Page 1: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

Facility Condition Assessment Reports

Page 2: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 1

Facility: \Elementary/Middle Schools\Herndon MagnetAddress: 11845 Gamm Rd, Belcher, LA 71004

Attributes: Temporary Building Rooms 2

General Information: Function: Elementary Middle Year Built:Gross Area: 83,646 S.F. Last Renovation:

Facility Description:

The Herndon Magnet School campus consists of one main building located at 11845 Gamm Road in Belcher, Louisiana. The original campus was constructed in 1956. Ancillary buildings on campus include covered walkways and a greenhouse. In addition to the buildings, the campus includes basketball court and tennis courts. This report contains condition and adequacy data collected during the 2009/2010 Facility Condition Assessment (FCA). The detailed condition and deficiency statements are contained in this report.

Current Repair Cost: $4,560,924.00 Replacement Cost: $13,416,399.00 FCI: 34.00%

19-Jan-2010Herndon Magnet School

Page 3: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 2

Facility: \Elementary/Middle Schools\Herndon Magnet\1956-67 BuildingsAddress: 11845 Gamm Road, Belcher, LA 71004

Attributes: Number of Floors 1

General Information: Function: Elementary Middle Year Built: 1956Gross Area: 74,106 S.F. Last Renovation:

Facility Description:

Herndon Magnet School is a 1-story building located at 11845 Gamm Road in Belcher, Louisiana. There have been additions in 1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010 Facility Condition Assessment (FCA). The detailed condition and deficiency statements are contained in this report.

Energy conservation opportunities for this building include: 1) Addition of a building automation system would allow programs to improve operation and reduce energy use; 2) Exterior windows are steel frame, operable clear glass design. Installation of fixed, double pane, low e, thermal windows with thermal breaks would improve energy use and improve comfort; 3) Replacing the roof mounted units for the kitchen and cafeteria with more efficient equipment would reduce energy and improve interior conditions; and 4) A review of billing rate may justify addition of power factor correction capacitor.

ADA vertical access needs for this building include installation of a wheelchair lift to provide access to the stage.

Current Repair Cost: $3,552,579.00 Replacement Cost: $12,016,077.00 FCI: 29.57%

19-Jan-2010South Elevation

19-Jan-2010East Elevation

19-Jan-2010North Elevation

19-Jan-2010West Elevation

Page 4: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 3

Facility: \Elementary/Middle Schools\Herndon Magnet\1956-67 Buildings (continued)

Building Condition:

System Unit Price$

Unit of

Meas Qty Renewal% Renewal$ Life Installed

Calc Next

Renewal

Next

Renewal CI% Deficiency$ Replacement Value FCI%

Total $162.15 S.F. 74,106 107 $12,813,068 49 1974 1966 2009 80 $3,552,581 $12,016,076 30

Substructure $22.20 S.F. 74,106 100 $1,645,153 100 1956 $1,645,153

Foundations $22.20 S.F. 74,106 100 $1,645,153 100 1956 $1,645,153

Standard Foundations $10.20 S.F. 74,106 100 $755,881 100 1956 $755,881

Special Foundations $3.00 S.F. 74,106 100 $222,318 100 1956 $222,318

Slab on Grade $9.00 S.F. 74,106 100 $666,954 100 1956 $666,954

Basement Construction 0 0 0

Basement Excavation 0 0 0 0

Basement Walls 0 0 0 0

Shell $41.00 S.F. 74,106 104 $3,155,760 69 1967 1986 100 $489,100 $3,038,642 16

Superstructure $10.80 S.F. 74,106 100 $800,345 100 1956 $800,345

Floor Construction 0 0 0 0

Roof Construction $10.80 S.F. 74,106 100 $800,345 100 1956 $800,345

Exterior Enclosure $20.40 S.F. 74,106 103 $1,556,226 78 1956 1986 $489,100 $1,511,762 32

Exterior Walls $14.40 S.F. 74,106 100 $1,067,126 100 1956 $1,067,126

Exterior Windows $4.80 S.F. 74,106 110 $391,280 30 1956 1986 $391,280 $355,709 110

Exterior Doors $1.20 S.F. 74,106 110 $97,820 30 1956 1986 $97,820 $88,927 110

Roofing $9.80 S.F. 74,106 110 $799,189 20 2010 2030 100 $726,535

Roof Coverings - EPDM 0 0 0 0

Roof Coverings - Standing

Seam Mettal

0 0 0 0

Roof Coverings;White Thermo

Plastic

$9.80 S.F. 74,106 110 $799,189 20 2010 2030 100 $726,535

Roof Openings 0 0 0 0

Interiors $27.80 S.F. 74,106 107 $2,212,411 53 1965 1976 8 $1,104,704 $2,059,787 54

Interior Construction $19.20 S.F. 74,106 106 $1,511,763 68 1956 1976 $631,384 $1,422,835 44

Partitions $10.80 S.F. 74,106 110 $880,379 100 1956 $800,345

Interior Doors $2.40 S.F. 74,106 80 $142,284 40 1956 1996 $142,284 $177,854 80

Fittings $6.00 S.F. 74,106 110 $489,100 20 1956 1976 $489,100 $444,636 110

Stairs 0 0 0

Stair Construction 0 0 0 0

Interior Finishes $8.60 S.F. 74,106 110 $700,648 19 1975 1976 8 $473,320 $636,952 74

Wall Finishes - Ceramic &

Glazed

$4.42 S.F. 6,000 110 $29,146 20 1956 1976 $29,146 $26,496 110

Wall Finishes - Paint $2.40 S.F. 68,106 110 $179,800 10 1983 1993 $179,800 $163,454 110

Floor Finishes - Carpet $2.76 S.F. 3,000 110 $9,108 8 2005 2013 38 $8,280

Floor Finishes - Ceramic &

Quarry Tile

$1.44 S.F. 6,000 110 $9,504 50 1956 2006 $9,504 $8,640 110

Floor Finishes - VCT $3.60 S.F. 55,106 110 $218,220 15 1996 2011 7 $198,382

Floor Finishes Gym Wood Floor $6.10 S.F. 10,000 110 $67,056 50 1956 2006 $67,056 $60,960 110

Ceiling Finishes $2.30 S.F. 74,106 110 $187,814 20 1956 1976 $187,814 $170,740 110

Services $60.35 S.F. 74,106 110 $4,919,364 22 1987 1966 2009 88 $1,567,497 $4,472,149 35

Conveying 0 0 0 $22,920

Elevators and Lifts 0 0 0 0 $22,920

Plumbing $7.54 S.F. 74,106 110 $614,309 30 1977 1986 98 $578,116 $558,463 104

Plumbing Fixtures $5.89 S.F. 74,106 110 $480,296 30 1956 1986 $480,296 $436,633 110

Domestic Water Distribution $0.44 S.F. 74,106 110 $36,193 30 1956 1986 $36,193 $32,903 110

Sanitary Waste $0.76 S.F. 74,106 110 $61,627 30 1956 1986 $61,627 $56,024 110

Rain Water Drainage $0.19 S.F. 74,106 110 $15,651 30 2010 2040 100 $14,228

Other Plumbing Systems -

Natural Gas

$0.25 S.F. 74,106 110 $20,542 30 2009 2039 97 $18,675

HVAC $33.72 S.F. 74,106 110 $2,748,740 20 2007 2024 2009 93 $146,730 $2,498,855 6

Heat Generating Systems 0 0 0 0

Cooling Generating Systems 0 0 0 0

Distribution Systems & Exhaust

Systems

$9.12 S.F. 74,106 110 $743,431 30 2009 2039 97 $675,847

Terminal & Package Units $21.60 S.F. 74,106 110 $1,760,759 15 2009 2024 93 $1,600,690

Controls & Instrumentation $1.80 S.F. 74,106 110 $146,730 20 2009 2029 2009 $146,730 $133,391 110

Other HVAC Systems/Equip -

Kitchen Hood

$1.20 S.F. 74,106 110 $97,820 30 2002 2032 73 $88,927

Fire Protection 0 0 0

Sprinklers S.F. 0 0 0 0

Electrical $19.09 S.F. 74,106 110 $1,556,315 23 1981 1966 2009 68 $819,731 $1,414,831 58

Electrical Service/Distribution $2.27 S.F. 74,106 110 $184,880 30 1999 2029 63 $168,072

Branch Wiring $6.77 S.F. 74,106 110 $551,704 30 1956 1986 $551,704 $501,549 110

Lighting $6.77 S.F. 74,106 110 $551,704 20 2004 2024 70 $501,549

Communications and Security -

Public Address & Clock System

$0.88 S.F. 74,106 110 $71,409 20 1970 1990 $71,409 $64,917 110

Page 5: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 4

System Unit Price$

Unit of

Meas Qty Renewal% Renewal$ Life Installed

Calc Next

Renewal

Next

Renewal CI% Deficiency$ Replacement Value FCI%

Fire Alarm $1.54 S.F. 74,106 110 $125,209 10 2000 2010 $125,209 $113,827 110

Security & CCTV $0.88 S.F. 74,106 110 $71,409 10 1956 1966 2009 $71,409 $64,917 110

Other Electrical Systems -

Emergency Generator

0 0 0 0

Equipment & Furnishings $10.80 S.F. 74,106 110 $880,380 20 1960 1976 2015 25 $391,280 $800,345 49

Equipment $7.20 S.F. 74,106 110 $586,920 20 1962 1976 2015 25 $97,820 $533,563 18

Commercial Equipment $6.00 S.F. 74,106 110 $489,100 20 1967 1987 2015 25 $444,636

Institutional Equipment $1.20 S.F. 74,106 110 $97,820 20 1956 1976 $97,820 $88,927 110

Furnishings $3.60 S.F. 74,106 110 $293,460 20 1956 1976 $293,460 $266,782 110

Fixed Furnishings $3.60 S.F. 74,106 110 $293,460 20 1956 1976 $293,460 $266,782 110

Page 6: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 5

Facility: \Elementary/Middle Schools\Herndon Magnet\1956-67 Buildings (continued)

Renewal Schedule:

Systems 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020

Total $3,552,581 $224,766 $9,953 $567,000 $505,874

Substructure

Foundations

Standard Foundations

Special Foundations

Slab on Grade

Basement Construction

Basement Excavation

Basement Walls

Shell $489,100

Superstructure

Floor Construction

Roof Construction

Exterior Enclosure $489,100

Exterior Walls

Exterior Windows $391,280

Exterior Doors $97,820

Roofing

Roof Coverings - EPDM

Roof Coverings - Standing Seam

Mettal

Roof Coverings;White Thermo

Plastic

Roof Openings

Interiors $1,104,704 $224,766 $9,953 $241,636

Interior Construction $631,384

Partitions

Interior Doors $142,284

Fittings $489,100

Stairs

Stair Construction

Interior Finishes $473,320 $224,766 $9,953 $241,636

Wall Finishes - Ceramic & Glazed $29,146

Wall Finishes - Paint $179,800 $241,636

Floor Finishes - Carpet $9,953

Floor Finishes - Ceramic & Quarry

Tile

$9,504

Floor Finishes - VCT $224,766

Floor Finishes Gym Wood Floor $67,056

Ceiling Finishes $187,814

Services $1,567,497 $264,238

Conveying $22,920

Elevators and Lifts $22,920

Plumbing $578,116

Plumbing Fixtures $480,296

Domestic Water Distribution $36,193

Sanitary Waste $61,627

Rain Water Drainage

Other Plumbing Systems - Natural

Gas

HVAC $146,730

Heat Generating Systems

Cooling Generating Systems

Distribution Systems & Exhaust

Systems

Terminal & Package Units

Controls & Instrumentation $146,730

Other HVAC Systems/Equip -

Kitchen Hood

Fire Protection

Sprinklers

Electrical $819,731 $264,238

Electrical Service/Distribution

Branch Wiring $551,704

Lighting

Page 7: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 6

Systems 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020

Communications and Security -

Public Address & Clock System

$71,409

Fire Alarm $125,209 $168,271

Security & CCTV $71,409 $95,967

Other Electrical Systems -

Emergency Generator

Equipment & Furnishings $391,280 $567,000

Equipment $97,820 $567,000

Commercial Equipment $567,000

Institutional Equipment $97,820

Furnishings $293,460

Fixed Furnishings $293,460

Page 8: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 7

Facility: \Elementary/Middle Schools\Herndon Magnet\1956-67 Buildings (continued)

Deficiency Sheet:

Deficiency: Surveyor/Update: Charu Aggarwal Fri, 04-Jun-2010Priority: 3Quantity: 1

Assembly: B2020 System: Exterior Windows Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: The exterior windows are worn, beyond expected life, and should be replaced.

Estimates:Raw Cost $326,066.40

Plus or (Minus) Additional Cost $0.00Total Estimated Amount $326,066.40

Deficiency: Surveyor/Update: Charu Aggarwal Fri, 04-Jun-2010Priority: 3Quantity: 1

Assembly: B2030 System: Exterior Doors Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: The exterior doors are worn, beyond expected life, and should be replaced.

Estimates:Raw Cost $81,516.60

Plus or (Minus) Additional Cost $0.00Total Estimated Amount $81,516.60

Page 9: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 8

Facility: \Elementary/Middle Schools\Herndon Magnet\ 1956-67 Buildings (continued)

Deficiency: Surveyor/Update: Charu Aggarwal Fri, 04-Jun-2010Priority: 3Quantity: 1

Assembly: C1020 System: Interior Doors Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: The interior doors are worn, beyond expected life, and should be replaced.

Estimates:Raw Cost $118,569.60

Plus or (Minus) Additional Cost $0.00Total Estimated Amount $118,569.60

Deficiency: Surveyor/Update: Charu Aggarwal Fri, 04-Jun-2010Priority: 3Quantity: 1

Assembly: C1030 System: Fittings Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: Fittings, such as chalk and tack boards, lockers, toilet and bath accessories, toilet partitions, and shelving, are

beyond expected life and should be replaced.

Estimates:Raw Cost $407,583.00

Plus or (Minus) Additional Cost $0.00Total Estimated Amount $407,583.00

Page 10: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 9

Facility: \Elementary/Middle Schools\Herndon Magnet\ 1956-67 Buildings (continued)

Deficiency: Surveyor/Update: Charu Aggarwal Fri, 04-Jun-2010Priority: 3Quantity: 1

Assembly: C3010 System: Wall Finishes - Ceramic & Glazed Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: The ceramic and glazed wall finishes are beyond expected life and should be replaced.

Estimates:Raw Cost $24,288.00

Plus or (Minus) Additional Cost $0.00Total Estimated Amount $24,288.00

Deficiency: Surveyor/Update: Charu Aggarwal Fri, 04-Jun-2010Priority: 3Quantity: 1

Assembly: C3010 System: Wall Finishes - Paint Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: The painted wall finishes are worn, beyond expected life, and should be replaced.

Estimates:Raw Cost $149,833.20

Plus or (Minus) Additional Cost $0.00Total Estimated Amount $149,833.20

Page 11: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 10

Facility: \Elementary/Middle Schools\Herndon Magnet\ 1956-67 Buildings (continued)

Deficiency: Surveyor/Update: Charu Aggarwal Fri, 04-Jun-2010Priority: 3Quantity: 1

Assembly: C3020 System: Floor Finishes - Ceramic & Quarry Tile Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: The ceramic tiles are deteriorating, beyond expected life, and should be replaced.

Estimates:Raw Cost $7,920.00

Plus or (Minus) Additional Cost $0.00Total Estimated Amount $7,920.00

Deficiency: Surveyor/Update: Phil Trenbath Fri, 04-Jun-2010Priority: 3Quantity: 1

Assembly: C3020 System: Floor Finishes Gym Wood Floor Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: The wood floor in the gym has had numerous repairs and needs to be replaced.

Estimates:Raw Cost $55,880.00

Plus or (Minus) Additional Cost $0.00Total Estimated Amount $55,880.00

Page 12: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 11

Facility: \Elementary/Middle Schools\Herndon Magnet\ 1956-67 Buildings (continued)

Deficiency: Surveyor/Update: Charu Aggarwal Fri, 04-Jun-2010Priority: 3Quantity: 1

Assembly: C3030 System: Ceiling Finishes Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: The ceiling finishes are stained, beyond expected life, and should be replaced.

Estimates:Raw Cost $156,511.87

Plus or (Minus) Additional Cost $0.00Total Estimated Amount $156,511.87

Deficiency: Surveyor/Update: Phil Trenbath Fri, 04-Jun-2010Priority: 5Quantity: 1

Assembly: D1010 System: Elevators and Lifts Material: Conveying Systems Distress: Missing Category: ADA / Accessibility Correction: Install Chair Lift Note: A chair lift is required to access the stage.

Estimates:Raw Cost $19,100.00

Plus or (Minus) Additional Cost $0.00Total Estimated Amount $19,100.00

Page 13: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 12

Facility: \Elementary/Middle Schools\Herndon Magnet\ 1956-67 Buildings (continued)

Deficiency: Surveyor/Update: Charu Aggarwal Mon, 18-Jan-2010Priority: 3Quantity: 1

Assembly: D2010 System: Plumbing Fixtures Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: Plumbing fixtures are original, badly worn and should be replaced.

Estimates:Raw Cost $400,246.51

Plus or (Minus) Additional Cost $0.00Total Estimated Amount $400,246.51

Deficiency: Surveyor/Update: Charu Aggarwal Fri, 04-Jun-2010Priority: 3Quantity: 1

Assembly: D2020 System: Domestic Water Distribution Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: Domestic water system is well past expected life, showing signs of deterioration, and should be replaced.

Estimates:Raw Cost $30,161.14

Plus or (Minus) Additional Cost $0.00Total Estimated Amount $30,161.14

Page 14: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 13

Facility: \Elementary/Middle Schools\Herndon Magnet\ 1956-67 Buildings (continued)

Deficiency: Surveyor/Update: Charu Aggarwal Fri, 04-Jun-2010Priority: 3Quantity: 1

Assembly: D2030 System: Sanitary Waste Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: Sanitary waste is beyond expected life and should be replaced.

Estimates:Raw Cost $51,355.46

Plus or (Minus) Additional Cost $0.00Total Estimated Amount $51,355.46

Deficiency: Surveyor/Update: Phil Trenbath Fri, 04-Jun-2010Priority: 4Quantity: 1

Assembly: D3060 System: Controls & Instrumentation Material: System Distress: Inadequate Category: Energy Conservation Correction: Renew System Note: Controls are individual low voltage programmable room thermostats. Recommend installation of a building

automation system to allow remote monitoring and control.

Estimates:Raw Cost $122,274.90

Plus or (Minus) Additional Cost $0.00Total Estimated Amount $122,274.90

Page 15: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 14

Facility: \Elementary/Middle Schools\Herndon Magnet\ 1956-67 Buildings (continued)

Deficiency: Surveyor/Update: Charu Aggarwal Thu, 03-Jun-2010Priority: 3Quantity: 1

Assembly: D5020 System: Branch Wiring Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: Branch wiring and distribution system have not been upgraded, show wear, and need to be replaced.

Estimates:Raw Cost $459,753.62

Plus or (Minus) Additional Cost $0.00Total Estimated Amount $459,753.62

Deficiency: Surveyor/Update: Charu Aggarwal Fri, 04-Jun-2010Priority: 3Quantity: 1

Assembly: D5030 System: Communications and Security - Public

Address & Clock System Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: Public address and communication system is obsolete and should be replaced. For integrity of the system, install

wiring in conduit.

Estimates:Raw Cost $59,507.12

Plus or (Minus) Additional Cost $0.00Total Estimated Amount $59,507.12

Page 16: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 15

Facility: \Elementary/Middle Schools\Herndon Magnet\ 1956-67 Buildings (continued)

Deficiency: Surveyor/Update: Charu Aggarwal Fri, 04-Jun-2010Priority: 3Quantity: 1

Assembly: D5030 System: Fire Alarm Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: The fire alarm system is beyond expected life and should be replaced.

Estimates:Raw Cost $104,341.25

Plus or (Minus) Additional Cost $0.00Total Estimated Amount $104,341.25

Deficiency: Surveyor/Update: Charu Aggarwal Fri, 04-Jun-2010Priority: 3Quantity: 1

Assembly: D5030 System: Security & CCTV Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: The security system is beyond expected life and should be replaced. For integrity of system, install wiring in

conduit.

Estimates:Raw Cost $59,507.12

Plus or (Minus) Additional Cost $0.00Total Estimated Amount $59,507.12

Page 17: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 16

Facility: \Elementary/Middle Schools\Herndon Magnet\ 1956-67 Buildings (continued)

Deficiency: Surveyor/Update: Charu Aggarwal Fri, 04-Jun-2010Priority: 3Quantity: 1

Assembly: E1020 System: Institutional Equipment Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: Institutional equipment, such as library equipment, theater and stage equipment, audio-visual equipment, and

laboratory equipment, is beyond expected life and should be replaced.

Estimates:Raw Cost $81,516.60

Plus or (Minus) Additional Cost $0.00Total Estimated Amount $81,516.60

Deficiency: Surveyor/Update: Charu Aggarwal Fri, 04-Jun-2010Priority: 3Quantity: 1

Assembly: E2010 System: Fixed Furnishings Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: Fixed furnishings, such as the base/wall cabinets, counter tops, window shades, and fixed seating, are worn,

beyond expected life, and should be replaced.

Estimates:Raw Cost $244,549.80

Plus or (Minus) Additional Cost $0.00Total Estimated Amount $244,549.80

Page 18: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 17

Facility: \Elementary/Middle Schools\Herndon Magnet\1956-67 Covered WalkwaysAddress: 11845 Gamm Road, Belcher, LA 71004

Attributes: ***None***

General Information: Function: Elementary Middle Year Built: 1956Gross Area: 9,000 S.F. Last Renovation:

Facility Description:

There are covered walkways between classroom sections that provide weather protection for the students.

Current Repair Cost: $224,964.00 Replacement Cost: $224,964.00 FCI: 100.00%

19-Jan-2010West Elevation

19-Jan-2010North Elevation

19-Jan-2010East Elevation

04-Jun-2010South Elevation

Page 19: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 18

Facility: \Elementary/Middle Schools\Herndon Magnet\1956-67 Covered Walkways (continued)

Building Condition:

System Unit Price$

Unit of

Meas Qty Renewal% Renewal$ Life Installed

Calc Next

Renewal

Next

Renewal CI% Deficiency$ Replacement Value FCI%

Total $25.00 S.F. 9,000 100 $224,964 25 1956 1981 $224,964 $224,964 100

Special Construction $25.00 S.F. 9,000 100 $224,964 25 1956 1981 $224,964 $224,964 100

Special Construction $25.00 S.F. 9,000 100 $224,964 25 1956 1981 $224,964 $224,964 100

Special Structures - Covered

Walkways Metal

$25.00 S.F. 9,000 100 $224,964 25 1956 1981 $224,964 $224,964 100

Page 20: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 19

Facility: \Elementary/Middle Schools\Herndon Magnet\1956-67 Covered Walkways (continued)

Renewal Schedule:

Systems 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020

Total $224,964

Special Construction $224,964

Special Construction $224,964

Special Structures - Covered

Walkways Metal

$224,964

Page 21: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 20

Facility: \Elementary/Middle Schools\Herndon Magnet\1956-67 Covered Walkways (continued)

Deficiency Sheet:

Deficiency: Surveyor/Update: Charu Aggarwal Fri, 04-Jun-2010Priority: 3Quantity: 1

Assembly: F1010 System: Special Structures - Covered Walkways Metal Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: The covered walkways are beyond expected life and need to be replaced.

Estimates:Raw Cost $187,470.00

Plus or (Minus) Additional Cost $0.00Total Estimated Amount $187,470.00

Page 22: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 21

Facility: \Elementary/Middle Schools\Herndon Magnet\Basketball CourtAddress: 11845 Gamm Road, Belcher, LA 71004

Attributes: ***None***

General Information: Function: Elementary Middle Year Built: 1956Gross Area: 3,798 S.F. Last Renovation:

Facility Description:

The Basketball Court at Herndon Magnet School is located at 11845 Gamm Road in Belcher, Louisiana 71004. There have been no additions or renovations. The basketball court consists of a concrete pad with backboards. This report contains condition and adequacy data collected during the 2009/2010 Facility Condition Assessment (FCA). The detailed condition and deficiency statements are contained in this report.

Current Repair Cost: $29,077.00 Replacement Cost: $26,844.00 FCI: 108.32%

11-Jan-2010Herndon Magnet School Basketball Court

Page 23: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 22

Facility: \Elementary/Middle Schools\Herndon Magnet\Basketball Court (continued)

Building Condition:

System Unit Price$

Unit of

Meas Qty Renewal% Renewal$ Life Installed

Calc Next

Renewal

Next

Renewal CI% Deficiency$ Replacement Value FCI%

Total $7.07 S.F. 3,798 110 $29,487 21 1956 1976 $29,077 $26,844 108

Special Construction $6.96 S.F. 3,798 110 $29,077 20 1956 1976 $29,077 $26,434 110

Special Construction $6.96 S.F. 3,798 110 $29,077 20 1956 1976 $29,077 $26,434 110

Special Structures - Basketball

Court - Concrete - Outdoor

$6.96 S.F. 3,798 110 $29,077 20 1956 1976 $29,077 $26,434 110

Building Sitework $0.11 S.F. 3,798 100 $410 100 1956 $410

Site Preparation $0.11 S.F. 3,798 100 $410 100 1956 $410

Site Earthwork $0.11 S.F. 3,798 0 $410 100 1956 $410

Site Improvements S.F. 3,798 0 0

Site Development - Fencing S.F. 3,798 0 0 0

Site Electrical Utilities S.F. 3,798 0 0

Site Lighting S.F. 3,798 0 0 0

Page 24: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 23

Facility: \Elementary/Middle Schools\Herndon Magnet\Basketball Court (continued)

Renewal Schedule:

Systems 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020

Total $29,077

Special Construction $29,077

Special Construction $29,077

Special Structures - Basketball

Court - Concrete - Outdoor

$29,077

Building Sitework

Site Preparation

Site Earthwork

Site Improvements

Site Development - Fencing

Site Electrical Utilities

Site Lighting

Page 25: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 24

Facility: \Elementary/Middle Schools\Herndon Magnet\Basketball Court (continued)

Deficiency Sheet:

Deficiency: Surveyor/Update: Phil Trenbath Fri, 04-Jun-2010Priority: 3Quantity: 1

Assembly: F1010 System: Special Structures - Basketball Court -

Concrete - Outdoor Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: Basketball court's concrete pad is beyond expected life, and should be replaced.

Estimates:Raw Cost $24,231.24

Plus or (Minus) Additional Cost $0.00Total Estimated Amount $24,231.24

Page 26: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 25

Facility: \Elementary/Middle Schools\Herndon Magnet\GreenhouseAddress: 11845 Gamm Road, Belcher, LA 71004

Attributes: Number of Floors 1

General Information: Function: Elementary Middle Year Built: 1967Gross Area: 540 S.F. Last Renovation:

Facility Description:

The Greenhouse at Herndon Magnet School is a 1-story building attached to the maintenance storage building located at 11845 Gamm Road in Belcher, Louisiana. There have been no additions or renovations. This report contains condition and adequacy data collected during the 2009/2010 Facility Condition Assessment (FCA). The detailed condition and deficiency statements are contained in this report.

Current Repair Cost: $1,490.00 Replacement Cost: $20,244.00 FCI: 7.36%

19-Jan-2010West Elevation

19-Jan-2010South Elevation

19-Jan-2010North Elevation

Page 27: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 26

Facility: \Elementary/Middle Schools\Herndon Magnet\Greenhouse (continued)

Building Condition:

System Unit Price$

Unit of

Meas Qty Renewal% Renewal$ Life Installed

Calc Next

Renewal

Next

Renewal CI% Deficiency$ Replacement Value FCI%

Total $37.49 S.F. 540 109 $21,998 48 1967 1997 14 $1,489 $20,244 7

Substructure $4.98 S.F. 540 100 $2,689 0 0 $2,689

Foundations $4.98 S.F. 540 100 $2,689 0 0 $2,689

Standard Foundations S.F. 0 100 100 0

Slab on Grade $4.98 S.F. 540 100 $2,689 0 0 $2,689

Shell $1.92 S.F. 540 110 $1,140 30 1967 1997 $1,140 $1,037 110

Exterior Enclosure $1.92 S.F. 540 110 $1,140 30 1967 1997 $1,140 $1,037 110

Exterior Doors $1.92 S.F. 540 110 $1,140 30 1967 1997 $1,140 $1,037 110

Services $0.59 S.F. 540 110 $349 30 1967 1997 $349 $318 110

Plumbing $0.59 S.F. 540 110 $349 30 1967 1997 $349 $318 110

Plumbing Fixtures S.F. 0 0 0 0

Domestic Water Distribution $0.59 S.F. 540 110 $349 30 1967 1997 $349 $318 110

Sanitary Waste S.F. 0 0 0 0

HVAC 0 0 0

Distribution Systems & Exhaust

Systems

S.F. 0 0 0 0

Terminal & Package Units S.F. 0 0 0 0

Electrical 0 0 0

Electrical Service/Distribution S.F. 0 0 0 0

Branch Wiring S.F. 0 0 0 0

Lighting S.F. 0 0 0 0

Special Construction $30.00 S.F. 540 110 $17,820 50 1967 2017 14 $16,200

Special Construction $30.00 S.F. 540 110 $17,820 50 1967 2017 14 $16,200

Special Structures - Pre-

Engineered Structure

$30.00 S.F. 540 110 $17,820 50 1967 2017 14 $16,200

Page 28: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 27

Facility: \Elementary/Middle Schools\Herndon Magnet\Greenhouse (continued)

Renewal Schedule:

Systems 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020

Total $1,489 $21,916

Substructure

Foundations

Standard Foundations

Slab on Grade

Shell $1,140

Exterior Enclosure $1,140

Exterior Doors $1,140

Services $349

Plumbing $349

Plumbing Fixtures

Domestic Water Distribution $349

Sanitary Waste

HVAC

Distribution Systems & Exhaust

Systems

Terminal & Package Units

Electrical

Electrical Service/Distribution

Branch Wiring

Lighting

Special Construction $21,916

Special Construction $21,916

Special Structures - Pre-Engineered

Structure

$21,916

Page 29: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 28

Facility: \Elementary/Middle Schools\Herndon Magnet\Greenhouse (continued)

Deficiency Sheet:

Deficiency: Surveyor/Update: Charu Aggarwal Fri, 04-Jun-2010Priority: 3Quantity: 1

Assembly: B2030 System: Exterior Doors Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: The exterior doors are worn, beyond expected life, and should be replaced.

Estimates:Raw Cost $950.40

Plus or (Minus) Additional Cost $0.00Total Estimated Amount $950.40

Deficiency: Surveyor/Update: Charu Aggarwal Fri, 04-Jun-2010Priority: 3Quantity: 1

Assembly: D2020 System: Domestic Water Distribution Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: Water supply line is beyond expected life and should be replaced.

Estimates:Raw Cost $291.06

Plus or (Minus) Additional Cost $0.00Total Estimated Amount $291.06

Page 30: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 29

Facility: \Elementary/Middle Schools\Herndon Magnet\SiteAddress: 11845 Gamm Rd, Belcher, LA 71004

Attributes: Site Area (in Acres) 80 (35 acres leased, 45 acres

school site)

General Information: Function: Elementary Middle Year Built: 1956Gross Area: 83,646 S.F. Last Renovation:

Facility Description:

The Herndon Magnet School site was constructed in 1956. There were additions in 1966 and 1967, and no major renovations. Campus site features include paved driveways and parking lots, pedestrian pavement, flag pole, landscaping and fencing. Site mechanical and electrical features include water, sewer, natural gas and site lighting. This report contains condition and adequacy data collected during the 2009/2010 Facility Condition Assessment (FCA). The detailed condition and deficiency statements are contained in this report.

Current Repair Cost: $752,814.00 Replacement Cost: $956,576.00 FCI: 78.70%

05-Jan-2010Aerial Image of Herndon Magnet School

Page 31: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 30

Facility: \Elementary/Middle Schools\Herndon Magnet\Site (continued)

Building Condition:

System Unit Price$

Unit of

Meas Qty Renewal% Renewal$ Life Installed

Calc Next

Renewal

Next

Renewal CI% Deficiency$ Replacement Value FCI%

Total $11.44 S.F. 83,646 100 $956,576 28 1961 1976 63 $752,814 $956,576 79

Building Sitework $11.44 S.F. 83,646 100 $956,576 28 1961 1976 63 $752,814 $956,576 79

Site Improvements $8.50 S.F. 83,646 100 $710,656 28 1965 1976 63 $506,894 $710,656 71

Roadways $1.38 S.F. 83,646 100 $115,431 50 1956 2006 $115,431 $115,431 100

Parking Lots $1.18 S.F. 83,646 100 $98,368 30 1999 2029 63 $98,368

Pedestrian Paving $0.82 S.F. 83,646 100 $68,255 50 1956 2006 $68,255 $68,255 100

Site Development $3.86 S.F. 83,646 100 $323,208 20 1956 1976 $323,208 $323,208 100

Landscaping $1.26 S.F. 83,646 100 $105,394 10 1956 $105,394

Site Mechanical Utilities $1.34 S.F. 83,646 100 $112,421 30 1956 1986 $112,421 $112,421 100

Water Supply $0.82 S.F. 83,646 100 $68,255 30 1956 1986 $68,255 $68,255 100

Sanitary Sewer $0.41 S.F. 83,646 100 $34,128 30 1956 1986 $34,128 $34,128 100

Storm Sewer S.F. 0 0 0 0

Fuel Distribution $0.12 S.F. 83,646 100 $10,038 30 1956 1986 $10,038 $10,038 100

Site Electrical Utilities $1.60 S.F. 83,646 100 $133,499 30 1956 1986 $133,499 $133,499 100

Site Lighting $1.60 S.F. 83,646 100 $133,499 30 1956 1986 $133,499 $133,499 100

Page 32: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 31

Facility: \Elementary/Middle Schools\Herndon Magnet\Site (continued)

Renewal Schedule:

Systems 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020

Total $752,814

Building Sitework $752,814

Site Improvements $506,894

Roadways $115,431

Parking Lots

Pedestrian Paving $68,255

Site Development $323,208

Landscaping

Site Mechanical Utilities $112,421

Water Supply $68,255

Sanitary Sewer $34,128

Storm Sewer

Fuel Distribution $10,038

Site Electrical Utilities $133,499

Site Lighting $133,499

Page 33: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 32

Facility: \Elementary/Middle Schools\Herndon Magnet\Site (continued)

Deficiency Sheet:

Deficiency: Surveyor/Update: Charu Aggarwal Fri, 04-Jun-2010Priority: 3Quantity: 1

Assembly: G2010 System: Roadways Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: Roadways are cracked, worn, and beyond expected life, and should be replaced.

Estimates:Raw Cost $96,192.90

Plus or (Minus) Additional Cost $0.00Total Estimated Amount $96,192.90

Deficiency: Surveyor/Update: Charu Aggarwal Fri, 04-Jun-2010Priority: 3Quantity: 1

Assembly: G2030 System: Pedestrian Paving Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: Pedestrian paving is worn, beyond expected life, and should be replaced.

Estimates:Raw Cost $56,879.28

Plus or (Minus) Additional Cost $0.00Total Estimated Amount $56,879.28

Page 34: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 33

Facility: \Elementary/Middle Schools\Herndon Magnet\ Site (continued)

Deficiency: Surveyor/Update: Charu Aggarwal Fri, 04-Jun-2010Priority: 3Quantity: 1

Assembly: G2040 System: Site Development Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: Site development features, such as fences and gates, signs, site furnishings, trash enclosures, playing fields, and

flagpoles, are beyond expected life and should be replaced.

Estimates:Raw Cost $269,340.12

Plus or (Minus) Additional Cost $0.00Total Estimated Amount $269,340.12

Deficiency: Surveyor/Update: Charu Aggarwal Fri, 04-Jun-2010Priority: 3Quantity: 1

Assembly: G3010 System: Water Supply Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: Water supply is original, deteriorated, and should be replaced.

Estimates:Raw Cost $56,879.28

Plus or (Minus) Additional Cost $0.00Total Estimated Amount $56,879.28

Page 35: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 34

Facility: \Elementary/Middle Schools\Herndon Magnet\ Site (continued)

Deficiency: Surveyor/Update: Charu Aggarwal Fri, 04-Jun-2010Priority: 3Quantity: 1

Assembly: G3020 System: Sanitary Sewer Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: Sanitary sewer is beyond expected life and should be replaced.

Estimates:Raw Cost $28,439.64

Plus or (Minus) Additional Cost $0.00Total Estimated Amount $28,439.64

Deficiency: Surveyor/Update: Charu Aggarwal Mon, 25-Jan-2010Priority: 3Quantity: 1

Assembly: G3060 System: Fuel Distribution Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: Gas meter amd regulator are worn and should be replaced.

Estimates:Raw Cost $8,364.60

Plus or (Minus) Additional Cost $0.00Total Estimated Amount $8,364.60

Page 36: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 35

Facility: \Elementary/Middle Schools\Herndon Magnet\ Site (continued)

Deficiency: Surveyor/Update: Charu Aggarwal Fri, 04-Jun-2010Priority: 3Quantity: 1

Assembly: G4020 System: Site Lighting Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: Site lighting is minimal, obsolete, and should be replaced.

Estimates:Raw Cost $111,249.18

Plus or (Minus) Additional Cost $0.00Total Estimated Amount $111,249.18

Page 37: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 36

Facility: \Elementary/Middle Schools\Herndon Magnet\Tennis CourtsAddress: 11845 Gamm Road, Belcher, LA 71004

Attributes: ***None***

General Information: Function: Elementary Middle Year Built: 1983Gross Area: 14,904 S.F. Last Renovation:

Facility Description:

The Tennis Courts at Herndon Magnet School are located at 11845 Gamm Road in Belcher, Louisiana. There have been no additions and no renovations. Two tennis courts with nets and perimeter fencing are located on the southwest corner of the property. This report contains condition and adequacy data collected during the 2009/2010 Facility Condition Assessment (FCA). The detailed condition and deficiency statements are contained in this report.

Current Repair Cost: $0.00 Replacement Cost: $171,694.00 FCI: 0.00%

11-Jan-2010Herndon Magnet Tennis Courts

Page 38: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 37

Facility: \Elementary/Middle Schools\Herndon Magnet\Tennis Courts (continued)

Building Condition:

System Unit Price$

Unit of

Meas Qty Renewal% Renewal$ Life Installed

Calc Next

Renewal

Next

Renewal CI% Deficiency$ Replacement Value FCI%

Total $11.52 S.F. 14,904 109 $187,558 21 1983 2003 10 0 $171,694

Special Construction $10.64 S.F. 14,904 110 $174,502 20 1983 2003 $158,638

Special Construction $10.64 S.F. 14,904 110 $174,502 20 1983 2003 $158,638

Special Structures - Tennis

Court Hard Surface

$10.64 S.F. 14,904 110 $174,502 20 1983 2003 $158,638

Building Sitework $0.88 S.F. 14,904 100 $13,056 39 1983 2013 10 $13,056

Site Preparation $0.11 S.F. 14,904 100 $1,610 100 1983 $1,610

Site Earthwork $0.11 S.F. 14,904 0 $1,610 100 1983 $1,610

Site Improvements $0.77 S.F. 14,904 100 $11,446 30 1983 2013 10 $11,446

Site Development - Fencing $0.77 S.F. 14,904 100 $11,446 30 1983 2013 10 $11,446

Site Electrical Utilities 0 0 0

Site Lighting S.F. 0 0 0 0

Page 39: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 38

Facility: \Elementary/Middle Schools\Herndon Magnet\Tennis Courts (continued)

Renewal Schedule:

Systems 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020

Total $12,508

Special Construction

Special Construction

Special Structures - Tennis Court

Hard Surface

Building Sitework $12,508

Site Preparation

Site Earthwork

Site Improvements $12,508

Site Development - Fencing $12,508

Site Electrical Utilities

Site Lighting

Page 40: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 39

Facility: \Elementary/Middle Schools\Herndon Magnet\Tennis Courts (continued)

Deficiency Sheet:

*** No Deficiencies Found ***

Page 41: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Survey Report

Deficiency Detail ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 1

Facility

Name Assembly System Material Distress Correction Qty Unit Raw Cost

Additional

Cost Total Cost Priority Def. Cat. Location / Note

Caddo Parish School District $3,800,770 $760,154 $4,560,924 Elementary/Middle Schools $3,800,770 $760,154 $4,560,924 Herndon Magnet $3,800,770 $760,154 $4,560,924 1956-67 Buildings $2,960,482 $592,096 $3,552,579 Building Systems $2,960,482 $592,096 $3,552,579

C3010 Wall Finishes - Ceramic & Glazed

System Beyond Expected Life

Renew System 1 Ea. $24,288 $4,858 $29,146 Necessary- 2-5 Yrs

Deferred Maintenance

The ceramic and glazed wall finishes are beyond expected life and should be replaced.

C3010 Wall Finishes - Paint

System Beyond Expected Life

Renew System 1 Ea. $149,833 $29,967 $179,800 Necessary- 2-5 Yrs

Deferred Maintenance

The painted wall finishes are worn, beyond expected life, and should be replaced.

C3020 Floor Finishes - Ceramic & Quarry Tile

System Beyond Expected Life

Renew System 1 Ea. $7,920 $1,584 $9,504 Necessary- 2-5 Yrs

Deferred Maintenance

The ceramic tiles are deteriorating, beyond expected life, and should be replaced.

C3030 Ceiling Finishes System Beyond Expected Life

Renew System 1 Ea. $156,512 $31,302 $187,814 Necessary- 2-5 Yrs

Deferred Maintenance

The ceiling finishes are stained, beyond expected life, and should be replaced.

D2010 Plumbing Fixtures

System Beyond Expected Life

Renew System 1 Ea. $400,247 $80,049 $480,296 Necessary- 2-5 Yrs

Deferred Maintenance

Plumbing fixtures are original, badly worn and should be replaced.

D2020 Domestic Water Distribution

System Beyond Expected Life

Renew System 1 Ea. $30,161 $6,032 $36,193 Necessary- 2-5 Yrs

Deferred Maintenance

Domestic water system is well past expected life, showing signs of deterioration, and should be replaced.

D2030 Sanitary Waste System Beyond Expected Life

Renew System 1 Ea. $51,355 $10,271 $61,627 Necessary- 2-5 Yrs

Deferred Maintenance

Sanitary waste is beyond expected life and should be replaced.

D5020 Branch Wiring System Beyond Expected Life

Renew System 1 Ea. $459,754 $91,951 $551,704 Necessary- 2-5 Yrs

Deferred Maintenance

Branch wiring and distribution system have not been upgraded, show wear, and need to be replaced.

D5030 Communications and Security - Public Address & Clock System

System Beyond Expected Life

Renew System 1 Ea. $59,507 $11,901 $71,409 Necessary- 2-5 Yrs

Deferred Maintenance

Public address and communication system is obsolete and should be replaced. For integrity of the system, install wiring in conduit.

D5030 Fire Alarm System Beyond Expected Life

Renew System 1 Ea. $104,341 $20,868 $125,209 Necessary- 2-5 Yrs

Deferred Maintenance

The fire alarm system is beyond expected life and should be replaced.

D5030 Security & CCTV System Beyond Expected Life

Renew System 1 Ea. $59,507 $11,901 $71,409 Necessary- 2-5 Yrs

Deferred Maintenance

The security system is beyond expected life and should be replaced. For integrity of system, install wiring in conduit.

E1020 Institutional Equipment

System Beyond Expected Life

Renew System 1 Ea. $81,517 $16,303 $97,820 Necessary- 2-5 Yrs

Deferred Maintenance

Institutional equipment, such as library equipment, theater and stage equipment, audio-visual equipment, and laboratory equipment, is beyond expected life and should be replaced.

Page 42: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Survey Report

Deficiency Detail ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 2

Facility

Name Assembly System Material Distress Correction Qty Unit Raw Cost

Additional

Cost Total Cost Priority Def. Cat. Location / Note

E2010 Fixed Furnishings

System Beyond Expected Life

Renew System 1 Ea. $244,550 $48,910 $293,460 Necessary- 2-5 Yrs

Deferred Maintenance

Fixed furnishings, such as the base/wall cabinets, counter tops, window shades, and fixed seating, are worn, beyond expected life, and should be replaced.

B2020 Exterior Windows

System Beyond Expected Life

Renew System 1 Ea. $326,066 $65,213 $391,280 Necessary- 2-5 Yrs

Deferred Maintenance

The exterior windows are worn, beyond expected life, and should be replaced.

B2030 Exterior Doors System Beyond Expected Life

Renew System 1 Ea. $81,517 $16,303 $97,820 Necessary- 2-5 Yrs

Deferred Maintenance

The exterior doors are worn, beyond expected life, and should be replaced.

C1020 Interior Doors System Beyond Expected Life

Renew System 1 Ea. $118,570 $23,714 $142,284 Necessary- 2-5 Yrs

Deferred Maintenance

The interior doors are worn, beyond expected life, and should be replaced.

C1030 Fittings System Beyond Expected Life

Renew System 1 Ea. $407,583 $81,517 $489,100 Necessary- 2-5 Yrs

Deferred Maintenance

Fittings, such as chalk and tack boards, lockers, toilet and bath accessories, toilet partitions, and shelving, are beyond expected life and should be replaced.

C3020 Floor Finishes Gym Wood Floor

System Beyond Expected Life

Renew System 1 Ea. $55,880 $11,176 $67,056 Necessary- 2-5 Yrs

Deferred Maintenance

The wood floor in the gym has had numerous repairs and needs to be replaced.

D1010 Elevators and Lifts

Conveying Systems

Missing Install Chair Lift 1 Each $19,100 $3,820 $22,920 Does Not Meet Current Code/Standards

ADA / Accessibility

A chair lift is required to access the stage.

D3060 Controls & Instrumentation

System Inadequate Renew System 1 Ea. $122,275 $24,455 $146,730 Recommended-3-10 Yrs

Energy Conservation

Controls are individual low voltage programmable room thermostats. Recommend installation of a building automation system to allow remote monitoring and control.

1956-67 Covered Walkways $187,470 $37,494 $224,964 Building Systems $187,470 $37,494 $224,964

F1010 Special Structures - Covered Walkways Metal

System Beyond Expected Life

Renew System 1 Ea. $187,470 $37,494 $224,964 Necessary- 2-5 Yrs

Deferred Maintenance

The covered walkways are beyond expected life and need to be replaced.

Basketball Court $24,231 $4,846 $29,077 Building Systems $24,231 $4,846 $29,077

F1010 Special Structures - Basketball Court - Concrete - Outdoor

System Beyond Expected Life

Renew System 1 Ea. $24,231 $4,846 $29,077 Necessary- 2-5 Yrs

Deferred Maintenance

Basketball court's concrete pad is beyond expected life, and should be replaced.

Page 43: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Survey Report

Deficiency Detail ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 3

Facility

Name Assembly System Material Distress Correction Qty Unit Raw Cost

Additional

Cost Total Cost Priority Def. Cat. Location / Note

Greenhouse $1,241 $248 $1,490 Building Systems $1,241 $248 $1,490

B2030 Exterior Doors System Beyond Expected Life

Renew System 1 Ea. $950 $190 $1,140 Necessary- 2-5 Yrs

Deferred Maintenance

The exterior doors are worn, beyond expected life, and should be replaced.

D2020 Domestic Water Distribution

System Beyond Expected Life

Renew System 1 Ea. $291 $58 $349 Necessary- 2-5 Yrs

Deferred Maintenance

Water supply line is beyond expected life and should be replaced.

Site $627,345 $125,469 $752,814 Building Systems $627,345 $125,469 $752,814

G2010 Roadways System Beyond Expected Life

Renew System 1 Ea. $96,193 $19,239 $115,431 Necessary- 2-5 Yrs

Deferred Maintenance

Roadways are cracked, worn, and beyond expected life, and should be replaced.

G2030 Pedestrian Paving

System Beyond Expected Life

Renew System 1 Ea. $56,879 $11,376 $68,255 Necessary- 2-5 Yrs

Deferred Maintenance

Pedestrian paving is worn, beyond expected life, and should be replaced.

G2040 Site Development

System Beyond Expected Life

Renew System 1 Ea. $269,340 $53,868 $323,208 Necessary- 2-5 Yrs

Deferred Maintenance

Site development features, such as fences and gates, signs, site furnishings, trash enclosures, playing fields, and flagpoles, are beyond expected life and should be replaced.

G3010 Water Supply System Beyond Expected Life

Renew System 1 Ea. $56,879 $11,376 $68,255 Necessary- 2-5 Yrs

Deferred Maintenance

Water supply is original, deteriorated, and should be replaced.

G3020 Sanitary Sewer System Beyond Expected Life

Renew System 1 Ea. $28,440 $5,688 $34,128 Necessary- 2-5 Yrs

Deferred Maintenance

Sanitary sewer is beyond expected life and should be replaced.

G3060 Fuel Distribution System Beyond Expected Life

Renew System 1 Ea. $8,365 $1,673 $10,038 Necessary- 2-5 Yrs

Deferred Maintenance

Gas meter amd regulator are worn and should be replaced.

G4020 Site Lighting System Beyond Expected Life

Renew System 1 Ea. $111,249 $22,250 $133,499 Necessary- 2-5 Yrs

Deferred Maintenance

Site lighting is minimal, obsolete, and should be replaced.

Page 44: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

Functional and Educational Adequacy

Suitability Report

Page 45: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

Suitability Report - Full

Project:Site:

Suitability

Possible

Score

Score

Percent

Score

CaddoCounty:

1Region:

Rating

241Site #:

Caddo 2009 Herndon Magnet School

Project #:

4057

Site Type: Site Size:Grade Config:

K-8 0.00ES/MS

Suitability - K-8

Site

3.00 3.00 100.00 TrafficGood

1.00 1.00 100.00 Pedestrian TrafficGood

1.35 1.35 100.00 ParkingGood

1.64 0.54 33.00 Play Courts & FieldsPoor

Safety and Security

1.22 0.00 0.00 FencingUnsat

0.15 0.05 33.00 Signage & Way FindingPoor

3.00 3.00 100.00 Ease of SupervisionG/F

0.50 0.00 0.00 Limited EntrancesP/U

0.50 0.50 100.00 Interior CirculationG/F

School Climate

5.00 0.00 0.00 Learning Style VarietyP/U

5.00 0.00 0.00 School EnvironmentP/U

1.00 1.00 100.00 LandscapingG/F

General Classrooms

12.95 8.68 67.00 SizeFair

2.78 2.78 100.00 AdjacenciesGood

2.78 1.86 67.00 Storage\Fixed Equip.Fair

Remedial - Special Needs

0.00 0.00 0.00 Size(N/A)

0.00 0.00 0.00 Adjacencies(N/A)

0.00 0.00 0.00 Storage\Fixed Equip.(N/A)

Library

2.43 1.22 50.00 SizeFair

0.52 0.52 100.00 AdjacenciesG/F

0.52 0.00 0.00 Storage\Fixed Equip.P/U

P.E.

8.40 4.20 50.00 SizeFair

1.80 1.80 100.00 AdjacenciesG/F

1.80 0.00 0.00 Storage\Fixed Equip.P/U

Music

2.64 0.00 0.00 SizeP/U

0.57 0.00 0.00 AdjacenciesP/U

0.57 0.57 100.00 Storage\Fixed Equip.G/F

Art

Page 1 of 33/9/2010 2:16:49PM

Page 46: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

Project:Site:

Suitability

Possible

Score

Score

Percent

Score

CaddoCounty:

1Region:

Rating

241Site #:

Caddo 2009 Herndon Magnet School

Project #:

4057

Site Type: Site Size:Grade Config:

K-8 0.00ES/MS

1.53 1.53 100.00 SizeGood

0.33 0.33 100.00 AdjacenciesG/F

0.33 0.00 0.00 Storage\Fixed Equip.P/U

Performing Arts\Auditorium

1.64 0.00 0.00 SizeUnsat

0.35 0.35 100.00 AdjacenciesGood

0.35 0.35 100.00 Storage\Fixed Equip.Good

Vocational Technical

4.29 1.41 33.00 SizePoor

0.92 0.92 100.00 AdjacenciesGood

0.92 0.92 100.00 Storage\Fixed Equip.G/F

Science

2.70 1.35 50.00 SizeFair

0.58 0.58 100.00 AdjacenciesGood

0.58 0.58 100.00 Storage\Fixed Equip.G/F

Kindergarten

1.18 0.00 0.00 SizeP/U

0.25 0.25 100.00 AdjacenciesG/F

0.25 0.25 100.00 Storage\Fixed Equip.G/F

Administration

1.59 0.79 50.00 SizeFair

0.34 0.34 100.00 AdjacenciesG/F

0.34 0.34 100.00 Storage\Fixed Equip.G/F

0.91 0.91 100.00Good Restrooms (Student)

0.91 0.45 50.00Fair Teacher Lounge and Work Room(s)

5.00 5.00 100.00Good Cafeteria

7.84 7.84 100.00Good Food Prep

0.41 0.41 100.00Good Counseling

0.34 0.00 0.00P/U Clinic

0.50 0.50 100.00G/F Custodial & Maintenance

95.47 57.46 60.19Total For Site:

Comments

Suitability - K-8

Herndon Magnet School is a K-8 magnet school for the whole parish with a focus on academics. Students must test

in and can choose between this magnet and one other for MS. The facility was originally designed for a K-12 school.

Suitability - K-8->Site-->Play Courts & Fields

The elementary playfield is good although it doesn't have a separately fenced K play area. The middle school play

field is poorly developed and doesn't have a football or baseball field.

Suitability - K-8->Safety and Security-->Fencing

The school site has no fencing and is adjacent to oil rigs, a dirt service road, and a pond. Domestic and wild animals

come on campus and disrupt activities.

Suitability - K-8->Safety and Security-->Signage & Way Finding

There is minimal way finding signage on the outside but none on the inside.

Page 2 of 33/9/2010 2:16:49PM

Page 47: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

Project:Site:

Suitability

Possible

Score

Score

Percent

Score

CaddoCounty:

1Region:

Rating

241Site #:

Caddo 2009 Herndon Magnet School

Project #:

4057

Site Type: Site Size:Grade Config:

K-8 0.00ES/MS

Suitability - K-8->Safety and Security-->Limited Entrances

The school is made up of five wings and the core buildings with numerous entry doors.

Suitability - K-8->School Climate-->Learning Style Variety

Classrooms are generally small with few areas for small groups or individual work.

Suitability - K-8->School Climate-->School Environment

Light levels are low even though there are lots of windows, most of the teacher pull all the blinds. Acoustics are not

great with a lot of hard surfaces. The building is generally in poor condition.

Suitability - K-8->General Classrooms-->Size

Most classrooms are less than 8-900 SF.

Suitability - K-8->General Classrooms-->Storage\Fixed Equip.

Not all the rooms have digital projectors or white boards.

Suitability - K-8->Library-->Size

Neither the ES or the MS library is large enough to meet the guideline. The MS library is close and does have

sufficient support rooms.

Suitability - K-8->Library-->Storage\Fixed Equip.

The ES library has no storage or work room.

Suitability - K-8->P.E.-->Size

The MS school gym is fine, the ES gym is very small.

Suitability - K-8->P.E.-->Storage\Fixed Equip.

The portable wall in the MS gym doesn't work.

Suitability - K-8->Music-->Size

None of the music rooms are large enough.

Suitability - K-8->Music-->Adjacencies

The MS music rooms are centrally located near classrooms, the counselor, and the administrative wing.

Suitability - K-8->Art-->Storage\Fixed Equip.

Kiln does not have separate room with venting.

Suitability - K-8->Performing Arts\Auditorium-->Size

The performing arts room is a multi-purpose room (flat floor) with a stage and no support rooms.

Suitability - K-8->Vocational Technical-->Size

The computer labs, the home econ. room, the business lab are all less than the guideline. There is no technology

lab.

Suitability - K-8->Science-->Size

Science labs are a bit small.

Suitability - K-8->Kindergarten-->Size

Kindergarten rooms are only about 6-700 SF.

Suitability - K-8->Administration-->Size

There is no conference room and the reception area is small.

Suitability - K-8->Teacher Lounge and Work Room(s)

Lounge is small for the number of staff.

Suitability - K-8->Clinic

Clinic is small and doesn't have any beds.

Page 3 of 33/9/2010 2:16:49PM

Page 48: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

Functional and Educational Adequacy

Technology Readiness Report

Page 49: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

Technology Readiness Report - Full

Project:Site:

Technology Readiness

Possible

ScoreScore

Percent

Score

CaddoCounty:

1Region:

Rating

241Site #:

Caddo 2009 Herndon Magnet School

Project #:

4057

Technology Readiness

15.00 15.00 100.00 Comm/IT Equipment Environment Good

10.00 10.00 100.00 Electrical Power Good

10.00 10.00 100.00 Cooling Good

10.00 10.00 100.00 Drops & Wireless Good

15.00 15.00 100.00 LAN Connectivity Good

10.00 10.00 100.00 WAN Backbone Good

10.00 10.00 100.00 LAN-WAN Performance Good

5.00 2.50 50.00 Video Distribution Fair

5.00 5.00 100.00 Voice Distribution Good

10.00 10.00 100.00 Faculty & Staff Technology Good

100.00 97.50 97.50Total For Site:

Comments

Technology Readiness->Video Distribution

Just to half the school, C and D wings.

Page 1 of 13/9/2010 2:02:34PM

Page 50: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

Functional and Educational Adequacy

Capacity and Utilization Report

Page 51: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

Capacity Calculations Appendix Preface Some spaces do not contribute to the functional capacity of a school. These spaces are generally spaces

which do not have students assigned to them. Some examples of these spaces include elementary art

rooms, elementary computer labs, elementary music rooms, and special education resource rooms.

Many schools have temporary buildings and these are also not included in the calculation of the

functional capacity. It is the district’s philosophy that, while temporary buildings can be useful in the

short run, they do not provide appropriate long term space and should be eliminated where possible.

Temporary buildings are generally used for the following functions:

1. To house students in temporary classrooms when the school is lacking enough classrooms

2. To house special programs when the school is lacking space for these programs

3. To house necessary storage or administrative support functions when permanent space is lacking

4. To house unnecessary storage or functions

It is the district’s strategy to eliminate all but the absolute necessary temporary buildings and it should

conduct an inventory of the uses of temporary buildings. Where the inventory identifies uses 1-3, the

district will need to consider a more appropriate space solution. In the case of number 4, the district will

need to ensure the principal of the school discontinues the inappropriate use of the temporary building.

Page 52: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

Caddo Parish School Board

Instructional Space Model Guidelines

Room Type Students/

Room

Pre-School 20

K Capacity (full day) and 1st Grade 20

Elementary Classroom (2) 24

Elementary Classroom (3-5) 26

Secondary Classroom (6-12) 25

Art (Secondary) 33

Music (Secondary) - Vocal 25

Music (Secondary) - Instrumental 30

Science Lab (Secondary) 25

Voc./Industrial Tech, Foods, Etc. 25

Gym (Secondary) 80

Computer Lab (Elementary)* 26

Computer Lab (Secondary) 33

Spec. Ed. - Severe 9

Spec. Ed. - Resource 0

Alternative Education 18

Portable 0

*These spaces do not contribute to capacity

Scheduling Factors

Elementary Schools 95.0%

Middle Schools 85.0%

High Schools 75.0%

Source: MGT of America, Inc., 2009.

Page 53: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

Caddo Parish School Board Capacity Calculations

Herndon Magnet SchoolES/M K-8

K-1 Classroom: 8

PK Classroom: 0

ES (2) Classroom: 4

ES (3-5) Classroom: 11

ART: 1

Secondary (6-12): 11

MU Inst: 1

MU Vocal: 2

Science: 2

GYM: 2

VO/TEC: 2

*Computer Lab: 2

SE - Resource: 7

SE - Severe: 0

Alt: 0

**Temp Bldg: 2

20

24

20

26

33

25

30

25

25

80

25

33

0

9

18

Room Type # of Classrooms x Students/Room = Capacity

Total Capacity (w/o scheduling factor) =

Herndon Magnet School Capacity =

x Scheduling factor =

0

96

160

286

275

33

30

50

50

160

50

66

0

0

0

0

*Computer Labs at Elementary Schools do not contribute to capacity**The temporary building number represents the number of temporary building teaching stations or rooms, not the number of temporary buildings.

1,068

1,256

85%

N/A

Page 54: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

Future Facility and Site Assessment Report

Page 55: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

FUTURE FACILITY AND SITE ASSESSMENT

School HERNDON MAGNET SCHOOL 11845 Gamm Road Belcher, LA 71004

Site Description 80 acre site (of which 45 acres are used by the school and 35 acres are leased out) in a rural area between Oil City and Hosston in the northeast part of the parish surrounded by farmland and oil wells and facing a 2-lane rural highway. The site is basically flat with a slight slope down to the northeast toward a bayou. The school complex consists of 1-story brick and flat roof buildings with double-loaded corridors in most classroom wings connected by covered walkways; classrooms have large window walls; there is a variety of wooden modular and temporary buildings. Site features include asphalt and gravel paving, surface drainage swales, lawns and a few trees, recreation fields, and paved tennis and basketball courts, and an on-site sewage treatment facility in the northeast corner.

SUMMARY Topic Grade Comments

Site Adequacy Adequate

Land for expansion of building is plentiful and without inhibiting constraints. SITE ASSESSMENT

Site Size Status Adequate

Student Capacity: 1068 Min. Acres Recommended: 21 Actual Site Acres: 45.0

Usable Area Remaining

Adequate

6.52 Acres. Approximates the reasonably usable land adjacent to the current facilities. Assumes major setbacks from property lines and roadways and aligns with building forms shown on graphic. Secondary area would not consume recreation fields or courts.

• Flood Plain No Constraint

• Potable Water No Constraint Pressure may be low.

• Sanitary Sewer Possible Constraint

CPSB to confirm capability of onsite treatment facility.

• Storm Drainage Needs Improvement

General site drainage adequate but numerous localized flooding locations.

• Electricity No Constraint

• Natural Gas No Constraint

• Ground Water No Constraint

• Air Pollution No Constraint

• HazMat/Soils No Constraint

• Habitats No Constraint No conflicts identified by DEQ

Ease of Access No Constraint

Ease of Traffic Flow Needs

Improvement

Bus and auto traffic use same entrance road but diverge into separated pick-up/drop-off areas. Localized flooding occurs at these areas and along the roadways.

Design Compatibility No Constraint

The school facility fits into the rural setting; expansion or replacement would not be intrusive.

Compatibility of Structures

No Constraint

The scheme of 1-story buildings with interior corridors and multiple wings or “houses” is generally compatible with contemporary design approaches to schools although the 1960’s aesthetic is not desirable, does not adequately support today’s building systems, and the open connections are not secure. The austere brick façade with high strip windows tucked under covered walkways could be blended with modern styling with masonry and high-tech glazing to provide a compatible yet contemporary appearance for any expansion or addition.

Page 56: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

HE

RN

DO

N M

AG

NE

T S

CH

OO

L

11845 G

am

mR

oad

Belc

her, L

A 7

1004

GA

MM

RO

AD

N

+FH

Auto

Dro

p-o

ff

SEWAGE TREATMENT

DRAINFIELD/OXIDATION POND

Primary 1: 0.66 Ac

Primary 2: 0.29 Ac

Primary 3: 0.48 Ac

Primary 4: 0.48 Ac

Primary 5: 0.53 Ac

Primary 6: 0.50 Ac

Secondary 1: 3.58Ac

Total: 6.52 Ac

Parkin

g

Primary 1

Primary 2

Primary 3

Primary 4

Primary 5

Primary 6

Secondary

E

E

E T

Bus Drop-off

Parkin

g

Parking

Total Usable

Site Area: 6.52 AcDETAILED VIEW

Pu

blis

he

d 0

1.2

9.1

0

Page 57: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

Building Code Verification Report

Page 58: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

Building Code Number COMPLYNOT

COMPLY

FCA

DEFICIENCY

NOT

KNOWN

SYSTEM

NOT

PRESENT

NA TO FCA

DATA

1Code of Federal Regulations 28 CFR Part

36, 1994 edition, Paragraph 4.1.2,

Paragraph 4.1.6

1 NPFA 101:15.2.3.2; IBC 1017.2

3 IBC 1005.2

5

a

b

c

d

6

a

b

1

2

4 IBC 1011.5.3

1 IBC 1007.3

2 IBC 1020.1

3

Hazardous storage?

Janitor’s closet?

Science labs?

IBC 1008.1.8.1

7

8

Boiler and furnace rooms?

Are corridor doors rated a minimum 20-minute rating?

Is glazing in rated doors above 20 minutes limited to 100 square inches?

NFPA 101:15.3.7

NFPA 101:15.3.2.1; IBC 508.2

Does every room or space greater than 250 SF and used for educational

purposes have not less than one outside window for emergency rescue

(exceptions: sprinklered building or room that has a door directly to the

outside)?

Do doors opening in the path of egress travel not reduce the required width to

less than 1/2 during the course of the swing?

When fully open, do corridor doors not project more than 7 inches into the

required corridor width?

Is the building subdivided into compartments by smoke partitions having not

less than a 1-hour fire rating? (Maximum area of compartment is 30,000 SF.

Length or width of building exceeds 300’ unless sprinklered.)

IBC 715.4.4.1

Is 1-hour rating or sprinkler protection provided for the following:

3

School Name: Herndon Magnet ES/MS

IBC 1005.2

NFPA101:15.2.11.1.1

IBC 1017.1

G2030 Pedestrian Paving

B2020 Exterior Windows

4

BUILDING CODE COMPLIANCE REPORT

Code Provision

Is there a continuous path of entry/exit for handicap accessibility to all parts of

the building?

Do exit access corridors have not less than 6’ of clear width?

Are both 1-hour rating and sprinkler protection provided for the following:

2

Does all door hardware comply by not requiring tight grasping, tight pinching or

twisting to operate?

Maintenance shops?

C10 Interior Construction

C1010 Partitions

C1020 Interior Doors

1

Are corridors 1-hour rated (exceptions: building is sprinklered or each room for

instruction has at least one door directly to the exterior)?

Where there is a chiller, is it separated from a boiler or water heater by a 2-

hour assembly?IBC 508.2

Laundries? NFPA 101:15.3.2.1; IBC 508.2

NFPA 101:7.1.3.2.1; IBC 1020.1.2

C2010 Stair Construction

Are all means of egress illuminated at all times building is occupied?

Do exit stairways have a minimum 48” clearance width between handrails?

Are stairs separated by 1-hour fire resistance rating?

Are penetrations into stairs limited to doors, electrical conduit serving the

stairway, piping necessary for the heating or cooling of the exit enclosure,

sprinkler piping, standpipes and penetrations for fire alarm circuits?

Page 59: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

Building Code Number COMPLYNOT

COMPLY

FCA

DEFICIENCY

NOT

KNOWN

SYSTEM

NOT

PRESENT

NA TO FCA

DATACode Provision

4

a NFPA 101:7.2.2.2.4.2; IBC 1012.4

b IBC 1012.5

c NFPA 101:7.2.2.4.4.6; IBC 1012.1

d NFPA 101:7.2.2.4.4.2; IBC 1012.2

5 IBC 1007.6

1

2

1 IBC 508.2

2 IBC 1203.1

3INTERNATIONAL MECHANICAL CODE

2000, 606.4

4 IBC 908.6

1 IBC 903.2

1 IBC 907.2

4

Is there a telephone or intercom communication in the cab?

Is there a fireman control panel at the ground floor controls?

Are handrails:

IBC 3006.2

IBC 3003.2

Continuously graspable?

Between 34” and 38” above the surface of the tread?

Between 1-1/4” and 2” in diameter?

Returning to wall, guard or walking surface?

3 IBC 907.11

IBC 907.2.12.2

Does the shaft have exhaust directly to the outside, an access ladder to the pit,

and battery backup lighting in the shaft/pit?

Are the mechanical rooms separated by fire rated partitions from remainder of

building?

Is there a standard and emergency ventilation system provided?

Are there automatic sprinkler systems provided in assembly spaces with more

than 300 occupants?

2

Is there a refrigerant detection and alarm system provided?

Are there emergency shut-offs provided?

Are the duct smoke detectors connected to the building’s fire alarm control

panel?

Is there a monitored fire alarm system provided?

Does the operation of fire detector, sprinkler device or manual fire alarm box

immediately sounds an alert tone followed by voice instructions giving

approved information and directions for an evacuation?

IBC 3004.1; IBC 3006.1

D30 HVAC Systems

D40 Fire Protection

D4010 Sprinklers

D50 Electrical

D5030 Communications and Security

D10 Conveying

D1010 Elevators

3Does the Elevator Machine Room have ventilation or air conditioning to protect

controls from overheating?

Is there an Area of Refuge in the stairwell or in a vestibule entering the stair? Is

there a communication device there?

Page 60: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

Energy Conservation Opportunities Report

Page 61: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

System Energy Conservation FCA Deficiency Replacement Cost

SCHOOL TYPEENERGY CONSERVATION OPPORTUNITIES

Herndon Magnet School ES/MS

1956-1967 Buildings Roof Covering No No

Exterior Windows Yes Yes $391,280.00

Interior Lighting No No

Bldg Controls & Instrumentation Yes Yes $146,730.00

Heating No No

Other HVAC Systems (Ventilation) No No

Terminal & Package Units No No

Cooling No No

Site Exterior Lighting Yes Yes $133,499.00

Page 62: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

Facility Condition Assessment Reports

Page 63: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 1

Facility: \Elementary/Middle Schools\KeithvilleAddress: 12201 Mansfield Road, Keithville, LA 71047

Attributes: ***None***

General Information: Function: Elementary Middle Year Built:Gross Area: 172,850 S.F. Last Renovation:

Facility Description:

The Keithville Elementary/Middle School campus consists of one main school building and one ancillary building located at 12201 Mansfield Road in Keithville, Louisiana. The original campus was constructed in 1988. There have been no additions and no major renovations. Ancillary buildings on campus include the covered walkways. In addition to the buildings, the campus contains softball fields, tennis courts, and a football field. This report contains condition and adequacy data collected during the 2009/2010 Facility Condition Assessment (FCA). The detailed condition and deficiency statements are contained in this report.

Current Repair Cost: $4,904,297.00 Replacement Cost: $29,840,895.00 FCI: 16.43%

19-Feb-2010Keithville Elementary/Middle School

Page 64: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 2

Facility: \Elementary/Middle Schools\Keithville\1988 BuildingAddress: 12201 Mansfield Road, Keithville, LA 71047

Attributes: Number of Floors 2

General Information: Function: Elementary Middle Year Built: 1988Gross Area: 161,630 S.F. Last Renovation:

Facility Description:

The Keithville Elementary/Middle School Main Building is a 2-story building located at 12201 Mansfield Road in Keithville, Louisiana. There have been no additions and no major renovations, with exception of a partial roof replacement in 2007. This report contains condition and adequacy data collected during the 2009/2010 Facility Condition Assessment (FCA). The detailed condition and deficiency statements are contained in this report.

Energy conservation opportunities for this building include: 1) Addition of a building automation system would allow programs to improve operation and reduce energy use; 2) Exterior windows are steel frame, operable clear glass design. Installation of fixed, double pane, low e, thermal windows with thermal breaks would improve energy use and comfort; 3) New low flow plumbing fixtures would reduce water use; 4) A review of billing rate may justify addition of power factor correction capacitors; 5) Replacing HVAC system with more energy efficient models; and 6) Upgrade lighting with electronic ballasts and T-8 lamps.

ADA vertical access needs for this building have been addressed with the addition of an elevator for access to second floor classrooms.

Current Repair Cost: $4,640,656.00 Replacement Cost: $26,384,686.00 FCI: 17.59%

19-Feb-2010West Elevation

19-Feb-2010South Elevation

19-Feb-2010East Elevation

19-Feb-2010North Elevation

Page 65: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 3

Facility: \Elementary/Middle Schools\Keithville\1988 Building (continued)

Building Condition:

System Unit Price$

Unit of

Meas Qty Renewal% Renewal$ Life Installed

Calc Next

Renewal

Next

Renewal CI% Deficiency$ Replacement Value FCI%

Total $163.24 S.F. 161,630 106 $27,927,304 60 1989 1998 2010 37 $4,640,656 $26,384,690 18

Substructure $22.20 S.F. 161,630 100 $3,588,186 100 1988 $3,588,186

Foundations $22.20 S.F. 161,630 100 $3,588,186 100 1988 $3,588,186

Standard Foundations $10.20 S.F. 161,630 100 $1,648,626 100 1988 $1,648,626

Special Foundations $3.00 S.F. 161,630 100 $484,890 100 1988 $484,890

Slab on Grade $9.00 S.F. 161,630 100 $1,454,670 100 1988 $1,454,670

Basement Construction 0 0 0

Basement Excavation 0 0 0 0

Basement Walls 0 0 0 0

Shell $53.94 S.F. 161,630 103 $8,969,495 82 1989 2018 58 $8,718,323

Superstructure $24.00 S.F. 161,630 100 $3,879,120 100 1988 $3,879,120

Floor Construction $13.20 S.F. 161,630 100 $2,133,516 100 1988 $2,133,516

Roof Construction $10.80 S.F. 161,630 100 $1,745,604 100 1988 $1,745,604

Exterior Enclosure $20.40 S.F. 161,630 103 $3,394,230 78 1988 2018 27 $3,297,252

Exterior Walls $14.40 S.F. 161,630 100 $2,327,472 100 1988 $2,327,472

Exterior Windows $4.80 S.F. 161,630 110 $853,406 30 1988 2018 27 $775,824

Exterior Doors $1.20 S.F. 161,630 110 $213,352 30 1988 2018 27 $193,956

Roofing $9.54 S.F. 161,630 110 $1,696,145 50 1997 2027 77 $1,541,951

Roof Coverings - BUR $9.54 S.F. 74,164 110 $778,277 20 2007 2027 85 $707,525

Roof Coverings - EPDM 0 0 0 0

Roof Coverings - Standing

Seam Mettal

$9.54 S.F. 87,466 110 $917,868 75 1988 2063 71 $834,426

Roof Openings 0 0 0 0

Interiors $31.09 S.F. 161,630 108 $5,410,369 57 1990 1998 2015 40 $751,066 $5,024,313 15

Interior Construction $19.20 S.F. 161,630 106 $3,297,252 68 1988 2008 2015 30 $3,103,296

Partitions $10.80 S.F. 161,630 110 $1,920,164 100 1988 $1,745,604

Interior Doors $2.40 S.F. 161,630 80 $310,330 40 1988 2028 45 $387,912

Fittings $6.00 S.F. 161,630 110 $1,066,758 20 1988 2008 2015 25 $969,780

Stairs $2.58 S.F. 161,630 110 $458,706 100 1988 $417,005

Stair Construction $2.58 S.F. 161,630 110 $458,706 100 1988 $417,005

Interior Finishes $9.31 S.F. 161,630 110 $1,654,411 22 1992 1998 55 $751,066 $1,504,012 50

Wall Finishes - Ceramic &

Glazed

$4.42 S.F. 32,300 110 $156,900 30 1988 2018 27 $142,637

Wall Finishes - Paint $2.40 S.F. 129,330 110 $341,431 10 1988 1998 $341,431 $310,392 110

Floor Finishes - Carpet $2.76 S.F. 16,150 110 $49,031 8 2003 2011 12 $44,574

Floor Finishes - Ceramic &

Quarry Tile

$1.44 S.F. 32,300 110 $51,163 50 1988 2038 56 $46,512

Floor Finishes - Terrazzo $6.05 S.F. 8,080 110 $53,755 50 1988 2038 56 $48,868

Floor Finishes - VCT $3.60 S.F. 88,950 110 $352,242 15 2007 2022 80 $320,220

Floor Finishes - Wood $13.52 S.F. 16,150 110 $240,254 40 1988 2028 45 $218,413

Ceiling Finishes $2.30 S.F. 161,630 110 $409,635 20 1988 2008 $409,635 $372,396 110

Services $46.42 S.F. 161,630 110 $8,252,441 27 1989 1998 2010 26 $2,182,777 $7,502,220 29

Conveying $1.20 S.F. 161,630 110 $213,352 30 1988 2018 27 $193,956

Elevators and Lifts $1.20 S.F. 161,630 110 $213,352 30 1988 2018 27 $193,956

Plumbing $7.54 S.F. 161,630 110 $1,339,848 30 1988 2018 27 $15,254 $1,218,044 1

Plumbing Fixtures $5.89 S.F. 161,630 110 $1,047,556 30 1988 2018 27 $15,254 $952,324 2

Domestic Water Distribution $0.44 S.F. 161,630 110 $78,940 30 1988 2018 27 $71,764

Sanitary Waste $0.76 S.F. 161,630 110 $134,412 30 1988 2018 27 $122,192

Rain Water Drainage $0.19 S.F. 161,630 110 $34,136 30 1988 2018 27 $31,033

Other Plumbing Systems -

Natural Gas

$0.25 S.F. 161,630 110 $44,804 30 1988 2018 27 $40,731

HVAC $18.59 S.F. 161,630 110 $3,304,816 29 1988 2008 2010 27 $535,383 $3,004,379 18

Heat Generating Systems $3.47 S.F. 161,630 110 $616,586 30 1988 2018 27 $560,533

Cooling Generating Systems $3.00 S.F. 161,630 110 $533,379 30 1988 2018 2010 $533,379 $484,890 110

Distribution Systems & Exhaust

Systems

$9.12 S.F. 161,630 110 $1,621,472 30 1988 2018 27 $1,474,066

Terminal & Package Units 0 0 0 0 $2,004

Controls & Instrumentation $1.80 S.F. 161,630 110 $320,027 20 1988 2008 2015 25 $290,934

Other HVAC Systems/Equip -

Kitchen Hood

$1.20 S.F. 161,630 110 $213,352 30 1988 2018 27 $193,956

Fire Protection 0 0 0

Sprinklers 0 0 0 0

Electrical $19.09 S.F. 161,630 110 $3,394,425 24 1990 1998 25 $1,632,140 $3,085,841 53

Electrical Service/Distribution $2.27 S.F. 161,630 110 $403,235 30 1988 2018 27 $366,577

Branch Wiring $6.77 S.F. 161,630 110 $1,203,303 30 1988 2018 27 $1,093,912

Lighting $6.77 S.F. 161,630 110 $1,203,303 20 1988 2008 $1,203,303 $1,093,912 110

Communications and Security -

Public Address & Clock System

$1.54 S.F. 161,630 110 $273,090 20 1988 2008 $273,090 $248,264 110

Page 66: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 4

System Unit Price$

Unit of

Meas Qty Renewal% Renewal$ Life Installed

Calc Next

Renewal

Next

Renewal CI% Deficiency$ Replacement Value FCI%

Fire Alarm $0.88 S.F. 161,630 110 $155,747 10 2001 2011 10 $141,588

Security & CCTV $0.88 S.F. 161,630 110 $155,747 10 1988 1998 $155,747 $141,588 110

Other Electrical Systems -

Emergency Generator

0 0 0 0

Equipment & Furnishings $9.60 S.F. 161,630 110 $1,706,813 20 1988 2008 $1,706,813 $1,551,648 110

Equipment $6.00 S.F. 161,630 110 $1,066,758 20 1988 2008 $1,066,758 $969,780 110

Commercial Equipment $6.00 S.F. 161,630 110 $1,066,758 20 1988 2008 $1,066,758 $969,780 110

Institutional Equipment 0 0 0 0

Furnishings $3.60 S.F. 161,630 110 $640,055 20 1988 2008 $640,055 $581,868 110

Fixed Furnishings $3.60 S.F. 161,630 110 $640,055 20 1988 2008 $640,055 $581,868 110

Page 67: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 5

Facility: \Elementary/Middle Schools\Keithville\1988 Building (continued)

Renewal Schedule:

Systems 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020

Total $4,640,656 $210,921 $1,607,664 $8,658,125 $63,975 $668,165

Substructure

Foundations

Standard Foundations

Special Foundations

Slab on Grade

Basement Construction

Basement Excavation

Basement Walls

Shell $1,351,337

Superstructure

Floor Construction

Roof Construction

Exterior Enclosure $1,351,337

Exterior Walls

Exterior Windows $1,081,070

Exterior Doors $270,267

Roofing

Roof Coverings - BUR

Roof Coverings - EPDM

Roof Coverings - Standing Seam

Mettal

Roof Openings

Interiors $751,066 $50,502 $1,236,665 $198,757 $63,975 $458,855

Interior Construction $1,236,665

Partitions

Interior Doors

Fittings $1,236,665

Stairs

Stair Construction

Interior Finishes $751,066 $50,502 $198,757 $63,975 $458,855

Wall Finishes - Ceramic & Glazed $198,757

Wall Finishes - Paint $341,431 $458,855

Floor Finishes - Carpet $50,502 $63,975

Floor Finishes - Ceramic & Quarry

Tile

Floor Finishes - Terrazzo

Floor Finishes - VCT

Floor Finishes - Wood

Ceiling Finishes $409,635

Services $2,182,777 $160,419 $370,999 $7,108,031 $209,310

Conveying $270,267

Elevators and Lifts $270,267

Plumbing $15,254 $1,697,279

Plumbing Fixtures $15,254 $1,327,013

Domestic Water Distribution $99,999

Sanitary Waste $170,268

Rain Water Drainage $43,243

Other Plumbing Systems - Natural

Gas

$56,756

HVAC $535,383 $370,999 $3,105,372

Heat Generating Systems $781,073

Cooling Generating Systems $533,379

Distribution Systems & Exhaust

Systems

$2,054,032

Terminal & Package Units $2,004

Controls & Instrumentation $370,999

Other HVAC Systems/Equip -

Kitchen Hood

$270,267

Fire Protection

Sprinklers

Electrical $1,632,140 $160,419 $2,035,113 $209,310

Electrical Service/Distribution $510,805

Branch Wiring $1,524,308

Lighting $1,203,303

Page 68: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 6

Systems 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020

Communications and Security -

Public Address & Clock System

$273,090

Fire Alarm $160,419

Security & CCTV $155,747 $209,310

Other Electrical Systems -

Emergency Generator

Equipment & Furnishings $1,706,813

Equipment $1,066,758

Commercial Equipment $1,066,758

Institutional Equipment

Furnishings $640,055

Fixed Furnishings $640,055

Page 69: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 7

Facility: \Elementary/Middle Schools\Keithville\1988 Building (continued)

Deficiency Sheet:

Deficiency: Surveyor/Update: Somnath Das Fri, 04-Jun-2010Priority: 3Quantity: 1

Assembly: C3010 System: Wall Finishes - Paint Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: The painted wall finishes are worn, beyond expected life, and should be replaced.

Estimates:Raw Cost $284,526.00

Plus or (Minus) Additional Cost $0.00Total Estimated Amount $284,526.00

Deficiency: Surveyor/Update: Jane Gulley Fri, 04-Jun-2010Priority: 3Quantity: 1

Assembly: C3030 System: Ceiling Finishes Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: The ceiling finishes are stained, beyond expected life, and should be replaced.

Estimates:Raw Cost $341,362.56

Plus or (Minus) Additional Cost $0.00Total Estimated Amount $341,362.56

Page 70: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 8

Facility: \Elementary/Middle Schools\Keithville\ 1988 Building (continued)

Deficiency: Surveyor/Update: Phil Trenbath Sun, 07-Mar-2010Priority: 3Quantity: 2

Assembly: D2010 System: Plumbing Fixtures Material: Plumbing Fixtures Distress: Failing Category: Deferred Maintenance Correction: Replace Group Wash Fountain Note: Replace worn group wash fountains. Surfaces are deteriorated and hold bacteria.

Estimates:Raw Cost $12,711.70

Plus or (Minus) Additional Cost $0.00Total Estimated Amount $12,711.70

Deficiency: Surveyor/Update: Phil Trenbath Sun, 07-Mar-2010Priority: 3Quantity: 1

Assembly: D3030 System: Cooling Generating Systems Material: System Distress: Inadequate Category: Deferred Maintenance Correction: Renew System Note: The system has low pressure, R-11 chillers. This presents a potential environmental issue; therefore, the chillers

should be replaced.

Estimates:Raw Cost $444,482.50

Plus or (Minus) Additional Cost $0.00Total Estimated Amount $444,482.50

Page 71: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 9

Facility: \Elementary/Middle Schools\Keithville\ 1988 Building (continued)

Deficiency: Surveyor/Update: Phil Trenbath Fri, 04-Jun-2010Priority: 3Quantity: 1

Assembly: D3050 System: Terminal & Package Units Material: Terminal and Package Units Distress: Missing Category: Deferred Maintenance Correction: Install CRCU Note: FM console lacks independent cooling. Install CRCU.

Estimates:Raw Cost $1,670.00

Plus or (Minus) Additional Cost $0.00Total Estimated Amount $1,670.00

Deficiency: Surveyor/Update: Phil Trenbath Fri, 04-Jun-2010Priority: 3Quantity: 1

Assembly: D5020 System: Lighting Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: Lighting system, which is 34 w lamps with hard ballasts, is beyond expected useful life and should be replaced.

Estimates:Raw Cost $1,002,752.52

Plus or (Minus) Additional Cost $0.00Total Estimated Amount $1,002,752.52

Page 72: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 10

Facility: \Elementary/Middle Schools\Keithville\ 1988 Building (continued)

Deficiency: Surveyor/Update: Phil Trenbath Fri, 04-Jun-2010Priority: 3Quantity: 1

Assembly: D5030 System: Communications and Security - Public

Address & Clock System Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: The clock and PA system is beyond expected life and should be replaced. For integrity of the system, install

wiring in conduit.

Estimates:Raw Cost $227,575.04

Plus or (Minus) Additional Cost $0.00Total Estimated Amount $227,575.04

Deficiency: Surveyor/Update: Phil Trenbath Sun, 07-Mar-2010Priority: 3Quantity: 1

Assembly: D5030 System: Security & CCTV Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: CCTV system is inadequate, beyond expected useful life, and should be replaced. For integrity of system, install

wiring in conduit.

Estimates:Raw Cost $129,788.89

Plus or (Minus) Additional Cost $0.00Total Estimated Amount $129,788.89

Page 73: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 11

Facility: \Elementary/Middle Schools\Keithville\ 1988 Building (continued)

Deficiency: Surveyor/Update: Phil Trenbath Fri, 04-Jun-2010Priority: 3Quantity: 1

Assembly: E1010 System: Commercial Equipment Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: Commerical equipment, including the kitchen cooler, is beyond expected life and should be replaced.

Estimates:Raw Cost $888,965.00

Plus or (Minus) Additional Cost $0.00Total Estimated Amount $888,965.00

Deficiency: Surveyor/Update: Phil Trenbath Fri, 04-Jun-2010Priority: 3Quantity: 1

Assembly: E2010 System: Fixed Furnishings Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: Fixed furnishings, such as the base/wall cabinets, counter tops, window shades, and fixed seating, are worn,

beyond expected life, and should be replaced.

Estimates:Raw Cost $533,379.00

Plus or (Minus) Additional Cost $0.00Total Estimated Amount $533,379.00

Page 74: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 12

Facility: \Elementary/Middle Schools\Keithville\Basketball CourtsAddress: 12201 Mansfield Road, Keithville, LA 71047

Attributes: ***None***

General Information: Function: Elementary Middle Year Built: 1988Gross Area: 8,000 S.F. Last Renovation:

Facility Description:

The Basketball Courts at Keithville Elementary/Middle School are located at 12201 Mansfield Road in Keithville, Louisiana. There have been no additions and no renovations. This report contains condition and adequacy data collected during the 2009/2010 Facility Condition Assessment (FCA). The detailed condition and deficiency statements are contained in this report.

Current Repair Cost: $0.00 Replacement Cost: $75,456.00 FCI: 0.00%

19-Feb-2010Keithville Elementary/Middle School Basketball Courts

Page 75: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 13

Facility: \Elementary/Middle Schools\Keithville\Basketball Courts (continued)

Building Condition:

System Unit Price$

Unit of

Meas Qty Renewal% Renewal$ Life Installed

Calc Next

Renewal

Next

Renewal CI% Deficiency$ Replacement Value FCI%

Total $9.43 S.F. 8,000 109 $82,301 23 1988 2008 2015 25 0 $75,456

Special Construction $6.96 S.F. 8,000 110 $61,248 20 1988 2008 2015 25 $55,680

Special Construction $6.96 S.F. 8,000 110 $61,248 20 1988 2008 2015 25 $55,680

Special Structures - Basketball

Court - Concrete - Outdoor

$6.96 S.F. 8,000 110 $61,248 20 1988 2008 2015 25 $55,680

Building Sitework $2.47 S.F. 8,000 106 $21,053 33 1988 2018 27 $19,776

Site Preparation $0.11 S.F. 8,000 100 $864 100 1988 $864

Site Earthwork $0.11 S.F. 8,000 100 $864 100 1988 $864

Site Improvements $0.77 S.F. 8,000 100 $6,144 30 1988 2018 27 $6,144

Site Development - Fencing $0.77 S.F. 8,000 100 $6,144 30 1988 2018 27 $6,144

Site Electrical Utilities $1.60 S.F. 8,000 110 $14,045 30 1988 2018 27 $12,768

Site Lighting $1.60 S.F. 8,000 110 $14,045 30 1988 2018 27 $12,768

Page 76: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 14

Facility: \Elementary/Middle Schools\Keithville\Basketball Courts (continued)

Renewal Schedule:

Systems 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020

Total $71,003 $25,575

Special Construction $71,003

Special Construction $71,003

Special Structures - Basketball

Court - Concrete - Outdoor

$71,003

Building Sitework $25,575

Site Preparation

Site Earthwork

Site Improvements $7,783

Site Development - Fencing $7,783

Site Electrical Utilities $17,792

Site Lighting $17,792

Page 77: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 15

Facility: \Elementary/Middle Schools\Keithville\Basketball Courts (continued)

Deficiency Sheet:

*** No Deficiencies Found ***

Page 78: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 16

Facility: \Elementary/Middle Schools\Keithville\Covered WalkwaysAddress: 12201 Mansfield Road, Keithville, LA 71047

Attributes: ***None***

General Information: Function: Elementary Middle Year Built: 1988Gross Area: 11,220 S.F. Last Renovation:

Facility Description:

Engineered metal covered walkways connect the classrooms and provide some weather protection for the students.

Current Repair Cost: $0.00 Replacement Cost: $280,455.00 FCI: 0.00%

19-Feb-2010North Elevation

25-Feb-2010South Elevation

25-Feb-2010West Elevation

25-Feb-2010South Elevation

Page 79: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 17

Facility: \Elementary/Middle Schools\Keithville\Covered Walkways (continued)

Building Condition:

System Unit Price$

Unit of

Meas Qty Renewal% Renewal$ Life Installed

Calc Next

Renewal

Next

Renewal CI% Deficiency$ Replacement Value FCI%

Total $25.00 S.F. 11,220 100 $280,455 25 1988 2013 12 0 $280,455

Special Construction $25.00 S.F. 11,220 100 $280,455 25 1988 2013 12 $280,455

Special Construction $25.00 S.F. 11,220 100 $280,455 25 1988 2013 12 $280,455

Special Structures - Covered

Walkways Metal

$25.00 S.F. 11,220 100 $280,455 25 1988 2013 12 $280,455

Page 80: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 18

Facility: \Elementary/Middle Schools\Keithville\Covered Walkways (continued)

Renewal Schedule:

Systems 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020

Total $306,461

Special Construction $306,461

Special Construction $306,461

Special Structures - Covered

Walkways Metal

$306,461

Page 81: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 19

Facility: \Elementary/Middle Schools\Keithville\Covered Walkways (continued)

Deficiency Sheet:

*** No Deficiencies Found ***

Page 82: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 20

Facility: \Elementary/Middle Schools\Keithville\Football FieldAddress: 12201 Mansfield Road, Keithville, LA 71047

Attributes: ***None***

General Information: Function: Elementary Middle Year Built: 1988Gross Area: 57,600 S.F. Last Renovation:

Facility Description:

The Football Field at Keithville Elementary/Middle School is located at 12201 Mansfield Road in Keithville, Louisiana. There have been no additions and no renovations. This report contains condition and adequacy data collected during the 2009/2010 Facility Condition Assessment (FCA). The detailed condition and deficiency statements are contained in this report.

Current Repair Cost: $95,040.00 Replacement Cost: $149,990.00 FCI: 63.36%

19-Feb-2010Keithville Elementary/Middle School Football Field

Page 83: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 21

Facility: \Elementary/Middle Schools\Keithville\Football Field (continued)

Building Condition:

System Unit Price$

Unit of

Meas Qty Renewal% Renewal$ Life Installed

Calc Next

Renewal

Next

Renewal CI% Deficiency$ Replacement Value FCI%

Total $2.60 S.F. 57,600 106 $158,630 52 1988 2008 $95,040 $149,990 63

Special Construction $1.38 S.F. 57,600 110 $87,437 20 1988 2008 $87,437 $79,488 110

Special Construction $1.38 S.F. 57,600 110 $87,437 20 1988 2008 $87,437 $79,488 110

Special Facilities - Field -

Natural Turf

$1.38 S.F. 57,600 110 $87,437 20 1988 2008 $87,437 $79,488 110

Building Sitework $1.22 S.F. 57,600 101 $71,193 91 1988 2008 $7,603 $70,502 11

Site Preparation $1.10 S.F. 57,600 100 $63,590 100 1988 $63,590

Site Earthwork $1.10 S.F. 57,600 100 $63,590 100 1988 $63,590

Site Improvements $0.12 S.F. 57,600 110 $7,603 20 1988 2008 $7,603 $6,912 110

Site Development - Goal Post $0.12 S.F. 57,600 110 $7,603 20 1988 2008 $7,603 $6,912 110

Site Development -

Landscaping & Irrigation

0 0 0 0

Site Mechanical Utilities 0 0 0

Water Supply - Water Service 0 0 0 0

Site Electrical Utilities 0 0 0

Site Lighting 0 0 0 0

Page 84: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 22

Facility: \Elementary/Middle Schools\Keithville\Football Field (continued)

Renewal Schedule:

Systems 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020

Total $95,040

Special Construction $87,437

Special Construction $87,437

Special Facilities - Field - Natural

Turf

$87,437

Building Sitework $7,603

Site Preparation

Site Earthwork

Site Improvements $7,603

Site Development - Goal Post $7,603

Site Development - Landscaping &

Irrigation

Site Mechanical Utilities

Water Supply - Water Service

Site Electrical Utilities

Site Lighting

Page 85: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 23

Facility: \Elementary/Middle Schools\Keithville\Football Field (continued)

Deficiency Sheet:

Deficiency: Surveyor/Update: Somnath Das Sun, 07-Mar-2010Priority: 3Quantity: 1

Assembly: F1040 System: Special Facilities - Field - Natural Turf Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: The natural turf is in poor condition and should be replaced.

Estimates:Raw Cost $72,864.00

Plus or (Minus) Additional Cost $0.00Total Estimated Amount $72,864.00

Deficiency: Surveyor/Update: Somnath Das Fri, 19-Feb-2010Priority: 3Quantity: 1

Assembly: G2040 System: Site Development - Goal Post Material: System Distress: Beyond Expected Life Category: Capital Renewal Correction: Renew System Note: The goal posts are in poor condition and should be replaced.

Estimates:Raw Cost $6,336.00

Plus or (Minus) Additional Cost $0.00Total Estimated Amount $6,336.00

Page 86: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 24

Facility: \Elementary/Middle Schools\Keithville\SiteAddress: 12201 Mansfield Road, Keithville, LA 71047

Attributes: Site Area (in Acres) 32.5

General Information: Function: Elementary Middle Year Built: 1988Gross Area: 172,850 S.F. Last Renovation:

Facility Description:

The original site was constructed in 1988. There have been no additions to the site and no major renovations. Campus site features include paved driveways and parking lots, pedestrian pavement, flag pole, landscaping, and fencing. Site mechanical and electrical features include water, sewer, natural gas, and site lighting. This report contains condition and adequacy data collected during the 2009/2010 Facility Condition Assessment (FCA). The detailed condition and deficiency statements are contained in this report.

Current Repair Cost: $0.00 Replacement Cost: $2,584,453.00 FCI: 0.00%

05-Jan-2010Aerial Image of Keithville Elementary/Middle School

Page 87: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 25

Facility: \Elementary/Middle Schools\Keithville\Site (continued)

Building Condition:

System Unit Price$

Unit of

Meas Qty Renewal% Renewal$ Life Installed

Calc Next

Renewal

Next

Renewal CI% Deficiency$ Replacement Value FCI%

Total $14.95 S.F. 172,850 100 $2,584,455 33 1988 2008 2015 39 0 $2,584,455

Building Sitework $14.95 S.F. 172,850 100 $2,584,455 33 1988 2008 2015 39 $2,584,455

Site Improvements $8.50 S.F. 172,850 100 $1,468,534 28 1988 2008 2015 35 $1,468,534

Roadways $1.38 S.F. 172,850 100 $238,533 50 1988 2038 56 $238,533

Parking Lots $1.18 S.F. 172,850 100 $203,272 30 1988 2018 27 $203,272

Pedestrian Paving $0.82 S.F. 172,850 100 $141,046 50 1988 2038 56 $141,046

Site Development $3.86 S.F. 172,850 100 $667,892 20 1988 2008 2015 25 $667,892

Landscaping $1.26 S.F. 172,850 100 $217,791 10 1988 $217,791

Site Mechanical Utilities $4.86 S.F. 172,850 100 $840,052 44 1988 2018 48 $840,052

Water Supply $0.82 S.F. 172,850 100 $141,046 30 1988 2018 27 $141,046

Sanitary Sewer $0.41 S.F. 172,850 100 $70,523 30 1988 2018 27 $70,523

Storm Sewer $3.52 S.F. 172,850 100 $607,741 50 1988 2038 56 $607,741

Fuel Distribution $0.12 S.F. 172,850 100 $20,742 30 1988 2018 27 $20,742

Site Electrical Utilities $1.60 S.F. 172,850 100 $275,869 30 1988 2018 27 $275,869

Site Lighting $1.60 S.F. 172,850 100 $275,869 30 1988 2018 27 $275,869

Page 88: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 26

Facility: \Elementary/Middle Schools\Keithville\Site (continued)

Renewal Schedule:

Systems 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020

Total $774,270 $901,243

Building Sitework $774,270 $901,243

Site Improvements $774,270 $257,498

Roadways

Parking Lots $257,498

Pedestrian Paving

Site Development $774,270

Landscaping

Site Mechanical Utilities $294,283

Water Supply $178,672

Sanitary Sewer $89,336

Storm Sewer

Fuel Distribution $26,275

Site Electrical Utilities $349,462

Site Lighting $349,462

Page 89: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 27

Facility: \Elementary/Middle Schools\Keithville\Site (continued)

Deficiency Sheet:

*** No Deficiencies Found ***

Page 90: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 28

Facility: \Elementary/Middle Schools\Keithville\Softball FieldsAddress: 12201 Mansfield Road, Keithville, LA 71047

Attributes: ***None***

General Information: Function: Elementary Middle Year Built: 1988Gross Area: 80,502 S.F. Last Renovation:

Facility Description:

The Softball Fields at Keithville Elementary/Middle School are located at 12201 Mansfield Road in Keithville, Louisiana. There have been no additions and no renovations. This report contains condition and adequacy data collected during the 2009/2010 Facility Condition Assessment (FCA). The detailed condition and deficiency statements are contained in this report.

Current Repair Cost: $0.00 Replacement Cost: $199,967.00 FCI: 0.00%

19-Feb-2010Keithville Elementary/Middle School Softball Fields

Page 91: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 29

Facility: \Elementary/Middle Schools\Keithville\Softball Fields (continued)

Building Condition:

System Unit Price$

Unit of

Meas Qty Renewal% Renewal$ Life Installed

Calc Next

Renewal

Next

Renewal CI% Deficiency$ Replacement Value FCI%

Total $2.48 S.F. 80,502 106 $211,076 54 1988 2008 2015 25 0 $199,967

Special Construction $1.38 S.F. 80,502 110 $122,202 20 1988 2008 2015 25 $111,093

Special Construction $1.38 S.F. 80,502 110 $122,202 20 1988 2008 2015 25 $111,093

Special Facilities - Field -

Natural Turf

$1.38 S.F. 80,502 110 $122,202 20 1988 2008 2015 25 $111,093

Building Sitework $1.10 S.F. 80,502 100 $88,874 100 1988 $88,874

Site Preparation $1.10 S.F. 80,502 100 $88,874 100 1988 $88,874

Site Earthwork $1.10 S.F. 80,502 100 $88,874 100 1988 $88,874

Site Improvements 0 0 0

Site Development - Fencing;

Scoreboard

0 0 0 0

Site Development -

Landscaping & Irrigation

0 0 0 0

Site Mechanical Utilities 0 0 0

Water Supply - Water Service 0 0 0 0

Site Electrical Utilities 0 0 0

Site Lighting 0 0 0 0

Page 92: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 30

Facility: \Elementary/Middle Schools\Keithville\Softball Fields (continued)

Renewal Schedule:

Systems 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020

Total $141,666

Special Construction $141,666

Special Construction $141,666

Special Facilities - Field - Natural

Turf

$141,666

Building Sitework

Site Preparation

Site Earthwork

Site Improvements

Site Development - Fencing;

Scoreboard

Site Development - Landscaping &

Irrigation

Site Mechanical Utilities

Water Supply - Water Service

Site Electrical Utilities

Site Lighting

Page 93: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 31

Facility: \Elementary/Middle Schools\Keithville\Softball Fields (continued)

Deficiency Sheet:

*** No Deficiencies Found ***

Page 94: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 32

Facility: \Elementary/Middle Schools\Keithville\Tennis CourtAddress: 12201 Mansfield Road, Keithville, LA 71047

Attributes: ***None***

General Information: Function: Elementary Middle Year Built: 1988Gross Area: 14,400 S.F. Last Renovation:

Facility Description:

The Tennis Court at Keithville Elementary/Middle School is located at 12201 Mansfield Road in Keithville, Louisiana. There have been no additions and no renovations. This report contains condition and adequacy data collected during the 2009/2010 Facility Condition Assessment (FCA). The detailed condition and deficiency statements are contained in this report.

Current Repair Cost: $168,601.00 Replacement Cost: $165,888.00 FCI: 101.64%

19-Feb-2010Keithville Elementary/Middle School Tennis Court

Page 95: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 33

Facility: \Elementary/Middle Schools\Keithville\Tennis Court (continued)

Building Condition:

System Unit Price$

Unit of

Meas Qty Renewal% Renewal$ Life Installed

Calc Next

Renewal

Next

Renewal CI% Deficiency$ Replacement Value FCI%

Total $11.52 S.F. 14,400 109 $181,215 21 1988 2008 27 $168,601 $165,888 102

Special Construction $10.64 S.F. 14,400 110 $168,601 20 1988 2008 $168,601 $153,274 110

Special Construction $10.64 S.F. 14,400 110 $168,601 20 1988 2008 $168,601 $153,274 110

Special Structures - Tennis

Court Hard Surface

$10.64 S.F. 14,400 110 $168,601 20 1988 2008 $168,601 $153,274 110

Building Sitework $0.88 S.F. 14,400 100 $12,614 39 1988 2018 27 $12,614

Site Preparation $0.11 S.F. 14,400 100 $1,555 100 1988 $1,555

Site Earthwork $0.11 S.F. 14,400 100 $1,555 100 1988 $1,555

Site Improvements $0.77 S.F. 14,400 100 $11,059 30 1988 2018 27 $11,059

Site Development - Fencing $0.77 S.F. 14,400 100 $11,059 30 1988 2018 27 $11,059

Site Electrical Utilities 0 0 0

Site Lighting 0 0 0 0

Page 96: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 34

Facility: \Elementary/Middle Schools\Keithville\Tennis Court (continued)

Renewal Schedule:

Systems 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020

Total $168,601 $14,009

Special Construction $168,601

Special Construction $168,601

Special Structures - Tennis Court

Hard Surface

$168,601

Building Sitework $14,009

Site Preparation

Site Earthwork

Site Improvements $14,009

Site Development - Fencing $14,009

Site Electrical Utilities

Site Lighting

Page 97: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 35

Facility: \Elementary/Middle Schools\Keithville\Tennis Court (continued)

Deficiency Sheet:

Deficiency: Surveyor/Update: Somnath Das Fri, 04-Jun-2010Priority: 3Quantity: 1

Assembly: F1010 System: Special Structures - Tennis Court Hard

Surface Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: The tennis court surface is in poor condition and should be replaced.

Estimates:Raw Cost $140,500.80

Plus or (Minus) Additional Cost $0.00Total Estimated Amount $140,500.80

Page 98: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Survey Report

Deficiency Detail ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 1

Facility

Name Assembly System Material Distress Correction Qty Unit Raw Cost

Additional

Cost Total Cost Priority Def. Cat. Location / Note

Caddo Parish School District $4,086,914 $817,383 $4,904,297 Elementary/Middle Schools $4,086,914 $817,383 $4,904,297 Keithville $4,086,914 $817,383 $4,904,297 1988 Building $3,867,213 $773,443 $4,640,656 Building Systems $3,867,213 $773,443 $4,640,656

C3010 Wall Finishes - Paint

System Beyond Expected Life

Renew System 1 Ea. $284,526 $56,905 $341,431 Necessary- 2-5 Yrs

Deferred Maintenance

The painted wall finishes are worn, beyond expected life, and should be replaced.

D5020 Lighting System Beyond Expected Life

Renew System 1 Ea. $1,002,753 $200,551 $1,203,303 Necessary- 2-5 Yrs

Deferred Maintenance

Lighting system, which is 34 w lamps with hard ballasts, is beyond expected useful life and should be replaced.

D5030 Communications and Security - Public Address & Clock System

System Beyond Expected Life

Renew System 1 Ea. $227,575 $45,515 $273,090 Necessary- 2-5 Yrs

Deferred Maintenance

The clock and PA system is beyond expected life and should be replaced. For integrity of the system, install wiring in conduit.

D5030 Security & CCTV System Beyond Expected Life

Renew System 1 Ea. $129,789 $25,958 $155,747 Necessary- 2-5 Yrs

Deferred Maintenance

CCTV system is inadequate, beyond expected useful life, and should be replaced. For integrity of system, install wiring in conduit.

E1010 Commercial Equipment

System Beyond Expected Life

Renew System 1 Ea. $888,965 $177,793 $1,066,758 Necessary- 2-5 Yrs

Deferred Maintenance

Commerical equipment, including the kitchen cooler, is beyond expected life and should be replaced.

E2010 Fixed Furnishings

System Beyond Expected Life

Renew System 1 Ea. $533,379 $106,676 $640,055 Necessary- 2-5 Yrs

Deferred Maintenance

Fixed furnishings, such as the base/wall cabinets, counter tops, window shades, and fixed seating, are worn, beyond expected life, and should be replaced.

D3030 Cooling Generating Systems

System Inadequate Renew System 1 Ea. $444,483 $88,897 $533,379 Necessary- 2-5 Yrs

Deferred Maintenance

The system has low pressure, R-11 chillers. This presents a potential environmental issue; therefore, the chillers should be replaced.

D3050 Terminal & Package Units

Terminal and Package Units

Missing Install CRCU 1 Each $1,670 $334 $2,004 Necessary- 2-5 Yrs

Deferred Maintenance

FM console lacks independent cooling. Install CRCU.

D2010 Plumbing Fixtures

Plumbing Fixtures

Failing Replace Group Wash Fountain

2 Ea. $12,712 $2,542 $15,254 Necessary- 2-5 Yrs

Deferred Maintenance

Replace worn group wash fountains. Surfaces are deteriorated and hold bacteria.

C3030 Ceiling Finishes System Beyond Expected Life

Renew System 1 Ea. $341,363 $68,273 $409,635 Necessary- 2-5 Yrs

Deferred Maintenance

The ceiling finishes are stained, beyond expected life, and should be replaced.

Football Field $79,200 $15,840 $95,040 Building Systems $79,200 $15,840 $95,040

F1040 Special Facilities - Field - Natural Turf

System Beyond Expected Life

Renew System 1 Ea. $72,864 $14,573 $87,437 Necessary- 2-5 Yrs

Deferred Maintenance

The natural turf is in poor condition and should be replaced.

G2040 Site Development - Goal Post

System Beyond Expected Life

Renew System 1 Ea. $6,336 $1,267 $7,603 Necessary- 2-5 Yrs

Capital Renewal

The goal posts are in poor condition and should be replaced.

Page 99: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Survey Report

Deficiency Detail ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 2

Facility

Name Assembly System Material Distress Correction Qty Unit Raw Cost

Additional

Cost Total Cost Priority Def. Cat. Location / Note

Tennis Court $140,501 $28,100 $168,601 Building Systems $140,501 $28,100 $168,601

F1010 Special Structures - Tennis Court Hard Surface

System Beyond Expected Life

Renew System 1 Ea. $140,501 $28,100 $168,601 Necessary- 2-5 Yrs

Deferred Maintenance

The tennis court surface is in poor condition and should be replaced.

Page 100: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

Functional and Educational Adequacy

Suitability Report

Page 101: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

Suitability Report - Full

Project:Site:

Suitability

Possible

Score

Score

Percent

Score

CaddoCounty:

1Region:

Rating

315Site #:

Caddo 2009 Keithville Elementary-Midd

Project #:

4057

Site Type: Site Size:Grade Config:

K-8 0.00ES/MS

Suitability - K-8

Site

3.00 3.00 100.00 TrafficGood

1.00 1.00 100.00 Pedestrian TrafficGood

1.35 1.35 100.00 ParkingGood

1.64 0.54 33.00 Play Courts & FieldsPoor

Safety and Security

1.22 0.82 67.00 FencingFair

0.15 0.15 100.00 Signage & Way FindingGood

3.00 3.00 100.00 Ease of SupervisionG/F

0.50 0.50 100.00 Limited EntrancesG/F

0.50 0.50 100.00 Interior CirculationG/F

School Climate

5.00 5.00 100.00 Learning Style VarietyG/F

5.00 5.00 100.00 School EnvironmentG/F

1.00 1.00 100.00 LandscapingG/F

General Classrooms

12.95 8.68 67.00 SizeFair

2.78 2.78 100.00 AdjacenciesGood

2.78 1.86 67.00 Storage\Fixed Equip.Fair

Remedial - Special Needs

3.17 3.17 100.00 SizeGood

0.68 0.68 100.00 AdjacenciesG/F

0.68 0.00 0.00 Storage\Fixed Equip.P/U

Library

2.43 2.43 100.00 SizeGood

0.52 0.52 100.00 AdjacenciesG/F

0.52 0.52 100.00 Storage\Fixed Equip.G/F

P.E.

8.40 4.20 50.00 SizeFair

1.80 1.80 100.00 AdjacenciesG/F

1.80 1.80 100.00 Storage\Fixed Equip.G/F

Music

2.64 2.64 100.00 SizeGood

0.57 0.00 0.00 AdjacenciesP/U

0.57 0.00 0.00 Storage\Fixed Equip.P/U

Art

Page 1 of 43/9/2010 2:17:21PM

Page 102: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

Project:Site:

Suitability

Possible

Score

Score

Percent

Score

CaddoCounty:

1Region:

Rating

315Site #:

Caddo 2009 Keithville Elementary-Midd

Project #:

4057

Site Type: Site Size:Grade Config:

K-8 0.00ES/MS

1.53 1.53 100.00 SizeGood

0.33 0.33 100.00 AdjacenciesG/F

0.33 0.33 100.00 Storage\Fixed Equip.G/F

Performing Arts\Auditorium

1.64 1.10 67.00 SizeFair

0.35 0.35 100.00 AdjacenciesGood

0.35 0.35 100.00 Storage\Fixed Equip.Good

Vocational Technical

0.00 0.00 0.00 Size(N/A)

0.00 0.00 0.00 Adjacencies(N/A)

0.00 0.00 0.00 Storage\Fixed Equip.(N/A)

Science

2.70 1.35 50.00 SizeFair

0.58 0.58 100.00 AdjacenciesGood

0.58 0.58 100.00 Storage\Fixed Equip.G/F

Kindergarten

1.18 1.18 100.00 SizeGood

0.25 0.25 100.00 AdjacenciesG/F

0.25 0.25 100.00 Storage\Fixed Equip.G/F

Administration

1.59 0.79 50.00 SizeFair

0.34 0.34 100.00 AdjacenciesG/F

0.34 0.00 0.00 Storage\Fixed Equip.P/U

0.91 0.91 100.00Good Restrooms (Student)

0.91 0.45 50.00Fair Teacher Lounge and Work Room(s)

5.00 1.65 33.00Poor Cafeteria

7.84 7.84 100.00Good Food Prep

0.41 0.20 50.00Fair Counseling

0.34 0.34 100.00G/F Clinic

0.50 0.50 100.00G/F Custodial & Maintenance

93.88 74.14 78.98Total For Site:

Comments

Suitability - K-8

This is a rural combined elementary/middle school with an auditorium, three gyms, two adjacent cafeteria.

Suitability - K-8->Site-->Play Courts & Fields

They have a football field and softball field used for practice and some competition. Some play and recreation

areas are in the Caddo Parish park on adjacent school district land.

Suitability - K-8->Safety and Security-->Fencing

The entire elementary school playground area is fenced in together despite ECE, Pre-k and k-2 age student play

equipment and PE activity differences.

Suitability - K-8->Safety and Security-->Interior Circulation

They have one-way stairwell pedestrian traffic, and long straight corridors in all academic wings.

Page 2 of 43/9/2010 2:17:21PM

Page 103: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

Project:Site:

Suitability

Possible

Score

Score

Percent

Score

CaddoCounty:

1Region:

Rating

315Site #:

Caddo 2009 Keithville Elementary-Midd

Project #:

4057

Site Type: Site Size:Grade Config:

K-8 0.00ES/MS

Suitability - K-8->General Classrooms-->Size

Most classrooms are between 750-850sf.

Suitability - K-8->General Classrooms-->Storage\Fixed Equip.

Some rooms need more storage space, and others need relocated or more electrical hookups, and computer drops.

Suitability - K-8->Remedial - Special Needs-->Storage\Fixed Equip.

Several remedial, special ed and resource rooms need more storage space.

Suitability - K-8->Library

The elementary and middle school library are adjoining spaces separated by office, work space, storage and reading

rooms.

Suitability - K-8->Library-->Size

The combined library spaces exceeds 5,000sf, excluding office space and work rooms.

Suitability - K-8->P.E.

There is an auxiliary gym (for middle school use), a large competitive gym, and a small elementary school gym for

PE.

Suitability - K-8->P.E.-->Size

The gym space for elementary school students is small.

Suitability - K-8->P.E.-->Storage\Fixed Equip.

The elementary school gym has a tile floor, and very little storage space.

Suitability - K-8->Music

The school has a large band room (2,100sf) with storage/practice rooms, office space, and instrument storage

room. It also has a good size (1,400sf) elementary school music room.

Suitability - K-8->Music-->Adjacencies

There is a classroom next door to the band room in what was once vocational/technical space.

Suitability - K-8->Music-->Storage\Fixed Equip.

The elementary school music room needs more storage.

Suitability - K-8->Art

The art classroom is large with two adjacent storage/work rooms, one with a kiln.

Suitability - K-8->Art-->Size

The main art classroom is over 800sf.

Suitability - K-8->Performing Arts\Auditorium

The auditorium seats between 550-650 with stage, sound system, and lighting system.

Suitability - K-8->Performing Arts\Auditorium-->Size

The auditorium seats about half the current student body.

Suitability - K-8->Performing Arts\Auditorium-->Storage\Fixed Equip.

It needs some better on-stage lighting for podium presentations. There are ready rooms, storage and bathrooms

near the stage.

Suitability - K-8->Science

There are a series of science classrooms, work space, and storage area, but not typical labs.

Suitability - K-8->Science-->Size

Each room is about 750-850sf.

Suitability - K-8->Administration-->Size

The main office and subsequent administrative office suite space needs more storage areas.

Page 3 of 43/9/2010 2:17:21PM

Page 104: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

Project:Site:

Suitability

Possible

Score

Score

Percent

Score

CaddoCounty:

1Region:

Rating

315Site #:

Caddo 2009 Keithville Elementary-Midd

Project #:

4057

Site Type: Site Size:Grade Config:

K-8 0.00ES/MS

Suitability - K-8->Administration-->Storage\Fixed Equip.

Some additional work and storage space needed. Secure space for test storage is lacking.

Suitability - K-8->Teacher Lounge and Work Room(s)

The teacher break area needs some additional lounge/work space for staff of this size. This area becomes very

crowded at lunch.

Suitability - K-8->Cafeteria

There are two adjacent cafeterias (ES & MS). The school serves lunch during a number of serving periods.

Elementary school students need age appropriate hand washing unit.

Suitability - K-8->Counseling

The counseling suite needs more conference room or small meeting spaces for parent/student encounters.

Suitability - K-8->Clinic

There is a designated room in the administrative suite with two cots and locking storage. A bathroom is around the

corner.

Page 4 of 43/9/2010 2:17:21PM

Page 105: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

Functional and Educational Adequacy

Technology Readiness Report

Page 106: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

Technology Readiness Report - Full

Project:Site:

Technology Readiness

Possible

ScoreScore

Percent

Score

CaddoCounty:

1Region:

Rating

315Site #:

Caddo 2009 Keithville Elementary-Middl

Project #:

4057

Technology Readiness

15.00 15.00 100.00 Comm/IT Equipment Environment Good

10.00 5.00 50.00 Electrical Power Fair

10.00 10.00 100.00 Cooling Good

10.00 10.00 100.00 Drops & Wireless Good

15.00 15.00 100.00 LAN Connectivity Good

10.00 10.00 100.00 WAN Backbone Good

10.00 6.70 67.00 LAN-WAN Performance Fair

5.00 2.50 50.00 Video Distribution Fair

5.00 2.50 50.00 Voice Distribution Fair

10.00 10.00 100.00 Faculty & Staff Technology Good

100.00 86.70 86.70Total For Site:

Comments

Technology Readiness->Electrical Power

Some rooms are in need of more or relocated electrical outlets. They currently use a number of extension cords or

power strips for computers.

Technology Readiness->LAN-WAN Performance

There are some problems with speed and capacity of connections.

Technology Readiness->Video Distribution

The middle school rooms are OK, but the elementary school rooms are not connected to Channel One.

Technology Readiness->Voice Distribution

Communication to the classrooms and throughout the school via an old PA system, and walkie-talkies to

administrative personnel.

Page 1 of 13/9/2010 2:02:59PM

Page 107: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

Functional and Educational Adequacy

Capacity and Utilization Report

Page 108: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

Capacity Calculations Appendix Preface Some spaces do not contribute to the functional capacity of a school. These spaces are generally spaces

which do not have students assigned to them. Some examples of these spaces include elementary art

rooms, elementary computer labs, elementary music rooms, and special education resource rooms.

Many schools have temporary buildings and these are also not included in the calculation of the

functional capacity. It is the district’s philosophy that, while temporary buildings can be useful in the

short run, they do not provide appropriate long term space and should be eliminated where possible.

Temporary buildings are generally used for the following functions:

1. To house students in temporary classrooms when the school is lacking enough classrooms

2. To house special programs when the school is lacking space for these programs

3. To house necessary storage or administrative support functions when permanent space is lacking

4. To house unnecessary storage or functions

It is the district’s strategy to eliminate all but the absolute necessary temporary buildings and it should

conduct an inventory of the uses of temporary buildings. Where the inventory identifies uses 1-3, the

district will need to consider a more appropriate space solution. In the case of number 4, the district will

need to ensure the principal of the school discontinues the inappropriate use of the temporary building.

Page 109: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

Caddo Parish School Board

Instructional Space Model Guidelines

Room Type Students/

Room

Pre-School 20

K Capacity (full day) and 1st Grade 20

Elementary Classroom (2) 24

Elementary Classroom (3-5) 26

Secondary Classroom (6-12) 25

Art (Secondary) 33

Music (Secondary) - Vocal 25

Music (Secondary) - Instrumental 30

Science Lab (Secondary) 25

Voc./Industrial Tech, Foods, Etc. 25

Gym (Secondary) 80

Computer Lab (Elementary)* 26

Computer Lab (Secondary) 33

Spec. Ed. - Severe 9

Spec. Ed. - Resource 0

Alternative Education 18

Portable 0

*These spaces do not contribute to capacity

Scheduling Factors

Elementary Schools 95.0%

Middle Schools 85.0%

High Schools 75.0%

Source: MGT of America, Inc., 2009.

Page 110: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

Caddo Parish School Board Capacity Calculations

Keithville Elementary-MiddleES/M K-8

K-1 Classroom: 8

PK Classroom: 1

ES (2) Classroom: 4

ES (3-5) Classroom: 14

ART: 3

Secondary (6-12): 23

MU Inst: 1

MU Vocal: 1

Science: 1

GYM: 3

VO/TEC: 1

*Computer Lab: 2

SE - Resource: 12

SE - Severe: 0

Alt: 0

**Temp Bldg: 0

20

24

20

26

33

25

30

25

25

80

25

33

0

9

18

Room Type # of Classrooms x Students/Room = Capacity

Total Capacity (w/o scheduling factor) =

Keithville Elementary-Middle Capacity =

x Scheduling factor =

20

96

160

364

575

99

30

25

25

240

25

66

0

0

0

0

*Computer Labs at Elementary Schools do not contribute to capacity**The temporary building number represents the number of temporary building teaching stations or rooms, not the number of temporary buildings.

1,466

1,725

85%

N/A

Page 111: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

Future Facility and Site Assessment Report

Page 112: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

FUTURE FACILITY AND SITE ASSESSMENT

School KEITHVILLE ELEMENTARY/MIDDLE SCHOOL 12201 Mansfield Road Keithville, LA 71047

Site Description 32.5 acre site in a rural town at the south end of the parish facing State Highway 171, aka Mansfield Road. The site is surrounded by woodlands and farmland with scattered single-family residences. The site slopes gently from the highway on the west to the east toward a bayou and lowlands. The school consists of a group of special purpose, 2-story brick veneer buildings with standing seam metal roofs; there are no additions. Site features include concrete paving for parking lots, driveways, and service roads; large open yards and recreation fields with a sprinkling of pine trees, drainage swales, basketball and tennis courts; a water well system supplying potable water and fire protection, and an on-site sewage treatment facility with oxidation ponds.

SUMMARY Topic Grade Comments

Site Adequacy Potential Constraint

Land for expansion of building is plentiful and without inhibiting constraints. SITE ASSESSMENT

Site Size Status Adequate

Student Capacity: 1466 Min. Acres Recommended: 25 Actual Site Acres: 32.5

Usable Area Remaining

Adequate

3.32 Acres. Approximate. Illustrates reasonable use of extra land, locates facilities adjacent to existing buildings as shown on graphic and stays away from the sewage facility; secondary areas would consume part of unstructured recreation yard and tennis courts and destroy a stand of trees.

• Flood Plain Potential Constraint

FEMA data not available.

• Potable Water Potential Constraint

Low pressure reported. CPSB needs to confirm capability of on-site well system to accept an increased load.

• Sanitary Sewer No Constraint

CPSB needs to confirm capability of on-site sewage treatment facility to accept an increased load.

• Storm Drainage No Constraint

• Electricity No Constraint

• Natural Gas No Constraint

• Ground Water No Constraint

• Air Pollution No Constraint

• HazMat/Soils No Constraint

• Habitats No Constraint No conflicts identified by DEQ.

Ease of Access No Constraint

Ease of Traffic Flow No Constraint Bus and auto traffic is separated.

Design Compatibility No Constraint

The school facility fits into the rural residential neighborhood; expansion or replacement would not be intrusive.

Compatibility of Structures

No Constraint The 1988 structures appear to be compatible with contemporary design approaches.

Page 113: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

KE

ITH

VIL

LE

EL

EM

EN

TA

RY

/ MID

DL

E S

CH

OO

L12201 M

an

sfie

ld R

dK

eith

ville

, LA

71047

Pu

blis

he

d 0

2.2

6.1

0

Primary 1: 0.85 Ac

Primary 2: 0.41 Ac

Secondary 1: 1.11 Ac

Secondary 2: 0.95 Ac

Total: 3.32 Ac

BA

RR

ON

RD

OLD MANSFIELD RD

N

U.S

. HIG

HW

AY

17

1

WOODLANDS Recreation

Fields

Water

Well

Parking

Sewage

Treatment

Plant

Open YardSlight

Slope

Slight

Slope

G

S

Auto

Dro

p-O

ff

+FH

Bus D

rop-O

ff

GM

+FHG

G

F

F

F

F

F

F

F

F

F

Primary 2

Primary 1

+FH

+FH

F

F

SD

SD

SDSD

FM

FM FM

FM

FM

FMF

F

+FH

SD

SD

SD

SD

SD

SD

SD

SD

W

W

W

W

W

W

W

SD

SD

W

SDSD

F

F F

F

RURAL RESIDENTIAL

RURAL RESIDENTIAL

WOODLANDS

FARMLAND

Lift

StationW SD

F

Secondary

1 Secondary

2

F

Page 114: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

Building Code Verification Report

Page 115: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

Building Code Number COMPLYNOT

COMPLY

FCA

DEFICIENCY

NOT

KNOWN

SYSTEM

NOT

PRESENT

NA TO FCA

DATA

1Code of Federal Regulations 28 CFR Part

36, 1994 edition, Paragraph 4.1.2,

Paragraph 4.1.6

1 NPFA 101:15.2.3.2; IBC 1017.2

3 IBC 1005.2

5

a

b

c

d

6

a

b

1

2

4 IBC 1011.5.3

1 IBC 1007.3

2 IBC 1020.1

NFPA 101:7.1.3.2.1; IBC 1020.1.2

C2010 Stair Construction

Are all means of egress illuminated at all times building is occupied?

Do exit stairways have a minimum 48” clearance width between handrails?

Are stairs separated by 1-hour fire resistance rating?

Are penetrations into stairs limited to doors, electrical conduit serving the

stairway, piping necessary for the heating or cooling of the exit enclosure,

sprinkler piping, standpipes and penetrations for fire alarm circuits?

Does all door hardware comply by not requiring tight grasping, tight pinching or

twisting to operate?

Maintenance shops?

C10 Interior Construction

C1010 Partitions

C1020 Interior Doors

1

Are corridors 1-hour rated (exceptions: building is sprinklered or each room for

instruction has at least one door directly to the exterior)?

Where there is a chiller, is it separated from a boiler or water heater by a 2-

hour assembly?IBC 508.2

Laundries? NFPA 101:15.3.2.1; IBC 508.2

School Name: Keithville ES/MS

IBC 1005.2

NFPA101:15.2.11.1.1

IBC 1017.1

G2030 Pedestrian Paving

B2020 Exterior Windows

4

BUILDING CODE COMPLIANCE REPORT

Code Provision

Is there a continuous path of entry/exit for handicap accessibility to all parts of

the building?

Do exit access corridors have not less than 6’ of clear width?

Are both 1-hour rating and sprinkler protection provided for the following:

2

IBC 1008.1.8.1

7

8

Boiler and furnace rooms?

Are corridor doors rated a minimum 20-minute rating?

Is glazing in rated doors above 20 minutes limited to 100 square inches?

NFPA 101:15.3.7

NFPA 101:15.3.2.1; IBC 508.2

Does every room or space greater than 250 SF and used for educational

purposes have not less than one outside window for emergency rescue

(exceptions: sprinklered building or room that has a door directly to the

outside)?

Do doors opening in the path of egress travel not reduce the required width to

less than 1/2 during the course of the swing?

When fully open, do corridor doors not project more than 7 inches into the

required corridor width?

Is the building subdivided into compartments by smoke partitions having not

less than a 1-hour fire rating? (Maximum area of compartment is 30,000 SF.

Length or width of building exceeds 300’ unless sprinklered.)

IBC 715.4.4.1

Is 1-hour rating or sprinkler protection provided for the following:

3

3

Hazardous storage?

Janitor’s closet?

Science labs?

Page 116: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

Building Code Number COMPLYNOT

COMPLY

FCA

DEFICIENCY

NOT

KNOWN

SYSTEM

NOT

PRESENT

NA TO FCA

DATACode Provision

4

a NFPA 101:7.2.2.2.4.2; IBC 1012.4

b IBC 1012.5

c NFPA 101:7.2.2.4.4.6; IBC 1012.1

d NFPA 101:7.2.2.4.4.2; IBC 1012.2

5 IBC 1007.6

1

2

1 IBC 508.2

2 IBC 1203.1

3INTERNATIONAL MECHANICAL CODE

2000, 606.4

4 IBC 908.6

1 IBC 903.2

1 IBC 907.2

D10 Conveying

D1010 Elevators

3Does the Elevator Machine Room have ventilation or air conditioning to protect

controls from overheating?

Is there an Area of Refuge in the stairwell or in a vestibule entering the stair? Is

there a communication device there?

Continuously graspable?

Between 34” and 38” above the surface of the tread?

Between 1-1/4” and 2” in diameter?

Returning to wall, guard or walking surface?

3 IBC 907.11

IBC 907.2.12.2

Does the shaft have exhaust directly to the outside, an access ladder to the pit,

and battery backup lighting in the shaft/pit?

Are the mechanical rooms separated by fire rated partitions from remainder of

building?

Is there a standard and emergency ventilation system provided?

Are there automatic sprinkler systems provided in assembly spaces with more

than 300 occupants?

2

Is there a refrigerant detection and alarm system provided?

Are there emergency shut-offs provided?

Are the duct smoke detectors connected to the building’s fire alarm control

panel?

Is there a monitored fire alarm system provided?

Does the operation of fire detector, sprinkler device or manual fire alarm box

immediately sounds an alert tone followed by voice instructions giving

approved information and directions for an evacuation?

IBC 3004.1; IBC 3006.1

D30 HVAC Systems

D40 Fire Protection

D4010 Sprinklers

D50 Electrical

D5030 Communications and Security

4

Is there a telephone or intercom communication in the cab?

Is there a fireman control panel at the ground floor controls?

Are handrails:

IBC 3006.2

IBC 3003.2

Page 117: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

Energy Conservation Opportunities Report

Page 118: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

System Energy Conservation FCA Deficiency Replacement Cost

SCHOOL TYPEENERGY CONSERVATION OPPORTUNITIES

Keithville Elementary/Middle ES/MS

1988 Building Roof Covering No No

Exterior Windows No No

Interior Lighting Yes Yes $1,203,303.00

Bldg Controls & Instrumentation No No

Heating No No

Other HVAC Systems (Ventilation) No No

Terminal & Package Units Yes Yes $2,004.00

Cooling Yes Yes $533,379.00

Site Exterior Lighting No No

Page 119: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

Facility Condition Assessment Reports

Page 120: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 1

Facility: \Elementary/Middle Schools\TurnerAddress: 5904 West 70th Street, Shreveport, LA 71129

Attributes: Temporary Building Rooms 8

General Information: Function: Elementary Middle Year Built:Gross Area: 202,576 S.F. Last Renovation:

Facility Description:

The Turner Elementary/Middle School campus consist one main building located at 5904 West 70th Street in Shreveport, Louisiana. The original campus was constructed in 1984. An addition to the main school building was constructed in 2006. Ancillary buildings adjacent to the campus include the Nursing Staff Center, which preceded the school in 1975 and has a covered storage structure. In addition to the buildings, the campus contains covered walkways, a football field with bleachers (no stadium), and two outdoor basketball courts which are not in use. This report contains condition and adequacy data collected during the 2009/2010 Facility Condition Assessment (FCA). The detailed condition and deficiency statements are contained in this report.

Current Repair Cost: $8,091,184.00 Replacement Cost: $32,953,941.00 FCI: 24.55%

01-Feb-2010Turner Elementary/Middle School

Page 121: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 2

Facility: \Elementary/Middle Schools\Turner\1975 Nursing Staff CenterAddress: 5904 West 70th Street, Shreveport, LA 71129

Attributes: Number of Floors 1

General Information: Function: Elementary Middle Year Built: 1975Gross Area: 8,698 S.F. Last Renovation:

Facility Description:

The Nursing Staff Center at Turner Elementary/Middle School consists of four 1-story buildings located at West 70th Street (east of the Turner School building) in Shreveport, Louisiana. The center serves the school nurses for Caddo Parish School District. There have been no additions and no major renovations, although HVAC upgrades are scheduled for 2010 and the covered storage shelter behind the Nursing Staff Center is scheduled to be demolished in 2010. This report contains condition and adequacy data collected during the 2009/2010 Facility Condition Assessment (FCA). The detailed condition and deficiency statements are contained in this report.

Current Repair Cost: $433,972.00 Replacement Cost: $1,297,081.00 FCI: 33.46%

01-Feb-2010South Elevation

01-Feb-2010West Elevation

01-Feb-2010North Elevation

01-Feb-2010East Elevation

Page 122: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 3

Facility: \Elementary/Middle Schools\Turner\1975 Nursing Staff Center (continued)

Building Condition:

System Unit Price$

Unit of

Meas Qty Renewal% Renewal$ Life Installed

Calc Next

Renewal

Next

Renewal CI% Deficiency$ Replacement Value FCI%

Total $149.12 S.F. 8,698 107 $1,381,903 53 1982 1995 2010 83 $433,970 $1,297,080 33

Substructure $19.20 S.F. 8,698 100 $167,002 100 1975 $167,002

Foundations $19.20 S.F. 8,698 100 $167,002 100 1975 $167,002

Standard Foundations $10.20 S.F. 8,698 100 $88,720 100 1975 $88,720

Special Foundations S.F. 8,698 100 100 1975

Slab on Grade $9.00 S.F. 8,698 100 $78,282 100 1975 $78,282

Basement Construction 0 0 0

Basement Excavation 0 0 0 0

Basement Walls 0 0 0 0

Shell $40.74 S.F. 8,698 104 $367,872 83 1975 2005 2010 53 $57,406 $354,356 16

Superstructure $10.80 S.F. 8,698 100 $93,938 100 1975 $93,938

Floor Construction 0 0 0 0

Roof Construction $10.80 S.F. 8,698 100 $93,938 100 1975 $93,938

Exterior Enclosure $20.40 S.F. 8,698 103 $182,657 78 1975 2005 2010 $57,406 $177,439 32

Exterior Walls $14.40 S.F. 8,698 100 $125,251 100 1975 $125,251

Exterior Windows $4.80 S.F. 8,698 110 $45,925 30 1975 2005 2010 $45,925 $41,750 110

Exterior Doors $1.20 S.F. 8,698 110 $11,481 30 1975 2005 2010 $11,481 $10,438 110

Roofing $9.54 S.F. 8,698 110 $91,277 75 1975 2050 53 $82,979

Roof Coverings - BUR 0 0 0 0

Roof Coverings - EPDM 0 0 0 0

Roof Coverings - Standing

Seam Mettal

$9.54 S.F. 8,698 110 $91,277 75 1975 2050 53 $82,979

Roof Openings 0 0 0 0

Interiors $27.50 S.F. 8,698 107 $256,889 52 1982 1995 2010 33 $108,959 $239,229 46

Interior Construction $19.20 S.F. 8,698 106 $177,439 68 1975 1995 2010 12 $57,407 $167,001 34

Partitions $10.80 S.F. 8,698 110 $103,332 100 1975 $93,938

Interior Doors $2.40 S.F. 8,698 80 $16,700 40 1975 2015 2015 12 $20,875

Fittings $6.00 S.F. 8,698 110 $57,407 20 1975 1995 2010 $57,407 $52,188 110

Stairs 0 0 0

Stair Construction 0 0 0 0

Interior Finishes $8.30 S.F. 8,698 110 $79,450 15 1989 1995 2010 46 $51,552 $72,228 71

Wall Finishes - 2009 Paint $2.40 S.F. 760 110 $2,006 10 2009 2019 90 $1,824

Wall Finishes - Original Paint $2.40 S.F. 7,938 110 $20,956 10 1995 2005 2013 30 $19,051

Floor Finishes - 2009 VCT $3.60 S.F. 760 110 $3,010 15 2009 2024 93 $2,736

Floor Finishes - Carpet 0 0 0 0

Floor Finishes - Ceramic &

Quarry Tile

0 0 0 0

Floor Finishes - Original VCT $3.60 S.F. 7,938 110 $31,434 15 1990 2005 2010 $31,434 $28,577 110

Ceiling Finishes - 2009 $2.30 S.F. 760 110 $1,926 20 2009 2029 95 $1,751

Ceiling Finishes -Original $2.30 S.F. 7,938 110 $20,118 20 1975 1995 2010 $20,118 $18,289 110

Services $58.08 S.F. 8,698 110 $555,696 22 1987 1995 98 $236,171 $505,180 47

Conveying 0 0 0

Elevators and Lifts 0 0 0 0

Plumbing $7.34 S.F. 8,698 110 $70,265 30 1975 2005 $70,265 $63,879 110

Plumbing Fixtures $5.89 S.F. 8,698 110 $56,373 30 1975 2005 $56,373 $51,249 110

Domestic Water Distribution $0.44 S.F. 8,698 110 $4,248 30 1975 2005 $4,248 $3,862 110

Sanitary Waste $0.76 S.F. 8,698 110 $7,233 30 1975 2005 $7,233 $6,576 110

Rain Water Drainage S.F. 0 0 0 0

Other Plumbing Systems -

Natural Gas

$0.25 S.F. 8,698 110 $2,411 30 1975 2005 $2,411 $2,192 110

HVAC $32.52 S.F. 8,698 110 $311,144 19 2010 2025 100 $282,859

Heat Generating Systems 0 0 0 0

Cooling Generating Systems 0 0 0 0

Distribution Systems & Exhaust

Systems

$9.12 S.F. 8,698 110 $87,258 30 2010 2040 100 $79,326

Terminal & Package Units $21.60 S.F. 8,698 110 $206,664 15 2010 2025 100 $187,877

Controls & Instrumentation $1.80 S.F. 8,698 110 $17,222 20 2010 2030 100 $15,656

Other HVAC Systems/Equip -

Kitchen Hood

0 0 0 0

Fire Protection 0 0 0

Sprinklers 0 0 0 0

Electrical $18.22 S.F. 8,698 110 $174,287 24 1983 1995 20 $165,906 $158,442 105

Electrical Service/Distribution $2.27 S.F. 8,698 110 $21,700 30 1975 2005 $21,700 $19,727 110

Branch Wiring $6.77 S.F. 8,698 110 $64,755 30 1975 2005 $64,755 $58,868 110

Lighting $6.77 S.F. 8,698 110 $64,755 20 1975 1995 $64,755 $58,868 110

Communications and Security -

Public Address & Clock System

0 0 0 0

Fire Alarm $1.54 S.F. 8,698 110 $14,696 10 1990 2000 $14,696 $13,360 110

Page 123: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 4

System Unit Price$

Unit of

Meas Qty Renewal% Renewal$ Life Installed

Calc Next

Renewal

Next

Renewal CI% Deficiency$ Replacement Value FCI%

Security & CCTV $0.88 S.F. 8,698 110 $8,381 10 2002 2012 20 $7,619

Other Electrical Systems -

Emergency Generator

0 0 0 0

Equipment & Furnishings $3.60 S.F. 8,698 110 $34,444 20 1978 1995 95 $31,434 $31,313 100

Equipment 0 0 0

Commercial Equipment 0 0 0 0

Institutional Equipment 0 0 0 0

Furnishings $3.60 S.F. 8,698 110 $34,444 20 1978 1995 95 $31,434 $31,313 100

Fixed Furnishings - 2009 $3.60 S.F. 760 110 $3,010 20 2009 2029 95 $2,736

Fixed Furnishings - Original $3.60 S.F. 7,938 110 $31,434 20 1975 1995 $31,434 $28,577 110

Page 124: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 5

Facility: \Elementary/Middle Schools\Turner\1975 Nursing Staff Center (continued)

Renewal Schedule:

Systems 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020

Total $433,970 $8,892 $22,900 $19,360 $2,618 $19,750

Substructure

Foundations

Standard Foundations

Special Foundations

Slab on Grade

Basement Construction

Basement Excavation

Basement Walls

Shell $57,406

Superstructure

Floor Construction

Roof Construction

Exterior Enclosure $57,406

Exterior Walls

Exterior Windows $45,925

Exterior Doors $11,481

Roofing

Roof Coverings - BUR

Roof Coverings - EPDM

Roof Coverings - Standing Seam

Mettal

Roof Openings

Interiors $108,959 $22,900 $19,360 $2,618

Interior Construction $57,407 $19,360

Partitions

Interior Doors $19,360

Fittings $57,407

Stairs

Stair Construction

Interior Finishes $51,552 $22,900 $2,618

Wall Finishes - 2009 Paint $2,618

Wall Finishes - Original Paint $22,900

Floor Finishes - 2009 VCT

Floor Finishes - Carpet

Floor Finishes - Ceramic & Quarry

Tile

Floor Finishes - Original VCT $31,434

Ceiling Finishes - 2009

Ceiling Finishes -Original $20,118

Services $236,171 $8,892 $19,750

Conveying

Elevators and Lifts

Plumbing $70,265

Plumbing Fixtures $56,373

Domestic Water Distribution $4,248

Sanitary Waste $7,233

Rain Water Drainage

Other Plumbing Systems - Natural

Gas

$2,411

HVAC

Heat Generating Systems

Cooling Generating Systems

Distribution Systems & Exhaust

Systems

Terminal & Package Units

Controls & Instrumentation

Other HVAC Systems/Equip -

Kitchen Hood

Fire Protection

Sprinklers

Electrical $165,906 $8,892 $19,750

Electrical Service/Distribution $21,700

Branch Wiring $64,755

Lighting $64,755

Page 125: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 6

Systems 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020

Communications and Security -

Public Address & Clock System

Fire Alarm $14,696 $19,750

Security & CCTV $8,892

Other Electrical Systems -

Emergency Generator

Equipment & Furnishings $31,434

Equipment

Commercial Equipment

Institutional Equipment

Furnishings $31,434

Fixed Furnishings - 2009

Fixed Furnishings - Original $31,434

Page 126: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 7

Facility: \Elementary/Middle Schools\Turner\1975 Nursing Staff Center (continued)

Deficiency Sheet:

Deficiency: Surveyor/Update: Eric Altman Fri, 04-Jun-2010Priority: 3Quantity: 1

Assembly: B2020 System: Exterior Windows Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: The exterior windows are worn, beyond expected life, and should be replaced.

Estimates:Raw Cost $38,271.20

Plus or (Minus) Additional Cost $0.00Total Estimated Amount $38,271.20

Deficiency: Surveyor/Update: Eric Altman Fri, 04-Jun-2010Priority: 3Quantity: 1

Assembly: B2030 System: Exterior Doors Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: The exterior doors are worn, beyond expected life, and should be replaced.

Estimates:Raw Cost $9,567.80

Plus or (Minus) Additional Cost $0.00Total Estimated Amount $9,567.80

Page 127: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 8

Facility: \Elementary/Middle Schools\Turner\ 1975 Nursing Staff Center (continued)

Deficiency: Surveyor/Update: Eric Altman Fri, 04-Jun-2010Priority: 3Quantity: 1

Assembly: C1030 System: Fittings Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: Fittings, such as chalk and tack boards, lockers, toilet and bath accessories, toilet partitions, and shelving, are

beyond expected life and should be replaced.

Estimates:Raw Cost $47,839.00

Plus or (Minus) Additional Cost $0.00Total Estimated Amount $47,839.00

Deficiency: Surveyor/Update: Eric Altman Fri, 04-Jun-2010Priority: 3Quantity: 1

Assembly: C3020 System: Floor Finishes - Original VCT Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: The VCT floor finishes are worn, beyond expected life, and should be replaced.

Estimates:Raw Cost $26,195.40

Plus or (Minus) Additional Cost $0.00Total Estimated Amount $26,195.40

Page 128: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 9

Facility: \Elementary/Middle Schools\Turner\ 1975 Nursing Staff Center (continued)

Deficiency: Surveyor/Update: Eric Altman Fri, 04-Jun-2010Priority: 3Quantity: 1

Assembly: C3030 System: Ceiling Finishes -Original Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: The ceiling finishes are beyond expected life and should be replaced.

Estimates:Raw Cost $16,765.06

Plus or (Minus) Additional Cost $0.00Total Estimated Amount $16,765.06

Deficiency: Surveyor/Update: Eric Altman Fri, 04-Jun-2010Priority: 3Quantity: 1

Assembly: D2010 System: Plumbing Fixtures Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: Plumbing fixtures are old, beyond expected life, and should be replaced.

Estimates:Raw Cost $46,977.90

Plus or (Minus) Additional Cost $0.00Total Estimated Amount $46,977.90

Page 129: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 10

Facility: \Elementary/Middle Schools\Turner\ 1975 Nursing Staff Center (continued)

Deficiency: Surveyor/Update: Eric Altman Fri, 04-Jun-2010Priority: 3Quantity: 1

Assembly: D2020 System: Domestic Water Distribution Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: Domestic water distribution system is beyond expected life and should be replaced.

Estimates:Raw Cost $3,540.09

Plus or (Minus) Additional Cost $0.00Total Estimated Amount $3,540.09

Deficiency: Surveyor/Update: Eric Altman Fri, 04-Jun-2010Priority: 3Quantity: 1

Assembly: D2030 System: Sanitary Waste Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: Sanitary waste is beyond expected life and should be replaced.

Estimates:Raw Cost $6,027.71

Plus or (Minus) Additional Cost $0.00Total Estimated Amount $6,027.71

Page 130: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 11

Facility: \Elementary/Middle Schools\Turner\ 1975 Nursing Staff Center (continued)

Deficiency: Surveyor/Update: Eric Altman Fri, 04-Jun-2010Priority: 3Quantity: 1

Assembly: D2090 System: Other Plumbing Systems - Natural Gas Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: System is old, beyond expected life, and should be replaced.

Estimates:Raw Cost $2,009.24

Plus or (Minus) Additional Cost $0.00Total Estimated Amount $2,009.24

Deficiency: Surveyor/Update: Eric Altman Fri, 04-Jun-2010Priority: 3Quantity: 1

Assembly: D5010 System: Electrical Service/Distribution Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: Electrical service/distribution is beyond expected life and should be replaced. Three-phase panelboard was not

accessible at time of field assessment.

Estimates:Raw Cost $18,083.14

Plus or (Minus) Additional Cost $0.00Total Estimated Amount $18,083.14

Page 131: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 12

Facility: \Elementary/Middle Schools\Turner\ 1975 Nursing Staff Center (continued)

Deficiency: Surveyor/Update: Eric Altman Thu, 03-Jun-2010Priority: 3Quantity: 1

Assembly: D5020 System: Branch Wiring Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: Branch wiring is beyond expected life and should be replaced.

Estimates:Raw Cost $53,962.39

Plus or (Minus) Additional Cost $0.00Total Estimated Amount $53,962.39

Deficiency: Surveyor/Update: Eric Altman Fri, 04-Jun-2010Priority: 3Quantity: 1

Assembly: D5020 System: Lighting Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: Lighting system is beyond expected life and should be replaced.

Estimates:Raw Cost $53,962.39

Plus or (Minus) Additional Cost $0.00Total Estimated Amount $53,962.39

Page 132: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 13

Facility: \Elementary/Middle Schools\Turner\ 1975 Nursing Staff Center (continued)

Deficiency: Surveyor/Update: Eric Altman Fri, 04-Jun-2010Priority: 3Quantity: 1

Assembly: D5030 System: Fire Alarm Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: The fire alarm system is beyond expected life and should be replaced.

Estimates:Raw Cost $12,246.78

Plus or (Minus) Additional Cost $0.00Total Estimated Amount $12,246.78

Deficiency: Surveyor/Update: Kate McPhillips Fri, 04-Jun-2010Priority: 3Quantity: 1

Assembly: E2010 System: Fixed Furnishings - Original Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: Fixed furnishings, such as the base/wall cabinets, counter tops, window shades, and fixed seating, are worn,

beyond expected life, and should be replaced.

Estimates:Raw Cost $26,195.40

Plus or (Minus) Additional Cost $0.00Total Estimated Amount $26,195.40

Page 133: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 14

Facility: \Elementary/Middle Schools\Turner\1984 BuildingAddress: 5904 West 70th Street, Shreveport, LA 71129

Attributes: Number of Floors 2

General Information: Function: Elementary Middle Year Built: 1984Gross Area: 172,891 S.F. Last Renovation:

Facility Description:

Turner Elementary/Middle School is a 2-story building located at 5904 West 70th Street in Shreveport, Louisiana. There have been no additions and no major renovations. This report contains condition and adequacy data collected during the 2009/2010 Facility Condition Assessment (FCA). The detailed condition and deficiency statements are contained in this report.

Energy conservation opportunities for this building include: 1) Installation of fixed, double pane, low e, thermal windows with thermal breaks would improve energy use and comfort; 2) Upon replacement of the roof covering, an insulation with a high thermal resistance value should be installed; 3) The plumbing fixtures should be replaced with low flow, energy efficient models; 4) Install high efficiency equipment, including boilers and chillers; 5) Addition of a building automation system would allow programs to improve operation and reduce energy use; 6) A power factor analysis may be justified to provide greater electrical consumption efficiency; and 7) Installation of high efficiency HID (high intensity discharge) lamps and ballasts, plus effective use of lighting controls (timers or photo cells) would, with proper maintenance, improve site lighting effectiveness and reduce electrical energy consumption.

ADA vertical access needs for this facility has been addressed by an elevator that provides access to upper floors and provisions of access to the stage and front entry.

Current Repair Cost: $6,235,572.00 Replacement Cost: $25,666,923.00 FCI: 24.29%

01-Feb-2010South Elevation

01-Feb-2010West Elevation

01-Feb-2010North Elevation

01-Feb-2010East Elevation

Page 134: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 15

Facility: \Elementary/Middle Schools\Turner\1984 Building (continued)

Building Condition:

System Unit Price$

Unit of

Meas Qty Renewal% Renewal$ Life Installed

Calc Next

Renewal

Next

Renewal CI% Deficiency$ Replacement Value FCI%

Total $148.46 S.F. 172,891 106 $27,278,669 54 1989 1992 2010 31 $6,235,572 $25,666,924 24

Substructure $19.20 S.F. 172,891 100 $3,319,507 100 1984 $3,319,507

Foundations $19.20 S.F. 172,891 100 $3,319,507 100 1984 $3,319,507

Standard Foundations $10.20 S.F. 172,891 100 $1,763,488 100 1984 $1,763,488

Special Foundations S.F. 0 0 0 0

Slab on Grade $9.00 S.F. 172,891 100 $1,556,019 100 1984 $1,556,019

Basement Construction 0 0 0

Basement Excavation 0 0 0 0

Basement Walls 0 0 0 0

Shell $44.43 S.F. 172,891 104 $7,951,942 71 1987 2004 2010 13 $1,814,318 $7,682,232 24

Superstructure $14.43 S.F. 172,891 100 $2,495,503 100 1984 $2,495,503

Floor Construction $13.20 S.F. 47,597 100 $628,280 100 1984 $628,280

Roof Construction $10.80 S.F. 172,891 100 $1,867,223 100 1984 $1,867,223

Exterior Enclosure $20.40 S.F. 172,891 103 $3,630,710 78 1984 2014 13 $3,526,976

Exterior Walls $14.40 S.F. 172,891 100 $2,489,630 100 1984 $2,489,630

Exterior Windows $4.80 S.F. 172,891 110 $912,864 30 1984 2014 13 $829,877

Exterior Doors $1.20 S.F. 172,891 110 $228,216 30 1984 2014 13 $207,469

Roofing $9.60 S.F. 172,891 110 $1,825,729 15 1993 2004 2010 13 $1,814,318 $1,659,753 109

Roof Coverings - BUR $9.54 S.F. 9,533 110 $100,039 20 1984 2004 $100,039 $90,945 110

Roof Coverings - EPDM $9.54 S.F. 163,358 110 $1,714,279 15 2003 2018 2010 $1,714,279 $1,558,435 110

Roof Coverings - Standing

Seam Mettal

0 0 0 0

Roof Openings $0.06 S.F. 172,891 110 $11,411 30 1984 2014 13 $10,373

Interiors $30.68 S.F. 172,891 108 $5,710,109 57 1989 1992 2014 55 $1,623,371 $5,304,172 31

Interior Construction $19.20 S.F. 172,891 106 $3,526,977 68 1984 2004 35 $1,141,081 $3,319,507 34

Partitions $10.80 S.F. 172,891 110 $2,053,945 100 1984 $1,867,223

Interior Doors $2.40 S.F. 172,891 80 $331,951 40 1984 2024 35 $414,938

Fittings $6.00 S.F. 172,891 110 $1,141,081 20 1984 2004 $1,141,081 $1,037,346 110

Stairs $2.58 S.F. 172,891 110 $490,665 100 1984 $446,059

Stair Construction $2.58 S.F. 172,891 110 $490,665 100 1984 $446,059

Interior Finishes $8.90 S.F. 172,891 110 $1,692,467 19 1996 1992 2014 60 $482,290 $1,538,606 31

Wall Finishes - Ceramic &

Glazed

$4.42 S.F. 13,484 110 $65,500 20 1984 2004 2014 20 $59,545

Wall Finishes - Paint $2.40 S.F. 159,407 110 $420,834 10 2005 2015 50 $382,577

Floor Finishes - Carpet $2.76 S.F. 9,102 110 $27,634 8 1984 1992 $27,634 $25,122 110

Floor Finishes - Ceramic &

Quarry Tile

$1.44 S.F. 13,484 110 $21,359 50 1984 2034 48 $19,417

Floor Finishes - Terrazzo $6.05 S.F. 4,340 110 $28,873 50 1984 2034 48 $26,248

Floor Finishes - VCT $3.60 S.F. 138,111 110 $546,920 15 2005 2020 67 $16,481 $497,200 3

Floor Finishes - Wood $16.57 S.F. 7,854 110 $143,172 50 2002 2052 84 $130,156

Ceiling Finishes $2.30 S.F. 172,891 110 $438,175 20 1984 2004 $438,175 $398,341 110

Services $43.34 S.F. 172,891 110 $8,243,166 27 1991 1999 29 $743,938 $7,493,790 10

Conveying $1.20 S.F. 172,891 110 $228,216 30 2000 2030 67 $207,469

Elevators and Lifts $1.20 S.F. 172,891 110 $228,216 30 2000 2030 67 $207,469

Plumbing $7.54 S.F. 172,891 110 $1,433,197 30 1984 2014 13 $1,302,908

Plumbing Fixtures $5.89 S.F. 172,891 110 $1,120,541 30 1984 2014 13 $1,018,674

Domestic Water Distribution $0.44 S.F. 172,891 110 $84,440 30 1984 2014 13 $76,764

Sanitary Waste $0.76 S.F. 172,891 110 $143,776 30 1984 2014 13 $130,706

Rain Water Drainage $0.19 S.F. 172,891 110 $36,515 30 1984 2014 13 $33,195

Other Plumbing Systems -

Natural Gas

$0.25 S.F. 172,891 110 $47,925 30 1984 2014 13 $43,569

HVAC $15.12 S.F. 172,891 110 $2,875,523 29 1987 2004 16 $400,992 $2,614,112 15

Heat Generating Systems 0 0 0 0

Cooling Generating Systems $3.00 S.F. 172,891 110 $570,540 30 1984 2014 13 $31,790 $518,673 6

Distribution Systems & Exhaust

Systems

$9.12 S.F. 172,891 110 $1,734,443 30 1984 2014 13 $26,878 $1,576,766 2

Terminal & Package Units 0 0 0 0

Controls & Instrumentation $1.80 S.F. 172,891 110 $342,324 20 1984 2004 $342,324 $311,204 110

Other HVAC Systems/Equip -

Kitchen Hood

$1.20 S.F. 172,891 110 $228,216 30 1995 2025 50 $207,469

Fire Protection 0 0 0

Sprinklers 0 0 0 0

Electrical $19.49 S.F. 172,891 110 $3,706,230 23 1996 1999 42 $342,946 $3,369,301 10

Electrical Service/Distribution $2.27 S.F. 172,891 110 $431,328 30 1984 2014 13 $392,117

Branch Wiring $6.77 S.F. 172,891 110 $1,287,139 30 1984 2014 13 $1,170,126

Lighting $6.77 S.F. 172,891 110 $1,287,139 20 2004 2024 70 $1,170,126

Communications and Security -

Public Address & Clock System

$0.88 S.F. 172,891 110 $166,598 20 2005 2025 75 $267,635 $151,453 177

Page 135: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 16

System Unit Price$

Unit of

Meas Qty Renewal% Renewal$ Life Installed

Calc Next

Renewal

Next

Renewal CI% Deficiency$ Replacement Value FCI%

Fire Alarm $1.54 S.F. 172,891 110 $292,117 10 2007 2017 70 $265,561

Security & CCTV $0.88 S.F. 172,891 110 $166,598 10 2005 2015 50 $151,453

Other Electrical Systems -

Emergency Generator

$0.40 S.F. 172,891 110 $75,311 15 1984 1999 $75,311 $68,465 110

Equipment & Furnishings $10.80 S.F. 172,891 110 $2,053,945 20 1984 2004 $2,053,945 $1,867,223 110

Equipment $7.20 S.F. 172,891 110 $1,369,297 20 1984 2004 $1,369,297 $1,244,815 110

Commercial Equipment $6.00 S.F. 172,891 110 $1,141,081 20 1984 2004 $1,141,081 $1,037,346 110

Institutional Equipment $1.20 S.F. 172,891 110 $228,216 20 1984 2004 $228,216 $207,469 110

Furnishings $3.60 S.F. 172,891 110 $684,648 20 1984 2004 $684,648 $622,408 110

Fixed Furnishings $3.60 S.F. 172,891 110 $684,648 20 1984 2004 $684,648 $622,408 110

Page 136: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 17

Facility: \Elementary/Middle Schools\Turner\1984 Building (continued)

Renewal Schedule:

Systems 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020

Total $6,235,572 $7,512,363 $680,995 $359,267 $35,006 $735,014

Substructure

Foundations

Standard Foundations

Special Foundations

Slab on Grade

Basement Construction

Basement Excavation

Basement Walls

Shell $1,814,318 $1,297,139

Superstructure

Floor Construction

Roof Construction

Exterior Enclosure $1,284,296

Exterior Walls

Exterior Windows $1,027,437

Exterior Doors $256,859

Roofing $1,814,318 $12,843

Roof Coverings - BUR $100,039

Roof Coverings - EPDM $1,714,279

Roof Coverings - Standing Seam

Mettal

Roof Openings $12,843

Interiors $1,623,371 $73,721 $487,863 $35,006 $735,014

Interior Construction $1,141,081

Partitions

Interior Doors

Fittings $1,141,081

Stairs

Stair Construction

Interior Finishes $482,290 $73,721 $487,863 $35,006 $735,014

Wall Finishes - Ceramic & Glazed $73,721

Wall Finishes - Paint $487,863

Floor Finishes - Carpet $27,634 $35,006

Floor Finishes - Ceramic & Quarry

Tile

Floor Finishes - Terrazzo

Floor Finishes - VCT $16,481 $735,014

Floor Finishes - Wood

Ceiling Finishes $438,175

Services $743,938 $6,141,503 $193,132 $359,267

Conveying

Elevators and Lifts

Plumbing $1,613,075

Plumbing Fixtures $1,261,179

Domestic Water Distribution $95,038

Sanitary Waste $161,821

Rain Water Drainage $41,097

Other Plumbing Systems - Natural

Gas

$53,940

HVAC $400,992 $2,594,278

Heat Generating Systems

Cooling Generating Systems $31,790 $642,148

Distribution Systems & Exhaust

Systems

$26,878 $1,952,130

Terminal & Package Units

Controls & Instrumentation $342,324

Other HVAC Systems/Equip -

Kitchen Hood

Fire Protection

Sprinklers

Electrical $342,946 $1,934,150 $193,132 $359,267

Electrical Service/Distribution $485,464

Branch Wiring $1,448,686

Lighting

Page 137: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 18

Systems 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020

Communications and Security -

Public Address & Clock System

$267,635

Fire Alarm $359,267

Security & CCTV $193,132

Other Electrical Systems -

Emergency Generator

$75,311

Equipment & Furnishings $2,053,945

Equipment $1,369,297

Commercial Equipment $1,141,081

Institutional Equipment $228,216

Furnishings $684,648

Fixed Furnishings $684,648

Page 138: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 19

Facility: \Elementary/Middle Schools\Turner\1984 Building (continued)

Deficiency Sheet:

Deficiency: Surveyor/Update: Kate McPhillips Fri, 04-Jun-2010Priority: 3Quantity: 1

Assembly: B3010 System: Roof Coverings - BUR Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: The built up roof is original, beyond expected life, and should be replaced. Roof replacement is to include

appropriate insulation for energy conservation.

Estimates:Raw Cost $83,366.09

Plus or (Minus) Additional Cost $0.00Total Estimated Amount $83,366.09

Deficiency: Surveyor/Update: Kate McPhillips Thu, 04-Mar-2010Priority: 3Quantity: 1

Assembly: B3010 System: Roof Coverings - EPDM Material: System Distress: Inadequate Category: Deferred Maintenance Correction: Renew System Note: The existing metal roof was covered with insulation and an EPDM system in 2003. There are still reported leaks in

several locations, including the library and cafeteria. Roof replacement is to include appropriate insulation for energy conservation.

Estimates:Raw Cost $1,428,565.71

Plus or (Minus) Additional Cost $0.00Total Estimated Amount $1,428,565.71

Page 139: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 20

Facility: \Elementary/Middle Schools\Turner\ 1984 Building (continued)

Deficiency: Surveyor/Update: Kate McPhillips Fri, 04-Jun-2010Priority: 3Quantity: 1

Assembly: C1030 System: Fittings Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: Fittings, such as chalk and tack boards, lockers, toilet and bath accessories, toilet partitions, and shelving, are

beyond expected life and should be replaced.

Estimates:Raw Cost $950,900.50

Plus or (Minus) Additional Cost $0.00Total Estimated Amount $950,900.50

Deficiency: Surveyor/Update: Kate McPhillips Fri, 04-Jun-2010Priority: 3Quantity: 1

Assembly: C3020 System: Floor Finishes - Carpet Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: Carpet floor finishes in the library are worn, beyond expected life, and should be replaced.

Estimates:Raw Cost $23,028.06

Plus or (Minus) Additional Cost $0.00Total Estimated Amount $23,028.06

Page 140: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 21

Facility: \Elementary/Middle Schools\Turner\ 1984 Building (continued)

Deficiency: Surveyor/Update: Kate McPhillips Fri, 04-Jun-2010Priority: 3Quantity: 4,112

Assembly: C3020 System: Floor Finishes - VCT Material: Floor Finishes Distress: Failing Category: Critical Repair Correction: Replace VCT Flooring Note: The VCT floor tile in the band room is showing signs of wear, separating, and should be replaced.

Estimates:Raw Cost $13,734.08

Plus or (Minus) Additional Cost $0.00Total Estimated Amount $13,734.08

Deficiency: Surveyor/Update: Kate McPhillips Fri, 04-Jun-2010Priority: 3Quantity: 1

Assembly: C3030 System: Ceiling Finishes Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: The ceiling finishes are beyond expected life and should be replaced.

Estimates:Raw Cost $365,145.79

Plus or (Minus) Additional Cost $0.00Total Estimated Amount $365,145.79

Page 141: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 22

Facility: \Elementary/Middle Schools\Turner\ 1984 Building (continued)

Deficiency: Surveyor/Update: Eric Altman Fri, 04-Jun-2010Priority: 3Quantity: 2

Assembly: D3030 System: Cooling Generating Systems Material: Terminal and Package Units Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Replace 10 T G/E Pkg Unit, Roof Mount Note: The split DX systems for the administration and library areas are original to the building, beyond expected life,

and should be replaced.

Estimates:Raw Cost $21,692.00

Plus or (Minus) Additional Cost $0.00Total Estimated Amount $21,692.00

Deficiency: Surveyor/Update: Eric Altman Wed, 24-Feb-2010Priority: 3Quantity: 2

Assembly: D3030 System: Cooling Generating Systems Material: Cooling Generation Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Chilled water pump Note: The chilled water pumps are old, in poor condition, and should be replaced.

Estimates:Raw Cost $4,800.00

Plus or (Minus) Additional Cost $0.00Total Estimated Amount $4,800.00

Page 142: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 23

Facility: \Elementary/Middle Schools\Turner\ 1984 Building (continued)

Deficiency: Surveyor/Update: Eric Altman Fri, 04-Jun-2010Priority: 3Quantity: 2

Assembly: D3040 System: Distribution Systems & Exhaust Systems Material: Distribution Systems Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Replace AHU 5000 CFM Note: The split DX systems for the administration and library areas are original to the building, beyond expected life,

and should be replaced.

Estimates:Raw Cost $22,398.00

Plus or (Minus) Additional Cost $0.00Total Estimated Amount $22,398.00

Deficiency: Surveyor/Update: Eric Altman Fri, 04-Jun-2010Priority: 3Quantity: 1

Assembly: D3060 System: Controls & Instrumentation Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: System is old, beyond expected life, and should be replaced.

Estimates:Raw Cost $285,270.15

Plus or (Minus) Additional Cost $0.00Total Estimated Amount $285,270.15

Page 143: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 24

Facility: \Elementary/Middle Schools\Turner\ 1984 Building (continued)

Deficiency: Surveyor/Update: Eric Altman Fri, 04-Jun-2010Priority: 3Quantity: 172,891

Assembly: D5030 System: Communications and Security - Public

Address & Clock System Material: Communications/Security Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Replace PA System/SF Note: The communications and security system is original to the building and should be replaced. For integrity of

system, install wiring in conduit.

Estimates:Raw Cost $223,029.39

Plus or (Minus) Additional Cost $0.00Total Estimated Amount $223,029.39

Deficiency: Surveyor/Update: Eric Altman Wed, 24-Feb-2010Priority: 3Quantity: 1

Assembly: D5090 System: Other Electrical Systems - Emergency

Generator Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: There is no generator. This deficiency is for the Exide emergency battery pack system, which is original to the

building, beyond expected useful life, and should be replaced.

Estimates:Raw Cost $62,759.43

Plus or (Minus) Additional Cost $0.00Total Estimated Amount $62,759.43

Page 144: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 25

Facility: \Elementary/Middle Schools\Turner\ 1984 Building (continued)

Deficiency: Surveyor/Update: Kate McPhillips Fri, 04-Jun-2010Priority: 3Quantity: 1

Assembly: E1010 System: Commercial Equipment Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: The commercial equipment is worn, beyond expected life, and should be replaced.

Estimates:Raw Cost $950,900.50

Plus or (Minus) Additional Cost $0.00Total Estimated Amount $950,900.50

Deficiency: Surveyor/Update: Kate McPhillips Fri, 04-Jun-2010Priority: 3Quantity: 1

Assembly: E1020 System: Institutional Equipment Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: Institutional equipment, such as library equipment, theater and stage equipment, audio-visual equipment, and

laboratory equipment, is beyond expected life and should be replaced.

Estimates:Raw Cost $190,180.10

Plus or (Minus) Additional Cost $0.00Total Estimated Amount $190,180.10

Page 145: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 26

Facility: \Elementary/Middle Schools\Turner\ 1984 Building (continued)

Deficiency: Surveyor/Update: Kate McPhillips Fri, 04-Jun-2010Priority: 3Quantity: 1

Assembly: E2010 System: Fixed Furnishings Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: Fixed furnishings, such as the base/wall cabinets, counter tops, window shades, and fixed seating, are worn,

beyond expected life, and should be replaced.

Estimates:Raw Cost $570,540.30

Plus or (Minus) Additional Cost $0.00Total Estimated Amount $570,540.30

Page 146: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 27

Facility: \Elementary/Middle Schools\Turner\2006 Classroom Wing AdditionAddress: 5904 West 70th Street, Shreveport, LA 71129

Attributes: Number of Floors 1

General Information: Function: Elementary Middle Year Built: 2006Gross Area: 18,987 S.F. Last Renovation:

Facility Description:

The 2006 Classroom Wing Addition at Turner Elementary/Middle School is a 1-story building located at 5904 West 70th Street in Shreveport, Louisiana. There have been no additions and no renovations. This report contains condition and adequacy data collected during the 2009/2010 Facility Condition Assessment (FCA). The detailed condition and deficiency statements are contained in this report.

Current Repair Cost: $0.00 Replacement Cost: $2,868,236.00 FCI: 0.00%

01-Feb-2010South Elevation

01-Feb-2010West Elevation

01-Feb-2010North Elevation

01-Feb-2010East Elevation

Page 147: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 28

Facility: \Elementary/Middle Schools\Turner\2006 Classroom Wing Addition (continued)

Building Condition:

System Unit Price$

Unit of

Meas Qty Renewal% Renewal$ Life Installed

Calc Next

Renewal

Next

Renewal CI% Deficiency$ Replacement Value FCI%

Total $151.06 S.F. 18,987 107 $3,057,088 49 2006 2016 2026 80 0 $2,868,237

Substructure $19.20 S.F. 18,987 100 $364,550 100 2006 $364,550

Foundations $19.20 S.F. 18,987 100 $364,550 100 2006 $364,550

Standard Foundations $10.20 S.F. 18,987 100 $193,667 100 2006 $193,667

Special Foundations 0 0 0 0

Slab on Grade $9.00 S.F. 18,987 100 $170,883 100 2006 $170,883

Basement Construction 0 0 0

Basement Excavation 0 0 0 0

Basement Walls 0 0 0 0

Shell $40.80 S.F. 18,987 104 $804,290 69 2006 2026 2026 83 $774,670

Superstructure $10.80 S.F. 18,987 100 $205,060 100 2006 $205,060

Floor Construction 0 0 0 0

Roof Construction $10.80 S.F. 18,987 100 $205,060 100 2006 $205,060

Exterior Enclosure $20.40 S.F. 18,987 103 $398,727 78 2006 2036 87 $387,335

Exterior Walls $14.40 S.F. 18,987 100 $273,413 100 2006 $273,413

Exterior Windows $4.80 S.F. 18,987 110 $100,251 30 2006 2036 87 $91,138

Exterior Doors $1.20 S.F. 18,987 110 $25,063 30 2006 2036 87 $22,784

Roofing $9.60 S.F. 18,987 110 $200,503 20 2006 2026 2026 80 $182,275

Roof Coverings - BUR $9.54 S.F. 18,987 110 $199,250 20 2006 2026 2026 80 $181,136

Roof Coverings - EPDM 0 0 0 0

Roof Coverings - Standing

Seam Mettal

0 0 0 0

Roof Openings $0.06 S.F. 18,987 110 $1,253 30 2006 2036 87 $1,139

Interiors $27.12 S.F. 18,987 107 $552,649 53 2006 2016 77 $514,836

Interior Construction $19.20 S.F. 18,987 106 $387,335 68 2006 2026 82 $364,551

Partitions $10.80 S.F. 18,987 110 $225,566 100 2006 $205,060

Interior Doors $2.40 S.F. 18,987 80 $36,455 40 2006 2046 90 $45,569

Fittings $6.00 S.F. 18,987 110 $125,314 20 2006 2026 80 $113,922

Stairs 0 0 0

Stair Construction 0 0 0 0

Interior Finishes $7.92 S.F. 18,987 110 $165,314 16 2006 2016 72 $150,285

Wall Finishes - Ceramic &

Glazed

0 0 0 0

Wall Finishes - Paint $2.40 S.F. 18,987 110 $50,126 10 2006 2016 60 $45,569

Floor Finishes - Carpet 0 0 0 0

Floor Finishes - Ceramic &

Quarry Tile

$1.44 S.F. 3,418 110 $5,414 50 2006 2056 92 $4,922

Floor Finishes - Terrazzo 0 0 0 0

Floor Finishes - VCT $3.60 S.F. 15,569 110 $61,653 15 2006 2021 73 $56,048

Ceiling Finishes $2.30 S.F. 18,987 110 $48,121 20 2006 2026 80 $43,746

Services $59.15 S.F. 18,987 110 $1,235,347 22 2006 2016 80 $1,123,044

Conveying 0 0 0

Elevators and Lifts 0 0 0 0

Plumbing $7.54 S.F. 18,987 110 $157,395 30 2006 2036 87 $143,086

Plumbing Fixtures $5.89 S.F. 18,987 110 $123,059 30 2006 2036 87 $111,871

Domestic Water Distribution $0.44 S.F. 18,987 110 $9,273 30 2006 2036 87 $8,430

Sanitary Waste $0.76 S.F. 18,987 110 $15,790 30 2006 2036 87 $14,354

Rain Water Drainage $0.19 S.F. 18,987 110 $4,010 30 2006 2036 87 $3,646

Other Plumbing Systems -

Natural Gas

$0.25 S.F. 18,987 110 $5,263 30 2006 2036 87 $4,785

HVAC $32.52 S.F. 18,987 110 $679,203 19 2006 2021 77 $617,457

Heat Generating Systems 0 0 0 0

Cooling Generating Systems 0 0 0 0

Distribution Systems & Exhaust

Systems

$9.12 S.F. 18,987 110 $190,478 30 2006 2036 87 $173,161

Terminal & Package Units $21.60 S.F. 18,987 110 $451,131 15 2006 2021 73 $410,119

Controls & Instrumentation $1.80 S.F. 18,987 110 $37,594 20 2006 2026 80 $34,177

Other HVAC Systems/Equip -

Kitchen Hood

0 0 0 0

Fire Protection 0 0 0

Sprinklers 0 0 0 0

Electrical $19.09 S.F. 18,987 110 $398,749 23 2006 2016 81 $362,501

Electrical Service/Distribution $2.27 S.F. 18,987 110 $47,369 30 2006 2036 87 $43,063

Branch Wiring $6.77 S.F. 18,987 110 $141,354 30 2006 2036 87 $128,504

Lighting $6.77 S.F. 18,987 110 $141,354 20 2006 2026 80 $128,504

Communications and Security -

Public Address & Clock System

$0.88 S.F. 18,987 110 $18,296 20 2006 2026 80 $16,633

Fire Alarm $1.54 S.F. 18,987 110 $32,080 10 2006 2016 60 $29,164

Page 148: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 29

System Unit Price$

Unit of

Meas Qty Renewal% Renewal$ Life Installed

Calc Next

Renewal

Next

Renewal CI% Deficiency$ Replacement Value FCI%

Security & CCTV $0.88 S.F. 18,987 110 $18,296 10 2006 2016 60 $16,633

Other Electrical Systems -

Emergency Generator

0 0 0 0

Equipment & Furnishings $4.80 S.F. 18,987 110 $100,252 20 2006 2026 80 $91,137

Equipment $1.20 S.F. 18,987 110 $25,063 20 2006 2026 80 $22,784

Commercial Equipment 0 0 0 0

Institutional Equipment $1.20 S.F. 18,987 110 $25,063 20 2006 2026 80 $22,784

Furnishings $3.60 S.F. 18,987 110 $75,189 20 2006 2026 80 $68,353

Fixed Furnishings $3.60 S.F. 18,987 110 $75,189 20 2006 2026 80 $68,353

Page 149: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 30

Facility: \Elementary/Middle Schools\Turner\2006 Classroom Wing Addition (continued)

Renewal Schedule:

Systems 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020

Total $120,005

Substructure

Foundations

Standard Foundations

Special Foundations

Slab on Grade

Basement Construction

Basement Excavation

Basement Walls

Shell

Superstructure

Floor Construction

Roof Construction

Exterior Enclosure

Exterior Walls

Exterior Windows

Exterior Doors

Roofing

Roof Coverings - BUR

Roof Coverings - EPDM

Roof Coverings - Standing Seam

Mettal

Roof Openings

Interiors $59,853

Interior Construction

Partitions

Interior Doors

Fittings

Stairs

Stair Construction

Interior Finishes $59,853

Wall Finishes - Ceramic & Glazed

Wall Finishes - Paint $59,853

Floor Finishes - Carpet

Floor Finishes - Ceramic & Quarry

Tile

Floor Finishes - Terrazzo

Floor Finishes - VCT

Ceiling Finishes

Services $60,152

Conveying

Elevators and Lifts

Plumbing

Plumbing Fixtures

Domestic Water Distribution

Sanitary Waste

Rain Water Drainage

Other Plumbing Systems - Natural

Gas

HVAC

Heat Generating Systems

Cooling Generating Systems

Distribution Systems & Exhaust

Systems

Terminal & Package Units

Controls & Instrumentation

Other HVAC Systems/Equip -

Kitchen Hood

Fire Protection

Sprinklers

Electrical $60,152

Electrical Service/Distribution

Branch Wiring

Lighting

Communications and Security -

Public Address & Clock System

Page 150: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 31

Systems 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020

Fire Alarm $38,306

Security & CCTV $21,846

Other Electrical Systems -

Emergency Generator

Equipment & Furnishings

Equipment

Commercial Equipment

Institutional Equipment

Furnishings

Fixed Furnishings

Page 151: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 32

Facility: \Elementary/Middle Schools\Turner\2006 Classroom Wing Addition (continued)

Deficiency Sheet:

*** No Deficiencies Found ***

Page 152: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 33

Facility: \Elementary/Middle Schools\Turner\Basketball CourtsAddress: 5904 West 70th Street, Shreveport, LA 71129

Attributes: Roof Area (in GSF) 0Site Area (in Acres) 0.18

General Information: Function: Elementary Middle Year Built: 1985Gross Area: 8,000 S.F. Last Renovation:

Facility Description:

The Basketball Courts at Turner Elementary/Middle School are located at 5904 West 70th Street in Shreveport, Louisiana. There have been no additions and no renovations. The basketball goals have been removed and the courts are not in use as of this report. This report contains condition and adequacy data collected during the 2009/2010 Facility Condition Assessment (FCA). The detailed condition and deficiency statements are contained in this report.

Current Repair Cost: $93,667.00 Replacement Cost: $92,160.00 FCI: 101.64%

01-Feb-2010Turner Elementary/Middle School Basketball Courts

Page 153: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 34

Facility: \Elementary/Middle Schools\Turner\Basketball Courts (continued)

Building Condition:

System Unit Price$

Unit of

Meas Qty Renewal% Renewal$ Life Installed

Calc Next

Renewal

Next

Renewal CI% Deficiency$ Replacement Value FCI%

Total $11.52 S.F. 8,000 109 $100,675 21 1985 2005 17 $93,667 $92,160 102

Special Construction $10.64 S.F. 8,000 110 $93,667 20 1985 2005 $93,667 $85,152 110

Special Construction $10.64 S.F. 8,000 110 $93,667 20 1985 2005 $93,667 $85,152 110

Special Structures - Basketball

Court - Concrete - Outdoor

$10.64 S.F. 8,000 110 $93,667 20 1985 2005 $93,667 $85,152 110

Building Sitework $0.88 S.F. 8,000 100 $7,008 39 1985 2015 17 $7,008

Site Preparation $0.11 S.F. 8,000 100 $864 100 1985 $864

Site Earthwork $0.11 S.F. 8,000 0 $864 100 1985 $864

Site Improvements $0.77 S.F. 8,000 100 $6,144 30 1985 2015 17 $6,144

Site Development - Fencing $0.77 S.F. 8,000 100 $6,144 30 1985 2015 17 $6,144

Site Electrical Utilities 0 0 0

Site Lighting 0 0 0 0

Page 154: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 35

Facility: \Elementary/Middle Schools\Turner\Basketball Courts (continued)

Renewal Schedule:

Systems 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020

Total $93,667 $7,123

Special Construction $93,667

Special Construction $93,667

Special Structures - Basketball

Court - Concrete - Outdoor

$93,667

Building Sitework $7,123

Site Preparation

Site Earthwork

Site Improvements $7,123

Site Development - Fencing $7,123

Site Electrical Utilities

Site Lighting

Page 155: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 36

Facility: \Elementary/Middle Schools\Turner\Basketball Courts (continued)

Deficiency Sheet:

Deficiency: Surveyor/Update: Kate McPhillips Fri, 04-Jun-2010Priority: 3Quantity: 1

Assembly: F1010 System: Special Structures - Basketball Court -

Concrete - Outdoor Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: The concrete pad is worn, beyond expected life, and should be replaced.

Estimates:Raw Cost $78,056.00

Plus or (Minus) Additional Cost $0.00Total Estimated Amount $78,056.00

Page 156: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 37

Facility: \Elementary/Middle Schools\Turner\Covered WalkwaysAddress: 5904 West 70th Street, Shreveport, LA 71129

Attributes: Number of Floors 1

General Information: Function: Elementary Middle Year Built: 2009Gross Area: 2,000 S.F. Last Renovation:

Facility Description:

The engineered covered walkways at Turner Elementary/Middle School connect the classrooms and provide some weather protection for the students.

Current Repair Cost: $0.00 Replacement Cost: $49,992.00 FCI: 0.00%

01-Feb-2010North Elevation

01-Feb-2010South Elevation

01-Feb-2010East Elevation

01-Feb-2010Northeast Elevation

Page 157: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 38

Facility: \Elementary/Middle Schools\Turner\Covered Walkways (continued)

Building Condition:

System Unit Price$

Unit of

Meas Qty Renewal% Renewal$ Life Installed

Calc Next

Renewal

Next

Renewal CI% Deficiency$ Replacement Value FCI%

Total $25.00 S.F. 2,000 100 $49,992 25 2009 2034 96 0 $49,992

Special Construction $25.00 S.F. 2,000 100 $49,992 25 2009 2034 96 $49,992

Special Construction $25.00 S.F. 2,000 100 $49,992 25 2009 2034 96 $49,992

Special Structures - Covered

Walkways Metal

$25.00 S.F. 2,000 100 $49,992 25 2009 2034 96 $49,992

Page 158: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 39

Facility: \Elementary/Middle Schools\Turner\Covered Walkways (continued)

Renewal Schedule:

Systems 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020

Total

Special Construction

Special Construction

Special Structures - Covered

Walkways Metal

Page 159: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 40

Facility: \Elementary/Middle Schools\Turner\Covered Walkways (continued)

Deficiency Sheet:

*** No Deficiencies Found ***

Page 160: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 41

Facility: \Elementary/Middle Schools\Turner\Football FieldAddress: 5904 West 70th Street, Shreveport, LA 71129

Attributes: Roof Area (in GSF) 0Site Area (in Acres) 1.32

General Information: Function: Elementary Middle Year Built: 1984Gross Area: 57,600 S.F. Last Renovation:

Facility Description:

The Football Field at Turner Elemetary/Middle School is located at 5904 West 70th Street in Shreveport, Louisiana. There have been no additions and no renovations. This report contains condition and adequacy data collected during the 2009/2010 Facility Condition Assessment (FCA). The detailed condition and deficiency statements are contained in this report.

Current Repair Cost: $100,362.00 Replacement Cost: $154,829.00 FCI: 64.82%

01-Feb-2010Turner Elementary/Middle School Football Field

Page 161: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 42

Facility: \Elementary/Middle Schools\Turner\Football Field (continued)

Building Condition:

System Unit Price$

Unit of

Meas Qty Renewal% Renewal$ Life Installed

Calc Next

Renewal

Next

Renewal CI% Deficiency$ Replacement Value FCI%

Total $2.69 S.F. 57,600 106 $163,952 51 1984 2004 $100,362 $154,828 65

Special Construction $1.38 S.F. 57,600 110 $87,437 20 1984 2004 $87,437 $79,488 110

Special Construction $1.38 S.F. 57,600 110 $87,437 20 1984 2004 $87,437 $79,488 110

Special Facilities - Field -

Natural Turf

$1.38 S.F. 57,600 110 $87,437 20 1984 2004 $87,437 $79,488 110

Building Sitework $1.31 S.F. 57,600 102 $76,515 86 1984 2004 $12,925 $75,340 17

Site Preparation $1.10 S.F. 57,600 100 $63,590 100 1984 $63,590

Site Earthwork $1.10 S.F. 57,600 100 $63,590 100 1984 $63,590

Site Improvements $0.20 S.F. 57,600 110 $12,925 20 1984 2004 $12,925 $11,750 110

Site Development - Fencing;

Scoreboard; Goal Post

$0.20 S.F. 57,600 110 $12,925 20 1984 2004 $12,925 $11,750 110

Site Development -

Landscaping & Irrigation

0 0 0 0

Site Mechanical Utilities 0 0 0

Water Supply - Water Service 0 0 0 0

Site Electrical Utilities 0 0 0

Site Lighting 0 0 0 0

Page 162: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 43

Facility: \Elementary/Middle Schools\Turner\Football Field (continued)

Renewal Schedule:

Systems 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020

Total $100,362

Special Construction $87,437

Special Construction $87,437

Special Facilities - Field - Natural

Turf

$87,437

Building Sitework $12,925

Site Preparation

Site Earthwork

Site Improvements $12,925

Site Development - Fencing;

Scoreboard; Goal Post

$12,925

Site Development - Landscaping &

Irrigation

Site Mechanical Utilities

Water Supply - Water Service

Site Electrical Utilities

Site Lighting

Page 163: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 44

Facility: \Elementary/Middle Schools\Turner\Football Field (continued)

Deficiency Sheet:

Deficiency: Surveyor/Update: Eric Altman Fri, 04-Jun-2010Priority: 3Quantity: 1

Assembly: F1040 System: Special Facilities - Field - Natural Turf Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: The natural turf is worn, beyond expected life, and should be replaced.

Estimates:Raw Cost $72,864.00

Plus or (Minus) Additional Cost $0.00Total Estimated Amount $72,864.00

Deficiency: Surveyor/Update: Eric Altman Fri, 04-Jun-2010Priority: 3Quantity: 1

Assembly: G2040 System: Site Development - Fencing; Scoreboard;

Goal Post Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: Site development, including bleachers, goal post, fencing, etc., is worn, beyond expected life, and should be

replaced.

Estimates:Raw Cost $10,771.20

Plus or (Minus) Additional Cost $0.00Total Estimated Amount $10,771.20

Page 164: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 45

Facility: \Elementary/Middle Schools\Turner\SiteAddress: 5904 West 70th Street, Shreveport, LA 71129

Attributes: Site Area (in Acres) 17

General Information: Function: Elementary Middle Year Built: 1984Gross Area: 202,576 S.F. Last Renovation:

Facility Description:

The original site was constructed in 1984. There have been no additions to the site and no major renovations. Site features include paved driveways and parking lots, pedestrian pavement, flag pole, landscaping, and fencing. Site mechanical and electrical features include water, sewer, natural gas, telephone, and site lighting. This report contains condition and adequacy data collected during the 2009/2010 Facility Condition Assessment (FCA). The detailed condition and deficiency statements are contained in this report.

Current Repair Cost: $1,227,611.00 Replacement Cost: $2,824,720.00 FCI: 43.46%

05-Jan-2010Aerial Image of Turner Elementary/Middle School

Page 165: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 46

Facility: \Elementary/Middle Schools\Turner\Site (continued)

Building Condition:

System Unit Price$

Unit of

Meas Qty Renewal% Renewal$ Life Installed

Calc Next

Renewal

Next

Renewal CI% Deficiency$ Replacement Value FCI%

Total $13.94 S.F. 202,576 100 $2,824,720 33 1984 2004 2010 36 $1,227,611 $2,824,720 43

Building Sitework $13.94 S.F. 202,576 100 $2,824,720 33 1984 2004 2010 36 $1,227,611 $2,824,720 43

Site Improvements $8.14 S.F. 202,576 100 $1,648,159 27 1984 2004 2010 48 $1,227,611 $1,648,159 74

Roadways $1.18 S.F. 202,576 100 $238,229 50 1984 2034 2010 $238,229 $238,229 100

Parking Lots $1.02 S.F. 202,576 100 $206,628 30 1984 2014 2010 $206,628 $206,628 100

Pedestrian Paving $0.82 S.F. 202,576 100 $165,302 50 1984 2034 48 $165,302

Site Development $3.86 S.F. 202,576 100 $782,754 20 1984 2004 $782,754 $782,754 100

Landscaping $1.26 S.F. 202,576 100 $255,246 10 1984 $255,246

Site Mechanical Utilities $4.86 S.F. 202,576 100 $984,519 44 1984 2014 38 $984,519

Water Supply $0.82 S.F. 202,576 100 $165,302 30 1984 2014 13 $165,302

Sanitary Sewer $0.41 S.F. 202,576 100 $82,651 30 1984 2014 13 $82,651

Storm Sewer $3.52 S.F. 202,576 100 $712,257 50 1984 2034 48 $712,257

Fuel Distribution $0.12 S.F. 202,576 100 $24,309 30 1984 2014 13 $24,309

Site Electrical Utilities $0.95 S.F. 202,576 100 $192,042 30 1984 2014 13 $192,042

Site Lighting $0.95 S.F. 202,576 100 $192,042 30 1984 2014 13 $192,042

Page 166: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 47

Facility: \Elementary/Middle Schools\Turner\Site (continued)

Renewal Schedule:

Systems 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020

Total $1,227,611 $522,578

Building Sitework $1,227,611 $522,578

Site Improvements $1,227,611

Roadways $238,229

Parking Lots $206,628

Pedestrian Paving

Site Development $782,754

Landscaping

Site Mechanical Utilities $306,433

Water Supply $186,049

Sanitary Sewer $93,024

Storm Sewer

Fuel Distribution $27,360

Site Electrical Utilities $216,145

Site Lighting $216,145

Page 167: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 48

Facility: \Elementary/Middle Schools\Turner\Site (continued)

Deficiency Sheet:

Deficiency: Surveyor/Update: Kate McPhillips Fri, 04-Jun-2010Priority: 3Quantity: 1

Assembly: G2010 System: Roadways Material: System Distress: Failing Category: Deferred Maintenance Correction: Renew System Note: The roadways are worn, beyond expected life, and should be replaced.

Estimates:Raw Cost $198,524.48

Plus or (Minus) Additional Cost $0.00Total Estimated Amount $198,524.48

Deficiency: Surveyor/Update: Kate McPhillips Fri, 04-Jun-2010Priority: 3Quantity: 1

Assembly: G2020 System: Parking Lots Material: System Distress: Failing Category: Deferred Maintenance Correction: Renew System Note: The front and back parking lots are cracking, showing signs of wear, and should be repaved.

Estimates:Raw Cost $172,189.60

Plus or (Minus) Additional Cost $0.00Total Estimated Amount $172,189.60

Page 168: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 49

Facility: \Elementary/Middle Schools\Turner\ Site (continued)

Deficiency: Surveyor/Update: Kate McPhillips Fri, 04-Jun-2010Priority: 3Quantity: 1

Assembly: G2040 System: Site Development Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: Site development features, such as fences and gates, signs, site furnishings, trash enclosures, playing fields, and

flagpoles, are beyond expected life and should be replaced.

Estimates:Raw Cost $652,294.72

Plus or (Minus) Additional Cost $0.00Total Estimated Amount $652,294.72

Page 169: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Survey Report

Deficiency Detail ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 1

Facility

Name Assembly System Material Distress Correction Qty Unit Raw Cost

Additional

Cost Total Cost Priority Def. Cat. Location / Note

Caddo Parish School District $6,742,654 $1,348,531 $8,091,184 Elementary/Middle Schools $6,742,654 $1,348,531 $8,091,184 Turner $6,742,654 $1,348,531 $8,091,184 1975 Nursing Staff Center $361,644 $72,329 $433,972 Building Systems $361,644 $72,329 $433,972

D5010 Electrical Service/Distribution

System Beyond Expected Life

Renew System 1 Ea. $18,083 $3,617 $21,700 Necessary- 2-5 Yrs

Deferred Maintenance

Electrical service/distribution is beyond expected life and should be replaced. Three-phase panelboard was not accessible at time of field assessment.

D5020 Branch Wiring System Beyond Expected Life

Renew System 1 Ea. $53,962 $10,792 $64,755 Necessary- 2-5 Yrs

Deferred Maintenance

Branch wiring is beyond expected life and should be replaced.

D5020 Lighting System Beyond Expected Life

Renew System 1 Ea. $53,962 $10,792 $64,755 Necessary- 2-5 Yrs

Deferred Maintenance

Lighting system is beyond expected life and should be replaced.

D5030 Fire Alarm System Beyond Expected Life

Renew System 1 Ea. $12,247 $2,449 $14,696 Necessary- 2-5 Yrs

Deferred Maintenance

The fire alarm system is beyond expected life and should be replaced.

D2010 Plumbing Fixtures

System Beyond Expected Life

Renew System 1 Ea. $46,978 $9,396 $56,373 Necessary- 2-5 Yrs

Deferred Maintenance

Plumbing fixtures are old, beyond expected life, and should be replaced.

D2020 Domestic Water Distribution

System Beyond Expected Life

Renew System 1 Ea. $3,540 $708 $4,248 Necessary- 2-5 Yrs

Deferred Maintenance

Domestic water distribution system is beyond expected life and should be replaced.

D2030 Sanitary Waste System Beyond Expected Life

Renew System 1 Ea. $6,028 $1,206 $7,233 Necessary- 2-5 Yrs

Deferred Maintenance

Sanitary waste is beyond expected life and should be replaced.

D2090 Other Plumbing Systems - Natural Gas

System Beyond Expected Life

Renew System 1 Ea. $2,009 $402 $2,411 Necessary- 2-5 Yrs

Deferred Maintenance

System is old, beyond expected life, and should be replaced.

B2020 Exterior Windows

System Beyond Expected Life

Renew System 1 Ea. $38,271 $7,654 $45,925 Necessary- 2-5 Yrs

Deferred Maintenance

The exterior windows are worn, beyond expected life, and should be replaced.

B2030 Exterior Doors System Beyond Expected Life

Renew System 1 Ea. $9,568 $1,914 $11,481 Necessary- 2-5 Yrs

Deferred Maintenance

The exterior doors are worn, beyond expected life, and should be replaced.

C1030 Fittings System Beyond Expected Life

Renew System 1 Ea. $47,839 $9,568 $57,407 Necessary- 2-5 Yrs

Deferred Maintenance

Fittings, such as chalk and tack boards, lockers, toilet and bath accessories, toilet partitions, and shelving, are beyond expected life and should be replaced.

C3020 Floor Finishes - Original VCT

System Beyond Expected Life

Renew System 1 Ea. $26,195 $5,239 $31,434 Necessary- 2-5 Yrs

Deferred Maintenance

The VCT floor finishes are worn, beyond expected life, and should be replaced.

C3030 Ceiling Finishes -Original

System Beyond Expected Life

Renew System 1 Ea. $16,765 $3,353 $20,118 Necessary- 2-5 Yrs

Deferred Maintenance

The ceiling finishes are beyond expected life and should be replaced.

E2010 Fixed Furnishings - Original

System Beyond Expected Life

Renew System 1 Ea. $26,195 $5,239 $31,434 Necessary- 2-5 Yrs

Deferred Maintenance

Fixed furnishings, such as the base/wall cabinets, counter tops, window shades, and fixed seating, are worn, beyond expected life, and should be replaced.

Page 170: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Survey Report

Deficiency Detail ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 2

Facility

Name Assembly System Material Distress Correction Qty Unit Raw Cost

Additional

Cost Total Cost Priority Def. Cat. Location / Note

1984 Building $5,196,310 $1,039,262 $6,235,572 Building Systems $5,196,310 $1,039,262 $6,235,572

E2010 Fixed Furnishings

System Beyond Expected Life

Renew System 1 Ea. $570,540 $114,108 $684,648 Necessary- 2-5 Yrs

Deferred Maintenance

Fixed furnishings, such as the base/wall cabinets, counter tops, window shades, and fixed seating, are worn, beyond expected life, and should be replaced.

E1020 Institutional Equipment

System Beyond Expected Life

Renew System 1 Ea. $190,180 $38,036 $228,216 Necessary- 2-5 Yrs

Deferred Maintenance

Institutional equipment, such as library equipment, theater and stage equipment, audio-visual equipment, and laboratory equipment, is beyond expected life and should be replaced.

C1030 Fittings System Beyond Expected Life

Renew System 1 Ea. $950,901 $190,180 $1,141,081 Necessary- 2-5 Yrs

Deferred Maintenance

Fittings, such as chalk and tack boards, lockers, toilet and bath accessories, toilet partitions, and shelving, are beyond expected life and should be replaced.

C3030 Ceiling Finishes System Beyond Expected Life

Renew System 1 Ea. $365,146 $73,029 $438,175 Necessary- 2-5 Yrs

Deferred Maintenance

The ceiling finishes are beyond expected life and should be replaced.

C3020 Floor Finishes - Carpet

System Beyond Expected Life

Renew System 1 Ea. $23,028 $4,606 $27,634 Necessary- 2-5 Yrs

Deferred Maintenance

Carpet floor finishes in the library are worn, beyond expected life, and should be replaced.

D3060 Controls & Instrumentation

System Beyond Expected Life

Renew System 1 Ea. $285,270 $57,054 $342,324 Necessary- 2-5 Yrs

Deferred Maintenance

System is old, beyond expected life, and should be replaced.

D5090 Other Electrical Systems - Emergency Generator

System Beyond Expected Life

Renew System 1 Ea. $62,759 $12,552 $75,311 Necessary- 2-5 Yrs

Deferred Maintenance

There is no generator. This deficiency is for the Exide emergency battery pack system, which is original to the building, beyond expected useful life, and should be replaced.

D3030 Cooling Generating Systems

Terminal and Package Units

Beyond Expected Life

Replace 10 T G/E Pkg Unit, Roof Mount

2 Ea. $21,692 $4,338 $26,030 Necessary- 2-5 Yrs

Deferred Maintenance

The split DX systems for the administration and library areas are original to the building, beyond expected life, and should be replaced.

D3040 Distribution Systems & Exhaust Systems

Distribution Systems

Beyond Expected Life

Replace AHU 5000 CFM 2 Ea. $22,398 $4,480 $26,878 Necessary- 2-5 Yrs

Deferred Maintenance

The split DX systems for the administration and library areas are original to the building, beyond expected life, and should be replaced.

D5030 Communications and Security - Public Address & Clock System

Communications/Security

Beyond Expected Life

Replace PA System/SF 172,891 S.F. $223,029 $44,606 $267,635 Necessary- 2-5 Yrs

Deferred Maintenance

The communications and security system is original to the building and should be replaced. For integrity of system, install wiring in conduit.

D3030 Cooling Generating Systems

Cooling Generation

Beyond Expected Life

Chilled water pump 2 Each $4,800 $960 $5,760 Necessary- 2-5 Yrs

Deferred Maintenance

The chilled water pumps are old, in poor condition, and should be replaced.

C3020 Floor Finishes - VCT

Floor Finishes Failing Replace VCT Flooring 4,112 S.F. $13,734 $2,747 $16,481 Necessary- 2-5 Yrs

Critical Repair

The VCT floor tile in the band room is showing signs of wear, separating, and should be replaced.

Page 171: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Survey Report

Deficiency Detail ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 3

Facility

Name Assembly System Material Distress Correction Qty Unit Raw Cost

Additional

Cost Total Cost Priority Def. Cat. Location / Note

B3010 Roof Coverings -EPDM

System Inadequate Renew System 1 Ea. $1,428,566 $285,713 $1,714,279 Necessary- 2-5 Yrs

Deferred Maintenance

The existing metal roof was covered with insulation and an EPDM system in 2003. There are still reported leaks in several locations, including the library and cafeteria. Roof replacement is to include appropriate insulation for energy conservation.

B3010 Roof Coverings -BUR

System Beyond Expected Life

Renew System 1 Ea. $83,366 $16,673 $100,039 Necessary- 2-5 Yrs

Deferred Maintenance

The built up roof is original, beyond expected life, and should be replaced. Roof replacement is to include appropriate insulation for energy conservation.

E1010 Commercial Equipment

System Beyond Expected Life

Renew System 1 Ea. $950,901 $190,180 $1,141,081 Necessary- 2-5 Yrs

Deferred Maintenance

The commercial equipment is worn, beyond expected life, and should be replaced.

Basketball Courts $78,056 $15,611 $93,667 Building Systems $78,056 $15,611 $93,667

F1010 Special Structures - Basketball Court - Concrete - Outdoor

System Beyond Expected Life

Renew System 1 Ea. $78,056 $15,611 $93,667 Necessary- 2-5 Yrs

Deferred Maintenance

The concrete pad is worn, beyond expected life, and should be replaced.

Football Field $83,635 $16,727 $100,362 Building Systems $83,635 $16,727 $100,362

F1040 Special Facilities - Field - Natural Turf

System Beyond Expected Life

Renew System 1 Ea. $72,864 $14,573 $87,437 Necessary- 2-5 Yrs

Deferred Maintenance

The natural turf is worn, beyond expected life, and should be replaced.

G2040 Site Development - Fencing; Scoreboard; Goal Post

System Beyond Expected Life

Renew System 1 Ea. $10,771 $2,154 $12,925 Necessary- 2-5 Yrs

Deferred Maintenance

Site development, including bleachers, goal post, fencing, etc., is worn, beyond expected life, and should be replaced.

Site $1,023,009 $204,602 $1,227,611 Building Systems $1,023,009 $204,602 $1,227,611

G2040 Site Development

System Beyond Expected Life

Renew System 1 Ea. $652,295 $130,459 $782,754 Necessary- 2-5 Yrs

Deferred Maintenance

Site development features, such as fences and gates, signs, site furnishings, trash enclosures, playing fields, and flagpoles, are beyond expected life and should be replaced.

G2010 Roadways System Failing Renew System 1 Ea. $198,524 $39,705 $238,229 Necessary- 2-5 Yrs

Deferred Maintenance

The roadways are worn, beyond expected life, and should be replaced.

G2020 Parking Lots System Failing Renew System 1 Ea. $172,190 $34,438 $206,628 Necessary- 2-5 Yrs

Deferred Maintenance

The front and back parking lots are cracking, showing signs of wear, and should be repaved.

Page 172: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

Functional and Educational Adequacy

Suitability Report

Page 173: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

Suitability Report - Full

Project:Site:

Suitability

Possible

Score

Score

Percent

Score

CaddoCounty:

1Region:

Rating

618Site #:

Caddo 2009 Turner Elementary-Middl

Project #:

4057

Site Type: Site Size:Grade Config:

K-8 0.00ES/MS

Suitability - K-8

Site

3.00 0.99 33.00 TrafficPoor

1.00 0.67 67.00 Pedestrian TrafficFair

1.35 1.35 100.00 ParkingGood

1.64 0.54 33.00 Play Courts & FieldsPoor

Safety and Security

1.22 0.82 67.00 FencingFair

0.15 0.05 33.00 Signage & Way FindingPoor

3.00 0.00 0.00 Ease of SupervisionP/U

0.50 0.00 0.00 Limited EntrancesP/U

0.50 0.00 0.00 Interior CirculationP/U

School Climate

5.00 0.00 0.00 Learning Style VarietyP/U

5.00 0.00 0.00 School EnvironmentP/U

1.00 0.00 0.00 LandscapingP/U

General Classrooms

12.95 8.68 67.00 SizeFair

2.78 1.86 67.00 AdjacenciesFair

2.78 1.86 67.00 Storage\Fixed Equip.Fair

Remedial - Special Needs

3.17 0.00 0.00 SizeP/U

0.68 0.00 0.00 AdjacenciesP/U

0.68 0.00 0.00 Storage\Fixed Equip.P/U

Library

2.43 2.43 100.00 SizeGood

0.52 0.00 0.00 AdjacenciesP/U

0.52 0.52 100.00 Storage\Fixed Equip.G/F

P.E.

8.40 8.40 100.00 SizeGood

1.80 1.80 100.00 AdjacenciesG/F

1.80 1.80 100.00 Storage\Fixed Equip.G/F

Music

2.64 0.00 0.00 SizeP/U

0.57 0.00 0.00 AdjacenciesP/U

0.57 0.00 0.00 Storage\Fixed Equip.P/U

Art

Page 1 of 53/9/2010 2:19:45PM

Page 174: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

Project:Site:

Suitability

Possible

Score

Score

Percent

Score

CaddoCounty:

1Region:

Rating

618Site #:

Caddo 2009 Turner Elementary-Middl

Project #:

4057

Site Type: Site Size:Grade Config:

K-8 0.00ES/MS

1.53 0.77 50.00 SizeFair

0.33 0.33 100.00 AdjacenciesG/F

0.33 0.00 0.00 Storage\Fixed Equip.P/U

Performing Arts\Auditorium

1.64 1.64 100.00 SizeGood

0.35 0.24 67.00 AdjacenciesFair

0.35 0.35 100.00 Storage\Fixed Equip.Good

Vocational Technical

4.29 2.87 67.00 SizeFair

0.92 0.92 100.00 AdjacenciesGood

0.92 0.92 100.00 Storage\Fixed Equip.G/F

Science

2.70 1.35 50.00 SizeFair

0.58 0.58 100.00 AdjacenciesGood

0.58 0.00 0.00 Storage\Fixed Equip.P/U

Kindergarten

1.18 0.00 0.00 SizeP/U

0.25 0.25 100.00 AdjacenciesG/F

0.25 0.25 100.00 Storage\Fixed Equip.G/F

Administration

1.59 1.59 100.00 SizeGood

0.34 0.00 0.00 AdjacenciesP/U

0.34 0.34 100.00 Storage\Fixed Equip.G/F

0.91 0.00 0.00P/U Restrooms (Student)

0.91 0.91 100.00Good Teacher Lounge and Work Room(s)

5.00 3.35 67.00Fair Cafeteria

7.84 7.84 100.00Good Food Prep

0.41 0.41 100.00Good Counseling

0.34 0.00 0.00P/U Clinic

0.50 0.50 100.00G/F Custodial & Maintenance

100.00 57.16 57.16Total For Site:

Comments

Suitability - K-8

Turner K-8 is a large complex of buildings serving students from preschool to grade 8. The school was built in the

1980's with several additions since. There are four portable buildings housing 8 classrooms. One other portable is

used for storage. Most classrooms are in a two-story wing with elementary students on one end and middle level

students on the other. There is a separate building for grade 6. The gyms, auditorium, library and cafeteria are in a

separate building with space allocated for each level.

Suitability - K-8->Site-->Traffic

The buses and parents share the same driveway in front of the school. It is separated from the parking and delivery.

There are two driveway loops, one at each end of the building. One is used for daycare pick up.

Suitability - K-8->Site-->Pedestrian Traffic

Pedestrians cross the bus and parent lane to access the school from the parking lot. There are two marked

handicapped lanes that provide a walkway from parking to the entrance.

Page 2 of 53/9/2010 2:19:45PM

Page 175: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

Project:Site:

Suitability

Possible

Score

Score

Percent

Score

CaddoCounty:

1Region:

Rating

618Site #:

Caddo 2009 Turner Elementary-Middl

Project #:

4057

Site Type: Site Size:Grade Config:

K-8 0.00ES/MS

Suitability - K-8->Site-->Play Courts & Fields

The school has a large site, but the play areas are not developed. The elementary side has a fenced play area with

grass, but no equipment. There is blacktop with poles, but no backstops. The large, grassed field has 3 old

climbing structures a significant distance from the school. The middle school side has open grass and a blacktop

area with poles, but no backstops.

Suitability - K-8->Safety and Security-->Fencing

There is fencing missing at the elementary play area where the turn around is located. There is fencing missing to

separate the delivery and parking areas from the play areas.

Suitability - K-8->Safety and Security-->Signage & Way Finding

The interior signage includes some room usage and room numbers. There are no way finding signs directing the

public to the office or other areas. The exterior signage includes a large sign at the entrance to the school. There is

no sign at the entrance behind the school and few traffic directional signs.

Suitability - K-8->Safety and Security-->Ease of Supervision

The facility is spread out over several buildings and includes many stairwells that are behind closed doors. The

middle school section includes some open commons areas with locker bays that provide hiding places.

Suitability - K-8->Safety and Security-->Limited Entrances

The school has multiple buildings and has no fencing to control access. All exterior doors are open.

Suitability - K-8->Safety and Security-->Interior Circulation

The stairways are narrow and intersections are congested.

Suitability - K-8->School Climate-->Learning Style Variety

There are a few spaces in the building that support learning style variety, but the building as a whole does not have

flexible learning spaces that accommodate different styles and different sized groups.

Suitability - K-8->School Climate-->School Environment

Some of the spaces are inviting and stimulating. The portable rooms are small and dark. The elementary

classrooms have limited natural light and are visually isolated from each other.

Suitability - K-8->School Climate-->Landscaping

There is only grass around the school.

Suitability - K-8->General Classrooms-->Size

Most of the classrooms do not meet the size standard.

Suitability - K-8->General Classrooms-->Adjacencies

Most classrooms are located near each other, although the library is in a separate building. Some rooms are

located near the music spaces without sufficient acoustical treatment.

Suitability - K-8->General Classrooms-->Storage\Fixed Equip.

Some classrooms have chalkboards only, rather than whiteboards. Some rooms do not have computers.

Suitability - K-8->Remedial - Special Needs-->Size

Most of the rooms used for special education are too small for the program. Some rooms do not have in-room

restrooms.

Suitability - K-8->Remedial - Special Needs-->Adjacencies

There are three special education rooms located in portable buildings behind the elementary wing and not located

near any restrooms.

Suitability - K-8->Remedial - Special Needs-->Storage\Fixed Equip.

Most of the special education rooms lack appropriate storage space for their large equipment. The room in the

portable building lacks a changing area with hot water. The severe room in the main building lacks adequate hot

water control in the changing space.

Page 3 of 53/9/2010 2:19:45PM

Page 176: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

Project:Site:

Suitability

Possible

Score

Score

Percent

Score

CaddoCounty:

1Region:

Rating

618Site #:

Caddo 2009 Turner Elementary-Middl

Project #:

4057

Site Type: Site Size:Grade Config:

K-8 0.00ES/MS

Suitability - K-8->Library-->Adjacencies

The library is located in a building separated from the classrooms. It shares a wall with the cafeteria and is adjacent

to the gym/PE areas. There is not adequate acoustical separation between the library and those areas. The internal

acoustics are difficult with elementary activities on one side and middle level activities on the other and no

separation.

Suitability - K-8->P.E.-->Storage\Fixed Equip.

The locker rooms are large enough, but many lockers are broken or missing.

Suitability - K-8->Music-->Size

The middle school band room is large enough for the program. The middle school orchestra and piano rooms are

small, have limited storage, and no practice spaces. The elementary music room is small, has limited storage and

no acoustical treatment to isolate it from the other classrooms in the wing.

Suitability - K-8->Music-->Adjacencies

The middle school band room is isolated. The other rooms are surrounded by general classrooms.

Suitability - K-8->Music-->Storage\Fixed Equip.

The middle school band room has appropriate casework and storage for instruments. The other rooms do not.

Suitability - K-8->Art-->Size

The art room at the elementary school is small for the program. The middle school art room is large enough, but is

not currently being used for art.

Suitability - K-8->Art-->Storage\Fixed Equip.

The elementary art room has limited storage space for large items and for displaying student work. The sink has a

clay trap, but there is no kiln. The middle school room has a large storage room with a vented kiln in the middle. It

is not currently used as an art room.

Suitability - K-8->Performing Arts\Auditorium-->Adjacencies

The auditorium is in a building with PE, cafeteria, and the gyms. It is not adjacent to the music spaces.

Suitability - K-8->Vocational Technical-->Size

There are two rooms used for home living. A large room is set up as a cooking class with stoves, etc. The other

room is used for lecture and does not meet the size standard.

Suitability - K-8->Science-->Size

Most of the science rooms are large enough for the program. The elementary room and the room in the 6th grade

wing do not meet the standard.

Suitability - K-8->Science-->Storage\Fixed Equip.

Most of the science rooms lacked chemical resistant counters and lab tables. Most rooms lacked safety equipment,

including fire extinguishers.

Suitability - K-8->Kindergarten-->Size

There are four kindergarten rooms. None of them meet the size standard.

Suitability - K-8->Administration-->Adjacencies

The office is located near the main entrance, but does not have sight lines to the entrances to the classroom wings

and no active supervision over the entrances.

Suitability - K-8->Restrooms (Student)

There are age-appropriate fixtures in the restrooms in the primary classrooms. None of them are accessible. The

hallway restrooms in the elementary wing do not have age-appropriate fixtures. The restrooms in the gym lack stall

doors and some towel dispensers. There are no urinal privacy partitions.

Suitability - K-8->Cafeteria

The elementary side of the cafeteria is sized appropriately, but the tables are not age-appropriate for the younger

children. The middle school side is small for the program.

Page 4 of 53/9/2010 2:19:45PM

Page 177: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

Project:Site:

Suitability

Possible

Score

Score

Percent

Score

CaddoCounty:

1Region:

Rating

618Site #:

Caddo 2009 Turner Elementary-Middl

Project #:

4057

Site Type: Site Size:Grade Config:

K-8 0.00ES/MS

Suitability - K-8->Clinic

The clinic space is not located for easy supervision of any students. The space is difficult to access.

Page 5 of 53/9/2010 2:19:45PM

Page 178: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

Functional and Educational Adequacy

Technology Readiness Report

Page 179: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

Technology Readiness Report - Full

Project:Site:

Technology Readiness

Possible

ScoreScore

Percent

Score

CaddoCounty:

1Region:

Rating

618Site #:

Caddo 2009 Turner Elementary-Middle

Project #:

4057

Technology Readiness

15.00 7.50 50.00 Comm/IT Equipment Environment Fair

10.00 10.00 100.00 Electrical Power Good

10.00 0.00 0.00 Cooling Unsat

10.00 3.30 33.00 Drops & Wireless Poor

15.00 4.95 33.00 LAN Connectivity Poor

10.00 10.00 100.00 WAN Backbone Good

10.00 3.30 33.00 LAN-WAN Performance Poor

5.00 5.00 100.00 Video Distribution Good

5.00 2.50 50.00 Voice Distribution Fair

10.00 10.00 100.00 Faculty & Staff Technology Good

100.00 56.55 56.55Total For Site:

Comments

Technology Readiness->Comm/IT Equipment Environment

The IT equipment is located in various places across the school. Most equipment is located in custodial closets.

Technology Readiness->Cooling

Many of the rooms were overheated, others were cool. All rooms have central AC, but temperatures vary widely

within the building. The computer labs have no capacity to control the temperature in the space.

Technology Readiness->Drops & Wireless

The spaces that have hard-wired connections are working well. The spaces that are wireless are problematic for

reliable connections to the internet.

Technology Readiness->LAN Connectivity

Some of the computers in the school are connected.

Technology Readiness->LAN-WAN Performance

Computer connectivity is not reliable in this school. The wireless networks are not reliable. Computers that are

hard-wired are more likely to be connected regularly to the internet.

Technology Readiness->Video Distribution

The middle school has Channel 1 televisions, but does not currently subscribe to their program. The elementary

school has a cable connector point in each room.

Technology Readiness->Voice Distribution

The rooms have intercoms, but not phone in most classrooms. Some rooms have portable, hand-held phones that

do not have voicemail and some have battery or other issues.

Technology Readiness->Faculty & Staff Technology

All staff have access to a staff computer station.

Page 1 of 13/9/2010 2:04:56PM

Page 180: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

Functional and Educational Adequacy

Capacity and Utilization Report

Page 181: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

Capacity Calculations Appendix Preface Some spaces do not contribute to the functional capacity of a school. These spaces are generally spaces

which do not have students assigned to them. Some examples of these spaces include elementary art

rooms, elementary computer labs, elementary music rooms, and special education resource rooms.

Many schools have temporary buildings and these are also not included in the calculation of the

functional capacity. It is the district’s philosophy that, while temporary buildings can be useful in the

short run, they do not provide appropriate long term space and should be eliminated where possible.

Temporary buildings are generally used for the following functions:

1. To house students in temporary classrooms when the school is lacking enough classrooms

2. To house special programs when the school is lacking space for these programs

3. To house necessary storage or administrative support functions when permanent space is lacking

4. To house unnecessary storage or functions

It is the district’s strategy to eliminate all but the absolute necessary temporary buildings and it should

conduct an inventory of the uses of temporary buildings. Where the inventory identifies uses 1-3, the

district will need to consider a more appropriate space solution. In the case of number 4, the district will

need to ensure the principal of the school discontinues the inappropriate use of the temporary building.

Page 182: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

Caddo Parish School Board

Instructional Space Model Guidelines

Room Type Students/

Room

Pre-School 20

K Capacity (full day) and 1st Grade 20

Elementary Classroom (2) 24

Elementary Classroom (3-5) 26

Secondary Classroom (6-12) 25

Art (Secondary) 33

Music (Secondary) - Vocal 25

Music (Secondary) - Instrumental 30

Science Lab (Secondary) 25

Voc./Industrial Tech, Foods, Etc. 25

Gym (Secondary) 80

Computer Lab (Elementary)* 26

Computer Lab (Secondary) 33

Spec. Ed. - Severe 9

Spec. Ed. - Resource 0

Alternative Education 18

Portable 0

*These spaces do not contribute to capacity

Scheduling Factors

Elementary Schools 95.0%

Middle Schools 85.0%

High Schools 75.0%

Source: MGT of America, Inc., 2009.

Page 183: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

Caddo Parish School Board Capacity Calculations

Turner Elementary-MiddleES/M K-8

K-1 Classroom: 9

PK Classroom: 2

ES (2) Classroom: 3

ES (3-5) Classroom: 11

ART: 2

Secondary (6-12): 22

MU Inst: 3

MU Vocal: 1

Science: 6

GYM: 3

VO/TEC: 2

*Computer Lab: 1

SE - Resource: 6

SE - Severe: 5

Alt: 0

**Temp Bldg: 8

20

24

20

26

33

25

30

25

25

80

25

33

0

9

18

Room Type # of Classrooms x Students/Room = Capacity

Total Capacity (w/o scheduling factor) =

Turner Elementary-Middle Capacity =

x Scheduling factor =

40

72

180

286

550

66

90

25

150

240

50

33

0

45

0

0

*Computer Labs at Elementary Schools do not contribute to capacity**The temporary building number represents the number of temporary building teaching stations or rooms, not the number of temporary buildings.

1,553

1,827

85%

N/A

Page 184: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

Future Facility and Site Assessment Report

Page 185: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

FUTURE FACILITY AND SITE ASSESSMENT

School TURNER ELEMENTARY / MIDDLE SCHOOL 5904 West 70th Street Shreveport, LA 71129

Site Description 17 acre site, part of a larger tract shared with adjacent Huntington High, set amidst the developing western Shreveport just west of the airport, with a multi-family residential neighborhood, church, and commercial to the south across West 70

th Street, a major arterial, multi-family residential to the west across

Rasberry Lane, and undeveloped woodlands to the east. The site slopes gently down from the north toward Turner. The school consists of a 2-story main building and multiple 1- story units added incrementally, with interior corridors and connected by covered outdoor walkways, some of which have barrel vaults. The buildings have flat roofs and the exterior envelope consists of brick walls with a minimum of punched windows; the second story has a skin of metal siding. There is a collection of temporary buildings at the school. Site features include concrete parking lots and drives, a football practice field, and a couple of basketball courts. On the east side of the property is a collection of small buildings and sheds comprising the CPSB Nursing Staff Center. The buildings are pre-engineered modular buildings and also a large open shed in the back used for open air storage. Site features include driveways around the back service areas and a front parking lot.

SUMMARY Topic Grade Comments

Site Adequacy Potential

Constraint

Land for expansion of building is available and without inhibiting constraints but site is much smaller than guideline for the population. SITE ASSESSMENT

Site Size Status Inadequate

Student Capacity: 1515 Min. Acres Recommended: 35 Actual Site Acres: 17.0

Usable Area Remaining

Adequate

4.84 Acres. Approximates the reasonably usable land adjacent to the current facilities (includes both Turner and Nursing Staff Center). Assumes major setbacks from property lines and roadways and aligns with building forms shown on graphic. Expansion areas would not consume recreation fields, or athletic facilities. Expansion zones at the Nursing facility might require redevelopment of the site for most efficient usage.

• Flood Plain No Constraint

• Potable Water No Constraint Low pressure reported.

• Sanitary Sewer No Constraint

• Storm Drainage No Constraint Some ponding reported in the parking lot.

• Electricity No Constraint

• Natural Gas No Constraint

• Ground Water No Constraint

• Air Pollution No Constraint

• HazMat/Soils No Constraint

• Habitats No Constraint No conflicts identified by DEQ.

Ease of Access No Constraint

Ease of Traffic Flow Needs Improvement

Bus and auto traffic use same driveways at front of building but have separate loading areas; these are congested at

Page 186: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

pickup time and conflict with parking lot. Separate drives and loading areas with bypass lanes and more queuing are desirable.

Design Compatibility No Constraint

The school facility fits into the neighborhood and has grown over the years; expansion would not be intrusive.

Compatibility of Structures

Potential Constraint

The configuration is generally compatible with contemporary design approaches to schools and the materials and general forms are easily blended with current designs as demonstrated by recent additions. Wall and roof assemblies may not adequately support today’s building systems. The open connected walkways between buildings pose a security risk.

Page 187: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

TU

RN

ER

EL

EM

./MID

DL

E S

CH

OO

L5904 W

est 7

0th

Stre

et

Sh

revep

ort, L

A 7

1129

N

WEST 70TH STREET

RA

SB

ER

RY

LA

NE

Pu

blis

he

d 0

2.1

2.1

0

COMMERCIAL

MU

LT

I-FA

MIL

Y

RE

SID

EN

TIA

L

MULTI-FAMILYCHURCH

CPSB Nursing

Staff Center

Turner Football

Field

WO

OD

LA

ND

S

HUNTINGTON

HS

Slo

pe

Bus & Auto Drop-Off

+FH

Parking

SMH

E E E E E EE E E E E E EE

+FH

+FH

+FH

SMH

WM

GM

Park

ing

Parking

ParkingParking

Parking

T

UE

UE

UE

E

E

EEE

E

Primary

1Primary

2

New

Bldg

Second-

ary 1

Slope

Existing

BldgPrimary

3

Primary 1: 1.63 Ac

Primary 2: 0.64 Ac

Primary 3: 0.98 Ac

Secondary 1: 0.51 Ac

Secondary 2: 1.08 Ac

Total: 4.84 Ac

Secondary 2

(Redevelop)

Utility Data Incomplete

Parking

Page 188: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

Building Code Verification Report

Page 189: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

Building Code Number COMPLYNOT

COMPLY

FCA

DEFICIENCY

NOT

KNOWN

SYSTEM

NOT

PRESENT

NA TO FCA

DATA

1Code of Federal Regulations 28 CFR Part

36, 1994 edition, Paragraph 4.1.2,

Paragraph 4.1.6

1 NPFA 101:15.2.3.2; IBC 1017.2

3 IBC 1005.2

5

a

b

c

d

6

a

b

1

2

4 IBC 1011.5.3

1 IBC 1007.3

2 IBC 1020.1

Are penetrations into stairs limited to doors, electrical conduit serving the

stairway, piping necessary for the heating or cooling of the exit enclosure,

sprinkler piping, standpipes and penetrations for fire alarm circuits?

8

Boiler and furnace rooms?

Are corridor doors rated a minimum 20-minute rating?

Is glazing in rated doors above 20 minutes limited to 100 square inches?

NFPA 101:15.3.7

NFPA 101:15.3.2.1; IBC 508.2

Does every room or space greater than 250 SF and used for educational

purposes have not less than one outside window for emergency rescue

(exceptions: sprinklered building or room that has a door directly to the

outside)?

Do doors opening in the path of egress travel not reduce the required width to

less than 1/2 during the course of the swing?

When fully open, do corridor doors not project more than 7 inches into the

required corridor width?

Is the building subdivided into compartments by smoke partitions having not

less than a 1-hour fire rating? (Maximum area of compartment is 30,000 SF.

Length or width of building exceeds 300’ unless sprinklered.)

IBC 715.4.4.1

Is 1-hour rating or sprinkler protection provided for the following:

Hazardous storage?

Janitor’s closet?

IBC 1008.1.8.1

Where there is a chiller, is it separated from a boiler or water heater by a 2-

hour assembly?

Laundries? NFPA 101:15.3.2.1; IBC 508.2

School Name: Turner ES/MS

NFPA101:15.2.11.1.1

G2030 Pedestrian Paving

B2020 Exterior Windows

4

BUILDING CODE COMPLIANCE REPORT

Code Provision

Is there a continuous path of entry/exit for handicap accessibility to all parts of

the building?

Do exit access corridors have not less than 6’ of clear width?

Are both 1-hour rating and sprinkler protection provided for the following:

Science labs?

7

Does all door hardware comply by not requiring tight grasping, tight pinching or

twisting to operate?

Maintenance shops?

IBC 508.2

C10 Interior Construction

C1010 Partitions

C1020 Interior Doors

1

IBC 1005.2

Are corridors 1-hour rated (exceptions: building is sprinklered or each room for

instruction has at least one door directly to the exterior)?IBC 1017.1

2

3

NFPA 101:7.1.3.2.1; IBC 1020.1.2

C2010 Stair Construction

Are all means of egress illuminated at all times building is occupied?

Do exit stairways have a minimum 48” clearance width between handrails?

Are stairs separated by 1-hour fire resistance rating?

3

Page 190: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

Building Code Number COMPLYNOT

COMPLY

FCA

DEFICIENCY

NOT

KNOWN

SYSTEM

NOT

PRESENT

NA TO FCA

DATACode Provision

4

a NFPA 101:7.2.2.2.4.2; IBC 1012.4

b IBC 1012.5

c NFPA 101:7.2.2.4.4.6; IBC 1012.1

d NFPA 101:7.2.2.4.4.2; IBC 1012.2

5 IBC 1007.6

1

2

1 IBC 508.2

2 IBC 1203.1

3INTERNATIONAL MECHANICAL CODE

2000, 606.4

4 IBC 908.6

1 IBC 903.2

1 IBC 907.2

Is there a telephone or intercom communication in the cab?

Is there a fireman control panel at the ground floor controls?

Are handrails:

IBC 3006.2

IBC 3003.2

Is there an Area of Refuge in the stairwell or in a vestibule entering the stair? Is

there a communication device there?

Between 34” and 38” above the surface of the tread?

Between 1-1/4” and 2” in diameter?

Returning to wall, guard or walking surface?

3 IBC 907.11

IBC 907.2.12.2

Does the shaft have exhaust directly to the outside, an access ladder to the pit,

and battery backup lighting in the shaft/pit?

Are the mechanical rooms separated by fire rated partitions from remainder of

building?

Is there a standard and emergency ventilation system provided?

Are there automatic sprinkler systems provided in assembly spaces with more

than 300 occupants?

2

Is there a refrigerant detection and alarm system provided?

Are there emergency shut-offs provided?

Are the duct smoke detectors connected to the building’s fire alarm control

panel?

Is there a monitored fire alarm system provided?

Does the operation of fire detector, sprinkler device or manual fire alarm box

immediately sounds an alert tone followed by voice instructions giving

approved information and directions for an evacuation?

IBC 3004.1; IBC 3006.1

D30 HVAC Systems

D40 Fire Protection

D4010 Sprinklers

D50 Electrical

D5030 Communications and Security

4

D10 Conveying

D1010 Elevators

3Does the Elevator Machine Room have ventilation or air conditioning to protect

controls from overheating?

Continuously graspable?

Page 191: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

Energy Conservation Opportunities Report

Page 192: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

System Energy Conservation FCA Deficiency Replacement Cost

SCHOOL TYPEENERGY CONSERVATION OPPORTUNITIES

Turner Elementary/Middle ES/MS

1975 Nursing Staff Center Roof Covering No No

Exterior Windows Yes Yes $45,925.00

Interior Lighting Yes Yes $64,755.00

Bldg Controls & Instrumentation No No

Heating No No

Other HVAC Systems (Ventilation) No No

Terminal & Package Units No No

Cooling No No

1984 Building Roof Covering Yes Yes $1,814,318.00

Exterior Windows No No

Interior Lighting No No

Bldg Controls & Instrumentation Yes Yes $342,324.00

Heating No No

Other HVAC Systems (Ventilation) Partial Yes $26,878.00

Terminal & Package Units No No

Cooling Partial Yes $31,790.00

2006 Classroom Wing Addition Roof Covering No No

Exterior Windows No No

Interior Lighting No No

Bldg Controls & Instrumentation No No

Heating No No

Other HVAC Systems (Ventilation) No No

Terminal & Package Units No No

Cooling No No

Site Exterior Lighting No No

Page 193: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

Facility Condition Assessment Reports

Page 194: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 1

Facility: \Elementary/Middle Schools\VivianAddress: 100 W. Kentucky Ave., Vivian, LA 71082

Attributes: Temporary Building Rooms 2

General Information: Function: Elementary Middle Year Built:Gross Area: 129,177 S.F. Last Renovation:

Facility Description:

The Vivian Elementary/Middle School campus consists of one main school building and six ancillary buildings located at on 100 West Kentucky Avenue in Vivian, Louisiana. The original campus was constructed in 1923. Ancillary buildings on campus include the 1989 C & D Buildings, 1999 E Building, 2004 H Building, covered walkways, and the Pine Street Building. In addition to the buildings, the campus contains basketball courts. This report contains condition and adequacy data collected during the 2009/2010 Facility Condition Assessment (FCA). The detailed condition and deficiency statements are contained in this report.

Current Repair Cost: $3,726,480.00 Replacement Cost: $22,089,677.00 FCI: 16.87%

20-Jan-2010Vivian Elementary/Middle School

Page 195: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 2

Facility: \Elementary/Middle Schools\Vivian\1923, 1930, 1972 (A&B Bldgs)Address: 100 W. Kentucky Avenue, Vivian , LA 71082

Attributes: Number of Floors 2

General Information: Function: Elementary Middle Year Built: 1923Gross Area: 61,634 S.F. Last Renovation:

Facility Description:

Vivian Elementary/Middle School is a 2-story building, designated as Buildings A and B, located at 100 West Kentucky in Vivian, Louisiana. There have been additions in 1930 and 1972, and HVAC and roofing renovations. This report contains condition and adequacy data collected during the 2009/2010 Facility Condition Assessment (FCA). The detailed condition and deficiency statements are contained in this report for each building.

Energy conservation opportunities for this building include: 1) installation of fixed, double pane, low e, thermal windows with thermal breaks would improve energy use and improve comfort; 2) Upon replacement of the roof covering, an insulation with a high thermal resistance value should be installed; 3) The plumbing fixtures should be replaced with low flow, energy efficient models; 4) Addition of a building automation system would allow programs to improve operation and reduce energy use; and 5) A power factor analysis may be justified to provide greater electrical consumption efficiency.

ADA vertical access needs for this building include provision of an elevator in B building and front entry access.

Current Repair Cost: $2,386,732.00 Replacement Cost: $10,228,117.00 FCI: 23.34%

20-Jan-2010East Elevation

20-Jan-2010South Elevation

20-Jan-2010North Elevation

20-Jan-2010West Elevation

Page 196: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 3

Facility: \Elementary/Middle Schools\Vivian\1923, 1930, 1972 (A&B Bldgs) (continued)

Building Condition:

System Unit Price$

Unit of

Meas Qty Renewal% Renewal$ Life Installed

Calc Next

Renewal

Next

Renewal CI% Deficiency$ Replacement Value FCI%

Total $165.95 S.F. 61,634 107 $10,907,014 51 1974 1943 2010 50 $2,386,733 $10,228,118 23

Substructure $10.20 S.F. 61,634 100 $628,667 100 1923 $628,667

Foundations $10.20 S.F. 61,634 100 $628,667 100 1923 $628,667

Standard Foundations $10.20 S.F. 61,634 100 $628,667 100 1923 $628,667

Special Foundations 0 0 0 0

Slab on Grade 0 0 0 0

Basement Construction 0 0 0

Basement Excavation 0 0 0 0

Basement Walls 0 0 0 0

Shell $53.94 S.F. 61,634 103 $3,420,319 81 1950 2002 47 $406,785 $3,324,538 12

Superstructure $24.00 S.F. 61,634 100 $1,479,216 100 1923 $1,479,216

Floor Construction $13.20 S.F. 61,634 100 $813,569 100 1923 $813,569

Roof Construction $10.80 S.F. 61,634 100 $665,647 100 1923 $665,647

Exterior Enclosure $20.40 S.F. 61,634 103 $1,294,315 78 1956 2002 $406,785 $1,257,334 32

Exterior Walls $14.40 S.F. 61,634 100 $887,530 100 1923 $887,530

Exterior Windows $4.80 S.F. 61,634 110 $325,428 30 1972 2002 $325,428 $295,843 110

Exterior Doors $1.20 S.F. 61,634 110 $81,357 30 1972 2002 $81,357 $73,961 110

Roofing $9.54 S.F. 61,634 110 $646,788 41 1988 2019 47 $587,988

Roof Coverings - BUR $9.54 S.F. 37,578 110 $394,344 20 1999 2019 45 $358,494

Roof Coverings - EPDM 0 0 0 0

Roof Coverings - Standing

Seam Mettal

$9.54 S.F. 24,056 110 $252,444 75 1972 2047 49 $229,494

Roof Openings 0 0 0 0

Interiors $29.94 S.F. 61,634 108 $1,985,563 56 1968 1992 49 $734,374 $1,845,402 40

Interior Construction $19.20 S.F. 61,634 106 $1,257,333 68 1956 1992 5 $406,784 $1,183,373 34

Partitions $10.80 S.F. 61,634 110 $732,212 100 1923 $665,647

Interior Doors $2.40 S.F. 61,634 80 $118,337 40 1972 2012 5 $147,922

Fittings $6.00 S.F. 61,634 110 $406,784 20 1972 1992 $406,784 $369,804 110

Stairs $2.58 S.F. 61,634 110 $174,917 100 1923 $159,016

Stair Construction $2.58 S.F. 61,634 110 $174,917 100 1923 $159,016

Interior Finishes $8.16 S.F. 61,634 110 $553,313 15 1996 2004 72 $327,590 $503,013 65

Wall Finishes - Ceramic &

Glazed

0 0 0 0

Wall Finishes - Paint $2.40 S.F. 61,634 110 $162,714 10 2000 2010 $162,714 $147,922 110

Floor Finishes - Carpet $2.76 S.F. 2,856 110 $8,671 8 1999 2007 $8,671 $7,883 110

Floor Finishes - Ceramic &

Quarry Tile

$1.44 S.F. 2,962 110 $4,692 50 1972 2022 24 $4,265

Floor Finishes - Terrazzo 0 0 0 0

Floor Finishes - VCT $3.60 S.F. 55,816 110 $221,031 15 2006 2021 73 $200,938

Ceiling Finishes $2.30 S.F. 61,634 110 $156,205 20 1984 2004 $156,205 $142,005 110

Services $61.07 S.F. 61,634 110 $4,140,253 22 1989 1953 2010 52 $1,001,503 $3,763,864 27

Conveying $0.72 S.F. 61,634 110 $48,814 30 1923 1953 2010 $48,814 $44,376 110

Elevators and Lifts $1.20 S.F. 36,980 110 $48,814 30 1923 1953 2010 $48,814 $44,376 110

Plumbing $7.54 S.F. 61,634 110 $510,921 30 1975 2002 17 $493,836 $464,474 106

Plumbing Fixtures $5.89 S.F. 61,634 110 $399,462 30 1972 2002 $399,462 $363,148 110

Domestic Water Distribution $0.44 S.F. 61,634 110 $30,102 30 1972 2002 $30,102 $27,365 110

Sanitary Waste $0.76 S.F. 61,634 110 $51,255 30 1972 2002 $51,255 $46,595 110

Rain Water Drainage $0.19 S.F. 61,634 110 $13,017 30 1972 2002 $13,017 $11,834 110

Other Plumbing Systems -

Natural Gas

$0.25 S.F. 61,634 110 $17,085 30 1985 2015 17 $15,532

HVAC $33.72 S.F. 61,634 110 $2,286,128 20 2001 2015 46 $2,078,298

Heat Generating Systems 0 0 0 0

Cooling Generating Systems 0 0 0 0

Distribution Systems & Exhaust

Systems

$9.12 S.F. 61,634 110 $618,312 30 2000 2030 67 $562,102

Terminal & Package Units $21.60 S.F. 61,634 110 $1,464,424 15 2000 2015 33 $1,331,294

Controls & Instrumentation $1.80 S.F. 61,634 110 $122,035 20 2005 2025 75 $110,941

Other HVAC Systems/Equip -

Kitchen Hood

$1.20 S.F. 61,634 110 $81,357 30 2000 2030 67 $73,961

Fire Protection 0 0 0

Sprinklers 0 0 0 0

Electrical $19.09 S.F. 61,634 110 $1,294,390 23 1998 2002 69 $458,853 $1,176,716 39

Electrical Service/Distribution $2.27 S.F. 61,634 110 $153,765 30 2001 2031 70 $139,786

Branch Wiring $6.77 S.F. 61,634 110 $458,853 30 1972 2002 $458,853 $417,139 110

Lighting $6.77 S.F. 61,634 110 $458,853 20 2005 2025 75 $417,139

Communications and Security -

Public Address & Clock System

$0.88 S.F. 61,634 110 $59,391 20 2000 2020 50 $53,991

Fire Alarm $1.54 S.F. 61,634 110 $104,137 10 2006 2016 60 $94,670

Page 197: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 4

System Unit Price$

Unit of

Meas Qty Renewal% Renewal$ Life Installed

Calc Next

Renewal

Next

Renewal CI% Deficiency$ Replacement Value FCI%

Security & CCTV $0.88 S.F. 61,634 110 $59,391 10 2005 2015 50 $53,991

Other Electrical Systems -

Emergency Generator

0 0 0 0

Equipment & Furnishings $10.80 S.F. 61,634 110 $732,212 20 1974 1943 49 $244,071 $665,647 37

Equipment $7.20 S.F. 61,634 110 $488,141 20 2000 2019 49 $443,765

Commercial Equipment $6.00 S.F. 61,634 110 $406,784 20 2000 2020 50 $369,804

Institutional Equipment $1.20 S.F. 61,634 110 $81,357 20 1999 2019 45 $73,961

Furnishings $3.60 S.F. 61,634 110 $244,071 20 1923 1943 $244,071 $221,882 110

Fixed Furnishings $3.60 S.F. 61,634 110 $244,071 20 1923 1943 $244,071 $221,882 110

Page 198: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 5

Facility: \Elementary/Middle Schools\Vivian\1923, 1930, 1972 (A&B Bldgs) (continued)

Renewal Schedule:

Systems 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020

Total $2,386,733 $125,544 $1,786,325 $124,345 $10,984 $620,681 $845,174

Substructure

Foundations

Standard Foundations

Special Foundations

Slab on Grade

Basement Construction

Basement Excavation

Basement Walls

Shell $406,785 $514,529

Superstructure

Floor Construction

Roof Construction

Exterior Enclosure $406,785

Exterior Walls

Exterior Windows $325,428

Exterior Doors $81,357

Roofing $514,529

Roof Coverings - BUR $514,529

Roof Coverings - EPDM

Roof Coverings - Standing Seam

Mettal

Roof Openings

Interiors $734,374 $125,544 $10,984 $218,674

Interior Construction $406,784 $125,544

Partitions

Interior Doors $125,544

Fittings $406,784

Stairs

Stair Construction

Interior Finishes $327,590 $10,984 $218,674

Wall Finishes - Ceramic & Glazed

Wall Finishes - Paint $162,714 $218,674

Floor Finishes - Carpet $8,671 $10,984

Floor Finishes - Ceramic & Quarry

Tile

Floor Finishes - Terrazzo

Floor Finishes - VCT

Ceiling Finishes $156,205

Services $1,001,503 $1,786,325 $124,345 $79,816

Conveying $48,814

Elevators and Lifts $48,814

Plumbing $493,836 $19,806

Plumbing Fixtures $399,462

Domestic Water Distribution $30,102

Sanitary Waste $51,255

Rain Water Drainage $13,017

Other Plumbing Systems - Natural

Gas

$19,806

HVAC $1,697,669

Heat Generating Systems

Cooling Generating Systems

Distribution Systems & Exhaust

Systems

Terminal & Package Units $1,697,669

Controls & Instrumentation

Other HVAC Systems/Equip -

Kitchen Hood

Fire Protection

Sprinklers

Electrical $458,853 $68,850 $124,345 $79,816

Electrical Service/Distribution

Branch Wiring $458,853

Lighting

Communications and Security -

Public Address & Clock System

$79,816

Page 199: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 6

Systems 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020

Fire Alarm $124,345

Security & CCTV $68,850

Other Electrical Systems -

Emergency Generator

Equipment & Furnishings $244,071 $106,152 $546,684

Equipment $106,152 $546,684

Commercial Equipment $546,684

Institutional Equipment $106,152

Furnishings $244,071

Fixed Furnishings $244,071

Page 200: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 7

Facility: \Elementary/Middle Schools\Vivian\1923, 1930, 1972 (A&B Bldgs) (continued)

Deficiency Sheet:

Deficiency: Surveyor/Update: Eric Altman Fri, 04-Jun-2010Priority: 3Quantity: 1

Assembly: B2020 System: Exterior Windows Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: The exterior windows are worn, beyond expected life, and should be replaced.

Estimates:Raw Cost $271,189.60

Plus or (Minus) Additional Cost $0.00Total Estimated Amount $271,189.60

Deficiency: Surveyor/Update: Eric Altman Fri, 04-Jun-2010Priority: 3Quantity: 1

Assembly: B2030 System: Exterior Doors Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: The exterior doors are worn, beyond expected life, and should be replaced.

Estimates:Raw Cost $67,797.40

Plus or (Minus) Additional Cost $0.00Total Estimated Amount $67,797.40

Page 201: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 8

Facility: \Elementary/Middle Schools\Vivian\ 1923, 1930, 1972 (A&B Bldgs) (continued)

Deficiency: Surveyor/Update: Eric Altman Fri, 04-Jun-2010Priority: 3Quantity: 1

Assembly: C1030 System: Fittings Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: Fittings, such as chalk and tack boards, lockers, toilet and bath accessories, toilet partitions, and shelving, are

beyond expected life and should be replaced.

Estimates:Raw Cost $338,987.00

Plus or (Minus) Additional Cost $0.00Total Estimated Amount $338,987.00

Deficiency: Surveyor/Update: Eric Altman Fri, 04-Jun-2010Priority: 3Quantity: 1

Assembly: C3010 System: Wall Finishes - Paint Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: The painted wall finishes are worn, beyond expected life, and should be replaced.

Estimates:Raw Cost $135,594.80

Plus or (Minus) Additional Cost $0.00Total Estimated Amount $135,594.80

Page 202: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 9

Facility: \Elementary/Middle Schools\Vivian\ 1923, 1930, 1972 (A&B Bldgs) (continued)

Deficiency: Surveyor/Update: Eric Altman Fri, 04-Jun-2010Priority: 3Quantity: 1

Assembly: C3020 System: Floor Finishes - Carpet Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: Carpet floor finishes are worn, beyond expected life, and should be replaced.

Estimates:Raw Cost $7,225.68

Plus or (Minus) Additional Cost $0.00Total Estimated Amount $7,225.68

Deficiency: Surveyor/Update: Eric Altman Fri, 04-Jun-2010Priority: 3Quantity: 1

Assembly: C3030 System: Ceiling Finishes Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: The ceiling finishes are stained, beyond expected life, and should be replaced.

Estimates:Raw Cost $130,171.01

Plus or (Minus) Additional Cost $0.00Total Estimated Amount $130,171.01

Page 203: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 10

Facility: \Elementary/Middle Schools\Vivian\ 1923, 1930, 1972 (A&B Bldgs) (continued)

Deficiency: Surveyor/Update: Eric Altman Fri, 04-Jun-2010Priority: 3Quantity: 1

Assembly: D1010 System: Elevators and Lifts Material: System Distress: Missing Category: ADA / Accessibility Correction: Renew System Note: An elevator is required to access the second floor of Building B.

Estimates:Raw Cost $40,678.00

Plus or (Minus) Additional Cost $0.00Total Estimated Amount $40,678.00

Deficiency: Surveyor/Update: Eric Altman Fri, 04-Jun-2010Priority: 3Quantity: 1

Assembly: D2010 System: Plumbing Fixtures Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: Plumbing fixtures are beyond expected life and should be replaced.

Estimates:Raw Cost $332,885.23

Plus or (Minus) Additional Cost $0.00Total Estimated Amount $332,885.23

Page 204: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 11

Facility: \Elementary/Middle Schools\Vivian\ 1923, 1930, 1972 (A&B Bldgs) (continued)

Deficiency: Surveyor/Update: Eric Altman Thu, 11-Mar-2010Priority: 3Quantity: 1

Assembly: D2020 System: Domestic Water Distribution Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: Domestic water distribution is beyond expected life and should be replaced.

Estimates:Raw Cost $25,085.04

Plus or (Minus) Additional Cost $0.00Total Estimated Amount $25,085.04

Deficiency: Surveyor/Update: Eric Altman Fri, 04-Jun-2010Priority: 3Quantity: 1

Assembly: D2030 System: Sanitary Waste Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: Sanitary waste is beyond expected life and should be replaced.

Estimates:Raw Cost $42,712.36

Plus or (Minus) Additional Cost $0.00Total Estimated Amount $42,712.36

Page 205: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 12

Facility: \Elementary/Middle Schools\Vivian\ 1923, 1930, 1972 (A&B Bldgs) (continued)

Deficiency: Surveyor/Update: Eric Altman Fri, 04-Jun-2010Priority: 3Quantity: 1

Assembly: D2040 System: Rain Water Drainage Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: Rain water drainage system is beyond expected life and should be replaced.

Estimates:Raw Cost $10,847.58

Plus or (Minus) Additional Cost $0.00Total Estimated Amount $10,847.58

Deficiency: Surveyor/Update: Eric Altman Thu, 03-Jun-2010Priority: 3Quantity: 1

Assembly: D5020 System: Branch Wiring Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: Branch wiring is beyond expected life and should be replaced.

Estimates:Raw Cost $382,377.34

Plus or (Minus) Additional Cost $0.00Total Estimated Amount $382,377.34

Page 206: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 13

Facility: \Elementary/Middle Schools\Vivian\ 1923, 1930, 1972 (A&B Bldgs) (continued)

Deficiency: Surveyor/Update: Eric Altman Fri, 04-Jun-2010Priority: 3Quantity: 1

Assembly: E2010 System: Fixed Furnishings Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: Fixed furnishings, such as the base/wall cabinets, counter tops, window shades, and fixed seating, are worn,

beyond expected life, and should be replaced.

Estimates:Raw Cost $203,392.20

Plus or (Minus) Additional Cost $0.00Total Estimated Amount $203,392.20

Page 207: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 14

Facility: \Elementary/Middle Schools\Vivian\1989 (C&D Bldgs)Address: 100 W. Kentucky Avenue, Vivian, LA 71082

Attributes: Number of Floors 1

General Information: Function: Elementary Middle Year Built: 1989Gross Area: 42,990 S.F. Last Renovation:

Facility Description:

Building C (Kindergarten) and Building D (Gymnasium) at Vivian Elementary/Middle School are 1-story buildings located at 100 West Kentucky Avenue in Vivian, Louisiana. There have been no additions and very few renovations. This report contains condition and adequacy data collected during the 2009/2010 Facility Condition Assessment (FCA). The detailed condition and deficiency statements are contained in this report.

Current Repair Cost: $136,187.00 Replacement Cost: $6,987,747.00 FCI: 1.95%

20-Jan-2010East Elevation

20-Jan-2010South Elevation

20-Jan-2010West Elevation

20-Jan-2010North Elevation

Page 208: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 15

Facility: \Elementary/Middle Schools\Vivian\1989 (C&D Bldgs) (continued)

Building Condition:

System Unit Price$

Unit of

Meas Qty Renewal% Renewal$ Life Installed

Calc Next

Renewal

Next

Renewal CI% Deficiency$ Replacement Value FCI%

Total $162.54 S.F. 42,990 107 $7,464,692 49 1993 1997 2014 52 $136,187 $6,987,745 2

Substructure $19.20 S.F. 42,990 100 $825,408 100 1989 $825,408

Foundations $19.20 S.F. 42,990 100 $825,408 100 1989 $825,408

Standard Foundations $10.20 S.F. 42,990 100 $438,498 100 1989 $438,498

Special Foundations 0 0 0 0

Slab on Grade $9.00 S.F. 42,990 100 $386,910 100 1989 $386,910

Basement Construction 0 0 0

Basement Excavation 0 0 0 0

Basement Walls 0 0 0 0

Shell $40.80 S.F. 42,990 104 $1,821,056 68 1992 2019 69 $3,077 $1,753,992

Superstructure $10.80 S.F. 42,990 100 $464,292 100 1989 $464,292

Floor Construction 0 0 0 0

Roof Construction $10.80 S.F. 42,990 100 $464,292 100 1989 $464,292

Exterior Enclosure $20.40 S.F. 42,990 103 $902,790 78 1989 2019 30 $876,996

Exterior Walls $14.40 S.F. 42,990 100 $619,056 100 1989 $619,056

Exterior Windows $4.80 S.F. 42,990 110 $226,987 30 1989 2019 30 $206,352

Exterior Doors $1.20 S.F. 42,990 110 $56,747 30 1989 2019 30 $51,588

Roofing $9.60 S.F. 42,990 110 $453,974 15 1999 2019 93 $3,077 $412,704 1

Roof Coverings - BUR 0 0 0 0

Roof Coverings - EPDM $9.54 S.F. 42,990 110 $451,137 15 2009 2024 93 $3,077 $410,125 1

Roof Coverings - Standing

Seam Mettal

0 0 0 0

Roof Openings $0.06 S.F. 42,990 110 $2,837 30 1989 2019 30 $2,579

Interiors $31.40 S.F. 42,990 108 $1,453,712 57 1989 1997 2014 36 $133,110 $1,349,694 10

Interior Construction $19.20 S.F. 42,990 106 $876,996 68 1989 2009 2015 30 $825,408

Partitions $10.80 S.F. 42,990 110 $510,721 100 1989 $464,292

Interior Doors $2.40 S.F. 42,990 80 $82,541 40 1989 2029 48 $103,176

Fittings $6.00 S.F. 42,990 110 $283,734 20 1989 2009 2015 25 $257,940

Stairs $2.58 S.F. 42,990 110 $122,006 100 1989 $110,914

Stair Construction $2.58 S.F. 42,990 110 $122,006 100 1989 $110,914

Interior Finishes $9.62 S.F. 42,990 110 $454,710 22 1989 1997 2014 42 $133,110 $413,372 32

Wall Finishes - Ceramic &

Glazed

0 0 0 0

Wall Finishes - Paint $2.40 S.F. 42,990 110 $113,494 10 1989 1999 2015 50 $103,176

Floor Finishes - Carpet $2.76 S.F. 5,037 110 $15,292 8 1989 1997 $15,292 $13,902 110

Floor Finishes - Ceramic &

Quarry Tile

$1.44 S.F. 1,719 110 $2,723 50 1989 2039 58 $2,475

Floor Finishes - VCT $3.60 S.F. 29,752 110 $117,818 15 1989 2004 $117,818 $107,107 110

Floor Finishes - Wood $13.52 S.F. 6,482 110 $96,429 50 1989 2039 58 $87,663

Ceiling Finishes $2.30 S.F. 42,990 110 $108,954 20 1989 2009 2014 20 $99,049

Services $60.35 S.F. 42,990 110 $2,853,795 22 1996 2015 56 $2,594,359

Conveying $1.20 S.F. 42,990 110 $56,747 30 1989 2019 30 $51,588

Elevators and Lifts $1.20 S.F. 42,990 110 $56,747 30 1989 2019 30 $51,588

Plumbing $7.54 S.F. 42,990 110 $356,369 30 1989 2019 30 $323,972

Plumbing Fixtures $5.89 S.F. 42,990 110 $278,627 30 1989 2019 30 $253,297

Domestic Water Distribution $0.44 S.F. 42,990 110 $20,996 30 1989 2019 30 $19,088

Sanitary Waste $0.76 S.F. 42,990 110 $35,750 30 1989 2019 30 $32,500

Rain Water Drainage $0.19 S.F. 42,990 110 $9,079 30 1989 2019 30 $8,254

Other Plumbing Systems -

Natural Gas

$0.25 S.F. 42,990 110 $11,917 30 1989 2019 30 $10,833

HVAC $32.52 S.F. 42,990 110 $1,537,838 19 2005 2020 72 $1,398,035

Heat Generating Systems 0 0 0 0

Cooling Generating Systems 0 0 0 0

Distribution Systems & Exhaust

Systems

$9.12 S.F. 42,990 110 $431,276 30 2005 2035 83 $392,069

Terminal & Package Units $21.60 S.F. 42,990 110 $1,021,442 15 2005 2020 67 $928,584

Controls & Instrumentation $1.80 S.F. 42,990 110 $85,120 20 2005 2025 75 $77,382

Other HVAC Systems/Equip -

Kitchen Hood

0 0 0 0

Fire Protection 0 0 0

Sprinklers 0 0 0 0

Electrical $19.09 S.F. 42,990 110 $902,841 23 1998 2015 41 $820,764

Electrical Service/Distribution $2.27 S.F. 42,990 110 $107,251 30 1989 2019 30 $97,501

Branch Wiring $6.77 S.F. 42,990 110 $320,052 30 1989 2019 30 $290,956

Lighting $6.77 S.F. 42,990 110 $320,052 20 2000 2020 50 $290,956

Communications and Security -

Public Address & Clock System

$0.88 S.F. 42,990 110 $41,425 20 2000 2020 50 $37,659

Fire Alarm $1.54 S.F. 42,990 110 $72,636 10 2006 2016 60 $66,033

Page 209: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 16

System Unit Price$

Unit of

Meas Qty Renewal% Renewal$ Life Installed

Calc Next

Renewal

Next

Renewal CI% Deficiency$ Replacement Value FCI%

Security & CCTV $0.88 S.F. 42,990 110 $41,425 10 2005 2015 50 $37,659

Other Electrical Systems -

Emergency Generator

0 0 0 0

Equipment & Furnishings $10.80 S.F. 42,990 110 $510,721 20 1989 2009 2015 25 $464,292

Equipment $7.20 S.F. 42,990 110 $340,481 20 1989 2009 2015 25 $309,528

Commercial Equipment $6.00 S.F. 42,990 110 $283,734 20 1989 2009 2015 25 $257,940

Institutional Equipment $1.20 S.F. 42,990 110 $56,747 20 1989 2009 2015 25 $51,588

Furnishings $3.60 S.F. 42,990 110 $170,240 20 1989 2009 2015 25 $154,764

Fixed Furnishings $3.60 S.F. 42,990 110 $170,240 20 1989 2009 2015 25 $154,764

Page 210: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 17

Facility: \Elementary/Middle Schools\Vivian\1989 (C&D Bldgs) (continued)

Renewal Schedule:

Systems 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020

Total $136,187 $122,629 $1,100,583 $86,731 $19,372 $1,470,469 $1,858,528

Substructure

Foundations

Standard Foundations

Special Foundations

Slab on Grade

Basement Construction

Basement Excavation

Basement Walls

Shell $3,077 $373,911

Superstructure

Floor Construction

Roof Construction

Exterior Enclosure $370,209

Exterior Walls

Exterior Windows $296,167

Exterior Doors $74,042

Roofing $3,077 $3,702

Roof Coverings - BUR

Roof Coverings - EPDM $3,077

Roof Coverings - Standing Seam

Mettal

Roof Openings $3,702

Interiors $133,110 $122,629 $460,495 $19,372

Interior Construction $328,925

Partitions

Interior Doors

Fittings $328,925

Stairs

Stair Construction

Interior Finishes $133,110 $122,629 $131,570 $19,372

Wall Finishes - Ceramic & Glazed

Wall Finishes - Paint $131,570

Floor Finishes - Carpet $15,292 $19,372

Floor Finishes - Ceramic & Quarry

Tile

Floor Finishes - VCT $117,818

Floor Finishes - Wood

Ceiling Finishes $122,629

Services $48,023 $86,731 $1,096,558 $1,858,528

Conveying $74,042

Elevators and Lifts $74,042

Plumbing $464,982

Plumbing Fixtures $363,545

Domestic Water Distribution $27,395

Sanitary Waste $46,646

Rain Water Drainage $11,847

Other Plumbing Systems - Natural

Gas

$15,549

HVAC $1,372,733

Heat Generating Systems

Cooling Generating Systems

Distribution Systems & Exhaust

Systems

Terminal & Package Units $1,372,733

Controls & Instrumentation

Other HVAC Systems/Equip -

Kitchen Hood

Fire Protection

Sprinklers

Electrical $48,023 $86,731 $557,534 $485,795

Electrical Service/Distribution $139,939

Branch Wiring $417,595

Lighting $430,123

Communications and Security -

Public Address & Clock System

$55,672

Page 211: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 18

Systems 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020

Fire Alarm $86,731

Security & CCTV $48,023

Other Electrical Systems -

Emergency Generator

Equipment & Furnishings $592,065

Equipment $394,710

Commercial Equipment $328,925

Institutional Equipment $65,785

Furnishings $197,355

Fixed Furnishings $197,355

Page 212: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 19

Facility: \Elementary/Middle Schools\Vivian\1989 (C&D Bldgs) (continued)

Deficiency Sheet:

Deficiency: Surveyor/Update: Troy Weeks Fri, 12-Mar-2010Priority: 3Quantity: 42,990

Assembly: B3010 System: Roof Coverings - EPDM Material: Roof Covering Distress: Failing Category: Critical Repair Correction: Roof Repair Note: There are reports of several roof leaks in the building. An investigatiion to locate and determine the cause of the

leaks is needed.

Estimates:Raw Cost $2,564.22

Plus or (Minus) Additional Cost $0.00Total Estimated Amount $2,564.22

Deficiency: Surveyor/Update: Kate McPhillips Fri, 04-Jun-2010Priority: 3Quantity: 1

Assembly: C3020 System: Floor Finishes - Carpet Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: Carpet floor finishes are worn, beyond expected life, and should be replaced.

Estimates:Raw Cost $12,743.61

Plus or (Minus) Additional Cost $0.00Total Estimated Amount $12,743.61

Page 213: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 20

Facility: \Elementary/Middle Schools\Vivian\ 1989 (C&D Bldgs) (continued)

Deficiency: Surveyor/Update: Kate McPhillips Fri, 04-Jun-2010Priority: 3Quantity: 1

Assembly: C3020 System: Floor Finishes - VCT Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: The VCT floor finishes are worn, beyond expected life, and should be replaced.

Estimates:Raw Cost $98,181.60

Plus or (Minus) Additional Cost $0.00Total Estimated Amount $98,181.60

Page 214: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 21

Facility: \Elementary/Middle Schools\Vivian\1999 (E Bldg)Address: 100 W. Kentucky Avenue, Vivian, LA 71082

Attributes: Number of Floors 1

General Information: Function: Elementary Middle Year Built: 1999Gross Area: 7,210 S.F. Last Renovation:

Facility Description:

Building E (Classrooms) at Vivian Elementary/Middle School is 1-story building located at 100 West Kentucky in Vivian, Louisiana. There have been no additions and very few renovations. This report contains condition and adequacy data collected during the 2009/2010 Facility Condition Assessment (FCA). The detailed condition and deficiency statements are contained in this report.

Current Repair Cost: $14,276.00 Replacement Cost: $1,091,536.00 FCI: 1.31%

20-Jan-2010East Elevation

20-Jan-2010South Elevation

20-Jan-2010North Elevation

Page 215: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 22

Facility: \Elementary/Middle Schools\Vivian\1999 (E Bldg) (continued)

Building Condition:

System Unit Price$

Unit of

Meas Qty Renewal% Renewal$ Life Installed

Calc Next

Renewal

Next

Renewal CI% Deficiency$ Replacement Value FCI%

Total $151.39 S.F. 7,210 107 $1,163,489 49 1999 2009 2010 47 $14,276 $1,091,535 1

Substructure $19.20 S.F. 7,210 100 $138,432 100 1999 $138,432

Foundations $19.20 S.F. 7,210 100 $138,432 100 1999 $138,432

Standard Foundations $10.20 S.F. 7,210 100 $73,542 100 1999 $73,542

Special Foundations 0 0 0 0

Slab on Grade $9.00 S.F. 7,210 100 $64,890 100 1999 $64,890

Basement Construction 0 0 0

Basement Excavation 0 0 0 0

Basement Walls 0 0 0 0

Shell $40.74 S.F. 7,210 104 $304,940 69 1999 2019 52 $293,735

Superstructure $10.80 S.F. 7,210 100 $77,868 100 1999 $77,868

Floor Construction 0 0 0 0

Roof Construction $10.80 S.F. 7,210 100 $77,868 100 1999 $77,868

Exterior Enclosure $20.40 S.F. 7,210 103 $151,410 78 1999 2029 63 $147,084

Exterior Walls $14.40 S.F. 7,210 100 $103,824 100 1999 $103,824

Exterior Windows $4.80 S.F. 7,210 110 $38,069 30 1999 2029 63 $34,608

Exterior Doors $1.20 S.F. 7,210 110 $9,517 30 1999 2029 63 $8,652

Roofing $9.54 S.F. 7,210 110 $75,662 20 1999 2019 45 $68,783

Roof Coverings - BUR $9.54 S.F. 7,210 110 $75,662 20 1999 2019 45 $68,783

Roof Coverings - EPDM 0 0 0 0

Roof Coverings - Standing

Seam Mettal

0 0 0 0

Roof Openings 0 0 0 0

Interiors $27.50 S.F. 7,210 107 $212,943 52 1999 2009 2015 46 $198,304

Interior Construction $19.20 S.F. 7,210 106 $147,084 68 1999 2019 51 $138,432

Partitions $10.80 S.F. 7,210 110 $85,655 100 1999 $77,868

Interior Doors $2.40 S.F. 7,210 80 $13,843 40 1999 2039 72 $17,304

Fittings $6.00 S.F. 7,210 110 $47,586 20 1999 2019 45 $43,260

Stairs 0 0 0

Stair Construction 0 0 0 0

Interior Finishes $8.30 S.F. 7,210 110 $65,859 15 1999 2009 2015 41 $59,872

Wall Finishes - Ceramic &

Glazed

0 0 0 0

Wall Finishes - Paint $2.40 S.F. 7,210 110 $19,034 10 1999 2009 2015 50 $17,304

Floor Finishes - Carpet 0 0 0 0

Floor Finishes - Ceramic &

Quarry Tile

0 0 0 0

Floor Finishes - Terrazzo 0 0 0 0

Floor Finishes - VCT $3.60 S.F. 7,210 110 $28,552 15 1999 2014 2015 33 $25,956

Ceiling Finishes $2.30 S.F. 7,210 110 $18,273 20 1999 2019 45 $16,612

Services $59.15 S.F. 7,210 110 $469,105 22 2000 2014 2010 47 $14,276 $426,456 3

Conveying 0 0 0

Elevators and Lifts 0 0 0 0

Plumbing $7.54 S.F. 7,210 110 $59,768 30 1999 2029 63 $54,334

Plumbing Fixtures $5.89 S.F. 7,210 110 $46,729 30 1999 2029 63 $42,481

Domestic Water Distribution $0.44 S.F. 7,210 110 $3,521 30 1999 2029 63 $3,201

Sanitary Waste $0.76 S.F. 7,210 110 $5,996 30 1999 2029 63 $5,451

Rain Water Drainage $0.19 S.F. 7,210 110 $1,523 30 1999 2029 63 $1,384

Other Plumbing Systems -

Natural Gas

$0.25 S.F. 7,210 110 $1,999 30 1999 2029 63 $1,817

HVAC $32.52 S.F. 7,210 110 $257,917 19 1999 2014 2010 38 $14,276 $234,469 6

Heat Generating Systems 0 0 0 0

Cooling Generating Systems 0 0 0 0

Distribution Systems & Exhaust

Systems

$9.12 S.F. 7,210 110 $72,331 30 1999 2029 63 $65,755

Terminal & Package Units $21.60 S.F. 7,210 110 $171,310 15 1999 2014 27 $155,736

Controls & Instrumentation $1.80 S.F. 7,210 110 $14,276 20 1999 2019 2010 $14,276 $12,978 110

Other HVAC Systems/Equip -

Kitchen Hood

0 0 0 0

Fire Protection 0 0 0

Sprinklers 0 0 0 0

Electrical $19.09 S.F. 7,210 110 $151,420 23 2001 2015 55 $137,653

Electrical Service/Distribution $2.27 S.F. 7,210 110 $17,988 30 1999 2029 63 $16,352

Branch Wiring $6.77 S.F. 7,210 110 $53,677 30 1999 2029 63 $48,797

Lighting $6.77 S.F. 7,210 110 $53,677 20 1999 2019 45 $48,797

Communications and Security -

Public Address & Clock System

$0.88 S.F. 7,210 110 $6,948 20 2000 2020 50 $6,316

Fire Alarm $1.54 S.F. 7,210 110 $12,182 10 2006 2016 60 $11,075

Page 216: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 23

System Unit Price$

Unit of

Meas Qty Renewal% Renewal$ Life Installed

Calc Next

Renewal

Next

Renewal CI% Deficiency$ Replacement Value FCI%

Security & CCTV $0.88 S.F. 7,210 110 $6,948 10 2005 2015 50 $6,316

Other Electrical Systems -

Emergency Generator

0 0 0 0

Equipment & Furnishings $4.80 S.F. 7,210 110 $38,069 20 1999 2019 45 $34,608

Equipment $1.20 S.F. 7,210 110 $9,517 20 1999 2019 45 $8,652

Commercial Equipment 0 0 0 0

Institutional Equipment $1.20 S.F. 7,210 110 $9,517 20 1999 2019 45 $8,652

Furnishings $3.60 S.F. 7,210 110 $28,552 20 1999 2019 45 $25,956

Fixed Furnishings $3.60 S.F. 7,210 110 $28,552 20 1999 2019 45 $25,956

Page 217: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 24

Facility: \Elementary/Middle Schools\Vivian\1999 (E Bldg) (continued)

Renewal Schedule:

Systems 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020

Total $14,276 $192,810 $63,219 $14,546 $304,359 $9,337

Substructure

Foundations

Standard Foundations

Special Foundations

Slab on Grade

Basement Construction

Basement Excavation

Basement Walls

Shell $98,721

Superstructure

Floor Construction

Roof Construction

Exterior Enclosure

Exterior Walls

Exterior Windows

Exterior Doors

Roofing $98,721

Roof Coverings - BUR $98,721

Roof Coverings - EPDM

Roof Coverings - Standing Seam

Mettal

Roof Openings

Interiors $55,165 $85,931

Interior Construction $62,089

Partitions

Interior Doors

Fittings $62,089

Stairs

Stair Construction

Interior Finishes $55,165 $23,842

Wall Finishes - Ceramic & Glazed

Wall Finishes - Paint $22,066

Floor Finishes - Carpet

Floor Finishes - Ceramic & Quarry

Tile

Floor Finishes - Terrazzo

Floor Finishes - VCT $33,099

Ceiling Finishes $23,842

Services $14,276 $192,810 $8,054 $14,546 $70,036 $9,337

Conveying

Elevators and Lifts

Plumbing

Plumbing Fixtures

Domestic Water Distribution

Sanitary Waste

Rain Water Drainage

Other Plumbing Systems - Natural

Gas

HVAC $14,276 $192,810

Heat Generating Systems

Cooling Generating Systems

Distribution Systems & Exhaust

Systems

Terminal & Package Units $192,810

Controls & Instrumentation $14,276

Other HVAC Systems/Equip -

Kitchen Hood

Fire Protection

Sprinklers

Electrical $8,054 $14,546 $70,036 $9,337

Electrical Service/Distribution

Branch Wiring

Lighting $70,036

Communications and Security -

Public Address & Clock System

$9,337

Page 218: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 25

Systems 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020

Fire Alarm $14,546

Security & CCTV $8,054

Other Electrical Systems -

Emergency Generator

Equipment & Furnishings $49,671

Equipment $12,418

Commercial Equipment

Institutional Equipment $12,418

Furnishings $37,253

Fixed Furnishings $37,253

Page 219: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 26

Facility: \Elementary/Middle Schools\Vivian\1999 (E Bldg) (continued)

Deficiency Sheet:

Deficiency: Surveyor/Update: Eric Altman Fri, 04-Jun-2010Priority: 4Quantity: 1

Assembly: D3060 System: Controls & Instrumentation Material: System Distress: Inadequate Category: Deferred Maintenance Correction: Renew System Note: Analog electric controls system is inadequate and needs to be upgraded/replaced.

Estimates:Raw Cost $11,896.50

Plus or (Minus) Additional Cost $0.00Total Estimated Amount $11,896.50

Page 220: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 27

Facility: \Elementary/Middle Schools\Vivian\2003 (H Bldg)Address: 100 W. Kentucky Ave., Vivian, LA 71082

Attributes: Number of Floors 1

General Information: Function: Elementary Middle Year Built: 2003Gross Area: 9,325 S.F. Last Renovation:

Facility Description:

Building H (Classrooms) at Vivian Elementary/Middle School is a 1-story building located at 100 West Kentucky Avenue in Vivian, Louisiana. There have been no additions and very few renovations. This report contains condition and adequacy data collected during the 2009/2010 Facility Condition Assessment (FCA). The detailed condition and deficiency statements are contained in this report.

Current Repair Cost: $0.00 Replacement Cost: $1,435,297.00 FCI: 0.00%

20-Jan-2010North Elevation

20-Jan-2010East Elevation

20-Jan-2010West Elevation

20-Jan-2010South Elevation

Page 221: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 28

Facility: \Elementary/Middle Schools\Vivian\2003 (H Bldg) (continued)

Building Condition:

System Unit Price$

Unit of

Meas Qty Renewal% Renewal$ Life Installed

Calc Next

Renewal

Next

Renewal CI% Deficiency$ Replacement Value FCI%

Total $153.92 S.F. 9,325 107 $1,530,711 49 2003 2013 2015 64 0 $1,435,297

Substructure $19.20 S.F. 9,325 100 $179,040 100 2003 $179,040

Foundations $19.20 S.F. 9,325 100 $179,040 100 2003 $179,040

Standard Foundations $10.20 S.F. 9,325 100 $95,115 100 2003 $95,115

Special Foundations 0 0 0 0

Slab on Grade $9.00 S.F. 9,325 100 $83,925 100 2003 $83,925

Basement Construction 0 0 0

Basement Excavation 0 0 0 0

Basement Walls 0 0 0 0

Shell $40.74 S.F. 9,325 104 $394,392 69 2003 2023 70 $379,900

Superstructure $10.80 S.F. 9,325 100 $100,710 100 2003 $100,710

Floor Construction 0 0 0 0

Roof Construction $10.80 S.F. 9,325 100 $100,710 100 2003 $100,710

Exterior Enclosure $20.40 S.F. 9,325 103 $195,825 78 2003 2033 77 $190,230

Exterior Walls $14.40 S.F. 9,325 100 $134,280 100 2003 $134,280

Exterior Windows $4.80 S.F. 9,325 110 $49,236 30 2003 2033 77 $44,760

Exterior Doors $1.20 S.F. 9,325 110 $12,309 30 2003 2033 77 $11,190

Roofing $9.54 S.F. 9,325 110 $97,857 20 2003 2023 65 $88,960

Roof Coverings - BUR $9.54 S.F. 9,325 110 $97,857 20 2003 2023 65 $88,960

Roof Coverings - EPDM 0 0 0 0

Roof Coverings - Standing

Seam Mettal

0 0 0 0

Roof Openings 0 0 0 0

Interiors $27.33 S.F. 9,325 107 $273,636 52 2003 2013 59 $254,863

Interior Construction $19.20 S.F. 9,325 106 $190,230 68 2003 2023 69 $179,040

Partitions $10.80 S.F. 9,325 110 $110,781 100 2003 $100,710

Interior Doors $2.40 S.F. 9,325 80 $17,904 40 2003 2043 82 $22,380

Fittings $6.00 S.F. 9,325 110 $61,545 20 2003 2023 65 $55,950

Stairs 0 0 0

Stair Construction 0 0 0 0

Interior Finishes $8.13 S.F. 9,325 110 $83,406 15 2003 2013 50 $75,823

Wall Finishes - Ceramic &

Glazed

0 0 0 0

Wall Finishes - Paint $2.40 S.F. 9,325 110 $24,618 10 2003 2013 30 $22,380

Floor Finishes - Carpet 0 0 0 0

Floor Finishes - Ceramic &

Quarry Tile

$1.44 S.F. 746 110 $1,182 50 2003 2053 86 $1,074

Floor Finishes - Terrazzo 0 0 0 0

Floor Finishes - VCT $3.60 S.F. 8,579 110 $33,973 15 2003 2018 53 $30,884

Ceiling Finishes $2.30 S.F. 9,325 110 $23,633 20 2003 2023 65 $21,485

Services $61.85 S.F. 9,325 110 $634,407 22 2003 2015 2015 64 $576,734

Conveying 0 0 0

Elevators and Lifts 0 0 0 0

Plumbing $7.54 S.F. 9,325 110 $77,300 30 2003 2033 77 $70,273

Plumbing Fixtures $5.89 S.F. 9,325 110 $60,437 30 2003 2033 77 $54,943

Domestic Water Distribution $0.44 S.F. 9,325 110 $4,554 30 2003 2033 77 $4,140

Sanitary Waste $0.76 S.F. 9,325 110 $7,755 30 2003 2033 77 $7,050

Rain Water Drainage $0.19 S.F. 9,325 110 $1,969 30 2003 2033 77 $1,790

Other Plumbing Systems -

Natural Gas

$0.25 S.F. 9,325 110 $2,585 30 2003 2033 77 $2,350

HVAC $32.52 S.F. 9,325 110 $333,574 19 2003 2018 60 $303,249

Heat Generating Systems S.F. 0 0 0 0

Cooling Generating Systems S.F. 0 0 0 0

Distribution Systems & Exhaust

Systems

$9.12 S.F. 9,325 110 $93,548 30 2003 2033 77 $85,044

Terminal & Package Units $21.60 S.F. 9,325 110 $221,562 15 2003 2018 53 $201,420

Controls & Instrumentation $1.80 S.F. 9,325 110 $18,464 20 2003 2023 65 $16,785

Other HVAC Systems/Equip -

Kitchen Hood

S.F. 0 0 0 0

Fire Protection $2.70 S.F. 9,325 110 $27,695 30 2003 2033 2015 17 $25,178

Sprinklers $2.70 S.F. 9,325 110 $27,695 30 2003 2033 2015 17 $25,178

Electrical $19.09 S.F. 9,325 110 $195,838 23 2004 2015 70 $178,034

Electrical Service/Distribution $2.27 S.F. 9,325 110 $23,264 30 2003 2033 77 $21,149

Branch Wiring $6.77 S.F. 9,325 110 $69,423 30 2003 2033 77 $63,112

Lighting $6.77 S.F. 9,325 110 $69,423 20 2003 2023 65 $63,112

Communications and Security -

Public Address & Clock System

$0.88 S.F. 9,325 110 $8,986 20 2005 2025 75 $8,169

Fire Alarm $1.54 S.F. 9,325 110 $15,756 10 2006 2016 60 $14,323

Page 222: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 29

System Unit Price$

Unit of

Meas Qty Renewal% Renewal$ Life Installed

Calc Next

Renewal

Next

Renewal CI% Deficiency$ Replacement Value FCI%

Security & CCTV $0.88 S.F. 9,325 110 $8,986 10 2005 2015 50 $8,169

Other Electrical Systems -

Emergency Generator

0 0 0 0

Equipment & Furnishings $4.80 S.F. 9,325 110 $49,236 20 2003 2023 65 $44,760

Equipment $1.20 S.F. 9,325 110 $12,309 20 2003 2023 65 $11,190

Commercial Equipment 0 0 0 0

Institutional Equipment $1.20 S.F. 9,325 110 $12,309 20 2003 2023 65 $11,190

Furnishings $3.60 S.F. 9,325 110 $36,927 20 2003 2023 65 $33,570

Fixed Furnishings $3.60 S.F. 9,325 110 $36,927 20 2003 2023 65 $33,570

Page 223: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 30

Facility: \Elementary/Middle Schools\Vivian\2003 (H Bldg) (continued)

Renewal Schedule:

Systems 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020

Total $26,901 $42,523 $18,813 $323,704

Substructure

Foundations

Standard Foundations

Special Foundations

Slab on Grade

Basement Construction

Basement Excavation

Basement Walls

Shell

Superstructure

Floor Construction

Roof Construction

Exterior Enclosure

Exterior Walls

Exterior Windows

Exterior Doors

Roofing

Roof Coverings - BUR

Roof Coverings - EPDM

Roof Coverings - Standing Seam

Mettal

Roof Openings

Interiors $26,901 $43,036

Interior Construction

Partitions

Interior Doors

Fittings

Stairs

Stair Construction

Interior Finishes $26,901 $43,036

Wall Finishes - Ceramic & Glazed

Wall Finishes - Paint $26,901

Floor Finishes - Carpet

Floor Finishes - Ceramic & Quarry

Tile

Floor Finishes - Terrazzo

Floor Finishes - VCT $43,036

Ceiling Finishes

Services $42,523 $18,813 $280,668

Conveying

Elevators and Lifts

Plumbing

Plumbing Fixtures

Domestic Water Distribution

Sanitary Waste

Rain Water Drainage

Other Plumbing Systems - Natural

Gas

HVAC $280,668

Heat Generating Systems

Cooling Generating Systems

Distribution Systems & Exhaust

Systems

Terminal & Package Units $280,668

Controls & Instrumentation

Other HVAC Systems/Equip -

Kitchen Hood

Fire Protection $32,106

Sprinklers $32,106

Electrical $10,417 $18,813

Electrical Service/Distribution

Branch Wiring

Lighting

Communications and Security -

Public Address & Clock System

Page 224: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 31

Systems 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020

Fire Alarm $18,813

Security & CCTV $10,417

Other Electrical Systems -

Emergency Generator

Equipment & Furnishings

Equipment

Commercial Equipment

Institutional Equipment

Furnishings

Fixed Furnishings

Page 225: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 32

Facility: \Elementary/Middle Schools\Vivian\2003 (H Bldg) (continued)

Deficiency Sheet:

*** No Deficiencies Found ***

Page 226: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 33

Facility: \Elementary/Middle Schools\Vivian\Basketball CourtAddress: 100 W. Kentucky Avenue, Vivian, LA 71082

Attributes: ***None***

General Information: Function: Elementary Middle Year Built: 1970Gross Area: 3,962 S.F. Last Renovation:

Facility Description:

The Basketball Court at Vivian Elementary/Middle School is located at 100 West Kentucky in Vivian, Louisiana. There have been no additions and no renovations. This report contains condition and adequacy data collected during the 2009/2010 Facility Condition Assessment (FCA). The detailed condition and deficiency statements are contained in this report.

Current Repair Cost: $30,333.00 Replacement Cost: $28,003.00 FCI: 108.32%

20-Jan-2010Vivian Elementary/Middle School Basketball Court

Page 227: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 34

Facility: \Elementary/Middle Schools\Vivian\Basketball Court (continued)

Building Condition:

System Unit Price$

Unit of

Meas Qty Renewal% Renewal$ Life Installed

Calc Next

Renewal

Next

Renewal CI% Deficiency$ Replacement Value FCI%

Total $7.07 S.F. 3,962 110 $30,761 21 1970 1990 $30,333 $28,004 108

Special Construction $6.96 S.F. 3,962 110 $30,333 20 1970 1990 $30,333 $27,576 110

Special Construction $6.96 S.F. 3,962 110 $30,333 20 1970 1990 $30,333 $27,576 110

Special Structures - Basketball

Court - Concrete - Outdoor

$6.96 S.F. 3,962 110 $30,333 20 1970 1990 $30,333 $27,576 110

Building Sitework $0.11 S.F. 3,962 100 $428 100 1970 $428

Site Preparation $0.11 S.F. 3,962 100 $428 100 1970 $428

Site Earthwork $0.11 S.F. 3,962 0 $428 100 1970 $428

Site Improvements 0 0 0

Site Development - Fencing 0 0 0 0

Site Electrical Utilities 0 0 0

Site Lighting 0 0 0 0

Page 228: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 35

Facility: \Elementary/Middle Schools\Vivian\Basketball Court (continued)

Renewal Schedule:

Systems 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020

Total $30,333

Special Construction $30,333

Special Construction $30,333

Special Structures - Basketball

Court - Concrete - Outdoor

$30,333

Building Sitework

Site Preparation

Site Earthwork

Site Improvements

Site Development - Fencing

Site Electrical Utilities

Site Lighting

Page 229: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 36

Facility: \Elementary/Middle Schools\Vivian\Basketball Court (continued)

Deficiency Sheet:

Deficiency: Surveyor/Update: Eric Altman Fri, 04-Jun-2010Priority: 3Quantity: 1

Assembly: F1010 System: Special Structures - Basketball Court -

Concrete - Outdoor Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: The concrete surface is worn, beyond expected life, and should be replaced.

Estimates:Raw Cost $25,277.56

Plus or (Minus) Additional Cost $0.00Total Estimated Amount $25,277.56

Page 230: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 37

Facility: \Elementary/Middle Schools\Vivian\Covered WalkwaysAddress: 100 W Kentucky Avenue, Vivian, LA 71082

Attributes: Number of Floors 1

General Information: Function: Elementary Middle Year Built: 1992Gross Area: 4,979 S.F. Last Renovation:

Facility Description:

The engineered metal covered walkways at Vivian Elementary/Middle School connect the classrooms and provide some weather protection for the students.

Current Repair Cost: $0.00 Replacement Cost: $124,455.00 FCI: 0.00%

04-Jun-2010East Elevation

04-Jun-2010South Elevation

04-Jun-2010West Elevation

04-Jun-2010North Elevation

Page 231: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 38

Facility: \Elementary/Middle Schools\Vivian\Covered Walkways (continued)

Building Condition:

System Unit Price$

Unit of

Meas Qty Renewal% Renewal$ Life Installed

Calc Next

Renewal

Next

Renewal CI% Deficiency$ Replacement Value FCI%

Total $25.00 S.F. 4,979 100 $124,455 25 1992 2017 28 0 $124,455

Special Construction $25.00 S.F. 4,979 100 $124,455 25 1992 2017 28 $124,455

Special Construction $25.00 S.F. 4,979 100 $124,455 25 1992 2017 28 $124,455

Special Structures - Covered

Walkways Metal

$25.00 S.F. 4,979 100 $124,455 25 1992 2017 28 $124,455

Page 232: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 39

Facility: \Elementary/Middle Schools\Vivian\Covered Walkways (continued)

Renewal Schedule:

Systems 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020

Total $153,064

Special Construction $153,064

Special Construction $153,064

Special Structures - Covered

Walkways Metal

$153,064

Page 233: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 40

Facility: \Elementary/Middle Schools\Vivian\Covered Walkways (continued)

Deficiency Sheet:

*** No Deficiencies Found ***

Page 234: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 41

Facility: \Elementary/Middle Schools\Vivian\Pine St Bldg (Teachers' Resource)Address: 100 W. Kentucky Avenue, Vivian, LA 71082

Attributes: Number of Floors 1

General Information: Function: Elementary Middle Year Built: 1970Gross Area: 3,039 S.F. Last Renovation: 2001

Facility Description:

The Pine Street Building, a Teachers’ Resource Facility, is a 1-story building located on Pine Street, across the street and east of the school campus in Vivian, Louisiana. There have been no additions, but there has been a major renovation when the School Board acquired the building in 2001. This report contains condition and adequacy data collected during the 2009/2010 Facility Condition Assessment (FCA). The detailed condition and deficiency statements are contained in this report.

Current Repair Cost: $95,567.00 Replacement Cost: $469,234.00 FCI: 20.37%

20-Jan-2010West Elevation

20-Jan-2010South Elevation

20-Jan-2010East Elevation

20-Jan-2010North Elevation

Page 235: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 42

Facility: \Elementary/Middle Schools\Vivian\Pine St Bldg (Teachers' Resource) (continued)

Building Condition:

System Unit Price$

Unit of

Meas Qty Renewal% Renewal$ Life Installed

Calc Next

Renewal

Next

Renewal CI% Deficiency$ Replacement Value FCI%

Total $154.40 S.F. 3,039 107 $500,474 50 1987 1985 2015 66 $95,566 $469,233 20

Substructure $19.20 S.F. 3,039 100 $58,349 100 1970 $58,349

Foundations $19.20 S.F. 3,039 100 $58,349 100 1970 $58,349

Standard Foundations $10.20 S.F. 3,039 100 $30,998 100 1970 $30,998

Special Foundations 0 0 0 0

Slab on Grade $9.00 S.F. 3,039 100 $27,351 100 1970 $27,351

Basement Construction 0 0 0

Basement Excavation 0 0 0 0

Basement Walls 0 0 0 0

Shell $40.74 S.F. 3,039 104 $128,531 69 1977 2000 80 $20,057 $123,809 16

Superstructure $10.80 S.F. 3,039 100 $32,821 100 1970 $32,821

Floor Construction 0 0 0 0

Roof Construction $10.80 S.F. 3,039 100 $32,821 100 1970 $32,821

Exterior Enclosure $20.40 S.F. 3,039 103 $63,819 78 1970 2000 $20,057 $61,996 32

Exterior Walls $14.40 S.F. 3,039 100 $43,762 100 1970 $43,762

Exterior Windows $4.80 S.F. 3,039 110 $16,046 30 1970 2000 $16,046 $14,587 110

Exterior Doors $1.20 S.F. 3,039 110 $4,011 30 1970 2000 $4,011 $3,647 110

Roofing $9.54 S.F. 3,039 110 $31,891 20 2006 2026 80 $28,992

Roof Coverings - BUR $9.54 S.F. 3,039 110 $31,891 20 2006 2026 80 $28,992

Roof Coverings - EPDM 0 0 0 0

Roof Coverings - Standing

Seam Mettal

0 0 0 0

Roof Openings 0 0 0 0

Interiors $30.08 S.F. 3,039 108 $98,379 56 1988 1985 50 $12,034 $91,426 13

Interior Construction $19.20 S.F. 3,039 106 $61,995 68 1991 2021 60 $58,349

Partitions $10.80 S.F. 3,039 110 $36,103 100 1970 $32,821

Interior Doors $2.40 S.F. 3,039 80 $5,835 40 2001 2041 78 $7,294

Fittings $6.00 S.F. 3,039 110 $20,057 20 2001 2021 55 $18,234

Stairs $2.58 S.F. 3,039 110 $8,625 100 1970 $7,841

Stair Construction $2.58 S.F. 3,039 110 $8,625 100 1970 $7,841

Interior Finishes $8.30 S.F. 3,039 110 $27,759 15 1991 1985 32 $12,034 $25,236 48

Wall Finishes - Ceramic &

Glazed

0 0 0 0

Wall Finishes - Paint $2.40 S.F. 3,039 110 $8,023 10 2001 2011 10 $7,294

Floor Finishes - Carpet 0 0 0 0

Floor Finishes - Ceramic &

Quarry Tile

0 0 0 0

Floor Finishes - Terrazzo 0 0 0 0

Floor Finishes - VCT $3.60 S.F. 3,039 110 $12,034 15 1970 1985 $12,034 $10,940 110

Ceiling Finishes $2.30 S.F. 3,039 110 $7,702 20 2001 2021 55 $7,002

Services $60.78 S.F. 3,039 110 $203,181 22 1994 2000 2015 68 $51,441 $184,709 28

Conveying 0 0 0

Elevators and Lifts 0 0 0 0

Plumbing $7.34 S.F. 3,039 110 $24,549 30 1993 2000 70 $2,527 $22,318 11

Plumbing Fixtures $5.89 S.F. 3,039 110 $19,696 30 2001 2031 70 $17,906

Domestic Water Distribution $0.44 S.F. 3,039 110 $1,484 30 2001 2031 70 $1,349

Sanitary Waste $0.76 S.F. 3,039 110 $2,527 30 1970 2000 $2,527 $2,297 110

Rain Water Drainage 0 0 0 0

Other Plumbing Systems -

Natural Gas

$0.25 S.F. 3,039 110 $842 30 2001 2031 70 $766

HVAC $32.52 S.F. 3,039 110 $108,711 19 2004 2021 72 $3,664 $98,828 4

Heat Generating Systems 0 0 0 0

Cooling Generating Systems 0 0 0 0

Distribution Systems & Exhaust

Systems

$9.12 S.F. 3,039 110 $30,487 30 2001 2031 70 $27,716

Terminal & Package Units $21.60 S.F. 3,039 110 $72,207 15 2006 2021 73 $3,664 $65,642 6

Controls & Instrumentation $1.80 S.F. 3,039 110 $6,017 20 2005 2025 75 $5,470

Other HVAC Systems/Equip -

Kitchen Hood

0 0 0 0

Fire Protection $2.70 S.F. 3,039 110 $9,026 30 1970 2000 2015 17 $8,205

Sprinklers $2.70 S.F. 3,039 110 $9,026 30 1970 2000 2015 17 $8,205

Electrical $18.22 S.F. 3,039 110 $60,895 24 1992 2000 63 $45,250 $55,358 82

Electrical Service/Distribution $2.27 S.F. 3,039 110 $7,582 30 2001 2031 70 $6,892

Branch Wiring $6.77 S.F. 3,039 110 $22,625 30 1970 2000 $22,625 $20,568 110

Lighting $6.77 S.F. 3,039 110 $22,625 20 1980 2000 $22,625 $20,568 110

Communications and Security -

Public Address & Clock System

0 0 0 0

Fire Alarm $1.54 S.F. 3,039 110 $5,135 10 2006 2016 60 $4,668

Page 236: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 43

System Unit Price$

Unit of

Meas Qty Renewal% Renewal$ Life Installed

Calc Next

Renewal

Next

Renewal CI% Deficiency$ Replacement Value FCI%

Security & CCTV $0.88 S.F. 3,039 110 $2,928 10 2005 2015 50 $2,662

Other Electrical Systems -

Emergency Generator

0 0 0 0

Equipment & Furnishings $3.60 S.F. 3,039 110 $12,034 20 1970 1990 $12,034 $10,940 110

Equipment 0 0 0

Commercial Equipment 0 0 0 0

Institutional Equipment 0 0 0 0

Furnishings $3.60 S.F. 3,039 110 $12,034 20 1970 1990 $12,034 $10,940 110

Fixed Furnishings $3.60 S.F. 3,039 110 $12,034 20 1970 1990 $12,034 $10,940 110

Page 237: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 44

Facility: \Elementary/Middle Schools\Vivian\Pine St Bldg (Teachers' Resource) (continued)

Renewal Schedule:

Systems 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020

Total $95,566 $8,264 $13,858 $6,131

Substructure

Foundations

Standard Foundations

Special Foundations

Slab on Grade

Basement Construction

Basement Excavation

Basement Walls

Shell $20,057

Superstructure

Floor Construction

Roof Construction

Exterior Enclosure $20,057

Exterior Walls

Exterior Windows $16,046

Exterior Doors $4,011

Roofing

Roof Coverings - BUR

Roof Coverings - EPDM

Roof Coverings - Standing Seam

Mettal

Roof Openings

Interiors $12,034 $8,264

Interior Construction

Partitions

Interior Doors

Fittings

Stairs

Stair Construction

Interior Finishes $12,034 $8,264

Wall Finishes - Ceramic & Glazed

Wall Finishes - Paint $8,264

Floor Finishes - Carpet

Floor Finishes - Ceramic & Quarry

Tile

Floor Finishes - Terrazzo

Floor Finishes - VCT $12,034

Ceiling Finishes

Services $51,441 $13,858 $6,131

Conveying

Elevators and Lifts

Plumbing $2,527

Plumbing Fixtures

Domestic Water Distribution

Sanitary Waste $2,527

Rain Water Drainage

Other Plumbing Systems - Natural

Gas

HVAC $3,664

Heat Generating Systems

Cooling Generating Systems

Distribution Systems & Exhaust

Systems

Terminal & Package Units $3,664

Controls & Instrumentation

Other HVAC Systems/Equip -

Kitchen Hood

Fire Protection $10,463

Sprinklers $10,463

Electrical $45,250 $3,395 $6,131

Electrical Service/Distribution

Branch Wiring $22,625

Lighting $22,625

Communications and Security -

Public Address & Clock System

Page 238: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 45

Systems 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020

Fire Alarm $6,131

Security & CCTV $3,395

Other Electrical Systems -

Emergency Generator

Equipment & Furnishings $12,034

Equipment

Commercial Equipment

Institutional Equipment

Furnishings $12,034

Fixed Furnishings $12,034

Page 239: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 46

Facility: \Elementary/Middle Schools\Vivian\Pine St Bldg (Teachers' Resource) (continued)

Deficiency Sheet:

Deficiency: Surveyor/Update: Eric Altman Fri, 04-Jun-2010Priority: 3Quantity: 1

Assembly: B2020 System: Exterior Windows Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: The exterior windows are worn, beyond expected life, and should be replaced.

Estimates:Raw Cost $13,371.60

Plus or (Minus) Additional Cost $0.00Total Estimated Amount $13,371.60

Deficiency: Surveyor/Update: Eric Altman Fri, 04-Jun-2010Priority: 3Quantity: 1

Assembly: B2030 System: Exterior Doors Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: The exterior doors are worn, beyond expected life, and should be replaced.

Estimates:Raw Cost $3,342.90

Plus or (Minus) Additional Cost $0.00Total Estimated Amount $3,342.90

Page 240: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 47

Facility: \Elementary/Middle Schools\Vivian\ Pine St Bldg (Teachers' Resource) (continued)

Deficiency: Surveyor/Update: Eric Altman Fri, 04-Jun-2010Priority: 3Quantity: 1

Assembly: C3020 System: Floor Finishes - VCT Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: The VCT floor finishes are worn, beyond expected life, and should be replaced.

Estimates:Raw Cost $10,028.70

Plus or (Minus) Additional Cost $0.00Total Estimated Amount $10,028.70

Deficiency: Surveyor/Update: Eric Altman Fri, 04-Jun-2010Priority: 3Quantity: 1

Assembly: D2030 System: Sanitary Waste Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: Sanitary waste is beyond expected life and should be replaced.

Estimates:Raw Cost $2,106.03

Plus or (Minus) Additional Cost $0.00Total Estimated Amount $2,106.03

Page 241: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 48

Facility: \Elementary/Middle Schools\Vivian\ Pine St Bldg (Teachers' Resource) (continued)

Deficiency: Surveyor/Update: Eric Altman Fri, 04-Jun-2010Priority: 3Quantity: 1

Assembly: D3050 System: Terminal & Package Units Material: Terminal and Package Units Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Replace A/C 4T Split System Note: Lennox split system with gas heat is beyond expected life and should be replaced.

Estimates:Raw Cost $3,053.00

Plus or (Minus) Additional Cost $0.00Total Estimated Amount $3,053.00

Deficiency: Surveyor/Update: Eric Altman Thu, 03-Jun-2010Priority: 3Quantity: 1

Assembly: D5020 System: Branch Wiring Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: Branch wiring is beyond expected life and should be replaced.

Estimates:Raw Cost $18,853.96

Plus or (Minus) Additional Cost $0.00Total Estimated Amount $18,853.96

Page 242: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 49

Facility: \Elementary/Middle Schools\Vivian\ Pine St Bldg (Teachers' Resource) (continued)

Deficiency: Surveyor/Update: Eric Altman Fri, 04-Jun-2010Priority: 3Quantity: 1

Assembly: D5020 System: Lighting Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: Lighting system is inadequate, beyond expected life, and should be replaced.

Estimates:Raw Cost $18,853.96

Plus or (Minus) Additional Cost $0.00Total Estimated Amount $18,853.96

Deficiency: Surveyor/Update: Eric Altman Fri, 04-Jun-2010Priority: 3Quantity: 1

Assembly: E2010 System: Fixed Furnishings Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: Fixed furnishings, such as the base/wall cabinets, counter tops, window shades, and fixed seating, are worn,

beyond expected life, and should be replaced.

Estimates:Raw Cost $10,028.70

Plus or (Minus) Additional Cost $0.00Total Estimated Amount $10,028.70

Page 243: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 50

Facility: \Elementary/Middle Schools\Vivian\SiteAddress: 100 W. Kentucky Avenue, Vivian, LA 71082

Attributes: Site Area (in Acres) 9

General Information: Function: Elementary Middle Year Built: 1923Gross Area: 129,177 S.F. Last Renovation:

Facility Description:

The original site was constructed in 1923 to include what is now Building B. There have been additions to the site to include Buildings A, C, D, and H. Campus site features include paved driveways and parking lots, pedestrian pavement, flag pole, landscaping, and fencing. Site mechanical and electrical features include water, sewer, natural gas and site lighting. This report contains condition and adequacy data collected during the 2009/2010 Facility Condition Assessment (FCA). The detailed condition and deficiency statements are contained in this report.

Current Repair Cost: $1,063,385.00 Replacement Cost: $1,725,288.00 FCI: 61.64%

05-Jan-2010Aerial Image of Vivian Elementary/Middle School

Page 244: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 51

Facility: \Elementary/Middle Schools\Vivian\Site (continued)

Building Condition:

System Unit Price$

Unit of

Meas Qty Renewal% Renewal$ Life Installed

Calc Next

Renewal

Next

Renewal CI% Deficiency$ Replacement Value FCI%

Total $13.36 S.F. 129,177 100 $1,725,286 34 1932 1953 55 $1,063,383 $1,725,286 62

Building Sitework $13.36 S.F. 129,177 100 $1,725,286 34 1932 1953 55 $1,063,383 $1,725,286 62

Site Improvements $8.50 S.F. 129,177 100 $1,097,487 28 1939 1953 55 $435,584 $1,097,487 40

Roadways $1.38 S.F. 129,177 100 $178,264 50 1923 1973 $178,264 $178,264 100

Parking Lots $1.18 S.F. 129,177 100 $151,912 30 1923 1953 $151,912 $151,912 100

Pedestrian Paving $0.82 S.F. 129,177 100 $105,408 50 1923 1973 $105,408 $105,408 100

Site Development $3.86 S.F. 129,177 100 $499,140 20 2001 2021 55 $499,140

Landscaping $1.26 S.F. 129,177 100 $162,763 10 1923 $162,763

Site Mechanical Utilities $4.86 S.F. 129,177 100 $627,799 44 1923 1953 $627,799 $627,799 100

Water Supply $0.82 S.F. 129,177 100 $105,408 30 1923 1953 $105,408 $105,408 100

Sanitary Sewer $0.41 S.F. 129,177 100 $52,704 30 1923 1953 $52,704 $52,704 100

Storm Sewer $3.52 S.F. 129,177 100 $454,186 50 1923 1973 $454,186 $454,186 100

Fuel Distribution $0.12 S.F. 129,177 100 $15,501 30 1923 1953 $15,501 $15,501 100

Site Electrical Utilities 0 0 0

Site Lighting 0 0 0 0

Page 245: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 52

Facility: \Elementary/Middle Schools\Vivian\Site (continued)

Renewal Schedule:

Systems 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020

Total $1,063,383

Building Sitework $1,063,383

Site Improvements $435,584

Roadways $178,264

Parking Lots $151,912

Pedestrian Paving $105,408

Site Development

Landscaping

Site Mechanical Utilities $627,799

Water Supply $105,408

Sanitary Sewer $52,704

Storm Sewer $454,186

Fuel Distribution $15,501

Site Electrical Utilities

Site Lighting

Page 246: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 53

Facility: \Elementary/Middle Schools\Vivian\Site (continued)

Deficiency Sheet:

Deficiency: Surveyor/Update: Kate McPhillips Fri, 04-Jun-2010Priority: 3Quantity: 1

Assembly: G2010 System: Roadways Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: The roadways are worn, beyond expected life, and should be replaced.

Estimates:Raw Cost $148,553.55

Plus or (Minus) Additional Cost $0.00Total Estimated Amount $148,553.55

Deficiency: Surveyor/Update: Kate McPhillips Fri, 04-Jun-2010Priority: 3Quantity: 1

Assembly: G2020 System: Parking Lots Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: The parking lot is worn, beyond expected life, covered in gravel in some areas, and should be replaced.

Estimates:Raw Cost $126,593.46

Plus or (Minus) Additional Cost $0.00Total Estimated Amount $126,593.46

Page 247: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 54

Facility: \Elementary/Middle Schools\Vivian\ Site (continued)

Deficiency: Surveyor/Update: Kate McPhillips Fri, 04-Jun-2010Priority: 3Quantity: 1

Assembly: G2030 System: Pedestrian Paving Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: The pedestrian paving is cracked, worn, and beyond expected life, and should be replaced. There is also a need

for a handicap access ramp at the front entry.

Estimates:Raw Cost $87,840.36

Plus or (Minus) Additional Cost $0.00Total Estimated Amount $87,840.36

Deficiency: Surveyor/Update: Kate McPhillips Fri, 04-Jun-2010Priority: 3Quantity: 1

Assembly: G3010 System: Water Supply Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: Water supply is beyond expected life and should be replaced.

Estimates:Raw Cost $87,840.36

Plus or (Minus) Additional Cost $0.00Total Estimated Amount $87,840.36

Page 248: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 55

Facility: \Elementary/Middle Schools\Vivian\ Site (continued)

Deficiency: Surveyor/Update: Kate McPhillips Fri, 04-Jun-2010Priority: 3Quantity: 1

Assembly: G3020 System: Sanitary Sewer Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: Sanitary sewer is beyond expected life and should be replaced.

Estimates:Raw Cost $43,920.18

Plus or (Minus) Additional Cost $0.00Total Estimated Amount $43,920.18

Deficiency: Surveyor/Update: Kate McPhillips Fri, 04-Jun-2010Priority: 3Quantity: 1

Assembly: G3030 System: Storm Sewer Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: Storm sewer is beyond expected life and should be replaced.

Estimates:Raw Cost $378,488.61

Plus or (Minus) Additional Cost $0.00Total Estimated Amount $378,488.61

Page 249: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 56

Facility: \Elementary/Middle Schools\Vivian\ Site (continued)

Deficiency: Surveyor/Update: Kate McPhillips Fri, 04-Jun-2010Priority: 3Quantity: 1

Assembly: G3060 System: Fuel Distribution Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: Natural gas system is beyond expected life and should be replaced.

Estimates:Raw Cost $12,917.70

Plus or (Minus) Additional Cost $0.00Total Estimated Amount $12,917.70

Page 250: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Survey Report

Deficiency Detail ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 1

Facility

Name Assembly System Material Distress Correction Qty Unit Raw Cost

Additional

Cost Total Cost Priority Def. Cat. Location / Note

Caddo Parish School District $3,105,400 $621,080 $3,726,480 Elementary/Middle Schools $3,105,400 $621,080 $3,726,480 Vivian $3,105,400 $621,080 $3,726,480 1923, 1930, 1972 (A&B Bldgs) $1,988,943 $397,789 $2,386,732 Building Systems $1,988,943 $397,789 $2,386,732

D5020 Branch Wiring System Beyond Expected Life

Renew System 1 Ea. $382,377 $76,475 $458,853 Necessary- 2-5 Yrs

Deferred Maintenance

Branch wiring is beyond expected life and should be replaced.

E2010 Fixed Furnishings

System Beyond Expected Life

Renew System 1 Ea. $203,392 $40,678 $244,071 Necessary- 2-5 Yrs

Deferred Maintenance

Fixed furnishings, such as the base/wall cabinets, counter tops, window shades, and fixed seating, are worn, beyond expected life, and should be replaced.

B2020 Exterior Windows

System Beyond Expected Life

Renew System 1 Ea. $271,190 $54,238 $325,428 Necessary- 2-5 Yrs

Deferred Maintenance

The exterior windows are worn, beyond expected life, and should be replaced.

B2030 Exterior Doors System Beyond Expected Life

Renew System 1 Ea. $67,797 $13,559 $81,357 Necessary- 2-5 Yrs

Deferred Maintenance

The exterior doors are worn, beyond expected life, and should be replaced.

C1030 Fittings System Beyond Expected Life

Renew System 1 Ea. $338,987 $67,797 $406,784 Necessary- 2-5 Yrs

Deferred Maintenance

Fittings, such as chalk and tack boards, lockers, toilet and bath accessories, toilet partitions, and shelving, are beyond expected life and should be replaced.

C3010 Wall Finishes - Paint

System Beyond Expected Life

Renew System 1 Ea. $135,595 $27,119 $162,714 Necessary- 2-5 Yrs

Deferred Maintenance

The painted wall finishes are worn, beyond expected life, and should be replaced.

C3020 Floor Finishes - Carpet

System Beyond Expected Life

Renew System 1 Ea. $7,226 $1,445 $8,671 Necessary- 2-5 Yrs

Deferred Maintenance

Carpet floor finishes are worn, beyond expected life, and should be replaced.

C3030 Ceiling Finishes System Beyond Expected Life

Renew System 1 Ea. $130,171 $26,034 $156,205 Necessary- 2-5 Yrs

Deferred Maintenance

The ceiling finishes are stained, beyond expected life, and should be replaced.

D2020 Domestic Water Distribution

System Beyond Expected Life

Renew System 1 Ea. $25,085 $5,017 $30,102 Necessary- 2-5 Yrs

Deferred Maintenance

Domestic water distribution is beyond expected life and should be replaced.

D2030 Sanitary Waste System Beyond Expected Life

Renew System 1 Ea. $42,712 $8,542 $51,255 Necessary- 2-5 Yrs

Deferred Maintenance

Sanitary waste is beyond expected life and should be replaced.

D2040 Rain Water Drainage

System Beyond Expected Life

Renew System 1 Ea. $10,848 $2,170 $13,017 Necessary- 2-5 Yrs

Deferred Maintenance

Rain water drainage system is beyond expected life and should be replaced.

D2010 Plumbing Fixtures

System Beyond Expected Life

Renew System 1 Ea. $332,885 $66,577 $399,462 Necessary- 2-5 Yrs

Deferred Maintenance

Plumbing fixtures are beyond expected life and should be replaced.

D1010 Elevators and Lifts

System Missing Renew System 1 Ea. $40,678 $8,136 $48,814 Necessary- 2-5 Yrs

ADA / Accessibility

An elevator is required to access the second floor of Building B.

Page 251: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Survey Report

Deficiency Detail ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 2

Facility

Name Assembly System Material Distress Correction Qty Unit Raw Cost

Additional

Cost Total Cost Priority Def. Cat. Location / Note

1989 (C&D Bldgs) $113,489 $22,698 $136,187 Building Systems $113,489 $22,698 $136,187

C3020 Floor Finishes - Carpet

System Beyond Expected Life

Renew System 1 Ea. $12,744 $2,549 $15,292 Necessary- 2-5 Yrs

Deferred Maintenance

Carpet floor finishes are worn, beyond expected life, and should be replaced.

C3020 Floor Finishes - VCT

System Beyond Expected Life

Renew System 1 Ea. $98,182 $19,636 $117,818 Necessary- 2-5 Yrs

Deferred Maintenance

The VCT floor finishes are worn, beyond expected life, and should be replaced.

B3010 Roof Coverings -EPDM

Roof Covering

Failing Roof Repair 42,990 S.F. $2,564 $513 $3,077 Necessary- 2-5 Yrs

Critical Repair

There are reports of several roof leaks in the building. An investigatiion to locate and determine the cause of the leaks is needed.

1999 (E Bldg) $11,897 $2,379 $14,276 Building Systems $11,897 $2,379 $14,276

D3060 Controls & Instrumentation

System Inadequate Renew System 1 Ea. $11,897 $2,379 $14,276 Recommended-3-10 Yrs

Deferred Maintenance

Analog electric controls system is inadequate and needs to be upgraded/replaced.

Basketball Court $25,278 $5,056 $30,333 Building Systems $25,278 $5,056 $30,333

F1010 Special Structures - Basketball Court - Concrete - Outdoor

System Beyond Expected Life

Renew System 1 Ea. $25,278 $5,056 $30,333 Necessary- 2-5 Yrs

Deferred Maintenance

The concrete surface is worn, beyond expected life, and should be replaced.

Page 252: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Survey Report

Deficiency Detail ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 3

Facility

Name Assembly System Material Distress Correction Qty Unit Raw Cost

Additional

Cost Total Cost Priority Def. Cat. Location / Note

Pine St Bldg (Teachers' Resource) $79,639 $15,928 $95,567 Building Systems $79,639 $15,928 $95,567

D5020 Branch Wiring System Beyond Expected Life

Renew System 1 Ea. $18,854 $3,771 $22,625 Necessary- 2-5 Yrs

Deferred Maintenance

Branch wiring is beyond expected life and should be replaced.

D5020 Lighting System Beyond Expected Life

Renew System 1 Ea. $18,854 $3,771 $22,625 Necessary- 2-5 Yrs

Deferred Maintenance

Lighting system is inadequate, beyond expected life, and should be replaced.

E2010 Fixed Furnishings

System Beyond Expected Life

Renew System 1 Ea. $10,029 $2,006 $12,034 Necessary- 2-5 Yrs

Deferred Maintenance

Fixed furnishings, such as the base/wall cabinets, counter tops, window shades, and fixed seating, are worn, beyond expected life, and should be replaced.

B2020 Exterior Windows

System Beyond Expected Life

Renew System 1 Ea. $13,372 $2,674 $16,046 Necessary- 2-5 Yrs

Deferred Maintenance

The exterior windows are worn, beyond expected life, and should be replaced.

B2030 Exterior Doors System Beyond Expected Life

Renew System 1 Ea. $3,343 $669 $4,011 Necessary- 2-5 Yrs

Deferred Maintenance

The exterior doors are worn, beyond expected life, and should be replaced.

C3020 Floor Finishes - VCT

System Beyond Expected Life

Renew System 1 Ea. $10,029 $2,006 $12,034 Necessary- 2-5 Yrs

Deferred Maintenance

The VCT floor finishes are worn, beyond expected life, and should be replaced.

D2030 Sanitary Waste System Beyond Expected Life

Renew System 1 Ea. $2,106 $421 $2,527 Necessary- 2-5 Yrs

Deferred Maintenance

Sanitary waste is beyond expected life and should be replaced.

D3050 Terminal & Package Units

Terminal and Package Units

Beyond Expected Life

Replace A/C 4T Split System

1 Ea. $3,053 $611 $3,664 Necessary- 2-5 Yrs

Deferred Maintenance

Lennox split system with gas heat is beyond expected life and should be replaced.

Site $886,154 $177,231 $1,063,385 Building Systems $886,154 $177,231 $1,063,385

G2010 Roadways System Beyond Expected Life

Renew System 1 Ea. $148,554 $29,711 $178,264 Necessary- 2-5 Yrs

Deferred Maintenance

The roadways are worn, beyond expected life, and should be replaced.

G2020 Parking Lots System Beyond Expected Life

Renew System 1 Ea. $126,593 $25,319 $151,912 Necessary- 2-5 Yrs

Deferred Maintenance

The parking lot is worn, beyond expected life, covered in gravel in some areas, and should be replaced.

G3010 Water Supply System Beyond Expected Life

Renew System 1 Ea. $87,840 $17,568 $105,408 Necessary- 2-5 Yrs

Deferred Maintenance

Water supply is beyond expected life and should be replaced.

G3020 Sanitary Sewer System Beyond Expected Life

Renew System 1 Ea. $43,920 $8,784 $52,704 Necessary- 2-5 Yrs

Deferred Maintenance

Sanitary sewer is beyond expected life and should be replaced.

G3030 Storm Sewer System Beyond Expected Life

Renew System 1 Ea. $378,489 $75,698 $454,186 Necessary- 2-5 Yrs

Deferred Maintenance

Storm sewer is beyond expected life and should be replaced.

G3060 Fuel Distribution System Beyond Expected Life

Renew System 1 Ea. $12,918 $2,584 $15,501 Necessary- 2-5 Yrs

Deferred Maintenance

Natural gas system is beyond expected life and should be replaced.

G2030 Pedestrian Paving

System Beyond Expected Life

Renew System 1 Ea. $87,840 $17,568 $105,408 Necessary- 2-5 Yrs

Deferred Maintenance

The pedestrian paving is cracked, worn, and beyond expected life, and should be replaced. There is also a need for a handicap access ramp at the front entry.

Page 253: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

Functional and Educational Adequacy

Suitability Report

Page 254: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

Suitability Report - Full

Project:Site:

Suitability

Possible

Score

Score

Percent

Score

CaddoCounty:

1Region:

Rating

630Site #:

Caddo 2009 Vivian Elementary-Middl

Project #:

4057

Site Type: Site Size:Grade Config:

K-8 0.00ES/MS

Suitability - K-8

Site

3.00 2.01 67.00 TrafficFair

1.00 0.67 67.00 Pedestrian TrafficFair

1.35 0.45 33.00 ParkingPoor

1.64 0.54 33.00 Play Courts & FieldsPoor

Safety and Security

1.22 1.22 100.00 FencingGood

0.15 0.05 33.00 Signage & Way FindingPoor

3.00 0.00 0.00 Ease of SupervisionP/U

0.50 0.00 0.00 Limited EntrancesP/U

0.50 0.00 0.00 Interior CirculationP/U

School Climate

5.00 0.00 0.00 Learning Style VarietyP/U

5.00 0.00 0.00 School EnvironmentP/U

1.00 0.00 0.00 LandscapingP/U

General Classrooms

12.95 8.68 67.00 SizeFair

2.78 2.78 100.00 AdjacenciesGood

2.78 2.78 100.00 Storage\Fixed Equip.Good

Remedial - Special Needs

3.17 1.59 50.00 SizeFair

0.68 0.68 100.00 AdjacenciesG/F

0.68 0.00 0.00 Storage\Fixed Equip.P/U

Library

2.43 1.22 50.00 SizeFair

0.52 0.52 100.00 AdjacenciesG/F

0.52 0.52 100.00 Storage\Fixed Equip.G/F

P.E.

8.40 8.40 100.00 SizeGood

1.80 1.80 100.00 AdjacenciesG/F

1.80 1.80 100.00 Storage\Fixed Equip.G/F

Music

2.64 2.64 100.00 SizeGood

0.57 0.00 0.00 AdjacenciesP/U

0.57 0.57 100.00 Storage\Fixed Equip.G/F

Art

Page 1 of 43/9/2010 2:19:58PM

Page 255: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

Project:Site:

Suitability

Possible

Score

Score

Percent

Score

CaddoCounty:

1Region:

Rating

630Site #:

Caddo 2009 Vivian Elementary-Middl

Project #:

4057

Site Type: Site Size:Grade Config:

K-8 0.00ES/MS

1.53 0.00 0.00 SizeP/U

0.33 0.33 100.00 AdjacenciesG/F

0.33 0.00 0.00 Storage\Fixed Equip.P/U

Performing Arts\Auditorium

1.64 1.64 100.00 SizeGood

0.35 0.35 100.00 AdjacenciesGood

0.35 0.35 100.00 Storage\Fixed Equip.Good

Vocational Technical

4.29 4.29 100.00 SizeGood

0.92 0.92 100.00 AdjacenciesGood

0.92 0.92 100.00 Storage\Fixed Equip.G/F

Science

2.70 0.00 0.00 SizeP/U

0.58 0.58 100.00 AdjacenciesGood

0.58 0.00 0.00 Storage\Fixed Equip.P/U

Kindergarten

1.18 0.00 0.00 SizeP/U

0.25 0.25 100.00 AdjacenciesG/F

0.25 0.25 100.00 Storage\Fixed Equip.G/F

Administration

1.59 0.79 50.00 SizeFair

0.34 0.34 100.00 AdjacenciesG/F

0.34 0.34 100.00 Storage\Fixed Equip.G/F

0.91 0.45 50.00Fair Restrooms (Student)

0.91 0.45 50.00Fair Teacher Lounge and Work Room(s)

5.00 3.35 67.00Fair Cafeteria

7.84 7.84 100.00Good Food Prep

0.41 0.20 50.00Fair Counseling

0.34 0.34 100.00G/F Clinic

0.50 0.50 100.00G/F Custodial & Maintenance

100.00 63.39 63.39Total For Site:

Comments

Suitability - K-8

Vivian Elementary Middle School provides a general educational program for grades PK-8. The middle school does

have some magnet programs that students must qualify for. The school serves the surrounding area which is a

large rural zone. The school has an extensive special education program in all grades. The facility is made up of 5

wings and one portable.

Suitability - K-8->Site-->Traffic

Primary parent drop off is separate but on-street.

Suitability - K-8->Site-->Pedestrian Traffic

Staff must cross street from parking lot.

Suitability - K-8->Site-->Parking

Most staff parking is across a street and about half of it is unpaved. The school shares half the parking with the

adjacent church.

Page 2 of 43/9/2010 2:19:58PM

Page 256: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

Project:Site:

Suitability

Possible

Score

Score

Percent

Score

CaddoCounty:

1Region:

Rating

630Site #:

Caddo 2009 Vivian Elementary-Middl

Project #:

4057

Site Type: Site Size:Grade Config:

K-8 0.00ES/MS

Suitability - K-8->Site-->Play Courts & Fields

There are no MS athletic fields and the PK-K play area is in poor condition.

Suitability - K-8->Safety and Security-->Signage & Way Finding

There is very little way finding signage and many rooms are not signed.

Suitability - K-8->Safety and Security-->Ease of Supervision

The number and configuration of the buildings make this a challenging site to supervise.

Suitability - K-8->Safety and Security-->Limited Entrances

There are numerous buildings with numerous entrances.

Suitability - K-8->Safety and Security-->Interior Circulation

Wings B and D have narrow, steep stairways. The halls are generally wide.

Suitability - K-8->School Climate-->Learning Style Variety

The small self-contained classrooms do not support a variety of learning styles.

Suitability - K-8->School Climate-->School Environment

The physical environment is not stimulating. Acoustics are poor, lighting is low, natural light is blocked, and overall

aesthetics are dull.

Suitability - K-8->School Climate-->Landscaping

Landscaping is minimal.

Suitability - K-8->General Classrooms-->Size

Most general classrooms are in the 6-700 SF range.

Suitability - K-8->Remedial - Special Needs-->Size

Special education classrooms are small, 6-700 SF.

Suitability - K-8->Remedial - Special Needs-->Storage\Fixed Equip.

Special education rooms need additional storage especially for the students equipment.

Suitability - K-8->Library-->Size

Both the ES and MS libraries are small.

Suitability - K-8->Music-->Adjacencies

The ES music room is adjacent to special education classrooms.

Suitability - K-8->Art-->Size

Both art rooms are small and the MS room does not have a separate room for the kiln.

Suitability - K-8->Art-->Storage\Fixed Equip.

Both art rooms need additional storage.

Suitability - K-8->Vocational Technical-->Size

The computer lab that houses business educ. is sufficiently large but it is shared with ES science.

Suitability - K-8->Science-->Size

Science rooms are in typical classrooms and are small and don't have storage/prep rooms.

Suitability - K-8->Science-->Storage\Fixed Equip.

Storage is lacking and there is no safety equipment.

Suitability - K-8->Kindergarten-->Size

PK and K rooms are too small.

Suitability - K-8->Administration-->Size

Conference room is small and there is no staff restroom in the administrative area.

Page 3 of 43/9/2010 2:19:58PM

Page 257: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

Project:Site:

Suitability

Possible

Score

Score

Percent

Score

CaddoCounty:

1Region:

Rating

630Site #:

Caddo 2009 Vivian Elementary-Middl

Project #:

4057

Site Type: Site Size:Grade Config:

K-8 0.00ES/MS

Suitability - K-8->Restrooms (Student)

Restrooms in the older B wing are in poor condition.

Suitability - K-8->Teacher Lounge and Work Room(s)

Teacher lounge and work rooms are small.

Suitability - K-8->Cafeteria

Cafeteria has a low ceiling which helps with the acoustics but compresses the space. It is a bit small for the

enrollment.

Suitability - K-8->Counseling

Counseling has no waiting space.

Suitability - K-8->Clinic

Clinic is not located near administration but this works okay.

Page 4 of 43/9/2010 2:19:58PM

Page 258: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

Functional and Educational Adequacy

Technology Readiness Report

Page 259: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

Technology Readiness Report - Full

Project:Site:

Technology Readiness

Possible

ScoreScore

Percent

Score

CaddoCounty:

1Region:

Rating

630Site #:

Caddo 2009 Vivian Elementary-Middle

Project #:

4057

Technology Readiness

15.00 7.50 50.00 Comm/IT Equipment Environment Fair

10.00 10.00 100.00 Electrical Power Good

10.00 10.00 100.00 Cooling Good

10.00 10.00 100.00 Drops & Wireless Good

15.00 15.00 100.00 LAN Connectivity Good

10.00 10.00 100.00 WAN Backbone Good

10.00 6.70 67.00 LAN-WAN Performance Fair

5.00 5.00 100.00 Video Distribution Good

5.00 0.00 0.00 Voice Distribution Unsat

10.00 10.00 100.00 Faculty & Staff Technology Good

100.00 84.20 84.20Total For Site:

Comments

Technology Readiness->Comm/IT Equipment Environment

Server is located in library storeroom which can get warm.

Technology Readiness->Voice Distribution

Intercom system is old and outdated.

Page 1 of 13/9/2010 2:05:06PM

Page 260: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

Functional and Educational Adequacy

Capacity and Utilization Report

Page 261: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

Capacity Calculations Appendix Preface Some spaces do not contribute to the functional capacity of a school. These spaces are generally spaces

which do not have students assigned to them. Some examples of these spaces include elementary art

rooms, elementary computer labs, elementary music rooms, and special education resource rooms.

Many schools have temporary buildings and these are also not included in the calculation of the

functional capacity. It is the district’s philosophy that, while temporary buildings can be useful in the

short run, they do not provide appropriate long term space and should be eliminated where possible.

Temporary buildings are generally used for the following functions:

1. To house students in temporary classrooms when the school is lacking enough classrooms

2. To house special programs when the school is lacking space for these programs

3. To house necessary storage or administrative support functions when permanent space is lacking

4. To house unnecessary storage or functions

It is the district’s strategy to eliminate all but the absolute necessary temporary buildings and it should

conduct an inventory of the uses of temporary buildings. Where the inventory identifies uses 1-3, the

district will need to consider a more appropriate space solution. In the case of number 4, the district will

need to ensure the principal of the school discontinues the inappropriate use of the temporary building.

Page 262: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

Caddo Parish School Board

Instructional Space Model Guidelines

Room Type Students/

Room

Pre-School 20

K Capacity (full day) and 1st Grade 20

Elementary Classroom (2) 24

Elementary Classroom (3-5) 26

Secondary Classroom (6-12) 25

Art (Secondary) 33

Music (Secondary) - Vocal 25

Music (Secondary) - Instrumental 30

Science Lab (Secondary) 25

Voc./Industrial Tech, Foods, Etc. 25

Gym (Secondary) 80

Computer Lab (Elementary)* 26

Computer Lab (Secondary) 33

Spec. Ed. - Severe 9

Spec. Ed. - Resource 0

Alternative Education 18

Portable 0

*These spaces do not contribute to capacity

Scheduling Factors

Elementary Schools 95.0%

Middle Schools 85.0%

High Schools 75.0%

Source: MGT of America, Inc., 2009.

Page 263: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

Caddo Parish School Board Capacity Calculations

Vivian Elementary-MiddleES/M K-8

K-1 Classroom: 8

PK Classroom: 2

ES (2) Classroom: 3

ES (3-5) Classroom: 8

ART: 2

Secondary (6-12): 6

MU Inst: 1

MU Vocal: 1

Science: 3.5

GYM: 3

VO/TEC: 0.5

*Computer Lab: 3

SE - Resource: 8

SE - Severe: 8

Alt: 0

**Temp Bldg: 2

20

24

20

26

33

25

30

25

25

80

25

33

0

9

18

Room Type # of Classrooms x Students/Room = Capacity

Total Capacity (w/o scheduling factor) =

Vivian Elementary-Middle Capacity =

x Scheduling factor =

40

72

160

208

150

66

30

25

87.5

240

12.5

99

0

72

0

0

*Computer Labs at Elementary Schools do not contribute to capacity**The temporary building number represents the number of temporary building teaching stations or rooms, not the number of temporary buildings.

1,073

1,262

85%

N/A

Page 264: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

Future Facility and Site Assessment Report

Page 265: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

FUTURE FACILITY AND SITE ASSESSMENT

School VIVIAN ELEMENTARY / MIDDLE SCHOOL 100 West Kentucky Ave. Vivian, LA 71082

Site Description 9 acre site in the town of Vivian in the northwest part of the parish surrounded by a residential neighborhood and faces a 2-lane lightly traveled street and the 4-lane State Highway 1 aka Pine Street borders the east side. The acreage is an accumulation of lots on several blocks including a parking lot across Kentucky Street to the south and a partial block across Pine Street (Hwy 1) reportedly leased to the City but used as a teacher resource facility. The original 1915 school on the north corner is now City property. The site slopes gently west to east and north with the main buildings sitting on a raised pad. The school is a collection of 6 incrementally added 1- and 2-story buildings including the original 1923 school, 4 classroom additions, an auditorium and gymnasium unit, and a modular unit. At the teacher resource center is a small 1-story brick, flat roof building. Site features include asphalt and gravel paving, lawns and a few trees, recreation field, paved basketball court, and playground equipment.

SUMMARY Topic Grade Comments

Site Adequacy Potential

Constraint

Although there is some available land, the campus is filling up, any additions will encroach on outdoor recreation and parking and site is much smaller than guideline. SITE ASSESSMENT

Site Size Status Inadequate

Student Capacity: 1012 Min. Acres Recommended: 20 Actual Site Acres: 9

Usable Area Remaining

Potential Constraint

1.50 Acres. Approximate. Both expansion areas crowd the site boundaries and impinge on recreation yards or parking.

• Flood Plain Potential

Constraint

The FEMA FIRM maps covering the Town of Vivian were blank and did not show any zone designations. The assumption used here is that there MIGHT be a problem but the data is not readily available from public sources.

• Potable Water No Constraint

• Sanitary Sewer No Constraint

• Storm Drainage No Constraint

Generally site drains well but a few localized ponding conditions were observed.

• Electricity No Constraint

• Natural Gas No Constraint

• Ground Water No Constraint

• Air Pollution No Constraint

• HazMat/Soils No Constraint

• Habitats No Constraint No conflicts identified by DEQ.

Ease of Access No Constraint

Ease of Traffic Flow Needs Improvement

Bus and auto traffic are separated on different streets. Auto drop-off is uncovered and street configuration is awkward.

Design Compatibility No Constraint

The school facility fits into the residential neighborhood and has grown over the years; expansion or replacement would not be intrusive although the site is getting full.

Compatibility of Structures

No Constraint The collection of buildings and styles are eclectic but share materials and massing that reasonably blend.

Page 266: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

VIV

IAN

EL

EM

EN

TA

RY

/MID

DL

E S

CH

OO

L100 W

est K

en

tucky

Viv

ian

, LA

71082

MISSISSIPPI STREET

N

KENTUCKY STREET

SP

RU

CE

ST

RE

ET

LA

HW

Y 1

/PIN

E S

TR

EE

T

Primary : 0.81 Ac

Secondary : 0.69 Ac

Total: 1.50 Ac

Primary

Secondary

1915 SCHOOL

PUBLIC LIBRARY

Recreation Yard

RESIDENTIAL

RESIDENTIAL

COMMERCIAL

RESIDENTIAL

RESIDENTIAL/COMMERCIAL

Auto

Pic

k-U

p

Bus Drop-Off

T

E

E

Total Usable

Site Area: 1.50 Ac

+ FH

Parking

1923 SCHOOL

Leased To City

Slope

Pu

blis

he

d 0

1.2

9.1

0

New

B

uild

ing

Teacher Resource Center

Page 267: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

Building Code Verification Report

Page 268: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

Building Code Number COMPLYNOT

COMPLY

FCA

DEFICIENCY

NOT

KNOWN

SYSTEM

NOT

PRESENT

NA TO FCA

DATA

1Code of Federal Regulations 28 CFR Part

36, 1994 edition, Paragraph 4.1.2,

Paragraph 4.1.6

1 NPFA 101:15.2.3.2; IBC 1017.2

3 IBC 1005.2

5

a

b

c

d

6

a

b

1

2

4 IBC 1011.5.3

1 IBC 1007.3

2 IBC 1020.1

Are penetrations into stairs limited to doors, electrical conduit serving the

stairway, piping necessary for the heating or cooling of the exit enclosure,

sprinkler piping, standpipes and penetrations for fire alarm circuits?

8

Boiler and furnace rooms?

Are corridor doors rated a minimum 20-minute rating?

Is glazing in rated doors above 20 minutes limited to 100 square inches?

NFPA 101:15.3.7

NFPA 101:15.3.2.1; IBC 508.2

Does every room or space greater than 250 SF and used for educational

purposes have not less than one outside window for emergency rescue

(exceptions: sprinklered building or room that has a door directly to the

outside)?

Do doors opening in the path of egress travel not reduce the required width to

less than 1/2 during the course of the swing?

When fully open, do corridor doors not project more than 7 inches into the

required corridor width?

Is the building subdivided into compartments by smoke partitions having not

less than a 1-hour fire rating? (Maximum area of compartment is 30,000 SF.

Length or width of building exceeds 300’ unless sprinklered.)

IBC 715.4.4.1

Is 1-hour rating or sprinkler protection provided for the following:

Hazardous storage?

Janitor’s closet?

IBC 1008.1.8.1

Where there is a chiller, is it separated from a boiler or water heater by a 2-

hour assembly?

Laundries? NFPA 101:15.3.2.1; IBC 508.2

School Name: Vivian ES/MS

NFPA101:15.2.11.1.1

G2030 Pedestrian Paving

B2020 Exterior Windows

4

BUILDING CODE COMPLIANCE REPORT

Code Provision

Is there a continuous path of entry/exit for handicap accessibility to all parts of

the building?

Do exit access corridors have not less than 6’ of clear width?

Are both 1-hour rating and sprinkler protection provided for the following:

Science labs?

7

Does all door hardware comply by not requiring tight grasping, tight pinching or

twisting to operate?

Maintenance shops?

IBC 508.2

C10 Interior Construction

C1010 Partitions

C1020 Interior Doors

1

IBC 1005.2

Are corridors 1-hour rated (exceptions: building is sprinklered or each room for

instruction has at least one door directly to the exterior)?IBC 1017.1

2

3

NFPA 101:7.1.3.2.1; IBC 1020.1.2

C2010 Stair Construction

Are all means of egress illuminated at all times building is occupied?

Do exit stairways have a minimum 48” clearance width between handrails?

Are stairs separated by 1-hour fire resistance rating?

3

Page 269: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

Building Code Number COMPLYNOT

COMPLY

FCA

DEFICIENCY

NOT

KNOWN

SYSTEM

NOT

PRESENT

NA TO FCA

DATACode Provision

4

a NFPA 101:7.2.2.2.4.2; IBC 1012.4

b IBC 1012.5

c NFPA 101:7.2.2.4.4.6; IBC 1012.1

d NFPA 101:7.2.2.4.4.2; IBC 1012.2

5 IBC 1007.6

1

2

1 IBC 508.2

2 IBC 1203.1

3INTERNATIONAL MECHANICAL CODE

2000, 606.4

4 IBC 908.6

1 IBC 903.2

1 IBC 907.2

Is there a telephone or intercom communication in the cab?

Is there a fireman control panel at the ground floor controls?

Are handrails:

IBC 3006.2

IBC 3003.2

Is there an Area of Refuge in the stairwell or in a vestibule entering the stair? Is

there a communication device there?

Between 34” and 38” above the surface of the tread?

Between 1-1/4” and 2” in diameter?

Returning to wall, guard or walking surface?

3 IBC 907.11

IBC 907.2.12.2

Does the shaft have exhaust directly to the outside, an access ladder to the pit,

and battery backup lighting in the shaft/pit?

Are the mechanical rooms separated by fire rated partitions from remainder of

building?

Is there a standard and emergency ventilation system provided?

Are there automatic sprinkler systems provided in assembly spaces with more

than 300 occupants?

2

Is there a refrigerant detection and alarm system provided?

Are there emergency shut-offs provided?

Are the duct smoke detectors connected to the building’s fire alarm control

panel?

Is there a monitored fire alarm system provided?

Does the operation of fire detector, sprinkler device or manual fire alarm box

immediately sounds an alert tone followed by voice instructions giving

approved information and directions for an evacuation?

IBC 3004.1; IBC 3006.1

D30 HVAC Systems

D40 Fire Protection

D4010 Sprinklers

D50 Electrical

D5030 Communications and Security

4

D10 Conveying

D1010 Elevators

3Does the Elevator Machine Room have ventilation or air conditioning to protect

controls from overheating?

Continuously graspable?

Page 270: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

Energy Conservation Opportunities Report

Page 271: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

System Energy Conservation FCA Deficiency Replacement Cost

SCHOOL TYPEENERGY CONSERVATION OPPORTUNITIES

Vivian Elementary/Middle ES/MS

1923, 1930, 1972 (A&B) Buildings Roof Covering No No

Exterior Windows Yes Yes $325,428.00

Interior Lighting No No

Bldg Controls & Instrumentation No No

Heating No No

Other HVAC Systems (Ventilation) No No

Terminal & Package Units No No

Cooling No No

1989 (C&D) Buildings Roof Covering Partial Yes $3,077.00

Exterior Windows No No

Interior Lighting No No

Bldg Controls & Instrumentation No No

Heating No No

Other HVAC Systems (Ventilation) No No

Terminal & Package Units No No

Cooling No No

1999 (E) Building Roof Covering No No

Exterior Windows No No

Interior Lighting No No

Bldg Controls & Instrumentation Yes Yes $14,276.00

Heating No No

Other HVAC Systems (Ventilation) No No

Terminal & Package Units No No

Cooling No No

2003 (H) Building Roof Covering No No

Exterior Windows No No

Interior Lighting No No

Bldg Controls & Instrumentation No No

Heating No No

Other HVAC Systems (Ventilation) No No

Terminal & Package Units No No

Cooling No No

Pine St Building (Teachers' Resource) Roof Covering No No

Exterior Windows Yes Yes $16,046.00

Interior Lighting Yes Yes $22,625.00

Bldg Controls & Instrumentation No No

Heating No No

Other HVAC Systems (Ventilation) No No

Terminal & Package Units No Yes $3,664.00

Cooling No No

Site Exterior Lighting No No

Page 272: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

Facility Condition Assessment Reports

Page 273: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 1

Facility: \Elementary/Middle Schools\VivianAddress: 100 W. Kentucky Ave., Vivian, LA 71082

Attributes: Temporary Building Rooms 2

General Information: Function: Elementary Middle Year Built:Gross Area: 129,177 S.F. Last Renovation:

Facility Description:

The Vivian Elementary/Middle School campus consists of one main school building and six ancillary buildings located at on 100 West Kentucky Avenue in Vivian, Louisiana. The original campus was constructed in 1923. Ancillary buildings on campus include the 1989 C & D Buildings, 1999 E Building, 2004 H Building, covered walkways, and the Pine Street Building. In addition to the buildings, the campus contains basketball courts. This report contains condition and adequacy data collected during the 2009/2010 Facility Condition Assessment (FCA). The detailed condition and deficiency statements are contained in this report.

Current Repair Cost: $3,726,480.00 Replacement Cost: $22,089,677.00 FCI: 16.87%

20-Jan-2010Vivian Elementary/Middle School

Page 274: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 2

Facility: \Elementary/Middle Schools\Vivian\1923, 1930, 1972 (A&B Bldgs)Address: 100 W. Kentucky Avenue, Vivian , LA 71082

Attributes: Number of Floors 2

General Information: Function: Elementary Middle Year Built: 1923Gross Area: 61,634 S.F. Last Renovation:

Facility Description:

Vivian Elementary/Middle School is a 2-story building, designated as Buildings A and B, located at 100 West Kentucky in Vivian, Louisiana. There have been additions in 1930 and 1972, and HVAC and roofing renovations. This report contains condition and adequacy data collected during the 2009/2010 Facility Condition Assessment (FCA). The detailed condition and deficiency statements are contained in this report for each building.

Energy conservation opportunities for this building include: 1) installation of fixed, double pane, low e, thermal windows with thermal breaks would improve energy use and improve comfort; 2) Upon replacement of the roof covering, an insulation with a high thermal resistance value should be installed; 3) The plumbing fixtures should be replaced with low flow, energy efficient models; 4) Addition of a building automation system would allow programs to improve operation and reduce energy use; and 5) A power factor analysis may be justified to provide greater electrical consumption efficiency.

ADA vertical access needs for this building include provision of an elevator in B building and front entry access.

Current Repair Cost: $2,386,732.00 Replacement Cost: $10,228,117.00 FCI: 23.34%

20-Jan-2010East Elevation

20-Jan-2010South Elevation

20-Jan-2010North Elevation

20-Jan-2010West Elevation

Page 275: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 3

Facility: \Elementary/Middle Schools\Vivian\1923, 1930, 1972 (A&B Bldgs) (continued)

Building Condition:

System Unit Price$

Unit of

Meas Qty Renewal% Renewal$ Life Installed

Calc Next

Renewal

Next

Renewal CI% Deficiency$ Replacement Value FCI%

Total $165.95 S.F. 61,634 107 $10,907,014 51 1974 1943 2010 50 $2,386,733 $10,228,118 23

Substructure $10.20 S.F. 61,634 100 $628,667 100 1923 $628,667

Foundations $10.20 S.F. 61,634 100 $628,667 100 1923 $628,667

Standard Foundations $10.20 S.F. 61,634 100 $628,667 100 1923 $628,667

Special Foundations 0 0 0 0

Slab on Grade 0 0 0 0

Basement Construction 0 0 0

Basement Excavation 0 0 0 0

Basement Walls 0 0 0 0

Shell $53.94 S.F. 61,634 103 $3,420,319 81 1950 2002 47 $406,785 $3,324,538 12

Superstructure $24.00 S.F. 61,634 100 $1,479,216 100 1923 $1,479,216

Floor Construction $13.20 S.F. 61,634 100 $813,569 100 1923 $813,569

Roof Construction $10.80 S.F. 61,634 100 $665,647 100 1923 $665,647

Exterior Enclosure $20.40 S.F. 61,634 103 $1,294,315 78 1956 2002 $406,785 $1,257,334 32

Exterior Walls $14.40 S.F. 61,634 100 $887,530 100 1923 $887,530

Exterior Windows $4.80 S.F. 61,634 110 $325,428 30 1972 2002 $325,428 $295,843 110

Exterior Doors $1.20 S.F. 61,634 110 $81,357 30 1972 2002 $81,357 $73,961 110

Roofing $9.54 S.F. 61,634 110 $646,788 41 1988 2019 47 $587,988

Roof Coverings - BUR $9.54 S.F. 37,578 110 $394,344 20 1999 2019 45 $358,494

Roof Coverings - EPDM 0 0 0 0

Roof Coverings - Standing

Seam Mettal

$9.54 S.F. 24,056 110 $252,444 75 1972 2047 49 $229,494

Roof Openings 0 0 0 0

Interiors $29.94 S.F. 61,634 108 $1,985,563 56 1968 1992 49 $734,374 $1,845,402 40

Interior Construction $19.20 S.F. 61,634 106 $1,257,333 68 1956 1992 5 $406,784 $1,183,373 34

Partitions $10.80 S.F. 61,634 110 $732,212 100 1923 $665,647

Interior Doors $2.40 S.F. 61,634 80 $118,337 40 1972 2012 5 $147,922

Fittings $6.00 S.F. 61,634 110 $406,784 20 1972 1992 $406,784 $369,804 110

Stairs $2.58 S.F. 61,634 110 $174,917 100 1923 $159,016

Stair Construction $2.58 S.F. 61,634 110 $174,917 100 1923 $159,016

Interior Finishes $8.16 S.F. 61,634 110 $553,313 15 1996 2004 72 $327,590 $503,013 65

Wall Finishes - Ceramic &

Glazed

0 0 0 0

Wall Finishes - Paint $2.40 S.F. 61,634 110 $162,714 10 2000 2010 $162,714 $147,922 110

Floor Finishes - Carpet $2.76 S.F. 2,856 110 $8,671 8 1999 2007 $8,671 $7,883 110

Floor Finishes - Ceramic &

Quarry Tile

$1.44 S.F. 2,962 110 $4,692 50 1972 2022 24 $4,265

Floor Finishes - Terrazzo 0 0 0 0

Floor Finishes - VCT $3.60 S.F. 55,816 110 $221,031 15 2006 2021 73 $200,938

Ceiling Finishes $2.30 S.F. 61,634 110 $156,205 20 1984 2004 $156,205 $142,005 110

Services $61.07 S.F. 61,634 110 $4,140,253 22 1989 1953 2010 52 $1,001,503 $3,763,864 27

Conveying $0.72 S.F. 61,634 110 $48,814 30 1923 1953 2010 $48,814 $44,376 110

Elevators and Lifts $1.20 S.F. 36,980 110 $48,814 30 1923 1953 2010 $48,814 $44,376 110

Plumbing $7.54 S.F. 61,634 110 $510,921 30 1975 2002 17 $493,836 $464,474 106

Plumbing Fixtures $5.89 S.F. 61,634 110 $399,462 30 1972 2002 $399,462 $363,148 110

Domestic Water Distribution $0.44 S.F. 61,634 110 $30,102 30 1972 2002 $30,102 $27,365 110

Sanitary Waste $0.76 S.F. 61,634 110 $51,255 30 1972 2002 $51,255 $46,595 110

Rain Water Drainage $0.19 S.F. 61,634 110 $13,017 30 1972 2002 $13,017 $11,834 110

Other Plumbing Systems -

Natural Gas

$0.25 S.F. 61,634 110 $17,085 30 1985 2015 17 $15,532

HVAC $33.72 S.F. 61,634 110 $2,286,128 20 2001 2015 46 $2,078,298

Heat Generating Systems 0 0 0 0

Cooling Generating Systems 0 0 0 0

Distribution Systems & Exhaust

Systems

$9.12 S.F. 61,634 110 $618,312 30 2000 2030 67 $562,102

Terminal & Package Units $21.60 S.F. 61,634 110 $1,464,424 15 2000 2015 33 $1,331,294

Controls & Instrumentation $1.80 S.F. 61,634 110 $122,035 20 2005 2025 75 $110,941

Other HVAC Systems/Equip -

Kitchen Hood

$1.20 S.F. 61,634 110 $81,357 30 2000 2030 67 $73,961

Fire Protection 0 0 0

Sprinklers 0 0 0 0

Electrical $19.09 S.F. 61,634 110 $1,294,390 23 1998 2002 69 $458,853 $1,176,716 39

Electrical Service/Distribution $2.27 S.F. 61,634 110 $153,765 30 2001 2031 70 $139,786

Branch Wiring $6.77 S.F. 61,634 110 $458,853 30 1972 2002 $458,853 $417,139 110

Lighting $6.77 S.F. 61,634 110 $458,853 20 2005 2025 75 $417,139

Communications and Security -

Public Address & Clock System

$0.88 S.F. 61,634 110 $59,391 20 2000 2020 50 $53,991

Fire Alarm $1.54 S.F. 61,634 110 $104,137 10 2006 2016 60 $94,670

Page 276: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 4

System Unit Price$

Unit of

Meas Qty Renewal% Renewal$ Life Installed

Calc Next

Renewal

Next

Renewal CI% Deficiency$ Replacement Value FCI%

Security & CCTV $0.88 S.F. 61,634 110 $59,391 10 2005 2015 50 $53,991

Other Electrical Systems -

Emergency Generator

0 0 0 0

Equipment & Furnishings $10.80 S.F. 61,634 110 $732,212 20 1974 1943 49 $244,071 $665,647 37

Equipment $7.20 S.F. 61,634 110 $488,141 20 2000 2019 49 $443,765

Commercial Equipment $6.00 S.F. 61,634 110 $406,784 20 2000 2020 50 $369,804

Institutional Equipment $1.20 S.F. 61,634 110 $81,357 20 1999 2019 45 $73,961

Furnishings $3.60 S.F. 61,634 110 $244,071 20 1923 1943 $244,071 $221,882 110

Fixed Furnishings $3.60 S.F. 61,634 110 $244,071 20 1923 1943 $244,071 $221,882 110

Page 277: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 5

Facility: \Elementary/Middle Schools\Vivian\1923, 1930, 1972 (A&B Bldgs) (continued)

Renewal Schedule:

Systems 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020

Total $2,386,733 $125,544 $1,786,325 $124,345 $10,984 $620,681 $845,174

Substructure

Foundations

Standard Foundations

Special Foundations

Slab on Grade

Basement Construction

Basement Excavation

Basement Walls

Shell $406,785 $514,529

Superstructure

Floor Construction

Roof Construction

Exterior Enclosure $406,785

Exterior Walls

Exterior Windows $325,428

Exterior Doors $81,357

Roofing $514,529

Roof Coverings - BUR $514,529

Roof Coverings - EPDM

Roof Coverings - Standing Seam

Mettal

Roof Openings

Interiors $734,374 $125,544 $10,984 $218,674

Interior Construction $406,784 $125,544

Partitions

Interior Doors $125,544

Fittings $406,784

Stairs

Stair Construction

Interior Finishes $327,590 $10,984 $218,674

Wall Finishes - Ceramic & Glazed

Wall Finishes - Paint $162,714 $218,674

Floor Finishes - Carpet $8,671 $10,984

Floor Finishes - Ceramic & Quarry

Tile

Floor Finishes - Terrazzo

Floor Finishes - VCT

Ceiling Finishes $156,205

Services $1,001,503 $1,786,325 $124,345 $79,816

Conveying $48,814

Elevators and Lifts $48,814

Plumbing $493,836 $19,806

Plumbing Fixtures $399,462

Domestic Water Distribution $30,102

Sanitary Waste $51,255

Rain Water Drainage $13,017

Other Plumbing Systems - Natural

Gas

$19,806

HVAC $1,697,669

Heat Generating Systems

Cooling Generating Systems

Distribution Systems & Exhaust

Systems

Terminal & Package Units $1,697,669

Controls & Instrumentation

Other HVAC Systems/Equip -

Kitchen Hood

Fire Protection

Sprinklers

Electrical $458,853 $68,850 $124,345 $79,816

Electrical Service/Distribution

Branch Wiring $458,853

Lighting

Communications and Security -

Public Address & Clock System

$79,816

Page 278: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 6

Systems 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020

Fire Alarm $124,345

Security & CCTV $68,850

Other Electrical Systems -

Emergency Generator

Equipment & Furnishings $244,071 $106,152 $546,684

Equipment $106,152 $546,684

Commercial Equipment $546,684

Institutional Equipment $106,152

Furnishings $244,071

Fixed Furnishings $244,071

Page 279: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 7

Facility: \Elementary/Middle Schools\Vivian\1923, 1930, 1972 (A&B Bldgs) (continued)

Deficiency Sheet:

Deficiency: Surveyor/Update: Eric Altman Fri, 04-Jun-2010Priority: 3Quantity: 1

Assembly: B2020 System: Exterior Windows Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: The exterior windows are worn, beyond expected life, and should be replaced.

Estimates:Raw Cost $271,189.60

Plus or (Minus) Additional Cost $0.00Total Estimated Amount $271,189.60

Deficiency: Surveyor/Update: Eric Altman Fri, 04-Jun-2010Priority: 3Quantity: 1

Assembly: B2030 System: Exterior Doors Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: The exterior doors are worn, beyond expected life, and should be replaced.

Estimates:Raw Cost $67,797.40

Plus or (Minus) Additional Cost $0.00Total Estimated Amount $67,797.40

Page 280: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 8

Facility: \Elementary/Middle Schools\Vivian\ 1923, 1930, 1972 (A&B Bldgs) (continued)

Deficiency: Surveyor/Update: Eric Altman Fri, 04-Jun-2010Priority: 3Quantity: 1

Assembly: C1030 System: Fittings Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: Fittings, such as chalk and tack boards, lockers, toilet and bath accessories, toilet partitions, and shelving, are

beyond expected life and should be replaced.

Estimates:Raw Cost $338,987.00

Plus or (Minus) Additional Cost $0.00Total Estimated Amount $338,987.00

Deficiency: Surveyor/Update: Eric Altman Fri, 04-Jun-2010Priority: 3Quantity: 1

Assembly: C3010 System: Wall Finishes - Paint Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: The painted wall finishes are worn, beyond expected life, and should be replaced.

Estimates:Raw Cost $135,594.80

Plus or (Minus) Additional Cost $0.00Total Estimated Amount $135,594.80

Page 281: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 9

Facility: \Elementary/Middle Schools\Vivian\ 1923, 1930, 1972 (A&B Bldgs) (continued)

Deficiency: Surveyor/Update: Eric Altman Fri, 04-Jun-2010Priority: 3Quantity: 1

Assembly: C3020 System: Floor Finishes - Carpet Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: Carpet floor finishes are worn, beyond expected life, and should be replaced.

Estimates:Raw Cost $7,225.68

Plus or (Minus) Additional Cost $0.00Total Estimated Amount $7,225.68

Deficiency: Surveyor/Update: Eric Altman Fri, 04-Jun-2010Priority: 3Quantity: 1

Assembly: C3030 System: Ceiling Finishes Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: The ceiling finishes are stained, beyond expected life, and should be replaced.

Estimates:Raw Cost $130,171.01

Plus or (Minus) Additional Cost $0.00Total Estimated Amount $130,171.01

Page 282: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 10

Facility: \Elementary/Middle Schools\Vivian\ 1923, 1930, 1972 (A&B Bldgs) (continued)

Deficiency: Surveyor/Update: Eric Altman Fri, 04-Jun-2010Priority: 3Quantity: 1

Assembly: D1010 System: Elevators and Lifts Material: System Distress: Missing Category: ADA / Accessibility Correction: Renew System Note: An elevator is required to access the second floor of Building B.

Estimates:Raw Cost $40,678.00

Plus or (Minus) Additional Cost $0.00Total Estimated Amount $40,678.00

Deficiency: Surveyor/Update: Eric Altman Fri, 04-Jun-2010Priority: 3Quantity: 1

Assembly: D2010 System: Plumbing Fixtures Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: Plumbing fixtures are beyond expected life and should be replaced.

Estimates:Raw Cost $332,885.23

Plus or (Minus) Additional Cost $0.00Total Estimated Amount $332,885.23

Page 283: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 11

Facility: \Elementary/Middle Schools\Vivian\ 1923, 1930, 1972 (A&B Bldgs) (continued)

Deficiency: Surveyor/Update: Eric Altman Thu, 11-Mar-2010Priority: 3Quantity: 1

Assembly: D2020 System: Domestic Water Distribution Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: Domestic water distribution is beyond expected life and should be replaced.

Estimates:Raw Cost $25,085.04

Plus or (Minus) Additional Cost $0.00Total Estimated Amount $25,085.04

Deficiency: Surveyor/Update: Eric Altman Fri, 04-Jun-2010Priority: 3Quantity: 1

Assembly: D2030 System: Sanitary Waste Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: Sanitary waste is beyond expected life and should be replaced.

Estimates:Raw Cost $42,712.36

Plus or (Minus) Additional Cost $0.00Total Estimated Amount $42,712.36

Page 284: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 12

Facility: \Elementary/Middle Schools\Vivian\ 1923, 1930, 1972 (A&B Bldgs) (continued)

Deficiency: Surveyor/Update: Eric Altman Fri, 04-Jun-2010Priority: 3Quantity: 1

Assembly: D2040 System: Rain Water Drainage Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: Rain water drainage system is beyond expected life and should be replaced.

Estimates:Raw Cost $10,847.58

Plus or (Minus) Additional Cost $0.00Total Estimated Amount $10,847.58

Deficiency: Surveyor/Update: Eric Altman Thu, 03-Jun-2010Priority: 3Quantity: 1

Assembly: D5020 System: Branch Wiring Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: Branch wiring is beyond expected life and should be replaced.

Estimates:Raw Cost $382,377.34

Plus or (Minus) Additional Cost $0.00Total Estimated Amount $382,377.34

Page 285: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 13

Facility: \Elementary/Middle Schools\Vivian\ 1923, 1930, 1972 (A&B Bldgs) (continued)

Deficiency: Surveyor/Update: Eric Altman Fri, 04-Jun-2010Priority: 3Quantity: 1

Assembly: E2010 System: Fixed Furnishings Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: Fixed furnishings, such as the base/wall cabinets, counter tops, window shades, and fixed seating, are worn,

beyond expected life, and should be replaced.

Estimates:Raw Cost $203,392.20

Plus or (Minus) Additional Cost $0.00Total Estimated Amount $203,392.20

Page 286: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 14

Facility: \Elementary/Middle Schools\Vivian\1989 (C&D Bldgs)Address: 100 W. Kentucky Avenue, Vivian, LA 71082

Attributes: Number of Floors 1

General Information: Function: Elementary Middle Year Built: 1989Gross Area: 42,990 S.F. Last Renovation:

Facility Description:

Building C (Kindergarten) and Building D (Gymnasium) at Vivian Elementary/Middle School are 1-story buildings located at 100 West Kentucky Avenue in Vivian, Louisiana. There have been no additions and very few renovations. This report contains condition and adequacy data collected during the 2009/2010 Facility Condition Assessment (FCA). The detailed condition and deficiency statements are contained in this report.

Current Repair Cost: $136,187.00 Replacement Cost: $6,987,747.00 FCI: 1.95%

20-Jan-2010East Elevation

20-Jan-2010South Elevation

20-Jan-2010West Elevation

20-Jan-2010North Elevation

Page 287: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 15

Facility: \Elementary/Middle Schools\Vivian\1989 (C&D Bldgs) (continued)

Building Condition:

System Unit Price$

Unit of

Meas Qty Renewal% Renewal$ Life Installed

Calc Next

Renewal

Next

Renewal CI% Deficiency$ Replacement Value FCI%

Total $162.54 S.F. 42,990 107 $7,464,692 49 1993 1997 2014 52 $136,187 $6,987,745 2

Substructure $19.20 S.F. 42,990 100 $825,408 100 1989 $825,408

Foundations $19.20 S.F. 42,990 100 $825,408 100 1989 $825,408

Standard Foundations $10.20 S.F. 42,990 100 $438,498 100 1989 $438,498

Special Foundations 0 0 0 0

Slab on Grade $9.00 S.F. 42,990 100 $386,910 100 1989 $386,910

Basement Construction 0 0 0

Basement Excavation 0 0 0 0

Basement Walls 0 0 0 0

Shell $40.80 S.F. 42,990 104 $1,821,056 68 1992 2019 69 $3,077 $1,753,992

Superstructure $10.80 S.F. 42,990 100 $464,292 100 1989 $464,292

Floor Construction 0 0 0 0

Roof Construction $10.80 S.F. 42,990 100 $464,292 100 1989 $464,292

Exterior Enclosure $20.40 S.F. 42,990 103 $902,790 78 1989 2019 30 $876,996

Exterior Walls $14.40 S.F. 42,990 100 $619,056 100 1989 $619,056

Exterior Windows $4.80 S.F. 42,990 110 $226,987 30 1989 2019 30 $206,352

Exterior Doors $1.20 S.F. 42,990 110 $56,747 30 1989 2019 30 $51,588

Roofing $9.60 S.F. 42,990 110 $453,974 15 1999 2019 93 $3,077 $412,704 1

Roof Coverings - BUR 0 0 0 0

Roof Coverings - EPDM $9.54 S.F. 42,990 110 $451,137 15 2009 2024 93 $3,077 $410,125 1

Roof Coverings - Standing

Seam Mettal

0 0 0 0

Roof Openings $0.06 S.F. 42,990 110 $2,837 30 1989 2019 30 $2,579

Interiors $31.40 S.F. 42,990 108 $1,453,712 57 1989 1997 2014 36 $133,110 $1,349,694 10

Interior Construction $19.20 S.F. 42,990 106 $876,996 68 1989 2009 2015 30 $825,408

Partitions $10.80 S.F. 42,990 110 $510,721 100 1989 $464,292

Interior Doors $2.40 S.F. 42,990 80 $82,541 40 1989 2029 48 $103,176

Fittings $6.00 S.F. 42,990 110 $283,734 20 1989 2009 2015 25 $257,940

Stairs $2.58 S.F. 42,990 110 $122,006 100 1989 $110,914

Stair Construction $2.58 S.F. 42,990 110 $122,006 100 1989 $110,914

Interior Finishes $9.62 S.F. 42,990 110 $454,710 22 1989 1997 2014 42 $133,110 $413,372 32

Wall Finishes - Ceramic &

Glazed

0 0 0 0

Wall Finishes - Paint $2.40 S.F. 42,990 110 $113,494 10 1989 1999 2015 50 $103,176

Floor Finishes - Carpet $2.76 S.F. 5,037 110 $15,292 8 1989 1997 $15,292 $13,902 110

Floor Finishes - Ceramic &

Quarry Tile

$1.44 S.F. 1,719 110 $2,723 50 1989 2039 58 $2,475

Floor Finishes - VCT $3.60 S.F. 29,752 110 $117,818 15 1989 2004 $117,818 $107,107 110

Floor Finishes - Wood $13.52 S.F. 6,482 110 $96,429 50 1989 2039 58 $87,663

Ceiling Finishes $2.30 S.F. 42,990 110 $108,954 20 1989 2009 2014 20 $99,049

Services $60.35 S.F. 42,990 110 $2,853,795 22 1996 2015 56 $2,594,359

Conveying $1.20 S.F. 42,990 110 $56,747 30 1989 2019 30 $51,588

Elevators and Lifts $1.20 S.F. 42,990 110 $56,747 30 1989 2019 30 $51,588

Plumbing $7.54 S.F. 42,990 110 $356,369 30 1989 2019 30 $323,972

Plumbing Fixtures $5.89 S.F. 42,990 110 $278,627 30 1989 2019 30 $253,297

Domestic Water Distribution $0.44 S.F. 42,990 110 $20,996 30 1989 2019 30 $19,088

Sanitary Waste $0.76 S.F. 42,990 110 $35,750 30 1989 2019 30 $32,500

Rain Water Drainage $0.19 S.F. 42,990 110 $9,079 30 1989 2019 30 $8,254

Other Plumbing Systems -

Natural Gas

$0.25 S.F. 42,990 110 $11,917 30 1989 2019 30 $10,833

HVAC $32.52 S.F. 42,990 110 $1,537,838 19 2005 2020 72 $1,398,035

Heat Generating Systems 0 0 0 0

Cooling Generating Systems 0 0 0 0

Distribution Systems & Exhaust

Systems

$9.12 S.F. 42,990 110 $431,276 30 2005 2035 83 $392,069

Terminal & Package Units $21.60 S.F. 42,990 110 $1,021,442 15 2005 2020 67 $928,584

Controls & Instrumentation $1.80 S.F. 42,990 110 $85,120 20 2005 2025 75 $77,382

Other HVAC Systems/Equip -

Kitchen Hood

0 0 0 0

Fire Protection 0 0 0

Sprinklers 0 0 0 0

Electrical $19.09 S.F. 42,990 110 $902,841 23 1998 2015 41 $820,764

Electrical Service/Distribution $2.27 S.F. 42,990 110 $107,251 30 1989 2019 30 $97,501

Branch Wiring $6.77 S.F. 42,990 110 $320,052 30 1989 2019 30 $290,956

Lighting $6.77 S.F. 42,990 110 $320,052 20 2000 2020 50 $290,956

Communications and Security -

Public Address & Clock System

$0.88 S.F. 42,990 110 $41,425 20 2000 2020 50 $37,659

Fire Alarm $1.54 S.F. 42,990 110 $72,636 10 2006 2016 60 $66,033

Page 288: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 16

System Unit Price$

Unit of

Meas Qty Renewal% Renewal$ Life Installed

Calc Next

Renewal

Next

Renewal CI% Deficiency$ Replacement Value FCI%

Security & CCTV $0.88 S.F. 42,990 110 $41,425 10 2005 2015 50 $37,659

Other Electrical Systems -

Emergency Generator

0 0 0 0

Equipment & Furnishings $10.80 S.F. 42,990 110 $510,721 20 1989 2009 2015 25 $464,292

Equipment $7.20 S.F. 42,990 110 $340,481 20 1989 2009 2015 25 $309,528

Commercial Equipment $6.00 S.F. 42,990 110 $283,734 20 1989 2009 2015 25 $257,940

Institutional Equipment $1.20 S.F. 42,990 110 $56,747 20 1989 2009 2015 25 $51,588

Furnishings $3.60 S.F. 42,990 110 $170,240 20 1989 2009 2015 25 $154,764

Fixed Furnishings $3.60 S.F. 42,990 110 $170,240 20 1989 2009 2015 25 $154,764

Page 289: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 17

Facility: \Elementary/Middle Schools\Vivian\1989 (C&D Bldgs) (continued)

Renewal Schedule:

Systems 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020

Total $136,187 $122,629 $1,100,583 $86,731 $19,372 $1,470,469 $1,858,528

Substructure

Foundations

Standard Foundations

Special Foundations

Slab on Grade

Basement Construction

Basement Excavation

Basement Walls

Shell $3,077 $373,911

Superstructure

Floor Construction

Roof Construction

Exterior Enclosure $370,209

Exterior Walls

Exterior Windows $296,167

Exterior Doors $74,042

Roofing $3,077 $3,702

Roof Coverings - BUR

Roof Coverings - EPDM $3,077

Roof Coverings - Standing Seam

Mettal

Roof Openings $3,702

Interiors $133,110 $122,629 $460,495 $19,372

Interior Construction $328,925

Partitions

Interior Doors

Fittings $328,925

Stairs

Stair Construction

Interior Finishes $133,110 $122,629 $131,570 $19,372

Wall Finishes - Ceramic & Glazed

Wall Finishes - Paint $131,570

Floor Finishes - Carpet $15,292 $19,372

Floor Finishes - Ceramic & Quarry

Tile

Floor Finishes - VCT $117,818

Floor Finishes - Wood

Ceiling Finishes $122,629

Services $48,023 $86,731 $1,096,558 $1,858,528

Conveying $74,042

Elevators and Lifts $74,042

Plumbing $464,982

Plumbing Fixtures $363,545

Domestic Water Distribution $27,395

Sanitary Waste $46,646

Rain Water Drainage $11,847

Other Plumbing Systems - Natural

Gas

$15,549

HVAC $1,372,733

Heat Generating Systems

Cooling Generating Systems

Distribution Systems & Exhaust

Systems

Terminal & Package Units $1,372,733

Controls & Instrumentation

Other HVAC Systems/Equip -

Kitchen Hood

Fire Protection

Sprinklers

Electrical $48,023 $86,731 $557,534 $485,795

Electrical Service/Distribution $139,939

Branch Wiring $417,595

Lighting $430,123

Communications and Security -

Public Address & Clock System

$55,672

Page 290: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 18

Systems 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020

Fire Alarm $86,731

Security & CCTV $48,023

Other Electrical Systems -

Emergency Generator

Equipment & Furnishings $592,065

Equipment $394,710

Commercial Equipment $328,925

Institutional Equipment $65,785

Furnishings $197,355

Fixed Furnishings $197,355

Page 291: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 19

Facility: \Elementary/Middle Schools\Vivian\1989 (C&D Bldgs) (continued)

Deficiency Sheet:

Deficiency: Surveyor/Update: Troy Weeks Fri, 12-Mar-2010Priority: 3Quantity: 42,990

Assembly: B3010 System: Roof Coverings - EPDM Material: Roof Covering Distress: Failing Category: Critical Repair Correction: Roof Repair Note: There are reports of several roof leaks in the building. An investigatiion to locate and determine the cause of the

leaks is needed.

Estimates:Raw Cost $2,564.22

Plus or (Minus) Additional Cost $0.00Total Estimated Amount $2,564.22

Deficiency: Surveyor/Update: Kate McPhillips Fri, 04-Jun-2010Priority: 3Quantity: 1

Assembly: C3020 System: Floor Finishes - Carpet Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: Carpet floor finishes are worn, beyond expected life, and should be replaced.

Estimates:Raw Cost $12,743.61

Plus or (Minus) Additional Cost $0.00Total Estimated Amount $12,743.61

Page 292: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 20

Facility: \Elementary/Middle Schools\Vivian\ 1989 (C&D Bldgs) (continued)

Deficiency: Surveyor/Update: Kate McPhillips Fri, 04-Jun-2010Priority: 3Quantity: 1

Assembly: C3020 System: Floor Finishes - VCT Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: The VCT floor finishes are worn, beyond expected life, and should be replaced.

Estimates:Raw Cost $98,181.60

Plus or (Minus) Additional Cost $0.00Total Estimated Amount $98,181.60

Page 293: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 21

Facility: \Elementary/Middle Schools\Vivian\1999 (E Bldg)Address: 100 W. Kentucky Avenue, Vivian, LA 71082

Attributes: Number of Floors 1

General Information: Function: Elementary Middle Year Built: 1999Gross Area: 7,210 S.F. Last Renovation:

Facility Description:

Building E (Classrooms) at Vivian Elementary/Middle School is 1-story building located at 100 West Kentucky in Vivian, Louisiana. There have been no additions and very few renovations. This report contains condition and adequacy data collected during the 2009/2010 Facility Condition Assessment (FCA). The detailed condition and deficiency statements are contained in this report.

Current Repair Cost: $14,276.00 Replacement Cost: $1,091,536.00 FCI: 1.31%

20-Jan-2010East Elevation

20-Jan-2010South Elevation

20-Jan-2010North Elevation

Page 294: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 22

Facility: \Elementary/Middle Schools\Vivian\1999 (E Bldg) (continued)

Building Condition:

System Unit Price$

Unit of

Meas Qty Renewal% Renewal$ Life Installed

Calc Next

Renewal

Next

Renewal CI% Deficiency$ Replacement Value FCI%

Total $151.39 S.F. 7,210 107 $1,163,489 49 1999 2009 2010 47 $14,276 $1,091,535 1

Substructure $19.20 S.F. 7,210 100 $138,432 100 1999 $138,432

Foundations $19.20 S.F. 7,210 100 $138,432 100 1999 $138,432

Standard Foundations $10.20 S.F. 7,210 100 $73,542 100 1999 $73,542

Special Foundations 0 0 0 0

Slab on Grade $9.00 S.F. 7,210 100 $64,890 100 1999 $64,890

Basement Construction 0 0 0

Basement Excavation 0 0 0 0

Basement Walls 0 0 0 0

Shell $40.74 S.F. 7,210 104 $304,940 69 1999 2019 52 $293,735

Superstructure $10.80 S.F. 7,210 100 $77,868 100 1999 $77,868

Floor Construction 0 0 0 0

Roof Construction $10.80 S.F. 7,210 100 $77,868 100 1999 $77,868

Exterior Enclosure $20.40 S.F. 7,210 103 $151,410 78 1999 2029 63 $147,084

Exterior Walls $14.40 S.F. 7,210 100 $103,824 100 1999 $103,824

Exterior Windows $4.80 S.F. 7,210 110 $38,069 30 1999 2029 63 $34,608

Exterior Doors $1.20 S.F. 7,210 110 $9,517 30 1999 2029 63 $8,652

Roofing $9.54 S.F. 7,210 110 $75,662 20 1999 2019 45 $68,783

Roof Coverings - BUR $9.54 S.F. 7,210 110 $75,662 20 1999 2019 45 $68,783

Roof Coverings - EPDM 0 0 0 0

Roof Coverings - Standing

Seam Mettal

0 0 0 0

Roof Openings 0 0 0 0

Interiors $27.50 S.F. 7,210 107 $212,943 52 1999 2009 2015 46 $198,304

Interior Construction $19.20 S.F. 7,210 106 $147,084 68 1999 2019 51 $138,432

Partitions $10.80 S.F. 7,210 110 $85,655 100 1999 $77,868

Interior Doors $2.40 S.F. 7,210 80 $13,843 40 1999 2039 72 $17,304

Fittings $6.00 S.F. 7,210 110 $47,586 20 1999 2019 45 $43,260

Stairs 0 0 0

Stair Construction 0 0 0 0

Interior Finishes $8.30 S.F. 7,210 110 $65,859 15 1999 2009 2015 41 $59,872

Wall Finishes - Ceramic &

Glazed

0 0 0 0

Wall Finishes - Paint $2.40 S.F. 7,210 110 $19,034 10 1999 2009 2015 50 $17,304

Floor Finishes - Carpet 0 0 0 0

Floor Finishes - Ceramic &

Quarry Tile

0 0 0 0

Floor Finishes - Terrazzo 0 0 0 0

Floor Finishes - VCT $3.60 S.F. 7,210 110 $28,552 15 1999 2014 2015 33 $25,956

Ceiling Finishes $2.30 S.F. 7,210 110 $18,273 20 1999 2019 45 $16,612

Services $59.15 S.F. 7,210 110 $469,105 22 2000 2014 2010 47 $14,276 $426,456 3

Conveying 0 0 0

Elevators and Lifts 0 0 0 0

Plumbing $7.54 S.F. 7,210 110 $59,768 30 1999 2029 63 $54,334

Plumbing Fixtures $5.89 S.F. 7,210 110 $46,729 30 1999 2029 63 $42,481

Domestic Water Distribution $0.44 S.F. 7,210 110 $3,521 30 1999 2029 63 $3,201

Sanitary Waste $0.76 S.F. 7,210 110 $5,996 30 1999 2029 63 $5,451

Rain Water Drainage $0.19 S.F. 7,210 110 $1,523 30 1999 2029 63 $1,384

Other Plumbing Systems -

Natural Gas

$0.25 S.F. 7,210 110 $1,999 30 1999 2029 63 $1,817

HVAC $32.52 S.F. 7,210 110 $257,917 19 1999 2014 2010 38 $14,276 $234,469 6

Heat Generating Systems 0 0 0 0

Cooling Generating Systems 0 0 0 0

Distribution Systems & Exhaust

Systems

$9.12 S.F. 7,210 110 $72,331 30 1999 2029 63 $65,755

Terminal & Package Units $21.60 S.F. 7,210 110 $171,310 15 1999 2014 27 $155,736

Controls & Instrumentation $1.80 S.F. 7,210 110 $14,276 20 1999 2019 2010 $14,276 $12,978 110

Other HVAC Systems/Equip -

Kitchen Hood

0 0 0 0

Fire Protection 0 0 0

Sprinklers 0 0 0 0

Electrical $19.09 S.F. 7,210 110 $151,420 23 2001 2015 55 $137,653

Electrical Service/Distribution $2.27 S.F. 7,210 110 $17,988 30 1999 2029 63 $16,352

Branch Wiring $6.77 S.F. 7,210 110 $53,677 30 1999 2029 63 $48,797

Lighting $6.77 S.F. 7,210 110 $53,677 20 1999 2019 45 $48,797

Communications and Security -

Public Address & Clock System

$0.88 S.F. 7,210 110 $6,948 20 2000 2020 50 $6,316

Fire Alarm $1.54 S.F. 7,210 110 $12,182 10 2006 2016 60 $11,075

Page 295: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 23

System Unit Price$

Unit of

Meas Qty Renewal% Renewal$ Life Installed

Calc Next

Renewal

Next

Renewal CI% Deficiency$ Replacement Value FCI%

Security & CCTV $0.88 S.F. 7,210 110 $6,948 10 2005 2015 50 $6,316

Other Electrical Systems -

Emergency Generator

0 0 0 0

Equipment & Furnishings $4.80 S.F. 7,210 110 $38,069 20 1999 2019 45 $34,608

Equipment $1.20 S.F. 7,210 110 $9,517 20 1999 2019 45 $8,652

Commercial Equipment 0 0 0 0

Institutional Equipment $1.20 S.F. 7,210 110 $9,517 20 1999 2019 45 $8,652

Furnishings $3.60 S.F. 7,210 110 $28,552 20 1999 2019 45 $25,956

Fixed Furnishings $3.60 S.F. 7,210 110 $28,552 20 1999 2019 45 $25,956

Page 296: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 24

Facility: \Elementary/Middle Schools\Vivian\1999 (E Bldg) (continued)

Renewal Schedule:

Systems 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020

Total $14,276 $192,810 $63,219 $14,546 $304,359 $9,337

Substructure

Foundations

Standard Foundations

Special Foundations

Slab on Grade

Basement Construction

Basement Excavation

Basement Walls

Shell $98,721

Superstructure

Floor Construction

Roof Construction

Exterior Enclosure

Exterior Walls

Exterior Windows

Exterior Doors

Roofing $98,721

Roof Coverings - BUR $98,721

Roof Coverings - EPDM

Roof Coverings - Standing Seam

Mettal

Roof Openings

Interiors $55,165 $85,931

Interior Construction $62,089

Partitions

Interior Doors

Fittings $62,089

Stairs

Stair Construction

Interior Finishes $55,165 $23,842

Wall Finishes - Ceramic & Glazed

Wall Finishes - Paint $22,066

Floor Finishes - Carpet

Floor Finishes - Ceramic & Quarry

Tile

Floor Finishes - Terrazzo

Floor Finishes - VCT $33,099

Ceiling Finishes $23,842

Services $14,276 $192,810 $8,054 $14,546 $70,036 $9,337

Conveying

Elevators and Lifts

Plumbing

Plumbing Fixtures

Domestic Water Distribution

Sanitary Waste

Rain Water Drainage

Other Plumbing Systems - Natural

Gas

HVAC $14,276 $192,810

Heat Generating Systems

Cooling Generating Systems

Distribution Systems & Exhaust

Systems

Terminal & Package Units $192,810

Controls & Instrumentation $14,276

Other HVAC Systems/Equip -

Kitchen Hood

Fire Protection

Sprinklers

Electrical $8,054 $14,546 $70,036 $9,337

Electrical Service/Distribution

Branch Wiring

Lighting $70,036

Communications and Security -

Public Address & Clock System

$9,337

Page 297: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 25

Systems 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020

Fire Alarm $14,546

Security & CCTV $8,054

Other Electrical Systems -

Emergency Generator

Equipment & Furnishings $49,671

Equipment $12,418

Commercial Equipment

Institutional Equipment $12,418

Furnishings $37,253

Fixed Furnishings $37,253

Page 298: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 26

Facility: \Elementary/Middle Schools\Vivian\1999 (E Bldg) (continued)

Deficiency Sheet:

Deficiency: Surveyor/Update: Eric Altman Fri, 04-Jun-2010Priority: 4Quantity: 1

Assembly: D3060 System: Controls & Instrumentation Material: System Distress: Inadequate Category: Deferred Maintenance Correction: Renew System Note: Analog electric controls system is inadequate and needs to be upgraded/replaced.

Estimates:Raw Cost $11,896.50

Plus or (Minus) Additional Cost $0.00Total Estimated Amount $11,896.50

Page 299: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 27

Facility: \Elementary/Middle Schools\Vivian\2003 (H Bldg)Address: 100 W. Kentucky Ave., Vivian, LA 71082

Attributes: Number of Floors 1

General Information: Function: Elementary Middle Year Built: 2003Gross Area: 9,325 S.F. Last Renovation:

Facility Description:

Building H (Classrooms) at Vivian Elementary/Middle School is a 1-story building located at 100 West Kentucky Avenue in Vivian, Louisiana. There have been no additions and very few renovations. This report contains condition and adequacy data collected during the 2009/2010 Facility Condition Assessment (FCA). The detailed condition and deficiency statements are contained in this report.

Current Repair Cost: $0.00 Replacement Cost: $1,435,297.00 FCI: 0.00%

20-Jan-2010North Elevation

20-Jan-2010East Elevation

20-Jan-2010West Elevation

20-Jan-2010South Elevation

Page 300: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 28

Facility: \Elementary/Middle Schools\Vivian\2003 (H Bldg) (continued)

Building Condition:

System Unit Price$

Unit of

Meas Qty Renewal% Renewal$ Life Installed

Calc Next

Renewal

Next

Renewal CI% Deficiency$ Replacement Value FCI%

Total $153.92 S.F. 9,325 107 $1,530,711 49 2003 2013 2015 64 0 $1,435,297

Substructure $19.20 S.F. 9,325 100 $179,040 100 2003 $179,040

Foundations $19.20 S.F. 9,325 100 $179,040 100 2003 $179,040

Standard Foundations $10.20 S.F. 9,325 100 $95,115 100 2003 $95,115

Special Foundations 0 0 0 0

Slab on Grade $9.00 S.F. 9,325 100 $83,925 100 2003 $83,925

Basement Construction 0 0 0

Basement Excavation 0 0 0 0

Basement Walls 0 0 0 0

Shell $40.74 S.F. 9,325 104 $394,392 69 2003 2023 70 $379,900

Superstructure $10.80 S.F. 9,325 100 $100,710 100 2003 $100,710

Floor Construction 0 0 0 0

Roof Construction $10.80 S.F. 9,325 100 $100,710 100 2003 $100,710

Exterior Enclosure $20.40 S.F. 9,325 103 $195,825 78 2003 2033 77 $190,230

Exterior Walls $14.40 S.F. 9,325 100 $134,280 100 2003 $134,280

Exterior Windows $4.80 S.F. 9,325 110 $49,236 30 2003 2033 77 $44,760

Exterior Doors $1.20 S.F. 9,325 110 $12,309 30 2003 2033 77 $11,190

Roofing $9.54 S.F. 9,325 110 $97,857 20 2003 2023 65 $88,960

Roof Coverings - BUR $9.54 S.F. 9,325 110 $97,857 20 2003 2023 65 $88,960

Roof Coverings - EPDM 0 0 0 0

Roof Coverings - Standing

Seam Mettal

0 0 0 0

Roof Openings 0 0 0 0

Interiors $27.33 S.F. 9,325 107 $273,636 52 2003 2013 59 $254,863

Interior Construction $19.20 S.F. 9,325 106 $190,230 68 2003 2023 69 $179,040

Partitions $10.80 S.F. 9,325 110 $110,781 100 2003 $100,710

Interior Doors $2.40 S.F. 9,325 80 $17,904 40 2003 2043 82 $22,380

Fittings $6.00 S.F. 9,325 110 $61,545 20 2003 2023 65 $55,950

Stairs 0 0 0

Stair Construction 0 0 0 0

Interior Finishes $8.13 S.F. 9,325 110 $83,406 15 2003 2013 50 $75,823

Wall Finishes - Ceramic &

Glazed

0 0 0 0

Wall Finishes - Paint $2.40 S.F. 9,325 110 $24,618 10 2003 2013 30 $22,380

Floor Finishes - Carpet 0 0 0 0

Floor Finishes - Ceramic &

Quarry Tile

$1.44 S.F. 746 110 $1,182 50 2003 2053 86 $1,074

Floor Finishes - Terrazzo 0 0 0 0

Floor Finishes - VCT $3.60 S.F. 8,579 110 $33,973 15 2003 2018 53 $30,884

Ceiling Finishes $2.30 S.F. 9,325 110 $23,633 20 2003 2023 65 $21,485

Services $61.85 S.F. 9,325 110 $634,407 22 2003 2015 2015 64 $576,734

Conveying 0 0 0

Elevators and Lifts 0 0 0 0

Plumbing $7.54 S.F. 9,325 110 $77,300 30 2003 2033 77 $70,273

Plumbing Fixtures $5.89 S.F. 9,325 110 $60,437 30 2003 2033 77 $54,943

Domestic Water Distribution $0.44 S.F. 9,325 110 $4,554 30 2003 2033 77 $4,140

Sanitary Waste $0.76 S.F. 9,325 110 $7,755 30 2003 2033 77 $7,050

Rain Water Drainage $0.19 S.F. 9,325 110 $1,969 30 2003 2033 77 $1,790

Other Plumbing Systems -

Natural Gas

$0.25 S.F. 9,325 110 $2,585 30 2003 2033 77 $2,350

HVAC $32.52 S.F. 9,325 110 $333,574 19 2003 2018 60 $303,249

Heat Generating Systems S.F. 0 0 0 0

Cooling Generating Systems S.F. 0 0 0 0

Distribution Systems & Exhaust

Systems

$9.12 S.F. 9,325 110 $93,548 30 2003 2033 77 $85,044

Terminal & Package Units $21.60 S.F. 9,325 110 $221,562 15 2003 2018 53 $201,420

Controls & Instrumentation $1.80 S.F. 9,325 110 $18,464 20 2003 2023 65 $16,785

Other HVAC Systems/Equip -

Kitchen Hood

S.F. 0 0 0 0

Fire Protection $2.70 S.F. 9,325 110 $27,695 30 2003 2033 2015 17 $25,178

Sprinklers $2.70 S.F. 9,325 110 $27,695 30 2003 2033 2015 17 $25,178

Electrical $19.09 S.F. 9,325 110 $195,838 23 2004 2015 70 $178,034

Electrical Service/Distribution $2.27 S.F. 9,325 110 $23,264 30 2003 2033 77 $21,149

Branch Wiring $6.77 S.F. 9,325 110 $69,423 30 2003 2033 77 $63,112

Lighting $6.77 S.F. 9,325 110 $69,423 20 2003 2023 65 $63,112

Communications and Security -

Public Address & Clock System

$0.88 S.F. 9,325 110 $8,986 20 2005 2025 75 $8,169

Fire Alarm $1.54 S.F. 9,325 110 $15,756 10 2006 2016 60 $14,323

Page 301: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 29

System Unit Price$

Unit of

Meas Qty Renewal% Renewal$ Life Installed

Calc Next

Renewal

Next

Renewal CI% Deficiency$ Replacement Value FCI%

Security & CCTV $0.88 S.F. 9,325 110 $8,986 10 2005 2015 50 $8,169

Other Electrical Systems -

Emergency Generator

0 0 0 0

Equipment & Furnishings $4.80 S.F. 9,325 110 $49,236 20 2003 2023 65 $44,760

Equipment $1.20 S.F. 9,325 110 $12,309 20 2003 2023 65 $11,190

Commercial Equipment 0 0 0 0

Institutional Equipment $1.20 S.F. 9,325 110 $12,309 20 2003 2023 65 $11,190

Furnishings $3.60 S.F. 9,325 110 $36,927 20 2003 2023 65 $33,570

Fixed Furnishings $3.60 S.F. 9,325 110 $36,927 20 2003 2023 65 $33,570

Page 302: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 30

Facility: \Elementary/Middle Schools\Vivian\2003 (H Bldg) (continued)

Renewal Schedule:

Systems 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020

Total $26,901 $42,523 $18,813 $323,704

Substructure

Foundations

Standard Foundations

Special Foundations

Slab on Grade

Basement Construction

Basement Excavation

Basement Walls

Shell

Superstructure

Floor Construction

Roof Construction

Exterior Enclosure

Exterior Walls

Exterior Windows

Exterior Doors

Roofing

Roof Coverings - BUR

Roof Coverings - EPDM

Roof Coverings - Standing Seam

Mettal

Roof Openings

Interiors $26,901 $43,036

Interior Construction

Partitions

Interior Doors

Fittings

Stairs

Stair Construction

Interior Finishes $26,901 $43,036

Wall Finishes - Ceramic & Glazed

Wall Finishes - Paint $26,901

Floor Finishes - Carpet

Floor Finishes - Ceramic & Quarry

Tile

Floor Finishes - Terrazzo

Floor Finishes - VCT $43,036

Ceiling Finishes

Services $42,523 $18,813 $280,668

Conveying

Elevators and Lifts

Plumbing

Plumbing Fixtures

Domestic Water Distribution

Sanitary Waste

Rain Water Drainage

Other Plumbing Systems - Natural

Gas

HVAC $280,668

Heat Generating Systems

Cooling Generating Systems

Distribution Systems & Exhaust

Systems

Terminal & Package Units $280,668

Controls & Instrumentation

Other HVAC Systems/Equip -

Kitchen Hood

Fire Protection $32,106

Sprinklers $32,106

Electrical $10,417 $18,813

Electrical Service/Distribution

Branch Wiring

Lighting

Communications and Security -

Public Address & Clock System

Page 303: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 31

Systems 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020

Fire Alarm $18,813

Security & CCTV $10,417

Other Electrical Systems -

Emergency Generator

Equipment & Furnishings

Equipment

Commercial Equipment

Institutional Equipment

Furnishings

Fixed Furnishings

Page 304: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 32

Facility: \Elementary/Middle Schools\Vivian\2003 (H Bldg) (continued)

Deficiency Sheet:

*** No Deficiencies Found ***

Page 305: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 33

Facility: \Elementary/Middle Schools\Vivian\Basketball CourtAddress: 100 W. Kentucky Avenue, Vivian, LA 71082

Attributes: ***None***

General Information: Function: Elementary Middle Year Built: 1970Gross Area: 3,962 S.F. Last Renovation:

Facility Description:

The Basketball Court at Vivian Elementary/Middle School is located at 100 West Kentucky in Vivian, Louisiana. There have been no additions and no renovations. This report contains condition and adequacy data collected during the 2009/2010 Facility Condition Assessment (FCA). The detailed condition and deficiency statements are contained in this report.

Current Repair Cost: $30,333.00 Replacement Cost: $28,003.00 FCI: 108.32%

20-Jan-2010Vivian Elementary/Middle School Basketball Court

Page 306: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 34

Facility: \Elementary/Middle Schools\Vivian\Basketball Court (continued)

Building Condition:

System Unit Price$

Unit of

Meas Qty Renewal% Renewal$ Life Installed

Calc Next

Renewal

Next

Renewal CI% Deficiency$ Replacement Value FCI%

Total $7.07 S.F. 3,962 110 $30,761 21 1970 1990 $30,333 $28,004 108

Special Construction $6.96 S.F. 3,962 110 $30,333 20 1970 1990 $30,333 $27,576 110

Special Construction $6.96 S.F. 3,962 110 $30,333 20 1970 1990 $30,333 $27,576 110

Special Structures - Basketball

Court - Concrete - Outdoor

$6.96 S.F. 3,962 110 $30,333 20 1970 1990 $30,333 $27,576 110

Building Sitework $0.11 S.F. 3,962 100 $428 100 1970 $428

Site Preparation $0.11 S.F. 3,962 100 $428 100 1970 $428

Site Earthwork $0.11 S.F. 3,962 0 $428 100 1970 $428

Site Improvements 0 0 0

Site Development - Fencing 0 0 0 0

Site Electrical Utilities 0 0 0

Site Lighting 0 0 0 0

Page 307: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 35

Facility: \Elementary/Middle Schools\Vivian\Basketball Court (continued)

Renewal Schedule:

Systems 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020

Total $30,333

Special Construction $30,333

Special Construction $30,333

Special Structures - Basketball

Court - Concrete - Outdoor

$30,333

Building Sitework

Site Preparation

Site Earthwork

Site Improvements

Site Development - Fencing

Site Electrical Utilities

Site Lighting

Page 308: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 36

Facility: \Elementary/Middle Schools\Vivian\Basketball Court (continued)

Deficiency Sheet:

Deficiency: Surveyor/Update: Eric Altman Fri, 04-Jun-2010Priority: 3Quantity: 1

Assembly: F1010 System: Special Structures - Basketball Court -

Concrete - Outdoor Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: The concrete surface is worn, beyond expected life, and should be replaced.

Estimates:Raw Cost $25,277.56

Plus or (Minus) Additional Cost $0.00Total Estimated Amount $25,277.56

Page 309: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 37

Facility: \Elementary/Middle Schools\Vivian\Covered WalkwaysAddress: 100 W Kentucky Avenue, Vivian, LA 71082

Attributes: Number of Floors 1

General Information: Function: Elementary Middle Year Built: 1992Gross Area: 4,979 S.F. Last Renovation:

Facility Description:

The engineered metal covered walkways at Vivian Elementary/Middle School connect the classrooms and provide some weather protection for the students.

Current Repair Cost: $0.00 Replacement Cost: $124,455.00 FCI: 0.00%

04-Jun-2010East Elevation

04-Jun-2010South Elevation

04-Jun-2010West Elevation

04-Jun-2010North Elevation

Page 310: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 38

Facility: \Elementary/Middle Schools\Vivian\Covered Walkways (continued)

Building Condition:

System Unit Price$

Unit of

Meas Qty Renewal% Renewal$ Life Installed

Calc Next

Renewal

Next

Renewal CI% Deficiency$ Replacement Value FCI%

Total $25.00 S.F. 4,979 100 $124,455 25 1992 2017 28 0 $124,455

Special Construction $25.00 S.F. 4,979 100 $124,455 25 1992 2017 28 $124,455

Special Construction $25.00 S.F. 4,979 100 $124,455 25 1992 2017 28 $124,455

Special Structures - Covered

Walkways Metal

$25.00 S.F. 4,979 100 $124,455 25 1992 2017 28 $124,455

Page 311: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 39

Facility: \Elementary/Middle Schools\Vivian\Covered Walkways (continued)

Renewal Schedule:

Systems 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020

Total $153,064

Special Construction $153,064

Special Construction $153,064

Special Structures - Covered

Walkways Metal

$153,064

Page 312: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 40

Facility: \Elementary/Middle Schools\Vivian\Covered Walkways (continued)

Deficiency Sheet:

*** No Deficiencies Found ***

Page 313: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 41

Facility: \Elementary/Middle Schools\Vivian\Pine St Bldg (Teachers' Resource)Address: 100 W. Kentucky Avenue, Vivian, LA 71082

Attributes: Number of Floors 1

General Information: Function: Elementary Middle Year Built: 1970Gross Area: 3,039 S.F. Last Renovation: 2001

Facility Description:

The Pine Street Building, a Teachers’ Resource Facility, is a 1-story building located on Pine Street, across the street and east of the school campus in Vivian, Louisiana. There have been no additions, but there has been a major renovation when the School Board acquired the building in 2001. This report contains condition and adequacy data collected during the 2009/2010 Facility Condition Assessment (FCA). The detailed condition and deficiency statements are contained in this report.

Current Repair Cost: $95,567.00 Replacement Cost: $469,234.00 FCI: 20.37%

20-Jan-2010West Elevation

20-Jan-2010South Elevation

20-Jan-2010East Elevation

20-Jan-2010North Elevation

Page 314: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 42

Facility: \Elementary/Middle Schools\Vivian\Pine St Bldg (Teachers' Resource) (continued)

Building Condition:

System Unit Price$

Unit of

Meas Qty Renewal% Renewal$ Life Installed

Calc Next

Renewal

Next

Renewal CI% Deficiency$ Replacement Value FCI%

Total $154.40 S.F. 3,039 107 $500,474 50 1987 1985 2015 66 $95,566 $469,233 20

Substructure $19.20 S.F. 3,039 100 $58,349 100 1970 $58,349

Foundations $19.20 S.F. 3,039 100 $58,349 100 1970 $58,349

Standard Foundations $10.20 S.F. 3,039 100 $30,998 100 1970 $30,998

Special Foundations 0 0 0 0

Slab on Grade $9.00 S.F. 3,039 100 $27,351 100 1970 $27,351

Basement Construction 0 0 0

Basement Excavation 0 0 0 0

Basement Walls 0 0 0 0

Shell $40.74 S.F. 3,039 104 $128,531 69 1977 2000 80 $20,057 $123,809 16

Superstructure $10.80 S.F. 3,039 100 $32,821 100 1970 $32,821

Floor Construction 0 0 0 0

Roof Construction $10.80 S.F. 3,039 100 $32,821 100 1970 $32,821

Exterior Enclosure $20.40 S.F. 3,039 103 $63,819 78 1970 2000 $20,057 $61,996 32

Exterior Walls $14.40 S.F. 3,039 100 $43,762 100 1970 $43,762

Exterior Windows $4.80 S.F. 3,039 110 $16,046 30 1970 2000 $16,046 $14,587 110

Exterior Doors $1.20 S.F. 3,039 110 $4,011 30 1970 2000 $4,011 $3,647 110

Roofing $9.54 S.F. 3,039 110 $31,891 20 2006 2026 80 $28,992

Roof Coverings - BUR $9.54 S.F. 3,039 110 $31,891 20 2006 2026 80 $28,992

Roof Coverings - EPDM 0 0 0 0

Roof Coverings - Standing

Seam Mettal

0 0 0 0

Roof Openings 0 0 0 0

Interiors $30.08 S.F. 3,039 108 $98,379 56 1988 1985 50 $12,034 $91,426 13

Interior Construction $19.20 S.F. 3,039 106 $61,995 68 1991 2021 60 $58,349

Partitions $10.80 S.F. 3,039 110 $36,103 100 1970 $32,821

Interior Doors $2.40 S.F. 3,039 80 $5,835 40 2001 2041 78 $7,294

Fittings $6.00 S.F. 3,039 110 $20,057 20 2001 2021 55 $18,234

Stairs $2.58 S.F. 3,039 110 $8,625 100 1970 $7,841

Stair Construction $2.58 S.F. 3,039 110 $8,625 100 1970 $7,841

Interior Finishes $8.30 S.F. 3,039 110 $27,759 15 1991 1985 32 $12,034 $25,236 48

Wall Finishes - Ceramic &

Glazed

0 0 0 0

Wall Finishes - Paint $2.40 S.F. 3,039 110 $8,023 10 2001 2011 10 $7,294

Floor Finishes - Carpet 0 0 0 0

Floor Finishes - Ceramic &

Quarry Tile

0 0 0 0

Floor Finishes - Terrazzo 0 0 0 0

Floor Finishes - VCT $3.60 S.F. 3,039 110 $12,034 15 1970 1985 $12,034 $10,940 110

Ceiling Finishes $2.30 S.F. 3,039 110 $7,702 20 2001 2021 55 $7,002

Services $60.78 S.F. 3,039 110 $203,181 22 1994 2000 2015 68 $51,441 $184,709 28

Conveying 0 0 0

Elevators and Lifts 0 0 0 0

Plumbing $7.34 S.F. 3,039 110 $24,549 30 1993 2000 70 $2,527 $22,318 11

Plumbing Fixtures $5.89 S.F. 3,039 110 $19,696 30 2001 2031 70 $17,906

Domestic Water Distribution $0.44 S.F. 3,039 110 $1,484 30 2001 2031 70 $1,349

Sanitary Waste $0.76 S.F. 3,039 110 $2,527 30 1970 2000 $2,527 $2,297 110

Rain Water Drainage 0 0 0 0

Other Plumbing Systems -

Natural Gas

$0.25 S.F. 3,039 110 $842 30 2001 2031 70 $766

HVAC $32.52 S.F. 3,039 110 $108,711 19 2004 2021 72 $3,664 $98,828 4

Heat Generating Systems 0 0 0 0

Cooling Generating Systems 0 0 0 0

Distribution Systems & Exhaust

Systems

$9.12 S.F. 3,039 110 $30,487 30 2001 2031 70 $27,716

Terminal & Package Units $21.60 S.F. 3,039 110 $72,207 15 2006 2021 73 $3,664 $65,642 6

Controls & Instrumentation $1.80 S.F. 3,039 110 $6,017 20 2005 2025 75 $5,470

Other HVAC Systems/Equip -

Kitchen Hood

0 0 0 0

Fire Protection $2.70 S.F. 3,039 110 $9,026 30 1970 2000 2015 17 $8,205

Sprinklers $2.70 S.F. 3,039 110 $9,026 30 1970 2000 2015 17 $8,205

Electrical $18.22 S.F. 3,039 110 $60,895 24 1992 2000 63 $45,250 $55,358 82

Electrical Service/Distribution $2.27 S.F. 3,039 110 $7,582 30 2001 2031 70 $6,892

Branch Wiring $6.77 S.F. 3,039 110 $22,625 30 1970 2000 $22,625 $20,568 110

Lighting $6.77 S.F. 3,039 110 $22,625 20 1980 2000 $22,625 $20,568 110

Communications and Security -

Public Address & Clock System

0 0 0 0

Fire Alarm $1.54 S.F. 3,039 110 $5,135 10 2006 2016 60 $4,668

Page 315: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 43

System Unit Price$

Unit of

Meas Qty Renewal% Renewal$ Life Installed

Calc Next

Renewal

Next

Renewal CI% Deficiency$ Replacement Value FCI%

Security & CCTV $0.88 S.F. 3,039 110 $2,928 10 2005 2015 50 $2,662

Other Electrical Systems -

Emergency Generator

0 0 0 0

Equipment & Furnishings $3.60 S.F. 3,039 110 $12,034 20 1970 1990 $12,034 $10,940 110

Equipment 0 0 0

Commercial Equipment 0 0 0 0

Institutional Equipment 0 0 0 0

Furnishings $3.60 S.F. 3,039 110 $12,034 20 1970 1990 $12,034 $10,940 110

Fixed Furnishings $3.60 S.F. 3,039 110 $12,034 20 1970 1990 $12,034 $10,940 110

Page 316: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 44

Facility: \Elementary/Middle Schools\Vivian\Pine St Bldg (Teachers' Resource) (continued)

Renewal Schedule:

Systems 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020

Total $95,566 $8,264 $13,858 $6,131

Substructure

Foundations

Standard Foundations

Special Foundations

Slab on Grade

Basement Construction

Basement Excavation

Basement Walls

Shell $20,057

Superstructure

Floor Construction

Roof Construction

Exterior Enclosure $20,057

Exterior Walls

Exterior Windows $16,046

Exterior Doors $4,011

Roofing

Roof Coverings - BUR

Roof Coverings - EPDM

Roof Coverings - Standing Seam

Mettal

Roof Openings

Interiors $12,034 $8,264

Interior Construction

Partitions

Interior Doors

Fittings

Stairs

Stair Construction

Interior Finishes $12,034 $8,264

Wall Finishes - Ceramic & Glazed

Wall Finishes - Paint $8,264

Floor Finishes - Carpet

Floor Finishes - Ceramic & Quarry

Tile

Floor Finishes - Terrazzo

Floor Finishes - VCT $12,034

Ceiling Finishes

Services $51,441 $13,858 $6,131

Conveying

Elevators and Lifts

Plumbing $2,527

Plumbing Fixtures

Domestic Water Distribution

Sanitary Waste $2,527

Rain Water Drainage

Other Plumbing Systems - Natural

Gas

HVAC $3,664

Heat Generating Systems

Cooling Generating Systems

Distribution Systems & Exhaust

Systems

Terminal & Package Units $3,664

Controls & Instrumentation

Other HVAC Systems/Equip -

Kitchen Hood

Fire Protection $10,463

Sprinklers $10,463

Electrical $45,250 $3,395 $6,131

Electrical Service/Distribution

Branch Wiring $22,625

Lighting $22,625

Communications and Security -

Public Address & Clock System

Page 317: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 45

Systems 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020

Fire Alarm $6,131

Security & CCTV $3,395

Other Electrical Systems -

Emergency Generator

Equipment & Furnishings $12,034

Equipment

Commercial Equipment

Institutional Equipment

Furnishings $12,034

Fixed Furnishings $12,034

Page 318: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 46

Facility: \Elementary/Middle Schools\Vivian\Pine St Bldg (Teachers' Resource) (continued)

Deficiency Sheet:

Deficiency: Surveyor/Update: Eric Altman Fri, 04-Jun-2010Priority: 3Quantity: 1

Assembly: B2020 System: Exterior Windows Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: The exterior windows are worn, beyond expected life, and should be replaced.

Estimates:Raw Cost $13,371.60

Plus or (Minus) Additional Cost $0.00Total Estimated Amount $13,371.60

Deficiency: Surveyor/Update: Eric Altman Fri, 04-Jun-2010Priority: 3Quantity: 1

Assembly: B2030 System: Exterior Doors Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: The exterior doors are worn, beyond expected life, and should be replaced.

Estimates:Raw Cost $3,342.90

Plus or (Minus) Additional Cost $0.00Total Estimated Amount $3,342.90

Page 319: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 47

Facility: \Elementary/Middle Schools\Vivian\ Pine St Bldg (Teachers' Resource) (continued)

Deficiency: Surveyor/Update: Eric Altman Fri, 04-Jun-2010Priority: 3Quantity: 1

Assembly: C3020 System: Floor Finishes - VCT Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: The VCT floor finishes are worn, beyond expected life, and should be replaced.

Estimates:Raw Cost $10,028.70

Plus or (Minus) Additional Cost $0.00Total Estimated Amount $10,028.70

Deficiency: Surveyor/Update: Eric Altman Fri, 04-Jun-2010Priority: 3Quantity: 1

Assembly: D2030 System: Sanitary Waste Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: Sanitary waste is beyond expected life and should be replaced.

Estimates:Raw Cost $2,106.03

Plus or (Minus) Additional Cost $0.00Total Estimated Amount $2,106.03

Page 320: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 48

Facility: \Elementary/Middle Schools\Vivian\ Pine St Bldg (Teachers' Resource) (continued)

Deficiency: Surveyor/Update: Eric Altman Fri, 04-Jun-2010Priority: 3Quantity: 1

Assembly: D3050 System: Terminal & Package Units Material: Terminal and Package Units Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Replace A/C 4T Split System Note: Lennox split system with gas heat is beyond expected life and should be replaced.

Estimates:Raw Cost $3,053.00

Plus or (Minus) Additional Cost $0.00Total Estimated Amount $3,053.00

Deficiency: Surveyor/Update: Eric Altman Thu, 03-Jun-2010Priority: 3Quantity: 1

Assembly: D5020 System: Branch Wiring Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: Branch wiring is beyond expected life and should be replaced.

Estimates:Raw Cost $18,853.96

Plus or (Minus) Additional Cost $0.00Total Estimated Amount $18,853.96

Page 321: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 49

Facility: \Elementary/Middle Schools\Vivian\ Pine St Bldg (Teachers' Resource) (continued)

Deficiency: Surveyor/Update: Eric Altman Fri, 04-Jun-2010Priority: 3Quantity: 1

Assembly: D5020 System: Lighting Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: Lighting system is inadequate, beyond expected life, and should be replaced.

Estimates:Raw Cost $18,853.96

Plus or (Minus) Additional Cost $0.00Total Estimated Amount $18,853.96

Deficiency: Surveyor/Update: Eric Altman Fri, 04-Jun-2010Priority: 3Quantity: 1

Assembly: E2010 System: Fixed Furnishings Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: Fixed furnishings, such as the base/wall cabinets, counter tops, window shades, and fixed seating, are worn,

beyond expected life, and should be replaced.

Estimates:Raw Cost $10,028.70

Plus or (Minus) Additional Cost $0.00Total Estimated Amount $10,028.70

Page 322: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 50

Facility: \Elementary/Middle Schools\Vivian\SiteAddress: 100 W. Kentucky Avenue, Vivian, LA 71082

Attributes: Site Area (in Acres) 9

General Information: Function: Elementary Middle Year Built: 1923Gross Area: 129,177 S.F. Last Renovation:

Facility Description:

The original site was constructed in 1923 to include what is now Building B. There have been additions to the site to include Buildings A, C, D, and H. Campus site features include paved driveways and parking lots, pedestrian pavement, flag pole, landscaping, and fencing. Site mechanical and electrical features include water, sewer, natural gas and site lighting. This report contains condition and adequacy data collected during the 2009/2010 Facility Condition Assessment (FCA). The detailed condition and deficiency statements are contained in this report.

Current Repair Cost: $1,063,385.00 Replacement Cost: $1,725,288.00 FCI: 61.64%

05-Jan-2010Aerial Image of Vivian Elementary/Middle School

Page 323: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 51

Facility: \Elementary/Middle Schools\Vivian\Site (continued)

Building Condition:

System Unit Price$

Unit of

Meas Qty Renewal% Renewal$ Life Installed

Calc Next

Renewal

Next

Renewal CI% Deficiency$ Replacement Value FCI%

Total $13.36 S.F. 129,177 100 $1,725,286 34 1932 1953 55 $1,063,383 $1,725,286 62

Building Sitework $13.36 S.F. 129,177 100 $1,725,286 34 1932 1953 55 $1,063,383 $1,725,286 62

Site Improvements $8.50 S.F. 129,177 100 $1,097,487 28 1939 1953 55 $435,584 $1,097,487 40

Roadways $1.38 S.F. 129,177 100 $178,264 50 1923 1973 $178,264 $178,264 100

Parking Lots $1.18 S.F. 129,177 100 $151,912 30 1923 1953 $151,912 $151,912 100

Pedestrian Paving $0.82 S.F. 129,177 100 $105,408 50 1923 1973 $105,408 $105,408 100

Site Development $3.86 S.F. 129,177 100 $499,140 20 2001 2021 55 $499,140

Landscaping $1.26 S.F. 129,177 100 $162,763 10 1923 $162,763

Site Mechanical Utilities $4.86 S.F. 129,177 100 $627,799 44 1923 1953 $627,799 $627,799 100

Water Supply $0.82 S.F. 129,177 100 $105,408 30 1923 1953 $105,408 $105,408 100

Sanitary Sewer $0.41 S.F. 129,177 100 $52,704 30 1923 1953 $52,704 $52,704 100

Storm Sewer $3.52 S.F. 129,177 100 $454,186 50 1923 1973 $454,186 $454,186 100

Fuel Distribution $0.12 S.F. 129,177 100 $15,501 30 1923 1953 $15,501 $15,501 100

Site Electrical Utilities 0 0 0

Site Lighting 0 0 0 0

Page 324: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 52

Facility: \Elementary/Middle Schools\Vivian\Site (continued)

Renewal Schedule:

Systems 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020

Total $1,063,383

Building Sitework $1,063,383

Site Improvements $435,584

Roadways $178,264

Parking Lots $151,912

Pedestrian Paving $105,408

Site Development

Landscaping

Site Mechanical Utilities $627,799

Water Supply $105,408

Sanitary Sewer $52,704

Storm Sewer $454,186

Fuel Distribution $15,501

Site Electrical Utilities

Site Lighting

Page 325: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 53

Facility: \Elementary/Middle Schools\Vivian\Site (continued)

Deficiency Sheet:

Deficiency: Surveyor/Update: Kate McPhillips Fri, 04-Jun-2010Priority: 3Quantity: 1

Assembly: G2010 System: Roadways Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: The roadways are worn, beyond expected life, and should be replaced.

Estimates:Raw Cost $148,553.55

Plus or (Minus) Additional Cost $0.00Total Estimated Amount $148,553.55

Deficiency: Surveyor/Update: Kate McPhillips Fri, 04-Jun-2010Priority: 3Quantity: 1

Assembly: G2020 System: Parking Lots Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: The parking lot is worn, beyond expected life, covered in gravel in some areas, and should be replaced.

Estimates:Raw Cost $126,593.46

Plus or (Minus) Additional Cost $0.00Total Estimated Amount $126,593.46

Page 326: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 54

Facility: \Elementary/Middle Schools\Vivian\ Site (continued)

Deficiency: Surveyor/Update: Kate McPhillips Fri, 04-Jun-2010Priority: 3Quantity: 1

Assembly: G2030 System: Pedestrian Paving Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: The pedestrian paving is cracked, worn, and beyond expected life, and should be replaced. There is also a need

for a handicap access ramp at the front entry.

Estimates:Raw Cost $87,840.36

Plus or (Minus) Additional Cost $0.00Total Estimated Amount $87,840.36

Deficiency: Surveyor/Update: Kate McPhillips Fri, 04-Jun-2010Priority: 3Quantity: 1

Assembly: G3010 System: Water Supply Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: Water supply is beyond expected life and should be replaced.

Estimates:Raw Cost $87,840.36

Plus or (Minus) Additional Cost $0.00Total Estimated Amount $87,840.36

Page 327: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 55

Facility: \Elementary/Middle Schools\Vivian\ Site (continued)

Deficiency: Surveyor/Update: Kate McPhillips Fri, 04-Jun-2010Priority: 3Quantity: 1

Assembly: G3020 System: Sanitary Sewer Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: Sanitary sewer is beyond expected life and should be replaced.

Estimates:Raw Cost $43,920.18

Plus or (Minus) Additional Cost $0.00Total Estimated Amount $43,920.18

Deficiency: Surveyor/Update: Kate McPhillips Fri, 04-Jun-2010Priority: 3Quantity: 1

Assembly: G3030 System: Storm Sewer Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: Storm sewer is beyond expected life and should be replaced.

Estimates:Raw Cost $378,488.61

Plus or (Minus) Additional Cost $0.00Total Estimated Amount $378,488.61

Page 328: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 56

Facility: \Elementary/Middle Schools\Vivian\ Site (continued)

Deficiency: Surveyor/Update: Kate McPhillips Fri, 04-Jun-2010Priority: 3Quantity: 1

Assembly: G3060 System: Fuel Distribution Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: Natural gas system is beyond expected life and should be replaced.

Estimates:Raw Cost $12,917.70

Plus or (Minus) Additional Cost $0.00Total Estimated Amount $12,917.70

Page 329: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Survey Report

Deficiency Detail ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 1

Facility

Name Assembly System Material Distress Correction Qty Unit Raw Cost

Additional

Cost Total Cost Priority Def. Cat. Location / Note

Caddo Parish School District $3,105,400 $621,080 $3,726,480 Elementary/Middle Schools $3,105,400 $621,080 $3,726,480 Vivian $3,105,400 $621,080 $3,726,480 1923, 1930, 1972 (A&B Bldgs) $1,988,943 $397,789 $2,386,732 Building Systems $1,988,943 $397,789 $2,386,732

D5020 Branch Wiring System Beyond Expected Life

Renew System 1 Ea. $382,377 $76,475 $458,853 Necessary- 2-5 Yrs

Deferred Maintenance

Branch wiring is beyond expected life and should be replaced.

E2010 Fixed Furnishings

System Beyond Expected Life

Renew System 1 Ea. $203,392 $40,678 $244,071 Necessary- 2-5 Yrs

Deferred Maintenance

Fixed furnishings, such as the base/wall cabinets, counter tops, window shades, and fixed seating, are worn, beyond expected life, and should be replaced.

B2020 Exterior Windows

System Beyond Expected Life

Renew System 1 Ea. $271,190 $54,238 $325,428 Necessary- 2-5 Yrs

Deferred Maintenance

The exterior windows are worn, beyond expected life, and should be replaced.

B2030 Exterior Doors System Beyond Expected Life

Renew System 1 Ea. $67,797 $13,559 $81,357 Necessary- 2-5 Yrs

Deferred Maintenance

The exterior doors are worn, beyond expected life, and should be replaced.

C1030 Fittings System Beyond Expected Life

Renew System 1 Ea. $338,987 $67,797 $406,784 Necessary- 2-5 Yrs

Deferred Maintenance

Fittings, such as chalk and tack boards, lockers, toilet and bath accessories, toilet partitions, and shelving, are beyond expected life and should be replaced.

C3010 Wall Finishes - Paint

System Beyond Expected Life

Renew System 1 Ea. $135,595 $27,119 $162,714 Necessary- 2-5 Yrs

Deferred Maintenance

The painted wall finishes are worn, beyond expected life, and should be replaced.

C3020 Floor Finishes - Carpet

System Beyond Expected Life

Renew System 1 Ea. $7,226 $1,445 $8,671 Necessary- 2-5 Yrs

Deferred Maintenance

Carpet floor finishes are worn, beyond expected life, and should be replaced.

C3030 Ceiling Finishes System Beyond Expected Life

Renew System 1 Ea. $130,171 $26,034 $156,205 Necessary- 2-5 Yrs

Deferred Maintenance

The ceiling finishes are stained, beyond expected life, and should be replaced.

D2020 Domestic Water Distribution

System Beyond Expected Life

Renew System 1 Ea. $25,085 $5,017 $30,102 Necessary- 2-5 Yrs

Deferred Maintenance

Domestic water distribution is beyond expected life and should be replaced.

D2030 Sanitary Waste System Beyond Expected Life

Renew System 1 Ea. $42,712 $8,542 $51,255 Necessary- 2-5 Yrs

Deferred Maintenance

Sanitary waste is beyond expected life and should be replaced.

D2040 Rain Water Drainage

System Beyond Expected Life

Renew System 1 Ea. $10,848 $2,170 $13,017 Necessary- 2-5 Yrs

Deferred Maintenance

Rain water drainage system is beyond expected life and should be replaced.

D2010 Plumbing Fixtures

System Beyond Expected Life

Renew System 1 Ea. $332,885 $66,577 $399,462 Necessary- 2-5 Yrs

Deferred Maintenance

Plumbing fixtures are beyond expected life and should be replaced.

D1010 Elevators and Lifts

System Missing Renew System 1 Ea. $40,678 $8,136 $48,814 Necessary- 2-5 Yrs

ADA / Accessibility

An elevator is required to access the second floor of Building B.

Page 330: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Survey Report

Deficiency Detail ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 2

Facility

Name Assembly System Material Distress Correction Qty Unit Raw Cost

Additional

Cost Total Cost Priority Def. Cat. Location / Note

1989 (C&D Bldgs) $113,489 $22,698 $136,187 Building Systems $113,489 $22,698 $136,187

C3020 Floor Finishes - Carpet

System Beyond Expected Life

Renew System 1 Ea. $12,744 $2,549 $15,292 Necessary- 2-5 Yrs

Deferred Maintenance

Carpet floor finishes are worn, beyond expected life, and should be replaced.

C3020 Floor Finishes - VCT

System Beyond Expected Life

Renew System 1 Ea. $98,182 $19,636 $117,818 Necessary- 2-5 Yrs

Deferred Maintenance

The VCT floor finishes are worn, beyond expected life, and should be replaced.

B3010 Roof Coverings -EPDM

Roof Covering

Failing Roof Repair 42,990 S.F. $2,564 $513 $3,077 Necessary- 2-5 Yrs

Critical Repair

There are reports of several roof leaks in the building. An investigatiion to locate and determine the cause of the leaks is needed.

1999 (E Bldg) $11,897 $2,379 $14,276 Building Systems $11,897 $2,379 $14,276

D3060 Controls & Instrumentation

System Inadequate Renew System 1 Ea. $11,897 $2,379 $14,276 Recommended-3-10 Yrs

Deferred Maintenance

Analog electric controls system is inadequate and needs to be upgraded/replaced.

Basketball Court $25,278 $5,056 $30,333 Building Systems $25,278 $5,056 $30,333

F1010 Special Structures - Basketball Court - Concrete - Outdoor

System Beyond Expected Life

Renew System 1 Ea. $25,278 $5,056 $30,333 Necessary- 2-5 Yrs

Deferred Maintenance

The concrete surface is worn, beyond expected life, and should be replaced.

Page 331: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Survey Report

Deficiency Detail ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 3

Facility

Name Assembly System Material Distress Correction Qty Unit Raw Cost

Additional

Cost Total Cost Priority Def. Cat. Location / Note

Pine St Bldg (Teachers' Resource) $79,639 $15,928 $95,567 Building Systems $79,639 $15,928 $95,567

D5020 Branch Wiring System Beyond Expected Life

Renew System 1 Ea. $18,854 $3,771 $22,625 Necessary- 2-5 Yrs

Deferred Maintenance

Branch wiring is beyond expected life and should be replaced.

D5020 Lighting System Beyond Expected Life

Renew System 1 Ea. $18,854 $3,771 $22,625 Necessary- 2-5 Yrs

Deferred Maintenance

Lighting system is inadequate, beyond expected life, and should be replaced.

E2010 Fixed Furnishings

System Beyond Expected Life

Renew System 1 Ea. $10,029 $2,006 $12,034 Necessary- 2-5 Yrs

Deferred Maintenance

Fixed furnishings, such as the base/wall cabinets, counter tops, window shades, and fixed seating, are worn, beyond expected life, and should be replaced.

B2020 Exterior Windows

System Beyond Expected Life

Renew System 1 Ea. $13,372 $2,674 $16,046 Necessary- 2-5 Yrs

Deferred Maintenance

The exterior windows are worn, beyond expected life, and should be replaced.

B2030 Exterior Doors System Beyond Expected Life

Renew System 1 Ea. $3,343 $669 $4,011 Necessary- 2-5 Yrs

Deferred Maintenance

The exterior doors are worn, beyond expected life, and should be replaced.

C3020 Floor Finishes - VCT

System Beyond Expected Life

Renew System 1 Ea. $10,029 $2,006 $12,034 Necessary- 2-5 Yrs

Deferred Maintenance

The VCT floor finishes are worn, beyond expected life, and should be replaced.

D2030 Sanitary Waste System Beyond Expected Life

Renew System 1 Ea. $2,106 $421 $2,527 Necessary- 2-5 Yrs

Deferred Maintenance

Sanitary waste is beyond expected life and should be replaced.

D3050 Terminal & Package Units

Terminal and Package Units

Beyond Expected Life

Replace A/C 4T Split System

1 Ea. $3,053 $611 $3,664 Necessary- 2-5 Yrs

Deferred Maintenance

Lennox split system with gas heat is beyond expected life and should be replaced.

Site $886,154 $177,231 $1,063,385 Building Systems $886,154 $177,231 $1,063,385

G2010 Roadways System Beyond Expected Life

Renew System 1 Ea. $148,554 $29,711 $178,264 Necessary- 2-5 Yrs

Deferred Maintenance

The roadways are worn, beyond expected life, and should be replaced.

G2020 Parking Lots System Beyond Expected Life

Renew System 1 Ea. $126,593 $25,319 $151,912 Necessary- 2-5 Yrs

Deferred Maintenance

The parking lot is worn, beyond expected life, covered in gravel in some areas, and should be replaced.

G3010 Water Supply System Beyond Expected Life

Renew System 1 Ea. $87,840 $17,568 $105,408 Necessary- 2-5 Yrs

Deferred Maintenance

Water supply is beyond expected life and should be replaced.

G3020 Sanitary Sewer System Beyond Expected Life

Renew System 1 Ea. $43,920 $8,784 $52,704 Necessary- 2-5 Yrs

Deferred Maintenance

Sanitary sewer is beyond expected life and should be replaced.

G3030 Storm Sewer System Beyond Expected Life

Renew System 1 Ea. $378,489 $75,698 $454,186 Necessary- 2-5 Yrs

Deferred Maintenance

Storm sewer is beyond expected life and should be replaced.

G3060 Fuel Distribution System Beyond Expected Life

Renew System 1 Ea. $12,918 $2,584 $15,501 Necessary- 2-5 Yrs

Deferred Maintenance

Natural gas system is beyond expected life and should be replaced.

G2030 Pedestrian Paving

System Beyond Expected Life

Renew System 1 Ea. $87,840 $17,568 $105,408 Necessary- 2-5 Yrs

Deferred Maintenance

The pedestrian paving is cracked, worn, and beyond expected life, and should be replaced. There is also a need for a handicap access ramp at the front entry.

Page 332: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

Functional and Educational Adequacy

Suitability Report

Page 333: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

Suitability Report - Full

Project:Site:

Suitability

Possible

Score

Score

Percent

Score

CaddoCounty:

1Region:

Rating

630Site #:

Caddo 2009 Vivian Elementary-Middl

Project #:

4057

Site Type: Site Size:Grade Config:

K-8 0.00ES/MS

Suitability - K-8

Site

3.00 2.01 67.00 TrafficFair

1.00 0.67 67.00 Pedestrian TrafficFair

1.35 0.45 33.00 ParkingPoor

1.64 0.54 33.00 Play Courts & FieldsPoor

Safety and Security

1.22 1.22 100.00 FencingGood

0.15 0.05 33.00 Signage & Way FindingPoor

3.00 0.00 0.00 Ease of SupervisionP/U

0.50 0.00 0.00 Limited EntrancesP/U

0.50 0.00 0.00 Interior CirculationP/U

School Climate

5.00 0.00 0.00 Learning Style VarietyP/U

5.00 0.00 0.00 School EnvironmentP/U

1.00 0.00 0.00 LandscapingP/U

General Classrooms

12.95 8.68 67.00 SizeFair

2.78 2.78 100.00 AdjacenciesGood

2.78 2.78 100.00 Storage\Fixed Equip.Good

Remedial - Special Needs

3.17 1.59 50.00 SizeFair

0.68 0.68 100.00 AdjacenciesG/F

0.68 0.00 0.00 Storage\Fixed Equip.P/U

Library

2.43 1.22 50.00 SizeFair

0.52 0.52 100.00 AdjacenciesG/F

0.52 0.52 100.00 Storage\Fixed Equip.G/F

P.E.

8.40 8.40 100.00 SizeGood

1.80 1.80 100.00 AdjacenciesG/F

1.80 1.80 100.00 Storage\Fixed Equip.G/F

Music

2.64 2.64 100.00 SizeGood

0.57 0.00 0.00 AdjacenciesP/U

0.57 0.57 100.00 Storage\Fixed Equip.G/F

Art

Page 1 of 43/9/2010 2:19:58PM

Page 334: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

Project:Site:

Suitability

Possible

Score

Score

Percent

Score

CaddoCounty:

1Region:

Rating

630Site #:

Caddo 2009 Vivian Elementary-Middl

Project #:

4057

Site Type: Site Size:Grade Config:

K-8 0.00ES/MS

1.53 0.00 0.00 SizeP/U

0.33 0.33 100.00 AdjacenciesG/F

0.33 0.00 0.00 Storage\Fixed Equip.P/U

Performing Arts\Auditorium

1.64 1.64 100.00 SizeGood

0.35 0.35 100.00 AdjacenciesGood

0.35 0.35 100.00 Storage\Fixed Equip.Good

Vocational Technical

4.29 4.29 100.00 SizeGood

0.92 0.92 100.00 AdjacenciesGood

0.92 0.92 100.00 Storage\Fixed Equip.G/F

Science

2.70 0.00 0.00 SizeP/U

0.58 0.58 100.00 AdjacenciesGood

0.58 0.00 0.00 Storage\Fixed Equip.P/U

Kindergarten

1.18 0.00 0.00 SizeP/U

0.25 0.25 100.00 AdjacenciesG/F

0.25 0.25 100.00 Storage\Fixed Equip.G/F

Administration

1.59 0.79 50.00 SizeFair

0.34 0.34 100.00 AdjacenciesG/F

0.34 0.34 100.00 Storage\Fixed Equip.G/F

0.91 0.45 50.00Fair Restrooms (Student)

0.91 0.45 50.00Fair Teacher Lounge and Work Room(s)

5.00 3.35 67.00Fair Cafeteria

7.84 7.84 100.00Good Food Prep

0.41 0.20 50.00Fair Counseling

0.34 0.34 100.00G/F Clinic

0.50 0.50 100.00G/F Custodial & Maintenance

100.00 63.39 63.39Total For Site:

Comments

Suitability - K-8

Vivian Elementary Middle School provides a general educational program for grades PK-8. The middle school does

have some magnet programs that students must qualify for. The school serves the surrounding area which is a

large rural zone. The school has an extensive special education program in all grades. The facility is made up of 5

wings and one portable.

Suitability - K-8->Site-->Traffic

Primary parent drop off is separate but on-street.

Suitability - K-8->Site-->Pedestrian Traffic

Staff must cross street from parking lot.

Suitability - K-8->Site-->Parking

Most staff parking is across a street and about half of it is unpaved. The school shares half the parking with the

adjacent church.

Page 2 of 43/9/2010 2:19:58PM

Page 335: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

Project:Site:

Suitability

Possible

Score

Score

Percent

Score

CaddoCounty:

1Region:

Rating

630Site #:

Caddo 2009 Vivian Elementary-Middl

Project #:

4057

Site Type: Site Size:Grade Config:

K-8 0.00ES/MS

Suitability - K-8->Site-->Play Courts & Fields

There are no MS athletic fields and the PK-K play area is in poor condition.

Suitability - K-8->Safety and Security-->Signage & Way Finding

There is very little way finding signage and many rooms are not signed.

Suitability - K-8->Safety and Security-->Ease of Supervision

The number and configuration of the buildings make this a challenging site to supervise.

Suitability - K-8->Safety and Security-->Limited Entrances

There are numerous buildings with numerous entrances.

Suitability - K-8->Safety and Security-->Interior Circulation

Wings B and D have narrow, steep stairways. The halls are generally wide.

Suitability - K-8->School Climate-->Learning Style Variety

The small self-contained classrooms do not support a variety of learning styles.

Suitability - K-8->School Climate-->School Environment

The physical environment is not stimulating. Acoustics are poor, lighting is low, natural light is blocked, and overall

aesthetics are dull.

Suitability - K-8->School Climate-->Landscaping

Landscaping is minimal.

Suitability - K-8->General Classrooms-->Size

Most general classrooms are in the 6-700 SF range.

Suitability - K-8->Remedial - Special Needs-->Size

Special education classrooms are small, 6-700 SF.

Suitability - K-8->Remedial - Special Needs-->Storage\Fixed Equip.

Special education rooms need additional storage especially for the students equipment.

Suitability - K-8->Library-->Size

Both the ES and MS libraries are small.

Suitability - K-8->Music-->Adjacencies

The ES music room is adjacent to special education classrooms.

Suitability - K-8->Art-->Size

Both art rooms are small and the MS room does not have a separate room for the kiln.

Suitability - K-8->Art-->Storage\Fixed Equip.

Both art rooms need additional storage.

Suitability - K-8->Vocational Technical-->Size

The computer lab that houses business educ. is sufficiently large but it is shared with ES science.

Suitability - K-8->Science-->Size

Science rooms are in typical classrooms and are small and don't have storage/prep rooms.

Suitability - K-8->Science-->Storage\Fixed Equip.

Storage is lacking and there is no safety equipment.

Suitability - K-8->Kindergarten-->Size

PK and K rooms are too small.

Suitability - K-8->Administration-->Size

Conference room is small and there is no staff restroom in the administrative area.

Page 3 of 43/9/2010 2:19:58PM

Page 336: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

Project:Site:

Suitability

Possible

Score

Score

Percent

Score

CaddoCounty:

1Region:

Rating

630Site #:

Caddo 2009 Vivian Elementary-Middl

Project #:

4057

Site Type: Site Size:Grade Config:

K-8 0.00ES/MS

Suitability - K-8->Restrooms (Student)

Restrooms in the older B wing are in poor condition.

Suitability - K-8->Teacher Lounge and Work Room(s)

Teacher lounge and work rooms are small.

Suitability - K-8->Cafeteria

Cafeteria has a low ceiling which helps with the acoustics but compresses the space. It is a bit small for the

enrollment.

Suitability - K-8->Counseling

Counseling has no waiting space.

Suitability - K-8->Clinic

Clinic is not located near administration but this works okay.

Page 4 of 43/9/2010 2:19:58PM

Page 337: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

Functional and Educational Adequacy

Technology Readiness Report

Page 338: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

Technology Readiness Report - Full

Project:Site:

Technology Readiness

Possible

ScoreScore

Percent

Score

CaddoCounty:

1Region:

Rating

630Site #:

Caddo 2009 Vivian Elementary-Middle

Project #:

4057

Technology Readiness

15.00 7.50 50.00 Comm/IT Equipment Environment Fair

10.00 10.00 100.00 Electrical Power Good

10.00 10.00 100.00 Cooling Good

10.00 10.00 100.00 Drops & Wireless Good

15.00 15.00 100.00 LAN Connectivity Good

10.00 10.00 100.00 WAN Backbone Good

10.00 6.70 67.00 LAN-WAN Performance Fair

5.00 5.00 100.00 Video Distribution Good

5.00 0.00 0.00 Voice Distribution Unsat

10.00 10.00 100.00 Faculty & Staff Technology Good

100.00 84.20 84.20Total For Site:

Comments

Technology Readiness->Comm/IT Equipment Environment

Server is located in library storeroom which can get warm.

Technology Readiness->Voice Distribution

Intercom system is old and outdated.

Page 1 of 13/9/2010 2:05:06PM

Page 339: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

Functional and Educational Adequacy

Capacity and Utilization Report

Page 340: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

Capacity Calculations Appendix Preface Some spaces do not contribute to the functional capacity of a school. These spaces are generally spaces

which do not have students assigned to them. Some examples of these spaces include elementary art

rooms, elementary computer labs, elementary music rooms, and special education resource rooms.

Many schools have temporary buildings and these are also not included in the calculation of the

functional capacity. It is the district’s philosophy that, while temporary buildings can be useful in the

short run, they do not provide appropriate long term space and should be eliminated where possible.

Temporary buildings are generally used for the following functions:

1. To house students in temporary classrooms when the school is lacking enough classrooms

2. To house special programs when the school is lacking space for these programs

3. To house necessary storage or administrative support functions when permanent space is lacking

4. To house unnecessary storage or functions

It is the district’s strategy to eliminate all but the absolute necessary temporary buildings and it should

conduct an inventory of the uses of temporary buildings. Where the inventory identifies uses 1-3, the

district will need to consider a more appropriate space solution. In the case of number 4, the district will

need to ensure the principal of the school discontinues the inappropriate use of the temporary building.

Page 341: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

Caddo Parish School Board

Instructional Space Model Guidelines

Room Type Students/

Room

Pre-School 20

K Capacity (full day) and 1st Grade 20

Elementary Classroom (2) 24

Elementary Classroom (3-5) 26

Secondary Classroom (6-12) 25

Art (Secondary) 33

Music (Secondary) - Vocal 25

Music (Secondary) - Instrumental 30

Science Lab (Secondary) 25

Voc./Industrial Tech, Foods, Etc. 25

Gym (Secondary) 80

Computer Lab (Elementary)* 26

Computer Lab (Secondary) 33

Spec. Ed. - Severe 9

Spec. Ed. - Resource 0

Alternative Education 18

Portable 0

*These spaces do not contribute to capacity

Scheduling Factors

Elementary Schools 95.0%

Middle Schools 85.0%

High Schools 75.0%

Source: MGT of America, Inc., 2009.

Page 342: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

Caddo Parish School Board Capacity Calculations

Vivian Elementary-MiddleES/M K-8

K-1 Classroom: 8

PK Classroom: 2

ES (2) Classroom: 3

ES (3-5) Classroom: 8

ART: 2

Secondary (6-12): 6

MU Inst: 1

MU Vocal: 1

Science: 3.5

GYM: 3

VO/TEC: 0.5

*Computer Lab: 3

SE - Resource: 8

SE - Severe: 8

Alt: 0

**Temp Bldg: 2

20

24

20

26

33

25

30

25

25

80

25

33

0

9

18

Room Type # of Classrooms x Students/Room = Capacity

Total Capacity (w/o scheduling factor) =

Vivian Elementary-Middle Capacity =

x Scheduling factor =

40

72

160

208

150

66

30

25

87.5

240

12.5

99

0

72

0

0

*Computer Labs at Elementary Schools do not contribute to capacity**The temporary building number represents the number of temporary building teaching stations or rooms, not the number of temporary buildings.

1,073

1,262

85%

N/A

Page 343: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

Future Facility and Site Assessment Report

Page 344: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

FUTURE FACILITY AND SITE ASSESSMENT

School VIVIAN ELEMENTARY / MIDDLE SCHOOL 100 West Kentucky Ave. Vivian, LA 71082

Site Description 9 acre site in the town of Vivian in the northwest part of the parish surrounded by a residential neighborhood and faces a 2-lane lightly traveled street and the 4-lane State Highway 1 aka Pine Street borders the east side. The acreage is an accumulation of lots on several blocks including a parking lot across Kentucky Street to the south and a partial block across Pine Street (Hwy 1) reportedly leased to the City but used as a teacher resource facility. The original 1915 school on the north corner is now City property. The site slopes gently west to east and north with the main buildings sitting on a raised pad. The school is a collection of 6 incrementally added 1- and 2-story buildings including the original 1923 school, 4 classroom additions, an auditorium and gymnasium unit, and a modular unit. At the teacher resource center is a small 1-story brick, flat roof building. Site features include asphalt and gravel paving, lawns and a few trees, recreation field, paved basketball court, and playground equipment.

SUMMARY Topic Grade Comments

Site Adequacy Potential

Constraint

Although there is some available land, the campus is filling up, any additions will encroach on outdoor recreation and parking and site is much smaller than guideline. SITE ASSESSMENT

Site Size Status Inadequate

Student Capacity: 1012 Min. Acres Recommended: 20 Actual Site Acres: 9

Usable Area Remaining

Potential Constraint

1.50 Acres. Approximate. Both expansion areas crowd the site boundaries and impinge on recreation yards or parking.

• Flood Plain Potential

Constraint

The FEMA FIRM maps covering the Town of Vivian were blank and did not show any zone designations. The assumption used here is that there MIGHT be a problem but the data is not readily available from public sources.

• Potable Water No Constraint

• Sanitary Sewer No Constraint

• Storm Drainage No Constraint

Generally site drains well but a few localized ponding conditions were observed.

• Electricity No Constraint

• Natural Gas No Constraint

• Ground Water No Constraint

• Air Pollution No Constraint

• HazMat/Soils No Constraint

• Habitats No Constraint No conflicts identified by DEQ.

Ease of Access No Constraint

Ease of Traffic Flow Needs Improvement

Bus and auto traffic are separated on different streets. Auto drop-off is uncovered and street configuration is awkward.

Design Compatibility No Constraint

The school facility fits into the residential neighborhood and has grown over the years; expansion or replacement would not be intrusive although the site is getting full.

Compatibility of Structures

No Constraint The collection of buildings and styles are eclectic but share materials and massing that reasonably blend.

Page 345: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

VIV

IAN

EL

EM

EN

TA

RY

/MID

DL

E S

CH

OO

L100 W

est K

en

tucky

Viv

ian

, LA

71082

MISSISSIPPI STREET

N

KENTUCKY STREET

SP

RU

CE

ST

RE

ET

LA

HW

Y 1

/PIN

E S

TR

EE

T

Primary : 0.81 Ac

Secondary : 0.69 Ac

Total: 1.50 Ac

Primary

Secondary

1915 SCHOOL

PUBLIC LIBRARY

Recreation Yard

RESIDENTIAL

RESIDENTIAL

COMMERCIAL

RESIDENTIAL

RESIDENTIAL/COMMERCIAL

Auto

Pic

k-U

p

Bus Drop-Off

T

E

E

Total Usable

Site Area: 1.50 Ac

+ FH

Parking

1923 SCHOOL

Leased To City

Slope

Pu

blis

he

d 0

1.2

9.1

0

New

B

uild

ing

Teacher Resource Center

Page 346: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

Building Code Verification Report

Page 347: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

Building Code Number COMPLYNOT

COMPLY

FCA

DEFICIENCY

NOT

KNOWN

SYSTEM

NOT

PRESENT

NA TO FCA

DATA

1Code of Federal Regulations 28 CFR Part

36, 1994 edition, Paragraph 4.1.2,

Paragraph 4.1.6

1 NPFA 101:15.2.3.2; IBC 1017.2

3 IBC 1005.2

5

a

b

c

d

6

a

b

1

2

4 IBC 1011.5.3

1 IBC 1007.3

2 IBC 1020.1

Are penetrations into stairs limited to doors, electrical conduit serving the

stairway, piping necessary for the heating or cooling of the exit enclosure,

sprinkler piping, standpipes and penetrations for fire alarm circuits?

8

Boiler and furnace rooms?

Are corridor doors rated a minimum 20-minute rating?

Is glazing in rated doors above 20 minutes limited to 100 square inches?

NFPA 101:15.3.7

NFPA 101:15.3.2.1; IBC 508.2

Does every room or space greater than 250 SF and used for educational

purposes have not less than one outside window for emergency rescue

(exceptions: sprinklered building or room that has a door directly to the

outside)?

Do doors opening in the path of egress travel not reduce the required width to

less than 1/2 during the course of the swing?

When fully open, do corridor doors not project more than 7 inches into the

required corridor width?

Is the building subdivided into compartments by smoke partitions having not

less than a 1-hour fire rating? (Maximum area of compartment is 30,000 SF.

Length or width of building exceeds 300’ unless sprinklered.)

IBC 715.4.4.1

Is 1-hour rating or sprinkler protection provided for the following:

Hazardous storage?

Janitor’s closet?

IBC 1008.1.8.1

Where there is a chiller, is it separated from a boiler or water heater by a 2-

hour assembly?

Laundries? NFPA 101:15.3.2.1; IBC 508.2

School Name: Vivian ES/MS

NFPA101:15.2.11.1.1

G2030 Pedestrian Paving

B2020 Exterior Windows

4

BUILDING CODE COMPLIANCE REPORT

Code Provision

Is there a continuous path of entry/exit for handicap accessibility to all parts of

the building?

Do exit access corridors have not less than 6’ of clear width?

Are both 1-hour rating and sprinkler protection provided for the following:

Science labs?

7

Does all door hardware comply by not requiring tight grasping, tight pinching or

twisting to operate?

Maintenance shops?

IBC 508.2

C10 Interior Construction

C1010 Partitions

C1020 Interior Doors

1

IBC 1005.2

Are corridors 1-hour rated (exceptions: building is sprinklered or each room for

instruction has at least one door directly to the exterior)?IBC 1017.1

2

3

NFPA 101:7.1.3.2.1; IBC 1020.1.2

C2010 Stair Construction

Are all means of egress illuminated at all times building is occupied?

Do exit stairways have a minimum 48” clearance width between handrails?

Are stairs separated by 1-hour fire resistance rating?

3

Page 348: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

Building Code Number COMPLYNOT

COMPLY

FCA

DEFICIENCY

NOT

KNOWN

SYSTEM

NOT

PRESENT

NA TO FCA

DATACode Provision

4

a NFPA 101:7.2.2.2.4.2; IBC 1012.4

b IBC 1012.5

c NFPA 101:7.2.2.4.4.6; IBC 1012.1

d NFPA 101:7.2.2.4.4.2; IBC 1012.2

5 IBC 1007.6

1

2

1 IBC 508.2

2 IBC 1203.1

3INTERNATIONAL MECHANICAL CODE

2000, 606.4

4 IBC 908.6

1 IBC 903.2

1 IBC 907.2

Is there a telephone or intercom communication in the cab?

Is there a fireman control panel at the ground floor controls?

Are handrails:

IBC 3006.2

IBC 3003.2

Is there an Area of Refuge in the stairwell or in a vestibule entering the stair? Is

there a communication device there?

Between 34” and 38” above the surface of the tread?

Between 1-1/4” and 2” in diameter?

Returning to wall, guard or walking surface?

3 IBC 907.11

IBC 907.2.12.2

Does the shaft have exhaust directly to the outside, an access ladder to the pit,

and battery backup lighting in the shaft/pit?

Are the mechanical rooms separated by fire rated partitions from remainder of

building?

Is there a standard and emergency ventilation system provided?

Are there automatic sprinkler systems provided in assembly spaces with more

than 300 occupants?

2

Is there a refrigerant detection and alarm system provided?

Are there emergency shut-offs provided?

Are the duct smoke detectors connected to the building’s fire alarm control

panel?

Is there a monitored fire alarm system provided?

Does the operation of fire detector, sprinkler device or manual fire alarm box

immediately sounds an alert tone followed by voice instructions giving

approved information and directions for an evacuation?

IBC 3004.1; IBC 3006.1

D30 HVAC Systems

D40 Fire Protection

D4010 Sprinklers

D50 Electrical

D5030 Communications and Security

4

D10 Conveying

D1010 Elevators

3Does the Elevator Machine Room have ventilation or air conditioning to protect

controls from overheating?

Continuously graspable?

Page 349: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

Energy Conservation Opportunities Report

Page 350: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

System Energy Conservation FCA Deficiency Replacement Cost

SCHOOL TYPEENERGY CONSERVATION OPPORTUNITIES

Vivian Elementary/Middle ES/MS

1923, 1930, 1972 (A&B) Buildings Roof Covering No No

Exterior Windows Yes Yes $325,428.00

Interior Lighting No No

Bldg Controls & Instrumentation No No

Heating No No

Other HVAC Systems (Ventilation) No No

Terminal & Package Units No No

Cooling No No

1989 (C&D) Buildings Roof Covering Partial Yes $3,077.00

Exterior Windows No No

Interior Lighting No No

Bldg Controls & Instrumentation No No

Heating No No

Other HVAC Systems (Ventilation) No No

Terminal & Package Units No No

Cooling No No

1999 (E) Building Roof Covering No No

Exterior Windows No No

Interior Lighting No No

Bldg Controls & Instrumentation Yes Yes $14,276.00

Heating No No

Other HVAC Systems (Ventilation) No No

Terminal & Package Units No No

Cooling No No

2003 (H) Building Roof Covering No No

Exterior Windows No No

Interior Lighting No No

Bldg Controls & Instrumentation No No

Heating No No

Other HVAC Systems (Ventilation) No No

Terminal & Package Units No No

Cooling No No

Pine St Building (Teachers' Resource) Roof Covering No No

Exterior Windows Yes Yes $16,046.00

Interior Lighting Yes Yes $22,625.00

Bldg Controls & Instrumentation No No

Heating No No

Other HVAC Systems (Ventilation) No No

Terminal & Package Units No Yes $3,664.00

Cooling No No

Site Exterior Lighting No No

Page 351: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

Facility Condition Assessment Reports

Page 352: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 1

Facility: \Elementary/Middle Schools\Walnut HillAddress: 9360 Woolworth Road, Shreveport, LA 71129

Attributes: Temporary Building Rooms 20

General Information: Function: Elementary Middle Year Built:Gross Area: 133,522 S.F. Last Renovation:

Facility Description:

The Walnut Hill Elementary/Middle School campus consists of one main building located at 9360 Woolworth Road in Shreveport, Louisiana. The original campus was constructed in 1956 and additions were constructed in 1966, 1967, 1987, 1998, 2004, and 2008. Ancillary buildings on campus include covered walkways. In addition to the main building, the campus contains basketball courts, football field, and tennis courts. This report contains condition and adequacy data collected during the 2009/2010 Facility Condition Assessment (FCA). The detailed condition and deficiency statements are contained in this report.

Current Repair Cost: $6,544,148.00 Replacement Cost: $21,205,690.00 FCI: 30.86%

19-Jan-2010Walnut Hill Elementary/Middle School

Page 353: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 2

Facility: \Elementary/Middle Schools\Walnut Hill\1956, 1966, 1967 BuildingsAddress: 9360 Woolworth Road, Shreveport, LA 71129

Attributes: Number of Floors 1

General Information: Function: Elementary Middle Year Built: 1956Gross Area: 87,005 S.F. Last Renovation:

Facility Description:

The Walnut Hill Elementary/Middle School Main Building is 1-story building located at 9360 Woolworth Road in Shreveport, Louisiana. There have been three additions in 1998, 2004, and 2008, HVAC renovations in 1997 and 2009, and roofing renovations in 1998, 2000, and 2009. This report contains condition and adequacy data collected during the 2009/2010 Facility Condition Assessment (FCA). The detailed condition and deficiency statements are contained in this report.

Energy conservation opportunities for this building include: 1) Exterior windows are steel frame, operable clear glass design. Installation of fixed, double pane, low e, thermal windows with thermal breaks would improve energy use and improve comfort; 2) Interior lights are T12 fixtures and incandescent lamps throughout the campus, as well as HPS fixtures in the old gym. Installation of T8 energy efficient lights would improve energy efficiency; and 3) A review of billing rate may justify addition of power factor correction capacitor.

There are no ADA vertical access needs for this building at this time.

Current Repair Cost: $4,581,964.00 Replacement Cost: $13,622,358.00 FCI: 33.64%

19-Jan-2010East Elevation

19-Jan-2010North Elevation

19-Jan-2010South Elevation

19-Jan-2010West Elevation

Page 354: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 3

Facility: \Elementary/Middle Schools\Walnut Hill\1956, 1966, 1967 Buildings (continued)

Building Condition:

System Unit Price$

Unit of

Meas Qty Renewal% Renewal$ Life Installed

Calc Next

Renewal

Next

Renewal CI% Deficiency$ Replacement Value FCI%

Total $156.57 S.F. 87,005 107 $14,535,648 48 1971 1964 79 $4,581,965 $13,622,358 34

Substructure $19.20 S.F. 87,005 100 $1,670,496 100 1956 $1,670,496

Foundations $19.20 S.F. 87,005 100 $1,670,496 100 1956 $1,670,496

Standard Foundations $10.20 S.F. 87,005 100 $887,451 100 1956 $887,451

Special Foundations 0 0 0 0

Slab on Grade $9.00 S.F. 87,005 100 $783,045 100 1956 $783,045

Basement Construction 0 0 0

Basement Excavation 0 0 0 0

Basement Walls 0 0 0 0

Shell $40.74 S.F. 87,005 104 $3,679,789 69 1965 1986 45 $574,233 $3,544,584 16

Superstructure $10.80 S.F. 87,005 100 $939,654 100 1956 $939,654

Floor Construction 0 0 0 0

Roof Construction $10.80 S.F. 87,005 100 $939,654 100 1956 $939,654

Exterior Enclosure $20.40 S.F. 87,005 103 $1,827,105 78 1956 1986 $574,233 $1,774,902 32

Exterior Walls $14.40 S.F. 87,005 100 $1,252,872 100 1956 $1,252,872

Exterior Windows $4.80 S.F. 87,005 110 $459,386 30 1956 1986 $459,386 $417,624 110

Exterior Doors $1.20 S.F. 87,005 110 $114,847 30 1956 1986 $114,847 $104,406 110

Roofing $9.54 S.F. 87,005 110 $913,030 20 1999 2019 45 $830,028

Roof Coverings - BUR $9.54 S.F. 87,005 110 $913,030 20 1999 2019 45 $830,028

Roof Coverings - EPDM 0 0 0 0

Roof Coverings - Standing

Seam Mettal

0 0 0 0

Roof Openings 0 0 0 0

Interiors $27.44 S.F. 87,005 107 $2,563,307 52 1956 1964 $1,529,688 $2,387,228 64

Interior Construction $19.20 S.F. 87,005 106 $1,774,902 68 1956 1976 $741,283 $1,670,496 44

Partitions $10.80 S.F. 87,005 110 $1,033,619 100 1956 $939,654

Interior Doors $2.40 S.F. 87,005 80 $167,050 40 1956 1996 $167,050 $208,812 80

Fittings $6.00 S.F. 87,005 110 $574,233 20 1956 1976 $574,233 $522,030 110

Stairs 0 0 0

Stair Construction 0 0 0 0

Interior Finishes $8.24 S.F. 87,005 110 $788,405 15 1956 1964 $788,405 $716,732 110

Wall Finishes - Ceramic &

Glazed

$4.42 S.F. 2,400 110 $11,658 20 1956 1976 $11,658 $10,598 110

Wall Finishes - Paint $2.40 S.F. 84,605 110 $223,357 10 1956 1966 $223,357 $203,052 110

Floor Finishes - Carpet $2.76 S.F. 1,300 110 $3,947 8 1956 1964 $3,947 $3,588 110

Floor Finishes - Ceramic &

Quarry Tile

$1.44 S.F. 4,400 110 $6,970 50 1956 2006 $6,970 $6,336 110

Floor Finishes - Terrazzo 0 0 0 0

Floor Finishes - VCT $3.60 S.F. 81,305 110 $321,968 15 1956 1971 $321,968 $292,698 110

Ceiling Finishes $2.30 S.F. 87,005 110 $220,505 20 1956 1976 $220,505 $200,460 110

Services $59.47 S.F. 87,005 110 $5,691,798 22 1986 1976 86 $1,547,786 $5,174,361 30

Conveying 0 0 0

Elevators and Lifts 0 0 0 0

Plumbing $7.54 S.F. 87,005 110 $721,236 30 1974 1986 67 $686,413 $655,669 105

Plumbing Fixtures $5.89 S.F. 87,005 110 $563,897 30 1956 1986 $563,897 $512,633 110

Domestic Water Distribution $0.44 S.F. 87,005 110 $42,493 30 1995 2025 50 $38,630

Sanitary Waste $0.76 S.F. 87,005 110 $72,353 30 1956 1986 $72,353 $65,776 110

Rain Water Drainage $0.19 S.F. 87,005 110 $18,375 30 1956 1986 $18,375 $16,705 110

Other Plumbing Systems -

Natural Gas

$0.25 S.F. 87,005 110 $24,118 30 2009 2039 97 $31,788 $21,925 145

HVAC $33.72 S.F. 87,005 110 $3,227,190 20 2004 2017 92 $52,648 $2,933,809 2

Heat Generating Systems 0 0 0 0

Cooling Generating Systems 0 0 0 0

Distribution Systems & Exhaust

Systems

$9.12 S.F. 87,005 110 $872,834 30 2009 2039 97 $793,486

Terminal & Package Units $21.60 S.F. 87,005 110 $2,067,239 15 2009 2024 93 $52,648 $1,879,308 3

Controls & Instrumentation $1.80 S.F. 87,005 110 $172,270 20 2009 2029 95 $156,609

Other HVAC Systems/Equip -

Kitchen Hood

$1.20 S.F. 87,005 110 $114,847 30 1987 2017 23 $104,406

Fire Protection 0 0 0

Sprinklers 0 0 0 0

Electrical $18.22 S.F. 87,005 110 $1,743,372 24 1984 1976 70 $808,725 $1,584,883 51

Electrical Service/Distribution $2.27 S.F. 87,005 110 $217,060 30 1996 2026 53 $197,327

Branch Wiring $6.77 S.F. 87,005 110 $647,735 30 1956 1986 $647,735 $588,850 110

Lighting $6.77 S.F. 87,005 110 $647,735 20 2007 2027 85 $77,152 $588,850 13

Communications and Security -

Public Address & Clock System

$0.88 S.F. 87,005 110 $83,838 20 1956 1976 $83,838 $76,216 110

Fire Alarm $1.54 S.F. 87,005 110 $147,004 10 2003 2013 30 $133,640

Page 355: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 4

System Unit Price$

Unit of

Meas Qty Renewal% Renewal$ Life Installed

Calc Next

Renewal

Next

Renewal CI% Deficiency$ Replacement Value FCI%

Security & CCTV 0 0 0 0

Other Electrical Systems -

Emergency Generator

0 0 0 0

Equipment & Furnishings $9.72 S.F. 87,005 110 $930,258 20 1956 1976 $930,258 $845,689 110

Equipment $6.12 S.F. 87,005 110 $585,718 20 1956 1976 $585,718 $532,471 110

Commercial Equipment $6.00 S.F. 87,005 110 $574,233 20 1956 1976 $574,233 $522,030 110

Institutional Equipment $0.12 S.F. 87,005 110 $11,485 20 1956 1976 $11,485 $10,441 110

Furnishings $3.60 S.F. 87,005 110 $344,540 20 1956 1976 $344,540 $313,218 110

Fixed Furnishings $3.60 S.F. 87,005 110 $344,540 20 1956 1976 $344,540 $313,218 110

Page 356: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 5

Facility: \Elementary/Middle Schools\Walnut Hill\1956, 1966, 1967 Buildings (continued)

Renewal Schedule:

Systems 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020

Total $4,581,965 $160,635 $141,247 $5,000 $1,191,298 $300,173

Substructure

Foundations

Standard Foundations

Special Foundations

Slab on Grade

Basement Construction

Basement Excavation

Basement Walls

Shell $574,233 $1,191,298

Superstructure

Floor Construction

Roof Construction

Exterior Enclosure $574,233

Exterior Walls

Exterior Windows $459,386

Exterior Doors $114,847

Roofing $1,191,298

Roof Coverings - BUR $1,191,298

Roof Coverings - EPDM

Roof Coverings - Standing Seam

Mettal

Roof Openings

Interiors $1,529,688 $5,000 $300,173

Interior Construction $741,283

Partitions

Interior Doors $167,050

Fittings $574,233

Stairs

Stair Construction

Interior Finishes $788,405 $5,000 $300,173

Wall Finishes - Ceramic & Glazed $11,658

Wall Finishes - Paint $223,357 $300,173

Floor Finishes - Carpet $3,947 $5,000

Floor Finishes - Ceramic & Quarry

Tile

$6,970

Floor Finishes - Terrazzo

Floor Finishes - VCT $321,968

Ceiling Finishes $220,505

Services $1,547,786 $160,635 $141,247

Conveying

Elevators and Lifts

Plumbing $686,413

Plumbing Fixtures $563,897

Domestic Water Distribution

Sanitary Waste $72,353

Rain Water Drainage $18,375

Other Plumbing Systems - Natural

Gas

$31,788

HVAC $52,648 $141,247

Heat Generating Systems

Cooling Generating Systems

Distribution Systems & Exhaust

Systems

Terminal & Package Units $52,648

Controls & Instrumentation

Other HVAC Systems/Equip -

Kitchen Hood

$141,247

Fire Protection

Sprinklers

Electrical $808,725 $160,635

Electrical Service/Distribution

Branch Wiring $647,735

Lighting $77,152

Communications and Security -

Public Address & Clock System

$83,838

Page 357: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 6

Systems 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020

Fire Alarm $160,635

Security & CCTV

Other Electrical Systems -

Emergency Generator

Equipment & Furnishings $930,258

Equipment $585,718

Commercial Equipment $574,233

Institutional Equipment $11,485

Furnishings $344,540

Fixed Furnishings $344,540

Page 358: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 7

Facility: \Elementary/Middle Schools\Walnut Hill\1956, 1966, 1967 Buildings (continued)

Deficiency Sheet:

Deficiency: Surveyor/Update: Angela Smiley Fri, 04-Jun-2010Priority: 3Quantity: 1

Assembly: B2020 System: Exterior Windows Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: The exterior windows are worn, beyond expected life, and should be replaced.

Estimates:Raw Cost $382,822.00

Plus or (Minus) Additional Cost $0.00Total Estimated Amount $382,822.00

Deficiency: Surveyor/Update: Angela Smiley Fri, 04-Jun-2010Priority: 3Quantity: 1

Assembly: B2030 System: Exterior Doors Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: The exterior doors are worn, beyond expected life, and should be replaced.

Estimates:Raw Cost $95,705.50

Plus or (Minus) Additional Cost $0.00Total Estimated Amount $95,705.50

Page 359: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 8

Facility: \Elementary/Middle Schools\Walnut Hill\ 1956, 1966, 1967 Buildings (continued)

Deficiency: Surveyor/Update: Angela Smiley Fri, 04-Jun-2010Priority: 3Quantity: 1

Assembly: C1020 System: Interior Doors Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: The interior doors are worn, beyond expected life, and should be replaced.

Estimates:Raw Cost $139,208.00

Plus or (Minus) Additional Cost $0.00Total Estimated Amount $139,208.00

Deficiency: Surveyor/Update: Angela Smiley Fri, 04-Jun-2010Priority: 3Quantity: 1

Assembly: C1030 System: Fittings Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: Fittings, such as chalk and tack boards, lockers, toilet and bath accessories, toilet partitions, and shelving, are

beyond expected life and should be replaced.

Estimates:Raw Cost $478,527.50

Plus or (Minus) Additional Cost $0.00Total Estimated Amount $478,527.50

Page 360: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 9

Facility: \Elementary/Middle Schools\Walnut Hill\ 1956, 1966, 1967 Buildings (continued)

Deficiency: Surveyor/Update: Angela Smiley Fri, 04-Jun-2010Priority: 3Quantity: 1

Assembly: C3010 System: Wall Finishes - Ceramic & Glazed Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: The ceramic wall finishes are beyond expected life, showing signs of wear, and should be replaced.

Estimates:Raw Cost $9,715.20

Plus or (Minus) Additional Cost $0.00Total Estimated Amount $9,715.20

Deficiency: Surveyor/Update: Angela Smiley Fri, 04-Jun-2010Priority: 3Quantity: 1

Assembly: C3010 System: Wall Finishes - Paint Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: The painted wall finishes are worn, beyond expected life, and should be replaced.

Estimates:Raw Cost $186,131.00

Plus or (Minus) Additional Cost $0.00Total Estimated Amount $186,131.00

Page 361: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 10

Facility: \Elementary/Middle Schools\Walnut Hill\ 1956, 1966, 1967 Buildings (continued)

Deficiency: Surveyor/Update: Angela Smiley Fri, 04-Jun-2010Priority: 3Quantity: 1

Assembly: C3020 System: Floor Finishes - Carpet Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: Carpet floor finishes are worn, beyond expected life, and should be replaced.

Estimates:Raw Cost $3,289.00

Plus or (Minus) Additional Cost $0.00Total Estimated Amount $3,289.00

Deficiency: Surveyor/Update: Angela Smiley Fri, 04-Jun-2010Priority: 3Quantity: 1

Assembly: C3020 System: Floor Finishes - Ceramic & Quarry Tile Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: The ceramic floor finishes are beyond expected life, showing signs of wear, and should be replaced.

Estimates:Raw Cost $5,808.00

Plus or (Minus) Additional Cost $0.00Total Estimated Amount $5,808.00

Page 362: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 11

Facility: \Elementary/Middle Schools\Walnut Hill\ 1956, 1966, 1967 Buildings (continued)

Deficiency: Surveyor/Update: Angela Smiley Fri, 04-Jun-2010Priority: 3Quantity: 1

Assembly: C3020 System: Floor Finishes - VCT Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: The VCT floor finishes are worn, beyond expected life, and should be replaced.

Estimates:Raw Cost $268,306.50

Plus or (Minus) Additional Cost $0.00Total Estimated Amount $268,306.50

Deficiency: Surveyor/Update: Angela Smiley Thu, 03-Jun-2010Priority: 3Quantity: 1

Assembly: C3030 System: Ceiling Finishes Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: The ceiling finishes are beyond expected life, showing signs of wear, and should be replaced.

Estimates:Raw Cost $183,754.56

Plus or (Minus) Additional Cost $0.00Total Estimated Amount $183,754.56

Page 363: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 12

Facility: \Elementary/Middle Schools\Walnut Hill\ 1956, 1966, 1967 Buildings (continued)

Deficiency: Surveyor/Update: Angela Smiley Fri, 04-Jun-2010Priority: 3Quantity: 1

Assembly: D2010 System: Plumbing Fixtures Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: Existing fixtures are inadequate and beyond expected life. Replacement with energy efficient fixtures is

recommended.

Estimates:Raw Cost $469,914.01

Plus or (Minus) Additional Cost $0.00Total Estimated Amount $469,914.01

Deficiency: Surveyor/Update: Angela Smiley Fri, 04-Jun-2010Priority: 3Quantity: 1

Assembly: D2030 System: Sanitary Waste Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: Sanitary waste is beyond expected life and should be replaced.

Estimates:Raw Cost $60,294.47

Plus or (Minus) Additional Cost $0.00Total Estimated Amount $60,294.47

Page 364: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 13

Facility: \Elementary/Middle Schools\Walnut Hill\ 1956, 1966, 1967 Buildings (continued)

Deficiency: Surveyor/Update: Angela Smiley Fri, 04-Jun-2010Priority: 3Quantity: 1

Assembly: D2040 System: Rain Water Drainage Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: Roof drains are beyond expected life and should be replaced.

Estimates:Raw Cost $15,312.88

Plus or (Minus) Additional Cost $0.00Total Estimated Amount $15,312.88

Deficiency: Surveyor/Update: Angela Smiley Fri, 04-Jun-2010Priority: 3Quantity: 20

Assembly: D2090 System: Other Plumbing Systems - Natural Gas Material: Plumbing Fixtures Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Replace Drinking Fountain Note: Water fountains around campus are beyond expected life and should be replaced.

Estimates:Raw Cost $26,490.00

Plus or (Minus) Additional Cost $0.00Total Estimated Amount $26,490.00

Page 365: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 14

Facility: \Elementary/Middle Schools\Walnut Hill\ 1956, 1966, 1967 Buildings (continued)

Deficiency: Surveyor/Update: Angela Smiley Fri, 04-Jun-2010Priority: 3Quantity: 4

Assembly: D3050 System: Terminal & Package Units Material: Terminal and Package Units Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Replace 10 T G/E Pkg Unit, Roof Mount Note: Existing (2 qty) package units to the cafeteria and (8 qty) ceiling mounted heaters are beyond expected life and

should be replaced with roof packaged units.

Estimates:Raw Cost $43,873.28

Plus or (Minus) Additional Cost $0.00Total Estimated Amount $43,873.28

Deficiency: Surveyor/Update: Angela Smiley Thu, 03-Jun-2010Priority: 3Quantity: 1

Assembly: D5020 System: Branch Wiring Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: Distribution is mostly original, beyond expected life, and should be replaced.

Estimates:Raw Cost $539,779.02

Plus or (Minus) Additional Cost $0.00Total Estimated Amount $539,779.02

Page 366: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 15

Facility: \Elementary/Middle Schools\Walnut Hill\ 1956, 1966, 1967 Buildings (continued)

Deficiency: Surveyor/Update: Angela Smiley Fri, 04-Jun-2010Priority: 3Quantity: 8,700

Assembly: D5020 System: Lighting Material: Lighting/Branch Wiring Distress: Inadequate Category: Energy Conservation Correction: Replace 2X4 Fluorescent. Fixture/sf Note: T-12 lights still remain throughout the school, as well as incandescent lights, and HPS fixtures in the old gym. An

upgrade to energy efficient light fixtures is recommended.

Estimates:Raw Cost $64,293.00

Plus or (Minus) Additional Cost $0.00Total Estimated Amount $64,293.00

Deficiency: Surveyor/Update: Angela Smiley Fri, 04-Jun-2010Priority: 3Quantity: 1

Assembly: D5030 System: Communications and Security - Public

Address & Clock System Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: PA system is beyond expected life and should be upgraded/replaced. For integrity of the system, install wiring in

conduit.

Estimates:Raw Cost $69,865.02

Plus or (Minus) Additional Cost $0.00Total Estimated Amount $69,865.02

Page 367: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 16

Facility: \Elementary/Middle Schools\Walnut Hill\ 1956, 1966, 1967 Buildings (continued)

Deficiency: Surveyor/Update: Angela Smiley Fri, 04-Jun-2010Priority: 3Quantity: 1

Assembly: E1010 System: Commercial Equipment Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: Commercial equipment, including the walk-in refrigerator and freezer, is beyond expected life and should be

replaced.

Estimates:Raw Cost $478,527.50

Plus or (Minus) Additional Cost $0.00Total Estimated Amount $478,527.50

Deficiency: Surveyor/Update: Angela Smiley Fri, 04-Jun-2010Priority: 3Quantity: 1

Assembly: E1020 System: Institutional Equipment Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: Institutional equipment, such as library equipment, theater and stage equipment, audio-visual equipment, and

laboratory equipment, is beyond expected life and should be replaced.

Estimates:Raw Cost $9,570.55

Plus or (Minus) Additional Cost $0.00Total Estimated Amount $9,570.55

Page 368: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 17

Facility: \Elementary/Middle Schools\Walnut Hill\ 1956, 1966, 1967 Buildings (continued)

Deficiency: Surveyor/Update: Angela Smiley Fri, 04-Jun-2010Priority: 3Quantity: 1

Assembly: E2010 System: Fixed Furnishings Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: Fixed furnishings, such as the base/wall cabinets, counter tops, window shades, and fixed seating, are worn,

beyond expected life, and should be replaced.

Estimates:Raw Cost $287,116.50

Plus or (Minus) Additional Cost $0.00Total Estimated Amount $287,116.50

Page 369: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 18

Facility: \Elementary/Middle Schools\Walnut Hill\1987 OfficeAddress: 9360 Woolworth Road, Shreveport, LA 71129

Attributes: Number of Floors 1

General Information: Function: Elementary Middle Year Built: 1987Gross Area: 767 S.F. Last Renovation:

Facility Description:

The 1987 Office Expansion/Addition at Walnut Hill Elementary/Middle School is a 1-story building located at 9360 Woolworth Road in Shreveport, Louisiana. There have been no additions, but there have been HVAC and roofing renovations. This report contains condition and adequacy data collected during the 2009/2010 Facility Condition Assessment (FCA). The detailed condition and deficiency statements are contained in this report.

Energy conservation opportunities for this building include: 1) Exterior windows are aluminum single pane, operable clear glass design. Installation of fixed, double pane, low e, thermal windows with thermal breaks would improve energy use and comfort; and 2) A review of billing rate may justify addition of power factor correction capacitor.

Current Repair Cost: $23,894.00 Replacement Cost: $108,598.00 FCI: 22.00%

19-Jan-2010East Elevation

19-Jan-2010Northeast Elevation

20-Jan-2010South Elevation

Page 370: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 19

Facility: \Elementary/Middle Schools\Walnut Hill\1987 Office (continued)

Building Condition:

System Unit Price$

Unit of

Meas Qty Renewal% Renewal$ Life Installed

Calc Next

Renewal

Next

Renewal CI% Deficiency$ Replacement Value FCI%

Total $141.59 S.F. 767 106 $115,501 51 1991 2000 61 $23,893 $108,598 22

Substructure $19.20 S.F. 767 100 $14,726 100 1987 $14,726

Foundations $19.20 S.F. 767 100 $14,726 100 1987 $14,726

Standard Foundations $10.20 S.F. 767 100 $7,823 100 1987 $7,823

Special Foundations 0 0 0 0

Slab on Grade $9.00 S.F. 767 100 $6,903 100 1987 $6,903

Basement Construction 0 0 0

Basement Excavation 0 0 0 0

Basement Walls 0 0 0 0

Shell $40.74 S.F. 767 104 $32,440 69 1987 2007 23 $8,049 $31,248 26

Superstructure $10.80 S.F. 767 100 $8,284 100 1987 $8,284

Floor Construction 0 0 0 0

Roof Construction $10.80 S.F. 767 100 $8,284 100 1987 $8,284

Exterior Enclosure $20.40 S.F. 767 103 $16,107 78 1987 2017 23 $15,647

Exterior Walls $14.40 S.F. 767 100 $11,045 100 1987 $11,045

Exterior Windows $4.80 S.F. 767 110 $4,050 30 1987 2017 23 $3,682

Exterior Doors $1.20 S.F. 767 110 $1,012 30 1987 2017 23 $920

Roofing $9.54 S.F. 767 110 $8,049 20 1987 2007 $8,049 $7,317 110

Roof Coverings - BUR $9.54 S.F. 767 110 $8,049 20 1987 2007 $8,049 $7,317 110

Roof Coverings - EPDM 0 0 0 0

Roof Coverings - Standing

Seam Mettal

0 0 0 0

Roof Openings 0 0 0 0

Interiors $27.50 S.F. 767 107 $22,653 52 1988 2000 42 $12,068 $21,096 57

Interior Construction $19.20 S.F. 767 106 $15,647 68 1987 2007 42 $5,062 $14,727 34

Partitions $10.80 S.F. 767 110 $9,112 100 1987 $8,284

Interior Doors $2.40 S.F. 767 80 $1,473 40 1987 2027 42 $1,841

Fittings $6.00 S.F. 767 110 $5,062 20 1987 2007 $5,062 $4,602 110

Stairs 0 0 0

Stair Construction 0 0 0 0

Interior Finishes $8.30 S.F. 767 110 $7,006 15 1988 2000 $7,006 $6,369 110

Wall Finishes - Ceramic &

Glazed

0 0 0 0

Wall Finishes - Paint $2.40 S.F. 767 110 $2,025 10 1990 2000 $2,025 $1,841 110

Floor Finishes - Carpet 0 0 0 0

Floor Finishes - Ceramic &

Quarry Tile

0 0 0 0

Floor Finishes - Terrazzo 0 0 0 0

Floor Finishes - VCT $3.60 S.F. 767 110 $3,037 15 1987 2002 $3,037 $2,761 110

Ceiling Finishes $2.30 S.F. 767 110 $1,944 20 1987 2007 $1,944 $1,767 110

Services $50.54 S.F. 767 110 $42,645 21 1996 2007 66 $739 $38,767 2

Conveying 0 0 0

Elevators and Lifts 0 0 0 0

Plumbing $1.20 S.F. 767 110 $1,013 30 1987 2017 23 $920

Plumbing Fixtures 0 0 0 0

Domestic Water Distribution 0 0 0 0

Sanitary Waste $0.76 S.F. 767 110 $638 30 1987 2017 23 $580

Rain Water Drainage $0.19 S.F. 767 110 $162 30 1987 2017 23 $147

Other Plumbing Systems -

Natural Gas

$0.25 S.F. 767 110 $213 30 1987 2017 23 $193

HVAC $32.52 S.F. 767 110 $27,438 19 2002 2017 73 $24,943

Heat Generating Systems 0 0 0 0

Cooling Generating Systems 0 0 0 0

Distribution Systems & Exhaust

Systems

$9.12 S.F. 767 110 $7,695 30 1987 2017 23 $6,995

Terminal & Package Units $21.60 S.F. 767 110 $18,224 15 2009 2024 93 $16,567

Controls & Instrumentation $1.80 S.F. 767 110 $1,519 20 2009 2029 95 $1,381

Other HVAC Systems/Equip -

Kitchen Hood

0 0 0 0

Fire Protection 0 0 0

Sprinklers 0 0 0 0

Electrical $16.82 S.F. 767 110 $14,194 23 1998 2007 54 $739 $12,904 6

Electrical Service/Distribution S.F. 0 0 0 0

Branch Wiring $6.77 S.F. 767 110 $5,710 30 1987 2017 23 $5,191

Lighting $6.77 S.F. 767 110 $5,710 20 2007 2027 85 $5,191

Communications and Security -

Public Address & Clock System

$0.88 S.F. 767 110 $739 20 1987 2007 $739 $672 110

Fire Alarm $1.54 S.F. 767 110 $1,296 10 2004 2014 40 $1,178

Page 371: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 20

System Unit Price$

Unit of

Meas Qty Renewal% Renewal$ Life Installed

Calc Next

Renewal

Next

Renewal CI% Deficiency$ Replacement Value FCI%

Security & CCTV $0.88 S.F. 767 110 $739 10 2007 2017 70 $672

Other Electrical Systems -

Emergency Generator

0 0 0 0

Equipment & Furnishings $3.60 S.F. 767 110 $3,037 20 1987 2007 $3,037 $2,761 110

Equipment 0 0 0

Commercial Equipment 0 0 0 0

Institutional Equipment 0 0 0 0

Furnishings $3.60 S.F. 767 110 $3,037 20 1987 2007 $3,037 $2,761 110

Fixed Furnishings $3.60 S.F. 767 110 $3,037 20 1987 2007 $3,037 $2,761 110

Page 372: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 21

Facility: \Elementary/Middle Schools\Walnut Hill\1987 Office (continued)

Renewal Schedule:

Systems 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020

Total $23,893 $1,459 $24,865 $2,721

Substructure

Foundations

Standard Foundations

Special Foundations

Slab on Grade

Basement Construction

Basement Excavation

Basement Walls

Shell $8,049 $6,226

Superstructure

Floor Construction

Roof Construction

Exterior Enclosure $6,226

Exterior Walls

Exterior Windows $4,981

Exterior Doors $1,245

Roofing $8,049

Roof Coverings - BUR $8,049

Roof Coverings - EPDM

Roof Coverings - Standing Seam

Mettal

Roof Openings

Interiors $12,068 $2,721

Interior Construction $5,062

Partitions

Interior Doors

Fittings $5,062

Stairs

Stair Construction

Interior Finishes $7,006 $2,721

Wall Finishes - Ceramic & Glazed

Wall Finishes - Paint $2,025 $2,721

Floor Finishes - Carpet

Floor Finishes - Ceramic & Quarry

Tile

Floor Finishes - Terrazzo

Floor Finishes - VCT $3,037

Ceiling Finishes $1,944

Services $739 $1,459 $18,639

Conveying

Elevators and Lifts

Plumbing $1,244

Plumbing Fixtures

Domestic Water Distribution

Sanitary Waste $784

Rain Water Drainage $199

Other Plumbing Systems - Natural

Gas

$261

HVAC $9,463

Heat Generating Systems

Cooling Generating Systems

Distribution Systems & Exhaust

Systems

$9,463

Terminal & Package Units

Controls & Instrumentation

Other HVAC Systems/Equip -

Kitchen Hood

Fire Protection

Sprinklers

Electrical $739 $1,459 $7,932

Electrical Service/Distribution

Branch Wiring $7,023

Lighting

Communications and Security -

Public Address & Clock System

$739

Page 373: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 22

Systems 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020

Fire Alarm $1,459

Security & CCTV $909

Other Electrical Systems -

Emergency Generator

Equipment & Furnishings $3,037

Equipment

Commercial Equipment

Institutional Equipment

Furnishings $3,037

Fixed Furnishings $3,037

Page 374: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 23

Facility: \Elementary/Middle Schools\Walnut Hill\1987 Office (continued)

Deficiency Sheet:

Deficiency: Surveyor/Update: Angela Smiley Fri, 04-Jun-2010Priority: 3Quantity: 1

Assembly: B3010 System: Roof Coverings - BUR Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: The modified bitumen roofing is beyond expected life and showing signs of wear. Roof replacement is to include

appropriate insulation for energy conservation.

Estimates:Raw Cost $6,707.42

Plus or (Minus) Additional Cost $0.00Total Estimated Amount $6,707.42

Deficiency: Surveyor/Update: Angela Smiley Fri, 04-Jun-2010Priority: 3Quantity: 1

Assembly: C1030 System: Fittings Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: Fittings, such as chalk and tack boards, lockers, toilet and bath accessories, toilet partitions, and shelving, are

beyond expected life and should be replaced.

Estimates:Raw Cost $4,218.50

Plus or (Minus) Additional Cost $0.00Total Estimated Amount $4,218.50

Page 375: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 24

Facility: \Elementary/Middle Schools\Walnut Hill\ 1987 Office (continued)

Deficiency: Surveyor/Update: Angela Smiley Fri, 04-Jun-2010Priority: 3Quantity: 1

Assembly: C3010 System: Wall Finishes - Paint Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: The painted wall finishes are worn, beyond expected life, and should be replaced.

Estimates:Raw Cost $1,687.40

Plus or (Minus) Additional Cost $0.00Total Estimated Amount $1,687.40

Deficiency: Surveyor/Update: Angela Smiley Fri, 04-Jun-2010Priority: 3Quantity: 1

Assembly: C3020 System: Floor Finishes - VCT Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: The VCT floor finishes are worn, beyond expected life, and should be replaced.

Estimates:Raw Cost $2,531.10

Plus or (Minus) Additional Cost $0.00Total Estimated Amount $2,531.10

Page 376: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 25

Facility: \Elementary/Middle Schools\Walnut Hill\ 1987 Office (continued)

Deficiency: Surveyor/Update: Angela Smiley Thu, 03-Jun-2010Priority: 3Quantity: 1

Assembly: C3030 System: Ceiling Finishes Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: The ceiling finishes are beyond expected life, showing signs of wear, and should be replaced.

Estimates:Raw Cost $1,619.90

Plus or (Minus) Additional Cost $0.00Total Estimated Amount $1,619.90

Deficiency: Surveyor/Update: Angela Smiley Fri, 04-Jun-2010Priority: 3Quantity: 1

Assembly: D5030 System: Communications and Security - Public

Address & Clock System Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: PA system is beyond expected life and should be replaced. For integrity of the system, install wiring in conduit.

Estimates:Raw Cost $615.90

Plus or (Minus) Additional Cost $0.00Total Estimated Amount $615.90

Page 377: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 26

Facility: \Elementary/Middle Schools\Walnut Hill\ 1987 Office (continued)

Deficiency: Surveyor/Update: Angela Smiley Fri, 04-Jun-2010Priority: 3Quantity: 1

Assembly: E2010 System: Fixed Furnishings Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: Fixed furnishings, such as the base/wall cabinets, counter tops, window shades, and fixed seating, are worn,

beyond expected life, and should be replaced.

Estimates:Raw Cost $2,531.10

Plus or (Minus) Additional Cost $0.00Total Estimated Amount $2,531.10

Page 378: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 27

Facility: \Elementary/Middle Schools\Walnut Hill\1998, 2004, 2008 AdditionsAddress: 9260 Woolworth Road, Shreveport, LA 71129

Attributes: Number of Floors 1

General Information: Function: Elementary Middle Year Built: 1998Gross Area: 31,950 S.F. Last Renovation:

Facility Description:

The 1998 (K and A Wing), 2004 (I Wing), and 2008 (Gymnasium) additions at Walnut Hill Elementary/Middle School are a 1-story buildings located at 9360 Woolworth Road in Shreveport, Louisiana. There have been no additions and no renovations. This report contains condition and adequacy data collected during the 2009/2010 Facility Condition Assessment (FCA). The detailed condition and deficiency statements are contained in this report.

Energy conservation opportunities for these buildings include: 1) Exterior windows are aluminum single pane, operable clear glass design. Installation of fixed, double pane, low e, thermal windows with thermal breaks would improve energy use and comfort; and 2) A review of billing rate may justify addition of power factor correction capacitor.

Current Repair Cost: $30,787.00 Replacement Cost: $4,725,956.00 FCI: 0.65%

19-Jan-2010South Elevation

19-Jan-2010North Elevation

19-Jan-2010East Elevation

19-Jan-2010West Elevation

Page 379: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 28

Facility: \Elementary/Middle Schools\Walnut Hill\1998, 2004, 2008 Additions (continued)

Building Condition:

System Unit Price$

Unit of

Meas Qty Renewal% Renewal$ Life Installed

Calc Next

Renewal

Next

Renewal CI% Deficiency$ Replacement Value FCI%

Total $147.92 S.F. 31,950 107 $5,033,688 50 2001 2008 69 $30,787 $4,725,955 1

Substructure $19.20 S.F. 31,950 100 $613,440 100 1998 $613,440

Foundations $19.20 S.F. 31,950 100 $613,440 100 1998 $613,440

Standard Foundations $10.20 S.F. 31,950 100 $325,890 100 1998 $325,890

Special Foundations 0 0 0 0

Slab on Grade $9.00 S.F. 31,950 100 $287,550 100 1998 $287,550

Basement Construction 0 0 0

Basement Excavation 0 0 0 0

Basement Walls 0 0 0 0

Shell $40.74 S.F. 31,950 104 $1,351,293 69 1998 2018 48 $1,301,643

Superstructure $10.80 S.F. 31,950 100 $345,060 100 1998 $345,060

Floor Construction 0 0 0 0

Roof Construction $10.80 S.F. 31,950 100 $345,060 100 1998 $345,060

Exterior Enclosure $20.40 S.F. 31,950 103 $670,950 78 1998 2028 60 $651,780

Exterior Walls $14.40 S.F. 31,950 100 $460,080 100 1998 $460,080

Exterior Windows $4.80 S.F. 31,950 110 $168,696 30 1998 2028 60 $153,360

Exterior Doors $1.20 S.F. 31,950 110 $42,174 30 1998 2028 60 $38,340

Roofing $9.54 S.F. 31,950 110 $335,283 20 1998 2018 40 $304,803

Roof Coverings - BUR $9.54 S.F. 31,950 110 $335,283 20 1998 2018 40 $304,803

Roof Coverings - EPDM 0 0 0 0

Roof Coverings - Standing

Seam Mettal

0 0 0 0

Roof Openings 0 0 0 0

Interiors $27.50 S.F. 31,950 107 $943,386 52 2002 2014 63 $878,537

Interior Construction $19.20 S.F. 31,950 106 $651,780 68 2000 2024 70 $613,440

Partitions $10.80 S.F. 31,950 110 $379,566 100 1998 $345,060

Interior Doors $2.40 S.F. 31,950 80 $61,344 40 1998 2038 70 $76,680

Fittings $6.00 S.F. 31,950 110 $210,870 20 2004 2024 70 $191,700

Stairs 0 0 0

Stair Construction 0 0 0 0

Interior Finishes $8.30 S.F. 31,950 110 $291,606 15 2004 2014 57 $265,097

Wall Finishes - Ceramic &

Glazed

$4.42 S.F. 1,500 110 $7,286 20 1998 2018 40 $6,624

Wall Finishes - Paint $2.40 S.F. 30,450 110 $80,388 10 2004 2014 40 $73,080

Floor Finishes - Carpet 0 0 0 0

Floor Finishes - Ceramic &

Quarry Tile

$1.44 S.F. 1,500 110 $2,376 50 2004 2054 88 $2,160

Floor Finishes - Terrazzo 0 0 0 0

Floor Finishes - VCT $3.60 S.F. 30,450 110 $120,582 15 2004 2019 60 $109,620

Ceiling Finishes $2.30 S.F. 31,950 110 $80,974 20 2004 2024 70 $73,613

Services $56.88 S.F. 31,950 110 $1,999,047 22 2002 2008 76 $30,787 $1,817,315 2

Conveying 0 0 0

Elevators and Lifts 0 0 0 0

Plumbing $7.54 S.F. 31,950 110 $264,853 30 2000 2028 62 $240,774

Plumbing Fixtures $5.89 S.F. 31,950 110 $207,074 30 1998 2028 60 $188,249

Domestic Water Distribution $0.44 S.F. 31,950 110 $15,604 30 2008 2038 93 $14,186

Sanitary Waste $0.76 S.F. 31,950 110 $26,570 30 1998 2028 60 $24,154

Rain Water Drainage $0.19 S.F. 31,950 110 $6,748 30 1998 2028 60 $6,134

Other Plumbing Systems -

Natural Gas

$0.25 S.F. 31,950 110 $8,857 30 1998 2028 60 $8,051

HVAC $32.52 S.F. 31,950 110 $1,142,915 19 2005 2024 84 $1,039,014

Heat Generating Systems S.F. 0 0 0 0

Cooling Generating Systems S.F. 0 0 0 0

Distribution Systems & Exhaust

Systems

$9.12 S.F. 31,950 110 $320,522 30 1998 2028 60 $291,384

Terminal & Package Units $21.60 S.F. 31,950 110 $759,132 15 2009 2024 93 $690,120

Controls & Instrumentation $1.80 S.F. 31,950 110 $63,261 20 2009 2029 95 $57,510

Other HVAC Systems/Equip -

Kitchen Hood

0 0 0 0

Fire Protection 0 0 0

Sprinklers 0 0 0 0

Electrical $16.82 S.F. 31,950 110 $591,279 23 2001 2008 67 $30,787 $537,527 6

Electrical Service/Distribution 0 0 0 0

Branch Wiring $6.77 S.F. 31,950 110 $237,861 30 1998 2028 60 $216,238

Lighting $6.77 S.F. 31,950 110 $237,861 20 2007 2027 85 $216,238

Communications and Security -

Public Address & Clock System

$0.88 S.F. 31,950 110 $30,787 20 1998 2018 40 $27,988

Fire Alarm $1.54 S.F. 31,950 110 $53,983 10 2003 2013 30 $49,075

Page 380: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 29

System Unit Price$

Unit of

Meas Qty Renewal% Renewal$ Life Installed

Calc Next

Renewal

Next

Renewal CI% Deficiency$ Replacement Value FCI%

Security & CCTV $0.88 S.F. 31,950 110 $30,787 10 1998 2008 $30,787 $27,988 110

Other Electrical Systems -

Emergency Generator

0 0 0 0

Equipment & Furnishings $3.60 S.F. 31,950 110 $126,522 20 2004 2024 70 $115,020

Equipment 0 0 0

Commercial Equipment 0 0 0 0

Institutional Equipment 0 0 0 0

Furnishings $3.60 S.F. 31,950 110 $126,522 20 2004 2024 70 $115,020

Fixed Furnishings $3.60 S.F. 31,950 110 $126,522 20 2004 2024 70 $115,020

Page 381: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 30

Facility: \Elementary/Middle Schools\Walnut Hill\1998, 2004, 2008 Additions (continued)

Renewal Schedule:

Systems 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020

Total $30,787 $58,988 $90,477 $472,957 $157,332 $41,375

Substructure

Foundations

Standard Foundations

Special Foundations

Slab on Grade

Basement Construction

Basement Excavation

Basement Walls

Shell $424,727

Superstructure

Floor Construction

Roof Construction

Exterior Enclosure

Exterior Walls

Exterior Windows

Exterior Doors

Roofing $424,727

Roof Coverings - BUR $424,727

Roof Coverings - EPDM

Roof Coverings - Standing Seam

Mettal

Roof Openings

Interiors $90,477 $9,230 $157,332

Interior Construction

Partitions

Interior Doors

Fittings

Stairs

Stair Construction

Interior Finishes $90,477 $9,230 $157,332

Wall Finishes - Ceramic & Glazed $9,230

Wall Finishes - Paint $90,477

Floor Finishes - Carpet

Floor Finishes - Ceramic & Quarry

Tile

Floor Finishes - Terrazzo

Floor Finishes - VCT $157,332

Ceiling Finishes

Services $30,787 $58,988 $39,000 $41,375

Conveying

Elevators and Lifts

Plumbing

Plumbing Fixtures

Domestic Water Distribution

Sanitary Waste

Rain Water Drainage

Other Plumbing Systems - Natural

Gas

HVAC

Heat Generating Systems

Cooling Generating Systems

Distribution Systems & Exhaust

Systems

Terminal & Package Units

Controls & Instrumentation

Other HVAC Systems/Equip -

Kitchen Hood

Fire Protection

Sprinklers

Electrical $30,787 $58,988 $39,000 $41,375

Electrical Service/Distribution

Branch Wiring

Lighting

Communications and Security -

Public Address & Clock System

$39,000

Page 382: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 31

Systems 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020

Fire Alarm $58,988

Security & CCTV $30,787 $41,375

Other Electrical Systems -

Emergency Generator

Equipment & Furnishings

Equipment

Commercial Equipment

Institutional Equipment

Furnishings

Fixed Furnishings

Page 383: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 32

Facility: \Elementary/Middle Schools\Walnut Hill\1998, 2004, 2008 Additions (continued)

Deficiency Sheet:

Deficiency: Surveyor/Update: Angela Smiley Fri, 04-Jun-2010Priority: 3Quantity: 1

Assembly: D5030 System: Security & CCTV Material: System Distress: Missing Category: Capital Renewal Correction: Renew System Note: The I Wing and K Wing (1998 section) buildings do not have security systems. Installation of security system is

recommended. For integrity of system, install wiring in conduit.

Estimates:Raw Cost $25,655.85

Plus or (Minus) Additional Cost $0.00Total Estimated Amount $25,655.85

Page 384: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 33

Facility: \Elementary/Middle Schools\Walnut Hill\Basketball CourtsAddress: 9360 Woolworth Road, Shreveport, LA 71129

Attributes: ***None***

General Information: Function: Elementary Middle Year Built: 1956Gross Area: 3,000 S.F. Last Renovation:

Facility Description:

The Basketball Court at Walnut Hill Elementary/Middle School is located at 9360 Woolworth Road in Shreveport, Louisiana. There have been no additions and no renovations. The basketball court consists of a marked concrete pad with backboards, however most nets are missing. This report contains condition and adequacy data collected during the 2009/2010 Facility Condition Assessment (FCA). The detailed condition and deficiency statements are contained in this report.

Current Repair Cost: $22,968.00 Replacement Cost: $21,204.00 FCI: 108.32%

19-Jan-2010Walnut Hill Elementary/Middle School Basketball Court

Page 385: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 34

Facility: \Elementary/Middle Schools\Walnut Hill\Basketball Courts (continued)

Building Condition:

System Unit Price$

Unit of

Meas Qty Renewal% Renewal$ Life Installed

Calc Next

Renewal

Next

Renewal CI% Deficiency$ Replacement Value FCI%

Total $7.07 S.F. 3,000 110 $23,292 21 1956 1976 $22,968 $21,204 108

Special Construction $6.96 S.F. 3,000 110 $22,968 20 1956 1976 $22,968 $20,880 110

Special Construction $6.96 S.F. 3,000 110 $22,968 20 1956 1976 $22,968 $20,880 110

Special Structures - Basketball

Court - Concrete - Outdoor

$6.96 S.F. 3,000 110 $22,968 20 1956 1976 $22,968 $20,880 110

Building Sitework $0.11 S.F. 3,000 100 $324 100 1956 $324

Site Preparation $0.11 S.F. 3,000 100 $324 100 1956 $324

Site Earthwork $0.11 S.F. 3,000 0 $324 100 1956 $324

Site Improvements 0 0 0

Site Development - Fencing 0 0 0 0

Site Electrical Utilities 0 0 0

Site Lighting 0 0 0 0

Page 386: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 35

Facility: \Elementary/Middle Schools\Walnut Hill\Basketball Courts (continued)

Renewal Schedule:

Systems 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020

Total $22,968

Special Construction $22,968

Special Construction $22,968

Special Structures - Basketball

Court - Concrete - Outdoor

$22,968

Building Sitework

Site Preparation

Site Earthwork

Site Improvements

Site Development - Fencing

Site Electrical Utilities

Site Lighting

Page 387: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 36

Facility: \Elementary/Middle Schools\Walnut Hill\Basketball Courts (continued)

Deficiency Sheet:

Deficiency: Surveyor/Update: Angela Smiley Fri, 04-Jun-2010Priority: 3Quantity: 1

Assembly: F1010 System: Special Structures - Basketball Court -

Concrete - Outdoor Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: The basketball court and backboards are worn, beyond expected life, and should be replaced.

Estimates:Raw Cost $19,140.00

Plus or (Minus) Additional Cost $0.00Total Estimated Amount $19,140.00

Page 388: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 37

Facility: \Elementary/Middle Schools\Walnut Hill\Covered WalkwaysAddress: 9360 Woolworth Road, Shreveport, LA 71129

Attributes: ***None***

General Information: Function: Elementary Middle Year Built: 1956Gross Area: 13,800 S.F. Last Renovation:

Facility Description:

Engineered covered walkways connect the classrooms and provide some weather protection for the students.

Current Repair Cost: $344,945.00 Replacement Cost: $344,945.00 FCI: 100.00%

19-Jan-2010East Elevation

08-Mar-2010North Elevation

08-Mar-2010West Elevation

08-Mar-2010South Elevation

Page 389: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 38

Facility: \Elementary/Middle Schools\Walnut Hill\Covered Walkways (continued)

Building Condition:

System Unit Price$

Unit of

Meas Qty Renewal% Renewal$ Life Installed

Calc Next

Renewal

Next

Renewal CI% Deficiency$ Replacement Value FCI%

Total $25.00 S.F. 13,800 100 $344,945 25 1956 1981 $344,945 $344,945 100

Special Construction $25.00 S.F. 13,800 100 $344,945 25 1956 1981 $344,945 $344,945 100

Special Construction $25.00 S.F. 13,800 100 $344,945 25 1956 1981 $344,945 $344,945 100

Special Structures - Covered

Walkways Metal

$25.00 S.F. 13,800 100 $344,945 25 1956 1981 $344,945 $344,945 100

Page 390: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 39

Facility: \Elementary/Middle Schools\Walnut Hill\Covered Walkways (continued)

Renewal Schedule:

Systems 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020

Total $344,945

Special Construction $344,945

Special Construction $344,945

Special Structures - Covered

Walkways Metal

$344,945

Page 391: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 40

Facility: \Elementary/Middle Schools\Walnut Hill\Covered Walkways (continued)

Deficiency Sheet:

Deficiency: Surveyor/Update: Bill Cadle Fri, 04-Jun-2010Priority: 3Quantity: 1

Assembly: F1010 System: Special Structures - Covered Walkways Metal Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: The covered walkways are worn, beyond expected life, and should be replaced.

Estimates:Raw Cost $287,454.00

Plus or (Minus) Additional Cost $0.00Total Estimated Amount $287,454.00

Page 392: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 41

Facility: \Elementary/Middle Schools\Walnut Hill\Football FieldAddress: 9360 Woolworth Road, Shreveport, LA 71129

Attributes: ***None***

General Information: Function: Elementary Middle Year Built: 1956Gross Area: 57,600 S.F. Last Renovation:

Facility Description:

The Football Field at Walnut Hill Elementary/Middle School is located at 9360 Woolworth Road in Shreveport, Louisiana. There have been no additions and no renovations. This report contains condition and adequacy data collected during the 2009/2010 Facility Condition Assessment (FCA). The detailed condition and deficiency statements are contained in this report.

Current Repair Cost: $188,559.00 Replacement Cost: $235,008.00 FCI: 80.24%

19-Jan-2010Walnut Hill Elementary/Middle School Football Field

Page 393: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 42

Facility: \Elementary/Middle Schools\Walnut Hill\Football Field (continued)

Building Condition:

System Unit Price$

Unit of

Meas Qty Renewal% Renewal$ Life Installed

Calc Next

Renewal

Next

Renewal CI% Deficiency$ Replacement Value FCI%

Total $4.08 S.F. 57,600 107 $252,150 44 1960 1976 $188,560 $235,008 80

Special Construction $1.38 S.F. 57,600 110 $87,437 20 1956 1976 $87,437 $79,488 110

Special Construction $1.38 S.F. 57,600 110 $87,437 20 1956 1976 $87,437 $79,488 110

Special Facilities - Field -

Natural Turf

$1.38 S.F. 57,600 110 $87,437 20 1956 1976 $87,437 $79,488 110

Building Sitework $2.70 S.F. 57,600 106 $164,713 57 1962 1997 $101,123 $155,520 65

Site Preparation $1.10 S.F. 57,600 100 $63,590 100 1956 $63,590

Site Earthwork $1.10 S.F. 57,600 100 $63,590 100 1956 $63,590

Site Improvements 0 0 0

Site Development - Fencing;

Scoreboard; Goal Post

0 0 0 0

Site Development -

Landscaping & Irrigation

0 0 0 0

Site Mechanical Utilities 0 0 0

Water Supply - Water Service 0 0 0 0

Site Electrical Utilities $1.60 S.F. 57,600 110 $101,123 30 1967 1997 $101,123 $91,930 110

Site Lighting $1.60 S.F. 57,600 110 $101,123 30 1967 1997 $101,123 $91,930 110

Page 394: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 43

Facility: \Elementary/Middle Schools\Walnut Hill\Football Field (continued)

Renewal Schedule:

Systems 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020

Total $188,560

Special Construction $87,437

Special Construction $87,437

Special Facilities - Field - Natural

Turf

$87,437

Building Sitework $101,123

Site Preparation

Site Earthwork

Site Improvements

Site Development - Fencing;

Scoreboard; Goal Post

Site Development - Landscaping &

Irrigation

Site Mechanical Utilities

Water Supply - Water Service

Site Electrical Utilities $101,123

Site Lighting $101,123

Page 395: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 44

Facility: \Elementary/Middle Schools\Walnut Hill\Football Field (continued)

Deficiency Sheet:

Deficiency: Surveyor/Update: Troy Weeks Fri, 04-Jun-2010Priority: 3Quantity: 1

Assembly: F1040 System: Special Facilities - Field - Natural Turf Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: The football field turf is worn, has bare spots, and should be replaced.

Estimates:Raw Cost $72,864.00

Plus or (Minus) Additional Cost $0.00Total Estimated Amount $72,864.00

Deficiency: Surveyor/Update: Angela Smiley Fri, 04-Jun-2010Priority: 3Quantity: 1

Assembly: G4020 System: Site Lighting Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: Site lighting is beyond expected life and should be replaced.

Estimates:Raw Cost $84,268.80

Plus or (Minus) Additional Cost $0.00Total Estimated Amount $84,268.80

Page 396: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 45

Facility: \Elementary/Middle Schools\Walnut Hill\SiteAddress: 9360 Woolworth Road, Shreveport, LA 71129

Attributes: Site Area (in Acres) 77.58 (50 acres leased, 27-59

acres used by school)

General Information: Function: Elementary Middle Year Built: 1956Gross Area: 133,522 S.F. Last Renovation:

Facility Description:

The original site was constructed in 1956. There have been four additions to the site and no major renovations. Campus site features include paved driveways and parking lots, pedestrian pavement, flag pole, landscaping, and fencing. Site mechanical and electrical features include water, sewer, natural gas, and site lighting. This report contains condition and adequacy data collected during the 2009/2010 Facility Condition Assessment (FCA). The detailed condition and deficiency statements are contained in this report.

Current Repair Cost: $1,187,278.00 Replacement Cost: $1,996,421.00 FCI: 59.47%

05-Jan-2010Aerial Image of Walnut Hill Elementary/Middle School

Page 397: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 46

Facility: \Elementary/Middle Schools\Walnut Hill\Site (continued)

Building Condition:

System Unit Price$

Unit of

Meas Qty Renewal% Renewal$ Life Installed

Calc Next

Renewal

Next

Renewal CI% Deficiency$ Replacement Value FCI%

Total $14.95 S.F. 133,522 100 $1,996,421 33 1961 1976 2015 56 $1,187,277 $1,996,421 59

Building Sitework $14.95 S.F. 133,522 100 $1,996,421 33 1961 1976 2015 56 $1,187,277 $1,996,421 59

Site Improvements $8.50 S.F. 133,522 100 $1,134,403 28 1956 1976 2020 50 $450,236 $1,134,403 40

Roadways $1.38 S.F. 133,522 100 $184,260 50 1956 2006 $184,260 $184,260 100

Parking Lots $1.18 S.F. 133,522 100 $157,022 30 1956 1986 $157,022 $157,022 100

Pedestrian Paving $0.82 S.F. 133,522 100 $108,954 50 1956 2006 $108,954 $108,954 100

Site Development $3.86 S.F. 133,522 100 $515,929 20 1956 1976 2020 50 $515,929

Landscaping $1.26 S.F. 133,522 100 $168,238 10 1956 $168,238

Site Mechanical Utilities $4.86 S.F. 133,522 100 $648,917 44 1969 1986 2015 83 $523,940 $648,917 81

Water Supply $0.82 S.F. 133,522 100 $108,954 30 2008 2038 93 $108,954

Sanitary Sewer $0.41 S.F. 133,522 100 $54,477 30 1956 1986 $54,477 $54,477 100

Storm Sewer $3.52 S.F. 133,522 100 $469,463 50 1956 2006 $469,463 $469,463 100

Fuel Distribution $0.12 S.F. 133,522 100 $16,023 30 1956 1986 2015 17 $16,023

Site Electrical Utilities $1.60 S.F. 133,522 100 $213,101 30 1956 1986 $213,101 $213,101 100

Site Lighting $1.60 S.F. 133,522 100 $213,101 30 1956 1986 $213,101 $213,101 100

Page 398: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 47

Facility: \Elementary/Middle Schools\Walnut Hill\Site (continued)

Renewal Schedule:

Systems 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020

Total $1,187,277 $18,575 $693,365

Building Sitework $1,187,277 $18,575 $693,365

Site Improvements $450,236 $693,365

Roadways $184,260

Parking Lots $157,022

Pedestrian Paving $108,954

Site Development $693,365

Landscaping

Site Mechanical Utilities $523,940 $18,575

Water Supply

Sanitary Sewer $54,477

Storm Sewer $469,463

Fuel Distribution $18,575

Site Electrical Utilities $213,101

Site Lighting $213,101

Page 399: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 48

Facility: \Elementary/Middle Schools\Walnut Hill\Site (continued)

Deficiency Sheet:

Deficiency: Surveyor/Update: Angela Smiley Fri, 04-Jun-2010Priority: 3Quantity: 1

Assembly: G2010 System: Roadways Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: The concrete roadways are deteriorating, beyond expected life, and should be replaced.

Estimates:Raw Cost $153,550.30

Plus or (Minus) Additional Cost $0.00Total Estimated Amount $153,550.30

Deficiency: Surveyor/Update: Angela Smiley Fri, 04-Jun-2010Priority: 3Quantity: 1

Assembly: G2020 System: Parking Lots Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: The parking lots and striping are beyond expected life and should be replaced.

Estimates:Raw Cost $130,851.56

Plus or (Minus) Additional Cost $0.00Total Estimated Amount $130,851.56

Page 400: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 49

Facility: \Elementary/Middle Schools\Walnut Hill\ Site (continued)

Deficiency: Surveyor/Update: Angela Smiley Fri, 04-Jun-2010Priority: 3Quantity: 1

Assembly: G2030 System: Pedestrian Paving Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: The concrete sidewalks are beyond expected life, deteriorating, and should be replaced.

Estimates:Raw Cost $90,794.96

Plus or (Minus) Additional Cost $0.00Total Estimated Amount $90,794.96

Deficiency: Surveyor/Update: Angela Smiley Fri, 04-Jun-2010Priority: 3Quantity: 1

Assembly: G3020 System: Sanitary Sewer Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: Sanitary sewer is beyond expected life and should be replaced.

Estimates:Raw Cost $45,397.48

Plus or (Minus) Additional Cost $0.00Total Estimated Amount $45,397.48

Page 401: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 50

Facility: \Elementary/Middle Schools\Walnut Hill\ Site (continued)

Deficiency: Surveyor/Update: Angela Smiley Fri, 04-Jun-2010Priority: 3Quantity: 1

Assembly: G3030 System: Storm Sewer Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: Storm sewer is beyond expected life and should be replaced.

Estimates:Raw Cost $391,219.46

Plus or (Minus) Additional Cost $0.00Total Estimated Amount $391,219.46

Deficiency: Surveyor/Update: Angela Smiley Fri, 04-Jun-2010Priority: 3Quantity: 1

Assembly: G4020 System: Site Lighting Material: System Distress: Inadequate Category: Deferred Maintenance Correction: Renew System Note: Site lighting is inadequate, beyond expected life, and should be replaced and upgraded.

Estimates:Raw Cost $177,584.26

Plus or (Minus) Additional Cost $0.00Total Estimated Amount $177,584.26

Page 402: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 51

Facility: \Elementary/Middle Schools\Walnut Hill\Tennis CourtsAddress: 9360 Woolworth Road, Shreveport, LA 71129

Attributes: ***None***

General Information: Function: Elementary Middle Year Built: 1956Gross Area: 13,125 S.F. Last Renovation:

Facility Description:

The Tennis Courts at Walnut Hill Elementary School is located at 9360 Woolworth Road in Shreveport, Louisiana. There have been no additions and no renovations. The tennis court with fencing is located on the north portion of the property. This report contains condition and adequacy data collected during the 2009/2010 Facility Condition Assessment (FCA). The detailed condition and deficiency statements are contained in this report.

Current Repair Cost: $163,753.00 Replacement Cost: $151,200.00 FCI: 108.30%

19-Jan-2010Walnut Hill Elementary/Middle School Tennis Courts

Page 403: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 52

Facility: \Elementary/Middle Schools\Walnut Hill\Tennis Courts (continued)

Building Condition:

System Unit Price$

Unit of

Meas Qty Renewal% Renewal$ Life Installed

Calc Next

Renewal

Next

Renewal CI% Deficiency$ Replacement Value FCI%

Total $11.52 S.F. 13,125 109 $165,171 21 1956 1976 $163,753 $151,200 108

Special Construction $10.64 S.F. 13,125 110 $153,673 20 1956 1976 $153,673 $139,702 110

Special Construction $10.64 S.F. 13,125 110 $153,673 20 1956 1976 $153,673 $139,702 110

Special Structures - Tennis

Court Hard Surface

$10.64 S.F. 13,125 110 $153,673 20 1956 1976 $153,673 $139,702 110

Building Sitework $0.88 S.F. 13,125 100 $11,498 39 1956 1986 $10,080 $11,498 88

Site Preparation $0.11 S.F. 13,125 100 $1,418 100 1956 $1,418

Site Earthwork $0.11 S.F. 13,125 0 $1,418 100 1956 $1,418

Site Improvements $0.77 S.F. 13,125 100 $10,080 30 1956 1986 $10,080 $10,080 100

Site Development - Fencing $0.77 S.F. 13,125 100 $10,080 30 1956 1986 $10,080 $10,080 100

Site Electrical Utilities 0 0 0

Site Lighting 0 0 0 0

Page 404: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 53

Facility: \Elementary/Middle Schools\Walnut Hill\Tennis Courts (continued)

Renewal Schedule:

Systems 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020

Total $163,753

Special Construction $153,673

Special Construction $153,673

Special Structures - Tennis Court

Hard Surface

$153,673

Building Sitework $10,080

Site Preparation

Site Earthwork

Site Improvements $10,080

Site Development - Fencing $10,080

Site Electrical Utilities

Site Lighting

Page 405: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Facility Report

Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 54

Facility: \Elementary/Middle Schools\Walnut Hill\Tennis Courts (continued)

Deficiency Sheet:

Deficiency: Surveyor/Update: Angela Smiley Fri, 04-Jun-2010Priority: 3Quantity: 1

Assembly: F1010 System: Special Structures - Tennis Court Hard

Surface Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: The tennis courts are beyond expected life, showing signs of wear, and should be replaced.

Estimates:Raw Cost $128,060.63

Plus or (Minus) Additional Cost $0.00Total Estimated Amount $128,060.63

Deficiency: Surveyor/Update: Angela Smiley Fri, 04-Jun-2010Priority: 3Quantity: 1

Assembly: G2040 System: Site Development - Fencing Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: The tennis court fencing is beyond expected life, showing signs of wear, and should be replaced.

Estimates:Raw Cost $8,400.00

Plus or (Minus) Additional Cost $0.00Total Estimated Amount $8,400.00

Page 406: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Survey Report

Deficiency Detail ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 1

Facility

Name Assembly System Material Distress Correction Qty Unit Raw Cost

Additional

Cost Total Cost Priority Def. Cat. Location / Note

Caddo Parish School District $5,453,456 $1,090,691 $6,544,147 Elementary/Middle Schools $5,453,456 $1,090,691 $6,544,147 Walnut Hill $5,453,456 $1,090,691 $6,544,147 1956, 1966, 1967 Buildings $3,818,303 $763,661 $4,581,964 Building Systems $3,818,303 $763,661 $4,581,964

D5020 Branch Wiring System Beyond Expected Life

Renew System 1 Ea. $539,779 $107,956 $647,735 Necessary- 2-5 Yrs

Deferred Maintenance

Distribution is mostly original, beyond expected life, and should be replaced.

D5030 Communications and Security - Public Address & Clock System

System Beyond Expected Life

Renew System 1 Ea. $69,865 $13,973 $83,838 Necessary- 2-5 Yrs

Deferred Maintenance

PA system is beyond expected life and should be upgraded/replaced. For integrity of the system, install wiring in conduit.

E1010 Commercial Equipment

System Beyond Expected Life

Renew System 1 Ea. $478,528 $95,706 $574,233 Necessary- 2-5 Yrs

Deferred Maintenance

Commercial equipment, including the walk-in refrigerator and freezer, is beyond expected life and should be replaced.

E1020 Institutional Equipment

System Beyond Expected Life

Renew System 1 Ea. $9,571 $1,914 $11,485 Necessary- 2-5 Yrs

Deferred Maintenance

Institutional equipment, such as library equipment, theater and stage equipment, audio-visual equipment, and laboratory equipment, is beyond expected life and should be replaced.

E2010 Fixed Furnishings

System Beyond Expected Life

Renew System 1 Ea. $287,117 $57,423 $344,540 Necessary- 2-5 Yrs

Deferred Maintenance

Fixed furnishings, such as the base/wall cabinets, counter tops, window shades, and fixed seating, are worn, beyond expected life, and should be replaced.

B2020 Exterior Windows

System Beyond Expected Life

Renew System 1 Ea. $382,822 $76,564 $459,386 Necessary- 2-5 Yrs

Deferred Maintenance

The exterior windows are worn, beyond expected life, and should be replaced.

B2030 Exterior Doors System Beyond Expected Life

Renew System 1 Ea. $95,706 $19,141 $114,847 Necessary- 2-5 Yrs

Deferred Maintenance

The exterior doors are worn, beyond expected life, and should be replaced.

C1020 Interior Doors System Beyond Expected Life

Renew System 1 Ea. $139,208 $27,842 $167,050 Necessary- 2-5 Yrs

Deferred Maintenance

The interior doors are worn, beyond expected life, and should be replaced.

C1030 Fittings System Beyond Expected Life

Renew System 1 Ea. $478,528 $95,706 $574,233 Necessary- 2-5 Yrs

Deferred Maintenance

Fittings, such as chalk and tack boards, lockers, toilet and bath accessories, toilet partitions, and shelving, are beyond expected life and should be replaced.

C3010 Wall Finishes - Ceramic & Glazed

System Beyond Expected Life

Renew System 1 Ea. $9,715 $1,943 $11,658 Necessary- 2-5 Yrs

Deferred Maintenance

The ceramic wall finishes are beyond expected life, showing signs of wear, and should be replaced.

C3010 Wall Finishes - Paint

System Beyond Expected Life

Renew System 1 Ea. $186,131 $37,226 $223,357 Necessary- 2-5 Yrs

Deferred Maintenance

The painted wall finishes are worn, beyond expected life, and should be replaced.

C3020 Floor Finishes - Carpet

System Beyond Expected Life

Renew System 1 Ea. $3,289 $658 $3,947 Necessary- 2-5 Yrs

Deferred Maintenance

Carpet floor finishes are worn, beyond expected life, and should be replaced.

C3020 Floor Finishes - Ceramic & Quarry Tile

System Beyond Expected Life

Renew System 1 Ea. $5,808 $1,162 $6,970 Necessary- 2-5 Yrs

Deferred Maintenance

The ceramic floor finishes are beyond expected life, showing signs of wear, and should be replaced.

Page 407: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Survey Report

Deficiency Detail ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 2

Facility

Name Assembly System Material Distress Correction Qty Unit Raw Cost

Additional

Cost Total Cost Priority Def. Cat. Location / Note

C3020 Floor Finishes - VCT

System Beyond Expected Life

Renew System 1 Ea. $268,307 $53,661 $321,968 Necessary- 2-5 Yrs

Deferred Maintenance

The VCT floor finishes are worn, beyond expected life, and should be replaced.

C3030 Ceiling Finishes System Beyond Expected Life

Renew System 1 Ea. $183,755 $36,751 $220,505 Necessary- 2-5 Yrs

Deferred Maintenance

The ceiling finishes are beyond expected life, showing signs of wear, and should be replaced.

D2010 Plumbing Fixtures

System Beyond Expected Life

Renew System 1 Ea. $469,914 $93,983 $563,897 Necessary- 2-5 Yrs

Deferred Maintenance

Existing fixtures are inadequate and beyond expected life. Replacement with energy efficient fixtures is recommended.

D2030 Sanitary Waste System Beyond Expected Life

Renew System 1 Ea. $60,294 $12,059 $72,353 Necessary- 2-5 Yrs

Deferred Maintenance

Sanitary waste is beyond expected life and should be replaced.

D2040 Rain Water Drainage

System Beyond Expected Life

Renew System 1 Ea. $15,313 $3,063 $18,375 Necessary- 2-5 Yrs

Deferred Maintenance

Roof drains are beyond expected life and should be replaced.

D3050 Terminal & Package Units

Terminal and Package Units

Beyond Expected Life

Replace 10 T G/E Pkg Unit, Roof Mount

4 Ea. $43,873 $8,775 $52,648 Necessary- 2-5 Yrs

Deferred Maintenance

Existing (2 qty) package units to the cafeteria and (8 qty) ceiling mounted heaters are beyond expected life and should be replaced with roof packaged units.

D5020 Lighting Lighting/Branch Wiring

Inadequate Replace 2X4 Fluorescent. Fixture/sf

8,700 S.F. $64,293 $12,859 $77,152 Necessary- 2-5 Yrs

Energy Conservation

T-12 lights still remain throughout the school, as well as incandescent lights, and HPS fixtures in the old gym. An upgrade to energy efficient light fixtures is recommended.

D2090 Other Plumbing Systems - Natural Gas

Plumbing Fixtures

Beyond Expected Life

Replace Drinking Fountain

20 Ea. $26,490 $5,298 $31,788 Necessary- 2-5 Yrs

Deferred Maintenance

Water fountains around campus are beyond expected life and should be replaced.

Page 408: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Survey Report

Deficiency Detail ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 3

Facility

Name Assembly System Material Distress Correction Qty Unit Raw Cost

Additional

Cost Total Cost Priority Def. Cat. Location / Note

1987 Office $19,911 $3,982 $23,894 Building Systems $19,911 $3,982 $23,894

D5030 Communications and Security - Public Address & Clock System

System Beyond Expected Life

Renew System 1 Ea. $616 $123 $739 Necessary- 2-5 Yrs

Deferred Maintenance

PA system is beyond expected life and should be replaced. For integrity of the system, install wiring in conduit.

E2010 Fixed Furnishings

System Beyond Expected Life

Renew System 1 Ea. $2,531 $506 $3,037 Necessary- 2-5 Yrs

Deferred Maintenance

Fixed furnishings, such as the base/wall cabinets, counter tops, window shades, and fixed seating, are worn, beyond expected life, and should be replaced.

B3010 Roof Coverings -BUR

System Beyond Expected Life

Renew System 1 Ea. $6,707 $1,341 $8,049 Necessary- 2-5 Yrs

Deferred Maintenance

The modified bitumen roofing is beyond expected life and showing signs of wear. Roof replacement is to include appropriate insulation for energy conservation.

C1030 Fittings System Beyond Expected Life

Renew System 1 Ea. $4,219 $844 $5,062 Necessary- 2-5 Yrs

Deferred Maintenance

Fittings, such as chalk and tack boards, lockers, toilet and bath accessories, toilet partitions, and shelving, are beyond expected life and should be replaced.

C3010 Wall Finishes - Paint

System Beyond Expected Life

Renew System 1 Ea. $1,687 $337 $2,025 Necessary- 2-5 Yrs

Deferred Maintenance

The painted wall finishes are worn, beyond expected life, and should be replaced.

C3020 Floor Finishes - VCT

System Beyond Expected Life

Renew System 1 Ea. $2,531 $506 $3,037 Necessary- 2-5 Yrs

Deferred Maintenance

The VCT floor finishes are worn, beyond expected life, and should be replaced.

C3030 Ceiling Finishes System Beyond Expected Life

Renew System 1 Ea. $1,620 $324 $1,944 Necessary- 2-5 Yrs

Deferred Maintenance

The ceiling finishes are beyond expected life, showing signs of wear, and should be replaced.

1998, 2004, 2008 Additions $25,656 $5,131 $30,787 Building Systems $25,656 $5,131 $30,787

D5030 Security & CCTV System Missing Renew System 1 Ea. $25,656 $5,131 $30,787 Necessary- 2-5 Yrs

Capital Renewal

The I Wing and K Wing (1998 section) buildings do not have security systems. Installation of security system is recommended. For integrity of system, install wiring in conduit.

Basketball Courts $19,140 $3,828 $22,968 Building Systems $19,140 $3,828 $22,968

F1010 Special Structures - Basketball Court - Concrete - Outdoor

System Beyond Expected Life

Renew System 1 Ea. $19,140 $3,828 $22,968 Necessary- 2-5 Yrs

Deferred Maintenance

The basketball court and backboards are worn, beyond expected life, and should be replaced.

Page 409: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

COMET4 Caddo Parish

1961 Midway COMET4 Survey Report

Deficiency Detail ReportShreveport, LA 71106 Report Date: 04 Jun 2010

Page 4

Facility

Name Assembly System Material Distress Correction Qty Unit Raw Cost

Additional

Cost Total Cost Priority Def. Cat. Location / Note

Covered Walkways $287,454 $57,491 $344,945 Building Systems $287,454 $57,491 $344,945

F1010 Special Structures - Covered Walkways Metal

System Beyond Expected Life

Renew System 1 Ea. $287,454 $57,491 $344,945 Necessary- 2-5 Yrs

Deferred Maintenance

The covered walkways are worn, beyond expected life, and should be replaced.

Football Field $157,133 $31,427 $188,559 Building Systems $157,133 $31,427 $188,559

G4020 Site Lighting System Beyond Expected Life

Renew System 1 Ea. $84,269 $16,854 $101,123 Necessary- 2-5 Yrs

Deferred Maintenance

Site lighting is beyond expected life and should be replaced.

F1040 Special Facilities - Field - Natural Turf

System Beyond Expected Life

Renew System 1 Ea. $72,864 $14,573 $87,437 Necessary- 2-5 Yrs

Deferred Maintenance

The football field turf is worn, has bare spots, and should be replaced.

Site $989,398 $197,880 $1,187,278 Building Systems $989,398 $197,880 $1,187,278

G2010 Roadways System Beyond Expected Life

Renew System 1 Ea. $153,550 $30,710 $184,260 Necessary- 2-5 Yrs

Deferred Maintenance

The concrete roadways are deteriorating, beyond expected life, and should be replaced.

G2020 Parking Lots System Beyond Expected Life

Renew System 1 Ea. $130,852 $26,170 $157,022 Necessary- 2-5 Yrs

Deferred Maintenance

The parking lots and striping are beyond expected life and should be replaced.

G2030 Pedestrian Paving

System Beyond Expected Life

Renew System 1 Ea. $90,795 $18,159 $108,954 Necessary- 2-5 Yrs

Deferred Maintenance

The concrete sidewalks are beyond expected life, deteriorating, and should be replaced.

G3020 Sanitary Sewer System Beyond Expected Life

Renew System 1 Ea. $45,397 $9,079 $54,477 Necessary- 2-5 Yrs

Deferred Maintenance

Sanitary sewer is beyond expected life and should be replaced.

G3030 Storm Sewer System Beyond Expected Life

Renew System 1 Ea. $391,219 $78,244 $469,463 Necessary- 2-5 Yrs

Deferred Maintenance

Storm sewer is beyond expected life and should be replaced.

G4020 Site Lighting System Inadequate Renew System 1 Ea. $177,584 $35,517 $213,101 Necessary- 2-5 Yrs

Deferred Maintenance

Site lighting is inadequate, beyond expected life, and should be replaced and upgraded.

Tennis Courts $136,461 $27,292 $163,753 Building Systems $136,461 $27,292 $163,753

F1010 Special Structures - Tennis Court Hard Surface

System Beyond Expected Life

Renew System 1 Ea. $128,061 $25,612 $153,673 Necessary- 2-5 Yrs

Deferred Maintenance

The tennis courts are beyond expected life, showing signs of wear, and should be replaced.

G2040 Site Development - Fencing

System Beyond Expected Life

Renew System 1 Ea. $8,400 $1,680 $10,080 Necessary- 2-5 Yrs

Deferred Maintenance

The tennis court fencing is beyond expected life, showing signs of wear, and should be replaced.

Page 410: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

Functional and Educational Adequacy

Suitability Report

Page 411: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

Suitability Report - Full

Project:Site:

Suitability

Possible

Score

Score

Percent

Score

CaddoCounty:

1Region:

Rating

640Site #:

Caddo 2009 Walnut Hill

Project #:

4057

Site Type: Site Size:Grade Config:

K-8 0.00ES/MS

Suitability - K-8

Site

3.00 2.01 67.00 TrafficFair

1.00 1.00 100.00 Pedestrian TrafficGood

1.35 0.90 67.00 ParkingFair

1.64 1.10 67.00 Play Courts & FieldsFair

Safety and Security

1.22 0.82 67.00 FencingFair

0.15 0.15 100.00 Signage & Way FindingGood

3.00 0.00 0.00 Ease of SupervisionP/U

0.50 0.00 0.00 Limited EntrancesP/U

0.50 0.50 100.00 Interior CirculationG/F

School Climate

5.00 5.00 100.00 Learning Style VarietyG/F

5.00 5.00 100.00 School EnvironmentG/F

1.00 1.00 100.00 LandscapingG/F

General Classrooms

12.95 4.27 33.00 SizePoor

2.78 1.86 67.00 AdjacenciesFair

2.78 1.86 67.00 Storage\Fixed Equip.Fair

Remedial - Special Needs

3.17 3.17 100.00 SizeGood

0.68 0.00 0.00 AdjacenciesP/U

0.68 0.00 0.00 Storage\Fixed Equip.P/U

Library

2.43 1.22 50.00 SizeFair

0.52 0.52 100.00 AdjacenciesG/F

0.52 0.00 0.00 Storage\Fixed Equip.P/U

P.E.

8.40 4.20 50.00 SizeFair

1.80 1.80 100.00 AdjacenciesG/F

1.80 0.00 0.00 Storage\Fixed Equip.P/U

Music

2.64 1.32 50.00 SizeFair

0.57 0.00 0.00 AdjacenciesP/U

0.57 0.00 0.00 Storage\Fixed Equip.P/U

Art

Page 1 of 43/9/2010 2:20:04PM

Page 412: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

Project:Site:

Suitability

Possible

Score

Score

Percent

Score

CaddoCounty:

1Region:

Rating

640Site #:

Caddo 2009 Walnut Hill

Project #:

4057

Site Type: Site Size:Grade Config:

K-8 0.00ES/MS

1.53 1.53 100.00 SizeGood

0.33 0.33 100.00 AdjacenciesG/F

0.33 0.00 0.00 Storage\Fixed Equip.P/U

Performing Arts\Auditorium

1.64 1.64 100.00 SizeGood

0.35 0.35 100.00 AdjacenciesGood

0.35 0.00 0.00 Storage\Fixed Equip.P/U

Vocational Technical

0.00 0.00 0.00 Size(N/A)

0.00 0.00 0.00 Adjacencies(N/A)

0.00 0.00 0.00 Storage\Fixed Equip.(N/A)

Science

2.70 2.70 100.00 SizeGood

0.58 0.58 100.00 AdjacenciesGood

0.58 0.00 0.00 Storage\Fixed Equip.P/U

Kindergarten

1.18 0.59 50.00 SizeFair

0.25 0.25 100.00 AdjacenciesG/F

0.25 0.25 100.00 Storage\Fixed Equip.G/F

Administration

1.59 0.00 0.00 SizeP/U

0.34 0.34 100.00 AdjacenciesG/F

0.34 0.00 0.00 Storage\Fixed Equip.P/U

0.91 0.00 0.00P/U Restrooms (Student)

0.91 0.45 50.00Fair Teacher Lounge and Work Room(s)

5.00 3.35 67.00Fair Cafeteria

7.84 5.25 67.00Fair Food Prep

0.41 0.41 100.00Good Counseling

0.34 0.34 100.00G/F Clinic

0.50 0.50 100.00G/F Custodial & Maintenance

93.88 56.57 60.26Total For Site:

Comments

Suitability - K-8

This is a rural elementary/middle school, serving grades pre-k through 8th grade. Older wings were built in late

1950's, a new wing was added in 2003, and a new competitive gym opened in 2009.

Suitability - K-8->Site-->Traffic

One-way parent drop off and bus drop off is in front and side of school. Some mix of traffic causes congestion at

peak times.

Suitability - K-8->Site-->Parking

They have two parking lots and some visitor parking in front. There is not enough parking for staff.

Suitability - K-8->Site-->Play Courts & Fields

There is some outdoor play areas, older outdoor basketball and tennis courts, and a football field on property.

Page 2 of 43/9/2010 2:20:04PM

Page 413: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

Project:Site:

Suitability

Possible

Score

Score

Percent

Score

CaddoCounty:

1Region:

Rating

640Site #:

Caddo 2009 Walnut Hill

Project #:

4057

Site Type: Site Size:Grade Config:

K-8 0.00ES/MS

Suitability - K-8->Safety and Security

This is a rural school, and some areas do not need to be completely fenced off from front area.

Suitability - K-8->Safety and Security-->Fencing

Fencing around school grounds separating adjacent property is OK. The football field needs fencing.

Suitability - K-8->Safety and Security-->Ease of Supervision

The building wings have good line of sight. Open connecting corridors are also straight and visible. Supervision and

sight problems are around the portables along the back of the school.

Suitability - K-8->Safety and Security-->Limited Entrances

There are open entrances to the school allowing access from several points into the main school facilities.

Suitability - K-8->General Classrooms-->Size

Classroom sizes differ dramatically by wing and grade level. Some area as small as 576sf, and others are

750-850sf. For some special programs (art, science lab, computer lab) larger classrooms are in use, or two smaller

classrooms are joined to form one room 850-1,200 sf.

Suitability - K-8->General Classrooms-->Adjacencies

Some classes are held in portables away from the main building wings. There are no bathrooms and limited

connectivity in these rooms.

Suitability - K-8->General Classrooms-->Storage\Fixed Equip.

A number of older classrooms and temporary buildings have limited storage space.

Suitability - K-8->Remedial - Special Needs

Some remedial and special ed classes are located in portable classrooms.

Suitability - K-8->Remedial - Special Needs-->Adjacencies

Some of these classes and resource programs are held in portable classrooms at back of school.

Suitability - K-8->Remedial - Special Needs-->Storage\Fixed Equip.

Older classrooms have limited storage space, and portable or temporary classrooms have not bathroom access or

water.

Suitability - K-8->Library

There are two libraries (middle school & elementary)

Suitability - K-8->Library-->Size

Both the middle school and elementary school library space is cramped and cannot accommodate more than one

class at a time.

Suitability - K-8->Library-->Storage\Fixed Equip.

Both libraries need more storage space.

Suitability - K-8->P.E.

PE is help in the old gym and the new gym. Also have some younger grades PE in portables.

Suitability - K-8->P.E.-->Size

Old and new gym are good size, but PE space in portables is too small (approximately 700sf).

Suitability - K-8->P.E.-->Storage\Fixed Equip.

Old gym and PE portables have limited or no storage for equipment.

Suitability - K-8->Music

There are several music rooms (choir and band) located in fixed classrooms. Younger grades vocal and

piano/keyboards/instruments are held in portables.

Suitability - K-8->Music-->Size

Portable rooms are very small, less than 700sf per building.

Page 3 of 43/9/2010 2:20:04PM

Page 414: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

Project:Site:

Suitability

Possible

Score

Score

Percent

Score

CaddoCounty:

1Region:

Rating

640Site #:

Caddo 2009 Walnut Hill

Project #:

4057

Site Type: Site Size:Grade Config:

K-8 0.00ES/MS

Suitability - K-8->Music-->Adjacencies

Portables were not set up for music/instrument instruction or practice and have poor acoustics.

Suitability - K-8->Music-->Storage\Fixed Equip.

The music portable classrooms do not have enough storage, or electrical outlets.

Suitability - K-8->Art-->Storage\Fixed Equip.

The middle school art classroom needs additional storage space..

Suitability - K-8->Performing Arts\Auditorium

The school has a combination cafeteria and auditorium that can be divided in two, with a stage at one end..

Suitability - K-8->Performing Arts\Auditorium-->Storage\Fixed Equip.

There is no storage space in the cafetorium space for tables, chairs, and other equipment.

Suitability - K-8->Science

These spaces include both science labs and science classrooms.

Suitability - K-8->Science-->Storage\Fixed Equip.

The science rooms/labs have limited equipment and limited storage cabinets and space.

Suitability - K-8->Kindergarten-->Size

There are six kindergarten classrooms that average about 500-600sf each with a bathroom.

Suitability - K-8->Administration

Rooms and work space in the administrative office section of the school are small. It does have a designated sick

room.

Suitability - K-8->Administration-->Size

Small offices and limited meeting space.

Suitability - K-8->Administration-->Storage\Fixed Equip.

There is limited storage space and workroom, meeting rooms in the office suite.

Suitability - K-8->Restrooms (Student)

Restrooms in older areas and portable restrooms were inadequate size and in poor condition.

Suitability - K-8->Teacher Lounge and Work Room(s)

The teacher lounge and work area is small and crowded. There is not room for more than a few persons at one

time.

Suitability - K-8->Cafeteria

The space used for a cafeteria is not large enough to accommodate the full school population. They start serving

lunch at 10:30AM - 12:30pm with continuous serving and seating periods.

Suitability - K-8->Food Prep

The food prep area is OK, but has some manager office space intruding into food prep areas, and they need more

freezer space.

Page 4 of 43/9/2010 2:20:04PM

Page 415: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

Functional and Educational Adequacy

Technology Readiness Report

Page 416: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

Technology Readiness Report - Full

Project:Site:

Technology Readiness

Possible

ScoreScore

Percent

Score

CaddoCounty:

1Region:

Rating

640Site #:

Caddo 2009 Walnut Hill

Project #:

4057

Technology Readiness

15.00 15.00 100.00 Comm/IT Equipment Environment Good

10.00 5.00 50.00 Electrical Power Fair

10.00 10.00 100.00 Cooling Good

10.00 6.70 67.00 Drops & Wireless Fair

15.00 10.05 67.00 LAN Connectivity Fair

10.00 10.00 100.00 WAN Backbone Good

10.00 6.70 67.00 LAN-WAN Performance Fair

5.00 0.00 0.00 Video Distribution Unsat

5.00 2.50 50.00 Voice Distribution Fair

10.00 10.00 100.00 Faculty & Staff Technology Good

100.00 75.95 75.95Total For Site:

Comments

Technology Readiness->Comm/IT Equipment Environment

Main servers are in teacher lounge within administrative office suite.

Technology Readiness->Electrical Power

Some of the classrooms in older wings are in need of additional or relocated electrical outlets.

Technology Readiness->Cooling

New HVAC units have been installed in older rooms.

Technology Readiness->Drops & Wireless

Most rooms have access to computer drops or wireless. Portables are not hardwired and have some connectivity

problems.

Technology Readiness->LAN Connectivity

Portable classrooms have wireless but the connections are not always reliable.

Technology Readiness->LAN-WAN Performance

Portables have connectivity problems.

Technology Readiness->Video Distribution

There is no video distribution system to all classrooms.

Technology Readiness->Voice Distribution

PA system

Page 1 of 13/9/2010 2:05:11PM

Page 417: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

Functional and Educational Adequacy

Capacity and Utilization Report

Page 418: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

Capacity Calculations Appendix Preface Some spaces do not contribute to the functional capacity of a school. These spaces are generally spaces

which do not have students assigned to them. Some examples of these spaces include elementary art

rooms, elementary computer labs, elementary music rooms, and special education resource rooms.

Many schools have temporary buildings and these are also not included in the calculation of the

functional capacity. It is the district’s philosophy that, while temporary buildings can be useful in the

short run, they do not provide appropriate long term space and should be eliminated where possible.

Temporary buildings are generally used for the following functions:

1. To house students in temporary classrooms when the school is lacking enough classrooms

2. To house special programs when the school is lacking space for these programs

3. To house necessary storage or administrative support functions when permanent space is lacking

4. To house unnecessary storage or functions

It is the district’s strategy to eliminate all but the absolute necessary temporary buildings and it should

conduct an inventory of the uses of temporary buildings. Where the inventory identifies uses 1-3, the

district will need to consider a more appropriate space solution. In the case of number 4, the district will

need to ensure the principal of the school discontinues the inappropriate use of the temporary building.

Page 419: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

Caddo Parish School Board

Instructional Space Model Guidelines

Room Type Students/

Room

Pre-School 20

K Capacity (full day) and 1st Grade 20

Elementary Classroom (2) 24

Elementary Classroom (3-5) 26

Secondary Classroom (6-12) 25

Art (Secondary) 33

Music (Secondary) - Vocal 25

Music (Secondary) - Instrumental 30

Science Lab (Secondary) 25

Voc./Industrial Tech, Foods, Etc. 25

Gym (Secondary) 80

Computer Lab (Elementary)* 26

Computer Lab (Secondary) 33

Spec. Ed. - Severe 9

Spec. Ed. - Resource 0

Alternative Education 18

Portable 0

*These spaces do not contribute to capacity

Scheduling Factors

Elementary Schools 95.0%

Middle Schools 85.0%

High Schools 75.0%

Source: MGT of America, Inc., 2009.

Page 420: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

Caddo Parish School Board Capacity Calculations

Walnut HillES/M K-8

K-1 Classroom: 13

PK Classroom: 2

ES (2) Classroom: 8

ES (3-5) Classroom: 22

ART: 1

Secondary (6-12): 23

MU Inst: 3

MU Vocal: 3

Science: 1

GYM: 2

VO/TEC: 1

*Computer Lab: 2

SE - Resource: 15

SE - Severe: 0

Alt: 0

**Temp Bldg: 20

20

24

20

26

33

25

30

25

25

80

25

33

0

9

18

Room Type # of Classrooms x Students/Room = Capacity

Total Capacity (w/o scheduling factor) =

Walnut Hill Capacity =

x Scheduling factor =

40

192

260

572

575

33

90

75

25

160

25

66

0

0

0

0

*Computer Labs at Elementary Schools do not contribute to capacity**The temporary building number represents the number of temporary building teaching stations or rooms, not the number of temporary buildings.

1,796

2,113

85%

N/A

Page 421: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

Future Facility and Site Assessment Report

Page 422: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

FUTURE FACILITY AND SITE ASSESSMENT

School WALNUT HILL ELEMENTARY / MIDDLE SCHOOL 9360 Woolworth Road Shreveport, LA 71129

Site Description 77.58 acre site (of which 27.58 acres are used by the school and 50 acres are leased out) in a rural area south of Metcalf in the west part of the parish surrounded by farmland and facing a 2-lane rural road. The site is crowned at the school location and slopes significantly to the north and south and gently to the road along the east side. The school complex consists of 1-story, flat roof, brick veneer double-loaded corridor classroom wings in a finger pattern connected by covered walkways; classroom wings have punched windows on the south walls and large ribbon window walls on the north walls; and there is a variety of wood temporary buildings. Site features include concrete, asphalt and gravel paving, surface drainage swales, lawns and numerous trees, recreation fields, a lit football practice field, and paved tennis and basketball courts.

SUMMARY Topic Grade Comments

Site Adequacy Adequate

Land for expansion of building is plentiful and without inhibiting constraints. SITE ASSESSMENT

Site Size Status Adequate

Student Capacity: 1796 Min. Acres Recommended: 28 Actual Site Acres: 27.58

Usable Area Remaining

Adequate

5.65 Acres. Approximates the reasonably usable land adjacent to the current facilities. Assumes major setbacks from property lines and roadways and aligns with building forms shown on graphic. Expansion areas would not consume recreation fields or courts.

• Flood Plain No Constraint

• Potable Water No Constraint Pressure may be low.

• Sanitary Sewer No Constraint

• Storm Drainage No Constraint

• Electricity No Constraint

• Natural Gas No Constraint

• Ground Water No Constraint

• Air Pollution No Constraint

• HazMat/Soils No Constraint

• Habitats No Constraint No conflicts identified by DEQ.

Ease of Access No Constraint

Ease of Traffic Flow Needs Improvement

Buses and autos have separated access drives but need bypass lanes, especially for autos.

Design Compatibility No Constraint

The school facility fits into the rural neighborhood; expansion would not be intrusive.

Compatibility of Structures

No Constraint

The scheme of 1-story buildings with interior corridors and multiple wings or “houses” is generally compatible with contemporary design approaches to schools although the 1960’s aesthetic is not desirable and does not adequately support today’s building systems. The gymnasium is a successful contemporary design that blends well with the original facility. The covered walkways pose a security risk.

Page 423: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

WA

LN

UT

HIL

L E

LE

M./M

IDD

LE

SC

HO

OL

9360 W

oo

lwo

rth R

oad

Sh

revep

ort, L

A 7

1129

WOOLWORTH ROAD

N

+FH

+FH

+FH

+FH

+FH

+FH

VIEW

PROPERTY

FARMLAND

Slope

Slope

Slope

Slo

pe

FARMLAND

Primary 1: 0.86 Ac

Primary 2: 2.61 Ac

Secondary 1: 0.65 Ac

Secondary 2: 0.83 Ac

Secondary 3: 0.70 Ac

Total: 5.65 Ac

Pro

perty C

ontin

ues N

orth

Pro

perty C

ontin

ues S

outh

Secondary 3

Primary 1

Bus Drop-off

ParkingParking

ParkingAut

o Dro

p-off

Primary 2

Secondary 2

Secondary 1

GMWM

Pu

blis

he

d 0

1.2

9.1

0

Utility Data Not Available

FUT.

PKG.

FUT.

PKG.FUT.

PKG.

Page 424: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

Building Code Verification Report

Page 425: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

Building Code Number COMPLYNOT

COMPLY

FCA

DEFICIENCY

NOT

KNOWN

SYSTEM

NOT

PRESENT

NA TO FCA

DATA

1Code of Federal Regulations 28 CFR Part

36, 1994 edition, Paragraph 4.1.2,

Paragraph 4.1.6

1 NPFA 101:15.2.3.2; IBC 1017.2

3 IBC 1005.2

5

a

b

c

d

6

a

b

1

2

4 IBC 1011.5.3

1 IBC 1007.3

2 IBC 1020.1

Are all means of egress illuminated at all times building is occupied?

Do exit stairways have a minimum 48” clearance width between handrails?

Are stairs separated by 1-hour fire resistance rating?

3

Does all door hardware comply by not requiring tight grasping, tight pinching or

twisting to operate?

Maintenance shops?

IBC 508.2

C10 Interior Construction

C1010 Partitions

C1020 Interior Doors

1

IBC 1005.2

Are corridors 1-hour rated (exceptions: building is sprinklered or each room for

instruction has at least one door directly to the exterior)?IBC 1017.1

2

3

Laundries? NFPA 101:15.3.2.1; IBC 508.2

School Name: Walnut Hill ES/MS

NFPA101:15.2.11.1.1

G2030 Pedestrian Paving

B2020 Exterior Windows

4

BUILDING CODE COMPLIANCE REPORT

Code Provision

Is there a continuous path of entry/exit for handicap accessibility to all parts of

the building?

Do exit access corridors have not less than 6’ of clear width?

Are both 1-hour rating and sprinkler protection provided for the following:

Science labs?

7

IBC 1008.1.8.1

NFPA 101:7.1.3.2.1; IBC 1020.1.2

C2010 Stair Construction

8

Boiler and furnace rooms?

Are corridor doors rated a minimum 20-minute rating?

Is glazing in rated doors above 20 minutes limited to 100 square inches?

NFPA 101:15.3.7

NFPA 101:15.3.2.1; IBC 508.2

Does every room or space greater than 250 SF and used for educational

purposes have not less than one outside window for emergency rescue

(exceptions: sprinklered building or room that has a door directly to the

outside)?

Do doors opening in the path of egress travel not reduce the required width to

less than 1/2 during the course of the swing?

When fully open, do corridor doors not project more than 7 inches into the

required corridor width?

Is the building subdivided into compartments by smoke partitions having not

less than a 1-hour fire rating? (Maximum area of compartment is 30,000 SF.

Length or width of building exceeds 300’ unless sprinklered.)

IBC 715.4.4.1

Is 1-hour rating or sprinkler protection provided for the following:

Hazardous storage?

Janitor’s closet?

Where there is a chiller, is it separated from a boiler or water heater by a 2-

hour assembly?

Are penetrations into stairs limited to doors, electrical conduit serving the

stairway, piping necessary for the heating or cooling of the exit enclosure,

sprinkler piping, standpipes and penetrations for fire alarm circuits?

Page 426: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

Building Code Number COMPLYNOT

COMPLY

FCA

DEFICIENCY

NOT

KNOWN

SYSTEM

NOT

PRESENT

NA TO FCA

DATACode Provision

4

a NFPA 101:7.2.2.2.4.2; IBC 1012.4

b IBC 1012.5

c NFPA 101:7.2.2.4.4.6; IBC 1012.1

d NFPA 101:7.2.2.4.4.2; IBC 1012.2

5 IBC 1007.6

1

2

1 IBC 508.2

2 IBC 1203.1

3INTERNATIONAL MECHANICAL CODE

2000, 606.4

4 IBC 908.6

1 IBC 903.2

1 IBC 907.2

3Does the Elevator Machine Room have ventilation or air conditioning to protect

controls from overheating?

Continuously graspable?

3 IBC 907.11

IBC 907.2.12.2

Does the shaft have exhaust directly to the outside, an access ladder to the pit,

and battery backup lighting in the shaft/pit?

Are the mechanical rooms separated by fire rated partitions from remainder of

building?

Is there a standard and emergency ventilation system provided?

Are there automatic sprinkler systems provided in assembly spaces with more

than 300 occupants?

2

Is there a refrigerant detection and alarm system provided?

Are there emergency shut-offs provided?

Are the duct smoke detectors connected to the building’s fire alarm control

panel?

Is there a monitored fire alarm system provided?

Does the operation of fire detector, sprinkler device or manual fire alarm box

immediately sounds an alert tone followed by voice instructions giving

approved information and directions for an evacuation?

IBC 3004.1; IBC 3006.1

D30 HVAC Systems

D40 Fire Protection

D4010 Sprinklers

D50 Electrical

D5030 Communications and Security

4

D10 Conveying

D1010 Elevators

Is there a telephone or intercom communication in the cab?

Is there a fireman control panel at the ground floor controls?

Are handrails:

IBC 3006.2

IBC 3003.2

Is there an Area of Refuge in the stairwell or in a vestibule entering the stair? Is

there a communication device there?

Between 34” and 38” above the surface of the tread?

Between 1-1/4” and 2” in diameter?

Returning to wall, guard or walking surface?

Page 427: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

Energy Conservation Opportunities Report

Page 428: Facility Condition Assessment Reports...1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010

System Energy Conservation FCA Deficiency Replacement Cost

SCHOOL TYPEENERGY CONSERVATION OPPORTUNITIES

Walnut Hill ES/MS

1956, 1966, 1967 Buildings Roof Covering No No

Exterior Windows Yes Yes $459,386.00

Interior Lighting Partial Yes $77,152.00

Bldg Controls & Instrumentation No No

Heating No No

Other HVAC Systems (Ventilation) No No

Terminal & Package Units Partial Yes $52,648.00

Cooling No No

1987 Office Roof Covering Yes Yes $8,049.00

Exterior Windows No No

Interior Lighting No No

Bldg Controls & Instrumentation No No

Heating No No

Other HVAC Systems (Ventilation) No No

Terminal & Package Units No No

Cooling No No

1998, 2004, 2008 Additions Roof Covering No No

Exterior Windows No No

Interior Lighting No No

Bldg Controls & Instrumentation No No

Heating No No

Other HVAC Systems (Ventilation) No No

Terminal & Package Units No No

Cooling No No

Site Exterior Lighting Yes Yes $213,101.00