,161$ 142,218,408$ 989,161$
Plant Operations/Maintenance 911,014$ 143,129,422$ 911,014$ Enterprise Elementary 481,201$ 143,610,623$ 481,201$
South Pine Grove 250,386$ 143,861,008$ 250,386$ Astronaut High 1,236,693$ 145,097,702$ 1,236,693$
West Shore Jr./Sr. High 590,342$ 145,688,043$ 590,342$ Mims Elementary 409,198$ 146,097,242$ 409,198$
Educational Services Facility 1,723,069$ 147,820,311$ 1,723,069$ Meadowlane Intermediate 1,758,395$ 149,578,706$ 1,758,395$
Viera High 3,660,675$ 153,239,381$ 3,660,675$ Riverview School 800,442$ 154,039,823$ 800,442$
Westside Bus Compound 144,400$ 154,184,224$ 144,400$ Sunrise Elementary 624,638$ 154,808,862$ 624,638$
Bayside High 1,068,897$ 155,877,759$ 1,068,897$ Manatee Bus Compound 187,658$ 156,065,417$ 187,658$ Satellite Bus Compound 460,156$ 156,525,572$ 460,156$
Heritage High 426,383$ 156,951,955$ 426,383$ Melbourne Bus Compound 17,994$ 156,969,949$ 17,994$
Annual Total 39,492,854$ 25,382,927$ 26,368,409$ 26,264,743$ 25,441,027$ 14,019,989$ Cumulative Total 156,969,949$
Sales Surtax Planned Project PriorityAnnual Project Distribution
1. Replacement of Critical Components At Failure (Emergency) Near Failure (Planned)
2. Projects in Prioritized Order
Summer 2015 Ocean Breeze Elementary
Audubon Elementary (Phase 2 / 2016)
Palm Bay Elementary (Phase 2 / 2016)
Oak Park Elementary (Phase 2 / 2016)
Andersen Elementary (Phase 2 / 2016)
DeLaura Middle – (Phase 3 / 2016)
Atlantis Elementary Chiller
Sherwood Elementary Chiller
Jefferson Middle Cooling Tower
Priority
Sales Surtax Priority List
Maintenance Reorganization
Capital Funding for Facilities
Agenda
Plant Operations & Maintenance
Dennis Bonny, Director
District Data
12,800,000 Square Feet (Equiv: 6,000 homes) 82 Schools / 4,145 Classrooms 934 Permanent Buildings / 413 Portables 108 Occupied Sites / 16 Vacant Parcels 2,600 Acres Average Age = 42 years
Plant Operations & Maintenance
Plant Operations & Maintenance
Work Orders
Emergency - Priority 1
Routine - Priority 2
Plant Operations & Maintenance
Emergency / Urgent (Priority 1) Work required to prevent or eliminate eminent hazards to
persons or property (Emergency / Safety)
Work required to prevent interruption of educational and work processes (Emergency / Mission)
Restore services disrupted by an interruption or breakdown of utilities (Urgent)
Correct loss or damage of property (Urgent)
Our goal is to respond to all Emergency work immediately and all Urgent work within 24 hours
Plant Operations & Maintenance
Routine (Priority 2) Routine work required to maintain or repair buildings,
grounds and equipment
This type of work is batched and scheduled by the Team Supervisor
Our goal is to complete this work within 30 days
Plant Operations & Maintenance
How do we receive work orders?
Emergency / Urgent – Priority 1 requests are typically phoned in to our Customer Service Representatives
633-3600 24 hrs/day, 7 days/week.
Routine – Priority 2 requests may be phoned in to the Customer Service Center, submitted electronically on our Computerized Maintenance Management System (TeamWorks).
Note: The Customer Service Teams will also be identifying and submitting work orders.
Plant Operations & Maintenance
Plant Operations & Maintenance
Plant Operations & Maintenance
Maintained Systems: Electrical, Plumbing, HVAC, Intercom, Fire Alarm
Roofing, Flooring, Windows, Doors, Hardware, Paint, Signage
Commercial Kitchen Equipment / Boilers
Athletic Facilities, Pools, Pavilions, Walkway Covers, Mulch
Grounds, Retention Areas, Paving, Fencing, Exterior Lighting
Classroom and Ancillary Facility Portables
Plant Operations & Maintenance
Not Maintained FF&E Items: Furniture, Bookshelves, Specialized Equipment
Appliances: Refrigerators, Ovens, Washers, Dryers, Microwaves, Ice Machines
Playground Equipment
Storage and Competitive Sports Portables
Concession Equipment owned by “Boosters”
School-Initiated Projects
Plant Operations & Maintenance
Not Installed Furniture, Equipment, Appliances, Playground Equipment
Banners, Signs, Screens
New Power / Data Outlets
New Walls, Doors, Windows, Trim
New Walkways, Planters, Fences, Gates,
Plant Operations & Maintenance
Why Not?
Plant Operations & Maintenance
Available Resources =
Level of Service
Benchmarking
Benchmarking
Benchmarking
#3
Sales Surtax Priority List
Maintenance Reorganization
Capital Funding for Facilities
Agenda
Capital Funding
Description Amount NotesRevenues
PECO $1,734,190 CO & DS $584,000 Other State $150,000 Fuel Tax RebateCapital Allocation $5,838,000 Capital Reserve and/or 1.5 Mill Ad Valorum
Funding Total $8,306,190
#4
Description Amount NotesLabor Cross-Charges
Capital Cross-Charges for Labor ($675,186)Assumes 50% of actual costs will be charged against Sales Surtax revenues
Capital Funding (#1)
Capital Funding
Description Amount Notes Remaining Available Funding $7,631,005
Maintenance SupplementsMaintenance Non-Labor Operating Supplement
($2,100,000)
Reserve for additional Maintenance Non-Labor Operating Supplement
($400,000)
Maintenance Replacement at Failure ($1,000,000) PECO
(#3)
Capital Funding
Description Amount Notes Remaining Available Funding $4,131,005
Annual ProjectsSafety to Life ($173,419) 10% of PECO Painting & Corrosion Control (Year 2) ($560,771) PECOSite Improvements (Year 1) ($584,000) CO & DS (Approval pending from FDOE)ADA ($100,000)Portable Relocation ($250,000)
FF&E ($350,000) $100,000 per area for schools / $50,000 for ancillary
Program-Related Facility Needs ($250,000) $200,000 for schools / $50,000 for ancillaryCustodial Equipment ($150,000)Energy Conservation Projects ($150,000) Maximum 3-year paybackFuel Tax Rebate Project ($150,000) Must be used on roads
Capital Funding (#2) Description Amount Notes
Remaining Available Funding $1,412,815
2015-16 Capital ProjectsESF Server Room & AS400 Back-up HVAC ($140,000)South Area Office Building Envelope and HVAC Improvements (Year 1)
($200,000)
Replace Underground Tank at North Area Bus
($250,000)
Lockmar Pool Repairs ($150,000)Gibson Field Drainage ($23,000)Grounds Equipment ($165,000)HVAC Commissioning at Ocean Breeze and Audubon
($45,000)New Code requirement / Not in project budgets
Design Standards Update ($47,000)Plant Operations & Maintenance Customer Service Phone System
($14,000)
Remaining Unallocated Capital Funds $378,815
Request for Input (The Test)
What changes would you like to see?
Don’t charge schools for any new work and do less construction?
Don’t reject any Work Orders even if it takes longer to do them?
Increase capital funding to do more things not funded by the sales surtax?
(#2 & #4)
(#1)
(#3)