facility condition assessment report...instrumentation system beyond service life renew system 1 ea....
TRANSCRIPT
Facility Condition Assessment Report
DeKalb County School System
1701 Mountain Industrial Blvd COMET4 Facility Report
Livsey Elementary Facility Executive Summary ReportStone Mountain, GA 30083 Report Date: 01 Jul 2011
Facility: \Elementary Schools\Livsey ElementaryAddress: 4137 Livsey Road, Tucker, GA 30084
Attributes: Facility Code 1061Super Cluster 2
General Information: Function: Elementary School Year Built:Gross Area: 40,414 S.F. Last Renovation:
Facility Description:
The Livsey Elementary School campus consists of two buildings located at 4137 Livsey Road in Tucker, Georgia. The original campus was constructed in 1971 and a gymnasium building was constructed in 2003. In addition to the buildings, the campus contains a storage building, covered walkways, playgrounds, and playfield. This report contains condition and adequacy data collected during the 2010/2011 Facility Condition Assessment (FCA). The detailed condition and deficiency statements are contained in this report for each building or other facility on the campus.
Current Repair Cost: $4,399,270.99 Replacement Cost: $8,756,400.10 FCI: 50.24%
08-Feb-2011Livsey Elementary School
DeKalb County School System
1701 Mountain Industrial Blvd COMET4 FCI Report
Livsey Elementary Weighted FCI ReportStone Mountain, GA 30083 Report Date: 01 Jul 2011
Facility Name
Last
Renovation
Cost Per
Sq. Ft.
Gross Area
(Sq. Ft.) Repair Cost
Replacement
Cost
Weighted
FCI
Critical
wt 1.25
Potentially
Critical
wt 1.1
Necessary
wt 1
Recommended
wt 0.75
Discretionary
wt 0.5
Livsey Elementary\ 1971 Building $193.48 34,936 $3,923,812 $6,759,292 52.32% $0 $247,692 $2,205,106 $1,293,617 $177,397
Livsey Elementary\Site $22.81 40,414 $405,947 $921,682 33.55% $0 $0 $30,808 $363,377 $11,763
Livsey Elementary\1971 Storage $80.95 170 $3,213 $13,762 17.51% $0 $0 $0 $3,213 $0
Livsey Elementary\ 2003 Gym $153.15 5,478 $56,154 $838,971 6.69% $0 $0 $56,154 $0 $0
Livsey Elementary\Playfield $4.84 36,600 $10,146 $177,085 2.86% $0 $0 $0 $0 $10,146
Livsey Elementary\Covered Walkway 2 $27.64 630 $0 $17,414 0.00% $0 $0 $0 $0 $0
Livsey Elementary\Covered Walkway 1 $27.64 1,020 $0 $28,194 0.00% $0 $0 $0 $0 $0
DeKalb County School System
1701 Mountain Industrial Blvd COMET4 Survey Report
Livsey Elementary Detailed Facility Needs Assessment ReportStone Mountain, GA 30083 Report Date: 01 Jul 2011
Facility
Name Assembly System Material Distress Correction Qty Unit Raw Cost
Additional
Cost Total Cost Priority Def. Cat. Location / Note
DeKalb County School System $3,216,593 $1,182,678 $4,399,271 Elementary Schools $3,216,593 $1,182,678 $4,399,271 Livsey Elementary $3,216,593 $1,182,678 $4,399,271 1971 Building $2,843,342 $1,080,470 $3,923,812 Building Systems $2,843,342 $1,080,470 $3,923,812
B2020 Exterior Windows
System Beyond Service Life
Renew System 1 Ea. $176,008 $66,883 $242,890 Recommended
Deferred Maintenance
The original metal frame, single pane, operable windows are aged, worn, and inefficient, and should be replaced.
B2030 Exterior Doors System Beyond Service Life
Renew System 1 Ea. $24,211 $9,200 $33,411 Recommended
Deferred Maintenance
The original metal exterior doors are aged and should be replaced with energy efficient doors.
B3010 Roof Coverings -BUR
System Beyond Service Life
Renew System 1 Ea. $154,487 $58,705 $213,192 Potentially Critical
Deferred Maintenance
The built-up roofing is aged, does not drain properly, and should be replaced.
B3020 Roof Openings System Beyond Service Life
Renew System 1 Ea. $15,756 $5,987 $21,743 Recommended
Deferred Maintenance
The roof openings are aged and worn and should be replaced.
C1020 Interior Doors System Beyond Service Life
Renew System 1 Ea. $42,203 $16,037 $58,240 Recommended
Deferred Maintenance
The original wood interior doors are aged and worn and should be replaced.
C3010 Wall Finishes - Paint
System Beyond Service Life
Renew System 1 Ea. $25,171 $9,565 $34,737 Recommended
Deferred Maintenance
The wall paint is aged, scuffed, and stained, and should be repainted.
C3020 Floor Finishes - Carpet
System Beyond Service Life
Renew System 1 Ea. $10,954 $4,162 $15,116 Discretionary
Deferred Maintenance
The carpet is aged and worn and should be replaced.
C3020 Floor Finishes - VCT
System Beyond Service Life
Renew System 1 Ea. $85,682 $32,559 $118,241 Recommended
Deferred Maintenance
The VCT flooring is aged and faded and should be replaced.
C3030 Ceiling Finishes System Beyond Service Life
Renew System 1 Ea. $250,177 $95,067 $345,244 Recommended
Deferred Maintenance
The acoustical ceiling tile and grid system is aged and damaged due to roof leaks and should be replaced.
D3020 Heat Generating Systems
System Beyond Service Life
Renew System 1 Ea. $115,673 $43,956 $159,629 Necessary
Deferred Maintenance
The boiler is functional, but aged and inefficient and should be replaced.
D3040 Distribution & Exhaust Systems
System Beyond Service Life
Renew System 1 Ea. $129,892 $49,359 $179,251 Necessary
Deferred Maintenance
Distribution and exhaust are distressed and should be replaced.
D3050 Terminal & Package Units
System Beyond Service Life
Renew System 1 Ea. $601,423 $228,541 $829,964 Necessary
Deferred Maintenance
RTUs are aged and worn and should be replaced with heat recovery units for improved indoor air quality.
D3060 Controls & Instrumentation
System Beyond Service Life
Renew System 1 Ea. $89,925 $34,172 $124,097 Necessary
Deferred Maintenance
Controls are aged and should be replaced.
D3090 Other HVAC Systems/Equip -Kitchen Hood
System Beyond Service Life
Renew System 1 Ea. $32,665 $12,413 $45,078 Necessary
Deferred Maintenance
The original kitchen hood is inefficient and should be replaced.
D5010 Electrical Service/Distribution
System Beyond Service Life
Renew System 1 Ea. $54,186 $20,591 $74,776 Necessary
Deferred Maintenance
Electrical service is aged, near capacity, and should be replaced.
D5020 Branch Wiring System Beyond Service Life
Renew System 1 Ea. $181,772 $69,073 $250,845 Necessary
Deferred Maintenance
Branch wiring is aged and inadequate and should be replaced.
DeKalb County School System
1701 Mountain Industrial Blvd COMET4 Survey Report
Livsey Elementary Detailed Facility Needs Assessment ReportStone Mountain, GA 30083 Report Date: 01 Jul 2011
Facility
Name Assembly System Material Distress Correction Qty Unit Raw Cost
Additional
Cost Total Cost Priority Def. Cat. Location / Note
D5030 Communications and Security - Clock & PA Systems
System Beyond Service Life
Renew System 1 Ea. $153,334 $58,267 $211,601 Necessary
Deferred Maintenance
The PA system is aged and should be replaced.
E1090 Other Equipment
System Beyond Service Life
Renew System 1 Ea. $318,197 $120,915 $439,112 Recommended
Deferred Maintenance
Kitchen equipment is aged and should be replaced.
E2010 Fixed Furnishings
System Beyond Service Life
Renew System 1 Ea. $117,595 $44,686 $162,281 Discretionary
Deferred Maintenance
Fixed furnishings, such as the base/wall cabinets, counter tops, window shades, and fixed seating, are worn and damaged, and should be replaced.
A1010 Standard Foundations
Engineering Study for Foundations
Needs Remediation
Study analyze and develop solution
1 Ea. $25,000 $9,500 $34,500 Potentially Critical
Safety Differential settlement was observed throughout the building and an engineering study is recommended to determine the cause. Pricing does not include remediation measures.
D5020 Lighting System Beyond Service Life
Renew System 1 Ea. $239,032 $90,832 $329,864 Necessary
Deferred Maintenance
There was a minor lighting replacement in 2008, but the bulk of the fixtures in the classrooms and media center remain aged and inadequate.
2003 Gym $40,691 $15,463 $56,154 Building Systems $40,691 $15,463 $56,154
D3050 Terminal & Package Units
Packaged A/C, Elec. Ht., Const. Volume
Missing Install Package A/C - 20 ton
1 Ea. $40,691 $15,463 $56,154 Necessary
Capital Improvement
An air conditioning system is missing in the gymnasium and should be installed.
1971 Storage $2,328 $885 $3,213 Building Systems $2,328 $885 $3,213
B2030 Exterior Doors System Beyond Service Life
Renew System 1 Ea. $381 $145 $526 Recommended
Deferred Maintenance
The original metal exterior doors are aged and should be replaced.
B3010 Roof Coverings System Beyond Service Life
Renew System 1 Ea. $1,947 $740 $2,686 Recommended
Deferred Maintenance
The built-up roofing is aged and worn and should be replaced.
Playfield $8,052 $2,094 $10,146 Building Systems $8,052 $2,094 $10,146
F1040 Special Facilities - Sports Field - Natural Turf
System Beyond Service Life
Renew System 1 Ea. $8,052 $2,094 $10,146 Discretionary
Deferred Maintenance
The grass is damaged and should be reseeded.
DeKalb County School System
1701 Mountain Industrial Blvd COMET4 Survey Report
Livsey Elementary Detailed Facility Needs Assessment ReportStone Mountain, GA 30083 Report Date: 01 Jul 2011
Facility
Name Assembly System Material Distress Correction Qty Unit Raw Cost
Additional
Cost Total Cost Priority Def. Cat. Location / Note
Site $322,180 $83,767 $405,947 Building Systems $322,180 $83,767 $405,947
G2010 Roadways System Beyond Service Life
Renew System 1 Ea. $114,695 $29,821 $144,516 Recommended
Deferred Maintenance
The asphaltic roadways are aged and should be resurfaced.
G2020 Parking Lots System Beyond Service Life
Renew System 1 Ea. $52,013 $13,523 $65,536 Recommended
Deferred Maintenance
The asphaltic parking lots are aged, inadequate, and should be resurfaced and restriped.
G2030 Pedestrian Paving
System Beyond Service Life
Renew System 1 Ea. $58,237 $15,142 $73,378 Recommended
Deferred Maintenance
The sidewalks are aged, cracked, damaged, and inadequate for accessibility, and should be replaced.
G2040 Site Development
System Beyond Service Life
Renew System 1 Ea. $9,336 $2,427 $11,763 Discretionary
Deferred Maintenance
Site delevelopment features, such as flagpole, signage, and site furnishings are beyond thier service life and should be replaced.
G2040105 Fence & Guardrails
System Beyond Service Life
Renew System 1 Ea. $63,450 $16,497 $79,947 Recommended
Deferred Maintenance
The fencing is aged, rusted, and damaged, and should be replaced.
G4020 Site Lighting System Beyond Service Life
Renew System 1 Ea. $24,450 $6,357 $30,808 Necessary
Deferred Maintenance
Exterior lighting is inadequate in the parking areas, northeast corner, east side, between the gym and the building, and around the portables.
DeKalb County School System
1701 Mountain Industrial Blvd COMET4 Facility Report
Livsey Elementary Facility Executive Summary ReportStone Mountain, GA 30083 Report Date: 01 Jul 2011
Facility: \Elementary Schools\Livsey Elementary\ 1971 BuildingAddress: 4137 Livsey Road, Tucker, GA 30084
Attributes: Building Codes 2010Fire Sprinkler System No
General Information: Function: Elementary School Year Built: 1971Gross Area: 34,936 S.F. Last Renovation:
Facility Description:
The Livsey Elementary School main building is a one-story building located at 4137 Livsey Road in Tucker, Georgia. There have been no additions and no major renovations. This report contains condition and adequacy data collected during the 2010/2011 Facility Condition Assessment (FCA). The detailed condition and deficiency statements are contained in this report.
Energy conservation opportunities for this building include: 1) Replacing the exterior windows with energy efficient windows; 2) Replacing the exterior doors with energy efficient doors; 3) Replacing the roof covering and insulation; 4) Replacing inefficient interior electrical lamps and fixtures; and 5) Replacing the existing RTUs with high efficient units.
Current Repair Cost: $3,923,811.73 Replacement Cost: $6,759,292.50 FCI: 58.05%
08-Feb-2011North Elevation
08-Feb-2011East Elevation
08-Feb-2011South Elevation
08-Feb-2011West Elevation
DeKalb County School System
1701 Mountain Industrial Blvd COMET4 Facility Report
Livsey Elementary Facility Executive Summary ReportStone Mountain, GA 30083 Report Date: 01 Jul 2011
Facility: \Elementary Schools\Livsey Elementary\ 1971 Building (continued)
Building Condition:
System Unit Price$
Unit of
Meas Qty Renewal% Renewal$ Life Installed
Calc Next
Renewal
Next
Renewal RSL Deficiency$ Replacement Value FCI%
Total $193.48 S.F. 34,936 108 $7,301,241 40 1977 1979 2010 $3,923,812 $6,759,291 58
Substructure $13.21 S.F. 34,936 100 $461,386 100 1971 $34,500 $461,386 7
Foundations $13.21 S.F. 34,936 100 $461,386 100 1971 $34,500 $461,386 7
Standard Foundations $6.49 S.F. 34,936 100 $226,595 100 1971 $34,500 $226,595 15
Special Foundations $4.14 S.F. 0 100 100 1971
Slab on Grade $6.72 S.F. 34,936 100 $234,791 100 1971 $234,791
Basement Construction 0 0 0
Basement Excavation $0.22 S.F. 0 100 100 1971
Basement Walls $5.93 S.F. 0 100 100 1971
Shell $32.20 S.F. 34,936 104 $1,171,253 69 1971 1981 $511,236 $1,124,777 45
Superstructure $4.43 S.F. 34,936 100 $154,759 100 1971 $154,759
Floor Construction $14.14 S.F. 0 100 100 1971
Roof Construction $4.43 S.F. 34,936 100 $154,759 100 1971 $154,759
Exterior Enclosure $21.65 S.F. 34,936 103 $781,559 75 1971 2001 $276,301 $756,440 37
Exterior Walls $14.46 S.F. 34,936 100 $505,258 100 1971 $505,258
Exterior Windows $6.32 S.F. 34,936 110 $242,890 30 1971 2001 $242,890 $220,809 110
Exterior Doors $0.87 S.F. 34,936 110 $33,411 30 1971 2001 $33,411 $30,373 110
Roofing $6.11 S.F. 34,936 110 $234,935 25 1971 1981 $234,935 $213,578 110
Roof Coverings - Asphalt
Shingles
$3.70 S.F. 0 110 10 1971 1981
Roof Coverings - BUR $5.55 S.F. 34,936 110 $213,192 25 1971 1996 $213,192 $193,811 110
Roof Coverings - EPDM $2.84 S.F. 0 110 15 1971 1986
Roof Coverings - Preformed
Metal
$4.28 S.F. 0 110 30 1971 2001
Roof Coverings - Standing
Seam Metal
$23.47 S.F. 0 110 75 1971 2046
Roof Openings $0.57 S.F. 34,936 110 $21,743 30 1971 2001 $21,743 $19,767 110
Interiors $50.12 S.F. 34,936 109 $1,904,331 44 1978 1979 $571,578 $1,751,064 33
Interior Construction $11.04 S.F. 34,936 104 $402,423 70 1984 2001 $58,240 $385,694 15
Partitions $6.40 S.F. 34,936 110 $246,072 100 1971 $223,702
Interior Doors $2.08 S.F. 34,936 80 $58,240 30 1971 2001 $58,240 $72,800 80
Fittings $2.55 S.F. 34,936 110 $98,111 20 2010 2030 $89,192
Interior Finishes $39.08 S.F. 34,936 110 $1,501,908 37 1971 1979 $513,338 $1,365,370 38
Wall Finishes - Ceramic &
Glazed
$9.58 S.F. 17,468 110 $184,024 30 1971 $167,295
Wall Finishes - Paint $1.81 S.F. 17,468 110 $34,737 10 1971 1981 $34,737 $31,579 110
Wall Finishes - Wall Coverings $1.99 S.F. 0 110 10 1971 1981
Floor Finishes - Carpet $7.87 S.F. 1,747 110 $15,116 8 1971 1979 $15,116 $13,742 110
Floor Finishes - Ceramic &
Quarry Tile
$13.40 S.F. 3,494 110 $51,501 50 1971 2021 $46,819
Floor Finishes - Terrazzo $48.99 S.F. 13,974 110 $753,045 50 1971 2021 $684,586
Floor Finishes - VCT $8.79 S.F. 12,228 110 $118,241 20 1971 1991 $118,241 $107,491 110
Floor Finishes - Wood $13.58 S.F. 0 110 20 1971 1991
Ceiling Finishes $8.98 S.F. 34,936 110 $345,244 20 1971 1991 $345,244 $313,858 110
Services $82.30 S.F. 34,936 110 $3,162,878 22 1981 1981 2010 $2,205,105 $2,875,343 77
Conveying 0 0 0
Elevators and Lifts $1.17 S.F. 0 110 30 1971
Plumbing $23.13 S.F. 34,936 110 $888,830 23 1990 2001 2019 $808,027
Plumbing Fixtures $16.10 S.F. 34,936 110 $618,893 20 2010 2030 $562,630
Domestic Water Distribution $3.59 S.F. 34,936 110 $137,885 30 2010 2040 $125,350
Sanitary Waste $3.05 S.F. 34,936 110 $117,203 30 1971 2001 2019 9 $106,548
Rain Water Drainage $0.88 S.F. 0 110 30 1971
Other Plumbing Systems -
Natural Gas
$0.39 S.F. 34,936 110 $14,849 30 1971 2001 2019 9 $13,499
HVAC $34.82 S.F. 34,936 110 $1,338,019 20 1971 1986 $1,338,019 $1,216,380 110
Heat Generating Systems $4.15 S.F. 34,936 110 $159,629 30 1971 2001 $159,629 $145,117 110
Cooling Generating Systems $4.22 S.F. 0 110 30 1971
Distribution & Exhaust Systems $4.66 S.F. 34,936 110 $179,251 30 1971 2001 $179,251 $162,955 110
Terminal & Package Units $21.60 S.F. 34,936 110 $829,964 15 1971 1986 $829,964 $754,513 110
Controls & Instrumentation $3.23 S.F. 34,936 110 $124,097 20 1971 1991 $124,097 $112,815 110
Other HVAC Systems/Equip -
Kitchen Hood
$1.17 S.F. 34,936 110 $45,078 30 1971 2001 $45,078 $40,980 110
Fire Protection 0 0 0 2010
Sprinklers $4.25 S.F. 0 110 30 0 2010
Standpipes $0.44 S.F. 0 110 30 0
Electrical $24.36 S.F. 34,936 110 $936,029 24 1983 1981 $867,086 $850,936 102
Electrical Service/Distribution $1.95 S.F. 34,936 110 $74,776 30 1971 2001 $74,776 $67,978 110
Branch Wiring $6.53 S.F. 34,936 110 $250,845 30 1971 2001 $250,845 $228,041 110
DeKalb County School System
1701 Mountain Industrial Blvd COMET4 Facility Report
Livsey Elementary Facility Executive Summary ReportStone Mountain, GA 30083 Report Date: 01 Jul 2011
System Unit Price$
Unit of
Meas Qty Renewal% Renewal$ Life Installed
Calc Next
Renewal
Next
Renewal RSL Deficiency$ Replacement Value FCI%
Lighting $8.58 S.F. 34,936 110 $329,864 30 1971 2001 $329,864 $299,877 110
Communications and Security -
Clock & PA Systems
$5.51 S.F. 34,936 110 $211,601 10 1971 1981 $211,601 $192,365 110
Communications and Security -
Fire Alarm
$1.20 S.F. 34,936 110 $46,139 10 2008 2018 $41,944
Communications and Security -
Security & CCTV
$0.59 S.F. 34,936 110 $22,804 10 2008 2018 $20,731
Other Electrical Systems -
Emergency Generator
$0.37 S.F. 0 110 15 1971
Equipment & Furnishings $15.65 S.F. 34,936 110 $601,393 20 1971 1991 $601,393 $546,721 110
Equipment $11.43 S.F. 34,936 110 $439,112 20 1971 1991 $439,112 $399,193 110
Commercial Equipment $7.53 S.F. 0 110 20 1971
Institutional Equipment $0.40 S.F. 0 110 20 1971
Other Equipment $11.43 S.F. 34,936 110 $439,112 20 1971 1991 $439,112 $399,193 110
Furnishings $4.22 S.F. 34,936 110 $162,281 20 1971 1991 $162,281 $147,528 110
Fixed Furnishings $4.22 S.F. 34,936 110 $162,281 20 1971 1991 $162,281 $147,528 110
Special Construction 0 0 0
Special Construction 0 0 0
Special Structures - Canopies $1.19 S.F. 0 100 25 1971 1996
DeKalb County School System
1701 Mountain Industrial Blvd COMET4 Facility Report
Livsey Elementary Facility Executive Summary ReportStone Mountain, GA 30083 Report Date: 01 Jul 2011
Facility: \Elementary Schools\Livsey Elementary\ 1971 Building (continued)
Renewal Schedule:
Systems 2010-12 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022
Total $3,923,812 $106,484 $172,298 $331,057 $1,113,679
Substructure $34,500
Foundations $34,500
Standard Foundations $34,500
Special Foundations
Slab on Grade
Basement Construction
Basement Excavation
Basement Walls
Shell $511,236
Superstructure
Floor Construction
Roof Construction
Exterior Enclosure $276,301
Exterior Walls
Exterior Windows $242,890
Exterior Doors $33,411
Roofing $234,935
Roof Coverings - Asphalt Shingles
Roof Coverings - BUR $213,192
Roof Coverings - EPDM
Roof Coverings - Preformed Metal
Roof Coverings - Standing Seam
Metal
Roof Openings $21,743
Interiors $571,578 $19,149 $46,683 $1,113,679
Interior Construction $58,240
Partitions
Interior Doors $58,240
Fittings
Interior Finishes $513,338 $19,149 $46,683 $1,113,679
Wall Finishes - Ceramic & Glazed
Wall Finishes - Paint $34,737 $46,683
Wall Finishes - Wall Coverings
Floor Finishes - Carpet $15,116 $19,149
Floor Finishes - Ceramic & Quarry
Tile
$71,289
Floor Finishes - Terrazzo $1,042,390
Floor Finishes - VCT $118,241
Floor Finishes - Wood
Ceiling Finishes $345,244
Services $2,205,105 $87,335 $172,298 $284,374
Conveying
Elevators and Lifts
Plumbing $172,298
Plumbing Fixtures
Domestic Water Distribution
Sanitary Waste $152,923
Rain Water Drainage
Other Plumbing Systems - Natural
Gas
$19,375
HVAC $1,338,019
Heat Generating Systems $159,629
Cooling Generating Systems
Distribution & Exhaust Systems $179,251
Terminal & Package Units $829,964
Controls & Instrumentation $124,097
Other HVAC Systems/Equip -
Kitchen Hood
$45,078
Fire Protection
Sprinklers
Standpipes
Electrical $867,086 $87,335 $284,374
Electrical Service/Distribution $74,776
Branch Wiring $250,845
DeKalb County School System
1701 Mountain Industrial Blvd COMET4 Facility Report
Livsey Elementary Facility Executive Summary ReportStone Mountain, GA 30083 Report Date: 01 Jul 2011
Systems 2010-12 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022
Lighting $329,864
Communications and Security -
Clock & PA Systems
$211,601 $284,374
Communications and Security - Fire
Alarm
$58,447
Communications and Security -
Security & CCTV
$28,888
Other Electrical Systems -
Emergency Generator
Equipment & Furnishings $601,393
Equipment $439,112
Commercial Equipment
Institutional Equipment
Other Equipment $439,112
Furnishings $162,281
Fixed Furnishings $162,281
Special Construction
Special Construction
Special Structures - Canopies
DeKalb County School System
1701 Mountain Industrial Blvd COMET4 Facility Report
Livsey Elementary Facility Executive Summary ReportStone Mountain, GA 30083 Report Date: 01 Jul 2011
Facility: \Elementary Schools\Livsey Elementary\ 1971 Building (continued)
Deficiency Sheet:
Deficiency: Surveyor/Update: Somnath Das Fri, 01-Apr-2011Priority: 2Quantity: 1
Assembly: A1010 System: Standard Foundations Material: Engineering Study for Foundations Distress: Needs Remediation Category: Safety Correction: Study analyze and develop solution Note: Differential settlement was observed throughout the building and an engineering study is recommended to
determine the cause. Pricing does not include remediation measures.
Estimates:Raw Cost $25,000.00
Plus or (Minus) Additional Cost $9,500.00Total Estimated Amount $34,500.00
Deficiency: Surveyor/Update: Paul Hufford Wed, 09-Mar-2011Priority: 4Quantity: 1
Assembly: B2020 System: Exterior Windows Material: System Distress: Beyond Service Life Category: Deferred Maintenance Correction: Renew System Note: The original metal frame, single pane, operable windows are aged, worn, and inefficient, and should be replaced.
Estimates:Raw Cost $176,007.57
Plus or (Minus) Additional Cost $66,882.88Total Estimated Amount $242,890.45
DeKalb County School System
1701 Mountain Industrial Blvd COMET4 Facility Report
Livsey Elementary Facility Executive Summary ReportStone Mountain, GA 30083 Report Date: 01 Jul 2011
Facility: \Elementary Schools\Livsey Elementary\ 1971 Building (continued)
Deficiency: Surveyor/Update: Paul Hufford Thu, 17-Feb-2011Priority: 4Quantity: 1
Assembly: B2030 System: Exterior Doors Material: System Distress: Beyond Service Life Category: Deferred Maintenance Correction: Renew System Note: The original metal exterior doors are aged and should be replaced with energy efficient doors.
Estimates:Raw Cost $24,210.65
Plus or (Minus) Additional Cost $9,200.05Total Estimated Amount $33,410.70
Deficiency: Surveyor/Update: Paul Hufford Wed, 09-Mar-2011Priority: 2Quantity: 1
Assembly: B3010 System: Roof Coverings - BUR Material: System Distress: Beyond Service Life Category: Deferred Maintenance Correction: Renew System Note: The built-up roofing is aged, does not drain properly, and should be replaced.
Estimates:Raw Cost $154,486.99
Plus or (Minus) Additional Cost $58,705.06Total Estimated Amount $213,192.05
DeKalb County School System
1701 Mountain Industrial Blvd COMET4 Facility Report
Livsey Elementary Facility Executive Summary ReportStone Mountain, GA 30083 Report Date: 01 Jul 2011
Facility: \Elementary Schools\Livsey Elementary\ 1971 Building (continued)
Deficiency: Surveyor/Update: Paul Hufford Fri, 24-Jun-2011Priority: 4Quantity: 1
Assembly: B3020 System: Roof Openings Material: System Distress: Beyond Service Life Category: Deferred Maintenance Correction: Renew System Note: The roof openings are aged and worn and should be replaced.
Estimates:Raw Cost $15,756.14
Plus or (Minus) Additional Cost $5,987.33Total Estimated Amount $21,743.47
Deficiency: Surveyor/Update: Paul Hufford Fri, 24-Jun-2011Priority: 4Quantity: 1
Assembly: C1020 System: Interior Doors Material: System Distress: Beyond Service Life Category: Deferred Maintenance Correction: Renew System Note: The original wood interior doors are aged and worn and should be replaced.
Estimates:Raw Cost $42,202.69
Plus or (Minus) Additional Cost $16,037.02Total Estimated Amount $58,239.71
DeKalb County School System
1701 Mountain Industrial Blvd COMET4 Facility Report
Livsey Elementary Facility Executive Summary ReportStone Mountain, GA 30083 Report Date: 01 Jul 2011
Facility: \Elementary Schools\Livsey Elementary\ 1971 Building (continued)
Deficiency: Surveyor/Update: Paul Hufford Sun, 26-Jun-2011Priority: 4Quantity: 1
Assembly: C3010 System: Wall Finishes - Paint Material: System Distress: Beyond Service Life Category: Deferred Maintenance Correction: Renew System Note: The wall paint is aged, scuffed, and stained, and should be repainted.
Estimates:Raw Cost $25,171.39
Plus or (Minus) Additional Cost $9,565.13Total Estimated Amount $34,736.52
Deficiency: Surveyor/Update: Paul Hufford Fri, 24-Jun-2011Priority: 5Quantity: 1
Assembly: C3020 System: Floor Finishes - Carpet Material: System Distress: Beyond Service Life Category: Deferred Maintenance Correction: Renew System Note: The carpet is aged and worn and should be replaced.
Estimates:Raw Cost $10,953.69
Plus or (Minus) Additional Cost $4,162.40Total Estimated Amount $15,116.09
DeKalb County School System
1701 Mountain Industrial Blvd COMET4 Facility Report
Livsey Elementary Facility Executive Summary ReportStone Mountain, GA 30083 Report Date: 01 Jul 2011
Facility: \Elementary Schools\Livsey Elementary\ 1971 Building (continued)
Deficiency: Surveyor/Update: Paul Hufford Fri, 24-Jun-2011Priority: 4Quantity: 1
Assembly: C3020 System: Floor Finishes - VCT Material: System Distress: Beyond Service Life Category: Deferred Maintenance Correction: Renew System Note: The VCT flooring is aged and faded and should be replaced.
Estimates:Raw Cost $85,681.60
Plus or (Minus) Additional Cost $32,559.01Total Estimated Amount $118,240.61
Deficiency: Surveyor/Update: Paul Hufford Tue, 21-Jun-2011Priority: 4Quantity: 1
Assembly: C3030 System: Ceiling Finishes Material: System Distress: Beyond Service Life Category: Deferred Maintenance Correction: Renew System Note: The acoustical ceiling tile and grid system is aged and damaged due to roof leaks and should be replaced.
Estimates:Raw Cost $250,176.70
Plus or (Minus) Additional Cost $95,067.14Total Estimated Amount $345,243.84
DeKalb County School System
1701 Mountain Industrial Blvd COMET4 Facility Report
Livsey Elementary Facility Executive Summary ReportStone Mountain, GA 30083 Report Date: 01 Jul 2011
Facility: \Elementary Schools\Livsey Elementary\ 1971 Building (continued)
Deficiency: Surveyor/Update: Paul Hufford Fri, 24-Jun-2011Priority: 3Quantity: 1
Assembly: D3020 System: Heat Generating Systems Material: System Distress: Beyond Service Life Category: Deferred Maintenance Correction: Renew System Note: The boiler is functional, but aged and inefficient and should be replaced.
Estimates:Raw Cost $115,673.10
Plus or (Minus) Additional Cost $43,955.78Total Estimated Amount $159,628.88
Deficiency: Surveyor/Update: Paul Hufford Fri, 18-Feb-2011Priority: 3Quantity: 1
Assembly: D3040 System: Distribution & Exhaust Systems Material: System Distress: Beyond Service Life Category: Deferred Maintenance Correction: Renew System Note: Distribution and exhaust are distressed and should be replaced.
Estimates:Raw Cost $129,892.05
Plus or (Minus) Additional Cost $49,358.98Total Estimated Amount $179,251.03
DeKalb County School System
1701 Mountain Industrial Blvd COMET4 Facility Report
Livsey Elementary Facility Executive Summary ReportStone Mountain, GA 30083 Report Date: 01 Jul 2011
Facility: \Elementary Schools\Livsey Elementary\ 1971 Building (continued)
Deficiency: Surveyor/Update: Paul Hufford Thu, 31-Mar-2011Priority: 3Quantity: 1
Assembly: D3050 System: Terminal & Package Units Material: System Distress: Beyond Service Life Category: Deferred Maintenance Correction: Renew System Note: RTUs are aged and worn and should be replaced with heat recovery units for improved indoor air quality.
Estimates:Raw Cost $601,423.24
Plus or (Minus) Additional Cost $228,540.83Total Estimated Amount $829,964.07
Deficiency: Surveyor/Update: Paul Hufford Thu, 03-Mar-2011Priority: 3Quantity: 1
Assembly: D3060 System: Controls & Instrumentation Material: System Distress: Beyond Service Life Category: Deferred Maintenance Correction: Renew System Note: Controls are aged and should be replaced.
Estimates:Raw Cost $89,925.26
Plus or (Minus) Additional Cost $34,171.60Total Estimated Amount $124,096.86
DeKalb County School System
1701 Mountain Industrial Blvd COMET4 Facility Report
Livsey Elementary Facility Executive Summary ReportStone Mountain, GA 30083 Report Date: 01 Jul 2011
Facility: \Elementary Schools\Livsey Elementary\ 1971 Building (continued)
Deficiency: Surveyor/Update: Paul Hufford Thu, 03-Mar-2011Priority: 3Quantity: 1
Assembly: D3090 System: Other HVAC Systems/Equip - Kitchen Hood Material: System Distress: Beyond Service Life Category: Deferred Maintenance Correction: Renew System Note: The original kitchen hood is inefficient and should be replaced.
Estimates:Raw Cost $32,665.16
Plus or (Minus) Additional Cost $12,412.76Total Estimated Amount $45,077.92
Deficiency: Surveyor/Update: Paul Hufford Wed, 09-Mar-2011Priority: 3Quantity: 1
Assembly: D5010 System: Electrical Service/Distribution Material: System Distress: Beyond Service Life Category: Deferred Maintenance Correction: Renew System Note: Electrical service is aged, near capacity, and should be replaced.
Estimates:Raw Cost $54,185.74
Plus or (Minus) Additional Cost $20,590.58Total Estimated Amount $74,776.32
DeKalb County School System
1701 Mountain Industrial Blvd COMET4 Facility Report
Livsey Elementary Facility Executive Summary ReportStone Mountain, GA 30083 Report Date: 01 Jul 2011
Facility: \Elementary Schools\Livsey Elementary\ 1971 Building (continued)
Deficiency: Surveyor/Update: Paul Hufford Tue, 21-Jun-2011Priority: 3Quantity: 1
Assembly: D5020 System: Branch Wiring Material: System Distress: Beyond Service Life Category: Deferred Maintenance Correction: Renew System Note: Branch wiring is aged and inadequate and should be replaced.
Estimates:Raw Cost $181,772.01
Plus or (Minus) Additional Cost $69,073.36Total Estimated Amount $250,845.37
Deficiency: Surveyor/Update: Paul Hufford Mon, 14-Mar-2011Priority: 3Quantity: 1
Assembly: D5020 System: Lighting Material: System Distress: Beyond Service Life Category: Deferred Maintenance Correction: Renew System Note: There was a minor lighting replacement in 2008, but the bulk of the fixtures in the classrooms and media center
remain aged and inadequate.
Estimates:Raw Cost $239,032.11
Plus or (Minus) Additional Cost $90,832.20Total Estimated Amount $329,864.31
DeKalb County School System
1701 Mountain Industrial Blvd COMET4 Facility Report
Livsey Elementary Facility Executive Summary ReportStone Mountain, GA 30083 Report Date: 01 Jul 2011
Facility: \Elementary Schools\Livsey Elementary\ 1971 Building (continued)
Deficiency: Surveyor/Update: Paul Hufford Wed, 09-Mar-2011Priority: 3Quantity: 1
Assembly: D5030 System: Communications and Security - Clock & PA
Systems Material: System Distress: Beyond Service Life Category: Deferred Maintenance Correction: Renew System Note: The PA system is aged and should be replaced.
Estimates:Raw Cost $153,334.10
Plus or (Minus) Additional Cost $58,266.96Total Estimated Amount $211,601.06
Deficiency: Surveyor/Update: Paul Hufford Wed, 09-Mar-2011Priority: 4Quantity: 1
Assembly: E1090 System: Other Equipment Material: System Distress: Beyond Service Life Category: Deferred Maintenance Correction: Renew System Note: Kitchen equipment is aged and should be replaced.
Estimates:Raw Cost $318,197.09
Plus or (Minus) Additional Cost $120,914.89Total Estimated Amount $439,111.98
DeKalb County School System
1701 Mountain Industrial Blvd COMET4 Facility Report
Livsey Elementary Facility Executive Summary ReportStone Mountain, GA 30083 Report Date: 01 Jul 2011
Facility: \Elementary Schools\Livsey Elementary\ 1971 Building (continued)
Deficiency: Surveyor/Update: Paul Hufford Wed, 09-Mar-2011Priority: 5Quantity: 1
Assembly: E2010 System: Fixed Furnishings Material: System Distress: Beyond Service Life Category: Deferred Maintenance Correction: Renew System Note: Fixed furnishings, such as the base/wall cabinets, counter tops, window shades, and fixed seating, are worn and
damaged, and should be replaced.
Estimates:Raw Cost $117,594.58
Plus or (Minus) Additional Cost $44,685.94Total Estimated Amount $162,280.52
DeKalb County School System
1701 Mountain Industrial Blvd COMET4 Facility Report
Livsey Elementary Facility Executive Summary ReportStone Mountain, GA 30083 Report Date: 01 Jul 2011
Facility: \Elementary Schools\Livsey Elementary\ 2003 GymAddress: 4137 Livsey Road, Tucker, GA 30084
Attributes: Building Codes 2020Fire Sprinkler System No
General Information: Function: Elementary School Year Built: 2003Gross Area: 5,478 S.F. Last Renovation:
Facility Description:
The 2003 Gymnasium Addition at Livsey Elementary School is a one-story building located at 4137 Livsey Road in Tucker, Georgia. There have been no additions and no major renovations. This report contains condition and adequacy data collected during the 2010/2011 Facility Condition Assessment (FCA). The detailed condition and deficiency statements are contained in this report.
An energy conservation opportunity for this building is to select and install an energy efficient cooling system.
Current Repair Cost: $56,153.58 Replacement Cost: $838,970.53 FCI: 6.69%
08-Feb-2011Northeast Elevation
08-Feb-2011Northwest Elevation
08-Feb-2011Southwest Elevation
08-Feb-2011Southeast Elevation
DeKalb County School System
1701 Mountain Industrial Blvd COMET4 Facility Report
Livsey Elementary Facility Executive Summary ReportStone Mountain, GA 30083 Report Date: 01 Jul 2011
Facility: \Elementary Schools\Livsey Elementary\ 2003 Gym (continued)
Building Condition:
System Unit Price$
Unit of
Meas Qty Renewal% Renewal$ Life Installed
Calc Next
Renewal
Next
Renewal RSL Deficiency$ Replacement Value FCI%
Total $153.15 S.F. 5,478 106 $889,609 61 2003 2011 2014 0 $838,974
Substructure $17.07 S.F. 5,478 100 $93,513 100 2003 $93,513
Foundations $17.07 S.F. 5,478 100 $93,513 100 2003 $93,513
Standard Foundations $10.57 S.F. 5,478 100 $57,907 100 2003 $57,907
Slab on Grade $6.50 S.F. 5,478 100 $35,606 100 2003 $35,606
Shell $45.06 S.F. 5,478 103 $254,585 89 2003 2033 $246,822
Superstructure $14.21 S.F. 5,478 100 $77,864 100 2003 $77,864
Roof Construction $14.21 S.F. 5,478 100 $77,864 100 2003 $77,864
Exterior Enclosure $18.96 S.F. 5,478 101 $105,124 91 2003 2033 $103,869
Exterior Walls $16.67 S.F. 5,478 100 $91,320 100 2003 $91,320
Exterior Doors $2.29 S.F. 5,478 110 $13,804 30 2003 2033 $12,549
Roofing $11.88 S.F. 5,478 110 $71,597 75 2003 2078 $65,089
Roof Coverings - Standing
Seam Metal
$11.88 S.F. 5,478 110 $71,597 75 2003 2078 $65,089
Interiors $45.91 S.F. 5,478 107 $269,677 57 2003 2011 2014 $251,512
Interior Construction $21.51 S.F. 5,478 104 $122,655 76 2003 2023 $117,855
Partitions $13.57 S.F. 5,478 110 $81,742 100 2003 $74,311
Interior Doors $4.25 S.F. 5,478 80 $18,627 40 2003 2043 $23,284
Fittings $3.70 S.F. 5,478 110 $22,286 20 2003 2023 $20,260
Interior Finishes $24.40 S.F. 5,478 110 $147,022 42 2003 2011 2014 $133,657
Wall Finishes - Ceramic $7.19 S.F. 0 110 30 2003 2033
Wall Finishes - Paint $1.52 S.F. 5,478 110 $9,147 10 2003 2013 $8,316
Floor Finishes - Ceramic Tile $7.16 S.F. 110 110 $867 8 2003 2011 2014 4 $788
Floor Finishes - Neoprene $19.06 S.F. 5,204 110 $109,094 50 2003 2053 $99,177
Floor Finishes - VCT $5.38 S.F. 164 110 $971 15 2003 2018 $883
Ceiling Finishes $4.47 S.F. 5,478 110 $26,943 20 2003 2023 $24,493
Services $45.11 S.F. 5,478 110 $271,834 26 2003 2013 $247,127
Plumbing $14.59 S.F. 5,478 110 $87,895 30 2003 2033 $79,906
Plumbing Fixtures $7.20 S.F. 5,478 110 $43,407 30 2003 2033 $39,461
Domestic Water Distribution $5.96 S.F. 5,478 110 $35,923 30 2003 2033 $32,658
Sanitary Waste $0.87 S.F. 5,478 110 $5,239 30 2003 2033 $4,763
Rain Water Drainage $0.22 S.F. 5,478 110 $1,330 30 2003 2033 $1,210
Other Plumbing Systems -
Natural Gas
$0.33 S.F. 5,478 110 $1,996 30 2003 2033 $1,814
HVAC $12.79 S.F. 5,478 110 $77,085 28 2003 2018 $70,078
Distribution Systems & Exhaust
Systems
$10.39 S.F. 5,478 110 $62,616 30 2003 2033 $56,924
Terminal & Package Units $0.81 S.F. 5,478 110 $4,906 15 2003 2018 $4,460
Controls & Instrumentation $1.59 S.F. 5,478 110 $9,563 20 2003 2023 $8,694
Electrical $17.73 S.F. 5,478 110 $106,854 22 2003 2013 $97,143
Electrical Service/Distribution $1.34 S.F. 5,478 110 $8,066 30 2003 2033 $7,333
Branch Wiring $5.96 S.F. 5,478 110 $35,923 30 2003 2033 $32,658
Lighting $5.96 S.F. 5,478 110 $35,923 20 2003 2023 $32,658
Communications and Security -
Fire Alarm
$2.46 S.F. 5,478 110 $14,802 10 2003 2013 $13,456
Communications and Security -
Public Address & Clock System
$1.01 S.F. 5,478 110 $6,070 20 2003 2023 $5,519
Communications and Security -
Security & CCTV
$1.01 S.F. 5,478 110 $6,070 10 2003 2013 $5,519
DeKalb County School System
1701 Mountain Industrial Blvd COMET4 Facility Report
Livsey Elementary Facility Executive Summary ReportStone Mountain, GA 30083 Report Date: 01 Jul 2011
Facility: \Elementary Schools\Livsey Elementary\ 2003 Gym (continued)
Renewal Schedule:
Systems 2010-12 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022
Total $32,802 $975 $7,445 $1,236
Substructure
Foundations
Standard Foundations
Slab on Grade
Shell
Superstructure
Roof Construction
Exterior Enclosure
Exterior Walls
Exterior Doors
Roofing
Roof Coverings - Standing Seam
Metal
Interiors $9,995 $975 $1,230 $1,236
Interior Construction
Partitions
Interior Doors
Fittings
Interior Finishes $9,995 $975 $1,230 $1,236
Wall Finishes - Ceramic
Wall Finishes - Paint $9,995
Floor Finishes - Ceramic Tile $975 $1,236
Floor Finishes - Neoprene
Floor Finishes - VCT $1,230
Ceiling Finishes
Services $22,807 $6,215
Plumbing
Plumbing Fixtures
Domestic Water Distribution
Sanitary Waste
Rain Water Drainage
Other Plumbing Systems - Natural
Gas
HVAC $6,215
Distribution Systems & Exhaust
Systems
Terminal & Package Units $6,215
Controls & Instrumentation
Electrical $22,807
Electrical Service/Distribution
Branch Wiring
Lighting
Communications and Security - Fire
Alarm
$16,174
Communications and Security -
Public Address & Clock System
Communications and Security -
Security & CCTV
$6,633
DeKalb County School System
1701 Mountain Industrial Blvd COMET4 Facility Report
Livsey Elementary Facility Executive Summary ReportStone Mountain, GA 30083 Report Date: 01 Jul 2011
Facility: \Elementary Schools\Livsey Elementary\ 2003 Gym (continued)
Deficiency Sheet:
Deficiency: Surveyor/Update: Chuck Gulley Thu, 26-May-2011Priority: 3Quantity: 1
Assembly: D3050 System: Terminal & Package Units Material: Packaged A/C, Elec. Ht., Const. Volume Distress: Missing Category: Capital Improvement Correction: Install Package A/C - 20 ton Note: An air conditioning system is missing in the gymnasium and should be installed.
Estimates:Raw Cost $40,691.00
Plus or (Minus) Additional Cost $15,462.58Total Estimated Amount $56,153.58
DeKalb County School System
1701 Mountain Industrial Blvd COMET4 Facility Report
Livsey Elementary Facility Executive Summary ReportStone Mountain, GA 30083 Report Date: 01 Jul 2011
Facility: \Elementary Schools\Livsey Elementary\1971 StorageAddress: 4137 Livsey Road, Tucker, GA 30084
Attributes: ***None***
General Information: Function: Storage Building Year Built: 1971Gross Area: 170 S.F. Last Renovation:
Facility Description:
The Storage Building at Pleasantdale Elementary School is located at 4137 Livsey Road in Tucker, Georgia. There have been no additions and no major renovations. This report contains condition and adequacy data collected during the 2010/2011 Facility Condition Assessment (FCA). The detailed condition and deficiency statements are contained in this report.
Current Repair Cost: $3,212.85 Replacement Cost: $13,761.64 FCI: 23.35%
08-Feb-2011North Elevation
08-Feb-2011West Elevation
08-Feb-2011South Elevation
08-Feb-2011East Elevation
DeKalb County School System
1701 Mountain Industrial Blvd COMET4 Facility Report
Livsey Elementary Facility Executive Summary ReportStone Mountain, GA 30083 Report Date: 01 Jul 2011
Facility: \Elementary Schools\Livsey Elementary\1971 Storage (continued)
Building Condition:
System Unit Price$
Unit of
Meas Qty Renewal% Renewal$ Life Installed
Calc Next
Renewal
Next
Renewal RSL Deficiency$ Replacement Value FCI%
Total $80.95 S.F. 170 104 $14,255 73 1971 1991 $3,212 $13,761 23
Substructure $3.41 S.F. 170 100 $579 100 1971 $579
Foundations $3.41 S.F. 170 100 $579 100 1971 $579
Standard Foundations $4.49 S.F. 0 100 100 1971
Slab on Grade $3.41 S.F. 170 100 $579 100 1971 $579
Basement Construction 0 0 0
Basement Excavation $0.21 S.F. 0 100 100 1971
Basement Walls $3.41 S.F. 0 100 100 1971
Shell $65.62 S.F. 170 103 $11,446 78 1971 1991 $3,212 $11,155 29
Superstructure $13.56 S.F. 170 100 $2,306 100 1971 $2,306
Roof Construction $13.57 S.F. 170 100 $2,306 100 1971 $2,306
Exterior Enclosure $37.69 S.F. 170 101 $6,454 94 1971 2001 $526 $6,407 8
Exterior Walls $34.87 S.F. 170 100 $5,928 100 1971 $5,928
Exterior Windows $4.54 S.F. 0 110 30 1971 2001
Exterior Doors $2.82 S.F. 170 110 $526 30 1971 2001 $526 $479 110
Roofing $14.36 S.F. 170 110 $2,686 20 1971 1991 $2,686 $2,442 110
Roof Coverings $14.37 S.F. 170 110 $2,686 20 1971 1991 $2,686 $2,442 110
Interiors $11.92 S.F. 170 110 $2,230 40 1971 1991 $2,027
Interior Construction $11.92 S.F. 170 110 $2,230 40 1971 1991 $2,027
Partitions $11.92 S.F. 170 110 $2,230 40 1971 $2,027
Interior Doors $2.26 S.F. 0 80 30 1971 2001
Fittings $2.79 S.F. 0 110 20 1971 1991
Interior Finishes 0 0 0
Wall Finishes $1.50 S.F. 0 110 20 1971 1991
Floor Finishes $6.07 S.F. 0 110 20 1971 1991
Ceiling Finishes $5.44 S.F. 0 110 20 1971 1991
Services 0 0 0
Plumbing 0 0 0
Rain Water Drainage $1.38 S.F. 0 110 30 1971 2001
Electrical 0 0 0
Electrical Service/Distribution $3.30 S.F. 0 110 30 1971 2001
Lighting and Branch Wiring $12.12 S.F. 0 110 30 1971 2001
DeKalb County School System
1701 Mountain Industrial Blvd COMET4 Facility Report
Livsey Elementary Facility Executive Summary ReportStone Mountain, GA 30083 Report Date: 01 Jul 2011
Facility: \Elementary Schools\Livsey Elementary\1971 Storage (continued)
Renewal Schedule:
Systems 2010-12 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022
Total $3,212
Substructure
Foundations
Standard Foundations
Slab on Grade
Basement Construction
Basement Excavation
Basement Walls
Shell $3,212
Superstructure
Roof Construction
Exterior Enclosure $526
Exterior Walls
Exterior Windows
Exterior Doors $526
Roofing $2,686
Roof Coverings $2,686
Interiors
Interior Construction
Partitions
Interior Doors
Fittings
Interior Finishes
Wall Finishes
Floor Finishes
Ceiling Finishes
Services
Plumbing
Rain Water Drainage
Electrical
Electrical Service/Distribution
Lighting and Branch Wiring
DeKalb County School System
1701 Mountain Industrial Blvd COMET4 Facility Report
Livsey Elementary Facility Executive Summary ReportStone Mountain, GA 30083 Report Date: 01 Jul 2011
Facility: \Elementary Schools\Livsey Elementary\1971 Storage (continued)
Deficiency Sheet:
Deficiency: Surveyor/Update: Somnath Das Wed, 09-Mar-2011Priority: 4Quantity: 1
Assembly: B2030 System: Exterior Doors Material: System Distress: Beyond Service Life Category: Deferred Maintenance Correction: Renew System Note: The original metal exterior doors are aged and should be replaced.
Estimates:Raw Cost $381.48
Plus or (Minus) Additional Cost $144.96Total Estimated Amount $526.44
Deficiency: Surveyor/Update: Somnath Das Fri, 24-Jun-2011Priority: 4Quantity: 1
Assembly: B3010 System: Roof Coverings Material: System Distress: Beyond Service Life Category: Deferred Maintenance Correction: Renew System Note: The built-up roofing is aged and worn and should be replaced.
Estimates:Raw Cost $1,946.67
Plus or (Minus) Additional Cost $739.73Total Estimated Amount $2,686.40
DeKalb County School System
1701 Mountain Industrial Blvd COMET4 Facility Report
Livsey Elementary Facility Executive Summary ReportStone Mountain, GA 30083 Report Date: 01 Jul 2011
Facility: \Elementary Schools\Livsey Elementary\Covered Walkway 1Address: 4137 Livsey Road, Tucker, GA 30084
Attributes: ***None***
General Information: Function: Elementary School Year Built: 2003Gross Area: 1,020 S.F. Last Renovation:
Facility Description:
An engineered metal covered walkway connects the classrooms with the gymnasium and provides some weather protection for the students.
Current Repair Cost: $0.00 Replacement Cost: $28,194.23 FCI: 0.00%
08-Feb-2011Southeast Elevation
08-Feb-2011Northwest Elevation
08-Feb-2011West Elevation
08-Feb-2011North Elevation
DeKalb County School System
1701 Mountain Industrial Blvd COMET4 Facility Report
Livsey Elementary Facility Executive Summary ReportStone Mountain, GA 30083 Report Date: 01 Jul 2011
Facility: \Elementary Schools\Livsey Elementary\Covered Walkway 1 (continued)
Building Condition:
System Unit Price$
Unit of
Meas Qty Renewal% Renewal$ Life Installed
Calc Next
Renewal
Next
Renewal RSL Deficiency$ Replacement Value FCI%
Total $27.64 S.F. 1,020 100 $28,194 25 2003 2028 0 $28,194
Special Construction $27.64 S.F. 1,020 100 $28,194 25 2003 2028 $28,194
Special Construction $27.64 S.F. 1,020 100 $28,194 25 2003 2028 $28,194
Special Structures - Covered
Walkways Metal
$27.64 S.F. 1,020 100 $28,194 25 2003 2028 $28,194
DeKalb County School System
1701 Mountain Industrial Blvd COMET4 Facility Report
Livsey Elementary Facility Executive Summary ReportStone Mountain, GA 30083 Report Date: 01 Jul 2011
Facility: \Elementary Schools\Livsey Elementary\Covered Walkway 1 (continued)
Renewal Schedule:
Systems 2010-12 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022
Total
Special Construction
Special Construction
Special Structures - Covered
Walkways Metal
DeKalb County School System
1701 Mountain Industrial Blvd COMET4 Facility Report
Livsey Elementary Facility Executive Summary ReportStone Mountain, GA 30083 Report Date: 01 Jul 2011
Facility: \Elementary Schools\Livsey Elementary\Covered Walkway 1 (continued)
Deficiency Sheet:
*** No Deficiencies Found ***
DeKalb County School System
1701 Mountain Industrial Blvd COMET4 Facility Report
Livsey Elementary Facility Executive Summary ReportStone Mountain, GA 30083 Report Date: 01 Jul 2011
Facility: \Elementary Schools\Livsey Elementary\Covered Walkway 2Address: 4137 Livsey Road, Tucker, GA 30084
Attributes: ***None***
General Information: Function: Elementary School Year Built: 2003Gross Area: 630 S.F. Last Renovation:
Facility Description:
An engineered metal covered walkway connects the main school building with the student drop off and pick up area and provides some weather protection for the students.
Current Repair Cost: $0.00 Replacement Cost: $17,414.08 FCI: 0.00%
08-Feb-2011Northwest Elevation
08-Feb-2011Southwest Elevation
08-Feb-2011Northeast Elevation
08-Feb-2011Northwest Elevation
DeKalb County School System
1701 Mountain Industrial Blvd COMET4 Facility Report
Livsey Elementary Facility Executive Summary ReportStone Mountain, GA 30083 Report Date: 01 Jul 2011
Facility: \Elementary Schools\Livsey Elementary\Covered Walkway 2 (continued)
Building Condition:
System Unit Price$
Unit of
Meas Qty Renewal% Renewal$ Life Installed
Calc Next
Renewal
Next
Renewal RSL Deficiency$ Replacement Value FCI%
Total $27.64 S.F. 630 100 $17,414 25 2003 2028 0 $17,414
Special Construction $27.64 S.F. 630 100 $17,414 25 2003 2028 $17,414
Special Construction $27.64 S.F. 630 100 $17,414 25 2003 2028 $17,414
Special Structures - Covered
Walkways Metal
$27.64 S.F. 630 100 $17,414 25 2003 2028 $17,414
DeKalb County School System
1701 Mountain Industrial Blvd COMET4 Facility Report
Livsey Elementary Facility Executive Summary ReportStone Mountain, GA 30083 Report Date: 01 Jul 2011
Facility: \Elementary Schools\Livsey Elementary\Covered Walkway 2 (continued)
Renewal Schedule:
Systems 2010-12 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022
Total
Special Construction
Special Construction
Special Structures - Covered
Walkways Metal
DeKalb County School System
1701 Mountain Industrial Blvd COMET4 Facility Report
Livsey Elementary Facility Executive Summary ReportStone Mountain, GA 30083 Report Date: 01 Jul 2011
Facility: \Elementary Schools\Livsey Elementary\Covered Walkway 2 (continued)
Deficiency Sheet:
*** No Deficiencies Found ***
DeKalb County School System
1701 Mountain Industrial Blvd COMET4 Facility Report
Livsey Elementary Facility Executive Summary ReportStone Mountain, GA 30083 Report Date: 01 Jul 2011
Facility: \Elementary Schools\Livsey Elementary\PlayfieldAddress: 4137 Livsey Road, Tucker, GA 30084
Attributes: ***None***
General Information: Function: Elementary School Year Built: 1971Gross Area: 36,600 S.F. Last Renovation:
Facility Description:
The Playfield at Livsey Elementary School is located on the campus grounds. There have been no additions and no major renovations. This report contains condition and adequacy data collected during the 2010/2011 Facility Condition Assessment (FCA). The detailed condition and deficiency statements are contained in this report.
Current Repair Cost: $10,145.52 Replacement Cost: $177,085.44 FCI: 5.73%
08-Feb-2011Playfield at Livsey Elementary School
DeKalb County School System
1701 Mountain Industrial Blvd COMET4 Facility Report
Livsey Elementary Facility Executive Summary ReportStone Mountain, GA 30083 Report Date: 01 Jul 2011
Facility: \Elementary Schools\Livsey Elementary\Playfield (continued)
Building Condition:
System Unit Price$
Unit of
Meas Qty Renewal% Renewal$ Life Installed
Calc Next
Renewal
Next
Renewal RSL Deficiency$ Replacement Value FCI%
Total $4.84 S.F. 36,600 101 $178,008 95 1971 1981 $10,146 $177,085 6
Special Construction $0.25 S.F. 36,600 110 $10,146 10 1971 1981 $10,146 $9,223 110
Special Construction $0.25 S.F. 36,600 110 $10,146 10 1971 1981 $10,146 $9,223 110
Special Facilities - Sports Field -
Natural Turf
$0.25 S.F. 36,600 110 $10,146 10 1971 1981 $10,146 $9,223 110
Building Sitework $4.59 S.F. 36,600 100 $167,862 100 1971 1991 $167,862
Site Preparation $4.59 S.F. 36,600 100 $167,862 100 1971 $167,862
Site Earthwork $4.59 S.F. 36,600 100 $167,862 100 1971 $167,862
Site Improvements 0 0 0
Site Development - Fencing $1.39 S.F. 0 110 20 1971 1991
Landscaping - Irrigation $0.09 S.F. 0 110 20 1971 1991
Site Mechanical Utilities 0 0 0
Water Supply - Water Service $0.34 S.F. 0 110 30 1971 2001
Site Electrical Utilities 0 0 0
Site Lighting $1.69 S.F. 0 110 30 1971 2001
DeKalb County School System
1701 Mountain Industrial Blvd COMET4 Facility Report
Livsey Elementary Facility Executive Summary ReportStone Mountain, GA 30083 Report Date: 01 Jul 2011
Facility: \Elementary Schools\Livsey Elementary\Playfield (continued)
Renewal Schedule:
Systems 2010-12 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022
Total $10,146 $13,635
Special Construction $10,146 $13,635
Special Construction $10,146 $13,635
Special Facilities - Sports Field -
Natural Turf
$10,146 $13,635
Building Sitework
Site Preparation
Site Earthwork
Site Improvements
Site Development - Fencing
Landscaping - Irrigation
Site Mechanical Utilities
Water Supply - Water Service
Site Electrical Utilities
Site Lighting
DeKalb County School System
1701 Mountain Industrial Blvd COMET4 Facility Report
Livsey Elementary Facility Executive Summary ReportStone Mountain, GA 30083 Report Date: 01 Jul 2011
Facility: \Elementary Schools\Livsey Elementary\Playfield (continued)
Deficiency Sheet:
Deficiency: Surveyor/Update: Kate McPhillips Thu, 17-Feb-2011Priority: 5Quantity: 1
Assembly: F1040 System: Special Facilities - Sports Field - Natural Turf Material: System Distress: Beyond Service Life Category: Deferred Maintenance Correction: Renew System Note: The grass is damaged and should be reseeded.
Estimates:Raw Cost $8,052.00
Plus or (Minus) Additional Cost $2,093.52Total Estimated Amount $10,145.52
DeKalb County School System
1701 Mountain Industrial Blvd COMET4 Facility Report
Livsey Elementary Facility Executive Summary ReportStone Mountain, GA 30083 Report Date: 01 Jul 2011
Facility: \Elementary Schools\Livsey Elementary\SiteAddress: 4137 Livsey Road, Tucker, GA 30084
Attributes: Site Code 1395
General Information: Function: Elementary School Year Built: 1971Gross Area: 40,414 S.F. Last Renovation:
Facility Description:
The Livsey Elementary School site was originally constructed in 1971, has a total area of 9.8 acres, and is occupied by approximately 40,414 square feet of permanent building space. Campus site features include paved driveways and parking lots, pedestrian pavement, flag pole, landscaping, and fencing. Site mechanical and electrical features include water, sewer, natural gas, and site lighting. This report contains condition and adequacy data collected during the 2010/2011 Facility Condition Assessment (FCA). The detailed condition and deficiency statements are contained in this report for the site features.
Current Repair Cost: $405,947.31 Replacement Cost: $921,681.68 FCI: 44.04%
04-Feb-2011Aerial Image of Livsey Elementary School
DeKalb County School System
1701 Mountain Industrial Blvd COMET4 Facility Report
Livsey Elementary Facility Executive Summary ReportStone Mountain, GA 30083 Report Date: 01 Jul 2011
Facility: \Elementary Schools\Livsey Elementary\Site (continued)
Building Condition:
System Unit Price$
Unit of
Meas Qty Renewal% Renewal$ Life Installed
Calc Next
Renewal
Next
Renewal RSL Deficiency$ Replacement Value FCI%
Total $22.81 S.F. 40,414 109 $1,005,856 35 1971 1981 $405,948 $921,682 44
Building Sitework $22.81 S.F. 40,414 109 $1,005,856 35 1971 1981 $405,948 $921,682 44
Site Improvements $11.87 S.F. 40,414 108 $519,656 22 1971 1981 $375,140 $479,682 78
Roadways $3.25 S.F. 40,414 110 $144,516 25 1971 1996 $144,516 $131,378 110
Parking Lots $1.47 S.F. 40,414 110 $65,536 25 1971 1996 $65,536 $59,578 110
Pedestrian Paving $1.65 S.F. 40,414 110 $73,378 30 1971 2001 $73,378 $66,707 110
Site Development $0.26 S.F. 40,414 110 $11,763 10 1971 1981 $11,763 $10,694 110
Site Development 2 $1.98 S.F. 40,414 100 $79,947 30 1971 2001 $79,947 $79,947 100
Fence & Guardrails $1.98 S.F. 40,414 100 $79,947 30 1971 2001 $79,947 $79,947 100
Landscaping $3.25 S.F. 40,414 110 $144,516 10 1971 $131,378
Site Mechanical Utilities $10.24 S.F. 40,414 110 $455,392 50 1971 2021 $413,993
Water Supply $2.38 S.F. 40,414 110 $105,866 50 1971 2021 $96,242
Sanitary Sewer $2.36 S.F. 40,414 110 $104,746 50 1971 2021 $95,223
Storm Sewer $5.51 S.F. 40,414 110 $244,780 50 1971 2021 $222,528
Fuel Distribution - Gas $0.21 S.F. 0 110 30 1971
Site Electrical Utilities $0.69 S.F. 40,414 110 $30,808 30 1971 2001 $30,808 $28,007 110
Electrical Distribution $0.52 S.F. 0 110 30 1971
Site Lighting $0.69 S.F. 40,414 110 $30,808 30 1971 2001 $30,808 $28,007 110
DeKalb County School System
1701 Mountain Industrial Blvd COMET4 Facility Report
Livsey Elementary Facility Executive Summary ReportStone Mountain, GA 30083 Report Date: 01 Jul 2011
Facility: \Elementary Schools\Livsey Elementary\Site (continued)
Renewal Schedule:
Systems 2010-12 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022
Total $405,948 $15,808 $630,369
Building Sitework $405,948 $15,808 $630,369
Site Improvements $375,140 $15,808
Roadways $144,516
Parking Lots $65,536
Pedestrian Paving $73,378
Site Development $11,763 $15,808
Site Development 2 $79,947
Fence & Guardrails $79,947
Landscaping
Site Mechanical Utilities $630,369
Water Supply $146,543
Sanitary Sewer $144,993
Storm Sewer $338,833
Fuel Distribution - Gas
Site Electrical Utilities $30,808
Electrical Distribution
Site Lighting $30,808
DeKalb County School System
1701 Mountain Industrial Blvd COMET4 Facility Report
Livsey Elementary Facility Executive Summary ReportStone Mountain, GA 30083 Report Date: 01 Jul 2011
Facility: \Elementary Schools\Livsey Elementary\Site (continued)
Deficiency Sheet:
Deficiency: Surveyor/Update: Paul Hufford Fri, 24-Jun-2011Priority: 4Quantity: 1
Assembly: G2010 System: Roadways Material: System Distress: Beyond Service Life Category: Deferred Maintenance Correction: Renew System Note: The asphaltic roadways are aged and should be resurfaced.
Estimates:Raw Cost $114,694.93
Plus or (Minus) Additional Cost $29,820.68Total Estimated Amount $144,515.61
Deficiency: Surveyor/Update: Paul Hufford Fri, 24-Jun-2011Priority: 4Quantity: 1
Assembly: G2020 System: Parking Lots Material: System Distress: Beyond Service Life Category: Deferred Maintenance Correction: Renew System Note: The asphaltic parking lots are aged, inadequate, and should be resurfaced and restriped.
Estimates:Raw Cost $52,012.82
Plus or (Minus) Additional Cost $13,523.33Total Estimated Amount $65,536.15
DeKalb County School System
1701 Mountain Industrial Blvd COMET4 Facility Report
Livsey Elementary Facility Executive Summary ReportStone Mountain, GA 30083 Report Date: 01 Jul 2011
Facility: \Elementary Schools\Livsey Elementary\ Site (continued)
Deficiency: Surveyor/Update: Paul Hufford Wed, 09-Mar-2011Priority: 4Quantity: 1
Assembly: G2030 System: Pedestrian Paving Material: System Distress: Beyond Service Life Category: Deferred Maintenance Correction: Renew System Note: The sidewalks are aged, cracked, damaged, and inadequate for accessibility, and should be replaced.
Estimates:Raw Cost $58,236.57
Plus or (Minus) Additional Cost $15,141.51Total Estimated Amount $73,378.08
Deficiency: Surveyor/Update: Paul Hufford Wed, 09-Mar-2011Priority: 5Quantity: 1
Assembly: G2040 System: Site Development Material: System Distress: Beyond Service Life Category: Deferred Maintenance Correction: Renew System Note: Site delevelopment features, such as flagpole, signage, and site furnishings are beyond thier service life and
should be replaced.
Estimates:Raw Cost $9,335.63
Plus or (Minus) Additional Cost $2,427.26Total Estimated Amount $11,762.89
DeKalb County School System
1701 Mountain Industrial Blvd COMET4 Facility Report
Livsey Elementary Facility Executive Summary ReportStone Mountain, GA 30083 Report Date: 01 Jul 2011
Facility: \Elementary Schools\Livsey Elementary\ Site (continued)
Deficiency: Surveyor/Update: Paul Hufford Wed, 09-Mar-2011Priority: 4Quantity: 1
Assembly: G2040105 System: Fence & Guardrails Material: System Distress: Beyond Service Life Category: Deferred Maintenance Correction: Renew System Note: The fencing is aged, rusted, and damaged, and should be replaced.
Estimates:Raw Cost $63,449.98
Plus or (Minus) Additional Cost $16,496.99Total Estimated Amount $79,946.97
Deficiency: Surveyor/Update: Paul Hufford Wed, 09-Mar-2011Priority: 3Quantity: 1
Assembly: G4020 System: Site Lighting Material: System Distress: Beyond Service Life Category: Deferred Maintenance Correction: Renew System Note: Exterior lighting is inadequate in the parking areas, northeast corner, east side, between the gym and the building,
and around the portables.
Estimates:Raw Cost $24,450.47
Plus or (Minus) Additional Cost $6,357.12Total Estimated Amount $30,807.59
Educational Adequacy Report
Suitability Report - Full
Project:Site:
Suitability
Possible
Score
Score
Percent
Score
DeKalbCounty:
1Region:
Rating
1061Site #:
Assessments 2010 Livsey ES
Project #:
4469
Site Type: Site Size:Grade Config:
PK-5 0.00Elementary
Suitability - Elementary
Site
2.00 1.34 67.00 TrafficFair
0.97 0.97 100.00 Pedestrian TrafficGood
0.81 0.54 67.00 ParkingFair
2.34 2.34 100.00 PlaygroundGood
Safety and Security
0.75 0.75 100.00 FencingGood
1.00 1.00 100.00 Signage & Way FindingGood
3.50 3.50 100.00 Ease of SupervisionG/F
0.50 0.50 100.00 Limited EntrancesG/F
0.50 0.50 100.00 Interior CirculationG/F
0.50 0.00 0.00 Sprinkler SystemUnsat
School Climate
5.00 0.00 0.00 Learning Style VarietyP/U
5.00 5.00 100.00 School EnvironmentG/F
1.00 1.00 100.00 LandscapingG/F
General Classrooms
16.45 11.02 67.00 SizeFair
3.53 2.36 67.00 AdjacenciesFair
3.53 2.36 67.00 Storage\Fixed Equip.Fair
Remedial - Special Needs
3.50 3.50 100.00 SizeGood
0.75 0.75 100.00 AdjacenciesG/F
0.75 0.75 100.00 Storage\Fixed Equip.G/F
Library
3.41 1.71 50.00 SizeFair
0.73 0.73 100.00 AdjacenciesG/F
0.73 0.73 100.00 Storage\Fixed Equip.G/F
P.E.
6.72 6.72 100.00 SizeGood
1.44 1.44 100.00 AdjacenciesG/F
1.44 1.44 100.00 Storage\Fixed Equip.G/F
Music
2.59 0.00 0.00 SizeP/U
0.56 0.00 0.00 AdjacenciesP/U
0.56 0.00 0.00 Storage\Fixed Equip.P/U
Page 1 of 31/19/2011 3:13:26PM
Project:Site:
Suitability
Possible
Score
Score
Percent
Score
DeKalbCounty:
1Region:
Rating
1061Site #:
Assessments 2010 Livsey ES
Project #:
4469
Site Type: Site Size:Grade Config:
PK-5 0.00Elementary
Art
1.64 0.00 0.00 SizeP/U
0.35 0.00 0.00 AdjacenciesP/U
0.35 0.00 0.00 Storage\Fixed Equip.P/U
Performing Arts\Auditorium
2.12 2.12 100.00 SizeGood
0.45 0.45 100.00 AdjacenciesGood
0.45 0.23 50.00 Storage\Fixed Equip.Fair
Computer Labs
1.19 0.60 50.00 SizeFair
0.26 0.26 100.00 AdjacenciesG/F
0.26 0.26 100.00 Storage\Fixed Equip.G/F
Kindergarten
2.86 1.43 50.00 SizeFair
0.61 0.61 100.00 AdjacenciesG/F
0.61 0.61 100.00 Storage\Fixed Equip.G/F
Administration
2.49 1.25 50.00 SizeFair
0.53 0.53 100.00 AdjacenciesG/F
0.53 0.00 0.00 Storage\Fixed Equip.P/U
0.89 0.89 100.00Good Restrooms (Student)
1.27 0.63 50.00Fair Teacher Lounge and Work Room(s)
5.00 3.35 67.00Fair Cafeteria
6.20 2.05 33.00Poor Food Prep
0.29 0.29 100.00Good Counseling
0.58 0.00 0.00P/U Clinic
0.50 0.50 100.00G/F Custodial & Maintenance
100.00 67.01 67.01Total For Site:
Comments
Suitability - Elementary
Livsey Elementary School opened in 1971 as a neighborhood school for students in grades PK through 5th. The
school has Discovery and special education programs as well as the standard elementary curriculum. The county
built the school on land deeded by James McEvaney Livsey around the turn of the century, and includes a large
common-use sporting field. The school has not been significantly renovated since 1971.
Suitability - Elementary->Site-->Traffic
The staff parking area doubles as the bus pickup and drop-off area.
Suitability - Elementary->Site-->Parking
The school lacks sufficient car parking spaces.
Suitability - Elementary->Safety and Security-->Sprinkler System
The school does not have a sprinkler system.
Suitability - Elementary->School Climate-->Learning Style Variety
The school lacks sufficient smaller rooms for specialized and remedial programs.
Page 2 of 31/19/2011 3:13:26PM
Project:Site:
Suitability
Possible
Score
Score
Percent
Score
DeKalbCounty:
1Region:
Rating
1061Site #:
Assessments 2010 Livsey ES
Project #:
4469
Site Type: Site Size:Grade Config:
PK-5 0.00Elementary
Suitability - Elementary->General Classrooms-->Size
Most classrooms are well-sized, but the school has some small general classrooms and uses trailers for some
classrooms.
Suitability - Elementary->General Classrooms-->Adjacencies
The school uses some trailers for classrooms that are outside of the main school building and some distance from
school amenities.
Suitability - Elementary->General Classrooms-->Storage\Fixed Equip.
Some school classrooms lack sufficient storage space.
Suitability - Elementary->Library-->Size
The school library is smaller than it should be for the current school enrollment.
Suitability - Elementary->Library-->Storage\Fixed Equip.
The school library lacks sufficient storage space for all its materials.
Suitability - Elementary->Music-->Size
The school music room is currently in a trailer.
Suitability - Elementary->Music-->Adjacencies
The school music room is currently in a trailer.
Suitability - Elementary->Music-->Storage\Fixed Equip.
The school music room is currently in a trailer.
Suitability - Elementary->Art-->Size
The school art room is currently in a trailer.
Suitability - Elementary->Art-->Adjacencies
The school art room is currently in a trailer.
Suitability - Elementary->Art-->Storage\Fixed Equip.
The school art room is currently in a trailer.
Suitability - Elementary->Performing Arts\Auditorium-->Storage\Fixed Equip.
The school auditorium space lacks sufficient storage space.
Suitability - Elementary->Computer Labs-->Size
The school computer lab is smaller than the standard and for the current student enrollment.
Suitability - Elementary->Kindergarten-->Size
Some rooms are smaller than they should be.
Suitability - Elementary->Administration-->Size
School administrative areas are too small, and would benefit from additional offices.
Suitability - Elementary->Administration-->Storage\Fixed Equip.
The school lacks sufficient administrative storage space in the main office.
Suitability - Elementary->Teacher Lounge and Work Room(s)
The teachers' lounge is too small for the number of teachers in the school.
Suitability - Elementary->Cafeteria
The school cafeteria is smaller than it should be, but is well laid out and has access to an outside courtyard.
Suitability - Elementary->Food Prep
The school kitchen is significantly smaller than it should be, and lacks good flow in serving areas.
Suitability - Elementary->Clinic
The clinic is small, lacks a waiting area and a separate bathroom space.
Page 3 of 31/19/2011 3:13:26PM
Technology Readiness Report
Technology Readiness Report - Full
Project:Site:
Technology Readiness
Possible
ScoreScore
Percent
Score
DeKalbCounty:
1Region:
Rating
1061Site #:
Assessments 2010 Livsey ES
Project #:
4469
Technology Readiness
15.00 7.50 50.00 MDF\IT Equipment Environment Fair
10.00 5.00 50.00 Electrical Power Fair
10.00 10.00 100.00 Cooling Good
10.00 6.70 67.00 Drops Fair
5.00 2.50 50.00 Wireless Fair
10.00 10.00 100.00 WAN Backbone Good
10.00 10.00 100.00 LAN-WAN Performance Good
5.00 2.50 50.00 Video Distribution Fair
5.00 5.00 100.00 Voice Distribution Good
10.00 10.00 100.00 Faculty & Staff Technology Good
5.00 5.00 100.00 Emergency Alert Good
5.00 0.00 0.00 Projectors Unsat
100.00 74.20 74.20Total For Site:
Comments
Technology Readiness->MDF\IT Equipment Environment
School IT equipment is mostly housed in janitorial spaces or other storage closets.
Technology Readiness->Electrical Power
The school has sufficient power outlets, but they are not well-positioned in classrooms.
Technology Readiness->Drops
Most rooms have two computer drops and sufficient computers. Approximately 20% of classrooms do not have
computers.
Technology Readiness->Wireless
The school wireless network is patchy and does not cover all of the school buildings.
Technology Readiness->Video Distribution
The school uses a combination of smartboards and analog video to distribute video signals.
Technology Readiness->Projectors
Around 50% of school general classrooms lack video projectors.
Page 1 of 11/19/2011 3:30:07PM