Facility Condition Assessment Reports
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 1
Facility: \Elementary/Middle Schools\Herndon MagnetAddress: 11845 Gamm Rd, Belcher, LA 71004
Attributes: Temporary Building Rooms 2
General Information: Function: Elementary Middle Year Built:Gross Area: 83,646 S.F. Last Renovation:
Facility Description:
The Herndon Magnet School campus consists of one main building located at 11845 Gamm Road in Belcher, Louisiana. The original campus was constructed in 1956. Ancillary buildings on campus include covered walkways and a greenhouse. In addition to the buildings, the campus includes basketball court and tennis courts. This report contains condition and adequacy data collected during the 2009/2010 Facility Condition Assessment (FCA). The detailed condition and deficiency statements are contained in this report.
Current Repair Cost: $4,560,924.00 Replacement Cost: $13,416,399.00 FCI: 34.00%
19-Jan-2010Herndon Magnet School
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 2
Facility: \Elementary/Middle Schools\Herndon Magnet\1956-67 BuildingsAddress: 11845 Gamm Road, Belcher, LA 71004
Attributes: Number of Floors 1
General Information: Function: Elementary Middle Year Built: 1956Gross Area: 74,106 S.F. Last Renovation:
Facility Description:
Herndon Magnet School is a 1-story building located at 11845 Gamm Road in Belcher, Louisiana. There have been additions in 1966 and 1967, and HVAC renovations in 1983, 2002, and 2009. This report contains condition and adequacy data collected during the 2009/2010 Facility Condition Assessment (FCA). The detailed condition and deficiency statements are contained in this report.
Energy conservation opportunities for this building include: 1) Addition of a building automation system would allow programs to improve operation and reduce energy use; 2) Exterior windows are steel frame, operable clear glass design. Installation of fixed, double pane, low e, thermal windows with thermal breaks would improve energy use and improve comfort; 3) Replacing the roof mounted units for the kitchen and cafeteria with more efficient equipment would reduce energy and improve interior conditions; and 4) A review of billing rate may justify addition of power factor correction capacitor.
ADA vertical access needs for this building include installation of a wheelchair lift to provide access to the stage.
Current Repair Cost: $3,552,579.00 Replacement Cost: $12,016,077.00 FCI: 29.57%
19-Jan-2010South Elevation
19-Jan-2010East Elevation
19-Jan-2010North Elevation
19-Jan-2010West Elevation
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 3
Facility: \Elementary/Middle Schools\Herndon Magnet\1956-67 Buildings (continued)
Building Condition:
System Unit Price$
Unit of
Meas Qty Renewal% Renewal$ Life Installed
Calc Next
Renewal
Next
Renewal CI% Deficiency$ Replacement Value FCI%
Total $162.15 S.F. 74,106 107 $12,813,068 49 1974 1966 2009 80 $3,552,581 $12,016,076 30
Substructure $22.20 S.F. 74,106 100 $1,645,153 100 1956 $1,645,153
Foundations $22.20 S.F. 74,106 100 $1,645,153 100 1956 $1,645,153
Standard Foundations $10.20 S.F. 74,106 100 $755,881 100 1956 $755,881
Special Foundations $3.00 S.F. 74,106 100 $222,318 100 1956 $222,318
Slab on Grade $9.00 S.F. 74,106 100 $666,954 100 1956 $666,954
Basement Construction 0 0 0
Basement Excavation 0 0 0 0
Basement Walls 0 0 0 0
Shell $41.00 S.F. 74,106 104 $3,155,760 69 1967 1986 100 $489,100 $3,038,642 16
Superstructure $10.80 S.F. 74,106 100 $800,345 100 1956 $800,345
Floor Construction 0 0 0 0
Roof Construction $10.80 S.F. 74,106 100 $800,345 100 1956 $800,345
Exterior Enclosure $20.40 S.F. 74,106 103 $1,556,226 78 1956 1986 $489,100 $1,511,762 32
Exterior Walls $14.40 S.F. 74,106 100 $1,067,126 100 1956 $1,067,126
Exterior Windows $4.80 S.F. 74,106 110 $391,280 30 1956 1986 $391,280 $355,709 110
Exterior Doors $1.20 S.F. 74,106 110 $97,820 30 1956 1986 $97,820 $88,927 110
Roofing $9.80 S.F. 74,106 110 $799,189 20 2010 2030 100 $726,535
Roof Coverings - EPDM 0 0 0 0
Roof Coverings - Standing
Seam Mettal
0 0 0 0
Roof Coverings;White Thermo
Plastic
$9.80 S.F. 74,106 110 $799,189 20 2010 2030 100 $726,535
Roof Openings 0 0 0 0
Interiors $27.80 S.F. 74,106 107 $2,212,411 53 1965 1976 8 $1,104,704 $2,059,787 54
Interior Construction $19.20 S.F. 74,106 106 $1,511,763 68 1956 1976 $631,384 $1,422,835 44
Partitions $10.80 S.F. 74,106 110 $880,379 100 1956 $800,345
Interior Doors $2.40 S.F. 74,106 80 $142,284 40 1956 1996 $142,284 $177,854 80
Fittings $6.00 S.F. 74,106 110 $489,100 20 1956 1976 $489,100 $444,636 110
Stairs 0 0 0
Stair Construction 0 0 0 0
Interior Finishes $8.60 S.F. 74,106 110 $700,648 19 1975 1976 8 $473,320 $636,952 74
Wall Finishes - Ceramic &
Glazed
$4.42 S.F. 6,000 110 $29,146 20 1956 1976 $29,146 $26,496 110
Wall Finishes - Paint $2.40 S.F. 68,106 110 $179,800 10 1983 1993 $179,800 $163,454 110
Floor Finishes - Carpet $2.76 S.F. 3,000 110 $9,108 8 2005 2013 38 $8,280
Floor Finishes - Ceramic &
Quarry Tile
$1.44 S.F. 6,000 110 $9,504 50 1956 2006 $9,504 $8,640 110
Floor Finishes - VCT $3.60 S.F. 55,106 110 $218,220 15 1996 2011 7 $198,382
Floor Finishes Gym Wood Floor $6.10 S.F. 10,000 110 $67,056 50 1956 2006 $67,056 $60,960 110
Ceiling Finishes $2.30 S.F. 74,106 110 $187,814 20 1956 1976 $187,814 $170,740 110
Services $60.35 S.F. 74,106 110 $4,919,364 22 1987 1966 2009 88 $1,567,497 $4,472,149 35
Conveying 0 0 0 $22,920
Elevators and Lifts 0 0 0 0 $22,920
Plumbing $7.54 S.F. 74,106 110 $614,309 30 1977 1986 98 $578,116 $558,463 104
Plumbing Fixtures $5.89 S.F. 74,106 110 $480,296 30 1956 1986 $480,296 $436,633 110
Domestic Water Distribution $0.44 S.F. 74,106 110 $36,193 30 1956 1986 $36,193 $32,903 110
Sanitary Waste $0.76 S.F. 74,106 110 $61,627 30 1956 1986 $61,627 $56,024 110
Rain Water Drainage $0.19 S.F. 74,106 110 $15,651 30 2010 2040 100 $14,228
Other Plumbing Systems -
Natural Gas
$0.25 S.F. 74,106 110 $20,542 30 2009 2039 97 $18,675
HVAC $33.72 S.F. 74,106 110 $2,748,740 20 2007 2024 2009 93 $146,730 $2,498,855 6
Heat Generating Systems 0 0 0 0
Cooling Generating Systems 0 0 0 0
Distribution Systems & Exhaust
Systems
$9.12 S.F. 74,106 110 $743,431 30 2009 2039 97 $675,847
Terminal & Package Units $21.60 S.F. 74,106 110 $1,760,759 15 2009 2024 93 $1,600,690
Controls & Instrumentation $1.80 S.F. 74,106 110 $146,730 20 2009 2029 2009 $146,730 $133,391 110
Other HVAC Systems/Equip -
Kitchen Hood
$1.20 S.F. 74,106 110 $97,820 30 2002 2032 73 $88,927
Fire Protection 0 0 0
Sprinklers S.F. 0 0 0 0
Electrical $19.09 S.F. 74,106 110 $1,556,315 23 1981 1966 2009 68 $819,731 $1,414,831 58
Electrical Service/Distribution $2.27 S.F. 74,106 110 $184,880 30 1999 2029 63 $168,072
Branch Wiring $6.77 S.F. 74,106 110 $551,704 30 1956 1986 $551,704 $501,549 110
Lighting $6.77 S.F. 74,106 110 $551,704 20 2004 2024 70 $501,549
Communications and Security -
Public Address & Clock System
$0.88 S.F. 74,106 110 $71,409 20 1970 1990 $71,409 $64,917 110
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 4
System Unit Price$
Unit of
Meas Qty Renewal% Renewal$ Life Installed
Calc Next
Renewal
Next
Renewal CI% Deficiency$ Replacement Value FCI%
Fire Alarm $1.54 S.F. 74,106 110 $125,209 10 2000 2010 $125,209 $113,827 110
Security & CCTV $0.88 S.F. 74,106 110 $71,409 10 1956 1966 2009 $71,409 $64,917 110
Other Electrical Systems -
Emergency Generator
0 0 0 0
Equipment & Furnishings $10.80 S.F. 74,106 110 $880,380 20 1960 1976 2015 25 $391,280 $800,345 49
Equipment $7.20 S.F. 74,106 110 $586,920 20 1962 1976 2015 25 $97,820 $533,563 18
Commercial Equipment $6.00 S.F. 74,106 110 $489,100 20 1967 1987 2015 25 $444,636
Institutional Equipment $1.20 S.F. 74,106 110 $97,820 20 1956 1976 $97,820 $88,927 110
Furnishings $3.60 S.F. 74,106 110 $293,460 20 1956 1976 $293,460 $266,782 110
Fixed Furnishings $3.60 S.F. 74,106 110 $293,460 20 1956 1976 $293,460 $266,782 110
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 5
Facility: \Elementary/Middle Schools\Herndon Magnet\1956-67 Buildings (continued)
Renewal Schedule:
Systems 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
Total $3,552,581 $224,766 $9,953 $567,000 $505,874
Substructure
Foundations
Standard Foundations
Special Foundations
Slab on Grade
Basement Construction
Basement Excavation
Basement Walls
Shell $489,100
Superstructure
Floor Construction
Roof Construction
Exterior Enclosure $489,100
Exterior Walls
Exterior Windows $391,280
Exterior Doors $97,820
Roofing
Roof Coverings - EPDM
Roof Coverings - Standing Seam
Mettal
Roof Coverings;White Thermo
Plastic
Roof Openings
Interiors $1,104,704 $224,766 $9,953 $241,636
Interior Construction $631,384
Partitions
Interior Doors $142,284
Fittings $489,100
Stairs
Stair Construction
Interior Finishes $473,320 $224,766 $9,953 $241,636
Wall Finishes - Ceramic & Glazed $29,146
Wall Finishes - Paint $179,800 $241,636
Floor Finishes - Carpet $9,953
Floor Finishes - Ceramic & Quarry
Tile
$9,504
Floor Finishes - VCT $224,766
Floor Finishes Gym Wood Floor $67,056
Ceiling Finishes $187,814
Services $1,567,497 $264,238
Conveying $22,920
Elevators and Lifts $22,920
Plumbing $578,116
Plumbing Fixtures $480,296
Domestic Water Distribution $36,193
Sanitary Waste $61,627
Rain Water Drainage
Other Plumbing Systems - Natural
Gas
HVAC $146,730
Heat Generating Systems
Cooling Generating Systems
Distribution Systems & Exhaust
Systems
Terminal & Package Units
Controls & Instrumentation $146,730
Other HVAC Systems/Equip -
Kitchen Hood
Fire Protection
Sprinklers
Electrical $819,731 $264,238
Electrical Service/Distribution
Branch Wiring $551,704
Lighting
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 6
Systems 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
Communications and Security -
Public Address & Clock System
$71,409
Fire Alarm $125,209 $168,271
Security & CCTV $71,409 $95,967
Other Electrical Systems -
Emergency Generator
Equipment & Furnishings $391,280 $567,000
Equipment $97,820 $567,000
Commercial Equipment $567,000
Institutional Equipment $97,820
Furnishings $293,460
Fixed Furnishings $293,460
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 7
Facility: \Elementary/Middle Schools\Herndon Magnet\1956-67 Buildings (continued)
Deficiency Sheet:
Deficiency: Surveyor/Update: Charu Aggarwal Fri, 04-Jun-2010Priority: 3Quantity: 1
Assembly: B2020 System: Exterior Windows Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: The exterior windows are worn, beyond expected life, and should be replaced.
Estimates:Raw Cost $326,066.40
Plus or (Minus) Additional Cost $0.00Total Estimated Amount $326,066.40
Deficiency: Surveyor/Update: Charu Aggarwal Fri, 04-Jun-2010Priority: 3Quantity: 1
Assembly: B2030 System: Exterior Doors Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: The exterior doors are worn, beyond expected life, and should be replaced.
Estimates:Raw Cost $81,516.60
Plus or (Minus) Additional Cost $0.00Total Estimated Amount $81,516.60
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 8
Facility: \Elementary/Middle Schools\Herndon Magnet\ 1956-67 Buildings (continued)
Deficiency: Surveyor/Update: Charu Aggarwal Fri, 04-Jun-2010Priority: 3Quantity: 1
Assembly: C1020 System: Interior Doors Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: The interior doors are worn, beyond expected life, and should be replaced.
Estimates:Raw Cost $118,569.60
Plus or (Minus) Additional Cost $0.00Total Estimated Amount $118,569.60
Deficiency: Surveyor/Update: Charu Aggarwal Fri, 04-Jun-2010Priority: 3Quantity: 1
Assembly: C1030 System: Fittings Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: Fittings, such as chalk and tack boards, lockers, toilet and bath accessories, toilet partitions, and shelving, are
beyond expected life and should be replaced.
Estimates:Raw Cost $407,583.00
Plus or (Minus) Additional Cost $0.00Total Estimated Amount $407,583.00
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 9
Facility: \Elementary/Middle Schools\Herndon Magnet\ 1956-67 Buildings (continued)
Deficiency: Surveyor/Update: Charu Aggarwal Fri, 04-Jun-2010Priority: 3Quantity: 1
Assembly: C3010 System: Wall Finishes - Ceramic & Glazed Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: The ceramic and glazed wall finishes are beyond expected life and should be replaced.
Estimates:Raw Cost $24,288.00
Plus or (Minus) Additional Cost $0.00Total Estimated Amount $24,288.00
Deficiency: Surveyor/Update: Charu Aggarwal Fri, 04-Jun-2010Priority: 3Quantity: 1
Assembly: C3010 System: Wall Finishes - Paint Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: The painted wall finishes are worn, beyond expected life, and should be replaced.
Estimates:Raw Cost $149,833.20
Plus or (Minus) Additional Cost $0.00Total Estimated Amount $149,833.20
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 10
Facility: \Elementary/Middle Schools\Herndon Magnet\ 1956-67 Buildings (continued)
Deficiency: Surveyor/Update: Charu Aggarwal Fri, 04-Jun-2010Priority: 3Quantity: 1
Assembly: C3020 System: Floor Finishes - Ceramic & Quarry Tile Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: The ceramic tiles are deteriorating, beyond expected life, and should be replaced.
Estimates:Raw Cost $7,920.00
Plus or (Minus) Additional Cost $0.00Total Estimated Amount $7,920.00
Deficiency: Surveyor/Update: Phil Trenbath Fri, 04-Jun-2010Priority: 3Quantity: 1
Assembly: C3020 System: Floor Finishes Gym Wood Floor Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: The wood floor in the gym has had numerous repairs and needs to be replaced.
Estimates:Raw Cost $55,880.00
Plus or (Minus) Additional Cost $0.00Total Estimated Amount $55,880.00
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 11
Facility: \Elementary/Middle Schools\Herndon Magnet\ 1956-67 Buildings (continued)
Deficiency: Surveyor/Update: Charu Aggarwal Fri, 04-Jun-2010Priority: 3Quantity: 1
Assembly: C3030 System: Ceiling Finishes Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: The ceiling finishes are stained, beyond expected life, and should be replaced.
Estimates:Raw Cost $156,511.87
Plus or (Minus) Additional Cost $0.00Total Estimated Amount $156,511.87
Deficiency: Surveyor/Update: Phil Trenbath Fri, 04-Jun-2010Priority: 5Quantity: 1
Assembly: D1010 System: Elevators and Lifts Material: Conveying Systems Distress: Missing Category: ADA / Accessibility Correction: Install Chair Lift Note: A chair lift is required to access the stage.
Estimates:Raw Cost $19,100.00
Plus or (Minus) Additional Cost $0.00Total Estimated Amount $19,100.00
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 12
Facility: \Elementary/Middle Schools\Herndon Magnet\ 1956-67 Buildings (continued)
Deficiency: Surveyor/Update: Charu Aggarwal Mon, 18-Jan-2010Priority: 3Quantity: 1
Assembly: D2010 System: Plumbing Fixtures Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: Plumbing fixtures are original, badly worn and should be replaced.
Estimates:Raw Cost $400,246.51
Plus or (Minus) Additional Cost $0.00Total Estimated Amount $400,246.51
Deficiency: Surveyor/Update: Charu Aggarwal Fri, 04-Jun-2010Priority: 3Quantity: 1
Assembly: D2020 System: Domestic Water Distribution Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: Domestic water system is well past expected life, showing signs of deterioration, and should be replaced.
Estimates:Raw Cost $30,161.14
Plus or (Minus) Additional Cost $0.00Total Estimated Amount $30,161.14
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 13
Facility: \Elementary/Middle Schools\Herndon Magnet\ 1956-67 Buildings (continued)
Deficiency: Surveyor/Update: Charu Aggarwal Fri, 04-Jun-2010Priority: 3Quantity: 1
Assembly: D2030 System: Sanitary Waste Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: Sanitary waste is beyond expected life and should be replaced.
Estimates:Raw Cost $51,355.46
Plus or (Minus) Additional Cost $0.00Total Estimated Amount $51,355.46
Deficiency: Surveyor/Update: Phil Trenbath Fri, 04-Jun-2010Priority: 4Quantity: 1
Assembly: D3060 System: Controls & Instrumentation Material: System Distress: Inadequate Category: Energy Conservation Correction: Renew System Note: Controls are individual low voltage programmable room thermostats. Recommend installation of a building
automation system to allow remote monitoring and control.
Estimates:Raw Cost $122,274.90
Plus or (Minus) Additional Cost $0.00Total Estimated Amount $122,274.90
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 14
Facility: \Elementary/Middle Schools\Herndon Magnet\ 1956-67 Buildings (continued)
Deficiency: Surveyor/Update: Charu Aggarwal Thu, 03-Jun-2010Priority: 3Quantity: 1
Assembly: D5020 System: Branch Wiring Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: Branch wiring and distribution system have not been upgraded, show wear, and need to be replaced.
Estimates:Raw Cost $459,753.62
Plus or (Minus) Additional Cost $0.00Total Estimated Amount $459,753.62
Deficiency: Surveyor/Update: Charu Aggarwal Fri, 04-Jun-2010Priority: 3Quantity: 1
Assembly: D5030 System: Communications and Security - Public
Address & Clock System Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: Public address and communication system is obsolete and should be replaced. For integrity of the system, install
wiring in conduit.
Estimates:Raw Cost $59,507.12
Plus or (Minus) Additional Cost $0.00Total Estimated Amount $59,507.12
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 15
Facility: \Elementary/Middle Schools\Herndon Magnet\ 1956-67 Buildings (continued)
Deficiency: Surveyor/Update: Charu Aggarwal Fri, 04-Jun-2010Priority: 3Quantity: 1
Assembly: D5030 System: Fire Alarm Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: The fire alarm system is beyond expected life and should be replaced.
Estimates:Raw Cost $104,341.25
Plus or (Minus) Additional Cost $0.00Total Estimated Amount $104,341.25
Deficiency: Surveyor/Update: Charu Aggarwal Fri, 04-Jun-2010Priority: 3Quantity: 1
Assembly: D5030 System: Security & CCTV Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: The security system is beyond expected life and should be replaced. For integrity of system, install wiring in
conduit.
Estimates:Raw Cost $59,507.12
Plus or (Minus) Additional Cost $0.00Total Estimated Amount $59,507.12
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 16
Facility: \Elementary/Middle Schools\Herndon Magnet\ 1956-67 Buildings (continued)
Deficiency: Surveyor/Update: Charu Aggarwal Fri, 04-Jun-2010Priority: 3Quantity: 1
Assembly: E1020 System: Institutional Equipment Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: Institutional equipment, such as library equipment, theater and stage equipment, audio-visual equipment, and
laboratory equipment, is beyond expected life and should be replaced.
Estimates:Raw Cost $81,516.60
Plus or (Minus) Additional Cost $0.00Total Estimated Amount $81,516.60
Deficiency: Surveyor/Update: Charu Aggarwal Fri, 04-Jun-2010Priority: 3Quantity: 1
Assembly: E2010 System: Fixed Furnishings Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: Fixed furnishings, such as the base/wall cabinets, counter tops, window shades, and fixed seating, are worn,
beyond expected life, and should be replaced.
Estimates:Raw Cost $244,549.80
Plus or (Minus) Additional Cost $0.00Total Estimated Amount $244,549.80
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 17
Facility: \Elementary/Middle Schools\Herndon Magnet\1956-67 Covered WalkwaysAddress: 11845 Gamm Road, Belcher, LA 71004
Attributes: ***None***
General Information: Function: Elementary Middle Year Built: 1956Gross Area: 9,000 S.F. Last Renovation:
Facility Description:
There are covered walkways between classroom sections that provide weather protection for the students.
Current Repair Cost: $224,964.00 Replacement Cost: $224,964.00 FCI: 100.00%
19-Jan-2010West Elevation
19-Jan-2010North Elevation
19-Jan-2010East Elevation
04-Jun-2010South Elevation
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 18
Facility: \Elementary/Middle Schools\Herndon Magnet\1956-67 Covered Walkways (continued)
Building Condition:
System Unit Price$
Unit of
Meas Qty Renewal% Renewal$ Life Installed
Calc Next
Renewal
Next
Renewal CI% Deficiency$ Replacement Value FCI%
Total $25.00 S.F. 9,000 100 $224,964 25 1956 1981 $224,964 $224,964 100
Special Construction $25.00 S.F. 9,000 100 $224,964 25 1956 1981 $224,964 $224,964 100
Special Construction $25.00 S.F. 9,000 100 $224,964 25 1956 1981 $224,964 $224,964 100
Special Structures - Covered
Walkways Metal
$25.00 S.F. 9,000 100 $224,964 25 1956 1981 $224,964 $224,964 100
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 19
Facility: \Elementary/Middle Schools\Herndon Magnet\1956-67 Covered Walkways (continued)
Renewal Schedule:
Systems 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
Total $224,964
Special Construction $224,964
Special Construction $224,964
Special Structures - Covered
Walkways Metal
$224,964
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 20
Facility: \Elementary/Middle Schools\Herndon Magnet\1956-67 Covered Walkways (continued)
Deficiency Sheet:
Deficiency: Surveyor/Update: Charu Aggarwal Fri, 04-Jun-2010Priority: 3Quantity: 1
Assembly: F1010 System: Special Structures - Covered Walkways Metal Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: The covered walkways are beyond expected life and need to be replaced.
Estimates:Raw Cost $187,470.00
Plus or (Minus) Additional Cost $0.00Total Estimated Amount $187,470.00
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 21
Facility: \Elementary/Middle Schools\Herndon Magnet\Basketball CourtAddress: 11845 Gamm Road, Belcher, LA 71004
Attributes: ***None***
General Information: Function: Elementary Middle Year Built: 1956Gross Area: 3,798 S.F. Last Renovation:
Facility Description:
The Basketball Court at Herndon Magnet School is located at 11845 Gamm Road in Belcher, Louisiana 71004. There have been no additions or renovations. The basketball court consists of a concrete pad with backboards. This report contains condition and adequacy data collected during the 2009/2010 Facility Condition Assessment (FCA). The detailed condition and deficiency statements are contained in this report.
Current Repair Cost: $29,077.00 Replacement Cost: $26,844.00 FCI: 108.32%
11-Jan-2010Herndon Magnet School Basketball Court
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 22
Facility: \Elementary/Middle Schools\Herndon Magnet\Basketball Court (continued)
Building Condition:
System Unit Price$
Unit of
Meas Qty Renewal% Renewal$ Life Installed
Calc Next
Renewal
Next
Renewal CI% Deficiency$ Replacement Value FCI%
Total $7.07 S.F. 3,798 110 $29,487 21 1956 1976 $29,077 $26,844 108
Special Construction $6.96 S.F. 3,798 110 $29,077 20 1956 1976 $29,077 $26,434 110
Special Construction $6.96 S.F. 3,798 110 $29,077 20 1956 1976 $29,077 $26,434 110
Special Structures - Basketball
Court - Concrete - Outdoor
$6.96 S.F. 3,798 110 $29,077 20 1956 1976 $29,077 $26,434 110
Building Sitework $0.11 S.F. 3,798 100 $410 100 1956 $410
Site Preparation $0.11 S.F. 3,798 100 $410 100 1956 $410
Site Earthwork $0.11 S.F. 3,798 0 $410 100 1956 $410
Site Improvements S.F. 3,798 0 0
Site Development - Fencing S.F. 3,798 0 0 0
Site Electrical Utilities S.F. 3,798 0 0
Site Lighting S.F. 3,798 0 0 0
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 23
Facility: \Elementary/Middle Schools\Herndon Magnet\Basketball Court (continued)
Renewal Schedule:
Systems 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
Total $29,077
Special Construction $29,077
Special Construction $29,077
Special Structures - Basketball
Court - Concrete - Outdoor
$29,077
Building Sitework
Site Preparation
Site Earthwork
Site Improvements
Site Development - Fencing
Site Electrical Utilities
Site Lighting
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 24
Facility: \Elementary/Middle Schools\Herndon Magnet\Basketball Court (continued)
Deficiency Sheet:
Deficiency: Surveyor/Update: Phil Trenbath Fri, 04-Jun-2010Priority: 3Quantity: 1
Assembly: F1010 System: Special Structures - Basketball Court -
Concrete - Outdoor Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: Basketball court's concrete pad is beyond expected life, and should be replaced.
Estimates:Raw Cost $24,231.24
Plus or (Minus) Additional Cost $0.00Total Estimated Amount $24,231.24
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 25
Facility: \Elementary/Middle Schools\Herndon Magnet\GreenhouseAddress: 11845 Gamm Road, Belcher, LA 71004
Attributes: Number of Floors 1
General Information: Function: Elementary Middle Year Built: 1967Gross Area: 540 S.F. Last Renovation:
Facility Description:
The Greenhouse at Herndon Magnet School is a 1-story building attached to the maintenance storage building located at 11845 Gamm Road in Belcher, Louisiana. There have been no additions or renovations. This report contains condition and adequacy data collected during the 2009/2010 Facility Condition Assessment (FCA). The detailed condition and deficiency statements are contained in this report.
Current Repair Cost: $1,490.00 Replacement Cost: $20,244.00 FCI: 7.36%
19-Jan-2010West Elevation
19-Jan-2010South Elevation
19-Jan-2010North Elevation
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 26
Facility: \Elementary/Middle Schools\Herndon Magnet\Greenhouse (continued)
Building Condition:
System Unit Price$
Unit of
Meas Qty Renewal% Renewal$ Life Installed
Calc Next
Renewal
Next
Renewal CI% Deficiency$ Replacement Value FCI%
Total $37.49 S.F. 540 109 $21,998 48 1967 1997 14 $1,489 $20,244 7
Substructure $4.98 S.F. 540 100 $2,689 0 0 $2,689
Foundations $4.98 S.F. 540 100 $2,689 0 0 $2,689
Standard Foundations S.F. 0 100 100 0
Slab on Grade $4.98 S.F. 540 100 $2,689 0 0 $2,689
Shell $1.92 S.F. 540 110 $1,140 30 1967 1997 $1,140 $1,037 110
Exterior Enclosure $1.92 S.F. 540 110 $1,140 30 1967 1997 $1,140 $1,037 110
Exterior Doors $1.92 S.F. 540 110 $1,140 30 1967 1997 $1,140 $1,037 110
Services $0.59 S.F. 540 110 $349 30 1967 1997 $349 $318 110
Plumbing $0.59 S.F. 540 110 $349 30 1967 1997 $349 $318 110
Plumbing Fixtures S.F. 0 0 0 0
Domestic Water Distribution $0.59 S.F. 540 110 $349 30 1967 1997 $349 $318 110
Sanitary Waste S.F. 0 0 0 0
HVAC 0 0 0
Distribution Systems & Exhaust
Systems
S.F. 0 0 0 0
Terminal & Package Units S.F. 0 0 0 0
Electrical 0 0 0
Electrical Service/Distribution S.F. 0 0 0 0
Branch Wiring S.F. 0 0 0 0
Lighting S.F. 0 0 0 0
Special Construction $30.00 S.F. 540 110 $17,820 50 1967 2017 14 $16,200
Special Construction $30.00 S.F. 540 110 $17,820 50 1967 2017 14 $16,200
Special Structures - Pre-
Engineered Structure
$30.00 S.F. 540 110 $17,820 50 1967 2017 14 $16,200
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 27
Facility: \Elementary/Middle Schools\Herndon Magnet\Greenhouse (continued)
Renewal Schedule:
Systems 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
Total $1,489 $21,916
Substructure
Foundations
Standard Foundations
Slab on Grade
Shell $1,140
Exterior Enclosure $1,140
Exterior Doors $1,140
Services $349
Plumbing $349
Plumbing Fixtures
Domestic Water Distribution $349
Sanitary Waste
HVAC
Distribution Systems & Exhaust
Systems
Terminal & Package Units
Electrical
Electrical Service/Distribution
Branch Wiring
Lighting
Special Construction $21,916
Special Construction $21,916
Special Structures - Pre-Engineered
Structure
$21,916
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 28
Facility: \Elementary/Middle Schools\Herndon Magnet\Greenhouse (continued)
Deficiency Sheet:
Deficiency: Surveyor/Update: Charu Aggarwal Fri, 04-Jun-2010Priority: 3Quantity: 1
Assembly: B2030 System: Exterior Doors Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: The exterior doors are worn, beyond expected life, and should be replaced.
Estimates:Raw Cost $950.40
Plus or (Minus) Additional Cost $0.00Total Estimated Amount $950.40
Deficiency: Surveyor/Update: Charu Aggarwal Fri, 04-Jun-2010Priority: 3Quantity: 1
Assembly: D2020 System: Domestic Water Distribution Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: Water supply line is beyond expected life and should be replaced.
Estimates:Raw Cost $291.06
Plus or (Minus) Additional Cost $0.00Total Estimated Amount $291.06
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 29
Facility: \Elementary/Middle Schools\Herndon Magnet\SiteAddress: 11845 Gamm Rd, Belcher, LA 71004
Attributes: Site Area (in Acres) 80 (35 acres leased, 45 acres
school site)
General Information: Function: Elementary Middle Year Built: 1956Gross Area: 83,646 S.F. Last Renovation:
Facility Description:
The Herndon Magnet School site was constructed in 1956. There were additions in 1966 and 1967, and no major renovations. Campus site features include paved driveways and parking lots, pedestrian pavement, flag pole, landscaping and fencing. Site mechanical and electrical features include water, sewer, natural gas and site lighting. This report contains condition and adequacy data collected during the 2009/2010 Facility Condition Assessment (FCA). The detailed condition and deficiency statements are contained in this report.
Current Repair Cost: $752,814.00 Replacement Cost: $956,576.00 FCI: 78.70%
05-Jan-2010Aerial Image of Herndon Magnet School
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 30
Facility: \Elementary/Middle Schools\Herndon Magnet\Site (continued)
Building Condition:
System Unit Price$
Unit of
Meas Qty Renewal% Renewal$ Life Installed
Calc Next
Renewal
Next
Renewal CI% Deficiency$ Replacement Value FCI%
Total $11.44 S.F. 83,646 100 $956,576 28 1961 1976 63 $752,814 $956,576 79
Building Sitework $11.44 S.F. 83,646 100 $956,576 28 1961 1976 63 $752,814 $956,576 79
Site Improvements $8.50 S.F. 83,646 100 $710,656 28 1965 1976 63 $506,894 $710,656 71
Roadways $1.38 S.F. 83,646 100 $115,431 50 1956 2006 $115,431 $115,431 100
Parking Lots $1.18 S.F. 83,646 100 $98,368 30 1999 2029 63 $98,368
Pedestrian Paving $0.82 S.F. 83,646 100 $68,255 50 1956 2006 $68,255 $68,255 100
Site Development $3.86 S.F. 83,646 100 $323,208 20 1956 1976 $323,208 $323,208 100
Landscaping $1.26 S.F. 83,646 100 $105,394 10 1956 $105,394
Site Mechanical Utilities $1.34 S.F. 83,646 100 $112,421 30 1956 1986 $112,421 $112,421 100
Water Supply $0.82 S.F. 83,646 100 $68,255 30 1956 1986 $68,255 $68,255 100
Sanitary Sewer $0.41 S.F. 83,646 100 $34,128 30 1956 1986 $34,128 $34,128 100
Storm Sewer S.F. 0 0 0 0
Fuel Distribution $0.12 S.F. 83,646 100 $10,038 30 1956 1986 $10,038 $10,038 100
Site Electrical Utilities $1.60 S.F. 83,646 100 $133,499 30 1956 1986 $133,499 $133,499 100
Site Lighting $1.60 S.F. 83,646 100 $133,499 30 1956 1986 $133,499 $133,499 100
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 31
Facility: \Elementary/Middle Schools\Herndon Magnet\Site (continued)
Renewal Schedule:
Systems 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
Total $752,814
Building Sitework $752,814
Site Improvements $506,894
Roadways $115,431
Parking Lots
Pedestrian Paving $68,255
Site Development $323,208
Landscaping
Site Mechanical Utilities $112,421
Water Supply $68,255
Sanitary Sewer $34,128
Storm Sewer
Fuel Distribution $10,038
Site Electrical Utilities $133,499
Site Lighting $133,499
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 32
Facility: \Elementary/Middle Schools\Herndon Magnet\Site (continued)
Deficiency Sheet:
Deficiency: Surveyor/Update: Charu Aggarwal Fri, 04-Jun-2010Priority: 3Quantity: 1
Assembly: G2010 System: Roadways Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: Roadways are cracked, worn, and beyond expected life, and should be replaced.
Estimates:Raw Cost $96,192.90
Plus or (Minus) Additional Cost $0.00Total Estimated Amount $96,192.90
Deficiency: Surveyor/Update: Charu Aggarwal Fri, 04-Jun-2010Priority: 3Quantity: 1
Assembly: G2030 System: Pedestrian Paving Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: Pedestrian paving is worn, beyond expected life, and should be replaced.
Estimates:Raw Cost $56,879.28
Plus or (Minus) Additional Cost $0.00Total Estimated Amount $56,879.28
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 33
Facility: \Elementary/Middle Schools\Herndon Magnet\ Site (continued)
Deficiency: Surveyor/Update: Charu Aggarwal Fri, 04-Jun-2010Priority: 3Quantity: 1
Assembly: G2040 System: Site Development Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: Site development features, such as fences and gates, signs, site furnishings, trash enclosures, playing fields, and
flagpoles, are beyond expected life and should be replaced.
Estimates:Raw Cost $269,340.12
Plus or (Minus) Additional Cost $0.00Total Estimated Amount $269,340.12
Deficiency: Surveyor/Update: Charu Aggarwal Fri, 04-Jun-2010Priority: 3Quantity: 1
Assembly: G3010 System: Water Supply Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: Water supply is original, deteriorated, and should be replaced.
Estimates:Raw Cost $56,879.28
Plus or (Minus) Additional Cost $0.00Total Estimated Amount $56,879.28
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 34
Facility: \Elementary/Middle Schools\Herndon Magnet\ Site (continued)
Deficiency: Surveyor/Update: Charu Aggarwal Fri, 04-Jun-2010Priority: 3Quantity: 1
Assembly: G3020 System: Sanitary Sewer Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: Sanitary sewer is beyond expected life and should be replaced.
Estimates:Raw Cost $28,439.64
Plus or (Minus) Additional Cost $0.00Total Estimated Amount $28,439.64
Deficiency: Surveyor/Update: Charu Aggarwal Mon, 25-Jan-2010Priority: 3Quantity: 1
Assembly: G3060 System: Fuel Distribution Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: Gas meter amd regulator are worn and should be replaced.
Estimates:Raw Cost $8,364.60
Plus or (Minus) Additional Cost $0.00Total Estimated Amount $8,364.60
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 35
Facility: \Elementary/Middle Schools\Herndon Magnet\ Site (continued)
Deficiency: Surveyor/Update: Charu Aggarwal Fri, 04-Jun-2010Priority: 3Quantity: 1
Assembly: G4020 System: Site Lighting Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: Site lighting is minimal, obsolete, and should be replaced.
Estimates:Raw Cost $111,249.18
Plus or (Minus) Additional Cost $0.00Total Estimated Amount $111,249.18
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 36
Facility: \Elementary/Middle Schools\Herndon Magnet\Tennis CourtsAddress: 11845 Gamm Road, Belcher, LA 71004
Attributes: ***None***
General Information: Function: Elementary Middle Year Built: 1983Gross Area: 14,904 S.F. Last Renovation:
Facility Description:
The Tennis Courts at Herndon Magnet School are located at 11845 Gamm Road in Belcher, Louisiana. There have been no additions and no renovations. Two tennis courts with nets and perimeter fencing are located on the southwest corner of the property. This report contains condition and adequacy data collected during the 2009/2010 Facility Condition Assessment (FCA). The detailed condition and deficiency statements are contained in this report.
Current Repair Cost: $0.00 Replacement Cost: $171,694.00 FCI: 0.00%
11-Jan-2010Herndon Magnet Tennis Courts
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 37
Facility: \Elementary/Middle Schools\Herndon Magnet\Tennis Courts (continued)
Building Condition:
System Unit Price$
Unit of
Meas Qty Renewal% Renewal$ Life Installed
Calc Next
Renewal
Next
Renewal CI% Deficiency$ Replacement Value FCI%
Total $11.52 S.F. 14,904 109 $187,558 21 1983 2003 10 0 $171,694
Special Construction $10.64 S.F. 14,904 110 $174,502 20 1983 2003 $158,638
Special Construction $10.64 S.F. 14,904 110 $174,502 20 1983 2003 $158,638
Special Structures - Tennis
Court Hard Surface
$10.64 S.F. 14,904 110 $174,502 20 1983 2003 $158,638
Building Sitework $0.88 S.F. 14,904 100 $13,056 39 1983 2013 10 $13,056
Site Preparation $0.11 S.F. 14,904 100 $1,610 100 1983 $1,610
Site Earthwork $0.11 S.F. 14,904 0 $1,610 100 1983 $1,610
Site Improvements $0.77 S.F. 14,904 100 $11,446 30 1983 2013 10 $11,446
Site Development - Fencing $0.77 S.F. 14,904 100 $11,446 30 1983 2013 10 $11,446
Site Electrical Utilities 0 0 0
Site Lighting S.F. 0 0 0 0
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 38
Facility: \Elementary/Middle Schools\Herndon Magnet\Tennis Courts (continued)
Renewal Schedule:
Systems 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
Total $12,508
Special Construction
Special Construction
Special Structures - Tennis Court
Hard Surface
Building Sitework $12,508
Site Preparation
Site Earthwork
Site Improvements $12,508
Site Development - Fencing $12,508
Site Electrical Utilities
Site Lighting
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 39
Facility: \Elementary/Middle Schools\Herndon Magnet\Tennis Courts (continued)
Deficiency Sheet:
*** No Deficiencies Found ***
COMET4 Caddo Parish
1961 Midway COMET4 Survey Report
Deficiency Detail ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 1
Facility
Name Assembly System Material Distress Correction Qty Unit Raw Cost
Additional
Cost Total Cost Priority Def. Cat. Location / Note
Caddo Parish School District $3,800,770 $760,154 $4,560,924 Elementary/Middle Schools $3,800,770 $760,154 $4,560,924 Herndon Magnet $3,800,770 $760,154 $4,560,924 1956-67 Buildings $2,960,482 $592,096 $3,552,579 Building Systems $2,960,482 $592,096 $3,552,579
C3010 Wall Finishes - Ceramic & Glazed
System Beyond Expected Life
Renew System 1 Ea. $24,288 $4,858 $29,146 Necessary- 2-5 Yrs
Deferred Maintenance
The ceramic and glazed wall finishes are beyond expected life and should be replaced.
C3010 Wall Finishes - Paint
System Beyond Expected Life
Renew System 1 Ea. $149,833 $29,967 $179,800 Necessary- 2-5 Yrs
Deferred Maintenance
The painted wall finishes are worn, beyond expected life, and should be replaced.
C3020 Floor Finishes - Ceramic & Quarry Tile
System Beyond Expected Life
Renew System 1 Ea. $7,920 $1,584 $9,504 Necessary- 2-5 Yrs
Deferred Maintenance
The ceramic tiles are deteriorating, beyond expected life, and should be replaced.
C3030 Ceiling Finishes System Beyond Expected Life
Renew System 1 Ea. $156,512 $31,302 $187,814 Necessary- 2-5 Yrs
Deferred Maintenance
The ceiling finishes are stained, beyond expected life, and should be replaced.
D2010 Plumbing Fixtures
System Beyond Expected Life
Renew System 1 Ea. $400,247 $80,049 $480,296 Necessary- 2-5 Yrs
Deferred Maintenance
Plumbing fixtures are original, badly worn and should be replaced.
D2020 Domestic Water Distribution
System Beyond Expected Life
Renew System 1 Ea. $30,161 $6,032 $36,193 Necessary- 2-5 Yrs
Deferred Maintenance
Domestic water system is well past expected life, showing signs of deterioration, and should be replaced.
D2030 Sanitary Waste System Beyond Expected Life
Renew System 1 Ea. $51,355 $10,271 $61,627 Necessary- 2-5 Yrs
Deferred Maintenance
Sanitary waste is beyond expected life and should be replaced.
D5020 Branch Wiring System Beyond Expected Life
Renew System 1 Ea. $459,754 $91,951 $551,704 Necessary- 2-5 Yrs
Deferred Maintenance
Branch wiring and distribution system have not been upgraded, show wear, and need to be replaced.
D5030 Communications and Security - Public Address & Clock System
System Beyond Expected Life
Renew System 1 Ea. $59,507 $11,901 $71,409 Necessary- 2-5 Yrs
Deferred Maintenance
Public address and communication system is obsolete and should be replaced. For integrity of the system, install wiring in conduit.
D5030 Fire Alarm System Beyond Expected Life
Renew System 1 Ea. $104,341 $20,868 $125,209 Necessary- 2-5 Yrs
Deferred Maintenance
The fire alarm system is beyond expected life and should be replaced.
D5030 Security & CCTV System Beyond Expected Life
Renew System 1 Ea. $59,507 $11,901 $71,409 Necessary- 2-5 Yrs
Deferred Maintenance
The security system is beyond expected life and should be replaced. For integrity of system, install wiring in conduit.
E1020 Institutional Equipment
System Beyond Expected Life
Renew System 1 Ea. $81,517 $16,303 $97,820 Necessary- 2-5 Yrs
Deferred Maintenance
Institutional equipment, such as library equipment, theater and stage equipment, audio-visual equipment, and laboratory equipment, is beyond expected life and should be replaced.
COMET4 Caddo Parish
1961 Midway COMET4 Survey Report
Deficiency Detail ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 2
Facility
Name Assembly System Material Distress Correction Qty Unit Raw Cost
Additional
Cost Total Cost Priority Def. Cat. Location / Note
E2010 Fixed Furnishings
System Beyond Expected Life
Renew System 1 Ea. $244,550 $48,910 $293,460 Necessary- 2-5 Yrs
Deferred Maintenance
Fixed furnishings, such as the base/wall cabinets, counter tops, window shades, and fixed seating, are worn, beyond expected life, and should be replaced.
B2020 Exterior Windows
System Beyond Expected Life
Renew System 1 Ea. $326,066 $65,213 $391,280 Necessary- 2-5 Yrs
Deferred Maintenance
The exterior windows are worn, beyond expected life, and should be replaced.
B2030 Exterior Doors System Beyond Expected Life
Renew System 1 Ea. $81,517 $16,303 $97,820 Necessary- 2-5 Yrs
Deferred Maintenance
The exterior doors are worn, beyond expected life, and should be replaced.
C1020 Interior Doors System Beyond Expected Life
Renew System 1 Ea. $118,570 $23,714 $142,284 Necessary- 2-5 Yrs
Deferred Maintenance
The interior doors are worn, beyond expected life, and should be replaced.
C1030 Fittings System Beyond Expected Life
Renew System 1 Ea. $407,583 $81,517 $489,100 Necessary- 2-5 Yrs
Deferred Maintenance
Fittings, such as chalk and tack boards, lockers, toilet and bath accessories, toilet partitions, and shelving, are beyond expected life and should be replaced.
C3020 Floor Finishes Gym Wood Floor
System Beyond Expected Life
Renew System 1 Ea. $55,880 $11,176 $67,056 Necessary- 2-5 Yrs
Deferred Maintenance
The wood floor in the gym has had numerous repairs and needs to be replaced.
D1010 Elevators and Lifts
Conveying Systems
Missing Install Chair Lift 1 Each $19,100 $3,820 $22,920 Does Not Meet Current Code/Standards
ADA / Accessibility
A chair lift is required to access the stage.
D3060 Controls & Instrumentation
System Inadequate Renew System 1 Ea. $122,275 $24,455 $146,730 Recommended-3-10 Yrs
Energy Conservation
Controls are individual low voltage programmable room thermostats. Recommend installation of a building automation system to allow remote monitoring and control.
1956-67 Covered Walkways $187,470 $37,494 $224,964 Building Systems $187,470 $37,494 $224,964
F1010 Special Structures - Covered Walkways Metal
System Beyond Expected Life
Renew System 1 Ea. $187,470 $37,494 $224,964 Necessary- 2-5 Yrs
Deferred Maintenance
The covered walkways are beyond expected life and need to be replaced.
Basketball Court $24,231 $4,846 $29,077 Building Systems $24,231 $4,846 $29,077
F1010 Special Structures - Basketball Court - Concrete - Outdoor
System Beyond Expected Life
Renew System 1 Ea. $24,231 $4,846 $29,077 Necessary- 2-5 Yrs
Deferred Maintenance
Basketball court's concrete pad is beyond expected life, and should be replaced.
COMET4 Caddo Parish
1961 Midway COMET4 Survey Report
Deficiency Detail ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 3
Facility
Name Assembly System Material Distress Correction Qty Unit Raw Cost
Additional
Cost Total Cost Priority Def. Cat. Location / Note
Greenhouse $1,241 $248 $1,490 Building Systems $1,241 $248 $1,490
B2030 Exterior Doors System Beyond Expected Life
Renew System 1 Ea. $950 $190 $1,140 Necessary- 2-5 Yrs
Deferred Maintenance
The exterior doors are worn, beyond expected life, and should be replaced.
D2020 Domestic Water Distribution
System Beyond Expected Life
Renew System 1 Ea. $291 $58 $349 Necessary- 2-5 Yrs
Deferred Maintenance
Water supply line is beyond expected life and should be replaced.
Site $627,345 $125,469 $752,814 Building Systems $627,345 $125,469 $752,814
G2010 Roadways System Beyond Expected Life
Renew System 1 Ea. $96,193 $19,239 $115,431 Necessary- 2-5 Yrs
Deferred Maintenance
Roadways are cracked, worn, and beyond expected life, and should be replaced.
G2030 Pedestrian Paving
System Beyond Expected Life
Renew System 1 Ea. $56,879 $11,376 $68,255 Necessary- 2-5 Yrs
Deferred Maintenance
Pedestrian paving is worn, beyond expected life, and should be replaced.
G2040 Site Development
System Beyond Expected Life
Renew System 1 Ea. $269,340 $53,868 $323,208 Necessary- 2-5 Yrs
Deferred Maintenance
Site development features, such as fences and gates, signs, site furnishings, trash enclosures, playing fields, and flagpoles, are beyond expected life and should be replaced.
G3010 Water Supply System Beyond Expected Life
Renew System 1 Ea. $56,879 $11,376 $68,255 Necessary- 2-5 Yrs
Deferred Maintenance
Water supply is original, deteriorated, and should be replaced.
G3020 Sanitary Sewer System Beyond Expected Life
Renew System 1 Ea. $28,440 $5,688 $34,128 Necessary- 2-5 Yrs
Deferred Maintenance
Sanitary sewer is beyond expected life and should be replaced.
G3060 Fuel Distribution System Beyond Expected Life
Renew System 1 Ea. $8,365 $1,673 $10,038 Necessary- 2-5 Yrs
Deferred Maintenance
Gas meter amd regulator are worn and should be replaced.
G4020 Site Lighting System Beyond Expected Life
Renew System 1 Ea. $111,249 $22,250 $133,499 Necessary- 2-5 Yrs
Deferred Maintenance
Site lighting is minimal, obsolete, and should be replaced.
Functional and Educational Adequacy
Suitability Report
Suitability Report - Full
Project:Site:
Suitability
Possible
Score
Score
Percent
Score
CaddoCounty:
1Region:
Rating
241Site #:
Caddo 2009 Herndon Magnet School
Project #:
4057
Site Type: Site Size:Grade Config:
K-8 0.00ES/MS
Suitability - K-8
Site
3.00 3.00 100.00 TrafficGood
1.00 1.00 100.00 Pedestrian TrafficGood
1.35 1.35 100.00 ParkingGood
1.64 0.54 33.00 Play Courts & FieldsPoor
Safety and Security
1.22 0.00 0.00 FencingUnsat
0.15 0.05 33.00 Signage & Way FindingPoor
3.00 3.00 100.00 Ease of SupervisionG/F
0.50 0.00 0.00 Limited EntrancesP/U
0.50 0.50 100.00 Interior CirculationG/F
School Climate
5.00 0.00 0.00 Learning Style VarietyP/U
5.00 0.00 0.00 School EnvironmentP/U
1.00 1.00 100.00 LandscapingG/F
General Classrooms
12.95 8.68 67.00 SizeFair
2.78 2.78 100.00 AdjacenciesGood
2.78 1.86 67.00 Storage\Fixed Equip.Fair
Remedial - Special Needs
0.00 0.00 0.00 Size(N/A)
0.00 0.00 0.00 Adjacencies(N/A)
0.00 0.00 0.00 Storage\Fixed Equip.(N/A)
Library
2.43 1.22 50.00 SizeFair
0.52 0.52 100.00 AdjacenciesG/F
0.52 0.00 0.00 Storage\Fixed Equip.P/U
P.E.
8.40 4.20 50.00 SizeFair
1.80 1.80 100.00 AdjacenciesG/F
1.80 0.00 0.00 Storage\Fixed Equip.P/U
Music
2.64 0.00 0.00 SizeP/U
0.57 0.00 0.00 AdjacenciesP/U
0.57 0.57 100.00 Storage\Fixed Equip.G/F
Art
Page 1 of 33/9/2010 2:16:49PM
Project:Site:
Suitability
Possible
Score
Score
Percent
Score
CaddoCounty:
1Region:
Rating
241Site #:
Caddo 2009 Herndon Magnet School
Project #:
4057
Site Type: Site Size:Grade Config:
K-8 0.00ES/MS
1.53 1.53 100.00 SizeGood
0.33 0.33 100.00 AdjacenciesG/F
0.33 0.00 0.00 Storage\Fixed Equip.P/U
Performing Arts\Auditorium
1.64 0.00 0.00 SizeUnsat
0.35 0.35 100.00 AdjacenciesGood
0.35 0.35 100.00 Storage\Fixed Equip.Good
Vocational Technical
4.29 1.41 33.00 SizePoor
0.92 0.92 100.00 AdjacenciesGood
0.92 0.92 100.00 Storage\Fixed Equip.G/F
Science
2.70 1.35 50.00 SizeFair
0.58 0.58 100.00 AdjacenciesGood
0.58 0.58 100.00 Storage\Fixed Equip.G/F
Kindergarten
1.18 0.00 0.00 SizeP/U
0.25 0.25 100.00 AdjacenciesG/F
0.25 0.25 100.00 Storage\Fixed Equip.G/F
Administration
1.59 0.79 50.00 SizeFair
0.34 0.34 100.00 AdjacenciesG/F
0.34 0.34 100.00 Storage\Fixed Equip.G/F
0.91 0.91 100.00Good Restrooms (Student)
0.91 0.45 50.00Fair Teacher Lounge and Work Room(s)
5.00 5.00 100.00Good Cafeteria
7.84 7.84 100.00Good Food Prep
0.41 0.41 100.00Good Counseling
0.34 0.00 0.00P/U Clinic
0.50 0.50 100.00G/F Custodial & Maintenance
95.47 57.46 60.19Total For Site:
Comments
Suitability - K-8
Herndon Magnet School is a K-8 magnet school for the whole parish with a focus on academics. Students must test
in and can choose between this magnet and one other for MS. The facility was originally designed for a K-12 school.
Suitability - K-8->Site-->Play Courts & Fields
The elementary playfield is good although it doesn't have a separately fenced K play area. The middle school play
field is poorly developed and doesn't have a football or baseball field.
Suitability - K-8->Safety and Security-->Fencing
The school site has no fencing and is adjacent to oil rigs, a dirt service road, and a pond. Domestic and wild animals
come on campus and disrupt activities.
Suitability - K-8->Safety and Security-->Signage & Way Finding
There is minimal way finding signage on the outside but none on the inside.
Page 2 of 33/9/2010 2:16:49PM
Project:Site:
Suitability
Possible
Score
Score
Percent
Score
CaddoCounty:
1Region:
Rating
241Site #:
Caddo 2009 Herndon Magnet School
Project #:
4057
Site Type: Site Size:Grade Config:
K-8 0.00ES/MS
Suitability - K-8->Safety and Security-->Limited Entrances
The school is made up of five wings and the core buildings with numerous entry doors.
Suitability - K-8->School Climate-->Learning Style Variety
Classrooms are generally small with few areas for small groups or individual work.
Suitability - K-8->School Climate-->School Environment
Light levels are low even though there are lots of windows, most of the teacher pull all the blinds. Acoustics are not
great with a lot of hard surfaces. The building is generally in poor condition.
Suitability - K-8->General Classrooms-->Size
Most classrooms are less than 8-900 SF.
Suitability - K-8->General Classrooms-->Storage\Fixed Equip.
Not all the rooms have digital projectors or white boards.
Suitability - K-8->Library-->Size
Neither the ES or the MS library is large enough to meet the guideline. The MS library is close and does have
sufficient support rooms.
Suitability - K-8->Library-->Storage\Fixed Equip.
The ES library has no storage or work room.
Suitability - K-8->P.E.-->Size
The MS school gym is fine, the ES gym is very small.
Suitability - K-8->P.E.-->Storage\Fixed Equip.
The portable wall in the MS gym doesn't work.
Suitability - K-8->Music-->Size
None of the music rooms are large enough.
Suitability - K-8->Music-->Adjacencies
The MS music rooms are centrally located near classrooms, the counselor, and the administrative wing.
Suitability - K-8->Art-->Storage\Fixed Equip.
Kiln does not have separate room with venting.
Suitability - K-8->Performing Arts\Auditorium-->Size
The performing arts room is a multi-purpose room (flat floor) with a stage and no support rooms.
Suitability - K-8->Vocational Technical-->Size
The computer labs, the home econ. room, the business lab are all less than the guideline. There is no technology
lab.
Suitability - K-8->Science-->Size
Science labs are a bit small.
Suitability - K-8->Kindergarten-->Size
Kindergarten rooms are only about 6-700 SF.
Suitability - K-8->Administration-->Size
There is no conference room and the reception area is small.
Suitability - K-8->Teacher Lounge and Work Room(s)
Lounge is small for the number of staff.
Suitability - K-8->Clinic
Clinic is small and doesn't have any beds.
Page 3 of 33/9/2010 2:16:49PM
Functional and Educational Adequacy
Technology Readiness Report
Technology Readiness Report - Full
Project:Site:
Technology Readiness
Possible
ScoreScore
Percent
Score
CaddoCounty:
1Region:
Rating
241Site #:
Caddo 2009 Herndon Magnet School
Project #:
4057
Technology Readiness
15.00 15.00 100.00 Comm/IT Equipment Environment Good
10.00 10.00 100.00 Electrical Power Good
10.00 10.00 100.00 Cooling Good
10.00 10.00 100.00 Drops & Wireless Good
15.00 15.00 100.00 LAN Connectivity Good
10.00 10.00 100.00 WAN Backbone Good
10.00 10.00 100.00 LAN-WAN Performance Good
5.00 2.50 50.00 Video Distribution Fair
5.00 5.00 100.00 Voice Distribution Good
10.00 10.00 100.00 Faculty & Staff Technology Good
100.00 97.50 97.50Total For Site:
Comments
Technology Readiness->Video Distribution
Just to half the school, C and D wings.
Page 1 of 13/9/2010 2:02:34PM
Functional and Educational Adequacy
Capacity and Utilization Report
Capacity Calculations Appendix Preface Some spaces do not contribute to the functional capacity of a school. These spaces are generally spaces
which do not have students assigned to them. Some examples of these spaces include elementary art
rooms, elementary computer labs, elementary music rooms, and special education resource rooms.
Many schools have temporary buildings and these are also not included in the calculation of the
functional capacity. It is the district’s philosophy that, while temporary buildings can be useful in the
short run, they do not provide appropriate long term space and should be eliminated where possible.
Temporary buildings are generally used for the following functions:
1. To house students in temporary classrooms when the school is lacking enough classrooms
2. To house special programs when the school is lacking space for these programs
3. To house necessary storage or administrative support functions when permanent space is lacking
4. To house unnecessary storage or functions
It is the district’s strategy to eliminate all but the absolute necessary temporary buildings and it should
conduct an inventory of the uses of temporary buildings. Where the inventory identifies uses 1-3, the
district will need to consider a more appropriate space solution. In the case of number 4, the district will
need to ensure the principal of the school discontinues the inappropriate use of the temporary building.
Caddo Parish School Board
Instructional Space Model Guidelines
Room Type Students/
Room
Pre-School 20
K Capacity (full day) and 1st Grade 20
Elementary Classroom (2) 24
Elementary Classroom (3-5) 26
Secondary Classroom (6-12) 25
Art (Secondary) 33
Music (Secondary) - Vocal 25
Music (Secondary) - Instrumental 30
Science Lab (Secondary) 25
Voc./Industrial Tech, Foods, Etc. 25
Gym (Secondary) 80
Computer Lab (Elementary)* 26
Computer Lab (Secondary) 33
Spec. Ed. - Severe 9
Spec. Ed. - Resource 0
Alternative Education 18
Portable 0
*These spaces do not contribute to capacity
Scheduling Factors
Elementary Schools 95.0%
Middle Schools 85.0%
High Schools 75.0%
Source: MGT of America, Inc., 2009.
Caddo Parish School Board Capacity Calculations
Herndon Magnet SchoolES/M K-8
K-1 Classroom: 8
PK Classroom: 0
ES (2) Classroom: 4
ES (3-5) Classroom: 11
ART: 1
Secondary (6-12): 11
MU Inst: 1
MU Vocal: 2
Science: 2
GYM: 2
VO/TEC: 2
*Computer Lab: 2
SE - Resource: 7
SE - Severe: 0
Alt: 0
**Temp Bldg: 2
20
24
20
26
33
25
30
25
25
80
25
33
0
9
18
Room Type # of Classrooms x Students/Room = Capacity
Total Capacity (w/o scheduling factor) =
Herndon Magnet School Capacity =
x Scheduling factor =
0
96
160
286
275
33
30
50
50
160
50
66
0
0
0
0
*Computer Labs at Elementary Schools do not contribute to capacity**The temporary building number represents the number of temporary building teaching stations or rooms, not the number of temporary buildings.
1,068
1,256
85%
N/A
Future Facility and Site Assessment Report
FUTURE FACILITY AND SITE ASSESSMENT
School HERNDON MAGNET SCHOOL 11845 Gamm Road Belcher, LA 71004
Site Description 80 acre site (of which 45 acres are used by the school and 35 acres are leased out) in a rural area between Oil City and Hosston in the northeast part of the parish surrounded by farmland and oil wells and facing a 2-lane rural highway. The site is basically flat with a slight slope down to the northeast toward a bayou. The school complex consists of 1-story brick and flat roof buildings with double-loaded corridors in most classroom wings connected by covered walkways; classrooms have large window walls; there is a variety of wooden modular and temporary buildings. Site features include asphalt and gravel paving, surface drainage swales, lawns and a few trees, recreation fields, and paved tennis and basketball courts, and an on-site sewage treatment facility in the northeast corner.
SUMMARY Topic Grade Comments
Site Adequacy Adequate
Land for expansion of building is plentiful and without inhibiting constraints. SITE ASSESSMENT
Site Size Status Adequate
Student Capacity: 1068 Min. Acres Recommended: 21 Actual Site Acres: 45.0
Usable Area Remaining
Adequate
6.52 Acres. Approximates the reasonably usable land adjacent to the current facilities. Assumes major setbacks from property lines and roadways and aligns with building forms shown on graphic. Secondary area would not consume recreation fields or courts.
• Flood Plain No Constraint
• Potable Water No Constraint Pressure may be low.
• Sanitary Sewer Possible Constraint
CPSB to confirm capability of onsite treatment facility.
• Storm Drainage Needs Improvement
General site drainage adequate but numerous localized flooding locations.
• Electricity No Constraint
• Natural Gas No Constraint
• Ground Water No Constraint
• Air Pollution No Constraint
• HazMat/Soils No Constraint
• Habitats No Constraint No conflicts identified by DEQ
Ease of Access No Constraint
Ease of Traffic Flow Needs
Improvement
Bus and auto traffic use same entrance road but diverge into separated pick-up/drop-off areas. Localized flooding occurs at these areas and along the roadways.
Design Compatibility No Constraint
The school facility fits into the rural setting; expansion or replacement would not be intrusive.
Compatibility of Structures
No Constraint
The scheme of 1-story buildings with interior corridors and multiple wings or “houses” is generally compatible with contemporary design approaches to schools although the 1960’s aesthetic is not desirable, does not adequately support today’s building systems, and the open connections are not secure. The austere brick façade with high strip windows tucked under covered walkways could be blended with modern styling with masonry and high-tech glazing to provide a compatible yet contemporary appearance for any expansion or addition.
HE
RN
DO
N M
AG
NE
T S
CH
OO
L
11845 G
am
mR
oad
Belc
her, L
A 7
1004
GA
MM
RO
AD
N
+FH
Auto
Dro
p-o
ff
SEWAGE TREATMENT
DRAINFIELD/OXIDATION POND
Primary 1: 0.66 Ac
Primary 2: 0.29 Ac
Primary 3: 0.48 Ac
Primary 4: 0.48 Ac
Primary 5: 0.53 Ac
Primary 6: 0.50 Ac
Secondary 1: 3.58Ac
Total: 6.52 Ac
Parkin
g
Primary 1
Primary 2
Primary 3
Primary 4
Primary 5
Primary 6
Secondary
E
E
E T
Bus Drop-off
Parkin
g
Parking
Total Usable
Site Area: 6.52 AcDETAILED VIEW
Pu
blis
he
d 0
1.2
9.1
0
Building Code Verification Report
Building Code Number COMPLYNOT
COMPLY
FCA
DEFICIENCY
NOT
KNOWN
SYSTEM
NOT
PRESENT
NA TO FCA
DATA
1Code of Federal Regulations 28 CFR Part
36, 1994 edition, Paragraph 4.1.2,
Paragraph 4.1.6
1 NPFA 101:15.2.3.2; IBC 1017.2
3 IBC 1005.2
5
a
b
c
d
6
a
b
1
2
4 IBC 1011.5.3
1 IBC 1007.3
2 IBC 1020.1
3
Hazardous storage?
Janitor’s closet?
Science labs?
IBC 1008.1.8.1
7
8
Boiler and furnace rooms?
Are corridor doors rated a minimum 20-minute rating?
Is glazing in rated doors above 20 minutes limited to 100 square inches?
NFPA 101:15.3.7
NFPA 101:15.3.2.1; IBC 508.2
Does every room or space greater than 250 SF and used for educational
purposes have not less than one outside window for emergency rescue
(exceptions: sprinklered building or room that has a door directly to the
outside)?
Do doors opening in the path of egress travel not reduce the required width to
less than 1/2 during the course of the swing?
When fully open, do corridor doors not project more than 7 inches into the
required corridor width?
Is the building subdivided into compartments by smoke partitions having not
less than a 1-hour fire rating? (Maximum area of compartment is 30,000 SF.
Length or width of building exceeds 300’ unless sprinklered.)
IBC 715.4.4.1
Is 1-hour rating or sprinkler protection provided for the following:
3
School Name: Herndon Magnet ES/MS
IBC 1005.2
NFPA101:15.2.11.1.1
IBC 1017.1
G2030 Pedestrian Paving
B2020 Exterior Windows
4
BUILDING CODE COMPLIANCE REPORT
Code Provision
Is there a continuous path of entry/exit for handicap accessibility to all parts of
the building?
Do exit access corridors have not less than 6’ of clear width?
Are both 1-hour rating and sprinkler protection provided for the following:
2
Does all door hardware comply by not requiring tight grasping, tight pinching or
twisting to operate?
Maintenance shops?
C10 Interior Construction
C1010 Partitions
C1020 Interior Doors
1
Are corridors 1-hour rated (exceptions: building is sprinklered or each room for
instruction has at least one door directly to the exterior)?
Where there is a chiller, is it separated from a boiler or water heater by a 2-
hour assembly?IBC 508.2
Laundries? NFPA 101:15.3.2.1; IBC 508.2
NFPA 101:7.1.3.2.1; IBC 1020.1.2
C2010 Stair Construction
Are all means of egress illuminated at all times building is occupied?
Do exit stairways have a minimum 48” clearance width between handrails?
Are stairs separated by 1-hour fire resistance rating?
Are penetrations into stairs limited to doors, electrical conduit serving the
stairway, piping necessary for the heating or cooling of the exit enclosure,
sprinkler piping, standpipes and penetrations for fire alarm circuits?
Building Code Number COMPLYNOT
COMPLY
FCA
DEFICIENCY
NOT
KNOWN
SYSTEM
NOT
PRESENT
NA TO FCA
DATACode Provision
4
a NFPA 101:7.2.2.2.4.2; IBC 1012.4
b IBC 1012.5
c NFPA 101:7.2.2.4.4.6; IBC 1012.1
d NFPA 101:7.2.2.4.4.2; IBC 1012.2
5 IBC 1007.6
1
2
1 IBC 508.2
2 IBC 1203.1
3INTERNATIONAL MECHANICAL CODE
2000, 606.4
4 IBC 908.6
1 IBC 903.2
1 IBC 907.2
4
Is there a telephone or intercom communication in the cab?
Is there a fireman control panel at the ground floor controls?
Are handrails:
IBC 3006.2
IBC 3003.2
Continuously graspable?
Between 34” and 38” above the surface of the tread?
Between 1-1/4” and 2” in diameter?
Returning to wall, guard or walking surface?
3 IBC 907.11
IBC 907.2.12.2
Does the shaft have exhaust directly to the outside, an access ladder to the pit,
and battery backup lighting in the shaft/pit?
Are the mechanical rooms separated by fire rated partitions from remainder of
building?
Is there a standard and emergency ventilation system provided?
Are there automatic sprinkler systems provided in assembly spaces with more
than 300 occupants?
2
Is there a refrigerant detection and alarm system provided?
Are there emergency shut-offs provided?
Are the duct smoke detectors connected to the building’s fire alarm control
panel?
Is there a monitored fire alarm system provided?
Does the operation of fire detector, sprinkler device or manual fire alarm box
immediately sounds an alert tone followed by voice instructions giving
approved information and directions for an evacuation?
IBC 3004.1; IBC 3006.1
D30 HVAC Systems
D40 Fire Protection
D4010 Sprinklers
D50 Electrical
D5030 Communications and Security
D10 Conveying
D1010 Elevators
3Does the Elevator Machine Room have ventilation or air conditioning to protect
controls from overheating?
Is there an Area of Refuge in the stairwell or in a vestibule entering the stair? Is
there a communication device there?
Energy Conservation Opportunities Report
System Energy Conservation FCA Deficiency Replacement Cost
SCHOOL TYPEENERGY CONSERVATION OPPORTUNITIES
Herndon Magnet School ES/MS
1956-1967 Buildings Roof Covering No No
Exterior Windows Yes Yes $391,280.00
Interior Lighting No No
Bldg Controls & Instrumentation Yes Yes $146,730.00
Heating No No
Other HVAC Systems (Ventilation) No No
Terminal & Package Units No No
Cooling No No
Site Exterior Lighting Yes Yes $133,499.00
Facility Condition Assessment Reports
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 1
Facility: \Elementary/Middle Schools\KeithvilleAddress: 12201 Mansfield Road, Keithville, LA 71047
Attributes: ***None***
General Information: Function: Elementary Middle Year Built:Gross Area: 172,850 S.F. Last Renovation:
Facility Description:
The Keithville Elementary/Middle School campus consists of one main school building and one ancillary building located at 12201 Mansfield Road in Keithville, Louisiana. The original campus was constructed in 1988. There have been no additions and no major renovations. Ancillary buildings on campus include the covered walkways. In addition to the buildings, the campus contains softball fields, tennis courts, and a football field. This report contains condition and adequacy data collected during the 2009/2010 Facility Condition Assessment (FCA). The detailed condition and deficiency statements are contained in this report.
Current Repair Cost: $4,904,297.00 Replacement Cost: $29,840,895.00 FCI: 16.43%
19-Feb-2010Keithville Elementary/Middle School
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 2
Facility: \Elementary/Middle Schools\Keithville\1988 BuildingAddress: 12201 Mansfield Road, Keithville, LA 71047
Attributes: Number of Floors 2
General Information: Function: Elementary Middle Year Built: 1988Gross Area: 161,630 S.F. Last Renovation:
Facility Description:
The Keithville Elementary/Middle School Main Building is a 2-story building located at 12201 Mansfield Road in Keithville, Louisiana. There have been no additions and no major renovations, with exception of a partial roof replacement in 2007. This report contains condition and adequacy data collected during the 2009/2010 Facility Condition Assessment (FCA). The detailed condition and deficiency statements are contained in this report.
Energy conservation opportunities for this building include: 1) Addition of a building automation system would allow programs to improve operation and reduce energy use; 2) Exterior windows are steel frame, operable clear glass design. Installation of fixed, double pane, low e, thermal windows with thermal breaks would improve energy use and comfort; 3) New low flow plumbing fixtures would reduce water use; 4) A review of billing rate may justify addition of power factor correction capacitors; 5) Replacing HVAC system with more energy efficient models; and 6) Upgrade lighting with electronic ballasts and T-8 lamps.
ADA vertical access needs for this building have been addressed with the addition of an elevator for access to second floor classrooms.
Current Repair Cost: $4,640,656.00 Replacement Cost: $26,384,686.00 FCI: 17.59%
19-Feb-2010West Elevation
19-Feb-2010South Elevation
19-Feb-2010East Elevation
19-Feb-2010North Elevation
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 3
Facility: \Elementary/Middle Schools\Keithville\1988 Building (continued)
Building Condition:
System Unit Price$
Unit of
Meas Qty Renewal% Renewal$ Life Installed
Calc Next
Renewal
Next
Renewal CI% Deficiency$ Replacement Value FCI%
Total $163.24 S.F. 161,630 106 $27,927,304 60 1989 1998 2010 37 $4,640,656 $26,384,690 18
Substructure $22.20 S.F. 161,630 100 $3,588,186 100 1988 $3,588,186
Foundations $22.20 S.F. 161,630 100 $3,588,186 100 1988 $3,588,186
Standard Foundations $10.20 S.F. 161,630 100 $1,648,626 100 1988 $1,648,626
Special Foundations $3.00 S.F. 161,630 100 $484,890 100 1988 $484,890
Slab on Grade $9.00 S.F. 161,630 100 $1,454,670 100 1988 $1,454,670
Basement Construction 0 0 0
Basement Excavation 0 0 0 0
Basement Walls 0 0 0 0
Shell $53.94 S.F. 161,630 103 $8,969,495 82 1989 2018 58 $8,718,323
Superstructure $24.00 S.F. 161,630 100 $3,879,120 100 1988 $3,879,120
Floor Construction $13.20 S.F. 161,630 100 $2,133,516 100 1988 $2,133,516
Roof Construction $10.80 S.F. 161,630 100 $1,745,604 100 1988 $1,745,604
Exterior Enclosure $20.40 S.F. 161,630 103 $3,394,230 78 1988 2018 27 $3,297,252
Exterior Walls $14.40 S.F. 161,630 100 $2,327,472 100 1988 $2,327,472
Exterior Windows $4.80 S.F. 161,630 110 $853,406 30 1988 2018 27 $775,824
Exterior Doors $1.20 S.F. 161,630 110 $213,352 30 1988 2018 27 $193,956
Roofing $9.54 S.F. 161,630 110 $1,696,145 50 1997 2027 77 $1,541,951
Roof Coverings - BUR $9.54 S.F. 74,164 110 $778,277 20 2007 2027 85 $707,525
Roof Coverings - EPDM 0 0 0 0
Roof Coverings - Standing
Seam Mettal
$9.54 S.F. 87,466 110 $917,868 75 1988 2063 71 $834,426
Roof Openings 0 0 0 0
Interiors $31.09 S.F. 161,630 108 $5,410,369 57 1990 1998 2015 40 $751,066 $5,024,313 15
Interior Construction $19.20 S.F. 161,630 106 $3,297,252 68 1988 2008 2015 30 $3,103,296
Partitions $10.80 S.F. 161,630 110 $1,920,164 100 1988 $1,745,604
Interior Doors $2.40 S.F. 161,630 80 $310,330 40 1988 2028 45 $387,912
Fittings $6.00 S.F. 161,630 110 $1,066,758 20 1988 2008 2015 25 $969,780
Stairs $2.58 S.F. 161,630 110 $458,706 100 1988 $417,005
Stair Construction $2.58 S.F. 161,630 110 $458,706 100 1988 $417,005
Interior Finishes $9.31 S.F. 161,630 110 $1,654,411 22 1992 1998 55 $751,066 $1,504,012 50
Wall Finishes - Ceramic &
Glazed
$4.42 S.F. 32,300 110 $156,900 30 1988 2018 27 $142,637
Wall Finishes - Paint $2.40 S.F. 129,330 110 $341,431 10 1988 1998 $341,431 $310,392 110
Floor Finishes - Carpet $2.76 S.F. 16,150 110 $49,031 8 2003 2011 12 $44,574
Floor Finishes - Ceramic &
Quarry Tile
$1.44 S.F. 32,300 110 $51,163 50 1988 2038 56 $46,512
Floor Finishes - Terrazzo $6.05 S.F. 8,080 110 $53,755 50 1988 2038 56 $48,868
Floor Finishes - VCT $3.60 S.F. 88,950 110 $352,242 15 2007 2022 80 $320,220
Floor Finishes - Wood $13.52 S.F. 16,150 110 $240,254 40 1988 2028 45 $218,413
Ceiling Finishes $2.30 S.F. 161,630 110 $409,635 20 1988 2008 $409,635 $372,396 110
Services $46.42 S.F. 161,630 110 $8,252,441 27 1989 1998 2010 26 $2,182,777 $7,502,220 29
Conveying $1.20 S.F. 161,630 110 $213,352 30 1988 2018 27 $193,956
Elevators and Lifts $1.20 S.F. 161,630 110 $213,352 30 1988 2018 27 $193,956
Plumbing $7.54 S.F. 161,630 110 $1,339,848 30 1988 2018 27 $15,254 $1,218,044 1
Plumbing Fixtures $5.89 S.F. 161,630 110 $1,047,556 30 1988 2018 27 $15,254 $952,324 2
Domestic Water Distribution $0.44 S.F. 161,630 110 $78,940 30 1988 2018 27 $71,764
Sanitary Waste $0.76 S.F. 161,630 110 $134,412 30 1988 2018 27 $122,192
Rain Water Drainage $0.19 S.F. 161,630 110 $34,136 30 1988 2018 27 $31,033
Other Plumbing Systems -
Natural Gas
$0.25 S.F. 161,630 110 $44,804 30 1988 2018 27 $40,731
HVAC $18.59 S.F. 161,630 110 $3,304,816 29 1988 2008 2010 27 $535,383 $3,004,379 18
Heat Generating Systems $3.47 S.F. 161,630 110 $616,586 30 1988 2018 27 $560,533
Cooling Generating Systems $3.00 S.F. 161,630 110 $533,379 30 1988 2018 2010 $533,379 $484,890 110
Distribution Systems & Exhaust
Systems
$9.12 S.F. 161,630 110 $1,621,472 30 1988 2018 27 $1,474,066
Terminal & Package Units 0 0 0 0 $2,004
Controls & Instrumentation $1.80 S.F. 161,630 110 $320,027 20 1988 2008 2015 25 $290,934
Other HVAC Systems/Equip -
Kitchen Hood
$1.20 S.F. 161,630 110 $213,352 30 1988 2018 27 $193,956
Fire Protection 0 0 0
Sprinklers 0 0 0 0
Electrical $19.09 S.F. 161,630 110 $3,394,425 24 1990 1998 25 $1,632,140 $3,085,841 53
Electrical Service/Distribution $2.27 S.F. 161,630 110 $403,235 30 1988 2018 27 $366,577
Branch Wiring $6.77 S.F. 161,630 110 $1,203,303 30 1988 2018 27 $1,093,912
Lighting $6.77 S.F. 161,630 110 $1,203,303 20 1988 2008 $1,203,303 $1,093,912 110
Communications and Security -
Public Address & Clock System
$1.54 S.F. 161,630 110 $273,090 20 1988 2008 $273,090 $248,264 110
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 4
System Unit Price$
Unit of
Meas Qty Renewal% Renewal$ Life Installed
Calc Next
Renewal
Next
Renewal CI% Deficiency$ Replacement Value FCI%
Fire Alarm $0.88 S.F. 161,630 110 $155,747 10 2001 2011 10 $141,588
Security & CCTV $0.88 S.F. 161,630 110 $155,747 10 1988 1998 $155,747 $141,588 110
Other Electrical Systems -
Emergency Generator
0 0 0 0
Equipment & Furnishings $9.60 S.F. 161,630 110 $1,706,813 20 1988 2008 $1,706,813 $1,551,648 110
Equipment $6.00 S.F. 161,630 110 $1,066,758 20 1988 2008 $1,066,758 $969,780 110
Commercial Equipment $6.00 S.F. 161,630 110 $1,066,758 20 1988 2008 $1,066,758 $969,780 110
Institutional Equipment 0 0 0 0
Furnishings $3.60 S.F. 161,630 110 $640,055 20 1988 2008 $640,055 $581,868 110
Fixed Furnishings $3.60 S.F. 161,630 110 $640,055 20 1988 2008 $640,055 $581,868 110
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 5
Facility: \Elementary/Middle Schools\Keithville\1988 Building (continued)
Renewal Schedule:
Systems 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
Total $4,640,656 $210,921 $1,607,664 $8,658,125 $63,975 $668,165
Substructure
Foundations
Standard Foundations
Special Foundations
Slab on Grade
Basement Construction
Basement Excavation
Basement Walls
Shell $1,351,337
Superstructure
Floor Construction
Roof Construction
Exterior Enclosure $1,351,337
Exterior Walls
Exterior Windows $1,081,070
Exterior Doors $270,267
Roofing
Roof Coverings - BUR
Roof Coverings - EPDM
Roof Coverings - Standing Seam
Mettal
Roof Openings
Interiors $751,066 $50,502 $1,236,665 $198,757 $63,975 $458,855
Interior Construction $1,236,665
Partitions
Interior Doors
Fittings $1,236,665
Stairs
Stair Construction
Interior Finishes $751,066 $50,502 $198,757 $63,975 $458,855
Wall Finishes - Ceramic & Glazed $198,757
Wall Finishes - Paint $341,431 $458,855
Floor Finishes - Carpet $50,502 $63,975
Floor Finishes - Ceramic & Quarry
Tile
Floor Finishes - Terrazzo
Floor Finishes - VCT
Floor Finishes - Wood
Ceiling Finishes $409,635
Services $2,182,777 $160,419 $370,999 $7,108,031 $209,310
Conveying $270,267
Elevators and Lifts $270,267
Plumbing $15,254 $1,697,279
Plumbing Fixtures $15,254 $1,327,013
Domestic Water Distribution $99,999
Sanitary Waste $170,268
Rain Water Drainage $43,243
Other Plumbing Systems - Natural
Gas
$56,756
HVAC $535,383 $370,999 $3,105,372
Heat Generating Systems $781,073
Cooling Generating Systems $533,379
Distribution Systems & Exhaust
Systems
$2,054,032
Terminal & Package Units $2,004
Controls & Instrumentation $370,999
Other HVAC Systems/Equip -
Kitchen Hood
$270,267
Fire Protection
Sprinklers
Electrical $1,632,140 $160,419 $2,035,113 $209,310
Electrical Service/Distribution $510,805
Branch Wiring $1,524,308
Lighting $1,203,303
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 6
Systems 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
Communications and Security -
Public Address & Clock System
$273,090
Fire Alarm $160,419
Security & CCTV $155,747 $209,310
Other Electrical Systems -
Emergency Generator
Equipment & Furnishings $1,706,813
Equipment $1,066,758
Commercial Equipment $1,066,758
Institutional Equipment
Furnishings $640,055
Fixed Furnishings $640,055
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 7
Facility: \Elementary/Middle Schools\Keithville\1988 Building (continued)
Deficiency Sheet:
Deficiency: Surveyor/Update: Somnath Das Fri, 04-Jun-2010Priority: 3Quantity: 1
Assembly: C3010 System: Wall Finishes - Paint Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: The painted wall finishes are worn, beyond expected life, and should be replaced.
Estimates:Raw Cost $284,526.00
Plus or (Minus) Additional Cost $0.00Total Estimated Amount $284,526.00
Deficiency: Surveyor/Update: Jane Gulley Fri, 04-Jun-2010Priority: 3Quantity: 1
Assembly: C3030 System: Ceiling Finishes Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: The ceiling finishes are stained, beyond expected life, and should be replaced.
Estimates:Raw Cost $341,362.56
Plus or (Minus) Additional Cost $0.00Total Estimated Amount $341,362.56
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 8
Facility: \Elementary/Middle Schools\Keithville\ 1988 Building (continued)
Deficiency: Surveyor/Update: Phil Trenbath Sun, 07-Mar-2010Priority: 3Quantity: 2
Assembly: D2010 System: Plumbing Fixtures Material: Plumbing Fixtures Distress: Failing Category: Deferred Maintenance Correction: Replace Group Wash Fountain Note: Replace worn group wash fountains. Surfaces are deteriorated and hold bacteria.
Estimates:Raw Cost $12,711.70
Plus or (Minus) Additional Cost $0.00Total Estimated Amount $12,711.70
Deficiency: Surveyor/Update: Phil Trenbath Sun, 07-Mar-2010Priority: 3Quantity: 1
Assembly: D3030 System: Cooling Generating Systems Material: System Distress: Inadequate Category: Deferred Maintenance Correction: Renew System Note: The system has low pressure, R-11 chillers. This presents a potential environmental issue; therefore, the chillers
should be replaced.
Estimates:Raw Cost $444,482.50
Plus or (Minus) Additional Cost $0.00Total Estimated Amount $444,482.50
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 9
Facility: \Elementary/Middle Schools\Keithville\ 1988 Building (continued)
Deficiency: Surveyor/Update: Phil Trenbath Fri, 04-Jun-2010Priority: 3Quantity: 1
Assembly: D3050 System: Terminal & Package Units Material: Terminal and Package Units Distress: Missing Category: Deferred Maintenance Correction: Install CRCU Note: FM console lacks independent cooling. Install CRCU.
Estimates:Raw Cost $1,670.00
Plus or (Minus) Additional Cost $0.00Total Estimated Amount $1,670.00
Deficiency: Surveyor/Update: Phil Trenbath Fri, 04-Jun-2010Priority: 3Quantity: 1
Assembly: D5020 System: Lighting Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: Lighting system, which is 34 w lamps with hard ballasts, is beyond expected useful life and should be replaced.
Estimates:Raw Cost $1,002,752.52
Plus or (Minus) Additional Cost $0.00Total Estimated Amount $1,002,752.52
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 10
Facility: \Elementary/Middle Schools\Keithville\ 1988 Building (continued)
Deficiency: Surveyor/Update: Phil Trenbath Fri, 04-Jun-2010Priority: 3Quantity: 1
Assembly: D5030 System: Communications and Security - Public
Address & Clock System Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: The clock and PA system is beyond expected life and should be replaced. For integrity of the system, install
wiring in conduit.
Estimates:Raw Cost $227,575.04
Plus or (Minus) Additional Cost $0.00Total Estimated Amount $227,575.04
Deficiency: Surveyor/Update: Phil Trenbath Sun, 07-Mar-2010Priority: 3Quantity: 1
Assembly: D5030 System: Security & CCTV Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: CCTV system is inadequate, beyond expected useful life, and should be replaced. For integrity of system, install
wiring in conduit.
Estimates:Raw Cost $129,788.89
Plus or (Minus) Additional Cost $0.00Total Estimated Amount $129,788.89
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 11
Facility: \Elementary/Middle Schools\Keithville\ 1988 Building (continued)
Deficiency: Surveyor/Update: Phil Trenbath Fri, 04-Jun-2010Priority: 3Quantity: 1
Assembly: E1010 System: Commercial Equipment Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: Commerical equipment, including the kitchen cooler, is beyond expected life and should be replaced.
Estimates:Raw Cost $888,965.00
Plus or (Minus) Additional Cost $0.00Total Estimated Amount $888,965.00
Deficiency: Surveyor/Update: Phil Trenbath Fri, 04-Jun-2010Priority: 3Quantity: 1
Assembly: E2010 System: Fixed Furnishings Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: Fixed furnishings, such as the base/wall cabinets, counter tops, window shades, and fixed seating, are worn,
beyond expected life, and should be replaced.
Estimates:Raw Cost $533,379.00
Plus or (Minus) Additional Cost $0.00Total Estimated Amount $533,379.00
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 12
Facility: \Elementary/Middle Schools\Keithville\Basketball CourtsAddress: 12201 Mansfield Road, Keithville, LA 71047
Attributes: ***None***
General Information: Function: Elementary Middle Year Built: 1988Gross Area: 8,000 S.F. Last Renovation:
Facility Description:
The Basketball Courts at Keithville Elementary/Middle School are located at 12201 Mansfield Road in Keithville, Louisiana. There have been no additions and no renovations. This report contains condition and adequacy data collected during the 2009/2010 Facility Condition Assessment (FCA). The detailed condition and deficiency statements are contained in this report.
Current Repair Cost: $0.00 Replacement Cost: $75,456.00 FCI: 0.00%
19-Feb-2010Keithville Elementary/Middle School Basketball Courts
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 13
Facility: \Elementary/Middle Schools\Keithville\Basketball Courts (continued)
Building Condition:
System Unit Price$
Unit of
Meas Qty Renewal% Renewal$ Life Installed
Calc Next
Renewal
Next
Renewal CI% Deficiency$ Replacement Value FCI%
Total $9.43 S.F. 8,000 109 $82,301 23 1988 2008 2015 25 0 $75,456
Special Construction $6.96 S.F. 8,000 110 $61,248 20 1988 2008 2015 25 $55,680
Special Construction $6.96 S.F. 8,000 110 $61,248 20 1988 2008 2015 25 $55,680
Special Structures - Basketball
Court - Concrete - Outdoor
$6.96 S.F. 8,000 110 $61,248 20 1988 2008 2015 25 $55,680
Building Sitework $2.47 S.F. 8,000 106 $21,053 33 1988 2018 27 $19,776
Site Preparation $0.11 S.F. 8,000 100 $864 100 1988 $864
Site Earthwork $0.11 S.F. 8,000 100 $864 100 1988 $864
Site Improvements $0.77 S.F. 8,000 100 $6,144 30 1988 2018 27 $6,144
Site Development - Fencing $0.77 S.F. 8,000 100 $6,144 30 1988 2018 27 $6,144
Site Electrical Utilities $1.60 S.F. 8,000 110 $14,045 30 1988 2018 27 $12,768
Site Lighting $1.60 S.F. 8,000 110 $14,045 30 1988 2018 27 $12,768
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 14
Facility: \Elementary/Middle Schools\Keithville\Basketball Courts (continued)
Renewal Schedule:
Systems 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
Total $71,003 $25,575
Special Construction $71,003
Special Construction $71,003
Special Structures - Basketball
Court - Concrete - Outdoor
$71,003
Building Sitework $25,575
Site Preparation
Site Earthwork
Site Improvements $7,783
Site Development - Fencing $7,783
Site Electrical Utilities $17,792
Site Lighting $17,792
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 15
Facility: \Elementary/Middle Schools\Keithville\Basketball Courts (continued)
Deficiency Sheet:
*** No Deficiencies Found ***
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 16
Facility: \Elementary/Middle Schools\Keithville\Covered WalkwaysAddress: 12201 Mansfield Road, Keithville, LA 71047
Attributes: ***None***
General Information: Function: Elementary Middle Year Built: 1988Gross Area: 11,220 S.F. Last Renovation:
Facility Description:
Engineered metal covered walkways connect the classrooms and provide some weather protection for the students.
Current Repair Cost: $0.00 Replacement Cost: $280,455.00 FCI: 0.00%
19-Feb-2010North Elevation
25-Feb-2010South Elevation
25-Feb-2010West Elevation
25-Feb-2010South Elevation
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 17
Facility: \Elementary/Middle Schools\Keithville\Covered Walkways (continued)
Building Condition:
System Unit Price$
Unit of
Meas Qty Renewal% Renewal$ Life Installed
Calc Next
Renewal
Next
Renewal CI% Deficiency$ Replacement Value FCI%
Total $25.00 S.F. 11,220 100 $280,455 25 1988 2013 12 0 $280,455
Special Construction $25.00 S.F. 11,220 100 $280,455 25 1988 2013 12 $280,455
Special Construction $25.00 S.F. 11,220 100 $280,455 25 1988 2013 12 $280,455
Special Structures - Covered
Walkways Metal
$25.00 S.F. 11,220 100 $280,455 25 1988 2013 12 $280,455
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 18
Facility: \Elementary/Middle Schools\Keithville\Covered Walkways (continued)
Renewal Schedule:
Systems 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
Total $306,461
Special Construction $306,461
Special Construction $306,461
Special Structures - Covered
Walkways Metal
$306,461
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 19
Facility: \Elementary/Middle Schools\Keithville\Covered Walkways (continued)
Deficiency Sheet:
*** No Deficiencies Found ***
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 20
Facility: \Elementary/Middle Schools\Keithville\Football FieldAddress: 12201 Mansfield Road, Keithville, LA 71047
Attributes: ***None***
General Information: Function: Elementary Middle Year Built: 1988Gross Area: 57,600 S.F. Last Renovation:
Facility Description:
The Football Field at Keithville Elementary/Middle School is located at 12201 Mansfield Road in Keithville, Louisiana. There have been no additions and no renovations. This report contains condition and adequacy data collected during the 2009/2010 Facility Condition Assessment (FCA). The detailed condition and deficiency statements are contained in this report.
Current Repair Cost: $95,040.00 Replacement Cost: $149,990.00 FCI: 63.36%
19-Feb-2010Keithville Elementary/Middle School Football Field
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 21
Facility: \Elementary/Middle Schools\Keithville\Football Field (continued)
Building Condition:
System Unit Price$
Unit of
Meas Qty Renewal% Renewal$ Life Installed
Calc Next
Renewal
Next
Renewal CI% Deficiency$ Replacement Value FCI%
Total $2.60 S.F. 57,600 106 $158,630 52 1988 2008 $95,040 $149,990 63
Special Construction $1.38 S.F. 57,600 110 $87,437 20 1988 2008 $87,437 $79,488 110
Special Construction $1.38 S.F. 57,600 110 $87,437 20 1988 2008 $87,437 $79,488 110
Special Facilities - Field -
Natural Turf
$1.38 S.F. 57,600 110 $87,437 20 1988 2008 $87,437 $79,488 110
Building Sitework $1.22 S.F. 57,600 101 $71,193 91 1988 2008 $7,603 $70,502 11
Site Preparation $1.10 S.F. 57,600 100 $63,590 100 1988 $63,590
Site Earthwork $1.10 S.F. 57,600 100 $63,590 100 1988 $63,590
Site Improvements $0.12 S.F. 57,600 110 $7,603 20 1988 2008 $7,603 $6,912 110
Site Development - Goal Post $0.12 S.F. 57,600 110 $7,603 20 1988 2008 $7,603 $6,912 110
Site Development -
Landscaping & Irrigation
0 0 0 0
Site Mechanical Utilities 0 0 0
Water Supply - Water Service 0 0 0 0
Site Electrical Utilities 0 0 0
Site Lighting 0 0 0 0
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 22
Facility: \Elementary/Middle Schools\Keithville\Football Field (continued)
Renewal Schedule:
Systems 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
Total $95,040
Special Construction $87,437
Special Construction $87,437
Special Facilities - Field - Natural
Turf
$87,437
Building Sitework $7,603
Site Preparation
Site Earthwork
Site Improvements $7,603
Site Development - Goal Post $7,603
Site Development - Landscaping &
Irrigation
Site Mechanical Utilities
Water Supply - Water Service
Site Electrical Utilities
Site Lighting
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 23
Facility: \Elementary/Middle Schools\Keithville\Football Field (continued)
Deficiency Sheet:
Deficiency: Surveyor/Update: Somnath Das Sun, 07-Mar-2010Priority: 3Quantity: 1
Assembly: F1040 System: Special Facilities - Field - Natural Turf Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: The natural turf is in poor condition and should be replaced.
Estimates:Raw Cost $72,864.00
Plus or (Minus) Additional Cost $0.00Total Estimated Amount $72,864.00
Deficiency: Surveyor/Update: Somnath Das Fri, 19-Feb-2010Priority: 3Quantity: 1
Assembly: G2040 System: Site Development - Goal Post Material: System Distress: Beyond Expected Life Category: Capital Renewal Correction: Renew System Note: The goal posts are in poor condition and should be replaced.
Estimates:Raw Cost $6,336.00
Plus or (Minus) Additional Cost $0.00Total Estimated Amount $6,336.00
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 24
Facility: \Elementary/Middle Schools\Keithville\SiteAddress: 12201 Mansfield Road, Keithville, LA 71047
Attributes: Site Area (in Acres) 32.5
General Information: Function: Elementary Middle Year Built: 1988Gross Area: 172,850 S.F. Last Renovation:
Facility Description:
The original site was constructed in 1988. There have been no additions to the site and no major renovations. Campus site features include paved driveways and parking lots, pedestrian pavement, flag pole, landscaping, and fencing. Site mechanical and electrical features include water, sewer, natural gas, and site lighting. This report contains condition and adequacy data collected during the 2009/2010 Facility Condition Assessment (FCA). The detailed condition and deficiency statements are contained in this report.
Current Repair Cost: $0.00 Replacement Cost: $2,584,453.00 FCI: 0.00%
05-Jan-2010Aerial Image of Keithville Elementary/Middle School
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 25
Facility: \Elementary/Middle Schools\Keithville\Site (continued)
Building Condition:
System Unit Price$
Unit of
Meas Qty Renewal% Renewal$ Life Installed
Calc Next
Renewal
Next
Renewal CI% Deficiency$ Replacement Value FCI%
Total $14.95 S.F. 172,850 100 $2,584,455 33 1988 2008 2015 39 0 $2,584,455
Building Sitework $14.95 S.F. 172,850 100 $2,584,455 33 1988 2008 2015 39 $2,584,455
Site Improvements $8.50 S.F. 172,850 100 $1,468,534 28 1988 2008 2015 35 $1,468,534
Roadways $1.38 S.F. 172,850 100 $238,533 50 1988 2038 56 $238,533
Parking Lots $1.18 S.F. 172,850 100 $203,272 30 1988 2018 27 $203,272
Pedestrian Paving $0.82 S.F. 172,850 100 $141,046 50 1988 2038 56 $141,046
Site Development $3.86 S.F. 172,850 100 $667,892 20 1988 2008 2015 25 $667,892
Landscaping $1.26 S.F. 172,850 100 $217,791 10 1988 $217,791
Site Mechanical Utilities $4.86 S.F. 172,850 100 $840,052 44 1988 2018 48 $840,052
Water Supply $0.82 S.F. 172,850 100 $141,046 30 1988 2018 27 $141,046
Sanitary Sewer $0.41 S.F. 172,850 100 $70,523 30 1988 2018 27 $70,523
Storm Sewer $3.52 S.F. 172,850 100 $607,741 50 1988 2038 56 $607,741
Fuel Distribution $0.12 S.F. 172,850 100 $20,742 30 1988 2018 27 $20,742
Site Electrical Utilities $1.60 S.F. 172,850 100 $275,869 30 1988 2018 27 $275,869
Site Lighting $1.60 S.F. 172,850 100 $275,869 30 1988 2018 27 $275,869
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 26
Facility: \Elementary/Middle Schools\Keithville\Site (continued)
Renewal Schedule:
Systems 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
Total $774,270 $901,243
Building Sitework $774,270 $901,243
Site Improvements $774,270 $257,498
Roadways
Parking Lots $257,498
Pedestrian Paving
Site Development $774,270
Landscaping
Site Mechanical Utilities $294,283
Water Supply $178,672
Sanitary Sewer $89,336
Storm Sewer
Fuel Distribution $26,275
Site Electrical Utilities $349,462
Site Lighting $349,462
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 27
Facility: \Elementary/Middle Schools\Keithville\Site (continued)
Deficiency Sheet:
*** No Deficiencies Found ***
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 28
Facility: \Elementary/Middle Schools\Keithville\Softball FieldsAddress: 12201 Mansfield Road, Keithville, LA 71047
Attributes: ***None***
General Information: Function: Elementary Middle Year Built: 1988Gross Area: 80,502 S.F. Last Renovation:
Facility Description:
The Softball Fields at Keithville Elementary/Middle School are located at 12201 Mansfield Road in Keithville, Louisiana. There have been no additions and no renovations. This report contains condition and adequacy data collected during the 2009/2010 Facility Condition Assessment (FCA). The detailed condition and deficiency statements are contained in this report.
Current Repair Cost: $0.00 Replacement Cost: $199,967.00 FCI: 0.00%
19-Feb-2010Keithville Elementary/Middle School Softball Fields
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 29
Facility: \Elementary/Middle Schools\Keithville\Softball Fields (continued)
Building Condition:
System Unit Price$
Unit of
Meas Qty Renewal% Renewal$ Life Installed
Calc Next
Renewal
Next
Renewal CI% Deficiency$ Replacement Value FCI%
Total $2.48 S.F. 80,502 106 $211,076 54 1988 2008 2015 25 0 $199,967
Special Construction $1.38 S.F. 80,502 110 $122,202 20 1988 2008 2015 25 $111,093
Special Construction $1.38 S.F. 80,502 110 $122,202 20 1988 2008 2015 25 $111,093
Special Facilities - Field -
Natural Turf
$1.38 S.F. 80,502 110 $122,202 20 1988 2008 2015 25 $111,093
Building Sitework $1.10 S.F. 80,502 100 $88,874 100 1988 $88,874
Site Preparation $1.10 S.F. 80,502 100 $88,874 100 1988 $88,874
Site Earthwork $1.10 S.F. 80,502 100 $88,874 100 1988 $88,874
Site Improvements 0 0 0
Site Development - Fencing;
Scoreboard
0 0 0 0
Site Development -
Landscaping & Irrigation
0 0 0 0
Site Mechanical Utilities 0 0 0
Water Supply - Water Service 0 0 0 0
Site Electrical Utilities 0 0 0
Site Lighting 0 0 0 0
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 30
Facility: \Elementary/Middle Schools\Keithville\Softball Fields (continued)
Renewal Schedule:
Systems 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
Total $141,666
Special Construction $141,666
Special Construction $141,666
Special Facilities - Field - Natural
Turf
$141,666
Building Sitework
Site Preparation
Site Earthwork
Site Improvements
Site Development - Fencing;
Scoreboard
Site Development - Landscaping &
Irrigation
Site Mechanical Utilities
Water Supply - Water Service
Site Electrical Utilities
Site Lighting
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 31
Facility: \Elementary/Middle Schools\Keithville\Softball Fields (continued)
Deficiency Sheet:
*** No Deficiencies Found ***
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 32
Facility: \Elementary/Middle Schools\Keithville\Tennis CourtAddress: 12201 Mansfield Road, Keithville, LA 71047
Attributes: ***None***
General Information: Function: Elementary Middle Year Built: 1988Gross Area: 14,400 S.F. Last Renovation:
Facility Description:
The Tennis Court at Keithville Elementary/Middle School is located at 12201 Mansfield Road in Keithville, Louisiana. There have been no additions and no renovations. This report contains condition and adequacy data collected during the 2009/2010 Facility Condition Assessment (FCA). The detailed condition and deficiency statements are contained in this report.
Current Repair Cost: $168,601.00 Replacement Cost: $165,888.00 FCI: 101.64%
19-Feb-2010Keithville Elementary/Middle School Tennis Court
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 33
Facility: \Elementary/Middle Schools\Keithville\Tennis Court (continued)
Building Condition:
System Unit Price$
Unit of
Meas Qty Renewal% Renewal$ Life Installed
Calc Next
Renewal
Next
Renewal CI% Deficiency$ Replacement Value FCI%
Total $11.52 S.F. 14,400 109 $181,215 21 1988 2008 27 $168,601 $165,888 102
Special Construction $10.64 S.F. 14,400 110 $168,601 20 1988 2008 $168,601 $153,274 110
Special Construction $10.64 S.F. 14,400 110 $168,601 20 1988 2008 $168,601 $153,274 110
Special Structures - Tennis
Court Hard Surface
$10.64 S.F. 14,400 110 $168,601 20 1988 2008 $168,601 $153,274 110
Building Sitework $0.88 S.F. 14,400 100 $12,614 39 1988 2018 27 $12,614
Site Preparation $0.11 S.F. 14,400 100 $1,555 100 1988 $1,555
Site Earthwork $0.11 S.F. 14,400 100 $1,555 100 1988 $1,555
Site Improvements $0.77 S.F. 14,400 100 $11,059 30 1988 2018 27 $11,059
Site Development - Fencing $0.77 S.F. 14,400 100 $11,059 30 1988 2018 27 $11,059
Site Electrical Utilities 0 0 0
Site Lighting 0 0 0 0
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 34
Facility: \Elementary/Middle Schools\Keithville\Tennis Court (continued)
Renewal Schedule:
Systems 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
Total $168,601 $14,009
Special Construction $168,601
Special Construction $168,601
Special Structures - Tennis Court
Hard Surface
$168,601
Building Sitework $14,009
Site Preparation
Site Earthwork
Site Improvements $14,009
Site Development - Fencing $14,009
Site Electrical Utilities
Site Lighting
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 35
Facility: \Elementary/Middle Schools\Keithville\Tennis Court (continued)
Deficiency Sheet:
Deficiency: Surveyor/Update: Somnath Das Fri, 04-Jun-2010Priority: 3Quantity: 1
Assembly: F1010 System: Special Structures - Tennis Court Hard
Surface Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: The tennis court surface is in poor condition and should be replaced.
Estimates:Raw Cost $140,500.80
Plus or (Minus) Additional Cost $0.00Total Estimated Amount $140,500.80
COMET4 Caddo Parish
1961 Midway COMET4 Survey Report
Deficiency Detail ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 1
Facility
Name Assembly System Material Distress Correction Qty Unit Raw Cost
Additional
Cost Total Cost Priority Def. Cat. Location / Note
Caddo Parish School District $4,086,914 $817,383 $4,904,297 Elementary/Middle Schools $4,086,914 $817,383 $4,904,297 Keithville $4,086,914 $817,383 $4,904,297 1988 Building $3,867,213 $773,443 $4,640,656 Building Systems $3,867,213 $773,443 $4,640,656
C3010 Wall Finishes - Paint
System Beyond Expected Life
Renew System 1 Ea. $284,526 $56,905 $341,431 Necessary- 2-5 Yrs
Deferred Maintenance
The painted wall finishes are worn, beyond expected life, and should be replaced.
D5020 Lighting System Beyond Expected Life
Renew System 1 Ea. $1,002,753 $200,551 $1,203,303 Necessary- 2-5 Yrs
Deferred Maintenance
Lighting system, which is 34 w lamps with hard ballasts, is beyond expected useful life and should be replaced.
D5030 Communications and Security - Public Address & Clock System
System Beyond Expected Life
Renew System 1 Ea. $227,575 $45,515 $273,090 Necessary- 2-5 Yrs
Deferred Maintenance
The clock and PA system is beyond expected life and should be replaced. For integrity of the system, install wiring in conduit.
D5030 Security & CCTV System Beyond Expected Life
Renew System 1 Ea. $129,789 $25,958 $155,747 Necessary- 2-5 Yrs
Deferred Maintenance
CCTV system is inadequate, beyond expected useful life, and should be replaced. For integrity of system, install wiring in conduit.
E1010 Commercial Equipment
System Beyond Expected Life
Renew System 1 Ea. $888,965 $177,793 $1,066,758 Necessary- 2-5 Yrs
Deferred Maintenance
Commerical equipment, including the kitchen cooler, is beyond expected life and should be replaced.
E2010 Fixed Furnishings
System Beyond Expected Life
Renew System 1 Ea. $533,379 $106,676 $640,055 Necessary- 2-5 Yrs
Deferred Maintenance
Fixed furnishings, such as the base/wall cabinets, counter tops, window shades, and fixed seating, are worn, beyond expected life, and should be replaced.
D3030 Cooling Generating Systems
System Inadequate Renew System 1 Ea. $444,483 $88,897 $533,379 Necessary- 2-5 Yrs
Deferred Maintenance
The system has low pressure, R-11 chillers. This presents a potential environmental issue; therefore, the chillers should be replaced.
D3050 Terminal & Package Units
Terminal and Package Units
Missing Install CRCU 1 Each $1,670 $334 $2,004 Necessary- 2-5 Yrs
Deferred Maintenance
FM console lacks independent cooling. Install CRCU.
D2010 Plumbing Fixtures
Plumbing Fixtures
Failing Replace Group Wash Fountain
2 Ea. $12,712 $2,542 $15,254 Necessary- 2-5 Yrs
Deferred Maintenance
Replace worn group wash fountains. Surfaces are deteriorated and hold bacteria.
C3030 Ceiling Finishes System Beyond Expected Life
Renew System 1 Ea. $341,363 $68,273 $409,635 Necessary- 2-5 Yrs
Deferred Maintenance
The ceiling finishes are stained, beyond expected life, and should be replaced.
Football Field $79,200 $15,840 $95,040 Building Systems $79,200 $15,840 $95,040
F1040 Special Facilities - Field - Natural Turf
System Beyond Expected Life
Renew System 1 Ea. $72,864 $14,573 $87,437 Necessary- 2-5 Yrs
Deferred Maintenance
The natural turf is in poor condition and should be replaced.
G2040 Site Development - Goal Post
System Beyond Expected Life
Renew System 1 Ea. $6,336 $1,267 $7,603 Necessary- 2-5 Yrs
Capital Renewal
The goal posts are in poor condition and should be replaced.
COMET4 Caddo Parish
1961 Midway COMET4 Survey Report
Deficiency Detail ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 2
Facility
Name Assembly System Material Distress Correction Qty Unit Raw Cost
Additional
Cost Total Cost Priority Def. Cat. Location / Note
Tennis Court $140,501 $28,100 $168,601 Building Systems $140,501 $28,100 $168,601
F1010 Special Structures - Tennis Court Hard Surface
System Beyond Expected Life
Renew System 1 Ea. $140,501 $28,100 $168,601 Necessary- 2-5 Yrs
Deferred Maintenance
The tennis court surface is in poor condition and should be replaced.
Functional and Educational Adequacy
Suitability Report
Suitability Report - Full
Project:Site:
Suitability
Possible
Score
Score
Percent
Score
CaddoCounty:
1Region:
Rating
315Site #:
Caddo 2009 Keithville Elementary-Midd
Project #:
4057
Site Type: Site Size:Grade Config:
K-8 0.00ES/MS
Suitability - K-8
Site
3.00 3.00 100.00 TrafficGood
1.00 1.00 100.00 Pedestrian TrafficGood
1.35 1.35 100.00 ParkingGood
1.64 0.54 33.00 Play Courts & FieldsPoor
Safety and Security
1.22 0.82 67.00 FencingFair
0.15 0.15 100.00 Signage & Way FindingGood
3.00 3.00 100.00 Ease of SupervisionG/F
0.50 0.50 100.00 Limited EntrancesG/F
0.50 0.50 100.00 Interior CirculationG/F
School Climate
5.00 5.00 100.00 Learning Style VarietyG/F
5.00 5.00 100.00 School EnvironmentG/F
1.00 1.00 100.00 LandscapingG/F
General Classrooms
12.95 8.68 67.00 SizeFair
2.78 2.78 100.00 AdjacenciesGood
2.78 1.86 67.00 Storage\Fixed Equip.Fair
Remedial - Special Needs
3.17 3.17 100.00 SizeGood
0.68 0.68 100.00 AdjacenciesG/F
0.68 0.00 0.00 Storage\Fixed Equip.P/U
Library
2.43 2.43 100.00 SizeGood
0.52 0.52 100.00 AdjacenciesG/F
0.52 0.52 100.00 Storage\Fixed Equip.G/F
P.E.
8.40 4.20 50.00 SizeFair
1.80 1.80 100.00 AdjacenciesG/F
1.80 1.80 100.00 Storage\Fixed Equip.G/F
Music
2.64 2.64 100.00 SizeGood
0.57 0.00 0.00 AdjacenciesP/U
0.57 0.00 0.00 Storage\Fixed Equip.P/U
Art
Page 1 of 43/9/2010 2:17:21PM
Project:Site:
Suitability
Possible
Score
Score
Percent
Score
CaddoCounty:
1Region:
Rating
315Site #:
Caddo 2009 Keithville Elementary-Midd
Project #:
4057
Site Type: Site Size:Grade Config:
K-8 0.00ES/MS
1.53 1.53 100.00 SizeGood
0.33 0.33 100.00 AdjacenciesG/F
0.33 0.33 100.00 Storage\Fixed Equip.G/F
Performing Arts\Auditorium
1.64 1.10 67.00 SizeFair
0.35 0.35 100.00 AdjacenciesGood
0.35 0.35 100.00 Storage\Fixed Equip.Good
Vocational Technical
0.00 0.00 0.00 Size(N/A)
0.00 0.00 0.00 Adjacencies(N/A)
0.00 0.00 0.00 Storage\Fixed Equip.(N/A)
Science
2.70 1.35 50.00 SizeFair
0.58 0.58 100.00 AdjacenciesGood
0.58 0.58 100.00 Storage\Fixed Equip.G/F
Kindergarten
1.18 1.18 100.00 SizeGood
0.25 0.25 100.00 AdjacenciesG/F
0.25 0.25 100.00 Storage\Fixed Equip.G/F
Administration
1.59 0.79 50.00 SizeFair
0.34 0.34 100.00 AdjacenciesG/F
0.34 0.00 0.00 Storage\Fixed Equip.P/U
0.91 0.91 100.00Good Restrooms (Student)
0.91 0.45 50.00Fair Teacher Lounge and Work Room(s)
5.00 1.65 33.00Poor Cafeteria
7.84 7.84 100.00Good Food Prep
0.41 0.20 50.00Fair Counseling
0.34 0.34 100.00G/F Clinic
0.50 0.50 100.00G/F Custodial & Maintenance
93.88 74.14 78.98Total For Site:
Comments
Suitability - K-8
This is a rural combined elementary/middle school with an auditorium, three gyms, two adjacent cafeteria.
Suitability - K-8->Site-->Play Courts & Fields
They have a football field and softball field used for practice and some competition. Some play and recreation
areas are in the Caddo Parish park on adjacent school district land.
Suitability - K-8->Safety and Security-->Fencing
The entire elementary school playground area is fenced in together despite ECE, Pre-k and k-2 age student play
equipment and PE activity differences.
Suitability - K-8->Safety and Security-->Interior Circulation
They have one-way stairwell pedestrian traffic, and long straight corridors in all academic wings.
Page 2 of 43/9/2010 2:17:21PM
Project:Site:
Suitability
Possible
Score
Score
Percent
Score
CaddoCounty:
1Region:
Rating
315Site #:
Caddo 2009 Keithville Elementary-Midd
Project #:
4057
Site Type: Site Size:Grade Config:
K-8 0.00ES/MS
Suitability - K-8->General Classrooms-->Size
Most classrooms are between 750-850sf.
Suitability - K-8->General Classrooms-->Storage\Fixed Equip.
Some rooms need more storage space, and others need relocated or more electrical hookups, and computer drops.
Suitability - K-8->Remedial - Special Needs-->Storage\Fixed Equip.
Several remedial, special ed and resource rooms need more storage space.
Suitability - K-8->Library
The elementary and middle school library are adjoining spaces separated by office, work space, storage and reading
rooms.
Suitability - K-8->Library-->Size
The combined library spaces exceeds 5,000sf, excluding office space and work rooms.
Suitability - K-8->P.E.
There is an auxiliary gym (for middle school use), a large competitive gym, and a small elementary school gym for
PE.
Suitability - K-8->P.E.-->Size
The gym space for elementary school students is small.
Suitability - K-8->P.E.-->Storage\Fixed Equip.
The elementary school gym has a tile floor, and very little storage space.
Suitability - K-8->Music
The school has a large band room (2,100sf) with storage/practice rooms, office space, and instrument storage
room. It also has a good size (1,400sf) elementary school music room.
Suitability - K-8->Music-->Adjacencies
There is a classroom next door to the band room in what was once vocational/technical space.
Suitability - K-8->Music-->Storage\Fixed Equip.
The elementary school music room needs more storage.
Suitability - K-8->Art
The art classroom is large with two adjacent storage/work rooms, one with a kiln.
Suitability - K-8->Art-->Size
The main art classroom is over 800sf.
Suitability - K-8->Performing Arts\Auditorium
The auditorium seats between 550-650 with stage, sound system, and lighting system.
Suitability - K-8->Performing Arts\Auditorium-->Size
The auditorium seats about half the current student body.
Suitability - K-8->Performing Arts\Auditorium-->Storage\Fixed Equip.
It needs some better on-stage lighting for podium presentations. There are ready rooms, storage and bathrooms
near the stage.
Suitability - K-8->Science
There are a series of science classrooms, work space, and storage area, but not typical labs.
Suitability - K-8->Science-->Size
Each room is about 750-850sf.
Suitability - K-8->Administration-->Size
The main office and subsequent administrative office suite space needs more storage areas.
Page 3 of 43/9/2010 2:17:21PM
Project:Site:
Suitability
Possible
Score
Score
Percent
Score
CaddoCounty:
1Region:
Rating
315Site #:
Caddo 2009 Keithville Elementary-Midd
Project #:
4057
Site Type: Site Size:Grade Config:
K-8 0.00ES/MS
Suitability - K-8->Administration-->Storage\Fixed Equip.
Some additional work and storage space needed. Secure space for test storage is lacking.
Suitability - K-8->Teacher Lounge and Work Room(s)
The teacher break area needs some additional lounge/work space for staff of this size. This area becomes very
crowded at lunch.
Suitability - K-8->Cafeteria
There are two adjacent cafeterias (ES & MS). The school serves lunch during a number of serving periods.
Elementary school students need age appropriate hand washing unit.
Suitability - K-8->Counseling
The counseling suite needs more conference room or small meeting spaces for parent/student encounters.
Suitability - K-8->Clinic
There is a designated room in the administrative suite with two cots and locking storage. A bathroom is around the
corner.
Page 4 of 43/9/2010 2:17:21PM
Functional and Educational Adequacy
Technology Readiness Report
Technology Readiness Report - Full
Project:Site:
Technology Readiness
Possible
ScoreScore
Percent
Score
CaddoCounty:
1Region:
Rating
315Site #:
Caddo 2009 Keithville Elementary-Middl
Project #:
4057
Technology Readiness
15.00 15.00 100.00 Comm/IT Equipment Environment Good
10.00 5.00 50.00 Electrical Power Fair
10.00 10.00 100.00 Cooling Good
10.00 10.00 100.00 Drops & Wireless Good
15.00 15.00 100.00 LAN Connectivity Good
10.00 10.00 100.00 WAN Backbone Good
10.00 6.70 67.00 LAN-WAN Performance Fair
5.00 2.50 50.00 Video Distribution Fair
5.00 2.50 50.00 Voice Distribution Fair
10.00 10.00 100.00 Faculty & Staff Technology Good
100.00 86.70 86.70Total For Site:
Comments
Technology Readiness->Electrical Power
Some rooms are in need of more or relocated electrical outlets. They currently use a number of extension cords or
power strips for computers.
Technology Readiness->LAN-WAN Performance
There are some problems with speed and capacity of connections.
Technology Readiness->Video Distribution
The middle school rooms are OK, but the elementary school rooms are not connected to Channel One.
Technology Readiness->Voice Distribution
Communication to the classrooms and throughout the school via an old PA system, and walkie-talkies to
administrative personnel.
Page 1 of 13/9/2010 2:02:59PM
Functional and Educational Adequacy
Capacity and Utilization Report
Capacity Calculations Appendix Preface Some spaces do not contribute to the functional capacity of a school. These spaces are generally spaces
which do not have students assigned to them. Some examples of these spaces include elementary art
rooms, elementary computer labs, elementary music rooms, and special education resource rooms.
Many schools have temporary buildings and these are also not included in the calculation of the
functional capacity. It is the district’s philosophy that, while temporary buildings can be useful in the
short run, they do not provide appropriate long term space and should be eliminated where possible.
Temporary buildings are generally used for the following functions:
1. To house students in temporary classrooms when the school is lacking enough classrooms
2. To house special programs when the school is lacking space for these programs
3. To house necessary storage or administrative support functions when permanent space is lacking
4. To house unnecessary storage or functions
It is the district’s strategy to eliminate all but the absolute necessary temporary buildings and it should
conduct an inventory of the uses of temporary buildings. Where the inventory identifies uses 1-3, the
district will need to consider a more appropriate space solution. In the case of number 4, the district will
need to ensure the principal of the school discontinues the inappropriate use of the temporary building.
Caddo Parish School Board
Instructional Space Model Guidelines
Room Type Students/
Room
Pre-School 20
K Capacity (full day) and 1st Grade 20
Elementary Classroom (2) 24
Elementary Classroom (3-5) 26
Secondary Classroom (6-12) 25
Art (Secondary) 33
Music (Secondary) - Vocal 25
Music (Secondary) - Instrumental 30
Science Lab (Secondary) 25
Voc./Industrial Tech, Foods, Etc. 25
Gym (Secondary) 80
Computer Lab (Elementary)* 26
Computer Lab (Secondary) 33
Spec. Ed. - Severe 9
Spec. Ed. - Resource 0
Alternative Education 18
Portable 0
*These spaces do not contribute to capacity
Scheduling Factors
Elementary Schools 95.0%
Middle Schools 85.0%
High Schools 75.0%
Source: MGT of America, Inc., 2009.
Caddo Parish School Board Capacity Calculations
Keithville Elementary-MiddleES/M K-8
K-1 Classroom: 8
PK Classroom: 1
ES (2) Classroom: 4
ES (3-5) Classroom: 14
ART: 3
Secondary (6-12): 23
MU Inst: 1
MU Vocal: 1
Science: 1
GYM: 3
VO/TEC: 1
*Computer Lab: 2
SE - Resource: 12
SE - Severe: 0
Alt: 0
**Temp Bldg: 0
20
24
20
26
33
25
30
25
25
80
25
33
0
9
18
Room Type # of Classrooms x Students/Room = Capacity
Total Capacity (w/o scheduling factor) =
Keithville Elementary-Middle Capacity =
x Scheduling factor =
20
96
160
364
575
99
30
25
25
240
25
66
0
0
0
0
*Computer Labs at Elementary Schools do not contribute to capacity**The temporary building number represents the number of temporary building teaching stations or rooms, not the number of temporary buildings.
1,466
1,725
85%
N/A
Future Facility and Site Assessment Report
FUTURE FACILITY AND SITE ASSESSMENT
School KEITHVILLE ELEMENTARY/MIDDLE SCHOOL 12201 Mansfield Road Keithville, LA 71047
Site Description 32.5 acre site in a rural town at the south end of the parish facing State Highway 171, aka Mansfield Road. The site is surrounded by woodlands and farmland with scattered single-family residences. The site slopes gently from the highway on the west to the east toward a bayou and lowlands. The school consists of a group of special purpose, 2-story brick veneer buildings with standing seam metal roofs; there are no additions. Site features include concrete paving for parking lots, driveways, and service roads; large open yards and recreation fields with a sprinkling of pine trees, drainage swales, basketball and tennis courts; a water well system supplying potable water and fire protection, and an on-site sewage treatment facility with oxidation ponds.
SUMMARY Topic Grade Comments
Site Adequacy Potential Constraint
Land for expansion of building is plentiful and without inhibiting constraints. SITE ASSESSMENT
Site Size Status Adequate
Student Capacity: 1466 Min. Acres Recommended: 25 Actual Site Acres: 32.5
Usable Area Remaining
Adequate
3.32 Acres. Approximate. Illustrates reasonable use of extra land, locates facilities adjacent to existing buildings as shown on graphic and stays away from the sewage facility; secondary areas would consume part of unstructured recreation yard and tennis courts and destroy a stand of trees.
• Flood Plain Potential Constraint
FEMA data not available.
• Potable Water Potential Constraint
Low pressure reported. CPSB needs to confirm capability of on-site well system to accept an increased load.
• Sanitary Sewer No Constraint
CPSB needs to confirm capability of on-site sewage treatment facility to accept an increased load.
• Storm Drainage No Constraint
• Electricity No Constraint
• Natural Gas No Constraint
• Ground Water No Constraint
• Air Pollution No Constraint
• HazMat/Soils No Constraint
• Habitats No Constraint No conflicts identified by DEQ.
Ease of Access No Constraint
Ease of Traffic Flow No Constraint Bus and auto traffic is separated.
Design Compatibility No Constraint
The school facility fits into the rural residential neighborhood; expansion or replacement would not be intrusive.
Compatibility of Structures
No Constraint The 1988 structures appear to be compatible with contemporary design approaches.
KE
ITH
VIL
LE
EL
EM
EN
TA
RY
/ MID
DL
E S
CH
OO
L12201 M
an
sfie
ld R
dK
eith
ville
, LA
71047
Pu
blis
he
d 0
2.2
6.1
0
Primary 1: 0.85 Ac
Primary 2: 0.41 Ac
Secondary 1: 1.11 Ac
Secondary 2: 0.95 Ac
Total: 3.32 Ac
BA
RR
ON
RD
OLD MANSFIELD RD
N
U.S
. HIG
HW
AY
17
1
WOODLANDS Recreation
Fields
Water
Well
Parking
Sewage
Treatment
Plant
Open YardSlight
Slope
Slight
Slope
G
S
Auto
Dro
p-O
ff
+FH
Bus D
rop-O
ff
GM
+FHG
G
F
F
F
F
F
F
F
F
F
Primary 2
Primary 1
+FH
+FH
F
F
SD
SD
SDSD
FM
FM FM
FM
FM
FMF
F
+FH
SD
SD
SD
SD
SD
SD
SD
SD
W
W
W
W
W
W
W
SD
SD
W
SDSD
F
F F
F
RURAL RESIDENTIAL
RURAL RESIDENTIAL
WOODLANDS
FARMLAND
Lift
StationW SD
F
Secondary
1 Secondary
2
F
Building Code Verification Report
Building Code Number COMPLYNOT
COMPLY
FCA
DEFICIENCY
NOT
KNOWN
SYSTEM
NOT
PRESENT
NA TO FCA
DATA
1Code of Federal Regulations 28 CFR Part
36, 1994 edition, Paragraph 4.1.2,
Paragraph 4.1.6
1 NPFA 101:15.2.3.2; IBC 1017.2
3 IBC 1005.2
5
a
b
c
d
6
a
b
1
2
4 IBC 1011.5.3
1 IBC 1007.3
2 IBC 1020.1
NFPA 101:7.1.3.2.1; IBC 1020.1.2
C2010 Stair Construction
Are all means of egress illuminated at all times building is occupied?
Do exit stairways have a minimum 48” clearance width between handrails?
Are stairs separated by 1-hour fire resistance rating?
Are penetrations into stairs limited to doors, electrical conduit serving the
stairway, piping necessary for the heating or cooling of the exit enclosure,
sprinkler piping, standpipes and penetrations for fire alarm circuits?
Does all door hardware comply by not requiring tight grasping, tight pinching or
twisting to operate?
Maintenance shops?
C10 Interior Construction
C1010 Partitions
C1020 Interior Doors
1
Are corridors 1-hour rated (exceptions: building is sprinklered or each room for
instruction has at least one door directly to the exterior)?
Where there is a chiller, is it separated from a boiler or water heater by a 2-
hour assembly?IBC 508.2
Laundries? NFPA 101:15.3.2.1; IBC 508.2
School Name: Keithville ES/MS
IBC 1005.2
NFPA101:15.2.11.1.1
IBC 1017.1
G2030 Pedestrian Paving
B2020 Exterior Windows
4
BUILDING CODE COMPLIANCE REPORT
Code Provision
Is there a continuous path of entry/exit for handicap accessibility to all parts of
the building?
Do exit access corridors have not less than 6’ of clear width?
Are both 1-hour rating and sprinkler protection provided for the following:
2
IBC 1008.1.8.1
7
8
Boiler and furnace rooms?
Are corridor doors rated a minimum 20-minute rating?
Is glazing in rated doors above 20 minutes limited to 100 square inches?
NFPA 101:15.3.7
NFPA 101:15.3.2.1; IBC 508.2
Does every room or space greater than 250 SF and used for educational
purposes have not less than one outside window for emergency rescue
(exceptions: sprinklered building or room that has a door directly to the
outside)?
Do doors opening in the path of egress travel not reduce the required width to
less than 1/2 during the course of the swing?
When fully open, do corridor doors not project more than 7 inches into the
required corridor width?
Is the building subdivided into compartments by smoke partitions having not
less than a 1-hour fire rating? (Maximum area of compartment is 30,000 SF.
Length or width of building exceeds 300’ unless sprinklered.)
IBC 715.4.4.1
Is 1-hour rating or sprinkler protection provided for the following:
3
3
Hazardous storage?
Janitor’s closet?
Science labs?
Building Code Number COMPLYNOT
COMPLY
FCA
DEFICIENCY
NOT
KNOWN
SYSTEM
NOT
PRESENT
NA TO FCA
DATACode Provision
4
a NFPA 101:7.2.2.2.4.2; IBC 1012.4
b IBC 1012.5
c NFPA 101:7.2.2.4.4.6; IBC 1012.1
d NFPA 101:7.2.2.4.4.2; IBC 1012.2
5 IBC 1007.6
1
2
1 IBC 508.2
2 IBC 1203.1
3INTERNATIONAL MECHANICAL CODE
2000, 606.4
4 IBC 908.6
1 IBC 903.2
1 IBC 907.2
D10 Conveying
D1010 Elevators
3Does the Elevator Machine Room have ventilation or air conditioning to protect
controls from overheating?
Is there an Area of Refuge in the stairwell or in a vestibule entering the stair? Is
there a communication device there?
Continuously graspable?
Between 34” and 38” above the surface of the tread?
Between 1-1/4” and 2” in diameter?
Returning to wall, guard or walking surface?
3 IBC 907.11
IBC 907.2.12.2
Does the shaft have exhaust directly to the outside, an access ladder to the pit,
and battery backup lighting in the shaft/pit?
Are the mechanical rooms separated by fire rated partitions from remainder of
building?
Is there a standard and emergency ventilation system provided?
Are there automatic sprinkler systems provided in assembly spaces with more
than 300 occupants?
2
Is there a refrigerant detection and alarm system provided?
Are there emergency shut-offs provided?
Are the duct smoke detectors connected to the building’s fire alarm control
panel?
Is there a monitored fire alarm system provided?
Does the operation of fire detector, sprinkler device or manual fire alarm box
immediately sounds an alert tone followed by voice instructions giving
approved information and directions for an evacuation?
IBC 3004.1; IBC 3006.1
D30 HVAC Systems
D40 Fire Protection
D4010 Sprinklers
D50 Electrical
D5030 Communications and Security
4
Is there a telephone or intercom communication in the cab?
Is there a fireman control panel at the ground floor controls?
Are handrails:
IBC 3006.2
IBC 3003.2
Energy Conservation Opportunities Report
System Energy Conservation FCA Deficiency Replacement Cost
SCHOOL TYPEENERGY CONSERVATION OPPORTUNITIES
Keithville Elementary/Middle ES/MS
1988 Building Roof Covering No No
Exterior Windows No No
Interior Lighting Yes Yes $1,203,303.00
Bldg Controls & Instrumentation No No
Heating No No
Other HVAC Systems (Ventilation) No No
Terminal & Package Units Yes Yes $2,004.00
Cooling Yes Yes $533,379.00
Site Exterior Lighting No No
Facility Condition Assessment Reports
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 1
Facility: \Elementary/Middle Schools\TurnerAddress: 5904 West 70th Street, Shreveport, LA 71129
Attributes: Temporary Building Rooms 8
General Information: Function: Elementary Middle Year Built:Gross Area: 202,576 S.F. Last Renovation:
Facility Description:
The Turner Elementary/Middle School campus consist one main building located at 5904 West 70th Street in Shreveport, Louisiana. The original campus was constructed in 1984. An addition to the main school building was constructed in 2006. Ancillary buildings adjacent to the campus include the Nursing Staff Center, which preceded the school in 1975 and has a covered storage structure. In addition to the buildings, the campus contains covered walkways, a football field with bleachers (no stadium), and two outdoor basketball courts which are not in use. This report contains condition and adequacy data collected during the 2009/2010 Facility Condition Assessment (FCA). The detailed condition and deficiency statements are contained in this report.
Current Repair Cost: $8,091,184.00 Replacement Cost: $32,953,941.00 FCI: 24.55%
01-Feb-2010Turner Elementary/Middle School
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 2
Facility: \Elementary/Middle Schools\Turner\1975 Nursing Staff CenterAddress: 5904 West 70th Street, Shreveport, LA 71129
Attributes: Number of Floors 1
General Information: Function: Elementary Middle Year Built: 1975Gross Area: 8,698 S.F. Last Renovation:
Facility Description:
The Nursing Staff Center at Turner Elementary/Middle School consists of four 1-story buildings located at West 70th Street (east of the Turner School building) in Shreveport, Louisiana. The center serves the school nurses for Caddo Parish School District. There have been no additions and no major renovations, although HVAC upgrades are scheduled for 2010 and the covered storage shelter behind the Nursing Staff Center is scheduled to be demolished in 2010. This report contains condition and adequacy data collected during the 2009/2010 Facility Condition Assessment (FCA). The detailed condition and deficiency statements are contained in this report.
Current Repair Cost: $433,972.00 Replacement Cost: $1,297,081.00 FCI: 33.46%
01-Feb-2010South Elevation
01-Feb-2010West Elevation
01-Feb-2010North Elevation
01-Feb-2010East Elevation
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 3
Facility: \Elementary/Middle Schools\Turner\1975 Nursing Staff Center (continued)
Building Condition:
System Unit Price$
Unit of
Meas Qty Renewal% Renewal$ Life Installed
Calc Next
Renewal
Next
Renewal CI% Deficiency$ Replacement Value FCI%
Total $149.12 S.F. 8,698 107 $1,381,903 53 1982 1995 2010 83 $433,970 $1,297,080 33
Substructure $19.20 S.F. 8,698 100 $167,002 100 1975 $167,002
Foundations $19.20 S.F. 8,698 100 $167,002 100 1975 $167,002
Standard Foundations $10.20 S.F. 8,698 100 $88,720 100 1975 $88,720
Special Foundations S.F. 8,698 100 100 1975
Slab on Grade $9.00 S.F. 8,698 100 $78,282 100 1975 $78,282
Basement Construction 0 0 0
Basement Excavation 0 0 0 0
Basement Walls 0 0 0 0
Shell $40.74 S.F. 8,698 104 $367,872 83 1975 2005 2010 53 $57,406 $354,356 16
Superstructure $10.80 S.F. 8,698 100 $93,938 100 1975 $93,938
Floor Construction 0 0 0 0
Roof Construction $10.80 S.F. 8,698 100 $93,938 100 1975 $93,938
Exterior Enclosure $20.40 S.F. 8,698 103 $182,657 78 1975 2005 2010 $57,406 $177,439 32
Exterior Walls $14.40 S.F. 8,698 100 $125,251 100 1975 $125,251
Exterior Windows $4.80 S.F. 8,698 110 $45,925 30 1975 2005 2010 $45,925 $41,750 110
Exterior Doors $1.20 S.F. 8,698 110 $11,481 30 1975 2005 2010 $11,481 $10,438 110
Roofing $9.54 S.F. 8,698 110 $91,277 75 1975 2050 53 $82,979
Roof Coverings - BUR 0 0 0 0
Roof Coverings - EPDM 0 0 0 0
Roof Coverings - Standing
Seam Mettal
$9.54 S.F. 8,698 110 $91,277 75 1975 2050 53 $82,979
Roof Openings 0 0 0 0
Interiors $27.50 S.F. 8,698 107 $256,889 52 1982 1995 2010 33 $108,959 $239,229 46
Interior Construction $19.20 S.F. 8,698 106 $177,439 68 1975 1995 2010 12 $57,407 $167,001 34
Partitions $10.80 S.F. 8,698 110 $103,332 100 1975 $93,938
Interior Doors $2.40 S.F. 8,698 80 $16,700 40 1975 2015 2015 12 $20,875
Fittings $6.00 S.F. 8,698 110 $57,407 20 1975 1995 2010 $57,407 $52,188 110
Stairs 0 0 0
Stair Construction 0 0 0 0
Interior Finishes $8.30 S.F. 8,698 110 $79,450 15 1989 1995 2010 46 $51,552 $72,228 71
Wall Finishes - 2009 Paint $2.40 S.F. 760 110 $2,006 10 2009 2019 90 $1,824
Wall Finishes - Original Paint $2.40 S.F. 7,938 110 $20,956 10 1995 2005 2013 30 $19,051
Floor Finishes - 2009 VCT $3.60 S.F. 760 110 $3,010 15 2009 2024 93 $2,736
Floor Finishes - Carpet 0 0 0 0
Floor Finishes - Ceramic &
Quarry Tile
0 0 0 0
Floor Finishes - Original VCT $3.60 S.F. 7,938 110 $31,434 15 1990 2005 2010 $31,434 $28,577 110
Ceiling Finishes - 2009 $2.30 S.F. 760 110 $1,926 20 2009 2029 95 $1,751
Ceiling Finishes -Original $2.30 S.F. 7,938 110 $20,118 20 1975 1995 2010 $20,118 $18,289 110
Services $58.08 S.F. 8,698 110 $555,696 22 1987 1995 98 $236,171 $505,180 47
Conveying 0 0 0
Elevators and Lifts 0 0 0 0
Plumbing $7.34 S.F. 8,698 110 $70,265 30 1975 2005 $70,265 $63,879 110
Plumbing Fixtures $5.89 S.F. 8,698 110 $56,373 30 1975 2005 $56,373 $51,249 110
Domestic Water Distribution $0.44 S.F. 8,698 110 $4,248 30 1975 2005 $4,248 $3,862 110
Sanitary Waste $0.76 S.F. 8,698 110 $7,233 30 1975 2005 $7,233 $6,576 110
Rain Water Drainage S.F. 0 0 0 0
Other Plumbing Systems -
Natural Gas
$0.25 S.F. 8,698 110 $2,411 30 1975 2005 $2,411 $2,192 110
HVAC $32.52 S.F. 8,698 110 $311,144 19 2010 2025 100 $282,859
Heat Generating Systems 0 0 0 0
Cooling Generating Systems 0 0 0 0
Distribution Systems & Exhaust
Systems
$9.12 S.F. 8,698 110 $87,258 30 2010 2040 100 $79,326
Terminal & Package Units $21.60 S.F. 8,698 110 $206,664 15 2010 2025 100 $187,877
Controls & Instrumentation $1.80 S.F. 8,698 110 $17,222 20 2010 2030 100 $15,656
Other HVAC Systems/Equip -
Kitchen Hood
0 0 0 0
Fire Protection 0 0 0
Sprinklers 0 0 0 0
Electrical $18.22 S.F. 8,698 110 $174,287 24 1983 1995 20 $165,906 $158,442 105
Electrical Service/Distribution $2.27 S.F. 8,698 110 $21,700 30 1975 2005 $21,700 $19,727 110
Branch Wiring $6.77 S.F. 8,698 110 $64,755 30 1975 2005 $64,755 $58,868 110
Lighting $6.77 S.F. 8,698 110 $64,755 20 1975 1995 $64,755 $58,868 110
Communications and Security -
Public Address & Clock System
0 0 0 0
Fire Alarm $1.54 S.F. 8,698 110 $14,696 10 1990 2000 $14,696 $13,360 110
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 4
System Unit Price$
Unit of
Meas Qty Renewal% Renewal$ Life Installed
Calc Next
Renewal
Next
Renewal CI% Deficiency$ Replacement Value FCI%
Security & CCTV $0.88 S.F. 8,698 110 $8,381 10 2002 2012 20 $7,619
Other Electrical Systems -
Emergency Generator
0 0 0 0
Equipment & Furnishings $3.60 S.F. 8,698 110 $34,444 20 1978 1995 95 $31,434 $31,313 100
Equipment 0 0 0
Commercial Equipment 0 0 0 0
Institutional Equipment 0 0 0 0
Furnishings $3.60 S.F. 8,698 110 $34,444 20 1978 1995 95 $31,434 $31,313 100
Fixed Furnishings - 2009 $3.60 S.F. 760 110 $3,010 20 2009 2029 95 $2,736
Fixed Furnishings - Original $3.60 S.F. 7,938 110 $31,434 20 1975 1995 $31,434 $28,577 110
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 5
Facility: \Elementary/Middle Schools\Turner\1975 Nursing Staff Center (continued)
Renewal Schedule:
Systems 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
Total $433,970 $8,892 $22,900 $19,360 $2,618 $19,750
Substructure
Foundations
Standard Foundations
Special Foundations
Slab on Grade
Basement Construction
Basement Excavation
Basement Walls
Shell $57,406
Superstructure
Floor Construction
Roof Construction
Exterior Enclosure $57,406
Exterior Walls
Exterior Windows $45,925
Exterior Doors $11,481
Roofing
Roof Coverings - BUR
Roof Coverings - EPDM
Roof Coverings - Standing Seam
Mettal
Roof Openings
Interiors $108,959 $22,900 $19,360 $2,618
Interior Construction $57,407 $19,360
Partitions
Interior Doors $19,360
Fittings $57,407
Stairs
Stair Construction
Interior Finishes $51,552 $22,900 $2,618
Wall Finishes - 2009 Paint $2,618
Wall Finishes - Original Paint $22,900
Floor Finishes - 2009 VCT
Floor Finishes - Carpet
Floor Finishes - Ceramic & Quarry
Tile
Floor Finishes - Original VCT $31,434
Ceiling Finishes - 2009
Ceiling Finishes -Original $20,118
Services $236,171 $8,892 $19,750
Conveying
Elevators and Lifts
Plumbing $70,265
Plumbing Fixtures $56,373
Domestic Water Distribution $4,248
Sanitary Waste $7,233
Rain Water Drainage
Other Plumbing Systems - Natural
Gas
$2,411
HVAC
Heat Generating Systems
Cooling Generating Systems
Distribution Systems & Exhaust
Systems
Terminal & Package Units
Controls & Instrumentation
Other HVAC Systems/Equip -
Kitchen Hood
Fire Protection
Sprinklers
Electrical $165,906 $8,892 $19,750
Electrical Service/Distribution $21,700
Branch Wiring $64,755
Lighting $64,755
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 6
Systems 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
Communications and Security -
Public Address & Clock System
Fire Alarm $14,696 $19,750
Security & CCTV $8,892
Other Electrical Systems -
Emergency Generator
Equipment & Furnishings $31,434
Equipment
Commercial Equipment
Institutional Equipment
Furnishings $31,434
Fixed Furnishings - 2009
Fixed Furnishings - Original $31,434
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 7
Facility: \Elementary/Middle Schools\Turner\1975 Nursing Staff Center (continued)
Deficiency Sheet:
Deficiency: Surveyor/Update: Eric Altman Fri, 04-Jun-2010Priority: 3Quantity: 1
Assembly: B2020 System: Exterior Windows Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: The exterior windows are worn, beyond expected life, and should be replaced.
Estimates:Raw Cost $38,271.20
Plus or (Minus) Additional Cost $0.00Total Estimated Amount $38,271.20
Deficiency: Surveyor/Update: Eric Altman Fri, 04-Jun-2010Priority: 3Quantity: 1
Assembly: B2030 System: Exterior Doors Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: The exterior doors are worn, beyond expected life, and should be replaced.
Estimates:Raw Cost $9,567.80
Plus or (Minus) Additional Cost $0.00Total Estimated Amount $9,567.80
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 8
Facility: \Elementary/Middle Schools\Turner\ 1975 Nursing Staff Center (continued)
Deficiency: Surveyor/Update: Eric Altman Fri, 04-Jun-2010Priority: 3Quantity: 1
Assembly: C1030 System: Fittings Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: Fittings, such as chalk and tack boards, lockers, toilet and bath accessories, toilet partitions, and shelving, are
beyond expected life and should be replaced.
Estimates:Raw Cost $47,839.00
Plus or (Minus) Additional Cost $0.00Total Estimated Amount $47,839.00
Deficiency: Surveyor/Update: Eric Altman Fri, 04-Jun-2010Priority: 3Quantity: 1
Assembly: C3020 System: Floor Finishes - Original VCT Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: The VCT floor finishes are worn, beyond expected life, and should be replaced.
Estimates:Raw Cost $26,195.40
Plus or (Minus) Additional Cost $0.00Total Estimated Amount $26,195.40
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 9
Facility: \Elementary/Middle Schools\Turner\ 1975 Nursing Staff Center (continued)
Deficiency: Surveyor/Update: Eric Altman Fri, 04-Jun-2010Priority: 3Quantity: 1
Assembly: C3030 System: Ceiling Finishes -Original Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: The ceiling finishes are beyond expected life and should be replaced.
Estimates:Raw Cost $16,765.06
Plus or (Minus) Additional Cost $0.00Total Estimated Amount $16,765.06
Deficiency: Surveyor/Update: Eric Altman Fri, 04-Jun-2010Priority: 3Quantity: 1
Assembly: D2010 System: Plumbing Fixtures Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: Plumbing fixtures are old, beyond expected life, and should be replaced.
Estimates:Raw Cost $46,977.90
Plus or (Minus) Additional Cost $0.00Total Estimated Amount $46,977.90
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 10
Facility: \Elementary/Middle Schools\Turner\ 1975 Nursing Staff Center (continued)
Deficiency: Surveyor/Update: Eric Altman Fri, 04-Jun-2010Priority: 3Quantity: 1
Assembly: D2020 System: Domestic Water Distribution Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: Domestic water distribution system is beyond expected life and should be replaced.
Estimates:Raw Cost $3,540.09
Plus or (Minus) Additional Cost $0.00Total Estimated Amount $3,540.09
Deficiency: Surveyor/Update: Eric Altman Fri, 04-Jun-2010Priority: 3Quantity: 1
Assembly: D2030 System: Sanitary Waste Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: Sanitary waste is beyond expected life and should be replaced.
Estimates:Raw Cost $6,027.71
Plus or (Minus) Additional Cost $0.00Total Estimated Amount $6,027.71
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 11
Facility: \Elementary/Middle Schools\Turner\ 1975 Nursing Staff Center (continued)
Deficiency: Surveyor/Update: Eric Altman Fri, 04-Jun-2010Priority: 3Quantity: 1
Assembly: D2090 System: Other Plumbing Systems - Natural Gas Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: System is old, beyond expected life, and should be replaced.
Estimates:Raw Cost $2,009.24
Plus or (Minus) Additional Cost $0.00Total Estimated Amount $2,009.24
Deficiency: Surveyor/Update: Eric Altman Fri, 04-Jun-2010Priority: 3Quantity: 1
Assembly: D5010 System: Electrical Service/Distribution Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: Electrical service/distribution is beyond expected life and should be replaced. Three-phase panelboard was not
accessible at time of field assessment.
Estimates:Raw Cost $18,083.14
Plus or (Minus) Additional Cost $0.00Total Estimated Amount $18,083.14
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 12
Facility: \Elementary/Middle Schools\Turner\ 1975 Nursing Staff Center (continued)
Deficiency: Surveyor/Update: Eric Altman Thu, 03-Jun-2010Priority: 3Quantity: 1
Assembly: D5020 System: Branch Wiring Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: Branch wiring is beyond expected life and should be replaced.
Estimates:Raw Cost $53,962.39
Plus or (Minus) Additional Cost $0.00Total Estimated Amount $53,962.39
Deficiency: Surveyor/Update: Eric Altman Fri, 04-Jun-2010Priority: 3Quantity: 1
Assembly: D5020 System: Lighting Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: Lighting system is beyond expected life and should be replaced.
Estimates:Raw Cost $53,962.39
Plus or (Minus) Additional Cost $0.00Total Estimated Amount $53,962.39
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 13
Facility: \Elementary/Middle Schools\Turner\ 1975 Nursing Staff Center (continued)
Deficiency: Surveyor/Update: Eric Altman Fri, 04-Jun-2010Priority: 3Quantity: 1
Assembly: D5030 System: Fire Alarm Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: The fire alarm system is beyond expected life and should be replaced.
Estimates:Raw Cost $12,246.78
Plus or (Minus) Additional Cost $0.00Total Estimated Amount $12,246.78
Deficiency: Surveyor/Update: Kate McPhillips Fri, 04-Jun-2010Priority: 3Quantity: 1
Assembly: E2010 System: Fixed Furnishings - Original Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: Fixed furnishings, such as the base/wall cabinets, counter tops, window shades, and fixed seating, are worn,
beyond expected life, and should be replaced.
Estimates:Raw Cost $26,195.40
Plus or (Minus) Additional Cost $0.00Total Estimated Amount $26,195.40
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 14
Facility: \Elementary/Middle Schools\Turner\1984 BuildingAddress: 5904 West 70th Street, Shreveport, LA 71129
Attributes: Number of Floors 2
General Information: Function: Elementary Middle Year Built: 1984Gross Area: 172,891 S.F. Last Renovation:
Facility Description:
Turner Elementary/Middle School is a 2-story building located at 5904 West 70th Street in Shreveport, Louisiana. There have been no additions and no major renovations. This report contains condition and adequacy data collected during the 2009/2010 Facility Condition Assessment (FCA). The detailed condition and deficiency statements are contained in this report.
Energy conservation opportunities for this building include: 1) Installation of fixed, double pane, low e, thermal windows with thermal breaks would improve energy use and comfort; 2) Upon replacement of the roof covering, an insulation with a high thermal resistance value should be installed; 3) The plumbing fixtures should be replaced with low flow, energy efficient models; 4) Install high efficiency equipment, including boilers and chillers; 5) Addition of a building automation system would allow programs to improve operation and reduce energy use; 6) A power factor analysis may be justified to provide greater electrical consumption efficiency; and 7) Installation of high efficiency HID (high intensity discharge) lamps and ballasts, plus effective use of lighting controls (timers or photo cells) would, with proper maintenance, improve site lighting effectiveness and reduce electrical energy consumption.
ADA vertical access needs for this facility has been addressed by an elevator that provides access to upper floors and provisions of access to the stage and front entry.
Current Repair Cost: $6,235,572.00 Replacement Cost: $25,666,923.00 FCI: 24.29%
01-Feb-2010South Elevation
01-Feb-2010West Elevation
01-Feb-2010North Elevation
01-Feb-2010East Elevation
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 15
Facility: \Elementary/Middle Schools\Turner\1984 Building (continued)
Building Condition:
System Unit Price$
Unit of
Meas Qty Renewal% Renewal$ Life Installed
Calc Next
Renewal
Next
Renewal CI% Deficiency$ Replacement Value FCI%
Total $148.46 S.F. 172,891 106 $27,278,669 54 1989 1992 2010 31 $6,235,572 $25,666,924 24
Substructure $19.20 S.F. 172,891 100 $3,319,507 100 1984 $3,319,507
Foundations $19.20 S.F. 172,891 100 $3,319,507 100 1984 $3,319,507
Standard Foundations $10.20 S.F. 172,891 100 $1,763,488 100 1984 $1,763,488
Special Foundations S.F. 0 0 0 0
Slab on Grade $9.00 S.F. 172,891 100 $1,556,019 100 1984 $1,556,019
Basement Construction 0 0 0
Basement Excavation 0 0 0 0
Basement Walls 0 0 0 0
Shell $44.43 S.F. 172,891 104 $7,951,942 71 1987 2004 2010 13 $1,814,318 $7,682,232 24
Superstructure $14.43 S.F. 172,891 100 $2,495,503 100 1984 $2,495,503
Floor Construction $13.20 S.F. 47,597 100 $628,280 100 1984 $628,280
Roof Construction $10.80 S.F. 172,891 100 $1,867,223 100 1984 $1,867,223
Exterior Enclosure $20.40 S.F. 172,891 103 $3,630,710 78 1984 2014 13 $3,526,976
Exterior Walls $14.40 S.F. 172,891 100 $2,489,630 100 1984 $2,489,630
Exterior Windows $4.80 S.F. 172,891 110 $912,864 30 1984 2014 13 $829,877
Exterior Doors $1.20 S.F. 172,891 110 $228,216 30 1984 2014 13 $207,469
Roofing $9.60 S.F. 172,891 110 $1,825,729 15 1993 2004 2010 13 $1,814,318 $1,659,753 109
Roof Coverings - BUR $9.54 S.F. 9,533 110 $100,039 20 1984 2004 $100,039 $90,945 110
Roof Coverings - EPDM $9.54 S.F. 163,358 110 $1,714,279 15 2003 2018 2010 $1,714,279 $1,558,435 110
Roof Coverings - Standing
Seam Mettal
0 0 0 0
Roof Openings $0.06 S.F. 172,891 110 $11,411 30 1984 2014 13 $10,373
Interiors $30.68 S.F. 172,891 108 $5,710,109 57 1989 1992 2014 55 $1,623,371 $5,304,172 31
Interior Construction $19.20 S.F. 172,891 106 $3,526,977 68 1984 2004 35 $1,141,081 $3,319,507 34
Partitions $10.80 S.F. 172,891 110 $2,053,945 100 1984 $1,867,223
Interior Doors $2.40 S.F. 172,891 80 $331,951 40 1984 2024 35 $414,938
Fittings $6.00 S.F. 172,891 110 $1,141,081 20 1984 2004 $1,141,081 $1,037,346 110
Stairs $2.58 S.F. 172,891 110 $490,665 100 1984 $446,059
Stair Construction $2.58 S.F. 172,891 110 $490,665 100 1984 $446,059
Interior Finishes $8.90 S.F. 172,891 110 $1,692,467 19 1996 1992 2014 60 $482,290 $1,538,606 31
Wall Finishes - Ceramic &
Glazed
$4.42 S.F. 13,484 110 $65,500 20 1984 2004 2014 20 $59,545
Wall Finishes - Paint $2.40 S.F. 159,407 110 $420,834 10 2005 2015 50 $382,577
Floor Finishes - Carpet $2.76 S.F. 9,102 110 $27,634 8 1984 1992 $27,634 $25,122 110
Floor Finishes - Ceramic &
Quarry Tile
$1.44 S.F. 13,484 110 $21,359 50 1984 2034 48 $19,417
Floor Finishes - Terrazzo $6.05 S.F. 4,340 110 $28,873 50 1984 2034 48 $26,248
Floor Finishes - VCT $3.60 S.F. 138,111 110 $546,920 15 2005 2020 67 $16,481 $497,200 3
Floor Finishes - Wood $16.57 S.F. 7,854 110 $143,172 50 2002 2052 84 $130,156
Ceiling Finishes $2.30 S.F. 172,891 110 $438,175 20 1984 2004 $438,175 $398,341 110
Services $43.34 S.F. 172,891 110 $8,243,166 27 1991 1999 29 $743,938 $7,493,790 10
Conveying $1.20 S.F. 172,891 110 $228,216 30 2000 2030 67 $207,469
Elevators and Lifts $1.20 S.F. 172,891 110 $228,216 30 2000 2030 67 $207,469
Plumbing $7.54 S.F. 172,891 110 $1,433,197 30 1984 2014 13 $1,302,908
Plumbing Fixtures $5.89 S.F. 172,891 110 $1,120,541 30 1984 2014 13 $1,018,674
Domestic Water Distribution $0.44 S.F. 172,891 110 $84,440 30 1984 2014 13 $76,764
Sanitary Waste $0.76 S.F. 172,891 110 $143,776 30 1984 2014 13 $130,706
Rain Water Drainage $0.19 S.F. 172,891 110 $36,515 30 1984 2014 13 $33,195
Other Plumbing Systems -
Natural Gas
$0.25 S.F. 172,891 110 $47,925 30 1984 2014 13 $43,569
HVAC $15.12 S.F. 172,891 110 $2,875,523 29 1987 2004 16 $400,992 $2,614,112 15
Heat Generating Systems 0 0 0 0
Cooling Generating Systems $3.00 S.F. 172,891 110 $570,540 30 1984 2014 13 $31,790 $518,673 6
Distribution Systems & Exhaust
Systems
$9.12 S.F. 172,891 110 $1,734,443 30 1984 2014 13 $26,878 $1,576,766 2
Terminal & Package Units 0 0 0 0
Controls & Instrumentation $1.80 S.F. 172,891 110 $342,324 20 1984 2004 $342,324 $311,204 110
Other HVAC Systems/Equip -
Kitchen Hood
$1.20 S.F. 172,891 110 $228,216 30 1995 2025 50 $207,469
Fire Protection 0 0 0
Sprinklers 0 0 0 0
Electrical $19.49 S.F. 172,891 110 $3,706,230 23 1996 1999 42 $342,946 $3,369,301 10
Electrical Service/Distribution $2.27 S.F. 172,891 110 $431,328 30 1984 2014 13 $392,117
Branch Wiring $6.77 S.F. 172,891 110 $1,287,139 30 1984 2014 13 $1,170,126
Lighting $6.77 S.F. 172,891 110 $1,287,139 20 2004 2024 70 $1,170,126
Communications and Security -
Public Address & Clock System
$0.88 S.F. 172,891 110 $166,598 20 2005 2025 75 $267,635 $151,453 177
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 16
System Unit Price$
Unit of
Meas Qty Renewal% Renewal$ Life Installed
Calc Next
Renewal
Next
Renewal CI% Deficiency$ Replacement Value FCI%
Fire Alarm $1.54 S.F. 172,891 110 $292,117 10 2007 2017 70 $265,561
Security & CCTV $0.88 S.F. 172,891 110 $166,598 10 2005 2015 50 $151,453
Other Electrical Systems -
Emergency Generator
$0.40 S.F. 172,891 110 $75,311 15 1984 1999 $75,311 $68,465 110
Equipment & Furnishings $10.80 S.F. 172,891 110 $2,053,945 20 1984 2004 $2,053,945 $1,867,223 110
Equipment $7.20 S.F. 172,891 110 $1,369,297 20 1984 2004 $1,369,297 $1,244,815 110
Commercial Equipment $6.00 S.F. 172,891 110 $1,141,081 20 1984 2004 $1,141,081 $1,037,346 110
Institutional Equipment $1.20 S.F. 172,891 110 $228,216 20 1984 2004 $228,216 $207,469 110
Furnishings $3.60 S.F. 172,891 110 $684,648 20 1984 2004 $684,648 $622,408 110
Fixed Furnishings $3.60 S.F. 172,891 110 $684,648 20 1984 2004 $684,648 $622,408 110
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 17
Facility: \Elementary/Middle Schools\Turner\1984 Building (continued)
Renewal Schedule:
Systems 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
Total $6,235,572 $7,512,363 $680,995 $359,267 $35,006 $735,014
Substructure
Foundations
Standard Foundations
Special Foundations
Slab on Grade
Basement Construction
Basement Excavation
Basement Walls
Shell $1,814,318 $1,297,139
Superstructure
Floor Construction
Roof Construction
Exterior Enclosure $1,284,296
Exterior Walls
Exterior Windows $1,027,437
Exterior Doors $256,859
Roofing $1,814,318 $12,843
Roof Coverings - BUR $100,039
Roof Coverings - EPDM $1,714,279
Roof Coverings - Standing Seam
Mettal
Roof Openings $12,843
Interiors $1,623,371 $73,721 $487,863 $35,006 $735,014
Interior Construction $1,141,081
Partitions
Interior Doors
Fittings $1,141,081
Stairs
Stair Construction
Interior Finishes $482,290 $73,721 $487,863 $35,006 $735,014
Wall Finishes - Ceramic & Glazed $73,721
Wall Finishes - Paint $487,863
Floor Finishes - Carpet $27,634 $35,006
Floor Finishes - Ceramic & Quarry
Tile
Floor Finishes - Terrazzo
Floor Finishes - VCT $16,481 $735,014
Floor Finishes - Wood
Ceiling Finishes $438,175
Services $743,938 $6,141,503 $193,132 $359,267
Conveying
Elevators and Lifts
Plumbing $1,613,075
Plumbing Fixtures $1,261,179
Domestic Water Distribution $95,038
Sanitary Waste $161,821
Rain Water Drainage $41,097
Other Plumbing Systems - Natural
Gas
$53,940
HVAC $400,992 $2,594,278
Heat Generating Systems
Cooling Generating Systems $31,790 $642,148
Distribution Systems & Exhaust
Systems
$26,878 $1,952,130
Terminal & Package Units
Controls & Instrumentation $342,324
Other HVAC Systems/Equip -
Kitchen Hood
Fire Protection
Sprinklers
Electrical $342,946 $1,934,150 $193,132 $359,267
Electrical Service/Distribution $485,464
Branch Wiring $1,448,686
Lighting
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 18
Systems 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
Communications and Security -
Public Address & Clock System
$267,635
Fire Alarm $359,267
Security & CCTV $193,132
Other Electrical Systems -
Emergency Generator
$75,311
Equipment & Furnishings $2,053,945
Equipment $1,369,297
Commercial Equipment $1,141,081
Institutional Equipment $228,216
Furnishings $684,648
Fixed Furnishings $684,648
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 19
Facility: \Elementary/Middle Schools\Turner\1984 Building (continued)
Deficiency Sheet:
Deficiency: Surveyor/Update: Kate McPhillips Fri, 04-Jun-2010Priority: 3Quantity: 1
Assembly: B3010 System: Roof Coverings - BUR Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: The built up roof is original, beyond expected life, and should be replaced. Roof replacement is to include
appropriate insulation for energy conservation.
Estimates:Raw Cost $83,366.09
Plus or (Minus) Additional Cost $0.00Total Estimated Amount $83,366.09
Deficiency: Surveyor/Update: Kate McPhillips Thu, 04-Mar-2010Priority: 3Quantity: 1
Assembly: B3010 System: Roof Coverings - EPDM Material: System Distress: Inadequate Category: Deferred Maintenance Correction: Renew System Note: The existing metal roof was covered with insulation and an EPDM system in 2003. There are still reported leaks in
several locations, including the library and cafeteria. Roof replacement is to include appropriate insulation for energy conservation.
Estimates:Raw Cost $1,428,565.71
Plus or (Minus) Additional Cost $0.00Total Estimated Amount $1,428,565.71
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 20
Facility: \Elementary/Middle Schools\Turner\ 1984 Building (continued)
Deficiency: Surveyor/Update: Kate McPhillips Fri, 04-Jun-2010Priority: 3Quantity: 1
Assembly: C1030 System: Fittings Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: Fittings, such as chalk and tack boards, lockers, toilet and bath accessories, toilet partitions, and shelving, are
beyond expected life and should be replaced.
Estimates:Raw Cost $950,900.50
Plus or (Minus) Additional Cost $0.00Total Estimated Amount $950,900.50
Deficiency: Surveyor/Update: Kate McPhillips Fri, 04-Jun-2010Priority: 3Quantity: 1
Assembly: C3020 System: Floor Finishes - Carpet Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: Carpet floor finishes in the library are worn, beyond expected life, and should be replaced.
Estimates:Raw Cost $23,028.06
Plus or (Minus) Additional Cost $0.00Total Estimated Amount $23,028.06
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 21
Facility: \Elementary/Middle Schools\Turner\ 1984 Building (continued)
Deficiency: Surveyor/Update: Kate McPhillips Fri, 04-Jun-2010Priority: 3Quantity: 4,112
Assembly: C3020 System: Floor Finishes - VCT Material: Floor Finishes Distress: Failing Category: Critical Repair Correction: Replace VCT Flooring Note: The VCT floor tile in the band room is showing signs of wear, separating, and should be replaced.
Estimates:Raw Cost $13,734.08
Plus or (Minus) Additional Cost $0.00Total Estimated Amount $13,734.08
Deficiency: Surveyor/Update: Kate McPhillips Fri, 04-Jun-2010Priority: 3Quantity: 1
Assembly: C3030 System: Ceiling Finishes Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: The ceiling finishes are beyond expected life and should be replaced.
Estimates:Raw Cost $365,145.79
Plus or (Minus) Additional Cost $0.00Total Estimated Amount $365,145.79
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 22
Facility: \Elementary/Middle Schools\Turner\ 1984 Building (continued)
Deficiency: Surveyor/Update: Eric Altman Fri, 04-Jun-2010Priority: 3Quantity: 2
Assembly: D3030 System: Cooling Generating Systems Material: Terminal and Package Units Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Replace 10 T G/E Pkg Unit, Roof Mount Note: The split DX systems for the administration and library areas are original to the building, beyond expected life,
and should be replaced.
Estimates:Raw Cost $21,692.00
Plus or (Minus) Additional Cost $0.00Total Estimated Amount $21,692.00
Deficiency: Surveyor/Update: Eric Altman Wed, 24-Feb-2010Priority: 3Quantity: 2
Assembly: D3030 System: Cooling Generating Systems Material: Cooling Generation Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Chilled water pump Note: The chilled water pumps are old, in poor condition, and should be replaced.
Estimates:Raw Cost $4,800.00
Plus or (Minus) Additional Cost $0.00Total Estimated Amount $4,800.00
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 23
Facility: \Elementary/Middle Schools\Turner\ 1984 Building (continued)
Deficiency: Surveyor/Update: Eric Altman Fri, 04-Jun-2010Priority: 3Quantity: 2
Assembly: D3040 System: Distribution Systems & Exhaust Systems Material: Distribution Systems Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Replace AHU 5000 CFM Note: The split DX systems for the administration and library areas are original to the building, beyond expected life,
and should be replaced.
Estimates:Raw Cost $22,398.00
Plus or (Minus) Additional Cost $0.00Total Estimated Amount $22,398.00
Deficiency: Surveyor/Update: Eric Altman Fri, 04-Jun-2010Priority: 3Quantity: 1
Assembly: D3060 System: Controls & Instrumentation Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: System is old, beyond expected life, and should be replaced.
Estimates:Raw Cost $285,270.15
Plus or (Minus) Additional Cost $0.00Total Estimated Amount $285,270.15
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 24
Facility: \Elementary/Middle Schools\Turner\ 1984 Building (continued)
Deficiency: Surveyor/Update: Eric Altman Fri, 04-Jun-2010Priority: 3Quantity: 172,891
Assembly: D5030 System: Communications and Security - Public
Address & Clock System Material: Communications/Security Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Replace PA System/SF Note: The communications and security system is original to the building and should be replaced. For integrity of
system, install wiring in conduit.
Estimates:Raw Cost $223,029.39
Plus or (Minus) Additional Cost $0.00Total Estimated Amount $223,029.39
Deficiency: Surveyor/Update: Eric Altman Wed, 24-Feb-2010Priority: 3Quantity: 1
Assembly: D5090 System: Other Electrical Systems - Emergency
Generator Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: There is no generator. This deficiency is for the Exide emergency battery pack system, which is original to the
building, beyond expected useful life, and should be replaced.
Estimates:Raw Cost $62,759.43
Plus or (Minus) Additional Cost $0.00Total Estimated Amount $62,759.43
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 25
Facility: \Elementary/Middle Schools\Turner\ 1984 Building (continued)
Deficiency: Surveyor/Update: Kate McPhillips Fri, 04-Jun-2010Priority: 3Quantity: 1
Assembly: E1010 System: Commercial Equipment Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: The commercial equipment is worn, beyond expected life, and should be replaced.
Estimates:Raw Cost $950,900.50
Plus or (Minus) Additional Cost $0.00Total Estimated Amount $950,900.50
Deficiency: Surveyor/Update: Kate McPhillips Fri, 04-Jun-2010Priority: 3Quantity: 1
Assembly: E1020 System: Institutional Equipment Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: Institutional equipment, such as library equipment, theater and stage equipment, audio-visual equipment, and
laboratory equipment, is beyond expected life and should be replaced.
Estimates:Raw Cost $190,180.10
Plus or (Minus) Additional Cost $0.00Total Estimated Amount $190,180.10
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 26
Facility: \Elementary/Middle Schools\Turner\ 1984 Building (continued)
Deficiency: Surveyor/Update: Kate McPhillips Fri, 04-Jun-2010Priority: 3Quantity: 1
Assembly: E2010 System: Fixed Furnishings Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: Fixed furnishings, such as the base/wall cabinets, counter tops, window shades, and fixed seating, are worn,
beyond expected life, and should be replaced.
Estimates:Raw Cost $570,540.30
Plus or (Minus) Additional Cost $0.00Total Estimated Amount $570,540.30
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 27
Facility: \Elementary/Middle Schools\Turner\2006 Classroom Wing AdditionAddress: 5904 West 70th Street, Shreveport, LA 71129
Attributes: Number of Floors 1
General Information: Function: Elementary Middle Year Built: 2006Gross Area: 18,987 S.F. Last Renovation:
Facility Description:
The 2006 Classroom Wing Addition at Turner Elementary/Middle School is a 1-story building located at 5904 West 70th Street in Shreveport, Louisiana. There have been no additions and no renovations. This report contains condition and adequacy data collected during the 2009/2010 Facility Condition Assessment (FCA). The detailed condition and deficiency statements are contained in this report.
Current Repair Cost: $0.00 Replacement Cost: $2,868,236.00 FCI: 0.00%
01-Feb-2010South Elevation
01-Feb-2010West Elevation
01-Feb-2010North Elevation
01-Feb-2010East Elevation
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 28
Facility: \Elementary/Middle Schools\Turner\2006 Classroom Wing Addition (continued)
Building Condition:
System Unit Price$
Unit of
Meas Qty Renewal% Renewal$ Life Installed
Calc Next
Renewal
Next
Renewal CI% Deficiency$ Replacement Value FCI%
Total $151.06 S.F. 18,987 107 $3,057,088 49 2006 2016 2026 80 0 $2,868,237
Substructure $19.20 S.F. 18,987 100 $364,550 100 2006 $364,550
Foundations $19.20 S.F. 18,987 100 $364,550 100 2006 $364,550
Standard Foundations $10.20 S.F. 18,987 100 $193,667 100 2006 $193,667
Special Foundations 0 0 0 0
Slab on Grade $9.00 S.F. 18,987 100 $170,883 100 2006 $170,883
Basement Construction 0 0 0
Basement Excavation 0 0 0 0
Basement Walls 0 0 0 0
Shell $40.80 S.F. 18,987 104 $804,290 69 2006 2026 2026 83 $774,670
Superstructure $10.80 S.F. 18,987 100 $205,060 100 2006 $205,060
Floor Construction 0 0 0 0
Roof Construction $10.80 S.F. 18,987 100 $205,060 100 2006 $205,060
Exterior Enclosure $20.40 S.F. 18,987 103 $398,727 78 2006 2036 87 $387,335
Exterior Walls $14.40 S.F. 18,987 100 $273,413 100 2006 $273,413
Exterior Windows $4.80 S.F. 18,987 110 $100,251 30 2006 2036 87 $91,138
Exterior Doors $1.20 S.F. 18,987 110 $25,063 30 2006 2036 87 $22,784
Roofing $9.60 S.F. 18,987 110 $200,503 20 2006 2026 2026 80 $182,275
Roof Coverings - BUR $9.54 S.F. 18,987 110 $199,250 20 2006 2026 2026 80 $181,136
Roof Coverings - EPDM 0 0 0 0
Roof Coverings - Standing
Seam Mettal
0 0 0 0
Roof Openings $0.06 S.F. 18,987 110 $1,253 30 2006 2036 87 $1,139
Interiors $27.12 S.F. 18,987 107 $552,649 53 2006 2016 77 $514,836
Interior Construction $19.20 S.F. 18,987 106 $387,335 68 2006 2026 82 $364,551
Partitions $10.80 S.F. 18,987 110 $225,566 100 2006 $205,060
Interior Doors $2.40 S.F. 18,987 80 $36,455 40 2006 2046 90 $45,569
Fittings $6.00 S.F. 18,987 110 $125,314 20 2006 2026 80 $113,922
Stairs 0 0 0
Stair Construction 0 0 0 0
Interior Finishes $7.92 S.F. 18,987 110 $165,314 16 2006 2016 72 $150,285
Wall Finishes - Ceramic &
Glazed
0 0 0 0
Wall Finishes - Paint $2.40 S.F. 18,987 110 $50,126 10 2006 2016 60 $45,569
Floor Finishes - Carpet 0 0 0 0
Floor Finishes - Ceramic &
Quarry Tile
$1.44 S.F. 3,418 110 $5,414 50 2006 2056 92 $4,922
Floor Finishes - Terrazzo 0 0 0 0
Floor Finishes - VCT $3.60 S.F. 15,569 110 $61,653 15 2006 2021 73 $56,048
Ceiling Finishes $2.30 S.F. 18,987 110 $48,121 20 2006 2026 80 $43,746
Services $59.15 S.F. 18,987 110 $1,235,347 22 2006 2016 80 $1,123,044
Conveying 0 0 0
Elevators and Lifts 0 0 0 0
Plumbing $7.54 S.F. 18,987 110 $157,395 30 2006 2036 87 $143,086
Plumbing Fixtures $5.89 S.F. 18,987 110 $123,059 30 2006 2036 87 $111,871
Domestic Water Distribution $0.44 S.F. 18,987 110 $9,273 30 2006 2036 87 $8,430
Sanitary Waste $0.76 S.F. 18,987 110 $15,790 30 2006 2036 87 $14,354
Rain Water Drainage $0.19 S.F. 18,987 110 $4,010 30 2006 2036 87 $3,646
Other Plumbing Systems -
Natural Gas
$0.25 S.F. 18,987 110 $5,263 30 2006 2036 87 $4,785
HVAC $32.52 S.F. 18,987 110 $679,203 19 2006 2021 77 $617,457
Heat Generating Systems 0 0 0 0
Cooling Generating Systems 0 0 0 0
Distribution Systems & Exhaust
Systems
$9.12 S.F. 18,987 110 $190,478 30 2006 2036 87 $173,161
Terminal & Package Units $21.60 S.F. 18,987 110 $451,131 15 2006 2021 73 $410,119
Controls & Instrumentation $1.80 S.F. 18,987 110 $37,594 20 2006 2026 80 $34,177
Other HVAC Systems/Equip -
Kitchen Hood
0 0 0 0
Fire Protection 0 0 0
Sprinklers 0 0 0 0
Electrical $19.09 S.F. 18,987 110 $398,749 23 2006 2016 81 $362,501
Electrical Service/Distribution $2.27 S.F. 18,987 110 $47,369 30 2006 2036 87 $43,063
Branch Wiring $6.77 S.F. 18,987 110 $141,354 30 2006 2036 87 $128,504
Lighting $6.77 S.F. 18,987 110 $141,354 20 2006 2026 80 $128,504
Communications and Security -
Public Address & Clock System
$0.88 S.F. 18,987 110 $18,296 20 2006 2026 80 $16,633
Fire Alarm $1.54 S.F. 18,987 110 $32,080 10 2006 2016 60 $29,164
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 29
System Unit Price$
Unit of
Meas Qty Renewal% Renewal$ Life Installed
Calc Next
Renewal
Next
Renewal CI% Deficiency$ Replacement Value FCI%
Security & CCTV $0.88 S.F. 18,987 110 $18,296 10 2006 2016 60 $16,633
Other Electrical Systems -
Emergency Generator
0 0 0 0
Equipment & Furnishings $4.80 S.F. 18,987 110 $100,252 20 2006 2026 80 $91,137
Equipment $1.20 S.F. 18,987 110 $25,063 20 2006 2026 80 $22,784
Commercial Equipment 0 0 0 0
Institutional Equipment $1.20 S.F. 18,987 110 $25,063 20 2006 2026 80 $22,784
Furnishings $3.60 S.F. 18,987 110 $75,189 20 2006 2026 80 $68,353
Fixed Furnishings $3.60 S.F. 18,987 110 $75,189 20 2006 2026 80 $68,353
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 30
Facility: \Elementary/Middle Schools\Turner\2006 Classroom Wing Addition (continued)
Renewal Schedule:
Systems 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
Total $120,005
Substructure
Foundations
Standard Foundations
Special Foundations
Slab on Grade
Basement Construction
Basement Excavation
Basement Walls
Shell
Superstructure
Floor Construction
Roof Construction
Exterior Enclosure
Exterior Walls
Exterior Windows
Exterior Doors
Roofing
Roof Coverings - BUR
Roof Coverings - EPDM
Roof Coverings - Standing Seam
Mettal
Roof Openings
Interiors $59,853
Interior Construction
Partitions
Interior Doors
Fittings
Stairs
Stair Construction
Interior Finishes $59,853
Wall Finishes - Ceramic & Glazed
Wall Finishes - Paint $59,853
Floor Finishes - Carpet
Floor Finishes - Ceramic & Quarry
Tile
Floor Finishes - Terrazzo
Floor Finishes - VCT
Ceiling Finishes
Services $60,152
Conveying
Elevators and Lifts
Plumbing
Plumbing Fixtures
Domestic Water Distribution
Sanitary Waste
Rain Water Drainage
Other Plumbing Systems - Natural
Gas
HVAC
Heat Generating Systems
Cooling Generating Systems
Distribution Systems & Exhaust
Systems
Terminal & Package Units
Controls & Instrumentation
Other HVAC Systems/Equip -
Kitchen Hood
Fire Protection
Sprinklers
Electrical $60,152
Electrical Service/Distribution
Branch Wiring
Lighting
Communications and Security -
Public Address & Clock System
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 31
Systems 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
Fire Alarm $38,306
Security & CCTV $21,846
Other Electrical Systems -
Emergency Generator
Equipment & Furnishings
Equipment
Commercial Equipment
Institutional Equipment
Furnishings
Fixed Furnishings
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 32
Facility: \Elementary/Middle Schools\Turner\2006 Classroom Wing Addition (continued)
Deficiency Sheet:
*** No Deficiencies Found ***
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 33
Facility: \Elementary/Middle Schools\Turner\Basketball CourtsAddress: 5904 West 70th Street, Shreveport, LA 71129
Attributes: Roof Area (in GSF) 0Site Area (in Acres) 0.18
General Information: Function: Elementary Middle Year Built: 1985Gross Area: 8,000 S.F. Last Renovation:
Facility Description:
The Basketball Courts at Turner Elementary/Middle School are located at 5904 West 70th Street in Shreveport, Louisiana. There have been no additions and no renovations. The basketball goals have been removed and the courts are not in use as of this report. This report contains condition and adequacy data collected during the 2009/2010 Facility Condition Assessment (FCA). The detailed condition and deficiency statements are contained in this report.
Current Repair Cost: $93,667.00 Replacement Cost: $92,160.00 FCI: 101.64%
01-Feb-2010Turner Elementary/Middle School Basketball Courts
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 34
Facility: \Elementary/Middle Schools\Turner\Basketball Courts (continued)
Building Condition:
System Unit Price$
Unit of
Meas Qty Renewal% Renewal$ Life Installed
Calc Next
Renewal
Next
Renewal CI% Deficiency$ Replacement Value FCI%
Total $11.52 S.F. 8,000 109 $100,675 21 1985 2005 17 $93,667 $92,160 102
Special Construction $10.64 S.F. 8,000 110 $93,667 20 1985 2005 $93,667 $85,152 110
Special Construction $10.64 S.F. 8,000 110 $93,667 20 1985 2005 $93,667 $85,152 110
Special Structures - Basketball
Court - Concrete - Outdoor
$10.64 S.F. 8,000 110 $93,667 20 1985 2005 $93,667 $85,152 110
Building Sitework $0.88 S.F. 8,000 100 $7,008 39 1985 2015 17 $7,008
Site Preparation $0.11 S.F. 8,000 100 $864 100 1985 $864
Site Earthwork $0.11 S.F. 8,000 0 $864 100 1985 $864
Site Improvements $0.77 S.F. 8,000 100 $6,144 30 1985 2015 17 $6,144
Site Development - Fencing $0.77 S.F. 8,000 100 $6,144 30 1985 2015 17 $6,144
Site Electrical Utilities 0 0 0
Site Lighting 0 0 0 0
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 35
Facility: \Elementary/Middle Schools\Turner\Basketball Courts (continued)
Renewal Schedule:
Systems 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
Total $93,667 $7,123
Special Construction $93,667
Special Construction $93,667
Special Structures - Basketball
Court - Concrete - Outdoor
$93,667
Building Sitework $7,123
Site Preparation
Site Earthwork
Site Improvements $7,123
Site Development - Fencing $7,123
Site Electrical Utilities
Site Lighting
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 36
Facility: \Elementary/Middle Schools\Turner\Basketball Courts (continued)
Deficiency Sheet:
Deficiency: Surveyor/Update: Kate McPhillips Fri, 04-Jun-2010Priority: 3Quantity: 1
Assembly: F1010 System: Special Structures - Basketball Court -
Concrete - Outdoor Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: The concrete pad is worn, beyond expected life, and should be replaced.
Estimates:Raw Cost $78,056.00
Plus or (Minus) Additional Cost $0.00Total Estimated Amount $78,056.00
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 37
Facility: \Elementary/Middle Schools\Turner\Covered WalkwaysAddress: 5904 West 70th Street, Shreveport, LA 71129
Attributes: Number of Floors 1
General Information: Function: Elementary Middle Year Built: 2009Gross Area: 2,000 S.F. Last Renovation:
Facility Description:
The engineered covered walkways at Turner Elementary/Middle School connect the classrooms and provide some weather protection for the students.
Current Repair Cost: $0.00 Replacement Cost: $49,992.00 FCI: 0.00%
01-Feb-2010North Elevation
01-Feb-2010South Elevation
01-Feb-2010East Elevation
01-Feb-2010Northeast Elevation
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 38
Facility: \Elementary/Middle Schools\Turner\Covered Walkways (continued)
Building Condition:
System Unit Price$
Unit of
Meas Qty Renewal% Renewal$ Life Installed
Calc Next
Renewal
Next
Renewal CI% Deficiency$ Replacement Value FCI%
Total $25.00 S.F. 2,000 100 $49,992 25 2009 2034 96 0 $49,992
Special Construction $25.00 S.F. 2,000 100 $49,992 25 2009 2034 96 $49,992
Special Construction $25.00 S.F. 2,000 100 $49,992 25 2009 2034 96 $49,992
Special Structures - Covered
Walkways Metal
$25.00 S.F. 2,000 100 $49,992 25 2009 2034 96 $49,992
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 39
Facility: \Elementary/Middle Schools\Turner\Covered Walkways (continued)
Renewal Schedule:
Systems 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
Total
Special Construction
Special Construction
Special Structures - Covered
Walkways Metal
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 40
Facility: \Elementary/Middle Schools\Turner\Covered Walkways (continued)
Deficiency Sheet:
*** No Deficiencies Found ***
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 41
Facility: \Elementary/Middle Schools\Turner\Football FieldAddress: 5904 West 70th Street, Shreveport, LA 71129
Attributes: Roof Area (in GSF) 0Site Area (in Acres) 1.32
General Information: Function: Elementary Middle Year Built: 1984Gross Area: 57,600 S.F. Last Renovation:
Facility Description:
The Football Field at Turner Elemetary/Middle School is located at 5904 West 70th Street in Shreveport, Louisiana. There have been no additions and no renovations. This report contains condition and adequacy data collected during the 2009/2010 Facility Condition Assessment (FCA). The detailed condition and deficiency statements are contained in this report.
Current Repair Cost: $100,362.00 Replacement Cost: $154,829.00 FCI: 64.82%
01-Feb-2010Turner Elementary/Middle School Football Field
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 42
Facility: \Elementary/Middle Schools\Turner\Football Field (continued)
Building Condition:
System Unit Price$
Unit of
Meas Qty Renewal% Renewal$ Life Installed
Calc Next
Renewal
Next
Renewal CI% Deficiency$ Replacement Value FCI%
Total $2.69 S.F. 57,600 106 $163,952 51 1984 2004 $100,362 $154,828 65
Special Construction $1.38 S.F. 57,600 110 $87,437 20 1984 2004 $87,437 $79,488 110
Special Construction $1.38 S.F. 57,600 110 $87,437 20 1984 2004 $87,437 $79,488 110
Special Facilities - Field -
Natural Turf
$1.38 S.F. 57,600 110 $87,437 20 1984 2004 $87,437 $79,488 110
Building Sitework $1.31 S.F. 57,600 102 $76,515 86 1984 2004 $12,925 $75,340 17
Site Preparation $1.10 S.F. 57,600 100 $63,590 100 1984 $63,590
Site Earthwork $1.10 S.F. 57,600 100 $63,590 100 1984 $63,590
Site Improvements $0.20 S.F. 57,600 110 $12,925 20 1984 2004 $12,925 $11,750 110
Site Development - Fencing;
Scoreboard; Goal Post
$0.20 S.F. 57,600 110 $12,925 20 1984 2004 $12,925 $11,750 110
Site Development -
Landscaping & Irrigation
0 0 0 0
Site Mechanical Utilities 0 0 0
Water Supply - Water Service 0 0 0 0
Site Electrical Utilities 0 0 0
Site Lighting 0 0 0 0
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 43
Facility: \Elementary/Middle Schools\Turner\Football Field (continued)
Renewal Schedule:
Systems 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
Total $100,362
Special Construction $87,437
Special Construction $87,437
Special Facilities - Field - Natural
Turf
$87,437
Building Sitework $12,925
Site Preparation
Site Earthwork
Site Improvements $12,925
Site Development - Fencing;
Scoreboard; Goal Post
$12,925
Site Development - Landscaping &
Irrigation
Site Mechanical Utilities
Water Supply - Water Service
Site Electrical Utilities
Site Lighting
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 44
Facility: \Elementary/Middle Schools\Turner\Football Field (continued)
Deficiency Sheet:
Deficiency: Surveyor/Update: Eric Altman Fri, 04-Jun-2010Priority: 3Quantity: 1
Assembly: F1040 System: Special Facilities - Field - Natural Turf Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: The natural turf is worn, beyond expected life, and should be replaced.
Estimates:Raw Cost $72,864.00
Plus or (Minus) Additional Cost $0.00Total Estimated Amount $72,864.00
Deficiency: Surveyor/Update: Eric Altman Fri, 04-Jun-2010Priority: 3Quantity: 1
Assembly: G2040 System: Site Development - Fencing; Scoreboard;
Goal Post Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: Site development, including bleachers, goal post, fencing, etc., is worn, beyond expected life, and should be
replaced.
Estimates:Raw Cost $10,771.20
Plus or (Minus) Additional Cost $0.00Total Estimated Amount $10,771.20
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 45
Facility: \Elementary/Middle Schools\Turner\SiteAddress: 5904 West 70th Street, Shreveport, LA 71129
Attributes: Site Area (in Acres) 17
General Information: Function: Elementary Middle Year Built: 1984Gross Area: 202,576 S.F. Last Renovation:
Facility Description:
The original site was constructed in 1984. There have been no additions to the site and no major renovations. Site features include paved driveways and parking lots, pedestrian pavement, flag pole, landscaping, and fencing. Site mechanical and electrical features include water, sewer, natural gas, telephone, and site lighting. This report contains condition and adequacy data collected during the 2009/2010 Facility Condition Assessment (FCA). The detailed condition and deficiency statements are contained in this report.
Current Repair Cost: $1,227,611.00 Replacement Cost: $2,824,720.00 FCI: 43.46%
05-Jan-2010Aerial Image of Turner Elementary/Middle School
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 46
Facility: \Elementary/Middle Schools\Turner\Site (continued)
Building Condition:
System Unit Price$
Unit of
Meas Qty Renewal% Renewal$ Life Installed
Calc Next
Renewal
Next
Renewal CI% Deficiency$ Replacement Value FCI%
Total $13.94 S.F. 202,576 100 $2,824,720 33 1984 2004 2010 36 $1,227,611 $2,824,720 43
Building Sitework $13.94 S.F. 202,576 100 $2,824,720 33 1984 2004 2010 36 $1,227,611 $2,824,720 43
Site Improvements $8.14 S.F. 202,576 100 $1,648,159 27 1984 2004 2010 48 $1,227,611 $1,648,159 74
Roadways $1.18 S.F. 202,576 100 $238,229 50 1984 2034 2010 $238,229 $238,229 100
Parking Lots $1.02 S.F. 202,576 100 $206,628 30 1984 2014 2010 $206,628 $206,628 100
Pedestrian Paving $0.82 S.F. 202,576 100 $165,302 50 1984 2034 48 $165,302
Site Development $3.86 S.F. 202,576 100 $782,754 20 1984 2004 $782,754 $782,754 100
Landscaping $1.26 S.F. 202,576 100 $255,246 10 1984 $255,246
Site Mechanical Utilities $4.86 S.F. 202,576 100 $984,519 44 1984 2014 38 $984,519
Water Supply $0.82 S.F. 202,576 100 $165,302 30 1984 2014 13 $165,302
Sanitary Sewer $0.41 S.F. 202,576 100 $82,651 30 1984 2014 13 $82,651
Storm Sewer $3.52 S.F. 202,576 100 $712,257 50 1984 2034 48 $712,257
Fuel Distribution $0.12 S.F. 202,576 100 $24,309 30 1984 2014 13 $24,309
Site Electrical Utilities $0.95 S.F. 202,576 100 $192,042 30 1984 2014 13 $192,042
Site Lighting $0.95 S.F. 202,576 100 $192,042 30 1984 2014 13 $192,042
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 47
Facility: \Elementary/Middle Schools\Turner\Site (continued)
Renewal Schedule:
Systems 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
Total $1,227,611 $522,578
Building Sitework $1,227,611 $522,578
Site Improvements $1,227,611
Roadways $238,229
Parking Lots $206,628
Pedestrian Paving
Site Development $782,754
Landscaping
Site Mechanical Utilities $306,433
Water Supply $186,049
Sanitary Sewer $93,024
Storm Sewer
Fuel Distribution $27,360
Site Electrical Utilities $216,145
Site Lighting $216,145
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 48
Facility: \Elementary/Middle Schools\Turner\Site (continued)
Deficiency Sheet:
Deficiency: Surveyor/Update: Kate McPhillips Fri, 04-Jun-2010Priority: 3Quantity: 1
Assembly: G2010 System: Roadways Material: System Distress: Failing Category: Deferred Maintenance Correction: Renew System Note: The roadways are worn, beyond expected life, and should be replaced.
Estimates:Raw Cost $198,524.48
Plus or (Minus) Additional Cost $0.00Total Estimated Amount $198,524.48
Deficiency: Surveyor/Update: Kate McPhillips Fri, 04-Jun-2010Priority: 3Quantity: 1
Assembly: G2020 System: Parking Lots Material: System Distress: Failing Category: Deferred Maintenance Correction: Renew System Note: The front and back parking lots are cracking, showing signs of wear, and should be repaved.
Estimates:Raw Cost $172,189.60
Plus or (Minus) Additional Cost $0.00Total Estimated Amount $172,189.60
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 49
Facility: \Elementary/Middle Schools\Turner\ Site (continued)
Deficiency: Surveyor/Update: Kate McPhillips Fri, 04-Jun-2010Priority: 3Quantity: 1
Assembly: G2040 System: Site Development Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: Site development features, such as fences and gates, signs, site furnishings, trash enclosures, playing fields, and
flagpoles, are beyond expected life and should be replaced.
Estimates:Raw Cost $652,294.72
Plus or (Minus) Additional Cost $0.00Total Estimated Amount $652,294.72
COMET4 Caddo Parish
1961 Midway COMET4 Survey Report
Deficiency Detail ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 1
Facility
Name Assembly System Material Distress Correction Qty Unit Raw Cost
Additional
Cost Total Cost Priority Def. Cat. Location / Note
Caddo Parish School District $6,742,654 $1,348,531 $8,091,184 Elementary/Middle Schools $6,742,654 $1,348,531 $8,091,184 Turner $6,742,654 $1,348,531 $8,091,184 1975 Nursing Staff Center $361,644 $72,329 $433,972 Building Systems $361,644 $72,329 $433,972
D5010 Electrical Service/Distribution
System Beyond Expected Life
Renew System 1 Ea. $18,083 $3,617 $21,700 Necessary- 2-5 Yrs
Deferred Maintenance
Electrical service/distribution is beyond expected life and should be replaced. Three-phase panelboard was not accessible at time of field assessment.
D5020 Branch Wiring System Beyond Expected Life
Renew System 1 Ea. $53,962 $10,792 $64,755 Necessary- 2-5 Yrs
Deferred Maintenance
Branch wiring is beyond expected life and should be replaced.
D5020 Lighting System Beyond Expected Life
Renew System 1 Ea. $53,962 $10,792 $64,755 Necessary- 2-5 Yrs
Deferred Maintenance
Lighting system is beyond expected life and should be replaced.
D5030 Fire Alarm System Beyond Expected Life
Renew System 1 Ea. $12,247 $2,449 $14,696 Necessary- 2-5 Yrs
Deferred Maintenance
The fire alarm system is beyond expected life and should be replaced.
D2010 Plumbing Fixtures
System Beyond Expected Life
Renew System 1 Ea. $46,978 $9,396 $56,373 Necessary- 2-5 Yrs
Deferred Maintenance
Plumbing fixtures are old, beyond expected life, and should be replaced.
D2020 Domestic Water Distribution
System Beyond Expected Life
Renew System 1 Ea. $3,540 $708 $4,248 Necessary- 2-5 Yrs
Deferred Maintenance
Domestic water distribution system is beyond expected life and should be replaced.
D2030 Sanitary Waste System Beyond Expected Life
Renew System 1 Ea. $6,028 $1,206 $7,233 Necessary- 2-5 Yrs
Deferred Maintenance
Sanitary waste is beyond expected life and should be replaced.
D2090 Other Plumbing Systems - Natural Gas
System Beyond Expected Life
Renew System 1 Ea. $2,009 $402 $2,411 Necessary- 2-5 Yrs
Deferred Maintenance
System is old, beyond expected life, and should be replaced.
B2020 Exterior Windows
System Beyond Expected Life
Renew System 1 Ea. $38,271 $7,654 $45,925 Necessary- 2-5 Yrs
Deferred Maintenance
The exterior windows are worn, beyond expected life, and should be replaced.
B2030 Exterior Doors System Beyond Expected Life
Renew System 1 Ea. $9,568 $1,914 $11,481 Necessary- 2-5 Yrs
Deferred Maintenance
The exterior doors are worn, beyond expected life, and should be replaced.
C1030 Fittings System Beyond Expected Life
Renew System 1 Ea. $47,839 $9,568 $57,407 Necessary- 2-5 Yrs
Deferred Maintenance
Fittings, such as chalk and tack boards, lockers, toilet and bath accessories, toilet partitions, and shelving, are beyond expected life and should be replaced.
C3020 Floor Finishes - Original VCT
System Beyond Expected Life
Renew System 1 Ea. $26,195 $5,239 $31,434 Necessary- 2-5 Yrs
Deferred Maintenance
The VCT floor finishes are worn, beyond expected life, and should be replaced.
C3030 Ceiling Finishes -Original
System Beyond Expected Life
Renew System 1 Ea. $16,765 $3,353 $20,118 Necessary- 2-5 Yrs
Deferred Maintenance
The ceiling finishes are beyond expected life and should be replaced.
E2010 Fixed Furnishings - Original
System Beyond Expected Life
Renew System 1 Ea. $26,195 $5,239 $31,434 Necessary- 2-5 Yrs
Deferred Maintenance
Fixed furnishings, such as the base/wall cabinets, counter tops, window shades, and fixed seating, are worn, beyond expected life, and should be replaced.
COMET4 Caddo Parish
1961 Midway COMET4 Survey Report
Deficiency Detail ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 2
Facility
Name Assembly System Material Distress Correction Qty Unit Raw Cost
Additional
Cost Total Cost Priority Def. Cat. Location / Note
1984 Building $5,196,310 $1,039,262 $6,235,572 Building Systems $5,196,310 $1,039,262 $6,235,572
E2010 Fixed Furnishings
System Beyond Expected Life
Renew System 1 Ea. $570,540 $114,108 $684,648 Necessary- 2-5 Yrs
Deferred Maintenance
Fixed furnishings, such as the base/wall cabinets, counter tops, window shades, and fixed seating, are worn, beyond expected life, and should be replaced.
E1020 Institutional Equipment
System Beyond Expected Life
Renew System 1 Ea. $190,180 $38,036 $228,216 Necessary- 2-5 Yrs
Deferred Maintenance
Institutional equipment, such as library equipment, theater and stage equipment, audio-visual equipment, and laboratory equipment, is beyond expected life and should be replaced.
C1030 Fittings System Beyond Expected Life
Renew System 1 Ea. $950,901 $190,180 $1,141,081 Necessary- 2-5 Yrs
Deferred Maintenance
Fittings, such as chalk and tack boards, lockers, toilet and bath accessories, toilet partitions, and shelving, are beyond expected life and should be replaced.
C3030 Ceiling Finishes System Beyond Expected Life
Renew System 1 Ea. $365,146 $73,029 $438,175 Necessary- 2-5 Yrs
Deferred Maintenance
The ceiling finishes are beyond expected life and should be replaced.
C3020 Floor Finishes - Carpet
System Beyond Expected Life
Renew System 1 Ea. $23,028 $4,606 $27,634 Necessary- 2-5 Yrs
Deferred Maintenance
Carpet floor finishes in the library are worn, beyond expected life, and should be replaced.
D3060 Controls & Instrumentation
System Beyond Expected Life
Renew System 1 Ea. $285,270 $57,054 $342,324 Necessary- 2-5 Yrs
Deferred Maintenance
System is old, beyond expected life, and should be replaced.
D5090 Other Electrical Systems - Emergency Generator
System Beyond Expected Life
Renew System 1 Ea. $62,759 $12,552 $75,311 Necessary- 2-5 Yrs
Deferred Maintenance
There is no generator. This deficiency is for the Exide emergency battery pack system, which is original to the building, beyond expected useful life, and should be replaced.
D3030 Cooling Generating Systems
Terminal and Package Units
Beyond Expected Life
Replace 10 T G/E Pkg Unit, Roof Mount
2 Ea. $21,692 $4,338 $26,030 Necessary- 2-5 Yrs
Deferred Maintenance
The split DX systems for the administration and library areas are original to the building, beyond expected life, and should be replaced.
D3040 Distribution Systems & Exhaust Systems
Distribution Systems
Beyond Expected Life
Replace AHU 5000 CFM 2 Ea. $22,398 $4,480 $26,878 Necessary- 2-5 Yrs
Deferred Maintenance
The split DX systems for the administration and library areas are original to the building, beyond expected life, and should be replaced.
D5030 Communications and Security - Public Address & Clock System
Communications/Security
Beyond Expected Life
Replace PA System/SF 172,891 S.F. $223,029 $44,606 $267,635 Necessary- 2-5 Yrs
Deferred Maintenance
The communications and security system is original to the building and should be replaced. For integrity of system, install wiring in conduit.
D3030 Cooling Generating Systems
Cooling Generation
Beyond Expected Life
Chilled water pump 2 Each $4,800 $960 $5,760 Necessary- 2-5 Yrs
Deferred Maintenance
The chilled water pumps are old, in poor condition, and should be replaced.
C3020 Floor Finishes - VCT
Floor Finishes Failing Replace VCT Flooring 4,112 S.F. $13,734 $2,747 $16,481 Necessary- 2-5 Yrs
Critical Repair
The VCT floor tile in the band room is showing signs of wear, separating, and should be replaced.
COMET4 Caddo Parish
1961 Midway COMET4 Survey Report
Deficiency Detail ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 3
Facility
Name Assembly System Material Distress Correction Qty Unit Raw Cost
Additional
Cost Total Cost Priority Def. Cat. Location / Note
B3010 Roof Coverings -EPDM
System Inadequate Renew System 1 Ea. $1,428,566 $285,713 $1,714,279 Necessary- 2-5 Yrs
Deferred Maintenance
The existing metal roof was covered with insulation and an EPDM system in 2003. There are still reported leaks in several locations, including the library and cafeteria. Roof replacement is to include appropriate insulation for energy conservation.
B3010 Roof Coverings -BUR
System Beyond Expected Life
Renew System 1 Ea. $83,366 $16,673 $100,039 Necessary- 2-5 Yrs
Deferred Maintenance
The built up roof is original, beyond expected life, and should be replaced. Roof replacement is to include appropriate insulation for energy conservation.
E1010 Commercial Equipment
System Beyond Expected Life
Renew System 1 Ea. $950,901 $190,180 $1,141,081 Necessary- 2-5 Yrs
Deferred Maintenance
The commercial equipment is worn, beyond expected life, and should be replaced.
Basketball Courts $78,056 $15,611 $93,667 Building Systems $78,056 $15,611 $93,667
F1010 Special Structures - Basketball Court - Concrete - Outdoor
System Beyond Expected Life
Renew System 1 Ea. $78,056 $15,611 $93,667 Necessary- 2-5 Yrs
Deferred Maintenance
The concrete pad is worn, beyond expected life, and should be replaced.
Football Field $83,635 $16,727 $100,362 Building Systems $83,635 $16,727 $100,362
F1040 Special Facilities - Field - Natural Turf
System Beyond Expected Life
Renew System 1 Ea. $72,864 $14,573 $87,437 Necessary- 2-5 Yrs
Deferred Maintenance
The natural turf is worn, beyond expected life, and should be replaced.
G2040 Site Development - Fencing; Scoreboard; Goal Post
System Beyond Expected Life
Renew System 1 Ea. $10,771 $2,154 $12,925 Necessary- 2-5 Yrs
Deferred Maintenance
Site development, including bleachers, goal post, fencing, etc., is worn, beyond expected life, and should be replaced.
Site $1,023,009 $204,602 $1,227,611 Building Systems $1,023,009 $204,602 $1,227,611
G2040 Site Development
System Beyond Expected Life
Renew System 1 Ea. $652,295 $130,459 $782,754 Necessary- 2-5 Yrs
Deferred Maintenance
Site development features, such as fences and gates, signs, site furnishings, trash enclosures, playing fields, and flagpoles, are beyond expected life and should be replaced.
G2010 Roadways System Failing Renew System 1 Ea. $198,524 $39,705 $238,229 Necessary- 2-5 Yrs
Deferred Maintenance
The roadways are worn, beyond expected life, and should be replaced.
G2020 Parking Lots System Failing Renew System 1 Ea. $172,190 $34,438 $206,628 Necessary- 2-5 Yrs
Deferred Maintenance
The front and back parking lots are cracking, showing signs of wear, and should be repaved.
Functional and Educational Adequacy
Suitability Report
Suitability Report - Full
Project:Site:
Suitability
Possible
Score
Score
Percent
Score
CaddoCounty:
1Region:
Rating
618Site #:
Caddo 2009 Turner Elementary-Middl
Project #:
4057
Site Type: Site Size:Grade Config:
K-8 0.00ES/MS
Suitability - K-8
Site
3.00 0.99 33.00 TrafficPoor
1.00 0.67 67.00 Pedestrian TrafficFair
1.35 1.35 100.00 ParkingGood
1.64 0.54 33.00 Play Courts & FieldsPoor
Safety and Security
1.22 0.82 67.00 FencingFair
0.15 0.05 33.00 Signage & Way FindingPoor
3.00 0.00 0.00 Ease of SupervisionP/U
0.50 0.00 0.00 Limited EntrancesP/U
0.50 0.00 0.00 Interior CirculationP/U
School Climate
5.00 0.00 0.00 Learning Style VarietyP/U
5.00 0.00 0.00 School EnvironmentP/U
1.00 0.00 0.00 LandscapingP/U
General Classrooms
12.95 8.68 67.00 SizeFair
2.78 1.86 67.00 AdjacenciesFair
2.78 1.86 67.00 Storage\Fixed Equip.Fair
Remedial - Special Needs
3.17 0.00 0.00 SizeP/U
0.68 0.00 0.00 AdjacenciesP/U
0.68 0.00 0.00 Storage\Fixed Equip.P/U
Library
2.43 2.43 100.00 SizeGood
0.52 0.00 0.00 AdjacenciesP/U
0.52 0.52 100.00 Storage\Fixed Equip.G/F
P.E.
8.40 8.40 100.00 SizeGood
1.80 1.80 100.00 AdjacenciesG/F
1.80 1.80 100.00 Storage\Fixed Equip.G/F
Music
2.64 0.00 0.00 SizeP/U
0.57 0.00 0.00 AdjacenciesP/U
0.57 0.00 0.00 Storage\Fixed Equip.P/U
Art
Page 1 of 53/9/2010 2:19:45PM
Project:Site:
Suitability
Possible
Score
Score
Percent
Score
CaddoCounty:
1Region:
Rating
618Site #:
Caddo 2009 Turner Elementary-Middl
Project #:
4057
Site Type: Site Size:Grade Config:
K-8 0.00ES/MS
1.53 0.77 50.00 SizeFair
0.33 0.33 100.00 AdjacenciesG/F
0.33 0.00 0.00 Storage\Fixed Equip.P/U
Performing Arts\Auditorium
1.64 1.64 100.00 SizeGood
0.35 0.24 67.00 AdjacenciesFair
0.35 0.35 100.00 Storage\Fixed Equip.Good
Vocational Technical
4.29 2.87 67.00 SizeFair
0.92 0.92 100.00 AdjacenciesGood
0.92 0.92 100.00 Storage\Fixed Equip.G/F
Science
2.70 1.35 50.00 SizeFair
0.58 0.58 100.00 AdjacenciesGood
0.58 0.00 0.00 Storage\Fixed Equip.P/U
Kindergarten
1.18 0.00 0.00 SizeP/U
0.25 0.25 100.00 AdjacenciesG/F
0.25 0.25 100.00 Storage\Fixed Equip.G/F
Administration
1.59 1.59 100.00 SizeGood
0.34 0.00 0.00 AdjacenciesP/U
0.34 0.34 100.00 Storage\Fixed Equip.G/F
0.91 0.00 0.00P/U Restrooms (Student)
0.91 0.91 100.00Good Teacher Lounge and Work Room(s)
5.00 3.35 67.00Fair Cafeteria
7.84 7.84 100.00Good Food Prep
0.41 0.41 100.00Good Counseling
0.34 0.00 0.00P/U Clinic
0.50 0.50 100.00G/F Custodial & Maintenance
100.00 57.16 57.16Total For Site:
Comments
Suitability - K-8
Turner K-8 is a large complex of buildings serving students from preschool to grade 8. The school was built in the
1980's with several additions since. There are four portable buildings housing 8 classrooms. One other portable is
used for storage. Most classrooms are in a two-story wing with elementary students on one end and middle level
students on the other. There is a separate building for grade 6. The gyms, auditorium, library and cafeteria are in a
separate building with space allocated for each level.
Suitability - K-8->Site-->Traffic
The buses and parents share the same driveway in front of the school. It is separated from the parking and delivery.
There are two driveway loops, one at each end of the building. One is used for daycare pick up.
Suitability - K-8->Site-->Pedestrian Traffic
Pedestrians cross the bus and parent lane to access the school from the parking lot. There are two marked
handicapped lanes that provide a walkway from parking to the entrance.
Page 2 of 53/9/2010 2:19:45PM
Project:Site:
Suitability
Possible
Score
Score
Percent
Score
CaddoCounty:
1Region:
Rating
618Site #:
Caddo 2009 Turner Elementary-Middl
Project #:
4057
Site Type: Site Size:Grade Config:
K-8 0.00ES/MS
Suitability - K-8->Site-->Play Courts & Fields
The school has a large site, but the play areas are not developed. The elementary side has a fenced play area with
grass, but no equipment. There is blacktop with poles, but no backstops. The large, grassed field has 3 old
climbing structures a significant distance from the school. The middle school side has open grass and a blacktop
area with poles, but no backstops.
Suitability - K-8->Safety and Security-->Fencing
There is fencing missing at the elementary play area where the turn around is located. There is fencing missing to
separate the delivery and parking areas from the play areas.
Suitability - K-8->Safety and Security-->Signage & Way Finding
The interior signage includes some room usage and room numbers. There are no way finding signs directing the
public to the office or other areas. The exterior signage includes a large sign at the entrance to the school. There is
no sign at the entrance behind the school and few traffic directional signs.
Suitability - K-8->Safety and Security-->Ease of Supervision
The facility is spread out over several buildings and includes many stairwells that are behind closed doors. The
middle school section includes some open commons areas with locker bays that provide hiding places.
Suitability - K-8->Safety and Security-->Limited Entrances
The school has multiple buildings and has no fencing to control access. All exterior doors are open.
Suitability - K-8->Safety and Security-->Interior Circulation
The stairways are narrow and intersections are congested.
Suitability - K-8->School Climate-->Learning Style Variety
There are a few spaces in the building that support learning style variety, but the building as a whole does not have
flexible learning spaces that accommodate different styles and different sized groups.
Suitability - K-8->School Climate-->School Environment
Some of the spaces are inviting and stimulating. The portable rooms are small and dark. The elementary
classrooms have limited natural light and are visually isolated from each other.
Suitability - K-8->School Climate-->Landscaping
There is only grass around the school.
Suitability - K-8->General Classrooms-->Size
Most of the classrooms do not meet the size standard.
Suitability - K-8->General Classrooms-->Adjacencies
Most classrooms are located near each other, although the library is in a separate building. Some rooms are
located near the music spaces without sufficient acoustical treatment.
Suitability - K-8->General Classrooms-->Storage\Fixed Equip.
Some classrooms have chalkboards only, rather than whiteboards. Some rooms do not have computers.
Suitability - K-8->Remedial - Special Needs-->Size
Most of the rooms used for special education are too small for the program. Some rooms do not have in-room
restrooms.
Suitability - K-8->Remedial - Special Needs-->Adjacencies
There are three special education rooms located in portable buildings behind the elementary wing and not located
near any restrooms.
Suitability - K-8->Remedial - Special Needs-->Storage\Fixed Equip.
Most of the special education rooms lack appropriate storage space for their large equipment. The room in the
portable building lacks a changing area with hot water. The severe room in the main building lacks adequate hot
water control in the changing space.
Page 3 of 53/9/2010 2:19:45PM
Project:Site:
Suitability
Possible
Score
Score
Percent
Score
CaddoCounty:
1Region:
Rating
618Site #:
Caddo 2009 Turner Elementary-Middl
Project #:
4057
Site Type: Site Size:Grade Config:
K-8 0.00ES/MS
Suitability - K-8->Library-->Adjacencies
The library is located in a building separated from the classrooms. It shares a wall with the cafeteria and is adjacent
to the gym/PE areas. There is not adequate acoustical separation between the library and those areas. The internal
acoustics are difficult with elementary activities on one side and middle level activities on the other and no
separation.
Suitability - K-8->P.E.-->Storage\Fixed Equip.
The locker rooms are large enough, but many lockers are broken or missing.
Suitability - K-8->Music-->Size
The middle school band room is large enough for the program. The middle school orchestra and piano rooms are
small, have limited storage, and no practice spaces. The elementary music room is small, has limited storage and
no acoustical treatment to isolate it from the other classrooms in the wing.
Suitability - K-8->Music-->Adjacencies
The middle school band room is isolated. The other rooms are surrounded by general classrooms.
Suitability - K-8->Music-->Storage\Fixed Equip.
The middle school band room has appropriate casework and storage for instruments. The other rooms do not.
Suitability - K-8->Art-->Size
The art room at the elementary school is small for the program. The middle school art room is large enough, but is
not currently being used for art.
Suitability - K-8->Art-->Storage\Fixed Equip.
The elementary art room has limited storage space for large items and for displaying student work. The sink has a
clay trap, but there is no kiln. The middle school room has a large storage room with a vented kiln in the middle. It
is not currently used as an art room.
Suitability - K-8->Performing Arts\Auditorium-->Adjacencies
The auditorium is in a building with PE, cafeteria, and the gyms. It is not adjacent to the music spaces.
Suitability - K-8->Vocational Technical-->Size
There are two rooms used for home living. A large room is set up as a cooking class with stoves, etc. The other
room is used for lecture and does not meet the size standard.
Suitability - K-8->Science-->Size
Most of the science rooms are large enough for the program. The elementary room and the room in the 6th grade
wing do not meet the standard.
Suitability - K-8->Science-->Storage\Fixed Equip.
Most of the science rooms lacked chemical resistant counters and lab tables. Most rooms lacked safety equipment,
including fire extinguishers.
Suitability - K-8->Kindergarten-->Size
There are four kindergarten rooms. None of them meet the size standard.
Suitability - K-8->Administration-->Adjacencies
The office is located near the main entrance, but does not have sight lines to the entrances to the classroom wings
and no active supervision over the entrances.
Suitability - K-8->Restrooms (Student)
There are age-appropriate fixtures in the restrooms in the primary classrooms. None of them are accessible. The
hallway restrooms in the elementary wing do not have age-appropriate fixtures. The restrooms in the gym lack stall
doors and some towel dispensers. There are no urinal privacy partitions.
Suitability - K-8->Cafeteria
The elementary side of the cafeteria is sized appropriately, but the tables are not age-appropriate for the younger
children. The middle school side is small for the program.
Page 4 of 53/9/2010 2:19:45PM
Project:Site:
Suitability
Possible
Score
Score
Percent
Score
CaddoCounty:
1Region:
Rating
618Site #:
Caddo 2009 Turner Elementary-Middl
Project #:
4057
Site Type: Site Size:Grade Config:
K-8 0.00ES/MS
Suitability - K-8->Clinic
The clinic space is not located for easy supervision of any students. The space is difficult to access.
Page 5 of 53/9/2010 2:19:45PM
Functional and Educational Adequacy
Technology Readiness Report
Technology Readiness Report - Full
Project:Site:
Technology Readiness
Possible
ScoreScore
Percent
Score
CaddoCounty:
1Region:
Rating
618Site #:
Caddo 2009 Turner Elementary-Middle
Project #:
4057
Technology Readiness
15.00 7.50 50.00 Comm/IT Equipment Environment Fair
10.00 10.00 100.00 Electrical Power Good
10.00 0.00 0.00 Cooling Unsat
10.00 3.30 33.00 Drops & Wireless Poor
15.00 4.95 33.00 LAN Connectivity Poor
10.00 10.00 100.00 WAN Backbone Good
10.00 3.30 33.00 LAN-WAN Performance Poor
5.00 5.00 100.00 Video Distribution Good
5.00 2.50 50.00 Voice Distribution Fair
10.00 10.00 100.00 Faculty & Staff Technology Good
100.00 56.55 56.55Total For Site:
Comments
Technology Readiness->Comm/IT Equipment Environment
The IT equipment is located in various places across the school. Most equipment is located in custodial closets.
Technology Readiness->Cooling
Many of the rooms were overheated, others were cool. All rooms have central AC, but temperatures vary widely
within the building. The computer labs have no capacity to control the temperature in the space.
Technology Readiness->Drops & Wireless
The spaces that have hard-wired connections are working well. The spaces that are wireless are problematic for
reliable connections to the internet.
Technology Readiness->LAN Connectivity
Some of the computers in the school are connected.
Technology Readiness->LAN-WAN Performance
Computer connectivity is not reliable in this school. The wireless networks are not reliable. Computers that are
hard-wired are more likely to be connected regularly to the internet.
Technology Readiness->Video Distribution
The middle school has Channel 1 televisions, but does not currently subscribe to their program. The elementary
school has a cable connector point in each room.
Technology Readiness->Voice Distribution
The rooms have intercoms, but not phone in most classrooms. Some rooms have portable, hand-held phones that
do not have voicemail and some have battery or other issues.
Technology Readiness->Faculty & Staff Technology
All staff have access to a staff computer station.
Page 1 of 13/9/2010 2:04:56PM
Functional and Educational Adequacy
Capacity and Utilization Report
Capacity Calculations Appendix Preface Some spaces do not contribute to the functional capacity of a school. These spaces are generally spaces
which do not have students assigned to them. Some examples of these spaces include elementary art
rooms, elementary computer labs, elementary music rooms, and special education resource rooms.
Many schools have temporary buildings and these are also not included in the calculation of the
functional capacity. It is the district’s philosophy that, while temporary buildings can be useful in the
short run, they do not provide appropriate long term space and should be eliminated where possible.
Temporary buildings are generally used for the following functions:
1. To house students in temporary classrooms when the school is lacking enough classrooms
2. To house special programs when the school is lacking space for these programs
3. To house necessary storage or administrative support functions when permanent space is lacking
4. To house unnecessary storage or functions
It is the district’s strategy to eliminate all but the absolute necessary temporary buildings and it should
conduct an inventory of the uses of temporary buildings. Where the inventory identifies uses 1-3, the
district will need to consider a more appropriate space solution. In the case of number 4, the district will
need to ensure the principal of the school discontinues the inappropriate use of the temporary building.
Caddo Parish School Board
Instructional Space Model Guidelines
Room Type Students/
Room
Pre-School 20
K Capacity (full day) and 1st Grade 20
Elementary Classroom (2) 24
Elementary Classroom (3-5) 26
Secondary Classroom (6-12) 25
Art (Secondary) 33
Music (Secondary) - Vocal 25
Music (Secondary) - Instrumental 30
Science Lab (Secondary) 25
Voc./Industrial Tech, Foods, Etc. 25
Gym (Secondary) 80
Computer Lab (Elementary)* 26
Computer Lab (Secondary) 33
Spec. Ed. - Severe 9
Spec. Ed. - Resource 0
Alternative Education 18
Portable 0
*These spaces do not contribute to capacity
Scheduling Factors
Elementary Schools 95.0%
Middle Schools 85.0%
High Schools 75.0%
Source: MGT of America, Inc., 2009.
Caddo Parish School Board Capacity Calculations
Turner Elementary-MiddleES/M K-8
K-1 Classroom: 9
PK Classroom: 2
ES (2) Classroom: 3
ES (3-5) Classroom: 11
ART: 2
Secondary (6-12): 22
MU Inst: 3
MU Vocal: 1
Science: 6
GYM: 3
VO/TEC: 2
*Computer Lab: 1
SE - Resource: 6
SE - Severe: 5
Alt: 0
**Temp Bldg: 8
20
24
20
26
33
25
30
25
25
80
25
33
0
9
18
Room Type # of Classrooms x Students/Room = Capacity
Total Capacity (w/o scheduling factor) =
Turner Elementary-Middle Capacity =
x Scheduling factor =
40
72
180
286
550
66
90
25
150
240
50
33
0
45
0
0
*Computer Labs at Elementary Schools do not contribute to capacity**The temporary building number represents the number of temporary building teaching stations or rooms, not the number of temporary buildings.
1,553
1,827
85%
N/A
Future Facility and Site Assessment Report
FUTURE FACILITY AND SITE ASSESSMENT
School TURNER ELEMENTARY / MIDDLE SCHOOL 5904 West 70th Street Shreveport, LA 71129
Site Description 17 acre site, part of a larger tract shared with adjacent Huntington High, set amidst the developing western Shreveport just west of the airport, with a multi-family residential neighborhood, church, and commercial to the south across West 70
th Street, a major arterial, multi-family residential to the west across
Rasberry Lane, and undeveloped woodlands to the east. The site slopes gently down from the north toward Turner. The school consists of a 2-story main building and multiple 1- story units added incrementally, with interior corridors and connected by covered outdoor walkways, some of which have barrel vaults. The buildings have flat roofs and the exterior envelope consists of brick walls with a minimum of punched windows; the second story has a skin of metal siding. There is a collection of temporary buildings at the school. Site features include concrete parking lots and drives, a football practice field, and a couple of basketball courts. On the east side of the property is a collection of small buildings and sheds comprising the CPSB Nursing Staff Center. The buildings are pre-engineered modular buildings and also a large open shed in the back used for open air storage. Site features include driveways around the back service areas and a front parking lot.
SUMMARY Topic Grade Comments
Site Adequacy Potential
Constraint
Land for expansion of building is available and without inhibiting constraints but site is much smaller than guideline for the population. SITE ASSESSMENT
Site Size Status Inadequate
Student Capacity: 1515 Min. Acres Recommended: 35 Actual Site Acres: 17.0
Usable Area Remaining
Adequate
4.84 Acres. Approximates the reasonably usable land adjacent to the current facilities (includes both Turner and Nursing Staff Center). Assumes major setbacks from property lines and roadways and aligns with building forms shown on graphic. Expansion areas would not consume recreation fields, or athletic facilities. Expansion zones at the Nursing facility might require redevelopment of the site for most efficient usage.
• Flood Plain No Constraint
• Potable Water No Constraint Low pressure reported.
• Sanitary Sewer No Constraint
• Storm Drainage No Constraint Some ponding reported in the parking lot.
• Electricity No Constraint
• Natural Gas No Constraint
• Ground Water No Constraint
• Air Pollution No Constraint
• HazMat/Soils No Constraint
• Habitats No Constraint No conflicts identified by DEQ.
Ease of Access No Constraint
Ease of Traffic Flow Needs Improvement
Bus and auto traffic use same driveways at front of building but have separate loading areas; these are congested at
pickup time and conflict with parking lot. Separate drives and loading areas with bypass lanes and more queuing are desirable.
Design Compatibility No Constraint
The school facility fits into the neighborhood and has grown over the years; expansion would not be intrusive.
Compatibility of Structures
Potential Constraint
The configuration is generally compatible with contemporary design approaches to schools and the materials and general forms are easily blended with current designs as demonstrated by recent additions. Wall and roof assemblies may not adequately support today’s building systems. The open connected walkways between buildings pose a security risk.
TU
RN
ER
EL
EM
./MID
DL
E S
CH
OO
L5904 W
est 7
0th
Stre
et
Sh
revep
ort, L
A 7
1129
N
WEST 70TH STREET
RA
SB
ER
RY
LA
NE
Pu
blis
he
d 0
2.1
2.1
0
COMMERCIAL
MU
LT
I-FA
MIL
Y
RE
SID
EN
TIA
L
MULTI-FAMILYCHURCH
CPSB Nursing
Staff Center
Turner Football
Field
WO
OD
LA
ND
S
HUNTINGTON
HS
Slo
pe
Bus & Auto Drop-Off
+FH
Parking
SMH
E E E E E EE E E E E E EE
+FH
+FH
+FH
SMH
WM
GM
Park
ing
Parking
ParkingParking
Parking
T
UE
UE
UE
E
E
EEE
E
Primary
1Primary
2
New
Bldg
Second-
ary 1
Slope
Existing
BldgPrimary
3
Primary 1: 1.63 Ac
Primary 2: 0.64 Ac
Primary 3: 0.98 Ac
Secondary 1: 0.51 Ac
Secondary 2: 1.08 Ac
Total: 4.84 Ac
Secondary 2
(Redevelop)
Utility Data Incomplete
Parking
Building Code Verification Report
Building Code Number COMPLYNOT
COMPLY
FCA
DEFICIENCY
NOT
KNOWN
SYSTEM
NOT
PRESENT
NA TO FCA
DATA
1Code of Federal Regulations 28 CFR Part
36, 1994 edition, Paragraph 4.1.2,
Paragraph 4.1.6
1 NPFA 101:15.2.3.2; IBC 1017.2
3 IBC 1005.2
5
a
b
c
d
6
a
b
1
2
4 IBC 1011.5.3
1 IBC 1007.3
2 IBC 1020.1
Are penetrations into stairs limited to doors, electrical conduit serving the
stairway, piping necessary for the heating or cooling of the exit enclosure,
sprinkler piping, standpipes and penetrations for fire alarm circuits?
8
Boiler and furnace rooms?
Are corridor doors rated a minimum 20-minute rating?
Is glazing in rated doors above 20 minutes limited to 100 square inches?
NFPA 101:15.3.7
NFPA 101:15.3.2.1; IBC 508.2
Does every room or space greater than 250 SF and used for educational
purposes have not less than one outside window for emergency rescue
(exceptions: sprinklered building or room that has a door directly to the
outside)?
Do doors opening in the path of egress travel not reduce the required width to
less than 1/2 during the course of the swing?
When fully open, do corridor doors not project more than 7 inches into the
required corridor width?
Is the building subdivided into compartments by smoke partitions having not
less than a 1-hour fire rating? (Maximum area of compartment is 30,000 SF.
Length or width of building exceeds 300’ unless sprinklered.)
IBC 715.4.4.1
Is 1-hour rating or sprinkler protection provided for the following:
Hazardous storage?
Janitor’s closet?
IBC 1008.1.8.1
Where there is a chiller, is it separated from a boiler or water heater by a 2-
hour assembly?
Laundries? NFPA 101:15.3.2.1; IBC 508.2
School Name: Turner ES/MS
NFPA101:15.2.11.1.1
G2030 Pedestrian Paving
B2020 Exterior Windows
4
BUILDING CODE COMPLIANCE REPORT
Code Provision
Is there a continuous path of entry/exit for handicap accessibility to all parts of
the building?
Do exit access corridors have not less than 6’ of clear width?
Are both 1-hour rating and sprinkler protection provided for the following:
Science labs?
7
Does all door hardware comply by not requiring tight grasping, tight pinching or
twisting to operate?
Maintenance shops?
IBC 508.2
C10 Interior Construction
C1010 Partitions
C1020 Interior Doors
1
IBC 1005.2
Are corridors 1-hour rated (exceptions: building is sprinklered or each room for
instruction has at least one door directly to the exterior)?IBC 1017.1
2
3
NFPA 101:7.1.3.2.1; IBC 1020.1.2
C2010 Stair Construction
Are all means of egress illuminated at all times building is occupied?
Do exit stairways have a minimum 48” clearance width between handrails?
Are stairs separated by 1-hour fire resistance rating?
3
Building Code Number COMPLYNOT
COMPLY
FCA
DEFICIENCY
NOT
KNOWN
SYSTEM
NOT
PRESENT
NA TO FCA
DATACode Provision
4
a NFPA 101:7.2.2.2.4.2; IBC 1012.4
b IBC 1012.5
c NFPA 101:7.2.2.4.4.6; IBC 1012.1
d NFPA 101:7.2.2.4.4.2; IBC 1012.2
5 IBC 1007.6
1
2
1 IBC 508.2
2 IBC 1203.1
3INTERNATIONAL MECHANICAL CODE
2000, 606.4
4 IBC 908.6
1 IBC 903.2
1 IBC 907.2
Is there a telephone or intercom communication in the cab?
Is there a fireman control panel at the ground floor controls?
Are handrails:
IBC 3006.2
IBC 3003.2
Is there an Area of Refuge in the stairwell or in a vestibule entering the stair? Is
there a communication device there?
Between 34” and 38” above the surface of the tread?
Between 1-1/4” and 2” in diameter?
Returning to wall, guard or walking surface?
3 IBC 907.11
IBC 907.2.12.2
Does the shaft have exhaust directly to the outside, an access ladder to the pit,
and battery backup lighting in the shaft/pit?
Are the mechanical rooms separated by fire rated partitions from remainder of
building?
Is there a standard and emergency ventilation system provided?
Are there automatic sprinkler systems provided in assembly spaces with more
than 300 occupants?
2
Is there a refrigerant detection and alarm system provided?
Are there emergency shut-offs provided?
Are the duct smoke detectors connected to the building’s fire alarm control
panel?
Is there a monitored fire alarm system provided?
Does the operation of fire detector, sprinkler device or manual fire alarm box
immediately sounds an alert tone followed by voice instructions giving
approved information and directions for an evacuation?
IBC 3004.1; IBC 3006.1
D30 HVAC Systems
D40 Fire Protection
D4010 Sprinklers
D50 Electrical
D5030 Communications and Security
4
D10 Conveying
D1010 Elevators
3Does the Elevator Machine Room have ventilation or air conditioning to protect
controls from overheating?
Continuously graspable?
Energy Conservation Opportunities Report
System Energy Conservation FCA Deficiency Replacement Cost
SCHOOL TYPEENERGY CONSERVATION OPPORTUNITIES
Turner Elementary/Middle ES/MS
1975 Nursing Staff Center Roof Covering No No
Exterior Windows Yes Yes $45,925.00
Interior Lighting Yes Yes $64,755.00
Bldg Controls & Instrumentation No No
Heating No No
Other HVAC Systems (Ventilation) No No
Terminal & Package Units No No
Cooling No No
1984 Building Roof Covering Yes Yes $1,814,318.00
Exterior Windows No No
Interior Lighting No No
Bldg Controls & Instrumentation Yes Yes $342,324.00
Heating No No
Other HVAC Systems (Ventilation) Partial Yes $26,878.00
Terminal & Package Units No No
Cooling Partial Yes $31,790.00
2006 Classroom Wing Addition Roof Covering No No
Exterior Windows No No
Interior Lighting No No
Bldg Controls & Instrumentation No No
Heating No No
Other HVAC Systems (Ventilation) No No
Terminal & Package Units No No
Cooling No No
Site Exterior Lighting No No
Facility Condition Assessment Reports
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 1
Facility: \Elementary/Middle Schools\VivianAddress: 100 W. Kentucky Ave., Vivian, LA 71082
Attributes: Temporary Building Rooms 2
General Information: Function: Elementary Middle Year Built:Gross Area: 129,177 S.F. Last Renovation:
Facility Description:
The Vivian Elementary/Middle School campus consists of one main school building and six ancillary buildings located at on 100 West Kentucky Avenue in Vivian, Louisiana. The original campus was constructed in 1923. Ancillary buildings on campus include the 1989 C & D Buildings, 1999 E Building, 2004 H Building, covered walkways, and the Pine Street Building. In addition to the buildings, the campus contains basketball courts. This report contains condition and adequacy data collected during the 2009/2010 Facility Condition Assessment (FCA). The detailed condition and deficiency statements are contained in this report.
Current Repair Cost: $3,726,480.00 Replacement Cost: $22,089,677.00 FCI: 16.87%
20-Jan-2010Vivian Elementary/Middle School
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 2
Facility: \Elementary/Middle Schools\Vivian\1923, 1930, 1972 (A&B Bldgs)Address: 100 W. Kentucky Avenue, Vivian , LA 71082
Attributes: Number of Floors 2
General Information: Function: Elementary Middle Year Built: 1923Gross Area: 61,634 S.F. Last Renovation:
Facility Description:
Vivian Elementary/Middle School is a 2-story building, designated as Buildings A and B, located at 100 West Kentucky in Vivian, Louisiana. There have been additions in 1930 and 1972, and HVAC and roofing renovations. This report contains condition and adequacy data collected during the 2009/2010 Facility Condition Assessment (FCA). The detailed condition and deficiency statements are contained in this report for each building.
Energy conservation opportunities for this building include: 1) installation of fixed, double pane, low e, thermal windows with thermal breaks would improve energy use and improve comfort; 2) Upon replacement of the roof covering, an insulation with a high thermal resistance value should be installed; 3) The plumbing fixtures should be replaced with low flow, energy efficient models; 4) Addition of a building automation system would allow programs to improve operation and reduce energy use; and 5) A power factor analysis may be justified to provide greater electrical consumption efficiency.
ADA vertical access needs for this building include provision of an elevator in B building and front entry access.
Current Repair Cost: $2,386,732.00 Replacement Cost: $10,228,117.00 FCI: 23.34%
20-Jan-2010East Elevation
20-Jan-2010South Elevation
20-Jan-2010North Elevation
20-Jan-2010West Elevation
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 3
Facility: \Elementary/Middle Schools\Vivian\1923, 1930, 1972 (A&B Bldgs) (continued)
Building Condition:
System Unit Price$
Unit of
Meas Qty Renewal% Renewal$ Life Installed
Calc Next
Renewal
Next
Renewal CI% Deficiency$ Replacement Value FCI%
Total $165.95 S.F. 61,634 107 $10,907,014 51 1974 1943 2010 50 $2,386,733 $10,228,118 23
Substructure $10.20 S.F. 61,634 100 $628,667 100 1923 $628,667
Foundations $10.20 S.F. 61,634 100 $628,667 100 1923 $628,667
Standard Foundations $10.20 S.F. 61,634 100 $628,667 100 1923 $628,667
Special Foundations 0 0 0 0
Slab on Grade 0 0 0 0
Basement Construction 0 0 0
Basement Excavation 0 0 0 0
Basement Walls 0 0 0 0
Shell $53.94 S.F. 61,634 103 $3,420,319 81 1950 2002 47 $406,785 $3,324,538 12
Superstructure $24.00 S.F. 61,634 100 $1,479,216 100 1923 $1,479,216
Floor Construction $13.20 S.F. 61,634 100 $813,569 100 1923 $813,569
Roof Construction $10.80 S.F. 61,634 100 $665,647 100 1923 $665,647
Exterior Enclosure $20.40 S.F. 61,634 103 $1,294,315 78 1956 2002 $406,785 $1,257,334 32
Exterior Walls $14.40 S.F. 61,634 100 $887,530 100 1923 $887,530
Exterior Windows $4.80 S.F. 61,634 110 $325,428 30 1972 2002 $325,428 $295,843 110
Exterior Doors $1.20 S.F. 61,634 110 $81,357 30 1972 2002 $81,357 $73,961 110
Roofing $9.54 S.F. 61,634 110 $646,788 41 1988 2019 47 $587,988
Roof Coverings - BUR $9.54 S.F. 37,578 110 $394,344 20 1999 2019 45 $358,494
Roof Coverings - EPDM 0 0 0 0
Roof Coverings - Standing
Seam Mettal
$9.54 S.F. 24,056 110 $252,444 75 1972 2047 49 $229,494
Roof Openings 0 0 0 0
Interiors $29.94 S.F. 61,634 108 $1,985,563 56 1968 1992 49 $734,374 $1,845,402 40
Interior Construction $19.20 S.F. 61,634 106 $1,257,333 68 1956 1992 5 $406,784 $1,183,373 34
Partitions $10.80 S.F. 61,634 110 $732,212 100 1923 $665,647
Interior Doors $2.40 S.F. 61,634 80 $118,337 40 1972 2012 5 $147,922
Fittings $6.00 S.F. 61,634 110 $406,784 20 1972 1992 $406,784 $369,804 110
Stairs $2.58 S.F. 61,634 110 $174,917 100 1923 $159,016
Stair Construction $2.58 S.F. 61,634 110 $174,917 100 1923 $159,016
Interior Finishes $8.16 S.F. 61,634 110 $553,313 15 1996 2004 72 $327,590 $503,013 65
Wall Finishes - Ceramic &
Glazed
0 0 0 0
Wall Finishes - Paint $2.40 S.F. 61,634 110 $162,714 10 2000 2010 $162,714 $147,922 110
Floor Finishes - Carpet $2.76 S.F. 2,856 110 $8,671 8 1999 2007 $8,671 $7,883 110
Floor Finishes - Ceramic &
Quarry Tile
$1.44 S.F. 2,962 110 $4,692 50 1972 2022 24 $4,265
Floor Finishes - Terrazzo 0 0 0 0
Floor Finishes - VCT $3.60 S.F. 55,816 110 $221,031 15 2006 2021 73 $200,938
Ceiling Finishes $2.30 S.F. 61,634 110 $156,205 20 1984 2004 $156,205 $142,005 110
Services $61.07 S.F. 61,634 110 $4,140,253 22 1989 1953 2010 52 $1,001,503 $3,763,864 27
Conveying $0.72 S.F. 61,634 110 $48,814 30 1923 1953 2010 $48,814 $44,376 110
Elevators and Lifts $1.20 S.F. 36,980 110 $48,814 30 1923 1953 2010 $48,814 $44,376 110
Plumbing $7.54 S.F. 61,634 110 $510,921 30 1975 2002 17 $493,836 $464,474 106
Plumbing Fixtures $5.89 S.F. 61,634 110 $399,462 30 1972 2002 $399,462 $363,148 110
Domestic Water Distribution $0.44 S.F. 61,634 110 $30,102 30 1972 2002 $30,102 $27,365 110
Sanitary Waste $0.76 S.F. 61,634 110 $51,255 30 1972 2002 $51,255 $46,595 110
Rain Water Drainage $0.19 S.F. 61,634 110 $13,017 30 1972 2002 $13,017 $11,834 110
Other Plumbing Systems -
Natural Gas
$0.25 S.F. 61,634 110 $17,085 30 1985 2015 17 $15,532
HVAC $33.72 S.F. 61,634 110 $2,286,128 20 2001 2015 46 $2,078,298
Heat Generating Systems 0 0 0 0
Cooling Generating Systems 0 0 0 0
Distribution Systems & Exhaust
Systems
$9.12 S.F. 61,634 110 $618,312 30 2000 2030 67 $562,102
Terminal & Package Units $21.60 S.F. 61,634 110 $1,464,424 15 2000 2015 33 $1,331,294
Controls & Instrumentation $1.80 S.F. 61,634 110 $122,035 20 2005 2025 75 $110,941
Other HVAC Systems/Equip -
Kitchen Hood
$1.20 S.F. 61,634 110 $81,357 30 2000 2030 67 $73,961
Fire Protection 0 0 0
Sprinklers 0 0 0 0
Electrical $19.09 S.F. 61,634 110 $1,294,390 23 1998 2002 69 $458,853 $1,176,716 39
Electrical Service/Distribution $2.27 S.F. 61,634 110 $153,765 30 2001 2031 70 $139,786
Branch Wiring $6.77 S.F. 61,634 110 $458,853 30 1972 2002 $458,853 $417,139 110
Lighting $6.77 S.F. 61,634 110 $458,853 20 2005 2025 75 $417,139
Communications and Security -
Public Address & Clock System
$0.88 S.F. 61,634 110 $59,391 20 2000 2020 50 $53,991
Fire Alarm $1.54 S.F. 61,634 110 $104,137 10 2006 2016 60 $94,670
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 4
System Unit Price$
Unit of
Meas Qty Renewal% Renewal$ Life Installed
Calc Next
Renewal
Next
Renewal CI% Deficiency$ Replacement Value FCI%
Security & CCTV $0.88 S.F. 61,634 110 $59,391 10 2005 2015 50 $53,991
Other Electrical Systems -
Emergency Generator
0 0 0 0
Equipment & Furnishings $10.80 S.F. 61,634 110 $732,212 20 1974 1943 49 $244,071 $665,647 37
Equipment $7.20 S.F. 61,634 110 $488,141 20 2000 2019 49 $443,765
Commercial Equipment $6.00 S.F. 61,634 110 $406,784 20 2000 2020 50 $369,804
Institutional Equipment $1.20 S.F. 61,634 110 $81,357 20 1999 2019 45 $73,961
Furnishings $3.60 S.F. 61,634 110 $244,071 20 1923 1943 $244,071 $221,882 110
Fixed Furnishings $3.60 S.F. 61,634 110 $244,071 20 1923 1943 $244,071 $221,882 110
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 5
Facility: \Elementary/Middle Schools\Vivian\1923, 1930, 1972 (A&B Bldgs) (continued)
Renewal Schedule:
Systems 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
Total $2,386,733 $125,544 $1,786,325 $124,345 $10,984 $620,681 $845,174
Substructure
Foundations
Standard Foundations
Special Foundations
Slab on Grade
Basement Construction
Basement Excavation
Basement Walls
Shell $406,785 $514,529
Superstructure
Floor Construction
Roof Construction
Exterior Enclosure $406,785
Exterior Walls
Exterior Windows $325,428
Exterior Doors $81,357
Roofing $514,529
Roof Coverings - BUR $514,529
Roof Coverings - EPDM
Roof Coverings - Standing Seam
Mettal
Roof Openings
Interiors $734,374 $125,544 $10,984 $218,674
Interior Construction $406,784 $125,544
Partitions
Interior Doors $125,544
Fittings $406,784
Stairs
Stair Construction
Interior Finishes $327,590 $10,984 $218,674
Wall Finishes - Ceramic & Glazed
Wall Finishes - Paint $162,714 $218,674
Floor Finishes - Carpet $8,671 $10,984
Floor Finishes - Ceramic & Quarry
Tile
Floor Finishes - Terrazzo
Floor Finishes - VCT
Ceiling Finishes $156,205
Services $1,001,503 $1,786,325 $124,345 $79,816
Conveying $48,814
Elevators and Lifts $48,814
Plumbing $493,836 $19,806
Plumbing Fixtures $399,462
Domestic Water Distribution $30,102
Sanitary Waste $51,255
Rain Water Drainage $13,017
Other Plumbing Systems - Natural
Gas
$19,806
HVAC $1,697,669
Heat Generating Systems
Cooling Generating Systems
Distribution Systems & Exhaust
Systems
Terminal & Package Units $1,697,669
Controls & Instrumentation
Other HVAC Systems/Equip -
Kitchen Hood
Fire Protection
Sprinklers
Electrical $458,853 $68,850 $124,345 $79,816
Electrical Service/Distribution
Branch Wiring $458,853
Lighting
Communications and Security -
Public Address & Clock System
$79,816
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 6
Systems 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
Fire Alarm $124,345
Security & CCTV $68,850
Other Electrical Systems -
Emergency Generator
Equipment & Furnishings $244,071 $106,152 $546,684
Equipment $106,152 $546,684
Commercial Equipment $546,684
Institutional Equipment $106,152
Furnishings $244,071
Fixed Furnishings $244,071
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 7
Facility: \Elementary/Middle Schools\Vivian\1923, 1930, 1972 (A&B Bldgs) (continued)
Deficiency Sheet:
Deficiency: Surveyor/Update: Eric Altman Fri, 04-Jun-2010Priority: 3Quantity: 1
Assembly: B2020 System: Exterior Windows Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: The exterior windows are worn, beyond expected life, and should be replaced.
Estimates:Raw Cost $271,189.60
Plus or (Minus) Additional Cost $0.00Total Estimated Amount $271,189.60
Deficiency: Surveyor/Update: Eric Altman Fri, 04-Jun-2010Priority: 3Quantity: 1
Assembly: B2030 System: Exterior Doors Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: The exterior doors are worn, beyond expected life, and should be replaced.
Estimates:Raw Cost $67,797.40
Plus or (Minus) Additional Cost $0.00Total Estimated Amount $67,797.40
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 8
Facility: \Elementary/Middle Schools\Vivian\ 1923, 1930, 1972 (A&B Bldgs) (continued)
Deficiency: Surveyor/Update: Eric Altman Fri, 04-Jun-2010Priority: 3Quantity: 1
Assembly: C1030 System: Fittings Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: Fittings, such as chalk and tack boards, lockers, toilet and bath accessories, toilet partitions, and shelving, are
beyond expected life and should be replaced.
Estimates:Raw Cost $338,987.00
Plus or (Minus) Additional Cost $0.00Total Estimated Amount $338,987.00
Deficiency: Surveyor/Update: Eric Altman Fri, 04-Jun-2010Priority: 3Quantity: 1
Assembly: C3010 System: Wall Finishes - Paint Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: The painted wall finishes are worn, beyond expected life, and should be replaced.
Estimates:Raw Cost $135,594.80
Plus or (Minus) Additional Cost $0.00Total Estimated Amount $135,594.80
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 9
Facility: \Elementary/Middle Schools\Vivian\ 1923, 1930, 1972 (A&B Bldgs) (continued)
Deficiency: Surveyor/Update: Eric Altman Fri, 04-Jun-2010Priority: 3Quantity: 1
Assembly: C3020 System: Floor Finishes - Carpet Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: Carpet floor finishes are worn, beyond expected life, and should be replaced.
Estimates:Raw Cost $7,225.68
Plus or (Minus) Additional Cost $0.00Total Estimated Amount $7,225.68
Deficiency: Surveyor/Update: Eric Altman Fri, 04-Jun-2010Priority: 3Quantity: 1
Assembly: C3030 System: Ceiling Finishes Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: The ceiling finishes are stained, beyond expected life, and should be replaced.
Estimates:Raw Cost $130,171.01
Plus or (Minus) Additional Cost $0.00Total Estimated Amount $130,171.01
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 10
Facility: \Elementary/Middle Schools\Vivian\ 1923, 1930, 1972 (A&B Bldgs) (continued)
Deficiency: Surveyor/Update: Eric Altman Fri, 04-Jun-2010Priority: 3Quantity: 1
Assembly: D1010 System: Elevators and Lifts Material: System Distress: Missing Category: ADA / Accessibility Correction: Renew System Note: An elevator is required to access the second floor of Building B.
Estimates:Raw Cost $40,678.00
Plus or (Minus) Additional Cost $0.00Total Estimated Amount $40,678.00
Deficiency: Surveyor/Update: Eric Altman Fri, 04-Jun-2010Priority: 3Quantity: 1
Assembly: D2010 System: Plumbing Fixtures Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: Plumbing fixtures are beyond expected life and should be replaced.
Estimates:Raw Cost $332,885.23
Plus or (Minus) Additional Cost $0.00Total Estimated Amount $332,885.23
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 11
Facility: \Elementary/Middle Schools\Vivian\ 1923, 1930, 1972 (A&B Bldgs) (continued)
Deficiency: Surveyor/Update: Eric Altman Thu, 11-Mar-2010Priority: 3Quantity: 1
Assembly: D2020 System: Domestic Water Distribution Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: Domestic water distribution is beyond expected life and should be replaced.
Estimates:Raw Cost $25,085.04
Plus or (Minus) Additional Cost $0.00Total Estimated Amount $25,085.04
Deficiency: Surveyor/Update: Eric Altman Fri, 04-Jun-2010Priority: 3Quantity: 1
Assembly: D2030 System: Sanitary Waste Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: Sanitary waste is beyond expected life and should be replaced.
Estimates:Raw Cost $42,712.36
Plus or (Minus) Additional Cost $0.00Total Estimated Amount $42,712.36
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 12
Facility: \Elementary/Middle Schools\Vivian\ 1923, 1930, 1972 (A&B Bldgs) (continued)
Deficiency: Surveyor/Update: Eric Altman Fri, 04-Jun-2010Priority: 3Quantity: 1
Assembly: D2040 System: Rain Water Drainage Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: Rain water drainage system is beyond expected life and should be replaced.
Estimates:Raw Cost $10,847.58
Plus or (Minus) Additional Cost $0.00Total Estimated Amount $10,847.58
Deficiency: Surveyor/Update: Eric Altman Thu, 03-Jun-2010Priority: 3Quantity: 1
Assembly: D5020 System: Branch Wiring Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: Branch wiring is beyond expected life and should be replaced.
Estimates:Raw Cost $382,377.34
Plus or (Minus) Additional Cost $0.00Total Estimated Amount $382,377.34
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 13
Facility: \Elementary/Middle Schools\Vivian\ 1923, 1930, 1972 (A&B Bldgs) (continued)
Deficiency: Surveyor/Update: Eric Altman Fri, 04-Jun-2010Priority: 3Quantity: 1
Assembly: E2010 System: Fixed Furnishings Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: Fixed furnishings, such as the base/wall cabinets, counter tops, window shades, and fixed seating, are worn,
beyond expected life, and should be replaced.
Estimates:Raw Cost $203,392.20
Plus or (Minus) Additional Cost $0.00Total Estimated Amount $203,392.20
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 14
Facility: \Elementary/Middle Schools\Vivian\1989 (C&D Bldgs)Address: 100 W. Kentucky Avenue, Vivian, LA 71082
Attributes: Number of Floors 1
General Information: Function: Elementary Middle Year Built: 1989Gross Area: 42,990 S.F. Last Renovation:
Facility Description:
Building C (Kindergarten) and Building D (Gymnasium) at Vivian Elementary/Middle School are 1-story buildings located at 100 West Kentucky Avenue in Vivian, Louisiana. There have been no additions and very few renovations. This report contains condition and adequacy data collected during the 2009/2010 Facility Condition Assessment (FCA). The detailed condition and deficiency statements are contained in this report.
Current Repair Cost: $136,187.00 Replacement Cost: $6,987,747.00 FCI: 1.95%
20-Jan-2010East Elevation
20-Jan-2010South Elevation
20-Jan-2010West Elevation
20-Jan-2010North Elevation
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 15
Facility: \Elementary/Middle Schools\Vivian\1989 (C&D Bldgs) (continued)
Building Condition:
System Unit Price$
Unit of
Meas Qty Renewal% Renewal$ Life Installed
Calc Next
Renewal
Next
Renewal CI% Deficiency$ Replacement Value FCI%
Total $162.54 S.F. 42,990 107 $7,464,692 49 1993 1997 2014 52 $136,187 $6,987,745 2
Substructure $19.20 S.F. 42,990 100 $825,408 100 1989 $825,408
Foundations $19.20 S.F. 42,990 100 $825,408 100 1989 $825,408
Standard Foundations $10.20 S.F. 42,990 100 $438,498 100 1989 $438,498
Special Foundations 0 0 0 0
Slab on Grade $9.00 S.F. 42,990 100 $386,910 100 1989 $386,910
Basement Construction 0 0 0
Basement Excavation 0 0 0 0
Basement Walls 0 0 0 0
Shell $40.80 S.F. 42,990 104 $1,821,056 68 1992 2019 69 $3,077 $1,753,992
Superstructure $10.80 S.F. 42,990 100 $464,292 100 1989 $464,292
Floor Construction 0 0 0 0
Roof Construction $10.80 S.F. 42,990 100 $464,292 100 1989 $464,292
Exterior Enclosure $20.40 S.F. 42,990 103 $902,790 78 1989 2019 30 $876,996
Exterior Walls $14.40 S.F. 42,990 100 $619,056 100 1989 $619,056
Exterior Windows $4.80 S.F. 42,990 110 $226,987 30 1989 2019 30 $206,352
Exterior Doors $1.20 S.F. 42,990 110 $56,747 30 1989 2019 30 $51,588
Roofing $9.60 S.F. 42,990 110 $453,974 15 1999 2019 93 $3,077 $412,704 1
Roof Coverings - BUR 0 0 0 0
Roof Coverings - EPDM $9.54 S.F. 42,990 110 $451,137 15 2009 2024 93 $3,077 $410,125 1
Roof Coverings - Standing
Seam Mettal
0 0 0 0
Roof Openings $0.06 S.F. 42,990 110 $2,837 30 1989 2019 30 $2,579
Interiors $31.40 S.F. 42,990 108 $1,453,712 57 1989 1997 2014 36 $133,110 $1,349,694 10
Interior Construction $19.20 S.F. 42,990 106 $876,996 68 1989 2009 2015 30 $825,408
Partitions $10.80 S.F. 42,990 110 $510,721 100 1989 $464,292
Interior Doors $2.40 S.F. 42,990 80 $82,541 40 1989 2029 48 $103,176
Fittings $6.00 S.F. 42,990 110 $283,734 20 1989 2009 2015 25 $257,940
Stairs $2.58 S.F. 42,990 110 $122,006 100 1989 $110,914
Stair Construction $2.58 S.F. 42,990 110 $122,006 100 1989 $110,914
Interior Finishes $9.62 S.F. 42,990 110 $454,710 22 1989 1997 2014 42 $133,110 $413,372 32
Wall Finishes - Ceramic &
Glazed
0 0 0 0
Wall Finishes - Paint $2.40 S.F. 42,990 110 $113,494 10 1989 1999 2015 50 $103,176
Floor Finishes - Carpet $2.76 S.F. 5,037 110 $15,292 8 1989 1997 $15,292 $13,902 110
Floor Finishes - Ceramic &
Quarry Tile
$1.44 S.F. 1,719 110 $2,723 50 1989 2039 58 $2,475
Floor Finishes - VCT $3.60 S.F. 29,752 110 $117,818 15 1989 2004 $117,818 $107,107 110
Floor Finishes - Wood $13.52 S.F. 6,482 110 $96,429 50 1989 2039 58 $87,663
Ceiling Finishes $2.30 S.F. 42,990 110 $108,954 20 1989 2009 2014 20 $99,049
Services $60.35 S.F. 42,990 110 $2,853,795 22 1996 2015 56 $2,594,359
Conveying $1.20 S.F. 42,990 110 $56,747 30 1989 2019 30 $51,588
Elevators and Lifts $1.20 S.F. 42,990 110 $56,747 30 1989 2019 30 $51,588
Plumbing $7.54 S.F. 42,990 110 $356,369 30 1989 2019 30 $323,972
Plumbing Fixtures $5.89 S.F. 42,990 110 $278,627 30 1989 2019 30 $253,297
Domestic Water Distribution $0.44 S.F. 42,990 110 $20,996 30 1989 2019 30 $19,088
Sanitary Waste $0.76 S.F. 42,990 110 $35,750 30 1989 2019 30 $32,500
Rain Water Drainage $0.19 S.F. 42,990 110 $9,079 30 1989 2019 30 $8,254
Other Plumbing Systems -
Natural Gas
$0.25 S.F. 42,990 110 $11,917 30 1989 2019 30 $10,833
HVAC $32.52 S.F. 42,990 110 $1,537,838 19 2005 2020 72 $1,398,035
Heat Generating Systems 0 0 0 0
Cooling Generating Systems 0 0 0 0
Distribution Systems & Exhaust
Systems
$9.12 S.F. 42,990 110 $431,276 30 2005 2035 83 $392,069
Terminal & Package Units $21.60 S.F. 42,990 110 $1,021,442 15 2005 2020 67 $928,584
Controls & Instrumentation $1.80 S.F. 42,990 110 $85,120 20 2005 2025 75 $77,382
Other HVAC Systems/Equip -
Kitchen Hood
0 0 0 0
Fire Protection 0 0 0
Sprinklers 0 0 0 0
Electrical $19.09 S.F. 42,990 110 $902,841 23 1998 2015 41 $820,764
Electrical Service/Distribution $2.27 S.F. 42,990 110 $107,251 30 1989 2019 30 $97,501
Branch Wiring $6.77 S.F. 42,990 110 $320,052 30 1989 2019 30 $290,956
Lighting $6.77 S.F. 42,990 110 $320,052 20 2000 2020 50 $290,956
Communications and Security -
Public Address & Clock System
$0.88 S.F. 42,990 110 $41,425 20 2000 2020 50 $37,659
Fire Alarm $1.54 S.F. 42,990 110 $72,636 10 2006 2016 60 $66,033
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 16
System Unit Price$
Unit of
Meas Qty Renewal% Renewal$ Life Installed
Calc Next
Renewal
Next
Renewal CI% Deficiency$ Replacement Value FCI%
Security & CCTV $0.88 S.F. 42,990 110 $41,425 10 2005 2015 50 $37,659
Other Electrical Systems -
Emergency Generator
0 0 0 0
Equipment & Furnishings $10.80 S.F. 42,990 110 $510,721 20 1989 2009 2015 25 $464,292
Equipment $7.20 S.F. 42,990 110 $340,481 20 1989 2009 2015 25 $309,528
Commercial Equipment $6.00 S.F. 42,990 110 $283,734 20 1989 2009 2015 25 $257,940
Institutional Equipment $1.20 S.F. 42,990 110 $56,747 20 1989 2009 2015 25 $51,588
Furnishings $3.60 S.F. 42,990 110 $170,240 20 1989 2009 2015 25 $154,764
Fixed Furnishings $3.60 S.F. 42,990 110 $170,240 20 1989 2009 2015 25 $154,764
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 17
Facility: \Elementary/Middle Schools\Vivian\1989 (C&D Bldgs) (continued)
Renewal Schedule:
Systems 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
Total $136,187 $122,629 $1,100,583 $86,731 $19,372 $1,470,469 $1,858,528
Substructure
Foundations
Standard Foundations
Special Foundations
Slab on Grade
Basement Construction
Basement Excavation
Basement Walls
Shell $3,077 $373,911
Superstructure
Floor Construction
Roof Construction
Exterior Enclosure $370,209
Exterior Walls
Exterior Windows $296,167
Exterior Doors $74,042
Roofing $3,077 $3,702
Roof Coverings - BUR
Roof Coverings - EPDM $3,077
Roof Coverings - Standing Seam
Mettal
Roof Openings $3,702
Interiors $133,110 $122,629 $460,495 $19,372
Interior Construction $328,925
Partitions
Interior Doors
Fittings $328,925
Stairs
Stair Construction
Interior Finishes $133,110 $122,629 $131,570 $19,372
Wall Finishes - Ceramic & Glazed
Wall Finishes - Paint $131,570
Floor Finishes - Carpet $15,292 $19,372
Floor Finishes - Ceramic & Quarry
Tile
Floor Finishes - VCT $117,818
Floor Finishes - Wood
Ceiling Finishes $122,629
Services $48,023 $86,731 $1,096,558 $1,858,528
Conveying $74,042
Elevators and Lifts $74,042
Plumbing $464,982
Plumbing Fixtures $363,545
Domestic Water Distribution $27,395
Sanitary Waste $46,646
Rain Water Drainage $11,847
Other Plumbing Systems - Natural
Gas
$15,549
HVAC $1,372,733
Heat Generating Systems
Cooling Generating Systems
Distribution Systems & Exhaust
Systems
Terminal & Package Units $1,372,733
Controls & Instrumentation
Other HVAC Systems/Equip -
Kitchen Hood
Fire Protection
Sprinklers
Electrical $48,023 $86,731 $557,534 $485,795
Electrical Service/Distribution $139,939
Branch Wiring $417,595
Lighting $430,123
Communications and Security -
Public Address & Clock System
$55,672
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 18
Systems 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
Fire Alarm $86,731
Security & CCTV $48,023
Other Electrical Systems -
Emergency Generator
Equipment & Furnishings $592,065
Equipment $394,710
Commercial Equipment $328,925
Institutional Equipment $65,785
Furnishings $197,355
Fixed Furnishings $197,355
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 19
Facility: \Elementary/Middle Schools\Vivian\1989 (C&D Bldgs) (continued)
Deficiency Sheet:
Deficiency: Surveyor/Update: Troy Weeks Fri, 12-Mar-2010Priority: 3Quantity: 42,990
Assembly: B3010 System: Roof Coverings - EPDM Material: Roof Covering Distress: Failing Category: Critical Repair Correction: Roof Repair Note: There are reports of several roof leaks in the building. An investigatiion to locate and determine the cause of the
leaks is needed.
Estimates:Raw Cost $2,564.22
Plus or (Minus) Additional Cost $0.00Total Estimated Amount $2,564.22
Deficiency: Surveyor/Update: Kate McPhillips Fri, 04-Jun-2010Priority: 3Quantity: 1
Assembly: C3020 System: Floor Finishes - Carpet Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: Carpet floor finishes are worn, beyond expected life, and should be replaced.
Estimates:Raw Cost $12,743.61
Plus or (Minus) Additional Cost $0.00Total Estimated Amount $12,743.61
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 20
Facility: \Elementary/Middle Schools\Vivian\ 1989 (C&D Bldgs) (continued)
Deficiency: Surveyor/Update: Kate McPhillips Fri, 04-Jun-2010Priority: 3Quantity: 1
Assembly: C3020 System: Floor Finishes - VCT Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: The VCT floor finishes are worn, beyond expected life, and should be replaced.
Estimates:Raw Cost $98,181.60
Plus or (Minus) Additional Cost $0.00Total Estimated Amount $98,181.60
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 21
Facility: \Elementary/Middle Schools\Vivian\1999 (E Bldg)Address: 100 W. Kentucky Avenue, Vivian, LA 71082
Attributes: Number of Floors 1
General Information: Function: Elementary Middle Year Built: 1999Gross Area: 7,210 S.F. Last Renovation:
Facility Description:
Building E (Classrooms) at Vivian Elementary/Middle School is 1-story building located at 100 West Kentucky in Vivian, Louisiana. There have been no additions and very few renovations. This report contains condition and adequacy data collected during the 2009/2010 Facility Condition Assessment (FCA). The detailed condition and deficiency statements are contained in this report.
Current Repair Cost: $14,276.00 Replacement Cost: $1,091,536.00 FCI: 1.31%
20-Jan-2010East Elevation
20-Jan-2010South Elevation
20-Jan-2010North Elevation
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 22
Facility: \Elementary/Middle Schools\Vivian\1999 (E Bldg) (continued)
Building Condition:
System Unit Price$
Unit of
Meas Qty Renewal% Renewal$ Life Installed
Calc Next
Renewal
Next
Renewal CI% Deficiency$ Replacement Value FCI%
Total $151.39 S.F. 7,210 107 $1,163,489 49 1999 2009 2010 47 $14,276 $1,091,535 1
Substructure $19.20 S.F. 7,210 100 $138,432 100 1999 $138,432
Foundations $19.20 S.F. 7,210 100 $138,432 100 1999 $138,432
Standard Foundations $10.20 S.F. 7,210 100 $73,542 100 1999 $73,542
Special Foundations 0 0 0 0
Slab on Grade $9.00 S.F. 7,210 100 $64,890 100 1999 $64,890
Basement Construction 0 0 0
Basement Excavation 0 0 0 0
Basement Walls 0 0 0 0
Shell $40.74 S.F. 7,210 104 $304,940 69 1999 2019 52 $293,735
Superstructure $10.80 S.F. 7,210 100 $77,868 100 1999 $77,868
Floor Construction 0 0 0 0
Roof Construction $10.80 S.F. 7,210 100 $77,868 100 1999 $77,868
Exterior Enclosure $20.40 S.F. 7,210 103 $151,410 78 1999 2029 63 $147,084
Exterior Walls $14.40 S.F. 7,210 100 $103,824 100 1999 $103,824
Exterior Windows $4.80 S.F. 7,210 110 $38,069 30 1999 2029 63 $34,608
Exterior Doors $1.20 S.F. 7,210 110 $9,517 30 1999 2029 63 $8,652
Roofing $9.54 S.F. 7,210 110 $75,662 20 1999 2019 45 $68,783
Roof Coverings - BUR $9.54 S.F. 7,210 110 $75,662 20 1999 2019 45 $68,783
Roof Coverings - EPDM 0 0 0 0
Roof Coverings - Standing
Seam Mettal
0 0 0 0
Roof Openings 0 0 0 0
Interiors $27.50 S.F. 7,210 107 $212,943 52 1999 2009 2015 46 $198,304
Interior Construction $19.20 S.F. 7,210 106 $147,084 68 1999 2019 51 $138,432
Partitions $10.80 S.F. 7,210 110 $85,655 100 1999 $77,868
Interior Doors $2.40 S.F. 7,210 80 $13,843 40 1999 2039 72 $17,304
Fittings $6.00 S.F. 7,210 110 $47,586 20 1999 2019 45 $43,260
Stairs 0 0 0
Stair Construction 0 0 0 0
Interior Finishes $8.30 S.F. 7,210 110 $65,859 15 1999 2009 2015 41 $59,872
Wall Finishes - Ceramic &
Glazed
0 0 0 0
Wall Finishes - Paint $2.40 S.F. 7,210 110 $19,034 10 1999 2009 2015 50 $17,304
Floor Finishes - Carpet 0 0 0 0
Floor Finishes - Ceramic &
Quarry Tile
0 0 0 0
Floor Finishes - Terrazzo 0 0 0 0
Floor Finishes - VCT $3.60 S.F. 7,210 110 $28,552 15 1999 2014 2015 33 $25,956
Ceiling Finishes $2.30 S.F. 7,210 110 $18,273 20 1999 2019 45 $16,612
Services $59.15 S.F. 7,210 110 $469,105 22 2000 2014 2010 47 $14,276 $426,456 3
Conveying 0 0 0
Elevators and Lifts 0 0 0 0
Plumbing $7.54 S.F. 7,210 110 $59,768 30 1999 2029 63 $54,334
Plumbing Fixtures $5.89 S.F. 7,210 110 $46,729 30 1999 2029 63 $42,481
Domestic Water Distribution $0.44 S.F. 7,210 110 $3,521 30 1999 2029 63 $3,201
Sanitary Waste $0.76 S.F. 7,210 110 $5,996 30 1999 2029 63 $5,451
Rain Water Drainage $0.19 S.F. 7,210 110 $1,523 30 1999 2029 63 $1,384
Other Plumbing Systems -
Natural Gas
$0.25 S.F. 7,210 110 $1,999 30 1999 2029 63 $1,817
HVAC $32.52 S.F. 7,210 110 $257,917 19 1999 2014 2010 38 $14,276 $234,469 6
Heat Generating Systems 0 0 0 0
Cooling Generating Systems 0 0 0 0
Distribution Systems & Exhaust
Systems
$9.12 S.F. 7,210 110 $72,331 30 1999 2029 63 $65,755
Terminal & Package Units $21.60 S.F. 7,210 110 $171,310 15 1999 2014 27 $155,736
Controls & Instrumentation $1.80 S.F. 7,210 110 $14,276 20 1999 2019 2010 $14,276 $12,978 110
Other HVAC Systems/Equip -
Kitchen Hood
0 0 0 0
Fire Protection 0 0 0
Sprinklers 0 0 0 0
Electrical $19.09 S.F. 7,210 110 $151,420 23 2001 2015 55 $137,653
Electrical Service/Distribution $2.27 S.F. 7,210 110 $17,988 30 1999 2029 63 $16,352
Branch Wiring $6.77 S.F. 7,210 110 $53,677 30 1999 2029 63 $48,797
Lighting $6.77 S.F. 7,210 110 $53,677 20 1999 2019 45 $48,797
Communications and Security -
Public Address & Clock System
$0.88 S.F. 7,210 110 $6,948 20 2000 2020 50 $6,316
Fire Alarm $1.54 S.F. 7,210 110 $12,182 10 2006 2016 60 $11,075
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 23
System Unit Price$
Unit of
Meas Qty Renewal% Renewal$ Life Installed
Calc Next
Renewal
Next
Renewal CI% Deficiency$ Replacement Value FCI%
Security & CCTV $0.88 S.F. 7,210 110 $6,948 10 2005 2015 50 $6,316
Other Electrical Systems -
Emergency Generator
0 0 0 0
Equipment & Furnishings $4.80 S.F. 7,210 110 $38,069 20 1999 2019 45 $34,608
Equipment $1.20 S.F. 7,210 110 $9,517 20 1999 2019 45 $8,652
Commercial Equipment 0 0 0 0
Institutional Equipment $1.20 S.F. 7,210 110 $9,517 20 1999 2019 45 $8,652
Furnishings $3.60 S.F. 7,210 110 $28,552 20 1999 2019 45 $25,956
Fixed Furnishings $3.60 S.F. 7,210 110 $28,552 20 1999 2019 45 $25,956
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 24
Facility: \Elementary/Middle Schools\Vivian\1999 (E Bldg) (continued)
Renewal Schedule:
Systems 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
Total $14,276 $192,810 $63,219 $14,546 $304,359 $9,337
Substructure
Foundations
Standard Foundations
Special Foundations
Slab on Grade
Basement Construction
Basement Excavation
Basement Walls
Shell $98,721
Superstructure
Floor Construction
Roof Construction
Exterior Enclosure
Exterior Walls
Exterior Windows
Exterior Doors
Roofing $98,721
Roof Coverings - BUR $98,721
Roof Coverings - EPDM
Roof Coverings - Standing Seam
Mettal
Roof Openings
Interiors $55,165 $85,931
Interior Construction $62,089
Partitions
Interior Doors
Fittings $62,089
Stairs
Stair Construction
Interior Finishes $55,165 $23,842
Wall Finishes - Ceramic & Glazed
Wall Finishes - Paint $22,066
Floor Finishes - Carpet
Floor Finishes - Ceramic & Quarry
Tile
Floor Finishes - Terrazzo
Floor Finishes - VCT $33,099
Ceiling Finishes $23,842
Services $14,276 $192,810 $8,054 $14,546 $70,036 $9,337
Conveying
Elevators and Lifts
Plumbing
Plumbing Fixtures
Domestic Water Distribution
Sanitary Waste
Rain Water Drainage
Other Plumbing Systems - Natural
Gas
HVAC $14,276 $192,810
Heat Generating Systems
Cooling Generating Systems
Distribution Systems & Exhaust
Systems
Terminal & Package Units $192,810
Controls & Instrumentation $14,276
Other HVAC Systems/Equip -
Kitchen Hood
Fire Protection
Sprinklers
Electrical $8,054 $14,546 $70,036 $9,337
Electrical Service/Distribution
Branch Wiring
Lighting $70,036
Communications and Security -
Public Address & Clock System
$9,337
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 25
Systems 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
Fire Alarm $14,546
Security & CCTV $8,054
Other Electrical Systems -
Emergency Generator
Equipment & Furnishings $49,671
Equipment $12,418
Commercial Equipment
Institutional Equipment $12,418
Furnishings $37,253
Fixed Furnishings $37,253
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 26
Facility: \Elementary/Middle Schools\Vivian\1999 (E Bldg) (continued)
Deficiency Sheet:
Deficiency: Surveyor/Update: Eric Altman Fri, 04-Jun-2010Priority: 4Quantity: 1
Assembly: D3060 System: Controls & Instrumentation Material: System Distress: Inadequate Category: Deferred Maintenance Correction: Renew System Note: Analog electric controls system is inadequate and needs to be upgraded/replaced.
Estimates:Raw Cost $11,896.50
Plus or (Minus) Additional Cost $0.00Total Estimated Amount $11,896.50
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 27
Facility: \Elementary/Middle Schools\Vivian\2003 (H Bldg)Address: 100 W. Kentucky Ave., Vivian, LA 71082
Attributes: Number of Floors 1
General Information: Function: Elementary Middle Year Built: 2003Gross Area: 9,325 S.F. Last Renovation:
Facility Description:
Building H (Classrooms) at Vivian Elementary/Middle School is a 1-story building located at 100 West Kentucky Avenue in Vivian, Louisiana. There have been no additions and very few renovations. This report contains condition and adequacy data collected during the 2009/2010 Facility Condition Assessment (FCA). The detailed condition and deficiency statements are contained in this report.
Current Repair Cost: $0.00 Replacement Cost: $1,435,297.00 FCI: 0.00%
20-Jan-2010North Elevation
20-Jan-2010East Elevation
20-Jan-2010West Elevation
20-Jan-2010South Elevation
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 28
Facility: \Elementary/Middle Schools\Vivian\2003 (H Bldg) (continued)
Building Condition:
System Unit Price$
Unit of
Meas Qty Renewal% Renewal$ Life Installed
Calc Next
Renewal
Next
Renewal CI% Deficiency$ Replacement Value FCI%
Total $153.92 S.F. 9,325 107 $1,530,711 49 2003 2013 2015 64 0 $1,435,297
Substructure $19.20 S.F. 9,325 100 $179,040 100 2003 $179,040
Foundations $19.20 S.F. 9,325 100 $179,040 100 2003 $179,040
Standard Foundations $10.20 S.F. 9,325 100 $95,115 100 2003 $95,115
Special Foundations 0 0 0 0
Slab on Grade $9.00 S.F. 9,325 100 $83,925 100 2003 $83,925
Basement Construction 0 0 0
Basement Excavation 0 0 0 0
Basement Walls 0 0 0 0
Shell $40.74 S.F. 9,325 104 $394,392 69 2003 2023 70 $379,900
Superstructure $10.80 S.F. 9,325 100 $100,710 100 2003 $100,710
Floor Construction 0 0 0 0
Roof Construction $10.80 S.F. 9,325 100 $100,710 100 2003 $100,710
Exterior Enclosure $20.40 S.F. 9,325 103 $195,825 78 2003 2033 77 $190,230
Exterior Walls $14.40 S.F. 9,325 100 $134,280 100 2003 $134,280
Exterior Windows $4.80 S.F. 9,325 110 $49,236 30 2003 2033 77 $44,760
Exterior Doors $1.20 S.F. 9,325 110 $12,309 30 2003 2033 77 $11,190
Roofing $9.54 S.F. 9,325 110 $97,857 20 2003 2023 65 $88,960
Roof Coverings - BUR $9.54 S.F. 9,325 110 $97,857 20 2003 2023 65 $88,960
Roof Coverings - EPDM 0 0 0 0
Roof Coverings - Standing
Seam Mettal
0 0 0 0
Roof Openings 0 0 0 0
Interiors $27.33 S.F. 9,325 107 $273,636 52 2003 2013 59 $254,863
Interior Construction $19.20 S.F. 9,325 106 $190,230 68 2003 2023 69 $179,040
Partitions $10.80 S.F. 9,325 110 $110,781 100 2003 $100,710
Interior Doors $2.40 S.F. 9,325 80 $17,904 40 2003 2043 82 $22,380
Fittings $6.00 S.F. 9,325 110 $61,545 20 2003 2023 65 $55,950
Stairs 0 0 0
Stair Construction 0 0 0 0
Interior Finishes $8.13 S.F. 9,325 110 $83,406 15 2003 2013 50 $75,823
Wall Finishes - Ceramic &
Glazed
0 0 0 0
Wall Finishes - Paint $2.40 S.F. 9,325 110 $24,618 10 2003 2013 30 $22,380
Floor Finishes - Carpet 0 0 0 0
Floor Finishes - Ceramic &
Quarry Tile
$1.44 S.F. 746 110 $1,182 50 2003 2053 86 $1,074
Floor Finishes - Terrazzo 0 0 0 0
Floor Finishes - VCT $3.60 S.F. 8,579 110 $33,973 15 2003 2018 53 $30,884
Ceiling Finishes $2.30 S.F. 9,325 110 $23,633 20 2003 2023 65 $21,485
Services $61.85 S.F. 9,325 110 $634,407 22 2003 2015 2015 64 $576,734
Conveying 0 0 0
Elevators and Lifts 0 0 0 0
Plumbing $7.54 S.F. 9,325 110 $77,300 30 2003 2033 77 $70,273
Plumbing Fixtures $5.89 S.F. 9,325 110 $60,437 30 2003 2033 77 $54,943
Domestic Water Distribution $0.44 S.F. 9,325 110 $4,554 30 2003 2033 77 $4,140
Sanitary Waste $0.76 S.F. 9,325 110 $7,755 30 2003 2033 77 $7,050
Rain Water Drainage $0.19 S.F. 9,325 110 $1,969 30 2003 2033 77 $1,790
Other Plumbing Systems -
Natural Gas
$0.25 S.F. 9,325 110 $2,585 30 2003 2033 77 $2,350
HVAC $32.52 S.F. 9,325 110 $333,574 19 2003 2018 60 $303,249
Heat Generating Systems S.F. 0 0 0 0
Cooling Generating Systems S.F. 0 0 0 0
Distribution Systems & Exhaust
Systems
$9.12 S.F. 9,325 110 $93,548 30 2003 2033 77 $85,044
Terminal & Package Units $21.60 S.F. 9,325 110 $221,562 15 2003 2018 53 $201,420
Controls & Instrumentation $1.80 S.F. 9,325 110 $18,464 20 2003 2023 65 $16,785
Other HVAC Systems/Equip -
Kitchen Hood
S.F. 0 0 0 0
Fire Protection $2.70 S.F. 9,325 110 $27,695 30 2003 2033 2015 17 $25,178
Sprinklers $2.70 S.F. 9,325 110 $27,695 30 2003 2033 2015 17 $25,178
Electrical $19.09 S.F. 9,325 110 $195,838 23 2004 2015 70 $178,034
Electrical Service/Distribution $2.27 S.F. 9,325 110 $23,264 30 2003 2033 77 $21,149
Branch Wiring $6.77 S.F. 9,325 110 $69,423 30 2003 2033 77 $63,112
Lighting $6.77 S.F. 9,325 110 $69,423 20 2003 2023 65 $63,112
Communications and Security -
Public Address & Clock System
$0.88 S.F. 9,325 110 $8,986 20 2005 2025 75 $8,169
Fire Alarm $1.54 S.F. 9,325 110 $15,756 10 2006 2016 60 $14,323
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 29
System Unit Price$
Unit of
Meas Qty Renewal% Renewal$ Life Installed
Calc Next
Renewal
Next
Renewal CI% Deficiency$ Replacement Value FCI%
Security & CCTV $0.88 S.F. 9,325 110 $8,986 10 2005 2015 50 $8,169
Other Electrical Systems -
Emergency Generator
0 0 0 0
Equipment & Furnishings $4.80 S.F. 9,325 110 $49,236 20 2003 2023 65 $44,760
Equipment $1.20 S.F. 9,325 110 $12,309 20 2003 2023 65 $11,190
Commercial Equipment 0 0 0 0
Institutional Equipment $1.20 S.F. 9,325 110 $12,309 20 2003 2023 65 $11,190
Furnishings $3.60 S.F. 9,325 110 $36,927 20 2003 2023 65 $33,570
Fixed Furnishings $3.60 S.F. 9,325 110 $36,927 20 2003 2023 65 $33,570
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 30
Facility: \Elementary/Middle Schools\Vivian\2003 (H Bldg) (continued)
Renewal Schedule:
Systems 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
Total $26,901 $42,523 $18,813 $323,704
Substructure
Foundations
Standard Foundations
Special Foundations
Slab on Grade
Basement Construction
Basement Excavation
Basement Walls
Shell
Superstructure
Floor Construction
Roof Construction
Exterior Enclosure
Exterior Walls
Exterior Windows
Exterior Doors
Roofing
Roof Coverings - BUR
Roof Coverings - EPDM
Roof Coverings - Standing Seam
Mettal
Roof Openings
Interiors $26,901 $43,036
Interior Construction
Partitions
Interior Doors
Fittings
Stairs
Stair Construction
Interior Finishes $26,901 $43,036
Wall Finishes - Ceramic & Glazed
Wall Finishes - Paint $26,901
Floor Finishes - Carpet
Floor Finishes - Ceramic & Quarry
Tile
Floor Finishes - Terrazzo
Floor Finishes - VCT $43,036
Ceiling Finishes
Services $42,523 $18,813 $280,668
Conveying
Elevators and Lifts
Plumbing
Plumbing Fixtures
Domestic Water Distribution
Sanitary Waste
Rain Water Drainage
Other Plumbing Systems - Natural
Gas
HVAC $280,668
Heat Generating Systems
Cooling Generating Systems
Distribution Systems & Exhaust
Systems
Terminal & Package Units $280,668
Controls & Instrumentation
Other HVAC Systems/Equip -
Kitchen Hood
Fire Protection $32,106
Sprinklers $32,106
Electrical $10,417 $18,813
Electrical Service/Distribution
Branch Wiring
Lighting
Communications and Security -
Public Address & Clock System
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 31
Systems 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
Fire Alarm $18,813
Security & CCTV $10,417
Other Electrical Systems -
Emergency Generator
Equipment & Furnishings
Equipment
Commercial Equipment
Institutional Equipment
Furnishings
Fixed Furnishings
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 32
Facility: \Elementary/Middle Schools\Vivian\2003 (H Bldg) (continued)
Deficiency Sheet:
*** No Deficiencies Found ***
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 33
Facility: \Elementary/Middle Schools\Vivian\Basketball CourtAddress: 100 W. Kentucky Avenue, Vivian, LA 71082
Attributes: ***None***
General Information: Function: Elementary Middle Year Built: 1970Gross Area: 3,962 S.F. Last Renovation:
Facility Description:
The Basketball Court at Vivian Elementary/Middle School is located at 100 West Kentucky in Vivian, Louisiana. There have been no additions and no renovations. This report contains condition and adequacy data collected during the 2009/2010 Facility Condition Assessment (FCA). The detailed condition and deficiency statements are contained in this report.
Current Repair Cost: $30,333.00 Replacement Cost: $28,003.00 FCI: 108.32%
20-Jan-2010Vivian Elementary/Middle School Basketball Court
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 34
Facility: \Elementary/Middle Schools\Vivian\Basketball Court (continued)
Building Condition:
System Unit Price$
Unit of
Meas Qty Renewal% Renewal$ Life Installed
Calc Next
Renewal
Next
Renewal CI% Deficiency$ Replacement Value FCI%
Total $7.07 S.F. 3,962 110 $30,761 21 1970 1990 $30,333 $28,004 108
Special Construction $6.96 S.F. 3,962 110 $30,333 20 1970 1990 $30,333 $27,576 110
Special Construction $6.96 S.F. 3,962 110 $30,333 20 1970 1990 $30,333 $27,576 110
Special Structures - Basketball
Court - Concrete - Outdoor
$6.96 S.F. 3,962 110 $30,333 20 1970 1990 $30,333 $27,576 110
Building Sitework $0.11 S.F. 3,962 100 $428 100 1970 $428
Site Preparation $0.11 S.F. 3,962 100 $428 100 1970 $428
Site Earthwork $0.11 S.F. 3,962 0 $428 100 1970 $428
Site Improvements 0 0 0
Site Development - Fencing 0 0 0 0
Site Electrical Utilities 0 0 0
Site Lighting 0 0 0 0
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 35
Facility: \Elementary/Middle Schools\Vivian\Basketball Court (continued)
Renewal Schedule:
Systems 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
Total $30,333
Special Construction $30,333
Special Construction $30,333
Special Structures - Basketball
Court - Concrete - Outdoor
$30,333
Building Sitework
Site Preparation
Site Earthwork
Site Improvements
Site Development - Fencing
Site Electrical Utilities
Site Lighting
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 36
Facility: \Elementary/Middle Schools\Vivian\Basketball Court (continued)
Deficiency Sheet:
Deficiency: Surveyor/Update: Eric Altman Fri, 04-Jun-2010Priority: 3Quantity: 1
Assembly: F1010 System: Special Structures - Basketball Court -
Concrete - Outdoor Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: The concrete surface is worn, beyond expected life, and should be replaced.
Estimates:Raw Cost $25,277.56
Plus or (Minus) Additional Cost $0.00Total Estimated Amount $25,277.56
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 37
Facility: \Elementary/Middle Schools\Vivian\Covered WalkwaysAddress: 100 W Kentucky Avenue, Vivian, LA 71082
Attributes: Number of Floors 1
General Information: Function: Elementary Middle Year Built: 1992Gross Area: 4,979 S.F. Last Renovation:
Facility Description:
The engineered metal covered walkways at Vivian Elementary/Middle School connect the classrooms and provide some weather protection for the students.
Current Repair Cost: $0.00 Replacement Cost: $124,455.00 FCI: 0.00%
04-Jun-2010East Elevation
04-Jun-2010South Elevation
04-Jun-2010West Elevation
04-Jun-2010North Elevation
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 38
Facility: \Elementary/Middle Schools\Vivian\Covered Walkways (continued)
Building Condition:
System Unit Price$
Unit of
Meas Qty Renewal% Renewal$ Life Installed
Calc Next
Renewal
Next
Renewal CI% Deficiency$ Replacement Value FCI%
Total $25.00 S.F. 4,979 100 $124,455 25 1992 2017 28 0 $124,455
Special Construction $25.00 S.F. 4,979 100 $124,455 25 1992 2017 28 $124,455
Special Construction $25.00 S.F. 4,979 100 $124,455 25 1992 2017 28 $124,455
Special Structures - Covered
Walkways Metal
$25.00 S.F. 4,979 100 $124,455 25 1992 2017 28 $124,455
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 39
Facility: \Elementary/Middle Schools\Vivian\Covered Walkways (continued)
Renewal Schedule:
Systems 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
Total $153,064
Special Construction $153,064
Special Construction $153,064
Special Structures - Covered
Walkways Metal
$153,064
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 40
Facility: \Elementary/Middle Schools\Vivian\Covered Walkways (continued)
Deficiency Sheet:
*** No Deficiencies Found ***
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 41
Facility: \Elementary/Middle Schools\Vivian\Pine St Bldg (Teachers' Resource)Address: 100 W. Kentucky Avenue, Vivian, LA 71082
Attributes: Number of Floors 1
General Information: Function: Elementary Middle Year Built: 1970Gross Area: 3,039 S.F. Last Renovation: 2001
Facility Description:
The Pine Street Building, a Teachers’ Resource Facility, is a 1-story building located on Pine Street, across the street and east of the school campus in Vivian, Louisiana. There have been no additions, but there has been a major renovation when the School Board acquired the building in 2001. This report contains condition and adequacy data collected during the 2009/2010 Facility Condition Assessment (FCA). The detailed condition and deficiency statements are contained in this report.
Current Repair Cost: $95,567.00 Replacement Cost: $469,234.00 FCI: 20.37%
20-Jan-2010West Elevation
20-Jan-2010South Elevation
20-Jan-2010East Elevation
20-Jan-2010North Elevation
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 42
Facility: \Elementary/Middle Schools\Vivian\Pine St Bldg (Teachers' Resource) (continued)
Building Condition:
System Unit Price$
Unit of
Meas Qty Renewal% Renewal$ Life Installed
Calc Next
Renewal
Next
Renewal CI% Deficiency$ Replacement Value FCI%
Total $154.40 S.F. 3,039 107 $500,474 50 1987 1985 2015 66 $95,566 $469,233 20
Substructure $19.20 S.F. 3,039 100 $58,349 100 1970 $58,349
Foundations $19.20 S.F. 3,039 100 $58,349 100 1970 $58,349
Standard Foundations $10.20 S.F. 3,039 100 $30,998 100 1970 $30,998
Special Foundations 0 0 0 0
Slab on Grade $9.00 S.F. 3,039 100 $27,351 100 1970 $27,351
Basement Construction 0 0 0
Basement Excavation 0 0 0 0
Basement Walls 0 0 0 0
Shell $40.74 S.F. 3,039 104 $128,531 69 1977 2000 80 $20,057 $123,809 16
Superstructure $10.80 S.F. 3,039 100 $32,821 100 1970 $32,821
Floor Construction 0 0 0 0
Roof Construction $10.80 S.F. 3,039 100 $32,821 100 1970 $32,821
Exterior Enclosure $20.40 S.F. 3,039 103 $63,819 78 1970 2000 $20,057 $61,996 32
Exterior Walls $14.40 S.F. 3,039 100 $43,762 100 1970 $43,762
Exterior Windows $4.80 S.F. 3,039 110 $16,046 30 1970 2000 $16,046 $14,587 110
Exterior Doors $1.20 S.F. 3,039 110 $4,011 30 1970 2000 $4,011 $3,647 110
Roofing $9.54 S.F. 3,039 110 $31,891 20 2006 2026 80 $28,992
Roof Coverings - BUR $9.54 S.F. 3,039 110 $31,891 20 2006 2026 80 $28,992
Roof Coverings - EPDM 0 0 0 0
Roof Coverings - Standing
Seam Mettal
0 0 0 0
Roof Openings 0 0 0 0
Interiors $30.08 S.F. 3,039 108 $98,379 56 1988 1985 50 $12,034 $91,426 13
Interior Construction $19.20 S.F. 3,039 106 $61,995 68 1991 2021 60 $58,349
Partitions $10.80 S.F. 3,039 110 $36,103 100 1970 $32,821
Interior Doors $2.40 S.F. 3,039 80 $5,835 40 2001 2041 78 $7,294
Fittings $6.00 S.F. 3,039 110 $20,057 20 2001 2021 55 $18,234
Stairs $2.58 S.F. 3,039 110 $8,625 100 1970 $7,841
Stair Construction $2.58 S.F. 3,039 110 $8,625 100 1970 $7,841
Interior Finishes $8.30 S.F. 3,039 110 $27,759 15 1991 1985 32 $12,034 $25,236 48
Wall Finishes - Ceramic &
Glazed
0 0 0 0
Wall Finishes - Paint $2.40 S.F. 3,039 110 $8,023 10 2001 2011 10 $7,294
Floor Finishes - Carpet 0 0 0 0
Floor Finishes - Ceramic &
Quarry Tile
0 0 0 0
Floor Finishes - Terrazzo 0 0 0 0
Floor Finishes - VCT $3.60 S.F. 3,039 110 $12,034 15 1970 1985 $12,034 $10,940 110
Ceiling Finishes $2.30 S.F. 3,039 110 $7,702 20 2001 2021 55 $7,002
Services $60.78 S.F. 3,039 110 $203,181 22 1994 2000 2015 68 $51,441 $184,709 28
Conveying 0 0 0
Elevators and Lifts 0 0 0 0
Plumbing $7.34 S.F. 3,039 110 $24,549 30 1993 2000 70 $2,527 $22,318 11
Plumbing Fixtures $5.89 S.F. 3,039 110 $19,696 30 2001 2031 70 $17,906
Domestic Water Distribution $0.44 S.F. 3,039 110 $1,484 30 2001 2031 70 $1,349
Sanitary Waste $0.76 S.F. 3,039 110 $2,527 30 1970 2000 $2,527 $2,297 110
Rain Water Drainage 0 0 0 0
Other Plumbing Systems -
Natural Gas
$0.25 S.F. 3,039 110 $842 30 2001 2031 70 $766
HVAC $32.52 S.F. 3,039 110 $108,711 19 2004 2021 72 $3,664 $98,828 4
Heat Generating Systems 0 0 0 0
Cooling Generating Systems 0 0 0 0
Distribution Systems & Exhaust
Systems
$9.12 S.F. 3,039 110 $30,487 30 2001 2031 70 $27,716
Terminal & Package Units $21.60 S.F. 3,039 110 $72,207 15 2006 2021 73 $3,664 $65,642 6
Controls & Instrumentation $1.80 S.F. 3,039 110 $6,017 20 2005 2025 75 $5,470
Other HVAC Systems/Equip -
Kitchen Hood
0 0 0 0
Fire Protection $2.70 S.F. 3,039 110 $9,026 30 1970 2000 2015 17 $8,205
Sprinklers $2.70 S.F. 3,039 110 $9,026 30 1970 2000 2015 17 $8,205
Electrical $18.22 S.F. 3,039 110 $60,895 24 1992 2000 63 $45,250 $55,358 82
Electrical Service/Distribution $2.27 S.F. 3,039 110 $7,582 30 2001 2031 70 $6,892
Branch Wiring $6.77 S.F. 3,039 110 $22,625 30 1970 2000 $22,625 $20,568 110
Lighting $6.77 S.F. 3,039 110 $22,625 20 1980 2000 $22,625 $20,568 110
Communications and Security -
Public Address & Clock System
0 0 0 0
Fire Alarm $1.54 S.F. 3,039 110 $5,135 10 2006 2016 60 $4,668
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 43
System Unit Price$
Unit of
Meas Qty Renewal% Renewal$ Life Installed
Calc Next
Renewal
Next
Renewal CI% Deficiency$ Replacement Value FCI%
Security & CCTV $0.88 S.F. 3,039 110 $2,928 10 2005 2015 50 $2,662
Other Electrical Systems -
Emergency Generator
0 0 0 0
Equipment & Furnishings $3.60 S.F. 3,039 110 $12,034 20 1970 1990 $12,034 $10,940 110
Equipment 0 0 0
Commercial Equipment 0 0 0 0
Institutional Equipment 0 0 0 0
Furnishings $3.60 S.F. 3,039 110 $12,034 20 1970 1990 $12,034 $10,940 110
Fixed Furnishings $3.60 S.F. 3,039 110 $12,034 20 1970 1990 $12,034 $10,940 110
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 44
Facility: \Elementary/Middle Schools\Vivian\Pine St Bldg (Teachers' Resource) (continued)
Renewal Schedule:
Systems 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
Total $95,566 $8,264 $13,858 $6,131
Substructure
Foundations
Standard Foundations
Special Foundations
Slab on Grade
Basement Construction
Basement Excavation
Basement Walls
Shell $20,057
Superstructure
Floor Construction
Roof Construction
Exterior Enclosure $20,057
Exterior Walls
Exterior Windows $16,046
Exterior Doors $4,011
Roofing
Roof Coverings - BUR
Roof Coverings - EPDM
Roof Coverings - Standing Seam
Mettal
Roof Openings
Interiors $12,034 $8,264
Interior Construction
Partitions
Interior Doors
Fittings
Stairs
Stair Construction
Interior Finishes $12,034 $8,264
Wall Finishes - Ceramic & Glazed
Wall Finishes - Paint $8,264
Floor Finishes - Carpet
Floor Finishes - Ceramic & Quarry
Tile
Floor Finishes - Terrazzo
Floor Finishes - VCT $12,034
Ceiling Finishes
Services $51,441 $13,858 $6,131
Conveying
Elevators and Lifts
Plumbing $2,527
Plumbing Fixtures
Domestic Water Distribution
Sanitary Waste $2,527
Rain Water Drainage
Other Plumbing Systems - Natural
Gas
HVAC $3,664
Heat Generating Systems
Cooling Generating Systems
Distribution Systems & Exhaust
Systems
Terminal & Package Units $3,664
Controls & Instrumentation
Other HVAC Systems/Equip -
Kitchen Hood
Fire Protection $10,463
Sprinklers $10,463
Electrical $45,250 $3,395 $6,131
Electrical Service/Distribution
Branch Wiring $22,625
Lighting $22,625
Communications and Security -
Public Address & Clock System
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 45
Systems 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
Fire Alarm $6,131
Security & CCTV $3,395
Other Electrical Systems -
Emergency Generator
Equipment & Furnishings $12,034
Equipment
Commercial Equipment
Institutional Equipment
Furnishings $12,034
Fixed Furnishings $12,034
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 46
Facility: \Elementary/Middle Schools\Vivian\Pine St Bldg (Teachers' Resource) (continued)
Deficiency Sheet:
Deficiency: Surveyor/Update: Eric Altman Fri, 04-Jun-2010Priority: 3Quantity: 1
Assembly: B2020 System: Exterior Windows Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: The exterior windows are worn, beyond expected life, and should be replaced.
Estimates:Raw Cost $13,371.60
Plus or (Minus) Additional Cost $0.00Total Estimated Amount $13,371.60
Deficiency: Surveyor/Update: Eric Altman Fri, 04-Jun-2010Priority: 3Quantity: 1
Assembly: B2030 System: Exterior Doors Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: The exterior doors are worn, beyond expected life, and should be replaced.
Estimates:Raw Cost $3,342.90
Plus or (Minus) Additional Cost $0.00Total Estimated Amount $3,342.90
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 47
Facility: \Elementary/Middle Schools\Vivian\ Pine St Bldg (Teachers' Resource) (continued)
Deficiency: Surveyor/Update: Eric Altman Fri, 04-Jun-2010Priority: 3Quantity: 1
Assembly: C3020 System: Floor Finishes - VCT Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: The VCT floor finishes are worn, beyond expected life, and should be replaced.
Estimates:Raw Cost $10,028.70
Plus or (Minus) Additional Cost $0.00Total Estimated Amount $10,028.70
Deficiency: Surveyor/Update: Eric Altman Fri, 04-Jun-2010Priority: 3Quantity: 1
Assembly: D2030 System: Sanitary Waste Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: Sanitary waste is beyond expected life and should be replaced.
Estimates:Raw Cost $2,106.03
Plus or (Minus) Additional Cost $0.00Total Estimated Amount $2,106.03
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 48
Facility: \Elementary/Middle Schools\Vivian\ Pine St Bldg (Teachers' Resource) (continued)
Deficiency: Surveyor/Update: Eric Altman Fri, 04-Jun-2010Priority: 3Quantity: 1
Assembly: D3050 System: Terminal & Package Units Material: Terminal and Package Units Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Replace A/C 4T Split System Note: Lennox split system with gas heat is beyond expected life and should be replaced.
Estimates:Raw Cost $3,053.00
Plus or (Minus) Additional Cost $0.00Total Estimated Amount $3,053.00
Deficiency: Surveyor/Update: Eric Altman Thu, 03-Jun-2010Priority: 3Quantity: 1
Assembly: D5020 System: Branch Wiring Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: Branch wiring is beyond expected life and should be replaced.
Estimates:Raw Cost $18,853.96
Plus or (Minus) Additional Cost $0.00Total Estimated Amount $18,853.96
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 49
Facility: \Elementary/Middle Schools\Vivian\ Pine St Bldg (Teachers' Resource) (continued)
Deficiency: Surveyor/Update: Eric Altman Fri, 04-Jun-2010Priority: 3Quantity: 1
Assembly: D5020 System: Lighting Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: Lighting system is inadequate, beyond expected life, and should be replaced.
Estimates:Raw Cost $18,853.96
Plus or (Minus) Additional Cost $0.00Total Estimated Amount $18,853.96
Deficiency: Surveyor/Update: Eric Altman Fri, 04-Jun-2010Priority: 3Quantity: 1
Assembly: E2010 System: Fixed Furnishings Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: Fixed furnishings, such as the base/wall cabinets, counter tops, window shades, and fixed seating, are worn,
beyond expected life, and should be replaced.
Estimates:Raw Cost $10,028.70
Plus or (Minus) Additional Cost $0.00Total Estimated Amount $10,028.70
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 50
Facility: \Elementary/Middle Schools\Vivian\SiteAddress: 100 W. Kentucky Avenue, Vivian, LA 71082
Attributes: Site Area (in Acres) 9
General Information: Function: Elementary Middle Year Built: 1923Gross Area: 129,177 S.F. Last Renovation:
Facility Description:
The original site was constructed in 1923 to include what is now Building B. There have been additions to the site to include Buildings A, C, D, and H. Campus site features include paved driveways and parking lots, pedestrian pavement, flag pole, landscaping, and fencing. Site mechanical and electrical features include water, sewer, natural gas and site lighting. This report contains condition and adequacy data collected during the 2009/2010 Facility Condition Assessment (FCA). The detailed condition and deficiency statements are contained in this report.
Current Repair Cost: $1,063,385.00 Replacement Cost: $1,725,288.00 FCI: 61.64%
05-Jan-2010Aerial Image of Vivian Elementary/Middle School
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 51
Facility: \Elementary/Middle Schools\Vivian\Site (continued)
Building Condition:
System Unit Price$
Unit of
Meas Qty Renewal% Renewal$ Life Installed
Calc Next
Renewal
Next
Renewal CI% Deficiency$ Replacement Value FCI%
Total $13.36 S.F. 129,177 100 $1,725,286 34 1932 1953 55 $1,063,383 $1,725,286 62
Building Sitework $13.36 S.F. 129,177 100 $1,725,286 34 1932 1953 55 $1,063,383 $1,725,286 62
Site Improvements $8.50 S.F. 129,177 100 $1,097,487 28 1939 1953 55 $435,584 $1,097,487 40
Roadways $1.38 S.F. 129,177 100 $178,264 50 1923 1973 $178,264 $178,264 100
Parking Lots $1.18 S.F. 129,177 100 $151,912 30 1923 1953 $151,912 $151,912 100
Pedestrian Paving $0.82 S.F. 129,177 100 $105,408 50 1923 1973 $105,408 $105,408 100
Site Development $3.86 S.F. 129,177 100 $499,140 20 2001 2021 55 $499,140
Landscaping $1.26 S.F. 129,177 100 $162,763 10 1923 $162,763
Site Mechanical Utilities $4.86 S.F. 129,177 100 $627,799 44 1923 1953 $627,799 $627,799 100
Water Supply $0.82 S.F. 129,177 100 $105,408 30 1923 1953 $105,408 $105,408 100
Sanitary Sewer $0.41 S.F. 129,177 100 $52,704 30 1923 1953 $52,704 $52,704 100
Storm Sewer $3.52 S.F. 129,177 100 $454,186 50 1923 1973 $454,186 $454,186 100
Fuel Distribution $0.12 S.F. 129,177 100 $15,501 30 1923 1953 $15,501 $15,501 100
Site Electrical Utilities 0 0 0
Site Lighting 0 0 0 0
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 52
Facility: \Elementary/Middle Schools\Vivian\Site (continued)
Renewal Schedule:
Systems 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
Total $1,063,383
Building Sitework $1,063,383
Site Improvements $435,584
Roadways $178,264
Parking Lots $151,912
Pedestrian Paving $105,408
Site Development
Landscaping
Site Mechanical Utilities $627,799
Water Supply $105,408
Sanitary Sewer $52,704
Storm Sewer $454,186
Fuel Distribution $15,501
Site Electrical Utilities
Site Lighting
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 53
Facility: \Elementary/Middle Schools\Vivian\Site (continued)
Deficiency Sheet:
Deficiency: Surveyor/Update: Kate McPhillips Fri, 04-Jun-2010Priority: 3Quantity: 1
Assembly: G2010 System: Roadways Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: The roadways are worn, beyond expected life, and should be replaced.
Estimates:Raw Cost $148,553.55
Plus or (Minus) Additional Cost $0.00Total Estimated Amount $148,553.55
Deficiency: Surveyor/Update: Kate McPhillips Fri, 04-Jun-2010Priority: 3Quantity: 1
Assembly: G2020 System: Parking Lots Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: The parking lot is worn, beyond expected life, covered in gravel in some areas, and should be replaced.
Estimates:Raw Cost $126,593.46
Plus or (Minus) Additional Cost $0.00Total Estimated Amount $126,593.46
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 54
Facility: \Elementary/Middle Schools\Vivian\ Site (continued)
Deficiency: Surveyor/Update: Kate McPhillips Fri, 04-Jun-2010Priority: 3Quantity: 1
Assembly: G2030 System: Pedestrian Paving Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: The pedestrian paving is cracked, worn, and beyond expected life, and should be replaced. There is also a need
for a handicap access ramp at the front entry.
Estimates:Raw Cost $87,840.36
Plus or (Minus) Additional Cost $0.00Total Estimated Amount $87,840.36
Deficiency: Surveyor/Update: Kate McPhillips Fri, 04-Jun-2010Priority: 3Quantity: 1
Assembly: G3010 System: Water Supply Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: Water supply is beyond expected life and should be replaced.
Estimates:Raw Cost $87,840.36
Plus or (Minus) Additional Cost $0.00Total Estimated Amount $87,840.36
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 55
Facility: \Elementary/Middle Schools\Vivian\ Site (continued)
Deficiency: Surveyor/Update: Kate McPhillips Fri, 04-Jun-2010Priority: 3Quantity: 1
Assembly: G3020 System: Sanitary Sewer Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: Sanitary sewer is beyond expected life and should be replaced.
Estimates:Raw Cost $43,920.18
Plus or (Minus) Additional Cost $0.00Total Estimated Amount $43,920.18
Deficiency: Surveyor/Update: Kate McPhillips Fri, 04-Jun-2010Priority: 3Quantity: 1
Assembly: G3030 System: Storm Sewer Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: Storm sewer is beyond expected life and should be replaced.
Estimates:Raw Cost $378,488.61
Plus or (Minus) Additional Cost $0.00Total Estimated Amount $378,488.61
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 56
Facility: \Elementary/Middle Schools\Vivian\ Site (continued)
Deficiency: Surveyor/Update: Kate McPhillips Fri, 04-Jun-2010Priority: 3Quantity: 1
Assembly: G3060 System: Fuel Distribution Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: Natural gas system is beyond expected life and should be replaced.
Estimates:Raw Cost $12,917.70
Plus or (Minus) Additional Cost $0.00Total Estimated Amount $12,917.70
COMET4 Caddo Parish
1961 Midway COMET4 Survey Report
Deficiency Detail ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 1
Facility
Name Assembly System Material Distress Correction Qty Unit Raw Cost
Additional
Cost Total Cost Priority Def. Cat. Location / Note
Caddo Parish School District $3,105,400 $621,080 $3,726,480 Elementary/Middle Schools $3,105,400 $621,080 $3,726,480 Vivian $3,105,400 $621,080 $3,726,480 1923, 1930, 1972 (A&B Bldgs) $1,988,943 $397,789 $2,386,732 Building Systems $1,988,943 $397,789 $2,386,732
D5020 Branch Wiring System Beyond Expected Life
Renew System 1 Ea. $382,377 $76,475 $458,853 Necessary- 2-5 Yrs
Deferred Maintenance
Branch wiring is beyond expected life and should be replaced.
E2010 Fixed Furnishings
System Beyond Expected Life
Renew System 1 Ea. $203,392 $40,678 $244,071 Necessary- 2-5 Yrs
Deferred Maintenance
Fixed furnishings, such as the base/wall cabinets, counter tops, window shades, and fixed seating, are worn, beyond expected life, and should be replaced.
B2020 Exterior Windows
System Beyond Expected Life
Renew System 1 Ea. $271,190 $54,238 $325,428 Necessary- 2-5 Yrs
Deferred Maintenance
The exterior windows are worn, beyond expected life, and should be replaced.
B2030 Exterior Doors System Beyond Expected Life
Renew System 1 Ea. $67,797 $13,559 $81,357 Necessary- 2-5 Yrs
Deferred Maintenance
The exterior doors are worn, beyond expected life, and should be replaced.
C1030 Fittings System Beyond Expected Life
Renew System 1 Ea. $338,987 $67,797 $406,784 Necessary- 2-5 Yrs
Deferred Maintenance
Fittings, such as chalk and tack boards, lockers, toilet and bath accessories, toilet partitions, and shelving, are beyond expected life and should be replaced.
C3010 Wall Finishes - Paint
System Beyond Expected Life
Renew System 1 Ea. $135,595 $27,119 $162,714 Necessary- 2-5 Yrs
Deferred Maintenance
The painted wall finishes are worn, beyond expected life, and should be replaced.
C3020 Floor Finishes - Carpet
System Beyond Expected Life
Renew System 1 Ea. $7,226 $1,445 $8,671 Necessary- 2-5 Yrs
Deferred Maintenance
Carpet floor finishes are worn, beyond expected life, and should be replaced.
C3030 Ceiling Finishes System Beyond Expected Life
Renew System 1 Ea. $130,171 $26,034 $156,205 Necessary- 2-5 Yrs
Deferred Maintenance
The ceiling finishes are stained, beyond expected life, and should be replaced.
D2020 Domestic Water Distribution
System Beyond Expected Life
Renew System 1 Ea. $25,085 $5,017 $30,102 Necessary- 2-5 Yrs
Deferred Maintenance
Domestic water distribution is beyond expected life and should be replaced.
D2030 Sanitary Waste System Beyond Expected Life
Renew System 1 Ea. $42,712 $8,542 $51,255 Necessary- 2-5 Yrs
Deferred Maintenance
Sanitary waste is beyond expected life and should be replaced.
D2040 Rain Water Drainage
System Beyond Expected Life
Renew System 1 Ea. $10,848 $2,170 $13,017 Necessary- 2-5 Yrs
Deferred Maintenance
Rain water drainage system is beyond expected life and should be replaced.
D2010 Plumbing Fixtures
System Beyond Expected Life
Renew System 1 Ea. $332,885 $66,577 $399,462 Necessary- 2-5 Yrs
Deferred Maintenance
Plumbing fixtures are beyond expected life and should be replaced.
D1010 Elevators and Lifts
System Missing Renew System 1 Ea. $40,678 $8,136 $48,814 Necessary- 2-5 Yrs
ADA / Accessibility
An elevator is required to access the second floor of Building B.
COMET4 Caddo Parish
1961 Midway COMET4 Survey Report
Deficiency Detail ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 2
Facility
Name Assembly System Material Distress Correction Qty Unit Raw Cost
Additional
Cost Total Cost Priority Def. Cat. Location / Note
1989 (C&D Bldgs) $113,489 $22,698 $136,187 Building Systems $113,489 $22,698 $136,187
C3020 Floor Finishes - Carpet
System Beyond Expected Life
Renew System 1 Ea. $12,744 $2,549 $15,292 Necessary- 2-5 Yrs
Deferred Maintenance
Carpet floor finishes are worn, beyond expected life, and should be replaced.
C3020 Floor Finishes - VCT
System Beyond Expected Life
Renew System 1 Ea. $98,182 $19,636 $117,818 Necessary- 2-5 Yrs
Deferred Maintenance
The VCT floor finishes are worn, beyond expected life, and should be replaced.
B3010 Roof Coverings -EPDM
Roof Covering
Failing Roof Repair 42,990 S.F. $2,564 $513 $3,077 Necessary- 2-5 Yrs
Critical Repair
There are reports of several roof leaks in the building. An investigatiion to locate and determine the cause of the leaks is needed.
1999 (E Bldg) $11,897 $2,379 $14,276 Building Systems $11,897 $2,379 $14,276
D3060 Controls & Instrumentation
System Inadequate Renew System 1 Ea. $11,897 $2,379 $14,276 Recommended-3-10 Yrs
Deferred Maintenance
Analog electric controls system is inadequate and needs to be upgraded/replaced.
Basketball Court $25,278 $5,056 $30,333 Building Systems $25,278 $5,056 $30,333
F1010 Special Structures - Basketball Court - Concrete - Outdoor
System Beyond Expected Life
Renew System 1 Ea. $25,278 $5,056 $30,333 Necessary- 2-5 Yrs
Deferred Maintenance
The concrete surface is worn, beyond expected life, and should be replaced.
COMET4 Caddo Parish
1961 Midway COMET4 Survey Report
Deficiency Detail ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 3
Facility
Name Assembly System Material Distress Correction Qty Unit Raw Cost
Additional
Cost Total Cost Priority Def. Cat. Location / Note
Pine St Bldg (Teachers' Resource) $79,639 $15,928 $95,567 Building Systems $79,639 $15,928 $95,567
D5020 Branch Wiring System Beyond Expected Life
Renew System 1 Ea. $18,854 $3,771 $22,625 Necessary- 2-5 Yrs
Deferred Maintenance
Branch wiring is beyond expected life and should be replaced.
D5020 Lighting System Beyond Expected Life
Renew System 1 Ea. $18,854 $3,771 $22,625 Necessary- 2-5 Yrs
Deferred Maintenance
Lighting system is inadequate, beyond expected life, and should be replaced.
E2010 Fixed Furnishings
System Beyond Expected Life
Renew System 1 Ea. $10,029 $2,006 $12,034 Necessary- 2-5 Yrs
Deferred Maintenance
Fixed furnishings, such as the base/wall cabinets, counter tops, window shades, and fixed seating, are worn, beyond expected life, and should be replaced.
B2020 Exterior Windows
System Beyond Expected Life
Renew System 1 Ea. $13,372 $2,674 $16,046 Necessary- 2-5 Yrs
Deferred Maintenance
The exterior windows are worn, beyond expected life, and should be replaced.
B2030 Exterior Doors System Beyond Expected Life
Renew System 1 Ea. $3,343 $669 $4,011 Necessary- 2-5 Yrs
Deferred Maintenance
The exterior doors are worn, beyond expected life, and should be replaced.
C3020 Floor Finishes - VCT
System Beyond Expected Life
Renew System 1 Ea. $10,029 $2,006 $12,034 Necessary- 2-5 Yrs
Deferred Maintenance
The VCT floor finishes are worn, beyond expected life, and should be replaced.
D2030 Sanitary Waste System Beyond Expected Life
Renew System 1 Ea. $2,106 $421 $2,527 Necessary- 2-5 Yrs
Deferred Maintenance
Sanitary waste is beyond expected life and should be replaced.
D3050 Terminal & Package Units
Terminal and Package Units
Beyond Expected Life
Replace A/C 4T Split System
1 Ea. $3,053 $611 $3,664 Necessary- 2-5 Yrs
Deferred Maintenance
Lennox split system with gas heat is beyond expected life and should be replaced.
Site $886,154 $177,231 $1,063,385 Building Systems $886,154 $177,231 $1,063,385
G2010 Roadways System Beyond Expected Life
Renew System 1 Ea. $148,554 $29,711 $178,264 Necessary- 2-5 Yrs
Deferred Maintenance
The roadways are worn, beyond expected life, and should be replaced.
G2020 Parking Lots System Beyond Expected Life
Renew System 1 Ea. $126,593 $25,319 $151,912 Necessary- 2-5 Yrs
Deferred Maintenance
The parking lot is worn, beyond expected life, covered in gravel in some areas, and should be replaced.
G3010 Water Supply System Beyond Expected Life
Renew System 1 Ea. $87,840 $17,568 $105,408 Necessary- 2-5 Yrs
Deferred Maintenance
Water supply is beyond expected life and should be replaced.
G3020 Sanitary Sewer System Beyond Expected Life
Renew System 1 Ea. $43,920 $8,784 $52,704 Necessary- 2-5 Yrs
Deferred Maintenance
Sanitary sewer is beyond expected life and should be replaced.
G3030 Storm Sewer System Beyond Expected Life
Renew System 1 Ea. $378,489 $75,698 $454,186 Necessary- 2-5 Yrs
Deferred Maintenance
Storm sewer is beyond expected life and should be replaced.
G3060 Fuel Distribution System Beyond Expected Life
Renew System 1 Ea. $12,918 $2,584 $15,501 Necessary- 2-5 Yrs
Deferred Maintenance
Natural gas system is beyond expected life and should be replaced.
G2030 Pedestrian Paving
System Beyond Expected Life
Renew System 1 Ea. $87,840 $17,568 $105,408 Necessary- 2-5 Yrs
Deferred Maintenance
The pedestrian paving is cracked, worn, and beyond expected life, and should be replaced. There is also a need for a handicap access ramp at the front entry.
Functional and Educational Adequacy
Suitability Report
Suitability Report - Full
Project:Site:
Suitability
Possible
Score
Score
Percent
Score
CaddoCounty:
1Region:
Rating
630Site #:
Caddo 2009 Vivian Elementary-Middl
Project #:
4057
Site Type: Site Size:Grade Config:
K-8 0.00ES/MS
Suitability - K-8
Site
3.00 2.01 67.00 TrafficFair
1.00 0.67 67.00 Pedestrian TrafficFair
1.35 0.45 33.00 ParkingPoor
1.64 0.54 33.00 Play Courts & FieldsPoor
Safety and Security
1.22 1.22 100.00 FencingGood
0.15 0.05 33.00 Signage & Way FindingPoor
3.00 0.00 0.00 Ease of SupervisionP/U
0.50 0.00 0.00 Limited EntrancesP/U
0.50 0.00 0.00 Interior CirculationP/U
School Climate
5.00 0.00 0.00 Learning Style VarietyP/U
5.00 0.00 0.00 School EnvironmentP/U
1.00 0.00 0.00 LandscapingP/U
General Classrooms
12.95 8.68 67.00 SizeFair
2.78 2.78 100.00 AdjacenciesGood
2.78 2.78 100.00 Storage\Fixed Equip.Good
Remedial - Special Needs
3.17 1.59 50.00 SizeFair
0.68 0.68 100.00 AdjacenciesG/F
0.68 0.00 0.00 Storage\Fixed Equip.P/U
Library
2.43 1.22 50.00 SizeFair
0.52 0.52 100.00 AdjacenciesG/F
0.52 0.52 100.00 Storage\Fixed Equip.G/F
P.E.
8.40 8.40 100.00 SizeGood
1.80 1.80 100.00 AdjacenciesG/F
1.80 1.80 100.00 Storage\Fixed Equip.G/F
Music
2.64 2.64 100.00 SizeGood
0.57 0.00 0.00 AdjacenciesP/U
0.57 0.57 100.00 Storage\Fixed Equip.G/F
Art
Page 1 of 43/9/2010 2:19:58PM
Project:Site:
Suitability
Possible
Score
Score
Percent
Score
CaddoCounty:
1Region:
Rating
630Site #:
Caddo 2009 Vivian Elementary-Middl
Project #:
4057
Site Type: Site Size:Grade Config:
K-8 0.00ES/MS
1.53 0.00 0.00 SizeP/U
0.33 0.33 100.00 AdjacenciesG/F
0.33 0.00 0.00 Storage\Fixed Equip.P/U
Performing Arts\Auditorium
1.64 1.64 100.00 SizeGood
0.35 0.35 100.00 AdjacenciesGood
0.35 0.35 100.00 Storage\Fixed Equip.Good
Vocational Technical
4.29 4.29 100.00 SizeGood
0.92 0.92 100.00 AdjacenciesGood
0.92 0.92 100.00 Storage\Fixed Equip.G/F
Science
2.70 0.00 0.00 SizeP/U
0.58 0.58 100.00 AdjacenciesGood
0.58 0.00 0.00 Storage\Fixed Equip.P/U
Kindergarten
1.18 0.00 0.00 SizeP/U
0.25 0.25 100.00 AdjacenciesG/F
0.25 0.25 100.00 Storage\Fixed Equip.G/F
Administration
1.59 0.79 50.00 SizeFair
0.34 0.34 100.00 AdjacenciesG/F
0.34 0.34 100.00 Storage\Fixed Equip.G/F
0.91 0.45 50.00Fair Restrooms (Student)
0.91 0.45 50.00Fair Teacher Lounge and Work Room(s)
5.00 3.35 67.00Fair Cafeteria
7.84 7.84 100.00Good Food Prep
0.41 0.20 50.00Fair Counseling
0.34 0.34 100.00G/F Clinic
0.50 0.50 100.00G/F Custodial & Maintenance
100.00 63.39 63.39Total For Site:
Comments
Suitability - K-8
Vivian Elementary Middle School provides a general educational program for grades PK-8. The middle school does
have some magnet programs that students must qualify for. The school serves the surrounding area which is a
large rural zone. The school has an extensive special education program in all grades. The facility is made up of 5
wings and one portable.
Suitability - K-8->Site-->Traffic
Primary parent drop off is separate but on-street.
Suitability - K-8->Site-->Pedestrian Traffic
Staff must cross street from parking lot.
Suitability - K-8->Site-->Parking
Most staff parking is across a street and about half of it is unpaved. The school shares half the parking with the
adjacent church.
Page 2 of 43/9/2010 2:19:58PM
Project:Site:
Suitability
Possible
Score
Score
Percent
Score
CaddoCounty:
1Region:
Rating
630Site #:
Caddo 2009 Vivian Elementary-Middl
Project #:
4057
Site Type: Site Size:Grade Config:
K-8 0.00ES/MS
Suitability - K-8->Site-->Play Courts & Fields
There are no MS athletic fields and the PK-K play area is in poor condition.
Suitability - K-8->Safety and Security-->Signage & Way Finding
There is very little way finding signage and many rooms are not signed.
Suitability - K-8->Safety and Security-->Ease of Supervision
The number and configuration of the buildings make this a challenging site to supervise.
Suitability - K-8->Safety and Security-->Limited Entrances
There are numerous buildings with numerous entrances.
Suitability - K-8->Safety and Security-->Interior Circulation
Wings B and D have narrow, steep stairways. The halls are generally wide.
Suitability - K-8->School Climate-->Learning Style Variety
The small self-contained classrooms do not support a variety of learning styles.
Suitability - K-8->School Climate-->School Environment
The physical environment is not stimulating. Acoustics are poor, lighting is low, natural light is blocked, and overall
aesthetics are dull.
Suitability - K-8->School Climate-->Landscaping
Landscaping is minimal.
Suitability - K-8->General Classrooms-->Size
Most general classrooms are in the 6-700 SF range.
Suitability - K-8->Remedial - Special Needs-->Size
Special education classrooms are small, 6-700 SF.
Suitability - K-8->Remedial - Special Needs-->Storage\Fixed Equip.
Special education rooms need additional storage especially for the students equipment.
Suitability - K-8->Library-->Size
Both the ES and MS libraries are small.
Suitability - K-8->Music-->Adjacencies
The ES music room is adjacent to special education classrooms.
Suitability - K-8->Art-->Size
Both art rooms are small and the MS room does not have a separate room for the kiln.
Suitability - K-8->Art-->Storage\Fixed Equip.
Both art rooms need additional storage.
Suitability - K-8->Vocational Technical-->Size
The computer lab that houses business educ. is sufficiently large but it is shared with ES science.
Suitability - K-8->Science-->Size
Science rooms are in typical classrooms and are small and don't have storage/prep rooms.
Suitability - K-8->Science-->Storage\Fixed Equip.
Storage is lacking and there is no safety equipment.
Suitability - K-8->Kindergarten-->Size
PK and K rooms are too small.
Suitability - K-8->Administration-->Size
Conference room is small and there is no staff restroom in the administrative area.
Page 3 of 43/9/2010 2:19:58PM
Project:Site:
Suitability
Possible
Score
Score
Percent
Score
CaddoCounty:
1Region:
Rating
630Site #:
Caddo 2009 Vivian Elementary-Middl
Project #:
4057
Site Type: Site Size:Grade Config:
K-8 0.00ES/MS
Suitability - K-8->Restrooms (Student)
Restrooms in the older B wing are in poor condition.
Suitability - K-8->Teacher Lounge and Work Room(s)
Teacher lounge and work rooms are small.
Suitability - K-8->Cafeteria
Cafeteria has a low ceiling which helps with the acoustics but compresses the space. It is a bit small for the
enrollment.
Suitability - K-8->Counseling
Counseling has no waiting space.
Suitability - K-8->Clinic
Clinic is not located near administration but this works okay.
Page 4 of 43/9/2010 2:19:58PM
Functional and Educational Adequacy
Technology Readiness Report
Technology Readiness Report - Full
Project:Site:
Technology Readiness
Possible
ScoreScore
Percent
Score
CaddoCounty:
1Region:
Rating
630Site #:
Caddo 2009 Vivian Elementary-Middle
Project #:
4057
Technology Readiness
15.00 7.50 50.00 Comm/IT Equipment Environment Fair
10.00 10.00 100.00 Electrical Power Good
10.00 10.00 100.00 Cooling Good
10.00 10.00 100.00 Drops & Wireless Good
15.00 15.00 100.00 LAN Connectivity Good
10.00 10.00 100.00 WAN Backbone Good
10.00 6.70 67.00 LAN-WAN Performance Fair
5.00 5.00 100.00 Video Distribution Good
5.00 0.00 0.00 Voice Distribution Unsat
10.00 10.00 100.00 Faculty & Staff Technology Good
100.00 84.20 84.20Total For Site:
Comments
Technology Readiness->Comm/IT Equipment Environment
Server is located in library storeroom which can get warm.
Technology Readiness->Voice Distribution
Intercom system is old and outdated.
Page 1 of 13/9/2010 2:05:06PM
Functional and Educational Adequacy
Capacity and Utilization Report
Capacity Calculations Appendix Preface Some spaces do not contribute to the functional capacity of a school. These spaces are generally spaces
which do not have students assigned to them. Some examples of these spaces include elementary art
rooms, elementary computer labs, elementary music rooms, and special education resource rooms.
Many schools have temporary buildings and these are also not included in the calculation of the
functional capacity. It is the district’s philosophy that, while temporary buildings can be useful in the
short run, they do not provide appropriate long term space and should be eliminated where possible.
Temporary buildings are generally used for the following functions:
1. To house students in temporary classrooms when the school is lacking enough classrooms
2. To house special programs when the school is lacking space for these programs
3. To house necessary storage or administrative support functions when permanent space is lacking
4. To house unnecessary storage or functions
It is the district’s strategy to eliminate all but the absolute necessary temporary buildings and it should
conduct an inventory of the uses of temporary buildings. Where the inventory identifies uses 1-3, the
district will need to consider a more appropriate space solution. In the case of number 4, the district will
need to ensure the principal of the school discontinues the inappropriate use of the temporary building.
Caddo Parish School Board
Instructional Space Model Guidelines
Room Type Students/
Room
Pre-School 20
K Capacity (full day) and 1st Grade 20
Elementary Classroom (2) 24
Elementary Classroom (3-5) 26
Secondary Classroom (6-12) 25
Art (Secondary) 33
Music (Secondary) - Vocal 25
Music (Secondary) - Instrumental 30
Science Lab (Secondary) 25
Voc./Industrial Tech, Foods, Etc. 25
Gym (Secondary) 80
Computer Lab (Elementary)* 26
Computer Lab (Secondary) 33
Spec. Ed. - Severe 9
Spec. Ed. - Resource 0
Alternative Education 18
Portable 0
*These spaces do not contribute to capacity
Scheduling Factors
Elementary Schools 95.0%
Middle Schools 85.0%
High Schools 75.0%
Source: MGT of America, Inc., 2009.
Caddo Parish School Board Capacity Calculations
Vivian Elementary-MiddleES/M K-8
K-1 Classroom: 8
PK Classroom: 2
ES (2) Classroom: 3
ES (3-5) Classroom: 8
ART: 2
Secondary (6-12): 6
MU Inst: 1
MU Vocal: 1
Science: 3.5
GYM: 3
VO/TEC: 0.5
*Computer Lab: 3
SE - Resource: 8
SE - Severe: 8
Alt: 0
**Temp Bldg: 2
20
24
20
26
33
25
30
25
25
80
25
33
0
9
18
Room Type # of Classrooms x Students/Room = Capacity
Total Capacity (w/o scheduling factor) =
Vivian Elementary-Middle Capacity =
x Scheduling factor =
40
72
160
208
150
66
30
25
87.5
240
12.5
99
0
72
0
0
*Computer Labs at Elementary Schools do not contribute to capacity**The temporary building number represents the number of temporary building teaching stations or rooms, not the number of temporary buildings.
1,073
1,262
85%
N/A
Future Facility and Site Assessment Report
FUTURE FACILITY AND SITE ASSESSMENT
School VIVIAN ELEMENTARY / MIDDLE SCHOOL 100 West Kentucky Ave. Vivian, LA 71082
Site Description 9 acre site in the town of Vivian in the northwest part of the parish surrounded by a residential neighborhood and faces a 2-lane lightly traveled street and the 4-lane State Highway 1 aka Pine Street borders the east side. The acreage is an accumulation of lots on several blocks including a parking lot across Kentucky Street to the south and a partial block across Pine Street (Hwy 1) reportedly leased to the City but used as a teacher resource facility. The original 1915 school on the north corner is now City property. The site slopes gently west to east and north with the main buildings sitting on a raised pad. The school is a collection of 6 incrementally added 1- and 2-story buildings including the original 1923 school, 4 classroom additions, an auditorium and gymnasium unit, and a modular unit. At the teacher resource center is a small 1-story brick, flat roof building. Site features include asphalt and gravel paving, lawns and a few trees, recreation field, paved basketball court, and playground equipment.
SUMMARY Topic Grade Comments
Site Adequacy Potential
Constraint
Although there is some available land, the campus is filling up, any additions will encroach on outdoor recreation and parking and site is much smaller than guideline. SITE ASSESSMENT
Site Size Status Inadequate
Student Capacity: 1012 Min. Acres Recommended: 20 Actual Site Acres: 9
Usable Area Remaining
Potential Constraint
1.50 Acres. Approximate. Both expansion areas crowd the site boundaries and impinge on recreation yards or parking.
• Flood Plain Potential
Constraint
The FEMA FIRM maps covering the Town of Vivian were blank and did not show any zone designations. The assumption used here is that there MIGHT be a problem but the data is not readily available from public sources.
• Potable Water No Constraint
• Sanitary Sewer No Constraint
• Storm Drainage No Constraint
Generally site drains well but a few localized ponding conditions were observed.
• Electricity No Constraint
• Natural Gas No Constraint
• Ground Water No Constraint
• Air Pollution No Constraint
• HazMat/Soils No Constraint
• Habitats No Constraint No conflicts identified by DEQ.
Ease of Access No Constraint
Ease of Traffic Flow Needs Improvement
Bus and auto traffic are separated on different streets. Auto drop-off is uncovered and street configuration is awkward.
Design Compatibility No Constraint
The school facility fits into the residential neighborhood and has grown over the years; expansion or replacement would not be intrusive although the site is getting full.
Compatibility of Structures
No Constraint The collection of buildings and styles are eclectic but share materials and massing that reasonably blend.
VIV
IAN
EL
EM
EN
TA
RY
/MID
DL
E S
CH
OO
L100 W
est K
en
tucky
Viv
ian
, LA
71082
MISSISSIPPI STREET
N
KENTUCKY STREET
SP
RU
CE
ST
RE
ET
LA
HW
Y 1
/PIN
E S
TR
EE
T
Primary : 0.81 Ac
Secondary : 0.69 Ac
Total: 1.50 Ac
Primary
Secondary
1915 SCHOOL
PUBLIC LIBRARY
Recreation Yard
RESIDENTIAL
RESIDENTIAL
COMMERCIAL
RESIDENTIAL
RESIDENTIAL/COMMERCIAL
Auto
Pic
k-U
p
Bus Drop-Off
T
E
E
Total Usable
Site Area: 1.50 Ac
+ FH
Parking
1923 SCHOOL
Leased To City
Slope
Pu
blis
he
d 0
1.2
9.1
0
New
B
uild
ing
Teacher Resource Center
Building Code Verification Report
Building Code Number COMPLYNOT
COMPLY
FCA
DEFICIENCY
NOT
KNOWN
SYSTEM
NOT
PRESENT
NA TO FCA
DATA
1Code of Federal Regulations 28 CFR Part
36, 1994 edition, Paragraph 4.1.2,
Paragraph 4.1.6
1 NPFA 101:15.2.3.2; IBC 1017.2
3 IBC 1005.2
5
a
b
c
d
6
a
b
1
2
4 IBC 1011.5.3
1 IBC 1007.3
2 IBC 1020.1
Are penetrations into stairs limited to doors, electrical conduit serving the
stairway, piping necessary for the heating or cooling of the exit enclosure,
sprinkler piping, standpipes and penetrations for fire alarm circuits?
8
Boiler and furnace rooms?
Are corridor doors rated a minimum 20-minute rating?
Is glazing in rated doors above 20 minutes limited to 100 square inches?
NFPA 101:15.3.7
NFPA 101:15.3.2.1; IBC 508.2
Does every room or space greater than 250 SF and used for educational
purposes have not less than one outside window for emergency rescue
(exceptions: sprinklered building or room that has a door directly to the
outside)?
Do doors opening in the path of egress travel not reduce the required width to
less than 1/2 during the course of the swing?
When fully open, do corridor doors not project more than 7 inches into the
required corridor width?
Is the building subdivided into compartments by smoke partitions having not
less than a 1-hour fire rating? (Maximum area of compartment is 30,000 SF.
Length or width of building exceeds 300’ unless sprinklered.)
IBC 715.4.4.1
Is 1-hour rating or sprinkler protection provided for the following:
Hazardous storage?
Janitor’s closet?
IBC 1008.1.8.1
Where there is a chiller, is it separated from a boiler or water heater by a 2-
hour assembly?
Laundries? NFPA 101:15.3.2.1; IBC 508.2
School Name: Vivian ES/MS
NFPA101:15.2.11.1.1
G2030 Pedestrian Paving
B2020 Exterior Windows
4
BUILDING CODE COMPLIANCE REPORT
Code Provision
Is there a continuous path of entry/exit for handicap accessibility to all parts of
the building?
Do exit access corridors have not less than 6’ of clear width?
Are both 1-hour rating and sprinkler protection provided for the following:
Science labs?
7
Does all door hardware comply by not requiring tight grasping, tight pinching or
twisting to operate?
Maintenance shops?
IBC 508.2
C10 Interior Construction
C1010 Partitions
C1020 Interior Doors
1
IBC 1005.2
Are corridors 1-hour rated (exceptions: building is sprinklered or each room for
instruction has at least one door directly to the exterior)?IBC 1017.1
2
3
NFPA 101:7.1.3.2.1; IBC 1020.1.2
C2010 Stair Construction
Are all means of egress illuminated at all times building is occupied?
Do exit stairways have a minimum 48” clearance width between handrails?
Are stairs separated by 1-hour fire resistance rating?
3
Building Code Number COMPLYNOT
COMPLY
FCA
DEFICIENCY
NOT
KNOWN
SYSTEM
NOT
PRESENT
NA TO FCA
DATACode Provision
4
a NFPA 101:7.2.2.2.4.2; IBC 1012.4
b IBC 1012.5
c NFPA 101:7.2.2.4.4.6; IBC 1012.1
d NFPA 101:7.2.2.4.4.2; IBC 1012.2
5 IBC 1007.6
1
2
1 IBC 508.2
2 IBC 1203.1
3INTERNATIONAL MECHANICAL CODE
2000, 606.4
4 IBC 908.6
1 IBC 903.2
1 IBC 907.2
Is there a telephone or intercom communication in the cab?
Is there a fireman control panel at the ground floor controls?
Are handrails:
IBC 3006.2
IBC 3003.2
Is there an Area of Refuge in the stairwell or in a vestibule entering the stair? Is
there a communication device there?
Between 34” and 38” above the surface of the tread?
Between 1-1/4” and 2” in diameter?
Returning to wall, guard or walking surface?
3 IBC 907.11
IBC 907.2.12.2
Does the shaft have exhaust directly to the outside, an access ladder to the pit,
and battery backup lighting in the shaft/pit?
Are the mechanical rooms separated by fire rated partitions from remainder of
building?
Is there a standard and emergency ventilation system provided?
Are there automatic sprinkler systems provided in assembly spaces with more
than 300 occupants?
2
Is there a refrigerant detection and alarm system provided?
Are there emergency shut-offs provided?
Are the duct smoke detectors connected to the building’s fire alarm control
panel?
Is there a monitored fire alarm system provided?
Does the operation of fire detector, sprinkler device or manual fire alarm box
immediately sounds an alert tone followed by voice instructions giving
approved information and directions for an evacuation?
IBC 3004.1; IBC 3006.1
D30 HVAC Systems
D40 Fire Protection
D4010 Sprinklers
D50 Electrical
D5030 Communications and Security
4
D10 Conveying
D1010 Elevators
3Does the Elevator Machine Room have ventilation or air conditioning to protect
controls from overheating?
Continuously graspable?
Energy Conservation Opportunities Report
System Energy Conservation FCA Deficiency Replacement Cost
SCHOOL TYPEENERGY CONSERVATION OPPORTUNITIES
Vivian Elementary/Middle ES/MS
1923, 1930, 1972 (A&B) Buildings Roof Covering No No
Exterior Windows Yes Yes $325,428.00
Interior Lighting No No
Bldg Controls & Instrumentation No No
Heating No No
Other HVAC Systems (Ventilation) No No
Terminal & Package Units No No
Cooling No No
1989 (C&D) Buildings Roof Covering Partial Yes $3,077.00
Exterior Windows No No
Interior Lighting No No
Bldg Controls & Instrumentation No No
Heating No No
Other HVAC Systems (Ventilation) No No
Terminal & Package Units No No
Cooling No No
1999 (E) Building Roof Covering No No
Exterior Windows No No
Interior Lighting No No
Bldg Controls & Instrumentation Yes Yes $14,276.00
Heating No No
Other HVAC Systems (Ventilation) No No
Terminal & Package Units No No
Cooling No No
2003 (H) Building Roof Covering No No
Exterior Windows No No
Interior Lighting No No
Bldg Controls & Instrumentation No No
Heating No No
Other HVAC Systems (Ventilation) No No
Terminal & Package Units No No
Cooling No No
Pine St Building (Teachers' Resource) Roof Covering No No
Exterior Windows Yes Yes $16,046.00
Interior Lighting Yes Yes $22,625.00
Bldg Controls & Instrumentation No No
Heating No No
Other HVAC Systems (Ventilation) No No
Terminal & Package Units No Yes $3,664.00
Cooling No No
Site Exterior Lighting No No
Facility Condition Assessment Reports
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 1
Facility: \Elementary/Middle Schools\VivianAddress: 100 W. Kentucky Ave., Vivian, LA 71082
Attributes: Temporary Building Rooms 2
General Information: Function: Elementary Middle Year Built:Gross Area: 129,177 S.F. Last Renovation:
Facility Description:
The Vivian Elementary/Middle School campus consists of one main school building and six ancillary buildings located at on 100 West Kentucky Avenue in Vivian, Louisiana. The original campus was constructed in 1923. Ancillary buildings on campus include the 1989 C & D Buildings, 1999 E Building, 2004 H Building, covered walkways, and the Pine Street Building. In addition to the buildings, the campus contains basketball courts. This report contains condition and adequacy data collected during the 2009/2010 Facility Condition Assessment (FCA). The detailed condition and deficiency statements are contained in this report.
Current Repair Cost: $3,726,480.00 Replacement Cost: $22,089,677.00 FCI: 16.87%
20-Jan-2010Vivian Elementary/Middle School
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 2
Facility: \Elementary/Middle Schools\Vivian\1923, 1930, 1972 (A&B Bldgs)Address: 100 W. Kentucky Avenue, Vivian , LA 71082
Attributes: Number of Floors 2
General Information: Function: Elementary Middle Year Built: 1923Gross Area: 61,634 S.F. Last Renovation:
Facility Description:
Vivian Elementary/Middle School is a 2-story building, designated as Buildings A and B, located at 100 West Kentucky in Vivian, Louisiana. There have been additions in 1930 and 1972, and HVAC and roofing renovations. This report contains condition and adequacy data collected during the 2009/2010 Facility Condition Assessment (FCA). The detailed condition and deficiency statements are contained in this report for each building.
Energy conservation opportunities for this building include: 1) installation of fixed, double pane, low e, thermal windows with thermal breaks would improve energy use and improve comfort; 2) Upon replacement of the roof covering, an insulation with a high thermal resistance value should be installed; 3) The plumbing fixtures should be replaced with low flow, energy efficient models; 4) Addition of a building automation system would allow programs to improve operation and reduce energy use; and 5) A power factor analysis may be justified to provide greater electrical consumption efficiency.
ADA vertical access needs for this building include provision of an elevator in B building and front entry access.
Current Repair Cost: $2,386,732.00 Replacement Cost: $10,228,117.00 FCI: 23.34%
20-Jan-2010East Elevation
20-Jan-2010South Elevation
20-Jan-2010North Elevation
20-Jan-2010West Elevation
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 3
Facility: \Elementary/Middle Schools\Vivian\1923, 1930, 1972 (A&B Bldgs) (continued)
Building Condition:
System Unit Price$
Unit of
Meas Qty Renewal% Renewal$ Life Installed
Calc Next
Renewal
Next
Renewal CI% Deficiency$ Replacement Value FCI%
Total $165.95 S.F. 61,634 107 $10,907,014 51 1974 1943 2010 50 $2,386,733 $10,228,118 23
Substructure $10.20 S.F. 61,634 100 $628,667 100 1923 $628,667
Foundations $10.20 S.F. 61,634 100 $628,667 100 1923 $628,667
Standard Foundations $10.20 S.F. 61,634 100 $628,667 100 1923 $628,667
Special Foundations 0 0 0 0
Slab on Grade 0 0 0 0
Basement Construction 0 0 0
Basement Excavation 0 0 0 0
Basement Walls 0 0 0 0
Shell $53.94 S.F. 61,634 103 $3,420,319 81 1950 2002 47 $406,785 $3,324,538 12
Superstructure $24.00 S.F. 61,634 100 $1,479,216 100 1923 $1,479,216
Floor Construction $13.20 S.F. 61,634 100 $813,569 100 1923 $813,569
Roof Construction $10.80 S.F. 61,634 100 $665,647 100 1923 $665,647
Exterior Enclosure $20.40 S.F. 61,634 103 $1,294,315 78 1956 2002 $406,785 $1,257,334 32
Exterior Walls $14.40 S.F. 61,634 100 $887,530 100 1923 $887,530
Exterior Windows $4.80 S.F. 61,634 110 $325,428 30 1972 2002 $325,428 $295,843 110
Exterior Doors $1.20 S.F. 61,634 110 $81,357 30 1972 2002 $81,357 $73,961 110
Roofing $9.54 S.F. 61,634 110 $646,788 41 1988 2019 47 $587,988
Roof Coverings - BUR $9.54 S.F. 37,578 110 $394,344 20 1999 2019 45 $358,494
Roof Coverings - EPDM 0 0 0 0
Roof Coverings - Standing
Seam Mettal
$9.54 S.F. 24,056 110 $252,444 75 1972 2047 49 $229,494
Roof Openings 0 0 0 0
Interiors $29.94 S.F. 61,634 108 $1,985,563 56 1968 1992 49 $734,374 $1,845,402 40
Interior Construction $19.20 S.F. 61,634 106 $1,257,333 68 1956 1992 5 $406,784 $1,183,373 34
Partitions $10.80 S.F. 61,634 110 $732,212 100 1923 $665,647
Interior Doors $2.40 S.F. 61,634 80 $118,337 40 1972 2012 5 $147,922
Fittings $6.00 S.F. 61,634 110 $406,784 20 1972 1992 $406,784 $369,804 110
Stairs $2.58 S.F. 61,634 110 $174,917 100 1923 $159,016
Stair Construction $2.58 S.F. 61,634 110 $174,917 100 1923 $159,016
Interior Finishes $8.16 S.F. 61,634 110 $553,313 15 1996 2004 72 $327,590 $503,013 65
Wall Finishes - Ceramic &
Glazed
0 0 0 0
Wall Finishes - Paint $2.40 S.F. 61,634 110 $162,714 10 2000 2010 $162,714 $147,922 110
Floor Finishes - Carpet $2.76 S.F. 2,856 110 $8,671 8 1999 2007 $8,671 $7,883 110
Floor Finishes - Ceramic &
Quarry Tile
$1.44 S.F. 2,962 110 $4,692 50 1972 2022 24 $4,265
Floor Finishes - Terrazzo 0 0 0 0
Floor Finishes - VCT $3.60 S.F. 55,816 110 $221,031 15 2006 2021 73 $200,938
Ceiling Finishes $2.30 S.F. 61,634 110 $156,205 20 1984 2004 $156,205 $142,005 110
Services $61.07 S.F. 61,634 110 $4,140,253 22 1989 1953 2010 52 $1,001,503 $3,763,864 27
Conveying $0.72 S.F. 61,634 110 $48,814 30 1923 1953 2010 $48,814 $44,376 110
Elevators and Lifts $1.20 S.F. 36,980 110 $48,814 30 1923 1953 2010 $48,814 $44,376 110
Plumbing $7.54 S.F. 61,634 110 $510,921 30 1975 2002 17 $493,836 $464,474 106
Plumbing Fixtures $5.89 S.F. 61,634 110 $399,462 30 1972 2002 $399,462 $363,148 110
Domestic Water Distribution $0.44 S.F. 61,634 110 $30,102 30 1972 2002 $30,102 $27,365 110
Sanitary Waste $0.76 S.F. 61,634 110 $51,255 30 1972 2002 $51,255 $46,595 110
Rain Water Drainage $0.19 S.F. 61,634 110 $13,017 30 1972 2002 $13,017 $11,834 110
Other Plumbing Systems -
Natural Gas
$0.25 S.F. 61,634 110 $17,085 30 1985 2015 17 $15,532
HVAC $33.72 S.F. 61,634 110 $2,286,128 20 2001 2015 46 $2,078,298
Heat Generating Systems 0 0 0 0
Cooling Generating Systems 0 0 0 0
Distribution Systems & Exhaust
Systems
$9.12 S.F. 61,634 110 $618,312 30 2000 2030 67 $562,102
Terminal & Package Units $21.60 S.F. 61,634 110 $1,464,424 15 2000 2015 33 $1,331,294
Controls & Instrumentation $1.80 S.F. 61,634 110 $122,035 20 2005 2025 75 $110,941
Other HVAC Systems/Equip -
Kitchen Hood
$1.20 S.F. 61,634 110 $81,357 30 2000 2030 67 $73,961
Fire Protection 0 0 0
Sprinklers 0 0 0 0
Electrical $19.09 S.F. 61,634 110 $1,294,390 23 1998 2002 69 $458,853 $1,176,716 39
Electrical Service/Distribution $2.27 S.F. 61,634 110 $153,765 30 2001 2031 70 $139,786
Branch Wiring $6.77 S.F. 61,634 110 $458,853 30 1972 2002 $458,853 $417,139 110
Lighting $6.77 S.F. 61,634 110 $458,853 20 2005 2025 75 $417,139
Communications and Security -
Public Address & Clock System
$0.88 S.F. 61,634 110 $59,391 20 2000 2020 50 $53,991
Fire Alarm $1.54 S.F. 61,634 110 $104,137 10 2006 2016 60 $94,670
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 4
System Unit Price$
Unit of
Meas Qty Renewal% Renewal$ Life Installed
Calc Next
Renewal
Next
Renewal CI% Deficiency$ Replacement Value FCI%
Security & CCTV $0.88 S.F. 61,634 110 $59,391 10 2005 2015 50 $53,991
Other Electrical Systems -
Emergency Generator
0 0 0 0
Equipment & Furnishings $10.80 S.F. 61,634 110 $732,212 20 1974 1943 49 $244,071 $665,647 37
Equipment $7.20 S.F. 61,634 110 $488,141 20 2000 2019 49 $443,765
Commercial Equipment $6.00 S.F. 61,634 110 $406,784 20 2000 2020 50 $369,804
Institutional Equipment $1.20 S.F. 61,634 110 $81,357 20 1999 2019 45 $73,961
Furnishings $3.60 S.F. 61,634 110 $244,071 20 1923 1943 $244,071 $221,882 110
Fixed Furnishings $3.60 S.F. 61,634 110 $244,071 20 1923 1943 $244,071 $221,882 110
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 5
Facility: \Elementary/Middle Schools\Vivian\1923, 1930, 1972 (A&B Bldgs) (continued)
Renewal Schedule:
Systems 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
Total $2,386,733 $125,544 $1,786,325 $124,345 $10,984 $620,681 $845,174
Substructure
Foundations
Standard Foundations
Special Foundations
Slab on Grade
Basement Construction
Basement Excavation
Basement Walls
Shell $406,785 $514,529
Superstructure
Floor Construction
Roof Construction
Exterior Enclosure $406,785
Exterior Walls
Exterior Windows $325,428
Exterior Doors $81,357
Roofing $514,529
Roof Coverings - BUR $514,529
Roof Coverings - EPDM
Roof Coverings - Standing Seam
Mettal
Roof Openings
Interiors $734,374 $125,544 $10,984 $218,674
Interior Construction $406,784 $125,544
Partitions
Interior Doors $125,544
Fittings $406,784
Stairs
Stair Construction
Interior Finishes $327,590 $10,984 $218,674
Wall Finishes - Ceramic & Glazed
Wall Finishes - Paint $162,714 $218,674
Floor Finishes - Carpet $8,671 $10,984
Floor Finishes - Ceramic & Quarry
Tile
Floor Finishes - Terrazzo
Floor Finishes - VCT
Ceiling Finishes $156,205
Services $1,001,503 $1,786,325 $124,345 $79,816
Conveying $48,814
Elevators and Lifts $48,814
Plumbing $493,836 $19,806
Plumbing Fixtures $399,462
Domestic Water Distribution $30,102
Sanitary Waste $51,255
Rain Water Drainage $13,017
Other Plumbing Systems - Natural
Gas
$19,806
HVAC $1,697,669
Heat Generating Systems
Cooling Generating Systems
Distribution Systems & Exhaust
Systems
Terminal & Package Units $1,697,669
Controls & Instrumentation
Other HVAC Systems/Equip -
Kitchen Hood
Fire Protection
Sprinklers
Electrical $458,853 $68,850 $124,345 $79,816
Electrical Service/Distribution
Branch Wiring $458,853
Lighting
Communications and Security -
Public Address & Clock System
$79,816
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 6
Systems 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
Fire Alarm $124,345
Security & CCTV $68,850
Other Electrical Systems -
Emergency Generator
Equipment & Furnishings $244,071 $106,152 $546,684
Equipment $106,152 $546,684
Commercial Equipment $546,684
Institutional Equipment $106,152
Furnishings $244,071
Fixed Furnishings $244,071
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 7
Facility: \Elementary/Middle Schools\Vivian\1923, 1930, 1972 (A&B Bldgs) (continued)
Deficiency Sheet:
Deficiency: Surveyor/Update: Eric Altman Fri, 04-Jun-2010Priority: 3Quantity: 1
Assembly: B2020 System: Exterior Windows Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: The exterior windows are worn, beyond expected life, and should be replaced.
Estimates:Raw Cost $271,189.60
Plus or (Minus) Additional Cost $0.00Total Estimated Amount $271,189.60
Deficiency: Surveyor/Update: Eric Altman Fri, 04-Jun-2010Priority: 3Quantity: 1
Assembly: B2030 System: Exterior Doors Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: The exterior doors are worn, beyond expected life, and should be replaced.
Estimates:Raw Cost $67,797.40
Plus or (Minus) Additional Cost $0.00Total Estimated Amount $67,797.40
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 8
Facility: \Elementary/Middle Schools\Vivian\ 1923, 1930, 1972 (A&B Bldgs) (continued)
Deficiency: Surveyor/Update: Eric Altman Fri, 04-Jun-2010Priority: 3Quantity: 1
Assembly: C1030 System: Fittings Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: Fittings, such as chalk and tack boards, lockers, toilet and bath accessories, toilet partitions, and shelving, are
beyond expected life and should be replaced.
Estimates:Raw Cost $338,987.00
Plus or (Minus) Additional Cost $0.00Total Estimated Amount $338,987.00
Deficiency: Surveyor/Update: Eric Altman Fri, 04-Jun-2010Priority: 3Quantity: 1
Assembly: C3010 System: Wall Finishes - Paint Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: The painted wall finishes are worn, beyond expected life, and should be replaced.
Estimates:Raw Cost $135,594.80
Plus or (Minus) Additional Cost $0.00Total Estimated Amount $135,594.80
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 9
Facility: \Elementary/Middle Schools\Vivian\ 1923, 1930, 1972 (A&B Bldgs) (continued)
Deficiency: Surveyor/Update: Eric Altman Fri, 04-Jun-2010Priority: 3Quantity: 1
Assembly: C3020 System: Floor Finishes - Carpet Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: Carpet floor finishes are worn, beyond expected life, and should be replaced.
Estimates:Raw Cost $7,225.68
Plus or (Minus) Additional Cost $0.00Total Estimated Amount $7,225.68
Deficiency: Surveyor/Update: Eric Altman Fri, 04-Jun-2010Priority: 3Quantity: 1
Assembly: C3030 System: Ceiling Finishes Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: The ceiling finishes are stained, beyond expected life, and should be replaced.
Estimates:Raw Cost $130,171.01
Plus or (Minus) Additional Cost $0.00Total Estimated Amount $130,171.01
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 10
Facility: \Elementary/Middle Schools\Vivian\ 1923, 1930, 1972 (A&B Bldgs) (continued)
Deficiency: Surveyor/Update: Eric Altman Fri, 04-Jun-2010Priority: 3Quantity: 1
Assembly: D1010 System: Elevators and Lifts Material: System Distress: Missing Category: ADA / Accessibility Correction: Renew System Note: An elevator is required to access the second floor of Building B.
Estimates:Raw Cost $40,678.00
Plus or (Minus) Additional Cost $0.00Total Estimated Amount $40,678.00
Deficiency: Surveyor/Update: Eric Altman Fri, 04-Jun-2010Priority: 3Quantity: 1
Assembly: D2010 System: Plumbing Fixtures Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: Plumbing fixtures are beyond expected life and should be replaced.
Estimates:Raw Cost $332,885.23
Plus or (Minus) Additional Cost $0.00Total Estimated Amount $332,885.23
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 11
Facility: \Elementary/Middle Schools\Vivian\ 1923, 1930, 1972 (A&B Bldgs) (continued)
Deficiency: Surveyor/Update: Eric Altman Thu, 11-Mar-2010Priority: 3Quantity: 1
Assembly: D2020 System: Domestic Water Distribution Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: Domestic water distribution is beyond expected life and should be replaced.
Estimates:Raw Cost $25,085.04
Plus or (Minus) Additional Cost $0.00Total Estimated Amount $25,085.04
Deficiency: Surveyor/Update: Eric Altman Fri, 04-Jun-2010Priority: 3Quantity: 1
Assembly: D2030 System: Sanitary Waste Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: Sanitary waste is beyond expected life and should be replaced.
Estimates:Raw Cost $42,712.36
Plus or (Minus) Additional Cost $0.00Total Estimated Amount $42,712.36
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 12
Facility: \Elementary/Middle Schools\Vivian\ 1923, 1930, 1972 (A&B Bldgs) (continued)
Deficiency: Surveyor/Update: Eric Altman Fri, 04-Jun-2010Priority: 3Quantity: 1
Assembly: D2040 System: Rain Water Drainage Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: Rain water drainage system is beyond expected life and should be replaced.
Estimates:Raw Cost $10,847.58
Plus or (Minus) Additional Cost $0.00Total Estimated Amount $10,847.58
Deficiency: Surveyor/Update: Eric Altman Thu, 03-Jun-2010Priority: 3Quantity: 1
Assembly: D5020 System: Branch Wiring Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: Branch wiring is beyond expected life and should be replaced.
Estimates:Raw Cost $382,377.34
Plus or (Minus) Additional Cost $0.00Total Estimated Amount $382,377.34
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 13
Facility: \Elementary/Middle Schools\Vivian\ 1923, 1930, 1972 (A&B Bldgs) (continued)
Deficiency: Surveyor/Update: Eric Altman Fri, 04-Jun-2010Priority: 3Quantity: 1
Assembly: E2010 System: Fixed Furnishings Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: Fixed furnishings, such as the base/wall cabinets, counter tops, window shades, and fixed seating, are worn,
beyond expected life, and should be replaced.
Estimates:Raw Cost $203,392.20
Plus or (Minus) Additional Cost $0.00Total Estimated Amount $203,392.20
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 14
Facility: \Elementary/Middle Schools\Vivian\1989 (C&D Bldgs)Address: 100 W. Kentucky Avenue, Vivian, LA 71082
Attributes: Number of Floors 1
General Information: Function: Elementary Middle Year Built: 1989Gross Area: 42,990 S.F. Last Renovation:
Facility Description:
Building C (Kindergarten) and Building D (Gymnasium) at Vivian Elementary/Middle School are 1-story buildings located at 100 West Kentucky Avenue in Vivian, Louisiana. There have been no additions and very few renovations. This report contains condition and adequacy data collected during the 2009/2010 Facility Condition Assessment (FCA). The detailed condition and deficiency statements are contained in this report.
Current Repair Cost: $136,187.00 Replacement Cost: $6,987,747.00 FCI: 1.95%
20-Jan-2010East Elevation
20-Jan-2010South Elevation
20-Jan-2010West Elevation
20-Jan-2010North Elevation
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 15
Facility: \Elementary/Middle Schools\Vivian\1989 (C&D Bldgs) (continued)
Building Condition:
System Unit Price$
Unit of
Meas Qty Renewal% Renewal$ Life Installed
Calc Next
Renewal
Next
Renewal CI% Deficiency$ Replacement Value FCI%
Total $162.54 S.F. 42,990 107 $7,464,692 49 1993 1997 2014 52 $136,187 $6,987,745 2
Substructure $19.20 S.F. 42,990 100 $825,408 100 1989 $825,408
Foundations $19.20 S.F. 42,990 100 $825,408 100 1989 $825,408
Standard Foundations $10.20 S.F. 42,990 100 $438,498 100 1989 $438,498
Special Foundations 0 0 0 0
Slab on Grade $9.00 S.F. 42,990 100 $386,910 100 1989 $386,910
Basement Construction 0 0 0
Basement Excavation 0 0 0 0
Basement Walls 0 0 0 0
Shell $40.80 S.F. 42,990 104 $1,821,056 68 1992 2019 69 $3,077 $1,753,992
Superstructure $10.80 S.F. 42,990 100 $464,292 100 1989 $464,292
Floor Construction 0 0 0 0
Roof Construction $10.80 S.F. 42,990 100 $464,292 100 1989 $464,292
Exterior Enclosure $20.40 S.F. 42,990 103 $902,790 78 1989 2019 30 $876,996
Exterior Walls $14.40 S.F. 42,990 100 $619,056 100 1989 $619,056
Exterior Windows $4.80 S.F. 42,990 110 $226,987 30 1989 2019 30 $206,352
Exterior Doors $1.20 S.F. 42,990 110 $56,747 30 1989 2019 30 $51,588
Roofing $9.60 S.F. 42,990 110 $453,974 15 1999 2019 93 $3,077 $412,704 1
Roof Coverings - BUR 0 0 0 0
Roof Coverings - EPDM $9.54 S.F. 42,990 110 $451,137 15 2009 2024 93 $3,077 $410,125 1
Roof Coverings - Standing
Seam Mettal
0 0 0 0
Roof Openings $0.06 S.F. 42,990 110 $2,837 30 1989 2019 30 $2,579
Interiors $31.40 S.F. 42,990 108 $1,453,712 57 1989 1997 2014 36 $133,110 $1,349,694 10
Interior Construction $19.20 S.F. 42,990 106 $876,996 68 1989 2009 2015 30 $825,408
Partitions $10.80 S.F. 42,990 110 $510,721 100 1989 $464,292
Interior Doors $2.40 S.F. 42,990 80 $82,541 40 1989 2029 48 $103,176
Fittings $6.00 S.F. 42,990 110 $283,734 20 1989 2009 2015 25 $257,940
Stairs $2.58 S.F. 42,990 110 $122,006 100 1989 $110,914
Stair Construction $2.58 S.F. 42,990 110 $122,006 100 1989 $110,914
Interior Finishes $9.62 S.F. 42,990 110 $454,710 22 1989 1997 2014 42 $133,110 $413,372 32
Wall Finishes - Ceramic &
Glazed
0 0 0 0
Wall Finishes - Paint $2.40 S.F. 42,990 110 $113,494 10 1989 1999 2015 50 $103,176
Floor Finishes - Carpet $2.76 S.F. 5,037 110 $15,292 8 1989 1997 $15,292 $13,902 110
Floor Finishes - Ceramic &
Quarry Tile
$1.44 S.F. 1,719 110 $2,723 50 1989 2039 58 $2,475
Floor Finishes - VCT $3.60 S.F. 29,752 110 $117,818 15 1989 2004 $117,818 $107,107 110
Floor Finishes - Wood $13.52 S.F. 6,482 110 $96,429 50 1989 2039 58 $87,663
Ceiling Finishes $2.30 S.F. 42,990 110 $108,954 20 1989 2009 2014 20 $99,049
Services $60.35 S.F. 42,990 110 $2,853,795 22 1996 2015 56 $2,594,359
Conveying $1.20 S.F. 42,990 110 $56,747 30 1989 2019 30 $51,588
Elevators and Lifts $1.20 S.F. 42,990 110 $56,747 30 1989 2019 30 $51,588
Plumbing $7.54 S.F. 42,990 110 $356,369 30 1989 2019 30 $323,972
Plumbing Fixtures $5.89 S.F. 42,990 110 $278,627 30 1989 2019 30 $253,297
Domestic Water Distribution $0.44 S.F. 42,990 110 $20,996 30 1989 2019 30 $19,088
Sanitary Waste $0.76 S.F. 42,990 110 $35,750 30 1989 2019 30 $32,500
Rain Water Drainage $0.19 S.F. 42,990 110 $9,079 30 1989 2019 30 $8,254
Other Plumbing Systems -
Natural Gas
$0.25 S.F. 42,990 110 $11,917 30 1989 2019 30 $10,833
HVAC $32.52 S.F. 42,990 110 $1,537,838 19 2005 2020 72 $1,398,035
Heat Generating Systems 0 0 0 0
Cooling Generating Systems 0 0 0 0
Distribution Systems & Exhaust
Systems
$9.12 S.F. 42,990 110 $431,276 30 2005 2035 83 $392,069
Terminal & Package Units $21.60 S.F. 42,990 110 $1,021,442 15 2005 2020 67 $928,584
Controls & Instrumentation $1.80 S.F. 42,990 110 $85,120 20 2005 2025 75 $77,382
Other HVAC Systems/Equip -
Kitchen Hood
0 0 0 0
Fire Protection 0 0 0
Sprinklers 0 0 0 0
Electrical $19.09 S.F. 42,990 110 $902,841 23 1998 2015 41 $820,764
Electrical Service/Distribution $2.27 S.F. 42,990 110 $107,251 30 1989 2019 30 $97,501
Branch Wiring $6.77 S.F. 42,990 110 $320,052 30 1989 2019 30 $290,956
Lighting $6.77 S.F. 42,990 110 $320,052 20 2000 2020 50 $290,956
Communications and Security -
Public Address & Clock System
$0.88 S.F. 42,990 110 $41,425 20 2000 2020 50 $37,659
Fire Alarm $1.54 S.F. 42,990 110 $72,636 10 2006 2016 60 $66,033
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 16
System Unit Price$
Unit of
Meas Qty Renewal% Renewal$ Life Installed
Calc Next
Renewal
Next
Renewal CI% Deficiency$ Replacement Value FCI%
Security & CCTV $0.88 S.F. 42,990 110 $41,425 10 2005 2015 50 $37,659
Other Electrical Systems -
Emergency Generator
0 0 0 0
Equipment & Furnishings $10.80 S.F. 42,990 110 $510,721 20 1989 2009 2015 25 $464,292
Equipment $7.20 S.F. 42,990 110 $340,481 20 1989 2009 2015 25 $309,528
Commercial Equipment $6.00 S.F. 42,990 110 $283,734 20 1989 2009 2015 25 $257,940
Institutional Equipment $1.20 S.F. 42,990 110 $56,747 20 1989 2009 2015 25 $51,588
Furnishings $3.60 S.F. 42,990 110 $170,240 20 1989 2009 2015 25 $154,764
Fixed Furnishings $3.60 S.F. 42,990 110 $170,240 20 1989 2009 2015 25 $154,764
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 17
Facility: \Elementary/Middle Schools\Vivian\1989 (C&D Bldgs) (continued)
Renewal Schedule:
Systems 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
Total $136,187 $122,629 $1,100,583 $86,731 $19,372 $1,470,469 $1,858,528
Substructure
Foundations
Standard Foundations
Special Foundations
Slab on Grade
Basement Construction
Basement Excavation
Basement Walls
Shell $3,077 $373,911
Superstructure
Floor Construction
Roof Construction
Exterior Enclosure $370,209
Exterior Walls
Exterior Windows $296,167
Exterior Doors $74,042
Roofing $3,077 $3,702
Roof Coverings - BUR
Roof Coverings - EPDM $3,077
Roof Coverings - Standing Seam
Mettal
Roof Openings $3,702
Interiors $133,110 $122,629 $460,495 $19,372
Interior Construction $328,925
Partitions
Interior Doors
Fittings $328,925
Stairs
Stair Construction
Interior Finishes $133,110 $122,629 $131,570 $19,372
Wall Finishes - Ceramic & Glazed
Wall Finishes - Paint $131,570
Floor Finishes - Carpet $15,292 $19,372
Floor Finishes - Ceramic & Quarry
Tile
Floor Finishes - VCT $117,818
Floor Finishes - Wood
Ceiling Finishes $122,629
Services $48,023 $86,731 $1,096,558 $1,858,528
Conveying $74,042
Elevators and Lifts $74,042
Plumbing $464,982
Plumbing Fixtures $363,545
Domestic Water Distribution $27,395
Sanitary Waste $46,646
Rain Water Drainage $11,847
Other Plumbing Systems - Natural
Gas
$15,549
HVAC $1,372,733
Heat Generating Systems
Cooling Generating Systems
Distribution Systems & Exhaust
Systems
Terminal & Package Units $1,372,733
Controls & Instrumentation
Other HVAC Systems/Equip -
Kitchen Hood
Fire Protection
Sprinklers
Electrical $48,023 $86,731 $557,534 $485,795
Electrical Service/Distribution $139,939
Branch Wiring $417,595
Lighting $430,123
Communications and Security -
Public Address & Clock System
$55,672
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 18
Systems 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
Fire Alarm $86,731
Security & CCTV $48,023
Other Electrical Systems -
Emergency Generator
Equipment & Furnishings $592,065
Equipment $394,710
Commercial Equipment $328,925
Institutional Equipment $65,785
Furnishings $197,355
Fixed Furnishings $197,355
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 19
Facility: \Elementary/Middle Schools\Vivian\1989 (C&D Bldgs) (continued)
Deficiency Sheet:
Deficiency: Surveyor/Update: Troy Weeks Fri, 12-Mar-2010Priority: 3Quantity: 42,990
Assembly: B3010 System: Roof Coverings - EPDM Material: Roof Covering Distress: Failing Category: Critical Repair Correction: Roof Repair Note: There are reports of several roof leaks in the building. An investigatiion to locate and determine the cause of the
leaks is needed.
Estimates:Raw Cost $2,564.22
Plus or (Minus) Additional Cost $0.00Total Estimated Amount $2,564.22
Deficiency: Surveyor/Update: Kate McPhillips Fri, 04-Jun-2010Priority: 3Quantity: 1
Assembly: C3020 System: Floor Finishes - Carpet Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: Carpet floor finishes are worn, beyond expected life, and should be replaced.
Estimates:Raw Cost $12,743.61
Plus or (Minus) Additional Cost $0.00Total Estimated Amount $12,743.61
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 20
Facility: \Elementary/Middle Schools\Vivian\ 1989 (C&D Bldgs) (continued)
Deficiency: Surveyor/Update: Kate McPhillips Fri, 04-Jun-2010Priority: 3Quantity: 1
Assembly: C3020 System: Floor Finishes - VCT Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: The VCT floor finishes are worn, beyond expected life, and should be replaced.
Estimates:Raw Cost $98,181.60
Plus or (Minus) Additional Cost $0.00Total Estimated Amount $98,181.60
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 21
Facility: \Elementary/Middle Schools\Vivian\1999 (E Bldg)Address: 100 W. Kentucky Avenue, Vivian, LA 71082
Attributes: Number of Floors 1
General Information: Function: Elementary Middle Year Built: 1999Gross Area: 7,210 S.F. Last Renovation:
Facility Description:
Building E (Classrooms) at Vivian Elementary/Middle School is 1-story building located at 100 West Kentucky in Vivian, Louisiana. There have been no additions and very few renovations. This report contains condition and adequacy data collected during the 2009/2010 Facility Condition Assessment (FCA). The detailed condition and deficiency statements are contained in this report.
Current Repair Cost: $14,276.00 Replacement Cost: $1,091,536.00 FCI: 1.31%
20-Jan-2010East Elevation
20-Jan-2010South Elevation
20-Jan-2010North Elevation
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 22
Facility: \Elementary/Middle Schools\Vivian\1999 (E Bldg) (continued)
Building Condition:
System Unit Price$
Unit of
Meas Qty Renewal% Renewal$ Life Installed
Calc Next
Renewal
Next
Renewal CI% Deficiency$ Replacement Value FCI%
Total $151.39 S.F. 7,210 107 $1,163,489 49 1999 2009 2010 47 $14,276 $1,091,535 1
Substructure $19.20 S.F. 7,210 100 $138,432 100 1999 $138,432
Foundations $19.20 S.F. 7,210 100 $138,432 100 1999 $138,432
Standard Foundations $10.20 S.F. 7,210 100 $73,542 100 1999 $73,542
Special Foundations 0 0 0 0
Slab on Grade $9.00 S.F. 7,210 100 $64,890 100 1999 $64,890
Basement Construction 0 0 0
Basement Excavation 0 0 0 0
Basement Walls 0 0 0 0
Shell $40.74 S.F. 7,210 104 $304,940 69 1999 2019 52 $293,735
Superstructure $10.80 S.F. 7,210 100 $77,868 100 1999 $77,868
Floor Construction 0 0 0 0
Roof Construction $10.80 S.F. 7,210 100 $77,868 100 1999 $77,868
Exterior Enclosure $20.40 S.F. 7,210 103 $151,410 78 1999 2029 63 $147,084
Exterior Walls $14.40 S.F. 7,210 100 $103,824 100 1999 $103,824
Exterior Windows $4.80 S.F. 7,210 110 $38,069 30 1999 2029 63 $34,608
Exterior Doors $1.20 S.F. 7,210 110 $9,517 30 1999 2029 63 $8,652
Roofing $9.54 S.F. 7,210 110 $75,662 20 1999 2019 45 $68,783
Roof Coverings - BUR $9.54 S.F. 7,210 110 $75,662 20 1999 2019 45 $68,783
Roof Coverings - EPDM 0 0 0 0
Roof Coverings - Standing
Seam Mettal
0 0 0 0
Roof Openings 0 0 0 0
Interiors $27.50 S.F. 7,210 107 $212,943 52 1999 2009 2015 46 $198,304
Interior Construction $19.20 S.F. 7,210 106 $147,084 68 1999 2019 51 $138,432
Partitions $10.80 S.F. 7,210 110 $85,655 100 1999 $77,868
Interior Doors $2.40 S.F. 7,210 80 $13,843 40 1999 2039 72 $17,304
Fittings $6.00 S.F. 7,210 110 $47,586 20 1999 2019 45 $43,260
Stairs 0 0 0
Stair Construction 0 0 0 0
Interior Finishes $8.30 S.F. 7,210 110 $65,859 15 1999 2009 2015 41 $59,872
Wall Finishes - Ceramic &
Glazed
0 0 0 0
Wall Finishes - Paint $2.40 S.F. 7,210 110 $19,034 10 1999 2009 2015 50 $17,304
Floor Finishes - Carpet 0 0 0 0
Floor Finishes - Ceramic &
Quarry Tile
0 0 0 0
Floor Finishes - Terrazzo 0 0 0 0
Floor Finishes - VCT $3.60 S.F. 7,210 110 $28,552 15 1999 2014 2015 33 $25,956
Ceiling Finishes $2.30 S.F. 7,210 110 $18,273 20 1999 2019 45 $16,612
Services $59.15 S.F. 7,210 110 $469,105 22 2000 2014 2010 47 $14,276 $426,456 3
Conveying 0 0 0
Elevators and Lifts 0 0 0 0
Plumbing $7.54 S.F. 7,210 110 $59,768 30 1999 2029 63 $54,334
Plumbing Fixtures $5.89 S.F. 7,210 110 $46,729 30 1999 2029 63 $42,481
Domestic Water Distribution $0.44 S.F. 7,210 110 $3,521 30 1999 2029 63 $3,201
Sanitary Waste $0.76 S.F. 7,210 110 $5,996 30 1999 2029 63 $5,451
Rain Water Drainage $0.19 S.F. 7,210 110 $1,523 30 1999 2029 63 $1,384
Other Plumbing Systems -
Natural Gas
$0.25 S.F. 7,210 110 $1,999 30 1999 2029 63 $1,817
HVAC $32.52 S.F. 7,210 110 $257,917 19 1999 2014 2010 38 $14,276 $234,469 6
Heat Generating Systems 0 0 0 0
Cooling Generating Systems 0 0 0 0
Distribution Systems & Exhaust
Systems
$9.12 S.F. 7,210 110 $72,331 30 1999 2029 63 $65,755
Terminal & Package Units $21.60 S.F. 7,210 110 $171,310 15 1999 2014 27 $155,736
Controls & Instrumentation $1.80 S.F. 7,210 110 $14,276 20 1999 2019 2010 $14,276 $12,978 110
Other HVAC Systems/Equip -
Kitchen Hood
0 0 0 0
Fire Protection 0 0 0
Sprinklers 0 0 0 0
Electrical $19.09 S.F. 7,210 110 $151,420 23 2001 2015 55 $137,653
Electrical Service/Distribution $2.27 S.F. 7,210 110 $17,988 30 1999 2029 63 $16,352
Branch Wiring $6.77 S.F. 7,210 110 $53,677 30 1999 2029 63 $48,797
Lighting $6.77 S.F. 7,210 110 $53,677 20 1999 2019 45 $48,797
Communications and Security -
Public Address & Clock System
$0.88 S.F. 7,210 110 $6,948 20 2000 2020 50 $6,316
Fire Alarm $1.54 S.F. 7,210 110 $12,182 10 2006 2016 60 $11,075
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 23
System Unit Price$
Unit of
Meas Qty Renewal% Renewal$ Life Installed
Calc Next
Renewal
Next
Renewal CI% Deficiency$ Replacement Value FCI%
Security & CCTV $0.88 S.F. 7,210 110 $6,948 10 2005 2015 50 $6,316
Other Electrical Systems -
Emergency Generator
0 0 0 0
Equipment & Furnishings $4.80 S.F. 7,210 110 $38,069 20 1999 2019 45 $34,608
Equipment $1.20 S.F. 7,210 110 $9,517 20 1999 2019 45 $8,652
Commercial Equipment 0 0 0 0
Institutional Equipment $1.20 S.F. 7,210 110 $9,517 20 1999 2019 45 $8,652
Furnishings $3.60 S.F. 7,210 110 $28,552 20 1999 2019 45 $25,956
Fixed Furnishings $3.60 S.F. 7,210 110 $28,552 20 1999 2019 45 $25,956
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 24
Facility: \Elementary/Middle Schools\Vivian\1999 (E Bldg) (continued)
Renewal Schedule:
Systems 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
Total $14,276 $192,810 $63,219 $14,546 $304,359 $9,337
Substructure
Foundations
Standard Foundations
Special Foundations
Slab on Grade
Basement Construction
Basement Excavation
Basement Walls
Shell $98,721
Superstructure
Floor Construction
Roof Construction
Exterior Enclosure
Exterior Walls
Exterior Windows
Exterior Doors
Roofing $98,721
Roof Coverings - BUR $98,721
Roof Coverings - EPDM
Roof Coverings - Standing Seam
Mettal
Roof Openings
Interiors $55,165 $85,931
Interior Construction $62,089
Partitions
Interior Doors
Fittings $62,089
Stairs
Stair Construction
Interior Finishes $55,165 $23,842
Wall Finishes - Ceramic & Glazed
Wall Finishes - Paint $22,066
Floor Finishes - Carpet
Floor Finishes - Ceramic & Quarry
Tile
Floor Finishes - Terrazzo
Floor Finishes - VCT $33,099
Ceiling Finishes $23,842
Services $14,276 $192,810 $8,054 $14,546 $70,036 $9,337
Conveying
Elevators and Lifts
Plumbing
Plumbing Fixtures
Domestic Water Distribution
Sanitary Waste
Rain Water Drainage
Other Plumbing Systems - Natural
Gas
HVAC $14,276 $192,810
Heat Generating Systems
Cooling Generating Systems
Distribution Systems & Exhaust
Systems
Terminal & Package Units $192,810
Controls & Instrumentation $14,276
Other HVAC Systems/Equip -
Kitchen Hood
Fire Protection
Sprinklers
Electrical $8,054 $14,546 $70,036 $9,337
Electrical Service/Distribution
Branch Wiring
Lighting $70,036
Communications and Security -
Public Address & Clock System
$9,337
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 25
Systems 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
Fire Alarm $14,546
Security & CCTV $8,054
Other Electrical Systems -
Emergency Generator
Equipment & Furnishings $49,671
Equipment $12,418
Commercial Equipment
Institutional Equipment $12,418
Furnishings $37,253
Fixed Furnishings $37,253
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 26
Facility: \Elementary/Middle Schools\Vivian\1999 (E Bldg) (continued)
Deficiency Sheet:
Deficiency: Surveyor/Update: Eric Altman Fri, 04-Jun-2010Priority: 4Quantity: 1
Assembly: D3060 System: Controls & Instrumentation Material: System Distress: Inadequate Category: Deferred Maintenance Correction: Renew System Note: Analog electric controls system is inadequate and needs to be upgraded/replaced.
Estimates:Raw Cost $11,896.50
Plus or (Minus) Additional Cost $0.00Total Estimated Amount $11,896.50
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 27
Facility: \Elementary/Middle Schools\Vivian\2003 (H Bldg)Address: 100 W. Kentucky Ave., Vivian, LA 71082
Attributes: Number of Floors 1
General Information: Function: Elementary Middle Year Built: 2003Gross Area: 9,325 S.F. Last Renovation:
Facility Description:
Building H (Classrooms) at Vivian Elementary/Middle School is a 1-story building located at 100 West Kentucky Avenue in Vivian, Louisiana. There have been no additions and very few renovations. This report contains condition and adequacy data collected during the 2009/2010 Facility Condition Assessment (FCA). The detailed condition and deficiency statements are contained in this report.
Current Repair Cost: $0.00 Replacement Cost: $1,435,297.00 FCI: 0.00%
20-Jan-2010North Elevation
20-Jan-2010East Elevation
20-Jan-2010West Elevation
20-Jan-2010South Elevation
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 28
Facility: \Elementary/Middle Schools\Vivian\2003 (H Bldg) (continued)
Building Condition:
System Unit Price$
Unit of
Meas Qty Renewal% Renewal$ Life Installed
Calc Next
Renewal
Next
Renewal CI% Deficiency$ Replacement Value FCI%
Total $153.92 S.F. 9,325 107 $1,530,711 49 2003 2013 2015 64 0 $1,435,297
Substructure $19.20 S.F. 9,325 100 $179,040 100 2003 $179,040
Foundations $19.20 S.F. 9,325 100 $179,040 100 2003 $179,040
Standard Foundations $10.20 S.F. 9,325 100 $95,115 100 2003 $95,115
Special Foundations 0 0 0 0
Slab on Grade $9.00 S.F. 9,325 100 $83,925 100 2003 $83,925
Basement Construction 0 0 0
Basement Excavation 0 0 0 0
Basement Walls 0 0 0 0
Shell $40.74 S.F. 9,325 104 $394,392 69 2003 2023 70 $379,900
Superstructure $10.80 S.F. 9,325 100 $100,710 100 2003 $100,710
Floor Construction 0 0 0 0
Roof Construction $10.80 S.F. 9,325 100 $100,710 100 2003 $100,710
Exterior Enclosure $20.40 S.F. 9,325 103 $195,825 78 2003 2033 77 $190,230
Exterior Walls $14.40 S.F. 9,325 100 $134,280 100 2003 $134,280
Exterior Windows $4.80 S.F. 9,325 110 $49,236 30 2003 2033 77 $44,760
Exterior Doors $1.20 S.F. 9,325 110 $12,309 30 2003 2033 77 $11,190
Roofing $9.54 S.F. 9,325 110 $97,857 20 2003 2023 65 $88,960
Roof Coverings - BUR $9.54 S.F. 9,325 110 $97,857 20 2003 2023 65 $88,960
Roof Coverings - EPDM 0 0 0 0
Roof Coverings - Standing
Seam Mettal
0 0 0 0
Roof Openings 0 0 0 0
Interiors $27.33 S.F. 9,325 107 $273,636 52 2003 2013 59 $254,863
Interior Construction $19.20 S.F. 9,325 106 $190,230 68 2003 2023 69 $179,040
Partitions $10.80 S.F. 9,325 110 $110,781 100 2003 $100,710
Interior Doors $2.40 S.F. 9,325 80 $17,904 40 2003 2043 82 $22,380
Fittings $6.00 S.F. 9,325 110 $61,545 20 2003 2023 65 $55,950
Stairs 0 0 0
Stair Construction 0 0 0 0
Interior Finishes $8.13 S.F. 9,325 110 $83,406 15 2003 2013 50 $75,823
Wall Finishes - Ceramic &
Glazed
0 0 0 0
Wall Finishes - Paint $2.40 S.F. 9,325 110 $24,618 10 2003 2013 30 $22,380
Floor Finishes - Carpet 0 0 0 0
Floor Finishes - Ceramic &
Quarry Tile
$1.44 S.F. 746 110 $1,182 50 2003 2053 86 $1,074
Floor Finishes - Terrazzo 0 0 0 0
Floor Finishes - VCT $3.60 S.F. 8,579 110 $33,973 15 2003 2018 53 $30,884
Ceiling Finishes $2.30 S.F. 9,325 110 $23,633 20 2003 2023 65 $21,485
Services $61.85 S.F. 9,325 110 $634,407 22 2003 2015 2015 64 $576,734
Conveying 0 0 0
Elevators and Lifts 0 0 0 0
Plumbing $7.54 S.F. 9,325 110 $77,300 30 2003 2033 77 $70,273
Plumbing Fixtures $5.89 S.F. 9,325 110 $60,437 30 2003 2033 77 $54,943
Domestic Water Distribution $0.44 S.F. 9,325 110 $4,554 30 2003 2033 77 $4,140
Sanitary Waste $0.76 S.F. 9,325 110 $7,755 30 2003 2033 77 $7,050
Rain Water Drainage $0.19 S.F. 9,325 110 $1,969 30 2003 2033 77 $1,790
Other Plumbing Systems -
Natural Gas
$0.25 S.F. 9,325 110 $2,585 30 2003 2033 77 $2,350
HVAC $32.52 S.F. 9,325 110 $333,574 19 2003 2018 60 $303,249
Heat Generating Systems S.F. 0 0 0 0
Cooling Generating Systems S.F. 0 0 0 0
Distribution Systems & Exhaust
Systems
$9.12 S.F. 9,325 110 $93,548 30 2003 2033 77 $85,044
Terminal & Package Units $21.60 S.F. 9,325 110 $221,562 15 2003 2018 53 $201,420
Controls & Instrumentation $1.80 S.F. 9,325 110 $18,464 20 2003 2023 65 $16,785
Other HVAC Systems/Equip -
Kitchen Hood
S.F. 0 0 0 0
Fire Protection $2.70 S.F. 9,325 110 $27,695 30 2003 2033 2015 17 $25,178
Sprinklers $2.70 S.F. 9,325 110 $27,695 30 2003 2033 2015 17 $25,178
Electrical $19.09 S.F. 9,325 110 $195,838 23 2004 2015 70 $178,034
Electrical Service/Distribution $2.27 S.F. 9,325 110 $23,264 30 2003 2033 77 $21,149
Branch Wiring $6.77 S.F. 9,325 110 $69,423 30 2003 2033 77 $63,112
Lighting $6.77 S.F. 9,325 110 $69,423 20 2003 2023 65 $63,112
Communications and Security -
Public Address & Clock System
$0.88 S.F. 9,325 110 $8,986 20 2005 2025 75 $8,169
Fire Alarm $1.54 S.F. 9,325 110 $15,756 10 2006 2016 60 $14,323
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 29
System Unit Price$
Unit of
Meas Qty Renewal% Renewal$ Life Installed
Calc Next
Renewal
Next
Renewal CI% Deficiency$ Replacement Value FCI%
Security & CCTV $0.88 S.F. 9,325 110 $8,986 10 2005 2015 50 $8,169
Other Electrical Systems -
Emergency Generator
0 0 0 0
Equipment & Furnishings $4.80 S.F. 9,325 110 $49,236 20 2003 2023 65 $44,760
Equipment $1.20 S.F. 9,325 110 $12,309 20 2003 2023 65 $11,190
Commercial Equipment 0 0 0 0
Institutional Equipment $1.20 S.F. 9,325 110 $12,309 20 2003 2023 65 $11,190
Furnishings $3.60 S.F. 9,325 110 $36,927 20 2003 2023 65 $33,570
Fixed Furnishings $3.60 S.F. 9,325 110 $36,927 20 2003 2023 65 $33,570
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 30
Facility: \Elementary/Middle Schools\Vivian\2003 (H Bldg) (continued)
Renewal Schedule:
Systems 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
Total $26,901 $42,523 $18,813 $323,704
Substructure
Foundations
Standard Foundations
Special Foundations
Slab on Grade
Basement Construction
Basement Excavation
Basement Walls
Shell
Superstructure
Floor Construction
Roof Construction
Exterior Enclosure
Exterior Walls
Exterior Windows
Exterior Doors
Roofing
Roof Coverings - BUR
Roof Coverings - EPDM
Roof Coverings - Standing Seam
Mettal
Roof Openings
Interiors $26,901 $43,036
Interior Construction
Partitions
Interior Doors
Fittings
Stairs
Stair Construction
Interior Finishes $26,901 $43,036
Wall Finishes - Ceramic & Glazed
Wall Finishes - Paint $26,901
Floor Finishes - Carpet
Floor Finishes - Ceramic & Quarry
Tile
Floor Finishes - Terrazzo
Floor Finishes - VCT $43,036
Ceiling Finishes
Services $42,523 $18,813 $280,668
Conveying
Elevators and Lifts
Plumbing
Plumbing Fixtures
Domestic Water Distribution
Sanitary Waste
Rain Water Drainage
Other Plumbing Systems - Natural
Gas
HVAC $280,668
Heat Generating Systems
Cooling Generating Systems
Distribution Systems & Exhaust
Systems
Terminal & Package Units $280,668
Controls & Instrumentation
Other HVAC Systems/Equip -
Kitchen Hood
Fire Protection $32,106
Sprinklers $32,106
Electrical $10,417 $18,813
Electrical Service/Distribution
Branch Wiring
Lighting
Communications and Security -
Public Address & Clock System
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 31
Systems 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
Fire Alarm $18,813
Security & CCTV $10,417
Other Electrical Systems -
Emergency Generator
Equipment & Furnishings
Equipment
Commercial Equipment
Institutional Equipment
Furnishings
Fixed Furnishings
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 32
Facility: \Elementary/Middle Schools\Vivian\2003 (H Bldg) (continued)
Deficiency Sheet:
*** No Deficiencies Found ***
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 33
Facility: \Elementary/Middle Schools\Vivian\Basketball CourtAddress: 100 W. Kentucky Avenue, Vivian, LA 71082
Attributes: ***None***
General Information: Function: Elementary Middle Year Built: 1970Gross Area: 3,962 S.F. Last Renovation:
Facility Description:
The Basketball Court at Vivian Elementary/Middle School is located at 100 West Kentucky in Vivian, Louisiana. There have been no additions and no renovations. This report contains condition and adequacy data collected during the 2009/2010 Facility Condition Assessment (FCA). The detailed condition and deficiency statements are contained in this report.
Current Repair Cost: $30,333.00 Replacement Cost: $28,003.00 FCI: 108.32%
20-Jan-2010Vivian Elementary/Middle School Basketball Court
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 34
Facility: \Elementary/Middle Schools\Vivian\Basketball Court (continued)
Building Condition:
System Unit Price$
Unit of
Meas Qty Renewal% Renewal$ Life Installed
Calc Next
Renewal
Next
Renewal CI% Deficiency$ Replacement Value FCI%
Total $7.07 S.F. 3,962 110 $30,761 21 1970 1990 $30,333 $28,004 108
Special Construction $6.96 S.F. 3,962 110 $30,333 20 1970 1990 $30,333 $27,576 110
Special Construction $6.96 S.F. 3,962 110 $30,333 20 1970 1990 $30,333 $27,576 110
Special Structures - Basketball
Court - Concrete - Outdoor
$6.96 S.F. 3,962 110 $30,333 20 1970 1990 $30,333 $27,576 110
Building Sitework $0.11 S.F. 3,962 100 $428 100 1970 $428
Site Preparation $0.11 S.F. 3,962 100 $428 100 1970 $428
Site Earthwork $0.11 S.F. 3,962 0 $428 100 1970 $428
Site Improvements 0 0 0
Site Development - Fencing 0 0 0 0
Site Electrical Utilities 0 0 0
Site Lighting 0 0 0 0
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 35
Facility: \Elementary/Middle Schools\Vivian\Basketball Court (continued)
Renewal Schedule:
Systems 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
Total $30,333
Special Construction $30,333
Special Construction $30,333
Special Structures - Basketball
Court - Concrete - Outdoor
$30,333
Building Sitework
Site Preparation
Site Earthwork
Site Improvements
Site Development - Fencing
Site Electrical Utilities
Site Lighting
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 36
Facility: \Elementary/Middle Schools\Vivian\Basketball Court (continued)
Deficiency Sheet:
Deficiency: Surveyor/Update: Eric Altman Fri, 04-Jun-2010Priority: 3Quantity: 1
Assembly: F1010 System: Special Structures - Basketball Court -
Concrete - Outdoor Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: The concrete surface is worn, beyond expected life, and should be replaced.
Estimates:Raw Cost $25,277.56
Plus or (Minus) Additional Cost $0.00Total Estimated Amount $25,277.56
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 37
Facility: \Elementary/Middle Schools\Vivian\Covered WalkwaysAddress: 100 W Kentucky Avenue, Vivian, LA 71082
Attributes: Number of Floors 1
General Information: Function: Elementary Middle Year Built: 1992Gross Area: 4,979 S.F. Last Renovation:
Facility Description:
The engineered metal covered walkways at Vivian Elementary/Middle School connect the classrooms and provide some weather protection for the students.
Current Repair Cost: $0.00 Replacement Cost: $124,455.00 FCI: 0.00%
04-Jun-2010East Elevation
04-Jun-2010South Elevation
04-Jun-2010West Elevation
04-Jun-2010North Elevation
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 38
Facility: \Elementary/Middle Schools\Vivian\Covered Walkways (continued)
Building Condition:
System Unit Price$
Unit of
Meas Qty Renewal% Renewal$ Life Installed
Calc Next
Renewal
Next
Renewal CI% Deficiency$ Replacement Value FCI%
Total $25.00 S.F. 4,979 100 $124,455 25 1992 2017 28 0 $124,455
Special Construction $25.00 S.F. 4,979 100 $124,455 25 1992 2017 28 $124,455
Special Construction $25.00 S.F. 4,979 100 $124,455 25 1992 2017 28 $124,455
Special Structures - Covered
Walkways Metal
$25.00 S.F. 4,979 100 $124,455 25 1992 2017 28 $124,455
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 39
Facility: \Elementary/Middle Schools\Vivian\Covered Walkways (continued)
Renewal Schedule:
Systems 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
Total $153,064
Special Construction $153,064
Special Construction $153,064
Special Structures - Covered
Walkways Metal
$153,064
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 40
Facility: \Elementary/Middle Schools\Vivian\Covered Walkways (continued)
Deficiency Sheet:
*** No Deficiencies Found ***
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 41
Facility: \Elementary/Middle Schools\Vivian\Pine St Bldg (Teachers' Resource)Address: 100 W. Kentucky Avenue, Vivian, LA 71082
Attributes: Number of Floors 1
General Information: Function: Elementary Middle Year Built: 1970Gross Area: 3,039 S.F. Last Renovation: 2001
Facility Description:
The Pine Street Building, a Teachers’ Resource Facility, is a 1-story building located on Pine Street, across the street and east of the school campus in Vivian, Louisiana. There have been no additions, but there has been a major renovation when the School Board acquired the building in 2001. This report contains condition and adequacy data collected during the 2009/2010 Facility Condition Assessment (FCA). The detailed condition and deficiency statements are contained in this report.
Current Repair Cost: $95,567.00 Replacement Cost: $469,234.00 FCI: 20.37%
20-Jan-2010West Elevation
20-Jan-2010South Elevation
20-Jan-2010East Elevation
20-Jan-2010North Elevation
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 42
Facility: \Elementary/Middle Schools\Vivian\Pine St Bldg (Teachers' Resource) (continued)
Building Condition:
System Unit Price$
Unit of
Meas Qty Renewal% Renewal$ Life Installed
Calc Next
Renewal
Next
Renewal CI% Deficiency$ Replacement Value FCI%
Total $154.40 S.F. 3,039 107 $500,474 50 1987 1985 2015 66 $95,566 $469,233 20
Substructure $19.20 S.F. 3,039 100 $58,349 100 1970 $58,349
Foundations $19.20 S.F. 3,039 100 $58,349 100 1970 $58,349
Standard Foundations $10.20 S.F. 3,039 100 $30,998 100 1970 $30,998
Special Foundations 0 0 0 0
Slab on Grade $9.00 S.F. 3,039 100 $27,351 100 1970 $27,351
Basement Construction 0 0 0
Basement Excavation 0 0 0 0
Basement Walls 0 0 0 0
Shell $40.74 S.F. 3,039 104 $128,531 69 1977 2000 80 $20,057 $123,809 16
Superstructure $10.80 S.F. 3,039 100 $32,821 100 1970 $32,821
Floor Construction 0 0 0 0
Roof Construction $10.80 S.F. 3,039 100 $32,821 100 1970 $32,821
Exterior Enclosure $20.40 S.F. 3,039 103 $63,819 78 1970 2000 $20,057 $61,996 32
Exterior Walls $14.40 S.F. 3,039 100 $43,762 100 1970 $43,762
Exterior Windows $4.80 S.F. 3,039 110 $16,046 30 1970 2000 $16,046 $14,587 110
Exterior Doors $1.20 S.F. 3,039 110 $4,011 30 1970 2000 $4,011 $3,647 110
Roofing $9.54 S.F. 3,039 110 $31,891 20 2006 2026 80 $28,992
Roof Coverings - BUR $9.54 S.F. 3,039 110 $31,891 20 2006 2026 80 $28,992
Roof Coverings - EPDM 0 0 0 0
Roof Coverings - Standing
Seam Mettal
0 0 0 0
Roof Openings 0 0 0 0
Interiors $30.08 S.F. 3,039 108 $98,379 56 1988 1985 50 $12,034 $91,426 13
Interior Construction $19.20 S.F. 3,039 106 $61,995 68 1991 2021 60 $58,349
Partitions $10.80 S.F. 3,039 110 $36,103 100 1970 $32,821
Interior Doors $2.40 S.F. 3,039 80 $5,835 40 2001 2041 78 $7,294
Fittings $6.00 S.F. 3,039 110 $20,057 20 2001 2021 55 $18,234
Stairs $2.58 S.F. 3,039 110 $8,625 100 1970 $7,841
Stair Construction $2.58 S.F. 3,039 110 $8,625 100 1970 $7,841
Interior Finishes $8.30 S.F. 3,039 110 $27,759 15 1991 1985 32 $12,034 $25,236 48
Wall Finishes - Ceramic &
Glazed
0 0 0 0
Wall Finishes - Paint $2.40 S.F. 3,039 110 $8,023 10 2001 2011 10 $7,294
Floor Finishes - Carpet 0 0 0 0
Floor Finishes - Ceramic &
Quarry Tile
0 0 0 0
Floor Finishes - Terrazzo 0 0 0 0
Floor Finishes - VCT $3.60 S.F. 3,039 110 $12,034 15 1970 1985 $12,034 $10,940 110
Ceiling Finishes $2.30 S.F. 3,039 110 $7,702 20 2001 2021 55 $7,002
Services $60.78 S.F. 3,039 110 $203,181 22 1994 2000 2015 68 $51,441 $184,709 28
Conveying 0 0 0
Elevators and Lifts 0 0 0 0
Plumbing $7.34 S.F. 3,039 110 $24,549 30 1993 2000 70 $2,527 $22,318 11
Plumbing Fixtures $5.89 S.F. 3,039 110 $19,696 30 2001 2031 70 $17,906
Domestic Water Distribution $0.44 S.F. 3,039 110 $1,484 30 2001 2031 70 $1,349
Sanitary Waste $0.76 S.F. 3,039 110 $2,527 30 1970 2000 $2,527 $2,297 110
Rain Water Drainage 0 0 0 0
Other Plumbing Systems -
Natural Gas
$0.25 S.F. 3,039 110 $842 30 2001 2031 70 $766
HVAC $32.52 S.F. 3,039 110 $108,711 19 2004 2021 72 $3,664 $98,828 4
Heat Generating Systems 0 0 0 0
Cooling Generating Systems 0 0 0 0
Distribution Systems & Exhaust
Systems
$9.12 S.F. 3,039 110 $30,487 30 2001 2031 70 $27,716
Terminal & Package Units $21.60 S.F. 3,039 110 $72,207 15 2006 2021 73 $3,664 $65,642 6
Controls & Instrumentation $1.80 S.F. 3,039 110 $6,017 20 2005 2025 75 $5,470
Other HVAC Systems/Equip -
Kitchen Hood
0 0 0 0
Fire Protection $2.70 S.F. 3,039 110 $9,026 30 1970 2000 2015 17 $8,205
Sprinklers $2.70 S.F. 3,039 110 $9,026 30 1970 2000 2015 17 $8,205
Electrical $18.22 S.F. 3,039 110 $60,895 24 1992 2000 63 $45,250 $55,358 82
Electrical Service/Distribution $2.27 S.F. 3,039 110 $7,582 30 2001 2031 70 $6,892
Branch Wiring $6.77 S.F. 3,039 110 $22,625 30 1970 2000 $22,625 $20,568 110
Lighting $6.77 S.F. 3,039 110 $22,625 20 1980 2000 $22,625 $20,568 110
Communications and Security -
Public Address & Clock System
0 0 0 0
Fire Alarm $1.54 S.F. 3,039 110 $5,135 10 2006 2016 60 $4,668
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 43
System Unit Price$
Unit of
Meas Qty Renewal% Renewal$ Life Installed
Calc Next
Renewal
Next
Renewal CI% Deficiency$ Replacement Value FCI%
Security & CCTV $0.88 S.F. 3,039 110 $2,928 10 2005 2015 50 $2,662
Other Electrical Systems -
Emergency Generator
0 0 0 0
Equipment & Furnishings $3.60 S.F. 3,039 110 $12,034 20 1970 1990 $12,034 $10,940 110
Equipment 0 0 0
Commercial Equipment 0 0 0 0
Institutional Equipment 0 0 0 0
Furnishings $3.60 S.F. 3,039 110 $12,034 20 1970 1990 $12,034 $10,940 110
Fixed Furnishings $3.60 S.F. 3,039 110 $12,034 20 1970 1990 $12,034 $10,940 110
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 44
Facility: \Elementary/Middle Schools\Vivian\Pine St Bldg (Teachers' Resource) (continued)
Renewal Schedule:
Systems 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
Total $95,566 $8,264 $13,858 $6,131
Substructure
Foundations
Standard Foundations
Special Foundations
Slab on Grade
Basement Construction
Basement Excavation
Basement Walls
Shell $20,057
Superstructure
Floor Construction
Roof Construction
Exterior Enclosure $20,057
Exterior Walls
Exterior Windows $16,046
Exterior Doors $4,011
Roofing
Roof Coverings - BUR
Roof Coverings - EPDM
Roof Coverings - Standing Seam
Mettal
Roof Openings
Interiors $12,034 $8,264
Interior Construction
Partitions
Interior Doors
Fittings
Stairs
Stair Construction
Interior Finishes $12,034 $8,264
Wall Finishes - Ceramic & Glazed
Wall Finishes - Paint $8,264
Floor Finishes - Carpet
Floor Finishes - Ceramic & Quarry
Tile
Floor Finishes - Terrazzo
Floor Finishes - VCT $12,034
Ceiling Finishes
Services $51,441 $13,858 $6,131
Conveying
Elevators and Lifts
Plumbing $2,527
Plumbing Fixtures
Domestic Water Distribution
Sanitary Waste $2,527
Rain Water Drainage
Other Plumbing Systems - Natural
Gas
HVAC $3,664
Heat Generating Systems
Cooling Generating Systems
Distribution Systems & Exhaust
Systems
Terminal & Package Units $3,664
Controls & Instrumentation
Other HVAC Systems/Equip -
Kitchen Hood
Fire Protection $10,463
Sprinklers $10,463
Electrical $45,250 $3,395 $6,131
Electrical Service/Distribution
Branch Wiring $22,625
Lighting $22,625
Communications and Security -
Public Address & Clock System
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 45
Systems 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
Fire Alarm $6,131
Security & CCTV $3,395
Other Electrical Systems -
Emergency Generator
Equipment & Furnishings $12,034
Equipment
Commercial Equipment
Institutional Equipment
Furnishings $12,034
Fixed Furnishings $12,034
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 46
Facility: \Elementary/Middle Schools\Vivian\Pine St Bldg (Teachers' Resource) (continued)
Deficiency Sheet:
Deficiency: Surveyor/Update: Eric Altman Fri, 04-Jun-2010Priority: 3Quantity: 1
Assembly: B2020 System: Exterior Windows Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: The exterior windows are worn, beyond expected life, and should be replaced.
Estimates:Raw Cost $13,371.60
Plus or (Minus) Additional Cost $0.00Total Estimated Amount $13,371.60
Deficiency: Surveyor/Update: Eric Altman Fri, 04-Jun-2010Priority: 3Quantity: 1
Assembly: B2030 System: Exterior Doors Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: The exterior doors are worn, beyond expected life, and should be replaced.
Estimates:Raw Cost $3,342.90
Plus or (Minus) Additional Cost $0.00Total Estimated Amount $3,342.90
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 47
Facility: \Elementary/Middle Schools\Vivian\ Pine St Bldg (Teachers' Resource) (continued)
Deficiency: Surveyor/Update: Eric Altman Fri, 04-Jun-2010Priority: 3Quantity: 1
Assembly: C3020 System: Floor Finishes - VCT Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: The VCT floor finishes are worn, beyond expected life, and should be replaced.
Estimates:Raw Cost $10,028.70
Plus or (Minus) Additional Cost $0.00Total Estimated Amount $10,028.70
Deficiency: Surveyor/Update: Eric Altman Fri, 04-Jun-2010Priority: 3Quantity: 1
Assembly: D2030 System: Sanitary Waste Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: Sanitary waste is beyond expected life and should be replaced.
Estimates:Raw Cost $2,106.03
Plus or (Minus) Additional Cost $0.00Total Estimated Amount $2,106.03
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 48
Facility: \Elementary/Middle Schools\Vivian\ Pine St Bldg (Teachers' Resource) (continued)
Deficiency: Surveyor/Update: Eric Altman Fri, 04-Jun-2010Priority: 3Quantity: 1
Assembly: D3050 System: Terminal & Package Units Material: Terminal and Package Units Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Replace A/C 4T Split System Note: Lennox split system with gas heat is beyond expected life and should be replaced.
Estimates:Raw Cost $3,053.00
Plus or (Minus) Additional Cost $0.00Total Estimated Amount $3,053.00
Deficiency: Surveyor/Update: Eric Altman Thu, 03-Jun-2010Priority: 3Quantity: 1
Assembly: D5020 System: Branch Wiring Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: Branch wiring is beyond expected life and should be replaced.
Estimates:Raw Cost $18,853.96
Plus or (Minus) Additional Cost $0.00Total Estimated Amount $18,853.96
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 49
Facility: \Elementary/Middle Schools\Vivian\ Pine St Bldg (Teachers' Resource) (continued)
Deficiency: Surveyor/Update: Eric Altman Fri, 04-Jun-2010Priority: 3Quantity: 1
Assembly: D5020 System: Lighting Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: Lighting system is inadequate, beyond expected life, and should be replaced.
Estimates:Raw Cost $18,853.96
Plus or (Minus) Additional Cost $0.00Total Estimated Amount $18,853.96
Deficiency: Surveyor/Update: Eric Altman Fri, 04-Jun-2010Priority: 3Quantity: 1
Assembly: E2010 System: Fixed Furnishings Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: Fixed furnishings, such as the base/wall cabinets, counter tops, window shades, and fixed seating, are worn,
beyond expected life, and should be replaced.
Estimates:Raw Cost $10,028.70
Plus or (Minus) Additional Cost $0.00Total Estimated Amount $10,028.70
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 50
Facility: \Elementary/Middle Schools\Vivian\SiteAddress: 100 W. Kentucky Avenue, Vivian, LA 71082
Attributes: Site Area (in Acres) 9
General Information: Function: Elementary Middle Year Built: 1923Gross Area: 129,177 S.F. Last Renovation:
Facility Description:
The original site was constructed in 1923 to include what is now Building B. There have been additions to the site to include Buildings A, C, D, and H. Campus site features include paved driveways and parking lots, pedestrian pavement, flag pole, landscaping, and fencing. Site mechanical and electrical features include water, sewer, natural gas and site lighting. This report contains condition and adequacy data collected during the 2009/2010 Facility Condition Assessment (FCA). The detailed condition and deficiency statements are contained in this report.
Current Repair Cost: $1,063,385.00 Replacement Cost: $1,725,288.00 FCI: 61.64%
05-Jan-2010Aerial Image of Vivian Elementary/Middle School
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 51
Facility: \Elementary/Middle Schools\Vivian\Site (continued)
Building Condition:
System Unit Price$
Unit of
Meas Qty Renewal% Renewal$ Life Installed
Calc Next
Renewal
Next
Renewal CI% Deficiency$ Replacement Value FCI%
Total $13.36 S.F. 129,177 100 $1,725,286 34 1932 1953 55 $1,063,383 $1,725,286 62
Building Sitework $13.36 S.F. 129,177 100 $1,725,286 34 1932 1953 55 $1,063,383 $1,725,286 62
Site Improvements $8.50 S.F. 129,177 100 $1,097,487 28 1939 1953 55 $435,584 $1,097,487 40
Roadways $1.38 S.F. 129,177 100 $178,264 50 1923 1973 $178,264 $178,264 100
Parking Lots $1.18 S.F. 129,177 100 $151,912 30 1923 1953 $151,912 $151,912 100
Pedestrian Paving $0.82 S.F. 129,177 100 $105,408 50 1923 1973 $105,408 $105,408 100
Site Development $3.86 S.F. 129,177 100 $499,140 20 2001 2021 55 $499,140
Landscaping $1.26 S.F. 129,177 100 $162,763 10 1923 $162,763
Site Mechanical Utilities $4.86 S.F. 129,177 100 $627,799 44 1923 1953 $627,799 $627,799 100
Water Supply $0.82 S.F. 129,177 100 $105,408 30 1923 1953 $105,408 $105,408 100
Sanitary Sewer $0.41 S.F. 129,177 100 $52,704 30 1923 1953 $52,704 $52,704 100
Storm Sewer $3.52 S.F. 129,177 100 $454,186 50 1923 1973 $454,186 $454,186 100
Fuel Distribution $0.12 S.F. 129,177 100 $15,501 30 1923 1953 $15,501 $15,501 100
Site Electrical Utilities 0 0 0
Site Lighting 0 0 0 0
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 52
Facility: \Elementary/Middle Schools\Vivian\Site (continued)
Renewal Schedule:
Systems 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
Total $1,063,383
Building Sitework $1,063,383
Site Improvements $435,584
Roadways $178,264
Parking Lots $151,912
Pedestrian Paving $105,408
Site Development
Landscaping
Site Mechanical Utilities $627,799
Water Supply $105,408
Sanitary Sewer $52,704
Storm Sewer $454,186
Fuel Distribution $15,501
Site Electrical Utilities
Site Lighting
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 53
Facility: \Elementary/Middle Schools\Vivian\Site (continued)
Deficiency Sheet:
Deficiency: Surveyor/Update: Kate McPhillips Fri, 04-Jun-2010Priority: 3Quantity: 1
Assembly: G2010 System: Roadways Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: The roadways are worn, beyond expected life, and should be replaced.
Estimates:Raw Cost $148,553.55
Plus or (Minus) Additional Cost $0.00Total Estimated Amount $148,553.55
Deficiency: Surveyor/Update: Kate McPhillips Fri, 04-Jun-2010Priority: 3Quantity: 1
Assembly: G2020 System: Parking Lots Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: The parking lot is worn, beyond expected life, covered in gravel in some areas, and should be replaced.
Estimates:Raw Cost $126,593.46
Plus or (Minus) Additional Cost $0.00Total Estimated Amount $126,593.46
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 54
Facility: \Elementary/Middle Schools\Vivian\ Site (continued)
Deficiency: Surveyor/Update: Kate McPhillips Fri, 04-Jun-2010Priority: 3Quantity: 1
Assembly: G2030 System: Pedestrian Paving Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: The pedestrian paving is cracked, worn, and beyond expected life, and should be replaced. There is also a need
for a handicap access ramp at the front entry.
Estimates:Raw Cost $87,840.36
Plus or (Minus) Additional Cost $0.00Total Estimated Amount $87,840.36
Deficiency: Surveyor/Update: Kate McPhillips Fri, 04-Jun-2010Priority: 3Quantity: 1
Assembly: G3010 System: Water Supply Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: Water supply is beyond expected life and should be replaced.
Estimates:Raw Cost $87,840.36
Plus or (Minus) Additional Cost $0.00Total Estimated Amount $87,840.36
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 55
Facility: \Elementary/Middle Schools\Vivian\ Site (continued)
Deficiency: Surveyor/Update: Kate McPhillips Fri, 04-Jun-2010Priority: 3Quantity: 1
Assembly: G3020 System: Sanitary Sewer Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: Sanitary sewer is beyond expected life and should be replaced.
Estimates:Raw Cost $43,920.18
Plus or (Minus) Additional Cost $0.00Total Estimated Amount $43,920.18
Deficiency: Surveyor/Update: Kate McPhillips Fri, 04-Jun-2010Priority: 3Quantity: 1
Assembly: G3030 System: Storm Sewer Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: Storm sewer is beyond expected life and should be replaced.
Estimates:Raw Cost $378,488.61
Plus or (Minus) Additional Cost $0.00Total Estimated Amount $378,488.61
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 56
Facility: \Elementary/Middle Schools\Vivian\ Site (continued)
Deficiency: Surveyor/Update: Kate McPhillips Fri, 04-Jun-2010Priority: 3Quantity: 1
Assembly: G3060 System: Fuel Distribution Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: Natural gas system is beyond expected life and should be replaced.
Estimates:Raw Cost $12,917.70
Plus or (Minus) Additional Cost $0.00Total Estimated Amount $12,917.70
COMET4 Caddo Parish
1961 Midway COMET4 Survey Report
Deficiency Detail ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 1
Facility
Name Assembly System Material Distress Correction Qty Unit Raw Cost
Additional
Cost Total Cost Priority Def. Cat. Location / Note
Caddo Parish School District $3,105,400 $621,080 $3,726,480 Elementary/Middle Schools $3,105,400 $621,080 $3,726,480 Vivian $3,105,400 $621,080 $3,726,480 1923, 1930, 1972 (A&B Bldgs) $1,988,943 $397,789 $2,386,732 Building Systems $1,988,943 $397,789 $2,386,732
D5020 Branch Wiring System Beyond Expected Life
Renew System 1 Ea. $382,377 $76,475 $458,853 Necessary- 2-5 Yrs
Deferred Maintenance
Branch wiring is beyond expected life and should be replaced.
E2010 Fixed Furnishings
System Beyond Expected Life
Renew System 1 Ea. $203,392 $40,678 $244,071 Necessary- 2-5 Yrs
Deferred Maintenance
Fixed furnishings, such as the base/wall cabinets, counter tops, window shades, and fixed seating, are worn, beyond expected life, and should be replaced.
B2020 Exterior Windows
System Beyond Expected Life
Renew System 1 Ea. $271,190 $54,238 $325,428 Necessary- 2-5 Yrs
Deferred Maintenance
The exterior windows are worn, beyond expected life, and should be replaced.
B2030 Exterior Doors System Beyond Expected Life
Renew System 1 Ea. $67,797 $13,559 $81,357 Necessary- 2-5 Yrs
Deferred Maintenance
The exterior doors are worn, beyond expected life, and should be replaced.
C1030 Fittings System Beyond Expected Life
Renew System 1 Ea. $338,987 $67,797 $406,784 Necessary- 2-5 Yrs
Deferred Maintenance
Fittings, such as chalk and tack boards, lockers, toilet and bath accessories, toilet partitions, and shelving, are beyond expected life and should be replaced.
C3010 Wall Finishes - Paint
System Beyond Expected Life
Renew System 1 Ea. $135,595 $27,119 $162,714 Necessary- 2-5 Yrs
Deferred Maintenance
The painted wall finishes are worn, beyond expected life, and should be replaced.
C3020 Floor Finishes - Carpet
System Beyond Expected Life
Renew System 1 Ea. $7,226 $1,445 $8,671 Necessary- 2-5 Yrs
Deferred Maintenance
Carpet floor finishes are worn, beyond expected life, and should be replaced.
C3030 Ceiling Finishes System Beyond Expected Life
Renew System 1 Ea. $130,171 $26,034 $156,205 Necessary- 2-5 Yrs
Deferred Maintenance
The ceiling finishes are stained, beyond expected life, and should be replaced.
D2020 Domestic Water Distribution
System Beyond Expected Life
Renew System 1 Ea. $25,085 $5,017 $30,102 Necessary- 2-5 Yrs
Deferred Maintenance
Domestic water distribution is beyond expected life and should be replaced.
D2030 Sanitary Waste System Beyond Expected Life
Renew System 1 Ea. $42,712 $8,542 $51,255 Necessary- 2-5 Yrs
Deferred Maintenance
Sanitary waste is beyond expected life and should be replaced.
D2040 Rain Water Drainage
System Beyond Expected Life
Renew System 1 Ea. $10,848 $2,170 $13,017 Necessary- 2-5 Yrs
Deferred Maintenance
Rain water drainage system is beyond expected life and should be replaced.
D2010 Plumbing Fixtures
System Beyond Expected Life
Renew System 1 Ea. $332,885 $66,577 $399,462 Necessary- 2-5 Yrs
Deferred Maintenance
Plumbing fixtures are beyond expected life and should be replaced.
D1010 Elevators and Lifts
System Missing Renew System 1 Ea. $40,678 $8,136 $48,814 Necessary- 2-5 Yrs
ADA / Accessibility
An elevator is required to access the second floor of Building B.
COMET4 Caddo Parish
1961 Midway COMET4 Survey Report
Deficiency Detail ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 2
Facility
Name Assembly System Material Distress Correction Qty Unit Raw Cost
Additional
Cost Total Cost Priority Def. Cat. Location / Note
1989 (C&D Bldgs) $113,489 $22,698 $136,187 Building Systems $113,489 $22,698 $136,187
C3020 Floor Finishes - Carpet
System Beyond Expected Life
Renew System 1 Ea. $12,744 $2,549 $15,292 Necessary- 2-5 Yrs
Deferred Maintenance
Carpet floor finishes are worn, beyond expected life, and should be replaced.
C3020 Floor Finishes - VCT
System Beyond Expected Life
Renew System 1 Ea. $98,182 $19,636 $117,818 Necessary- 2-5 Yrs
Deferred Maintenance
The VCT floor finishes are worn, beyond expected life, and should be replaced.
B3010 Roof Coverings -EPDM
Roof Covering
Failing Roof Repair 42,990 S.F. $2,564 $513 $3,077 Necessary- 2-5 Yrs
Critical Repair
There are reports of several roof leaks in the building. An investigatiion to locate and determine the cause of the leaks is needed.
1999 (E Bldg) $11,897 $2,379 $14,276 Building Systems $11,897 $2,379 $14,276
D3060 Controls & Instrumentation
System Inadequate Renew System 1 Ea. $11,897 $2,379 $14,276 Recommended-3-10 Yrs
Deferred Maintenance
Analog electric controls system is inadequate and needs to be upgraded/replaced.
Basketball Court $25,278 $5,056 $30,333 Building Systems $25,278 $5,056 $30,333
F1010 Special Structures - Basketball Court - Concrete - Outdoor
System Beyond Expected Life
Renew System 1 Ea. $25,278 $5,056 $30,333 Necessary- 2-5 Yrs
Deferred Maintenance
The concrete surface is worn, beyond expected life, and should be replaced.
COMET4 Caddo Parish
1961 Midway COMET4 Survey Report
Deficiency Detail ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 3
Facility
Name Assembly System Material Distress Correction Qty Unit Raw Cost
Additional
Cost Total Cost Priority Def. Cat. Location / Note
Pine St Bldg (Teachers' Resource) $79,639 $15,928 $95,567 Building Systems $79,639 $15,928 $95,567
D5020 Branch Wiring System Beyond Expected Life
Renew System 1 Ea. $18,854 $3,771 $22,625 Necessary- 2-5 Yrs
Deferred Maintenance
Branch wiring is beyond expected life and should be replaced.
D5020 Lighting System Beyond Expected Life
Renew System 1 Ea. $18,854 $3,771 $22,625 Necessary- 2-5 Yrs
Deferred Maintenance
Lighting system is inadequate, beyond expected life, and should be replaced.
E2010 Fixed Furnishings
System Beyond Expected Life
Renew System 1 Ea. $10,029 $2,006 $12,034 Necessary- 2-5 Yrs
Deferred Maintenance
Fixed furnishings, such as the base/wall cabinets, counter tops, window shades, and fixed seating, are worn, beyond expected life, and should be replaced.
B2020 Exterior Windows
System Beyond Expected Life
Renew System 1 Ea. $13,372 $2,674 $16,046 Necessary- 2-5 Yrs
Deferred Maintenance
The exterior windows are worn, beyond expected life, and should be replaced.
B2030 Exterior Doors System Beyond Expected Life
Renew System 1 Ea. $3,343 $669 $4,011 Necessary- 2-5 Yrs
Deferred Maintenance
The exterior doors are worn, beyond expected life, and should be replaced.
C3020 Floor Finishes - VCT
System Beyond Expected Life
Renew System 1 Ea. $10,029 $2,006 $12,034 Necessary- 2-5 Yrs
Deferred Maintenance
The VCT floor finishes are worn, beyond expected life, and should be replaced.
D2030 Sanitary Waste System Beyond Expected Life
Renew System 1 Ea. $2,106 $421 $2,527 Necessary- 2-5 Yrs
Deferred Maintenance
Sanitary waste is beyond expected life and should be replaced.
D3050 Terminal & Package Units
Terminal and Package Units
Beyond Expected Life
Replace A/C 4T Split System
1 Ea. $3,053 $611 $3,664 Necessary- 2-5 Yrs
Deferred Maintenance
Lennox split system with gas heat is beyond expected life and should be replaced.
Site $886,154 $177,231 $1,063,385 Building Systems $886,154 $177,231 $1,063,385
G2010 Roadways System Beyond Expected Life
Renew System 1 Ea. $148,554 $29,711 $178,264 Necessary- 2-5 Yrs
Deferred Maintenance
The roadways are worn, beyond expected life, and should be replaced.
G2020 Parking Lots System Beyond Expected Life
Renew System 1 Ea. $126,593 $25,319 $151,912 Necessary- 2-5 Yrs
Deferred Maintenance
The parking lot is worn, beyond expected life, covered in gravel in some areas, and should be replaced.
G3010 Water Supply System Beyond Expected Life
Renew System 1 Ea. $87,840 $17,568 $105,408 Necessary- 2-5 Yrs
Deferred Maintenance
Water supply is beyond expected life and should be replaced.
G3020 Sanitary Sewer System Beyond Expected Life
Renew System 1 Ea. $43,920 $8,784 $52,704 Necessary- 2-5 Yrs
Deferred Maintenance
Sanitary sewer is beyond expected life and should be replaced.
G3030 Storm Sewer System Beyond Expected Life
Renew System 1 Ea. $378,489 $75,698 $454,186 Necessary- 2-5 Yrs
Deferred Maintenance
Storm sewer is beyond expected life and should be replaced.
G3060 Fuel Distribution System Beyond Expected Life
Renew System 1 Ea. $12,918 $2,584 $15,501 Necessary- 2-5 Yrs
Deferred Maintenance
Natural gas system is beyond expected life and should be replaced.
G2030 Pedestrian Paving
System Beyond Expected Life
Renew System 1 Ea. $87,840 $17,568 $105,408 Necessary- 2-5 Yrs
Deferred Maintenance
The pedestrian paving is cracked, worn, and beyond expected life, and should be replaced. There is also a need for a handicap access ramp at the front entry.
Functional and Educational Adequacy
Suitability Report
Suitability Report - Full
Project:Site:
Suitability
Possible
Score
Score
Percent
Score
CaddoCounty:
1Region:
Rating
630Site #:
Caddo 2009 Vivian Elementary-Middl
Project #:
4057
Site Type: Site Size:Grade Config:
K-8 0.00ES/MS
Suitability - K-8
Site
3.00 2.01 67.00 TrafficFair
1.00 0.67 67.00 Pedestrian TrafficFair
1.35 0.45 33.00 ParkingPoor
1.64 0.54 33.00 Play Courts & FieldsPoor
Safety and Security
1.22 1.22 100.00 FencingGood
0.15 0.05 33.00 Signage & Way FindingPoor
3.00 0.00 0.00 Ease of SupervisionP/U
0.50 0.00 0.00 Limited EntrancesP/U
0.50 0.00 0.00 Interior CirculationP/U
School Climate
5.00 0.00 0.00 Learning Style VarietyP/U
5.00 0.00 0.00 School EnvironmentP/U
1.00 0.00 0.00 LandscapingP/U
General Classrooms
12.95 8.68 67.00 SizeFair
2.78 2.78 100.00 AdjacenciesGood
2.78 2.78 100.00 Storage\Fixed Equip.Good
Remedial - Special Needs
3.17 1.59 50.00 SizeFair
0.68 0.68 100.00 AdjacenciesG/F
0.68 0.00 0.00 Storage\Fixed Equip.P/U
Library
2.43 1.22 50.00 SizeFair
0.52 0.52 100.00 AdjacenciesG/F
0.52 0.52 100.00 Storage\Fixed Equip.G/F
P.E.
8.40 8.40 100.00 SizeGood
1.80 1.80 100.00 AdjacenciesG/F
1.80 1.80 100.00 Storage\Fixed Equip.G/F
Music
2.64 2.64 100.00 SizeGood
0.57 0.00 0.00 AdjacenciesP/U
0.57 0.57 100.00 Storage\Fixed Equip.G/F
Art
Page 1 of 43/9/2010 2:19:58PM
Project:Site:
Suitability
Possible
Score
Score
Percent
Score
CaddoCounty:
1Region:
Rating
630Site #:
Caddo 2009 Vivian Elementary-Middl
Project #:
4057
Site Type: Site Size:Grade Config:
K-8 0.00ES/MS
1.53 0.00 0.00 SizeP/U
0.33 0.33 100.00 AdjacenciesG/F
0.33 0.00 0.00 Storage\Fixed Equip.P/U
Performing Arts\Auditorium
1.64 1.64 100.00 SizeGood
0.35 0.35 100.00 AdjacenciesGood
0.35 0.35 100.00 Storage\Fixed Equip.Good
Vocational Technical
4.29 4.29 100.00 SizeGood
0.92 0.92 100.00 AdjacenciesGood
0.92 0.92 100.00 Storage\Fixed Equip.G/F
Science
2.70 0.00 0.00 SizeP/U
0.58 0.58 100.00 AdjacenciesGood
0.58 0.00 0.00 Storage\Fixed Equip.P/U
Kindergarten
1.18 0.00 0.00 SizeP/U
0.25 0.25 100.00 AdjacenciesG/F
0.25 0.25 100.00 Storage\Fixed Equip.G/F
Administration
1.59 0.79 50.00 SizeFair
0.34 0.34 100.00 AdjacenciesG/F
0.34 0.34 100.00 Storage\Fixed Equip.G/F
0.91 0.45 50.00Fair Restrooms (Student)
0.91 0.45 50.00Fair Teacher Lounge and Work Room(s)
5.00 3.35 67.00Fair Cafeteria
7.84 7.84 100.00Good Food Prep
0.41 0.20 50.00Fair Counseling
0.34 0.34 100.00G/F Clinic
0.50 0.50 100.00G/F Custodial & Maintenance
100.00 63.39 63.39Total For Site:
Comments
Suitability - K-8
Vivian Elementary Middle School provides a general educational program for grades PK-8. The middle school does
have some magnet programs that students must qualify for. The school serves the surrounding area which is a
large rural zone. The school has an extensive special education program in all grades. The facility is made up of 5
wings and one portable.
Suitability - K-8->Site-->Traffic
Primary parent drop off is separate but on-street.
Suitability - K-8->Site-->Pedestrian Traffic
Staff must cross street from parking lot.
Suitability - K-8->Site-->Parking
Most staff parking is across a street and about half of it is unpaved. The school shares half the parking with the
adjacent church.
Page 2 of 43/9/2010 2:19:58PM
Project:Site:
Suitability
Possible
Score
Score
Percent
Score
CaddoCounty:
1Region:
Rating
630Site #:
Caddo 2009 Vivian Elementary-Middl
Project #:
4057
Site Type: Site Size:Grade Config:
K-8 0.00ES/MS
Suitability - K-8->Site-->Play Courts & Fields
There are no MS athletic fields and the PK-K play area is in poor condition.
Suitability - K-8->Safety and Security-->Signage & Way Finding
There is very little way finding signage and many rooms are not signed.
Suitability - K-8->Safety and Security-->Ease of Supervision
The number and configuration of the buildings make this a challenging site to supervise.
Suitability - K-8->Safety and Security-->Limited Entrances
There are numerous buildings with numerous entrances.
Suitability - K-8->Safety and Security-->Interior Circulation
Wings B and D have narrow, steep stairways. The halls are generally wide.
Suitability - K-8->School Climate-->Learning Style Variety
The small self-contained classrooms do not support a variety of learning styles.
Suitability - K-8->School Climate-->School Environment
The physical environment is not stimulating. Acoustics are poor, lighting is low, natural light is blocked, and overall
aesthetics are dull.
Suitability - K-8->School Climate-->Landscaping
Landscaping is minimal.
Suitability - K-8->General Classrooms-->Size
Most general classrooms are in the 6-700 SF range.
Suitability - K-8->Remedial - Special Needs-->Size
Special education classrooms are small, 6-700 SF.
Suitability - K-8->Remedial - Special Needs-->Storage\Fixed Equip.
Special education rooms need additional storage especially for the students equipment.
Suitability - K-8->Library-->Size
Both the ES and MS libraries are small.
Suitability - K-8->Music-->Adjacencies
The ES music room is adjacent to special education classrooms.
Suitability - K-8->Art-->Size
Both art rooms are small and the MS room does not have a separate room for the kiln.
Suitability - K-8->Art-->Storage\Fixed Equip.
Both art rooms need additional storage.
Suitability - K-8->Vocational Technical-->Size
The computer lab that houses business educ. is sufficiently large but it is shared with ES science.
Suitability - K-8->Science-->Size
Science rooms are in typical classrooms and are small and don't have storage/prep rooms.
Suitability - K-8->Science-->Storage\Fixed Equip.
Storage is lacking and there is no safety equipment.
Suitability - K-8->Kindergarten-->Size
PK and K rooms are too small.
Suitability - K-8->Administration-->Size
Conference room is small and there is no staff restroom in the administrative area.
Page 3 of 43/9/2010 2:19:58PM
Project:Site:
Suitability
Possible
Score
Score
Percent
Score
CaddoCounty:
1Region:
Rating
630Site #:
Caddo 2009 Vivian Elementary-Middl
Project #:
4057
Site Type: Site Size:Grade Config:
K-8 0.00ES/MS
Suitability - K-8->Restrooms (Student)
Restrooms in the older B wing are in poor condition.
Suitability - K-8->Teacher Lounge and Work Room(s)
Teacher lounge and work rooms are small.
Suitability - K-8->Cafeteria
Cafeteria has a low ceiling which helps with the acoustics but compresses the space. It is a bit small for the
enrollment.
Suitability - K-8->Counseling
Counseling has no waiting space.
Suitability - K-8->Clinic
Clinic is not located near administration but this works okay.
Page 4 of 43/9/2010 2:19:58PM
Functional and Educational Adequacy
Technology Readiness Report
Technology Readiness Report - Full
Project:Site:
Technology Readiness
Possible
ScoreScore
Percent
Score
CaddoCounty:
1Region:
Rating
630Site #:
Caddo 2009 Vivian Elementary-Middle
Project #:
4057
Technology Readiness
15.00 7.50 50.00 Comm/IT Equipment Environment Fair
10.00 10.00 100.00 Electrical Power Good
10.00 10.00 100.00 Cooling Good
10.00 10.00 100.00 Drops & Wireless Good
15.00 15.00 100.00 LAN Connectivity Good
10.00 10.00 100.00 WAN Backbone Good
10.00 6.70 67.00 LAN-WAN Performance Fair
5.00 5.00 100.00 Video Distribution Good
5.00 0.00 0.00 Voice Distribution Unsat
10.00 10.00 100.00 Faculty & Staff Technology Good
100.00 84.20 84.20Total For Site:
Comments
Technology Readiness->Comm/IT Equipment Environment
Server is located in library storeroom which can get warm.
Technology Readiness->Voice Distribution
Intercom system is old and outdated.
Page 1 of 13/9/2010 2:05:06PM
Functional and Educational Adequacy
Capacity and Utilization Report
Capacity Calculations Appendix Preface Some spaces do not contribute to the functional capacity of a school. These spaces are generally spaces
which do not have students assigned to them. Some examples of these spaces include elementary art
rooms, elementary computer labs, elementary music rooms, and special education resource rooms.
Many schools have temporary buildings and these are also not included in the calculation of the
functional capacity. It is the district’s philosophy that, while temporary buildings can be useful in the
short run, they do not provide appropriate long term space and should be eliminated where possible.
Temporary buildings are generally used for the following functions:
1. To house students in temporary classrooms when the school is lacking enough classrooms
2. To house special programs when the school is lacking space for these programs
3. To house necessary storage or administrative support functions when permanent space is lacking
4. To house unnecessary storage or functions
It is the district’s strategy to eliminate all but the absolute necessary temporary buildings and it should
conduct an inventory of the uses of temporary buildings. Where the inventory identifies uses 1-3, the
district will need to consider a more appropriate space solution. In the case of number 4, the district will
need to ensure the principal of the school discontinues the inappropriate use of the temporary building.
Caddo Parish School Board
Instructional Space Model Guidelines
Room Type Students/
Room
Pre-School 20
K Capacity (full day) and 1st Grade 20
Elementary Classroom (2) 24
Elementary Classroom (3-5) 26
Secondary Classroom (6-12) 25
Art (Secondary) 33
Music (Secondary) - Vocal 25
Music (Secondary) - Instrumental 30
Science Lab (Secondary) 25
Voc./Industrial Tech, Foods, Etc. 25
Gym (Secondary) 80
Computer Lab (Elementary)* 26
Computer Lab (Secondary) 33
Spec. Ed. - Severe 9
Spec. Ed. - Resource 0
Alternative Education 18
Portable 0
*These spaces do not contribute to capacity
Scheduling Factors
Elementary Schools 95.0%
Middle Schools 85.0%
High Schools 75.0%
Source: MGT of America, Inc., 2009.
Caddo Parish School Board Capacity Calculations
Vivian Elementary-MiddleES/M K-8
K-1 Classroom: 8
PK Classroom: 2
ES (2) Classroom: 3
ES (3-5) Classroom: 8
ART: 2
Secondary (6-12): 6
MU Inst: 1
MU Vocal: 1
Science: 3.5
GYM: 3
VO/TEC: 0.5
*Computer Lab: 3
SE - Resource: 8
SE - Severe: 8
Alt: 0
**Temp Bldg: 2
20
24
20
26
33
25
30
25
25
80
25
33
0
9
18
Room Type # of Classrooms x Students/Room = Capacity
Total Capacity (w/o scheduling factor) =
Vivian Elementary-Middle Capacity =
x Scheduling factor =
40
72
160
208
150
66
30
25
87.5
240
12.5
99
0
72
0
0
*Computer Labs at Elementary Schools do not contribute to capacity**The temporary building number represents the number of temporary building teaching stations or rooms, not the number of temporary buildings.
1,073
1,262
85%
N/A
Future Facility and Site Assessment Report
FUTURE FACILITY AND SITE ASSESSMENT
School VIVIAN ELEMENTARY / MIDDLE SCHOOL 100 West Kentucky Ave. Vivian, LA 71082
Site Description 9 acre site in the town of Vivian in the northwest part of the parish surrounded by a residential neighborhood and faces a 2-lane lightly traveled street and the 4-lane State Highway 1 aka Pine Street borders the east side. The acreage is an accumulation of lots on several blocks including a parking lot across Kentucky Street to the south and a partial block across Pine Street (Hwy 1) reportedly leased to the City but used as a teacher resource facility. The original 1915 school on the north corner is now City property. The site slopes gently west to east and north with the main buildings sitting on a raised pad. The school is a collection of 6 incrementally added 1- and 2-story buildings including the original 1923 school, 4 classroom additions, an auditorium and gymnasium unit, and a modular unit. At the teacher resource center is a small 1-story brick, flat roof building. Site features include asphalt and gravel paving, lawns and a few trees, recreation field, paved basketball court, and playground equipment.
SUMMARY Topic Grade Comments
Site Adequacy Potential
Constraint
Although there is some available land, the campus is filling up, any additions will encroach on outdoor recreation and parking and site is much smaller than guideline. SITE ASSESSMENT
Site Size Status Inadequate
Student Capacity: 1012 Min. Acres Recommended: 20 Actual Site Acres: 9
Usable Area Remaining
Potential Constraint
1.50 Acres. Approximate. Both expansion areas crowd the site boundaries and impinge on recreation yards or parking.
• Flood Plain Potential
Constraint
The FEMA FIRM maps covering the Town of Vivian were blank and did not show any zone designations. The assumption used here is that there MIGHT be a problem but the data is not readily available from public sources.
• Potable Water No Constraint
• Sanitary Sewer No Constraint
• Storm Drainage No Constraint
Generally site drains well but a few localized ponding conditions were observed.
• Electricity No Constraint
• Natural Gas No Constraint
• Ground Water No Constraint
• Air Pollution No Constraint
• HazMat/Soils No Constraint
• Habitats No Constraint No conflicts identified by DEQ.
Ease of Access No Constraint
Ease of Traffic Flow Needs Improvement
Bus and auto traffic are separated on different streets. Auto drop-off is uncovered and street configuration is awkward.
Design Compatibility No Constraint
The school facility fits into the residential neighborhood and has grown over the years; expansion or replacement would not be intrusive although the site is getting full.
Compatibility of Structures
No Constraint The collection of buildings and styles are eclectic but share materials and massing that reasonably blend.
VIV
IAN
EL
EM
EN
TA
RY
/MID
DL
E S
CH
OO
L100 W
est K
en
tucky
Viv
ian
, LA
71082
MISSISSIPPI STREET
N
KENTUCKY STREET
SP
RU
CE
ST
RE
ET
LA
HW
Y 1
/PIN
E S
TR
EE
T
Primary : 0.81 Ac
Secondary : 0.69 Ac
Total: 1.50 Ac
Primary
Secondary
1915 SCHOOL
PUBLIC LIBRARY
Recreation Yard
RESIDENTIAL
RESIDENTIAL
COMMERCIAL
RESIDENTIAL
RESIDENTIAL/COMMERCIAL
Auto
Pic
k-U
p
Bus Drop-Off
T
E
E
Total Usable
Site Area: 1.50 Ac
+ FH
Parking
1923 SCHOOL
Leased To City
Slope
Pu
blis
he
d 0
1.2
9.1
0
New
B
uild
ing
Teacher Resource Center
Building Code Verification Report
Building Code Number COMPLYNOT
COMPLY
FCA
DEFICIENCY
NOT
KNOWN
SYSTEM
NOT
PRESENT
NA TO FCA
DATA
1Code of Federal Regulations 28 CFR Part
36, 1994 edition, Paragraph 4.1.2,
Paragraph 4.1.6
1 NPFA 101:15.2.3.2; IBC 1017.2
3 IBC 1005.2
5
a
b
c
d
6
a
b
1
2
4 IBC 1011.5.3
1 IBC 1007.3
2 IBC 1020.1
Are penetrations into stairs limited to doors, electrical conduit serving the
stairway, piping necessary for the heating or cooling of the exit enclosure,
sprinkler piping, standpipes and penetrations for fire alarm circuits?
8
Boiler and furnace rooms?
Are corridor doors rated a minimum 20-minute rating?
Is glazing in rated doors above 20 minutes limited to 100 square inches?
NFPA 101:15.3.7
NFPA 101:15.3.2.1; IBC 508.2
Does every room or space greater than 250 SF and used for educational
purposes have not less than one outside window for emergency rescue
(exceptions: sprinklered building or room that has a door directly to the
outside)?
Do doors opening in the path of egress travel not reduce the required width to
less than 1/2 during the course of the swing?
When fully open, do corridor doors not project more than 7 inches into the
required corridor width?
Is the building subdivided into compartments by smoke partitions having not
less than a 1-hour fire rating? (Maximum area of compartment is 30,000 SF.
Length or width of building exceeds 300’ unless sprinklered.)
IBC 715.4.4.1
Is 1-hour rating or sprinkler protection provided for the following:
Hazardous storage?
Janitor’s closet?
IBC 1008.1.8.1
Where there is a chiller, is it separated from a boiler or water heater by a 2-
hour assembly?
Laundries? NFPA 101:15.3.2.1; IBC 508.2
School Name: Vivian ES/MS
NFPA101:15.2.11.1.1
G2030 Pedestrian Paving
B2020 Exterior Windows
4
BUILDING CODE COMPLIANCE REPORT
Code Provision
Is there a continuous path of entry/exit for handicap accessibility to all parts of
the building?
Do exit access corridors have not less than 6’ of clear width?
Are both 1-hour rating and sprinkler protection provided for the following:
Science labs?
7
Does all door hardware comply by not requiring tight grasping, tight pinching or
twisting to operate?
Maintenance shops?
IBC 508.2
C10 Interior Construction
C1010 Partitions
C1020 Interior Doors
1
IBC 1005.2
Are corridors 1-hour rated (exceptions: building is sprinklered or each room for
instruction has at least one door directly to the exterior)?IBC 1017.1
2
3
NFPA 101:7.1.3.2.1; IBC 1020.1.2
C2010 Stair Construction
Are all means of egress illuminated at all times building is occupied?
Do exit stairways have a minimum 48” clearance width between handrails?
Are stairs separated by 1-hour fire resistance rating?
3
Building Code Number COMPLYNOT
COMPLY
FCA
DEFICIENCY
NOT
KNOWN
SYSTEM
NOT
PRESENT
NA TO FCA
DATACode Provision
4
a NFPA 101:7.2.2.2.4.2; IBC 1012.4
b IBC 1012.5
c NFPA 101:7.2.2.4.4.6; IBC 1012.1
d NFPA 101:7.2.2.4.4.2; IBC 1012.2
5 IBC 1007.6
1
2
1 IBC 508.2
2 IBC 1203.1
3INTERNATIONAL MECHANICAL CODE
2000, 606.4
4 IBC 908.6
1 IBC 903.2
1 IBC 907.2
Is there a telephone or intercom communication in the cab?
Is there a fireman control panel at the ground floor controls?
Are handrails:
IBC 3006.2
IBC 3003.2
Is there an Area of Refuge in the stairwell or in a vestibule entering the stair? Is
there a communication device there?
Between 34” and 38” above the surface of the tread?
Between 1-1/4” and 2” in diameter?
Returning to wall, guard or walking surface?
3 IBC 907.11
IBC 907.2.12.2
Does the shaft have exhaust directly to the outside, an access ladder to the pit,
and battery backup lighting in the shaft/pit?
Are the mechanical rooms separated by fire rated partitions from remainder of
building?
Is there a standard and emergency ventilation system provided?
Are there automatic sprinkler systems provided in assembly spaces with more
than 300 occupants?
2
Is there a refrigerant detection and alarm system provided?
Are there emergency shut-offs provided?
Are the duct smoke detectors connected to the building’s fire alarm control
panel?
Is there a monitored fire alarm system provided?
Does the operation of fire detector, sprinkler device or manual fire alarm box
immediately sounds an alert tone followed by voice instructions giving
approved information and directions for an evacuation?
IBC 3004.1; IBC 3006.1
D30 HVAC Systems
D40 Fire Protection
D4010 Sprinklers
D50 Electrical
D5030 Communications and Security
4
D10 Conveying
D1010 Elevators
3Does the Elevator Machine Room have ventilation or air conditioning to protect
controls from overheating?
Continuously graspable?
Energy Conservation Opportunities Report
System Energy Conservation FCA Deficiency Replacement Cost
SCHOOL TYPEENERGY CONSERVATION OPPORTUNITIES
Vivian Elementary/Middle ES/MS
1923, 1930, 1972 (A&B) Buildings Roof Covering No No
Exterior Windows Yes Yes $325,428.00
Interior Lighting No No
Bldg Controls & Instrumentation No No
Heating No No
Other HVAC Systems (Ventilation) No No
Terminal & Package Units No No
Cooling No No
1989 (C&D) Buildings Roof Covering Partial Yes $3,077.00
Exterior Windows No No
Interior Lighting No No
Bldg Controls & Instrumentation No No
Heating No No
Other HVAC Systems (Ventilation) No No
Terminal & Package Units No No
Cooling No No
1999 (E) Building Roof Covering No No
Exterior Windows No No
Interior Lighting No No
Bldg Controls & Instrumentation Yes Yes $14,276.00
Heating No No
Other HVAC Systems (Ventilation) No No
Terminal & Package Units No No
Cooling No No
2003 (H) Building Roof Covering No No
Exterior Windows No No
Interior Lighting No No
Bldg Controls & Instrumentation No No
Heating No No
Other HVAC Systems (Ventilation) No No
Terminal & Package Units No No
Cooling No No
Pine St Building (Teachers' Resource) Roof Covering No No
Exterior Windows Yes Yes $16,046.00
Interior Lighting Yes Yes $22,625.00
Bldg Controls & Instrumentation No No
Heating No No
Other HVAC Systems (Ventilation) No No
Terminal & Package Units No Yes $3,664.00
Cooling No No
Site Exterior Lighting No No
Facility Condition Assessment Reports
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 1
Facility: \Elementary/Middle Schools\Walnut HillAddress: 9360 Woolworth Road, Shreveport, LA 71129
Attributes: Temporary Building Rooms 20
General Information: Function: Elementary Middle Year Built:Gross Area: 133,522 S.F. Last Renovation:
Facility Description:
The Walnut Hill Elementary/Middle School campus consists of one main building located at 9360 Woolworth Road in Shreveport, Louisiana. The original campus was constructed in 1956 and additions were constructed in 1966, 1967, 1987, 1998, 2004, and 2008. Ancillary buildings on campus include covered walkways. In addition to the main building, the campus contains basketball courts, football field, and tennis courts. This report contains condition and adequacy data collected during the 2009/2010 Facility Condition Assessment (FCA). The detailed condition and deficiency statements are contained in this report.
Current Repair Cost: $6,544,148.00 Replacement Cost: $21,205,690.00 FCI: 30.86%
19-Jan-2010Walnut Hill Elementary/Middle School
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 2
Facility: \Elementary/Middle Schools\Walnut Hill\1956, 1966, 1967 BuildingsAddress: 9360 Woolworth Road, Shreveport, LA 71129
Attributes: Number of Floors 1
General Information: Function: Elementary Middle Year Built: 1956Gross Area: 87,005 S.F. Last Renovation:
Facility Description:
The Walnut Hill Elementary/Middle School Main Building is 1-story building located at 9360 Woolworth Road in Shreveport, Louisiana. There have been three additions in 1998, 2004, and 2008, HVAC renovations in 1997 and 2009, and roofing renovations in 1998, 2000, and 2009. This report contains condition and adequacy data collected during the 2009/2010 Facility Condition Assessment (FCA). The detailed condition and deficiency statements are contained in this report.
Energy conservation opportunities for this building include: 1) Exterior windows are steel frame, operable clear glass design. Installation of fixed, double pane, low e, thermal windows with thermal breaks would improve energy use and improve comfort; 2) Interior lights are T12 fixtures and incandescent lamps throughout the campus, as well as HPS fixtures in the old gym. Installation of T8 energy efficient lights would improve energy efficiency; and 3) A review of billing rate may justify addition of power factor correction capacitor.
There are no ADA vertical access needs for this building at this time.
Current Repair Cost: $4,581,964.00 Replacement Cost: $13,622,358.00 FCI: 33.64%
19-Jan-2010East Elevation
19-Jan-2010North Elevation
19-Jan-2010South Elevation
19-Jan-2010West Elevation
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 3
Facility: \Elementary/Middle Schools\Walnut Hill\1956, 1966, 1967 Buildings (continued)
Building Condition:
System Unit Price$
Unit of
Meas Qty Renewal% Renewal$ Life Installed
Calc Next
Renewal
Next
Renewal CI% Deficiency$ Replacement Value FCI%
Total $156.57 S.F. 87,005 107 $14,535,648 48 1971 1964 79 $4,581,965 $13,622,358 34
Substructure $19.20 S.F. 87,005 100 $1,670,496 100 1956 $1,670,496
Foundations $19.20 S.F. 87,005 100 $1,670,496 100 1956 $1,670,496
Standard Foundations $10.20 S.F. 87,005 100 $887,451 100 1956 $887,451
Special Foundations 0 0 0 0
Slab on Grade $9.00 S.F. 87,005 100 $783,045 100 1956 $783,045
Basement Construction 0 0 0
Basement Excavation 0 0 0 0
Basement Walls 0 0 0 0
Shell $40.74 S.F. 87,005 104 $3,679,789 69 1965 1986 45 $574,233 $3,544,584 16
Superstructure $10.80 S.F. 87,005 100 $939,654 100 1956 $939,654
Floor Construction 0 0 0 0
Roof Construction $10.80 S.F. 87,005 100 $939,654 100 1956 $939,654
Exterior Enclosure $20.40 S.F. 87,005 103 $1,827,105 78 1956 1986 $574,233 $1,774,902 32
Exterior Walls $14.40 S.F. 87,005 100 $1,252,872 100 1956 $1,252,872
Exterior Windows $4.80 S.F. 87,005 110 $459,386 30 1956 1986 $459,386 $417,624 110
Exterior Doors $1.20 S.F. 87,005 110 $114,847 30 1956 1986 $114,847 $104,406 110
Roofing $9.54 S.F. 87,005 110 $913,030 20 1999 2019 45 $830,028
Roof Coverings - BUR $9.54 S.F. 87,005 110 $913,030 20 1999 2019 45 $830,028
Roof Coverings - EPDM 0 0 0 0
Roof Coverings - Standing
Seam Mettal
0 0 0 0
Roof Openings 0 0 0 0
Interiors $27.44 S.F. 87,005 107 $2,563,307 52 1956 1964 $1,529,688 $2,387,228 64
Interior Construction $19.20 S.F. 87,005 106 $1,774,902 68 1956 1976 $741,283 $1,670,496 44
Partitions $10.80 S.F. 87,005 110 $1,033,619 100 1956 $939,654
Interior Doors $2.40 S.F. 87,005 80 $167,050 40 1956 1996 $167,050 $208,812 80
Fittings $6.00 S.F. 87,005 110 $574,233 20 1956 1976 $574,233 $522,030 110
Stairs 0 0 0
Stair Construction 0 0 0 0
Interior Finishes $8.24 S.F. 87,005 110 $788,405 15 1956 1964 $788,405 $716,732 110
Wall Finishes - Ceramic &
Glazed
$4.42 S.F. 2,400 110 $11,658 20 1956 1976 $11,658 $10,598 110
Wall Finishes - Paint $2.40 S.F. 84,605 110 $223,357 10 1956 1966 $223,357 $203,052 110
Floor Finishes - Carpet $2.76 S.F. 1,300 110 $3,947 8 1956 1964 $3,947 $3,588 110
Floor Finishes - Ceramic &
Quarry Tile
$1.44 S.F. 4,400 110 $6,970 50 1956 2006 $6,970 $6,336 110
Floor Finishes - Terrazzo 0 0 0 0
Floor Finishes - VCT $3.60 S.F. 81,305 110 $321,968 15 1956 1971 $321,968 $292,698 110
Ceiling Finishes $2.30 S.F. 87,005 110 $220,505 20 1956 1976 $220,505 $200,460 110
Services $59.47 S.F. 87,005 110 $5,691,798 22 1986 1976 86 $1,547,786 $5,174,361 30
Conveying 0 0 0
Elevators and Lifts 0 0 0 0
Plumbing $7.54 S.F. 87,005 110 $721,236 30 1974 1986 67 $686,413 $655,669 105
Plumbing Fixtures $5.89 S.F. 87,005 110 $563,897 30 1956 1986 $563,897 $512,633 110
Domestic Water Distribution $0.44 S.F. 87,005 110 $42,493 30 1995 2025 50 $38,630
Sanitary Waste $0.76 S.F. 87,005 110 $72,353 30 1956 1986 $72,353 $65,776 110
Rain Water Drainage $0.19 S.F. 87,005 110 $18,375 30 1956 1986 $18,375 $16,705 110
Other Plumbing Systems -
Natural Gas
$0.25 S.F. 87,005 110 $24,118 30 2009 2039 97 $31,788 $21,925 145
HVAC $33.72 S.F. 87,005 110 $3,227,190 20 2004 2017 92 $52,648 $2,933,809 2
Heat Generating Systems 0 0 0 0
Cooling Generating Systems 0 0 0 0
Distribution Systems & Exhaust
Systems
$9.12 S.F. 87,005 110 $872,834 30 2009 2039 97 $793,486
Terminal & Package Units $21.60 S.F. 87,005 110 $2,067,239 15 2009 2024 93 $52,648 $1,879,308 3
Controls & Instrumentation $1.80 S.F. 87,005 110 $172,270 20 2009 2029 95 $156,609
Other HVAC Systems/Equip -
Kitchen Hood
$1.20 S.F. 87,005 110 $114,847 30 1987 2017 23 $104,406
Fire Protection 0 0 0
Sprinklers 0 0 0 0
Electrical $18.22 S.F. 87,005 110 $1,743,372 24 1984 1976 70 $808,725 $1,584,883 51
Electrical Service/Distribution $2.27 S.F. 87,005 110 $217,060 30 1996 2026 53 $197,327
Branch Wiring $6.77 S.F. 87,005 110 $647,735 30 1956 1986 $647,735 $588,850 110
Lighting $6.77 S.F. 87,005 110 $647,735 20 2007 2027 85 $77,152 $588,850 13
Communications and Security -
Public Address & Clock System
$0.88 S.F. 87,005 110 $83,838 20 1956 1976 $83,838 $76,216 110
Fire Alarm $1.54 S.F. 87,005 110 $147,004 10 2003 2013 30 $133,640
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 4
System Unit Price$
Unit of
Meas Qty Renewal% Renewal$ Life Installed
Calc Next
Renewal
Next
Renewal CI% Deficiency$ Replacement Value FCI%
Security & CCTV 0 0 0 0
Other Electrical Systems -
Emergency Generator
0 0 0 0
Equipment & Furnishings $9.72 S.F. 87,005 110 $930,258 20 1956 1976 $930,258 $845,689 110
Equipment $6.12 S.F. 87,005 110 $585,718 20 1956 1976 $585,718 $532,471 110
Commercial Equipment $6.00 S.F. 87,005 110 $574,233 20 1956 1976 $574,233 $522,030 110
Institutional Equipment $0.12 S.F. 87,005 110 $11,485 20 1956 1976 $11,485 $10,441 110
Furnishings $3.60 S.F. 87,005 110 $344,540 20 1956 1976 $344,540 $313,218 110
Fixed Furnishings $3.60 S.F. 87,005 110 $344,540 20 1956 1976 $344,540 $313,218 110
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 5
Facility: \Elementary/Middle Schools\Walnut Hill\1956, 1966, 1967 Buildings (continued)
Renewal Schedule:
Systems 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
Total $4,581,965 $160,635 $141,247 $5,000 $1,191,298 $300,173
Substructure
Foundations
Standard Foundations
Special Foundations
Slab on Grade
Basement Construction
Basement Excavation
Basement Walls
Shell $574,233 $1,191,298
Superstructure
Floor Construction
Roof Construction
Exterior Enclosure $574,233
Exterior Walls
Exterior Windows $459,386
Exterior Doors $114,847
Roofing $1,191,298
Roof Coverings - BUR $1,191,298
Roof Coverings - EPDM
Roof Coverings - Standing Seam
Mettal
Roof Openings
Interiors $1,529,688 $5,000 $300,173
Interior Construction $741,283
Partitions
Interior Doors $167,050
Fittings $574,233
Stairs
Stair Construction
Interior Finishes $788,405 $5,000 $300,173
Wall Finishes - Ceramic & Glazed $11,658
Wall Finishes - Paint $223,357 $300,173
Floor Finishes - Carpet $3,947 $5,000
Floor Finishes - Ceramic & Quarry
Tile
$6,970
Floor Finishes - Terrazzo
Floor Finishes - VCT $321,968
Ceiling Finishes $220,505
Services $1,547,786 $160,635 $141,247
Conveying
Elevators and Lifts
Plumbing $686,413
Plumbing Fixtures $563,897
Domestic Water Distribution
Sanitary Waste $72,353
Rain Water Drainage $18,375
Other Plumbing Systems - Natural
Gas
$31,788
HVAC $52,648 $141,247
Heat Generating Systems
Cooling Generating Systems
Distribution Systems & Exhaust
Systems
Terminal & Package Units $52,648
Controls & Instrumentation
Other HVAC Systems/Equip -
Kitchen Hood
$141,247
Fire Protection
Sprinklers
Electrical $808,725 $160,635
Electrical Service/Distribution
Branch Wiring $647,735
Lighting $77,152
Communications and Security -
Public Address & Clock System
$83,838
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 6
Systems 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
Fire Alarm $160,635
Security & CCTV
Other Electrical Systems -
Emergency Generator
Equipment & Furnishings $930,258
Equipment $585,718
Commercial Equipment $574,233
Institutional Equipment $11,485
Furnishings $344,540
Fixed Furnishings $344,540
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 7
Facility: \Elementary/Middle Schools\Walnut Hill\1956, 1966, 1967 Buildings (continued)
Deficiency Sheet:
Deficiency: Surveyor/Update: Angela Smiley Fri, 04-Jun-2010Priority: 3Quantity: 1
Assembly: B2020 System: Exterior Windows Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: The exterior windows are worn, beyond expected life, and should be replaced.
Estimates:Raw Cost $382,822.00
Plus or (Minus) Additional Cost $0.00Total Estimated Amount $382,822.00
Deficiency: Surveyor/Update: Angela Smiley Fri, 04-Jun-2010Priority: 3Quantity: 1
Assembly: B2030 System: Exterior Doors Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: The exterior doors are worn, beyond expected life, and should be replaced.
Estimates:Raw Cost $95,705.50
Plus or (Minus) Additional Cost $0.00Total Estimated Amount $95,705.50
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 8
Facility: \Elementary/Middle Schools\Walnut Hill\ 1956, 1966, 1967 Buildings (continued)
Deficiency: Surveyor/Update: Angela Smiley Fri, 04-Jun-2010Priority: 3Quantity: 1
Assembly: C1020 System: Interior Doors Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: The interior doors are worn, beyond expected life, and should be replaced.
Estimates:Raw Cost $139,208.00
Plus or (Minus) Additional Cost $0.00Total Estimated Amount $139,208.00
Deficiency: Surveyor/Update: Angela Smiley Fri, 04-Jun-2010Priority: 3Quantity: 1
Assembly: C1030 System: Fittings Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: Fittings, such as chalk and tack boards, lockers, toilet and bath accessories, toilet partitions, and shelving, are
beyond expected life and should be replaced.
Estimates:Raw Cost $478,527.50
Plus or (Minus) Additional Cost $0.00Total Estimated Amount $478,527.50
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 9
Facility: \Elementary/Middle Schools\Walnut Hill\ 1956, 1966, 1967 Buildings (continued)
Deficiency: Surveyor/Update: Angela Smiley Fri, 04-Jun-2010Priority: 3Quantity: 1
Assembly: C3010 System: Wall Finishes - Ceramic & Glazed Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: The ceramic wall finishes are beyond expected life, showing signs of wear, and should be replaced.
Estimates:Raw Cost $9,715.20
Plus or (Minus) Additional Cost $0.00Total Estimated Amount $9,715.20
Deficiency: Surveyor/Update: Angela Smiley Fri, 04-Jun-2010Priority: 3Quantity: 1
Assembly: C3010 System: Wall Finishes - Paint Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: The painted wall finishes are worn, beyond expected life, and should be replaced.
Estimates:Raw Cost $186,131.00
Plus or (Minus) Additional Cost $0.00Total Estimated Amount $186,131.00
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 10
Facility: \Elementary/Middle Schools\Walnut Hill\ 1956, 1966, 1967 Buildings (continued)
Deficiency: Surveyor/Update: Angela Smiley Fri, 04-Jun-2010Priority: 3Quantity: 1
Assembly: C3020 System: Floor Finishes - Carpet Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: Carpet floor finishes are worn, beyond expected life, and should be replaced.
Estimates:Raw Cost $3,289.00
Plus or (Minus) Additional Cost $0.00Total Estimated Amount $3,289.00
Deficiency: Surveyor/Update: Angela Smiley Fri, 04-Jun-2010Priority: 3Quantity: 1
Assembly: C3020 System: Floor Finishes - Ceramic & Quarry Tile Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: The ceramic floor finishes are beyond expected life, showing signs of wear, and should be replaced.
Estimates:Raw Cost $5,808.00
Plus or (Minus) Additional Cost $0.00Total Estimated Amount $5,808.00
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 11
Facility: \Elementary/Middle Schools\Walnut Hill\ 1956, 1966, 1967 Buildings (continued)
Deficiency: Surveyor/Update: Angela Smiley Fri, 04-Jun-2010Priority: 3Quantity: 1
Assembly: C3020 System: Floor Finishes - VCT Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: The VCT floor finishes are worn, beyond expected life, and should be replaced.
Estimates:Raw Cost $268,306.50
Plus or (Minus) Additional Cost $0.00Total Estimated Amount $268,306.50
Deficiency: Surveyor/Update: Angela Smiley Thu, 03-Jun-2010Priority: 3Quantity: 1
Assembly: C3030 System: Ceiling Finishes Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: The ceiling finishes are beyond expected life, showing signs of wear, and should be replaced.
Estimates:Raw Cost $183,754.56
Plus or (Minus) Additional Cost $0.00Total Estimated Amount $183,754.56
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 12
Facility: \Elementary/Middle Schools\Walnut Hill\ 1956, 1966, 1967 Buildings (continued)
Deficiency: Surveyor/Update: Angela Smiley Fri, 04-Jun-2010Priority: 3Quantity: 1
Assembly: D2010 System: Plumbing Fixtures Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: Existing fixtures are inadequate and beyond expected life. Replacement with energy efficient fixtures is
recommended.
Estimates:Raw Cost $469,914.01
Plus or (Minus) Additional Cost $0.00Total Estimated Amount $469,914.01
Deficiency: Surveyor/Update: Angela Smiley Fri, 04-Jun-2010Priority: 3Quantity: 1
Assembly: D2030 System: Sanitary Waste Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: Sanitary waste is beyond expected life and should be replaced.
Estimates:Raw Cost $60,294.47
Plus or (Minus) Additional Cost $0.00Total Estimated Amount $60,294.47
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 13
Facility: \Elementary/Middle Schools\Walnut Hill\ 1956, 1966, 1967 Buildings (continued)
Deficiency: Surveyor/Update: Angela Smiley Fri, 04-Jun-2010Priority: 3Quantity: 1
Assembly: D2040 System: Rain Water Drainage Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: Roof drains are beyond expected life and should be replaced.
Estimates:Raw Cost $15,312.88
Plus or (Minus) Additional Cost $0.00Total Estimated Amount $15,312.88
Deficiency: Surveyor/Update: Angela Smiley Fri, 04-Jun-2010Priority: 3Quantity: 20
Assembly: D2090 System: Other Plumbing Systems - Natural Gas Material: Plumbing Fixtures Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Replace Drinking Fountain Note: Water fountains around campus are beyond expected life and should be replaced.
Estimates:Raw Cost $26,490.00
Plus or (Minus) Additional Cost $0.00Total Estimated Amount $26,490.00
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 14
Facility: \Elementary/Middle Schools\Walnut Hill\ 1956, 1966, 1967 Buildings (continued)
Deficiency: Surveyor/Update: Angela Smiley Fri, 04-Jun-2010Priority: 3Quantity: 4
Assembly: D3050 System: Terminal & Package Units Material: Terminal and Package Units Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Replace 10 T G/E Pkg Unit, Roof Mount Note: Existing (2 qty) package units to the cafeteria and (8 qty) ceiling mounted heaters are beyond expected life and
should be replaced with roof packaged units.
Estimates:Raw Cost $43,873.28
Plus or (Minus) Additional Cost $0.00Total Estimated Amount $43,873.28
Deficiency: Surveyor/Update: Angela Smiley Thu, 03-Jun-2010Priority: 3Quantity: 1
Assembly: D5020 System: Branch Wiring Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: Distribution is mostly original, beyond expected life, and should be replaced.
Estimates:Raw Cost $539,779.02
Plus or (Minus) Additional Cost $0.00Total Estimated Amount $539,779.02
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 15
Facility: \Elementary/Middle Schools\Walnut Hill\ 1956, 1966, 1967 Buildings (continued)
Deficiency: Surveyor/Update: Angela Smiley Fri, 04-Jun-2010Priority: 3Quantity: 8,700
Assembly: D5020 System: Lighting Material: Lighting/Branch Wiring Distress: Inadequate Category: Energy Conservation Correction: Replace 2X4 Fluorescent. Fixture/sf Note: T-12 lights still remain throughout the school, as well as incandescent lights, and HPS fixtures in the old gym. An
upgrade to energy efficient light fixtures is recommended.
Estimates:Raw Cost $64,293.00
Plus or (Minus) Additional Cost $0.00Total Estimated Amount $64,293.00
Deficiency: Surveyor/Update: Angela Smiley Fri, 04-Jun-2010Priority: 3Quantity: 1
Assembly: D5030 System: Communications and Security - Public
Address & Clock System Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: PA system is beyond expected life and should be upgraded/replaced. For integrity of the system, install wiring in
conduit.
Estimates:Raw Cost $69,865.02
Plus or (Minus) Additional Cost $0.00Total Estimated Amount $69,865.02
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 16
Facility: \Elementary/Middle Schools\Walnut Hill\ 1956, 1966, 1967 Buildings (continued)
Deficiency: Surveyor/Update: Angela Smiley Fri, 04-Jun-2010Priority: 3Quantity: 1
Assembly: E1010 System: Commercial Equipment Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: Commercial equipment, including the walk-in refrigerator and freezer, is beyond expected life and should be
replaced.
Estimates:Raw Cost $478,527.50
Plus or (Minus) Additional Cost $0.00Total Estimated Amount $478,527.50
Deficiency: Surveyor/Update: Angela Smiley Fri, 04-Jun-2010Priority: 3Quantity: 1
Assembly: E1020 System: Institutional Equipment Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: Institutional equipment, such as library equipment, theater and stage equipment, audio-visual equipment, and
laboratory equipment, is beyond expected life and should be replaced.
Estimates:Raw Cost $9,570.55
Plus or (Minus) Additional Cost $0.00Total Estimated Amount $9,570.55
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 17
Facility: \Elementary/Middle Schools\Walnut Hill\ 1956, 1966, 1967 Buildings (continued)
Deficiency: Surveyor/Update: Angela Smiley Fri, 04-Jun-2010Priority: 3Quantity: 1
Assembly: E2010 System: Fixed Furnishings Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: Fixed furnishings, such as the base/wall cabinets, counter tops, window shades, and fixed seating, are worn,
beyond expected life, and should be replaced.
Estimates:Raw Cost $287,116.50
Plus or (Minus) Additional Cost $0.00Total Estimated Amount $287,116.50
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 18
Facility: \Elementary/Middle Schools\Walnut Hill\1987 OfficeAddress: 9360 Woolworth Road, Shreveport, LA 71129
Attributes: Number of Floors 1
General Information: Function: Elementary Middle Year Built: 1987Gross Area: 767 S.F. Last Renovation:
Facility Description:
The 1987 Office Expansion/Addition at Walnut Hill Elementary/Middle School is a 1-story building located at 9360 Woolworth Road in Shreveport, Louisiana. There have been no additions, but there have been HVAC and roofing renovations. This report contains condition and adequacy data collected during the 2009/2010 Facility Condition Assessment (FCA). The detailed condition and deficiency statements are contained in this report.
Energy conservation opportunities for this building include: 1) Exterior windows are aluminum single pane, operable clear glass design. Installation of fixed, double pane, low e, thermal windows with thermal breaks would improve energy use and comfort; and 2) A review of billing rate may justify addition of power factor correction capacitor.
Current Repair Cost: $23,894.00 Replacement Cost: $108,598.00 FCI: 22.00%
19-Jan-2010East Elevation
19-Jan-2010Northeast Elevation
20-Jan-2010South Elevation
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 19
Facility: \Elementary/Middle Schools\Walnut Hill\1987 Office (continued)
Building Condition:
System Unit Price$
Unit of
Meas Qty Renewal% Renewal$ Life Installed
Calc Next
Renewal
Next
Renewal CI% Deficiency$ Replacement Value FCI%
Total $141.59 S.F. 767 106 $115,501 51 1991 2000 61 $23,893 $108,598 22
Substructure $19.20 S.F. 767 100 $14,726 100 1987 $14,726
Foundations $19.20 S.F. 767 100 $14,726 100 1987 $14,726
Standard Foundations $10.20 S.F. 767 100 $7,823 100 1987 $7,823
Special Foundations 0 0 0 0
Slab on Grade $9.00 S.F. 767 100 $6,903 100 1987 $6,903
Basement Construction 0 0 0
Basement Excavation 0 0 0 0
Basement Walls 0 0 0 0
Shell $40.74 S.F. 767 104 $32,440 69 1987 2007 23 $8,049 $31,248 26
Superstructure $10.80 S.F. 767 100 $8,284 100 1987 $8,284
Floor Construction 0 0 0 0
Roof Construction $10.80 S.F. 767 100 $8,284 100 1987 $8,284
Exterior Enclosure $20.40 S.F. 767 103 $16,107 78 1987 2017 23 $15,647
Exterior Walls $14.40 S.F. 767 100 $11,045 100 1987 $11,045
Exterior Windows $4.80 S.F. 767 110 $4,050 30 1987 2017 23 $3,682
Exterior Doors $1.20 S.F. 767 110 $1,012 30 1987 2017 23 $920
Roofing $9.54 S.F. 767 110 $8,049 20 1987 2007 $8,049 $7,317 110
Roof Coverings - BUR $9.54 S.F. 767 110 $8,049 20 1987 2007 $8,049 $7,317 110
Roof Coverings - EPDM 0 0 0 0
Roof Coverings - Standing
Seam Mettal
0 0 0 0
Roof Openings 0 0 0 0
Interiors $27.50 S.F. 767 107 $22,653 52 1988 2000 42 $12,068 $21,096 57
Interior Construction $19.20 S.F. 767 106 $15,647 68 1987 2007 42 $5,062 $14,727 34
Partitions $10.80 S.F. 767 110 $9,112 100 1987 $8,284
Interior Doors $2.40 S.F. 767 80 $1,473 40 1987 2027 42 $1,841
Fittings $6.00 S.F. 767 110 $5,062 20 1987 2007 $5,062 $4,602 110
Stairs 0 0 0
Stair Construction 0 0 0 0
Interior Finishes $8.30 S.F. 767 110 $7,006 15 1988 2000 $7,006 $6,369 110
Wall Finishes - Ceramic &
Glazed
0 0 0 0
Wall Finishes - Paint $2.40 S.F. 767 110 $2,025 10 1990 2000 $2,025 $1,841 110
Floor Finishes - Carpet 0 0 0 0
Floor Finishes - Ceramic &
Quarry Tile
0 0 0 0
Floor Finishes - Terrazzo 0 0 0 0
Floor Finishes - VCT $3.60 S.F. 767 110 $3,037 15 1987 2002 $3,037 $2,761 110
Ceiling Finishes $2.30 S.F. 767 110 $1,944 20 1987 2007 $1,944 $1,767 110
Services $50.54 S.F. 767 110 $42,645 21 1996 2007 66 $739 $38,767 2
Conveying 0 0 0
Elevators and Lifts 0 0 0 0
Plumbing $1.20 S.F. 767 110 $1,013 30 1987 2017 23 $920
Plumbing Fixtures 0 0 0 0
Domestic Water Distribution 0 0 0 0
Sanitary Waste $0.76 S.F. 767 110 $638 30 1987 2017 23 $580
Rain Water Drainage $0.19 S.F. 767 110 $162 30 1987 2017 23 $147
Other Plumbing Systems -
Natural Gas
$0.25 S.F. 767 110 $213 30 1987 2017 23 $193
HVAC $32.52 S.F. 767 110 $27,438 19 2002 2017 73 $24,943
Heat Generating Systems 0 0 0 0
Cooling Generating Systems 0 0 0 0
Distribution Systems & Exhaust
Systems
$9.12 S.F. 767 110 $7,695 30 1987 2017 23 $6,995
Terminal & Package Units $21.60 S.F. 767 110 $18,224 15 2009 2024 93 $16,567
Controls & Instrumentation $1.80 S.F. 767 110 $1,519 20 2009 2029 95 $1,381
Other HVAC Systems/Equip -
Kitchen Hood
0 0 0 0
Fire Protection 0 0 0
Sprinklers 0 0 0 0
Electrical $16.82 S.F. 767 110 $14,194 23 1998 2007 54 $739 $12,904 6
Electrical Service/Distribution S.F. 0 0 0 0
Branch Wiring $6.77 S.F. 767 110 $5,710 30 1987 2017 23 $5,191
Lighting $6.77 S.F. 767 110 $5,710 20 2007 2027 85 $5,191
Communications and Security -
Public Address & Clock System
$0.88 S.F. 767 110 $739 20 1987 2007 $739 $672 110
Fire Alarm $1.54 S.F. 767 110 $1,296 10 2004 2014 40 $1,178
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 20
System Unit Price$
Unit of
Meas Qty Renewal% Renewal$ Life Installed
Calc Next
Renewal
Next
Renewal CI% Deficiency$ Replacement Value FCI%
Security & CCTV $0.88 S.F. 767 110 $739 10 2007 2017 70 $672
Other Electrical Systems -
Emergency Generator
0 0 0 0
Equipment & Furnishings $3.60 S.F. 767 110 $3,037 20 1987 2007 $3,037 $2,761 110
Equipment 0 0 0
Commercial Equipment 0 0 0 0
Institutional Equipment 0 0 0 0
Furnishings $3.60 S.F. 767 110 $3,037 20 1987 2007 $3,037 $2,761 110
Fixed Furnishings $3.60 S.F. 767 110 $3,037 20 1987 2007 $3,037 $2,761 110
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 21
Facility: \Elementary/Middle Schools\Walnut Hill\1987 Office (continued)
Renewal Schedule:
Systems 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
Total $23,893 $1,459 $24,865 $2,721
Substructure
Foundations
Standard Foundations
Special Foundations
Slab on Grade
Basement Construction
Basement Excavation
Basement Walls
Shell $8,049 $6,226
Superstructure
Floor Construction
Roof Construction
Exterior Enclosure $6,226
Exterior Walls
Exterior Windows $4,981
Exterior Doors $1,245
Roofing $8,049
Roof Coverings - BUR $8,049
Roof Coverings - EPDM
Roof Coverings - Standing Seam
Mettal
Roof Openings
Interiors $12,068 $2,721
Interior Construction $5,062
Partitions
Interior Doors
Fittings $5,062
Stairs
Stair Construction
Interior Finishes $7,006 $2,721
Wall Finishes - Ceramic & Glazed
Wall Finishes - Paint $2,025 $2,721
Floor Finishes - Carpet
Floor Finishes - Ceramic & Quarry
Tile
Floor Finishes - Terrazzo
Floor Finishes - VCT $3,037
Ceiling Finishes $1,944
Services $739 $1,459 $18,639
Conveying
Elevators and Lifts
Plumbing $1,244
Plumbing Fixtures
Domestic Water Distribution
Sanitary Waste $784
Rain Water Drainage $199
Other Plumbing Systems - Natural
Gas
$261
HVAC $9,463
Heat Generating Systems
Cooling Generating Systems
Distribution Systems & Exhaust
Systems
$9,463
Terminal & Package Units
Controls & Instrumentation
Other HVAC Systems/Equip -
Kitchen Hood
Fire Protection
Sprinklers
Electrical $739 $1,459 $7,932
Electrical Service/Distribution
Branch Wiring $7,023
Lighting
Communications and Security -
Public Address & Clock System
$739
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 22
Systems 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
Fire Alarm $1,459
Security & CCTV $909
Other Electrical Systems -
Emergency Generator
Equipment & Furnishings $3,037
Equipment
Commercial Equipment
Institutional Equipment
Furnishings $3,037
Fixed Furnishings $3,037
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 23
Facility: \Elementary/Middle Schools\Walnut Hill\1987 Office (continued)
Deficiency Sheet:
Deficiency: Surveyor/Update: Angela Smiley Fri, 04-Jun-2010Priority: 3Quantity: 1
Assembly: B3010 System: Roof Coverings - BUR Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: The modified bitumen roofing is beyond expected life and showing signs of wear. Roof replacement is to include
appropriate insulation for energy conservation.
Estimates:Raw Cost $6,707.42
Plus or (Minus) Additional Cost $0.00Total Estimated Amount $6,707.42
Deficiency: Surveyor/Update: Angela Smiley Fri, 04-Jun-2010Priority: 3Quantity: 1
Assembly: C1030 System: Fittings Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: Fittings, such as chalk and tack boards, lockers, toilet and bath accessories, toilet partitions, and shelving, are
beyond expected life and should be replaced.
Estimates:Raw Cost $4,218.50
Plus or (Minus) Additional Cost $0.00Total Estimated Amount $4,218.50
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 24
Facility: \Elementary/Middle Schools\Walnut Hill\ 1987 Office (continued)
Deficiency: Surveyor/Update: Angela Smiley Fri, 04-Jun-2010Priority: 3Quantity: 1
Assembly: C3010 System: Wall Finishes - Paint Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: The painted wall finishes are worn, beyond expected life, and should be replaced.
Estimates:Raw Cost $1,687.40
Plus or (Minus) Additional Cost $0.00Total Estimated Amount $1,687.40
Deficiency: Surveyor/Update: Angela Smiley Fri, 04-Jun-2010Priority: 3Quantity: 1
Assembly: C3020 System: Floor Finishes - VCT Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: The VCT floor finishes are worn, beyond expected life, and should be replaced.
Estimates:Raw Cost $2,531.10
Plus or (Minus) Additional Cost $0.00Total Estimated Amount $2,531.10
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 25
Facility: \Elementary/Middle Schools\Walnut Hill\ 1987 Office (continued)
Deficiency: Surveyor/Update: Angela Smiley Thu, 03-Jun-2010Priority: 3Quantity: 1
Assembly: C3030 System: Ceiling Finishes Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: The ceiling finishes are beyond expected life, showing signs of wear, and should be replaced.
Estimates:Raw Cost $1,619.90
Plus or (Minus) Additional Cost $0.00Total Estimated Amount $1,619.90
Deficiency: Surveyor/Update: Angela Smiley Fri, 04-Jun-2010Priority: 3Quantity: 1
Assembly: D5030 System: Communications and Security - Public
Address & Clock System Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: PA system is beyond expected life and should be replaced. For integrity of the system, install wiring in conduit.
Estimates:Raw Cost $615.90
Plus or (Minus) Additional Cost $0.00Total Estimated Amount $615.90
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 26
Facility: \Elementary/Middle Schools\Walnut Hill\ 1987 Office (continued)
Deficiency: Surveyor/Update: Angela Smiley Fri, 04-Jun-2010Priority: 3Quantity: 1
Assembly: E2010 System: Fixed Furnishings Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: Fixed furnishings, such as the base/wall cabinets, counter tops, window shades, and fixed seating, are worn,
beyond expected life, and should be replaced.
Estimates:Raw Cost $2,531.10
Plus or (Minus) Additional Cost $0.00Total Estimated Amount $2,531.10
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 27
Facility: \Elementary/Middle Schools\Walnut Hill\1998, 2004, 2008 AdditionsAddress: 9260 Woolworth Road, Shreveport, LA 71129
Attributes: Number of Floors 1
General Information: Function: Elementary Middle Year Built: 1998Gross Area: 31,950 S.F. Last Renovation:
Facility Description:
The 1998 (K and A Wing), 2004 (I Wing), and 2008 (Gymnasium) additions at Walnut Hill Elementary/Middle School are a 1-story buildings located at 9360 Woolworth Road in Shreveport, Louisiana. There have been no additions and no renovations. This report contains condition and adequacy data collected during the 2009/2010 Facility Condition Assessment (FCA). The detailed condition and deficiency statements are contained in this report.
Energy conservation opportunities for these buildings include: 1) Exterior windows are aluminum single pane, operable clear glass design. Installation of fixed, double pane, low e, thermal windows with thermal breaks would improve energy use and comfort; and 2) A review of billing rate may justify addition of power factor correction capacitor.
Current Repair Cost: $30,787.00 Replacement Cost: $4,725,956.00 FCI: 0.65%
19-Jan-2010South Elevation
19-Jan-2010North Elevation
19-Jan-2010East Elevation
19-Jan-2010West Elevation
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 28
Facility: \Elementary/Middle Schools\Walnut Hill\1998, 2004, 2008 Additions (continued)
Building Condition:
System Unit Price$
Unit of
Meas Qty Renewal% Renewal$ Life Installed
Calc Next
Renewal
Next
Renewal CI% Deficiency$ Replacement Value FCI%
Total $147.92 S.F. 31,950 107 $5,033,688 50 2001 2008 69 $30,787 $4,725,955 1
Substructure $19.20 S.F. 31,950 100 $613,440 100 1998 $613,440
Foundations $19.20 S.F. 31,950 100 $613,440 100 1998 $613,440
Standard Foundations $10.20 S.F. 31,950 100 $325,890 100 1998 $325,890
Special Foundations 0 0 0 0
Slab on Grade $9.00 S.F. 31,950 100 $287,550 100 1998 $287,550
Basement Construction 0 0 0
Basement Excavation 0 0 0 0
Basement Walls 0 0 0 0
Shell $40.74 S.F. 31,950 104 $1,351,293 69 1998 2018 48 $1,301,643
Superstructure $10.80 S.F. 31,950 100 $345,060 100 1998 $345,060
Floor Construction 0 0 0 0
Roof Construction $10.80 S.F. 31,950 100 $345,060 100 1998 $345,060
Exterior Enclosure $20.40 S.F. 31,950 103 $670,950 78 1998 2028 60 $651,780
Exterior Walls $14.40 S.F. 31,950 100 $460,080 100 1998 $460,080
Exterior Windows $4.80 S.F. 31,950 110 $168,696 30 1998 2028 60 $153,360
Exterior Doors $1.20 S.F. 31,950 110 $42,174 30 1998 2028 60 $38,340
Roofing $9.54 S.F. 31,950 110 $335,283 20 1998 2018 40 $304,803
Roof Coverings - BUR $9.54 S.F. 31,950 110 $335,283 20 1998 2018 40 $304,803
Roof Coverings - EPDM 0 0 0 0
Roof Coverings - Standing
Seam Mettal
0 0 0 0
Roof Openings 0 0 0 0
Interiors $27.50 S.F. 31,950 107 $943,386 52 2002 2014 63 $878,537
Interior Construction $19.20 S.F. 31,950 106 $651,780 68 2000 2024 70 $613,440
Partitions $10.80 S.F. 31,950 110 $379,566 100 1998 $345,060
Interior Doors $2.40 S.F. 31,950 80 $61,344 40 1998 2038 70 $76,680
Fittings $6.00 S.F. 31,950 110 $210,870 20 2004 2024 70 $191,700
Stairs 0 0 0
Stair Construction 0 0 0 0
Interior Finishes $8.30 S.F. 31,950 110 $291,606 15 2004 2014 57 $265,097
Wall Finishes - Ceramic &
Glazed
$4.42 S.F. 1,500 110 $7,286 20 1998 2018 40 $6,624
Wall Finishes - Paint $2.40 S.F. 30,450 110 $80,388 10 2004 2014 40 $73,080
Floor Finishes - Carpet 0 0 0 0
Floor Finishes - Ceramic &
Quarry Tile
$1.44 S.F. 1,500 110 $2,376 50 2004 2054 88 $2,160
Floor Finishes - Terrazzo 0 0 0 0
Floor Finishes - VCT $3.60 S.F. 30,450 110 $120,582 15 2004 2019 60 $109,620
Ceiling Finishes $2.30 S.F. 31,950 110 $80,974 20 2004 2024 70 $73,613
Services $56.88 S.F. 31,950 110 $1,999,047 22 2002 2008 76 $30,787 $1,817,315 2
Conveying 0 0 0
Elevators and Lifts 0 0 0 0
Plumbing $7.54 S.F. 31,950 110 $264,853 30 2000 2028 62 $240,774
Plumbing Fixtures $5.89 S.F. 31,950 110 $207,074 30 1998 2028 60 $188,249
Domestic Water Distribution $0.44 S.F. 31,950 110 $15,604 30 2008 2038 93 $14,186
Sanitary Waste $0.76 S.F. 31,950 110 $26,570 30 1998 2028 60 $24,154
Rain Water Drainage $0.19 S.F. 31,950 110 $6,748 30 1998 2028 60 $6,134
Other Plumbing Systems -
Natural Gas
$0.25 S.F. 31,950 110 $8,857 30 1998 2028 60 $8,051
HVAC $32.52 S.F. 31,950 110 $1,142,915 19 2005 2024 84 $1,039,014
Heat Generating Systems S.F. 0 0 0 0
Cooling Generating Systems S.F. 0 0 0 0
Distribution Systems & Exhaust
Systems
$9.12 S.F. 31,950 110 $320,522 30 1998 2028 60 $291,384
Terminal & Package Units $21.60 S.F. 31,950 110 $759,132 15 2009 2024 93 $690,120
Controls & Instrumentation $1.80 S.F. 31,950 110 $63,261 20 2009 2029 95 $57,510
Other HVAC Systems/Equip -
Kitchen Hood
0 0 0 0
Fire Protection 0 0 0
Sprinklers 0 0 0 0
Electrical $16.82 S.F. 31,950 110 $591,279 23 2001 2008 67 $30,787 $537,527 6
Electrical Service/Distribution 0 0 0 0
Branch Wiring $6.77 S.F. 31,950 110 $237,861 30 1998 2028 60 $216,238
Lighting $6.77 S.F. 31,950 110 $237,861 20 2007 2027 85 $216,238
Communications and Security -
Public Address & Clock System
$0.88 S.F. 31,950 110 $30,787 20 1998 2018 40 $27,988
Fire Alarm $1.54 S.F. 31,950 110 $53,983 10 2003 2013 30 $49,075
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 29
System Unit Price$
Unit of
Meas Qty Renewal% Renewal$ Life Installed
Calc Next
Renewal
Next
Renewal CI% Deficiency$ Replacement Value FCI%
Security & CCTV $0.88 S.F. 31,950 110 $30,787 10 1998 2008 $30,787 $27,988 110
Other Electrical Systems -
Emergency Generator
0 0 0 0
Equipment & Furnishings $3.60 S.F. 31,950 110 $126,522 20 2004 2024 70 $115,020
Equipment 0 0 0
Commercial Equipment 0 0 0 0
Institutional Equipment 0 0 0 0
Furnishings $3.60 S.F. 31,950 110 $126,522 20 2004 2024 70 $115,020
Fixed Furnishings $3.60 S.F. 31,950 110 $126,522 20 2004 2024 70 $115,020
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 30
Facility: \Elementary/Middle Schools\Walnut Hill\1998, 2004, 2008 Additions (continued)
Renewal Schedule:
Systems 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
Total $30,787 $58,988 $90,477 $472,957 $157,332 $41,375
Substructure
Foundations
Standard Foundations
Special Foundations
Slab on Grade
Basement Construction
Basement Excavation
Basement Walls
Shell $424,727
Superstructure
Floor Construction
Roof Construction
Exterior Enclosure
Exterior Walls
Exterior Windows
Exterior Doors
Roofing $424,727
Roof Coverings - BUR $424,727
Roof Coverings - EPDM
Roof Coverings - Standing Seam
Mettal
Roof Openings
Interiors $90,477 $9,230 $157,332
Interior Construction
Partitions
Interior Doors
Fittings
Stairs
Stair Construction
Interior Finishes $90,477 $9,230 $157,332
Wall Finishes - Ceramic & Glazed $9,230
Wall Finishes - Paint $90,477
Floor Finishes - Carpet
Floor Finishes - Ceramic & Quarry
Tile
Floor Finishes - Terrazzo
Floor Finishes - VCT $157,332
Ceiling Finishes
Services $30,787 $58,988 $39,000 $41,375
Conveying
Elevators and Lifts
Plumbing
Plumbing Fixtures
Domestic Water Distribution
Sanitary Waste
Rain Water Drainage
Other Plumbing Systems - Natural
Gas
HVAC
Heat Generating Systems
Cooling Generating Systems
Distribution Systems & Exhaust
Systems
Terminal & Package Units
Controls & Instrumentation
Other HVAC Systems/Equip -
Kitchen Hood
Fire Protection
Sprinklers
Electrical $30,787 $58,988 $39,000 $41,375
Electrical Service/Distribution
Branch Wiring
Lighting
Communications and Security -
Public Address & Clock System
$39,000
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 31
Systems 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
Fire Alarm $58,988
Security & CCTV $30,787 $41,375
Other Electrical Systems -
Emergency Generator
Equipment & Furnishings
Equipment
Commercial Equipment
Institutional Equipment
Furnishings
Fixed Furnishings
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 32
Facility: \Elementary/Middle Schools\Walnut Hill\1998, 2004, 2008 Additions (continued)
Deficiency Sheet:
Deficiency: Surveyor/Update: Angela Smiley Fri, 04-Jun-2010Priority: 3Quantity: 1
Assembly: D5030 System: Security & CCTV Material: System Distress: Missing Category: Capital Renewal Correction: Renew System Note: The I Wing and K Wing (1998 section) buildings do not have security systems. Installation of security system is
recommended. For integrity of system, install wiring in conduit.
Estimates:Raw Cost $25,655.85
Plus or (Minus) Additional Cost $0.00Total Estimated Amount $25,655.85
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 33
Facility: \Elementary/Middle Schools\Walnut Hill\Basketball CourtsAddress: 9360 Woolworth Road, Shreveport, LA 71129
Attributes: ***None***
General Information: Function: Elementary Middle Year Built: 1956Gross Area: 3,000 S.F. Last Renovation:
Facility Description:
The Basketball Court at Walnut Hill Elementary/Middle School is located at 9360 Woolworth Road in Shreveport, Louisiana. There have been no additions and no renovations. The basketball court consists of a marked concrete pad with backboards, however most nets are missing. This report contains condition and adequacy data collected during the 2009/2010 Facility Condition Assessment (FCA). The detailed condition and deficiency statements are contained in this report.
Current Repair Cost: $22,968.00 Replacement Cost: $21,204.00 FCI: 108.32%
19-Jan-2010Walnut Hill Elementary/Middle School Basketball Court
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 34
Facility: \Elementary/Middle Schools\Walnut Hill\Basketball Courts (continued)
Building Condition:
System Unit Price$
Unit of
Meas Qty Renewal% Renewal$ Life Installed
Calc Next
Renewal
Next
Renewal CI% Deficiency$ Replacement Value FCI%
Total $7.07 S.F. 3,000 110 $23,292 21 1956 1976 $22,968 $21,204 108
Special Construction $6.96 S.F. 3,000 110 $22,968 20 1956 1976 $22,968 $20,880 110
Special Construction $6.96 S.F. 3,000 110 $22,968 20 1956 1976 $22,968 $20,880 110
Special Structures - Basketball
Court - Concrete - Outdoor
$6.96 S.F. 3,000 110 $22,968 20 1956 1976 $22,968 $20,880 110
Building Sitework $0.11 S.F. 3,000 100 $324 100 1956 $324
Site Preparation $0.11 S.F. 3,000 100 $324 100 1956 $324
Site Earthwork $0.11 S.F. 3,000 0 $324 100 1956 $324
Site Improvements 0 0 0
Site Development - Fencing 0 0 0 0
Site Electrical Utilities 0 0 0
Site Lighting 0 0 0 0
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 35
Facility: \Elementary/Middle Schools\Walnut Hill\Basketball Courts (continued)
Renewal Schedule:
Systems 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
Total $22,968
Special Construction $22,968
Special Construction $22,968
Special Structures - Basketball
Court - Concrete - Outdoor
$22,968
Building Sitework
Site Preparation
Site Earthwork
Site Improvements
Site Development - Fencing
Site Electrical Utilities
Site Lighting
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 36
Facility: \Elementary/Middle Schools\Walnut Hill\Basketball Courts (continued)
Deficiency Sheet:
Deficiency: Surveyor/Update: Angela Smiley Fri, 04-Jun-2010Priority: 3Quantity: 1
Assembly: F1010 System: Special Structures - Basketball Court -
Concrete - Outdoor Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: The basketball court and backboards are worn, beyond expected life, and should be replaced.
Estimates:Raw Cost $19,140.00
Plus or (Minus) Additional Cost $0.00Total Estimated Amount $19,140.00
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 37
Facility: \Elementary/Middle Schools\Walnut Hill\Covered WalkwaysAddress: 9360 Woolworth Road, Shreveport, LA 71129
Attributes: ***None***
General Information: Function: Elementary Middle Year Built: 1956Gross Area: 13,800 S.F. Last Renovation:
Facility Description:
Engineered covered walkways connect the classrooms and provide some weather protection for the students.
Current Repair Cost: $344,945.00 Replacement Cost: $344,945.00 FCI: 100.00%
19-Jan-2010East Elevation
08-Mar-2010North Elevation
08-Mar-2010West Elevation
08-Mar-2010South Elevation
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 38
Facility: \Elementary/Middle Schools\Walnut Hill\Covered Walkways (continued)
Building Condition:
System Unit Price$
Unit of
Meas Qty Renewal% Renewal$ Life Installed
Calc Next
Renewal
Next
Renewal CI% Deficiency$ Replacement Value FCI%
Total $25.00 S.F. 13,800 100 $344,945 25 1956 1981 $344,945 $344,945 100
Special Construction $25.00 S.F. 13,800 100 $344,945 25 1956 1981 $344,945 $344,945 100
Special Construction $25.00 S.F. 13,800 100 $344,945 25 1956 1981 $344,945 $344,945 100
Special Structures - Covered
Walkways Metal
$25.00 S.F. 13,800 100 $344,945 25 1956 1981 $344,945 $344,945 100
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 39
Facility: \Elementary/Middle Schools\Walnut Hill\Covered Walkways (continued)
Renewal Schedule:
Systems 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
Total $344,945
Special Construction $344,945
Special Construction $344,945
Special Structures - Covered
Walkways Metal
$344,945
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 40
Facility: \Elementary/Middle Schools\Walnut Hill\Covered Walkways (continued)
Deficiency Sheet:
Deficiency: Surveyor/Update: Bill Cadle Fri, 04-Jun-2010Priority: 3Quantity: 1
Assembly: F1010 System: Special Structures - Covered Walkways Metal Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: The covered walkways are worn, beyond expected life, and should be replaced.
Estimates:Raw Cost $287,454.00
Plus or (Minus) Additional Cost $0.00Total Estimated Amount $287,454.00
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 41
Facility: \Elementary/Middle Schools\Walnut Hill\Football FieldAddress: 9360 Woolworth Road, Shreveport, LA 71129
Attributes: ***None***
General Information: Function: Elementary Middle Year Built: 1956Gross Area: 57,600 S.F. Last Renovation:
Facility Description:
The Football Field at Walnut Hill Elementary/Middle School is located at 9360 Woolworth Road in Shreveport, Louisiana. There have been no additions and no renovations. This report contains condition and adequacy data collected during the 2009/2010 Facility Condition Assessment (FCA). The detailed condition and deficiency statements are contained in this report.
Current Repair Cost: $188,559.00 Replacement Cost: $235,008.00 FCI: 80.24%
19-Jan-2010Walnut Hill Elementary/Middle School Football Field
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 42
Facility: \Elementary/Middle Schools\Walnut Hill\Football Field (continued)
Building Condition:
System Unit Price$
Unit of
Meas Qty Renewal% Renewal$ Life Installed
Calc Next
Renewal
Next
Renewal CI% Deficiency$ Replacement Value FCI%
Total $4.08 S.F. 57,600 107 $252,150 44 1960 1976 $188,560 $235,008 80
Special Construction $1.38 S.F. 57,600 110 $87,437 20 1956 1976 $87,437 $79,488 110
Special Construction $1.38 S.F. 57,600 110 $87,437 20 1956 1976 $87,437 $79,488 110
Special Facilities - Field -
Natural Turf
$1.38 S.F. 57,600 110 $87,437 20 1956 1976 $87,437 $79,488 110
Building Sitework $2.70 S.F. 57,600 106 $164,713 57 1962 1997 $101,123 $155,520 65
Site Preparation $1.10 S.F. 57,600 100 $63,590 100 1956 $63,590
Site Earthwork $1.10 S.F. 57,600 100 $63,590 100 1956 $63,590
Site Improvements 0 0 0
Site Development - Fencing;
Scoreboard; Goal Post
0 0 0 0
Site Development -
Landscaping & Irrigation
0 0 0 0
Site Mechanical Utilities 0 0 0
Water Supply - Water Service 0 0 0 0
Site Electrical Utilities $1.60 S.F. 57,600 110 $101,123 30 1967 1997 $101,123 $91,930 110
Site Lighting $1.60 S.F. 57,600 110 $101,123 30 1967 1997 $101,123 $91,930 110
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 43
Facility: \Elementary/Middle Schools\Walnut Hill\Football Field (continued)
Renewal Schedule:
Systems 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
Total $188,560
Special Construction $87,437
Special Construction $87,437
Special Facilities - Field - Natural
Turf
$87,437
Building Sitework $101,123
Site Preparation
Site Earthwork
Site Improvements
Site Development - Fencing;
Scoreboard; Goal Post
Site Development - Landscaping &
Irrigation
Site Mechanical Utilities
Water Supply - Water Service
Site Electrical Utilities $101,123
Site Lighting $101,123
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 44
Facility: \Elementary/Middle Schools\Walnut Hill\Football Field (continued)
Deficiency Sheet:
Deficiency: Surveyor/Update: Troy Weeks Fri, 04-Jun-2010Priority: 3Quantity: 1
Assembly: F1040 System: Special Facilities - Field - Natural Turf Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: The football field turf is worn, has bare spots, and should be replaced.
Estimates:Raw Cost $72,864.00
Plus or (Minus) Additional Cost $0.00Total Estimated Amount $72,864.00
Deficiency: Surveyor/Update: Angela Smiley Fri, 04-Jun-2010Priority: 3Quantity: 1
Assembly: G4020 System: Site Lighting Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: Site lighting is beyond expected life and should be replaced.
Estimates:Raw Cost $84,268.80
Plus or (Minus) Additional Cost $0.00Total Estimated Amount $84,268.80
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 45
Facility: \Elementary/Middle Schools\Walnut Hill\SiteAddress: 9360 Woolworth Road, Shreveport, LA 71129
Attributes: Site Area (in Acres) 77.58 (50 acres leased, 27-59
acres used by school)
General Information: Function: Elementary Middle Year Built: 1956Gross Area: 133,522 S.F. Last Renovation:
Facility Description:
The original site was constructed in 1956. There have been four additions to the site and no major renovations. Campus site features include paved driveways and parking lots, pedestrian pavement, flag pole, landscaping, and fencing. Site mechanical and electrical features include water, sewer, natural gas, and site lighting. This report contains condition and adequacy data collected during the 2009/2010 Facility Condition Assessment (FCA). The detailed condition and deficiency statements are contained in this report.
Current Repair Cost: $1,187,278.00 Replacement Cost: $1,996,421.00 FCI: 59.47%
05-Jan-2010Aerial Image of Walnut Hill Elementary/Middle School
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 46
Facility: \Elementary/Middle Schools\Walnut Hill\Site (continued)
Building Condition:
System Unit Price$
Unit of
Meas Qty Renewal% Renewal$ Life Installed
Calc Next
Renewal
Next
Renewal CI% Deficiency$ Replacement Value FCI%
Total $14.95 S.F. 133,522 100 $1,996,421 33 1961 1976 2015 56 $1,187,277 $1,996,421 59
Building Sitework $14.95 S.F. 133,522 100 $1,996,421 33 1961 1976 2015 56 $1,187,277 $1,996,421 59
Site Improvements $8.50 S.F. 133,522 100 $1,134,403 28 1956 1976 2020 50 $450,236 $1,134,403 40
Roadways $1.38 S.F. 133,522 100 $184,260 50 1956 2006 $184,260 $184,260 100
Parking Lots $1.18 S.F. 133,522 100 $157,022 30 1956 1986 $157,022 $157,022 100
Pedestrian Paving $0.82 S.F. 133,522 100 $108,954 50 1956 2006 $108,954 $108,954 100
Site Development $3.86 S.F. 133,522 100 $515,929 20 1956 1976 2020 50 $515,929
Landscaping $1.26 S.F. 133,522 100 $168,238 10 1956 $168,238
Site Mechanical Utilities $4.86 S.F. 133,522 100 $648,917 44 1969 1986 2015 83 $523,940 $648,917 81
Water Supply $0.82 S.F. 133,522 100 $108,954 30 2008 2038 93 $108,954
Sanitary Sewer $0.41 S.F. 133,522 100 $54,477 30 1956 1986 $54,477 $54,477 100
Storm Sewer $3.52 S.F. 133,522 100 $469,463 50 1956 2006 $469,463 $469,463 100
Fuel Distribution $0.12 S.F. 133,522 100 $16,023 30 1956 1986 2015 17 $16,023
Site Electrical Utilities $1.60 S.F. 133,522 100 $213,101 30 1956 1986 $213,101 $213,101 100
Site Lighting $1.60 S.F. 133,522 100 $213,101 30 1956 1986 $213,101 $213,101 100
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 47
Facility: \Elementary/Middle Schools\Walnut Hill\Site (continued)
Renewal Schedule:
Systems 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
Total $1,187,277 $18,575 $693,365
Building Sitework $1,187,277 $18,575 $693,365
Site Improvements $450,236 $693,365
Roadways $184,260
Parking Lots $157,022
Pedestrian Paving $108,954
Site Development $693,365
Landscaping
Site Mechanical Utilities $523,940 $18,575
Water Supply
Sanitary Sewer $54,477
Storm Sewer $469,463
Fuel Distribution $18,575
Site Electrical Utilities $213,101
Site Lighting $213,101
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 48
Facility: \Elementary/Middle Schools\Walnut Hill\Site (continued)
Deficiency Sheet:
Deficiency: Surveyor/Update: Angela Smiley Fri, 04-Jun-2010Priority: 3Quantity: 1
Assembly: G2010 System: Roadways Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: The concrete roadways are deteriorating, beyond expected life, and should be replaced.
Estimates:Raw Cost $153,550.30
Plus or (Minus) Additional Cost $0.00Total Estimated Amount $153,550.30
Deficiency: Surveyor/Update: Angela Smiley Fri, 04-Jun-2010Priority: 3Quantity: 1
Assembly: G2020 System: Parking Lots Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: The parking lots and striping are beyond expected life and should be replaced.
Estimates:Raw Cost $130,851.56
Plus or (Minus) Additional Cost $0.00Total Estimated Amount $130,851.56
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 49
Facility: \Elementary/Middle Schools\Walnut Hill\ Site (continued)
Deficiency: Surveyor/Update: Angela Smiley Fri, 04-Jun-2010Priority: 3Quantity: 1
Assembly: G2030 System: Pedestrian Paving Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: The concrete sidewalks are beyond expected life, deteriorating, and should be replaced.
Estimates:Raw Cost $90,794.96
Plus or (Minus) Additional Cost $0.00Total Estimated Amount $90,794.96
Deficiency: Surveyor/Update: Angela Smiley Fri, 04-Jun-2010Priority: 3Quantity: 1
Assembly: G3020 System: Sanitary Sewer Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: Sanitary sewer is beyond expected life and should be replaced.
Estimates:Raw Cost $45,397.48
Plus or (Minus) Additional Cost $0.00Total Estimated Amount $45,397.48
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 50
Facility: \Elementary/Middle Schools\Walnut Hill\ Site (continued)
Deficiency: Surveyor/Update: Angela Smiley Fri, 04-Jun-2010Priority: 3Quantity: 1
Assembly: G3030 System: Storm Sewer Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: Storm sewer is beyond expected life and should be replaced.
Estimates:Raw Cost $391,219.46
Plus or (Minus) Additional Cost $0.00Total Estimated Amount $391,219.46
Deficiency: Surveyor/Update: Angela Smiley Fri, 04-Jun-2010Priority: 3Quantity: 1
Assembly: G4020 System: Site Lighting Material: System Distress: Inadequate Category: Deferred Maintenance Correction: Renew System Note: Site lighting is inadequate, beyond expected life, and should be replaced and upgraded.
Estimates:Raw Cost $177,584.26
Plus or (Minus) Additional Cost $0.00Total Estimated Amount $177,584.26
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 51
Facility: \Elementary/Middle Schools\Walnut Hill\Tennis CourtsAddress: 9360 Woolworth Road, Shreveport, LA 71129
Attributes: ***None***
General Information: Function: Elementary Middle Year Built: 1956Gross Area: 13,125 S.F. Last Renovation:
Facility Description:
The Tennis Courts at Walnut Hill Elementary School is located at 9360 Woolworth Road in Shreveport, Louisiana. There have been no additions and no renovations. The tennis court with fencing is located on the north portion of the property. This report contains condition and adequacy data collected during the 2009/2010 Facility Condition Assessment (FCA). The detailed condition and deficiency statements are contained in this report.
Current Repair Cost: $163,753.00 Replacement Cost: $151,200.00 FCI: 108.30%
19-Jan-2010Walnut Hill Elementary/Middle School Tennis Courts
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 52
Facility: \Elementary/Middle Schools\Walnut Hill\Tennis Courts (continued)
Building Condition:
System Unit Price$
Unit of
Meas Qty Renewal% Renewal$ Life Installed
Calc Next
Renewal
Next
Renewal CI% Deficiency$ Replacement Value FCI%
Total $11.52 S.F. 13,125 109 $165,171 21 1956 1976 $163,753 $151,200 108
Special Construction $10.64 S.F. 13,125 110 $153,673 20 1956 1976 $153,673 $139,702 110
Special Construction $10.64 S.F. 13,125 110 $153,673 20 1956 1976 $153,673 $139,702 110
Special Structures - Tennis
Court Hard Surface
$10.64 S.F. 13,125 110 $153,673 20 1956 1976 $153,673 $139,702 110
Building Sitework $0.88 S.F. 13,125 100 $11,498 39 1956 1986 $10,080 $11,498 88
Site Preparation $0.11 S.F. 13,125 100 $1,418 100 1956 $1,418
Site Earthwork $0.11 S.F. 13,125 0 $1,418 100 1956 $1,418
Site Improvements $0.77 S.F. 13,125 100 $10,080 30 1956 1986 $10,080 $10,080 100
Site Development - Fencing $0.77 S.F. 13,125 100 $10,080 30 1956 1986 $10,080 $10,080 100
Site Electrical Utilities 0 0 0
Site Lighting 0 0 0 0
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 53
Facility: \Elementary/Middle Schools\Walnut Hill\Tennis Courts (continued)
Renewal Schedule:
Systems 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
Total $163,753
Special Construction $153,673
Special Construction $153,673
Special Structures - Tennis Court
Hard Surface
$153,673
Building Sitework $10,080
Site Preparation
Site Earthwork
Site Improvements $10,080
Site Development - Fencing $10,080
Site Electrical Utilities
Site Lighting
COMET4 Caddo Parish
1961 Midway COMET4 Facility Report
Facility Executive Summary ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 54
Facility: \Elementary/Middle Schools\Walnut Hill\Tennis Courts (continued)
Deficiency Sheet:
Deficiency: Surveyor/Update: Angela Smiley Fri, 04-Jun-2010Priority: 3Quantity: 1
Assembly: F1010 System: Special Structures - Tennis Court Hard
Surface Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: The tennis courts are beyond expected life, showing signs of wear, and should be replaced.
Estimates:Raw Cost $128,060.63
Plus or (Minus) Additional Cost $0.00Total Estimated Amount $128,060.63
Deficiency: Surveyor/Update: Angela Smiley Fri, 04-Jun-2010Priority: 3Quantity: 1
Assembly: G2040 System: Site Development - Fencing Material: System Distress: Beyond Expected Life Category: Deferred Maintenance Correction: Renew System Note: The tennis court fencing is beyond expected life, showing signs of wear, and should be replaced.
Estimates:Raw Cost $8,400.00
Plus or (Minus) Additional Cost $0.00Total Estimated Amount $8,400.00
COMET4 Caddo Parish
1961 Midway COMET4 Survey Report
Deficiency Detail ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 1
Facility
Name Assembly System Material Distress Correction Qty Unit Raw Cost
Additional
Cost Total Cost Priority Def. Cat. Location / Note
Caddo Parish School District $5,453,456 $1,090,691 $6,544,147 Elementary/Middle Schools $5,453,456 $1,090,691 $6,544,147 Walnut Hill $5,453,456 $1,090,691 $6,544,147 1956, 1966, 1967 Buildings $3,818,303 $763,661 $4,581,964 Building Systems $3,818,303 $763,661 $4,581,964
D5020 Branch Wiring System Beyond Expected Life
Renew System 1 Ea. $539,779 $107,956 $647,735 Necessary- 2-5 Yrs
Deferred Maintenance
Distribution is mostly original, beyond expected life, and should be replaced.
D5030 Communications and Security - Public Address & Clock System
System Beyond Expected Life
Renew System 1 Ea. $69,865 $13,973 $83,838 Necessary- 2-5 Yrs
Deferred Maintenance
PA system is beyond expected life and should be upgraded/replaced. For integrity of the system, install wiring in conduit.
E1010 Commercial Equipment
System Beyond Expected Life
Renew System 1 Ea. $478,528 $95,706 $574,233 Necessary- 2-5 Yrs
Deferred Maintenance
Commercial equipment, including the walk-in refrigerator and freezer, is beyond expected life and should be replaced.
E1020 Institutional Equipment
System Beyond Expected Life
Renew System 1 Ea. $9,571 $1,914 $11,485 Necessary- 2-5 Yrs
Deferred Maintenance
Institutional equipment, such as library equipment, theater and stage equipment, audio-visual equipment, and laboratory equipment, is beyond expected life and should be replaced.
E2010 Fixed Furnishings
System Beyond Expected Life
Renew System 1 Ea. $287,117 $57,423 $344,540 Necessary- 2-5 Yrs
Deferred Maintenance
Fixed furnishings, such as the base/wall cabinets, counter tops, window shades, and fixed seating, are worn, beyond expected life, and should be replaced.
B2020 Exterior Windows
System Beyond Expected Life
Renew System 1 Ea. $382,822 $76,564 $459,386 Necessary- 2-5 Yrs
Deferred Maintenance
The exterior windows are worn, beyond expected life, and should be replaced.
B2030 Exterior Doors System Beyond Expected Life
Renew System 1 Ea. $95,706 $19,141 $114,847 Necessary- 2-5 Yrs
Deferred Maintenance
The exterior doors are worn, beyond expected life, and should be replaced.
C1020 Interior Doors System Beyond Expected Life
Renew System 1 Ea. $139,208 $27,842 $167,050 Necessary- 2-5 Yrs
Deferred Maintenance
The interior doors are worn, beyond expected life, and should be replaced.
C1030 Fittings System Beyond Expected Life
Renew System 1 Ea. $478,528 $95,706 $574,233 Necessary- 2-5 Yrs
Deferred Maintenance
Fittings, such as chalk and tack boards, lockers, toilet and bath accessories, toilet partitions, and shelving, are beyond expected life and should be replaced.
C3010 Wall Finishes - Ceramic & Glazed
System Beyond Expected Life
Renew System 1 Ea. $9,715 $1,943 $11,658 Necessary- 2-5 Yrs
Deferred Maintenance
The ceramic wall finishes are beyond expected life, showing signs of wear, and should be replaced.
C3010 Wall Finishes - Paint
System Beyond Expected Life
Renew System 1 Ea. $186,131 $37,226 $223,357 Necessary- 2-5 Yrs
Deferred Maintenance
The painted wall finishes are worn, beyond expected life, and should be replaced.
C3020 Floor Finishes - Carpet
System Beyond Expected Life
Renew System 1 Ea. $3,289 $658 $3,947 Necessary- 2-5 Yrs
Deferred Maintenance
Carpet floor finishes are worn, beyond expected life, and should be replaced.
C3020 Floor Finishes - Ceramic & Quarry Tile
System Beyond Expected Life
Renew System 1 Ea. $5,808 $1,162 $6,970 Necessary- 2-5 Yrs
Deferred Maintenance
The ceramic floor finishes are beyond expected life, showing signs of wear, and should be replaced.
COMET4 Caddo Parish
1961 Midway COMET4 Survey Report
Deficiency Detail ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 2
Facility
Name Assembly System Material Distress Correction Qty Unit Raw Cost
Additional
Cost Total Cost Priority Def. Cat. Location / Note
C3020 Floor Finishes - VCT
System Beyond Expected Life
Renew System 1 Ea. $268,307 $53,661 $321,968 Necessary- 2-5 Yrs
Deferred Maintenance
The VCT floor finishes are worn, beyond expected life, and should be replaced.
C3030 Ceiling Finishes System Beyond Expected Life
Renew System 1 Ea. $183,755 $36,751 $220,505 Necessary- 2-5 Yrs
Deferred Maintenance
The ceiling finishes are beyond expected life, showing signs of wear, and should be replaced.
D2010 Plumbing Fixtures
System Beyond Expected Life
Renew System 1 Ea. $469,914 $93,983 $563,897 Necessary- 2-5 Yrs
Deferred Maintenance
Existing fixtures are inadequate and beyond expected life. Replacement with energy efficient fixtures is recommended.
D2030 Sanitary Waste System Beyond Expected Life
Renew System 1 Ea. $60,294 $12,059 $72,353 Necessary- 2-5 Yrs
Deferred Maintenance
Sanitary waste is beyond expected life and should be replaced.
D2040 Rain Water Drainage
System Beyond Expected Life
Renew System 1 Ea. $15,313 $3,063 $18,375 Necessary- 2-5 Yrs
Deferred Maintenance
Roof drains are beyond expected life and should be replaced.
D3050 Terminal & Package Units
Terminal and Package Units
Beyond Expected Life
Replace 10 T G/E Pkg Unit, Roof Mount
4 Ea. $43,873 $8,775 $52,648 Necessary- 2-5 Yrs
Deferred Maintenance
Existing (2 qty) package units to the cafeteria and (8 qty) ceiling mounted heaters are beyond expected life and should be replaced with roof packaged units.
D5020 Lighting Lighting/Branch Wiring
Inadequate Replace 2X4 Fluorescent. Fixture/sf
8,700 S.F. $64,293 $12,859 $77,152 Necessary- 2-5 Yrs
Energy Conservation
T-12 lights still remain throughout the school, as well as incandescent lights, and HPS fixtures in the old gym. An upgrade to energy efficient light fixtures is recommended.
D2090 Other Plumbing Systems - Natural Gas
Plumbing Fixtures
Beyond Expected Life
Replace Drinking Fountain
20 Ea. $26,490 $5,298 $31,788 Necessary- 2-5 Yrs
Deferred Maintenance
Water fountains around campus are beyond expected life and should be replaced.
COMET4 Caddo Parish
1961 Midway COMET4 Survey Report
Deficiency Detail ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 3
Facility
Name Assembly System Material Distress Correction Qty Unit Raw Cost
Additional
Cost Total Cost Priority Def. Cat. Location / Note
1987 Office $19,911 $3,982 $23,894 Building Systems $19,911 $3,982 $23,894
D5030 Communications and Security - Public Address & Clock System
System Beyond Expected Life
Renew System 1 Ea. $616 $123 $739 Necessary- 2-5 Yrs
Deferred Maintenance
PA system is beyond expected life and should be replaced. For integrity of the system, install wiring in conduit.
E2010 Fixed Furnishings
System Beyond Expected Life
Renew System 1 Ea. $2,531 $506 $3,037 Necessary- 2-5 Yrs
Deferred Maintenance
Fixed furnishings, such as the base/wall cabinets, counter tops, window shades, and fixed seating, are worn, beyond expected life, and should be replaced.
B3010 Roof Coverings -BUR
System Beyond Expected Life
Renew System 1 Ea. $6,707 $1,341 $8,049 Necessary- 2-5 Yrs
Deferred Maintenance
The modified bitumen roofing is beyond expected life and showing signs of wear. Roof replacement is to include appropriate insulation for energy conservation.
C1030 Fittings System Beyond Expected Life
Renew System 1 Ea. $4,219 $844 $5,062 Necessary- 2-5 Yrs
Deferred Maintenance
Fittings, such as chalk and tack boards, lockers, toilet and bath accessories, toilet partitions, and shelving, are beyond expected life and should be replaced.
C3010 Wall Finishes - Paint
System Beyond Expected Life
Renew System 1 Ea. $1,687 $337 $2,025 Necessary- 2-5 Yrs
Deferred Maintenance
The painted wall finishes are worn, beyond expected life, and should be replaced.
C3020 Floor Finishes - VCT
System Beyond Expected Life
Renew System 1 Ea. $2,531 $506 $3,037 Necessary- 2-5 Yrs
Deferred Maintenance
The VCT floor finishes are worn, beyond expected life, and should be replaced.
C3030 Ceiling Finishes System Beyond Expected Life
Renew System 1 Ea. $1,620 $324 $1,944 Necessary- 2-5 Yrs
Deferred Maintenance
The ceiling finishes are beyond expected life, showing signs of wear, and should be replaced.
1998, 2004, 2008 Additions $25,656 $5,131 $30,787 Building Systems $25,656 $5,131 $30,787
D5030 Security & CCTV System Missing Renew System 1 Ea. $25,656 $5,131 $30,787 Necessary- 2-5 Yrs
Capital Renewal
The I Wing and K Wing (1998 section) buildings do not have security systems. Installation of security system is recommended. For integrity of system, install wiring in conduit.
Basketball Courts $19,140 $3,828 $22,968 Building Systems $19,140 $3,828 $22,968
F1010 Special Structures - Basketball Court - Concrete - Outdoor
System Beyond Expected Life
Renew System 1 Ea. $19,140 $3,828 $22,968 Necessary- 2-5 Yrs
Deferred Maintenance
The basketball court and backboards are worn, beyond expected life, and should be replaced.
COMET4 Caddo Parish
1961 Midway COMET4 Survey Report
Deficiency Detail ReportShreveport, LA 71106 Report Date: 04 Jun 2010
Page 4
Facility
Name Assembly System Material Distress Correction Qty Unit Raw Cost
Additional
Cost Total Cost Priority Def. Cat. Location / Note
Covered Walkways $287,454 $57,491 $344,945 Building Systems $287,454 $57,491 $344,945
F1010 Special Structures - Covered Walkways Metal
System Beyond Expected Life
Renew System 1 Ea. $287,454 $57,491 $344,945 Necessary- 2-5 Yrs
Deferred Maintenance
The covered walkways are worn, beyond expected life, and should be replaced.
Football Field $157,133 $31,427 $188,559 Building Systems $157,133 $31,427 $188,559
G4020 Site Lighting System Beyond Expected Life
Renew System 1 Ea. $84,269 $16,854 $101,123 Necessary- 2-5 Yrs
Deferred Maintenance
Site lighting is beyond expected life and should be replaced.
F1040 Special Facilities - Field - Natural Turf
System Beyond Expected Life
Renew System 1 Ea. $72,864 $14,573 $87,437 Necessary- 2-5 Yrs
Deferred Maintenance
The football field turf is worn, has bare spots, and should be replaced.
Site $989,398 $197,880 $1,187,278 Building Systems $989,398 $197,880 $1,187,278
G2010 Roadways System Beyond Expected Life
Renew System 1 Ea. $153,550 $30,710 $184,260 Necessary- 2-5 Yrs
Deferred Maintenance
The concrete roadways are deteriorating, beyond expected life, and should be replaced.
G2020 Parking Lots System Beyond Expected Life
Renew System 1 Ea. $130,852 $26,170 $157,022 Necessary- 2-5 Yrs
Deferred Maintenance
The parking lots and striping are beyond expected life and should be replaced.
G2030 Pedestrian Paving
System Beyond Expected Life
Renew System 1 Ea. $90,795 $18,159 $108,954 Necessary- 2-5 Yrs
Deferred Maintenance
The concrete sidewalks are beyond expected life, deteriorating, and should be replaced.
G3020 Sanitary Sewer System Beyond Expected Life
Renew System 1 Ea. $45,397 $9,079 $54,477 Necessary- 2-5 Yrs
Deferred Maintenance
Sanitary sewer is beyond expected life and should be replaced.
G3030 Storm Sewer System Beyond Expected Life
Renew System 1 Ea. $391,219 $78,244 $469,463 Necessary- 2-5 Yrs
Deferred Maintenance
Storm sewer is beyond expected life and should be replaced.
G4020 Site Lighting System Inadequate Renew System 1 Ea. $177,584 $35,517 $213,101 Necessary- 2-5 Yrs
Deferred Maintenance
Site lighting is inadequate, beyond expected life, and should be replaced and upgraded.
Tennis Courts $136,461 $27,292 $163,753 Building Systems $136,461 $27,292 $163,753
F1010 Special Structures - Tennis Court Hard Surface
System Beyond Expected Life
Renew System 1 Ea. $128,061 $25,612 $153,673 Necessary- 2-5 Yrs
Deferred Maintenance
The tennis courts are beyond expected life, showing signs of wear, and should be replaced.
G2040 Site Development - Fencing
System Beyond Expected Life
Renew System 1 Ea. $8,400 $1,680 $10,080 Necessary- 2-5 Yrs
Deferred Maintenance
The tennis court fencing is beyond expected life, showing signs of wear, and should be replaced.
Functional and Educational Adequacy
Suitability Report
Suitability Report - Full
Project:Site:
Suitability
Possible
Score
Score
Percent
Score
CaddoCounty:
1Region:
Rating
640Site #:
Caddo 2009 Walnut Hill
Project #:
4057
Site Type: Site Size:Grade Config:
K-8 0.00ES/MS
Suitability - K-8
Site
3.00 2.01 67.00 TrafficFair
1.00 1.00 100.00 Pedestrian TrafficGood
1.35 0.90 67.00 ParkingFair
1.64 1.10 67.00 Play Courts & FieldsFair
Safety and Security
1.22 0.82 67.00 FencingFair
0.15 0.15 100.00 Signage & Way FindingGood
3.00 0.00 0.00 Ease of SupervisionP/U
0.50 0.00 0.00 Limited EntrancesP/U
0.50 0.50 100.00 Interior CirculationG/F
School Climate
5.00 5.00 100.00 Learning Style VarietyG/F
5.00 5.00 100.00 School EnvironmentG/F
1.00 1.00 100.00 LandscapingG/F
General Classrooms
12.95 4.27 33.00 SizePoor
2.78 1.86 67.00 AdjacenciesFair
2.78 1.86 67.00 Storage\Fixed Equip.Fair
Remedial - Special Needs
3.17 3.17 100.00 SizeGood
0.68 0.00 0.00 AdjacenciesP/U
0.68 0.00 0.00 Storage\Fixed Equip.P/U
Library
2.43 1.22 50.00 SizeFair
0.52 0.52 100.00 AdjacenciesG/F
0.52 0.00 0.00 Storage\Fixed Equip.P/U
P.E.
8.40 4.20 50.00 SizeFair
1.80 1.80 100.00 AdjacenciesG/F
1.80 0.00 0.00 Storage\Fixed Equip.P/U
Music
2.64 1.32 50.00 SizeFair
0.57 0.00 0.00 AdjacenciesP/U
0.57 0.00 0.00 Storage\Fixed Equip.P/U
Art
Page 1 of 43/9/2010 2:20:04PM
Project:Site:
Suitability
Possible
Score
Score
Percent
Score
CaddoCounty:
1Region:
Rating
640Site #:
Caddo 2009 Walnut Hill
Project #:
4057
Site Type: Site Size:Grade Config:
K-8 0.00ES/MS
1.53 1.53 100.00 SizeGood
0.33 0.33 100.00 AdjacenciesG/F
0.33 0.00 0.00 Storage\Fixed Equip.P/U
Performing Arts\Auditorium
1.64 1.64 100.00 SizeGood
0.35 0.35 100.00 AdjacenciesGood
0.35 0.00 0.00 Storage\Fixed Equip.P/U
Vocational Technical
0.00 0.00 0.00 Size(N/A)
0.00 0.00 0.00 Adjacencies(N/A)
0.00 0.00 0.00 Storage\Fixed Equip.(N/A)
Science
2.70 2.70 100.00 SizeGood
0.58 0.58 100.00 AdjacenciesGood
0.58 0.00 0.00 Storage\Fixed Equip.P/U
Kindergarten
1.18 0.59 50.00 SizeFair
0.25 0.25 100.00 AdjacenciesG/F
0.25 0.25 100.00 Storage\Fixed Equip.G/F
Administration
1.59 0.00 0.00 SizeP/U
0.34 0.34 100.00 AdjacenciesG/F
0.34 0.00 0.00 Storage\Fixed Equip.P/U
0.91 0.00 0.00P/U Restrooms (Student)
0.91 0.45 50.00Fair Teacher Lounge and Work Room(s)
5.00 3.35 67.00Fair Cafeteria
7.84 5.25 67.00Fair Food Prep
0.41 0.41 100.00Good Counseling
0.34 0.34 100.00G/F Clinic
0.50 0.50 100.00G/F Custodial & Maintenance
93.88 56.57 60.26Total For Site:
Comments
Suitability - K-8
This is a rural elementary/middle school, serving grades pre-k through 8th grade. Older wings were built in late
1950's, a new wing was added in 2003, and a new competitive gym opened in 2009.
Suitability - K-8->Site-->Traffic
One-way parent drop off and bus drop off is in front and side of school. Some mix of traffic causes congestion at
peak times.
Suitability - K-8->Site-->Parking
They have two parking lots and some visitor parking in front. There is not enough parking for staff.
Suitability - K-8->Site-->Play Courts & Fields
There is some outdoor play areas, older outdoor basketball and tennis courts, and a football field on property.
Page 2 of 43/9/2010 2:20:04PM
Project:Site:
Suitability
Possible
Score
Score
Percent
Score
CaddoCounty:
1Region:
Rating
640Site #:
Caddo 2009 Walnut Hill
Project #:
4057
Site Type: Site Size:Grade Config:
K-8 0.00ES/MS
Suitability - K-8->Safety and Security
This is a rural school, and some areas do not need to be completely fenced off from front area.
Suitability - K-8->Safety and Security-->Fencing
Fencing around school grounds separating adjacent property is OK. The football field needs fencing.
Suitability - K-8->Safety and Security-->Ease of Supervision
The building wings have good line of sight. Open connecting corridors are also straight and visible. Supervision and
sight problems are around the portables along the back of the school.
Suitability - K-8->Safety and Security-->Limited Entrances
There are open entrances to the school allowing access from several points into the main school facilities.
Suitability - K-8->General Classrooms-->Size
Classroom sizes differ dramatically by wing and grade level. Some area as small as 576sf, and others are
750-850sf. For some special programs (art, science lab, computer lab) larger classrooms are in use, or two smaller
classrooms are joined to form one room 850-1,200 sf.
Suitability - K-8->General Classrooms-->Adjacencies
Some classes are held in portables away from the main building wings. There are no bathrooms and limited
connectivity in these rooms.
Suitability - K-8->General Classrooms-->Storage\Fixed Equip.
A number of older classrooms and temporary buildings have limited storage space.
Suitability - K-8->Remedial - Special Needs
Some remedial and special ed classes are located in portable classrooms.
Suitability - K-8->Remedial - Special Needs-->Adjacencies
Some of these classes and resource programs are held in portable classrooms at back of school.
Suitability - K-8->Remedial - Special Needs-->Storage\Fixed Equip.
Older classrooms have limited storage space, and portable or temporary classrooms have not bathroom access or
water.
Suitability - K-8->Library
There are two libraries (middle school & elementary)
Suitability - K-8->Library-->Size
Both the middle school and elementary school library space is cramped and cannot accommodate more than one
class at a time.
Suitability - K-8->Library-->Storage\Fixed Equip.
Both libraries need more storage space.
Suitability - K-8->P.E.
PE is help in the old gym and the new gym. Also have some younger grades PE in portables.
Suitability - K-8->P.E.-->Size
Old and new gym are good size, but PE space in portables is too small (approximately 700sf).
Suitability - K-8->P.E.-->Storage\Fixed Equip.
Old gym and PE portables have limited or no storage for equipment.
Suitability - K-8->Music
There are several music rooms (choir and band) located in fixed classrooms. Younger grades vocal and
piano/keyboards/instruments are held in portables.
Suitability - K-8->Music-->Size
Portable rooms are very small, less than 700sf per building.
Page 3 of 43/9/2010 2:20:04PM
Project:Site:
Suitability
Possible
Score
Score
Percent
Score
CaddoCounty:
1Region:
Rating
640Site #:
Caddo 2009 Walnut Hill
Project #:
4057
Site Type: Site Size:Grade Config:
K-8 0.00ES/MS
Suitability - K-8->Music-->Adjacencies
Portables were not set up for music/instrument instruction or practice and have poor acoustics.
Suitability - K-8->Music-->Storage\Fixed Equip.
The music portable classrooms do not have enough storage, or electrical outlets.
Suitability - K-8->Art-->Storage\Fixed Equip.
The middle school art classroom needs additional storage space..
Suitability - K-8->Performing Arts\Auditorium
The school has a combination cafeteria and auditorium that can be divided in two, with a stage at one end..
Suitability - K-8->Performing Arts\Auditorium-->Storage\Fixed Equip.
There is no storage space in the cafetorium space for tables, chairs, and other equipment.
Suitability - K-8->Science
These spaces include both science labs and science classrooms.
Suitability - K-8->Science-->Storage\Fixed Equip.
The science rooms/labs have limited equipment and limited storage cabinets and space.
Suitability - K-8->Kindergarten-->Size
There are six kindergarten classrooms that average about 500-600sf each with a bathroom.
Suitability - K-8->Administration
Rooms and work space in the administrative office section of the school are small. It does have a designated sick
room.
Suitability - K-8->Administration-->Size
Small offices and limited meeting space.
Suitability - K-8->Administration-->Storage\Fixed Equip.
There is limited storage space and workroom, meeting rooms in the office suite.
Suitability - K-8->Restrooms (Student)
Restrooms in older areas and portable restrooms were inadequate size and in poor condition.
Suitability - K-8->Teacher Lounge and Work Room(s)
The teacher lounge and work area is small and crowded. There is not room for more than a few persons at one
time.
Suitability - K-8->Cafeteria
The space used for a cafeteria is not large enough to accommodate the full school population. They start serving
lunch at 10:30AM - 12:30pm with continuous serving and seating periods.
Suitability - K-8->Food Prep
The food prep area is OK, but has some manager office space intruding into food prep areas, and they need more
freezer space.
Page 4 of 43/9/2010 2:20:04PM
Functional and Educational Adequacy
Technology Readiness Report
Technology Readiness Report - Full
Project:Site:
Technology Readiness
Possible
ScoreScore
Percent
Score
CaddoCounty:
1Region:
Rating
640Site #:
Caddo 2009 Walnut Hill
Project #:
4057
Technology Readiness
15.00 15.00 100.00 Comm/IT Equipment Environment Good
10.00 5.00 50.00 Electrical Power Fair
10.00 10.00 100.00 Cooling Good
10.00 6.70 67.00 Drops & Wireless Fair
15.00 10.05 67.00 LAN Connectivity Fair
10.00 10.00 100.00 WAN Backbone Good
10.00 6.70 67.00 LAN-WAN Performance Fair
5.00 0.00 0.00 Video Distribution Unsat
5.00 2.50 50.00 Voice Distribution Fair
10.00 10.00 100.00 Faculty & Staff Technology Good
100.00 75.95 75.95Total For Site:
Comments
Technology Readiness->Comm/IT Equipment Environment
Main servers are in teacher lounge within administrative office suite.
Technology Readiness->Electrical Power
Some of the classrooms in older wings are in need of additional or relocated electrical outlets.
Technology Readiness->Cooling
New HVAC units have been installed in older rooms.
Technology Readiness->Drops & Wireless
Most rooms have access to computer drops or wireless. Portables are not hardwired and have some connectivity
problems.
Technology Readiness->LAN Connectivity
Portable classrooms have wireless but the connections are not always reliable.
Technology Readiness->LAN-WAN Performance
Portables have connectivity problems.
Technology Readiness->Video Distribution
There is no video distribution system to all classrooms.
Technology Readiness->Voice Distribution
PA system
Page 1 of 13/9/2010 2:05:11PM
Functional and Educational Adequacy
Capacity and Utilization Report
Capacity Calculations Appendix Preface Some spaces do not contribute to the functional capacity of a school. These spaces are generally spaces
which do not have students assigned to them. Some examples of these spaces include elementary art
rooms, elementary computer labs, elementary music rooms, and special education resource rooms.
Many schools have temporary buildings and these are also not included in the calculation of the
functional capacity. It is the district’s philosophy that, while temporary buildings can be useful in the
short run, they do not provide appropriate long term space and should be eliminated where possible.
Temporary buildings are generally used for the following functions:
1. To house students in temporary classrooms when the school is lacking enough classrooms
2. To house special programs when the school is lacking space for these programs
3. To house necessary storage or administrative support functions when permanent space is lacking
4. To house unnecessary storage or functions
It is the district’s strategy to eliminate all but the absolute necessary temporary buildings and it should
conduct an inventory of the uses of temporary buildings. Where the inventory identifies uses 1-3, the
district will need to consider a more appropriate space solution. In the case of number 4, the district will
need to ensure the principal of the school discontinues the inappropriate use of the temporary building.
Caddo Parish School Board
Instructional Space Model Guidelines
Room Type Students/
Room
Pre-School 20
K Capacity (full day) and 1st Grade 20
Elementary Classroom (2) 24
Elementary Classroom (3-5) 26
Secondary Classroom (6-12) 25
Art (Secondary) 33
Music (Secondary) - Vocal 25
Music (Secondary) - Instrumental 30
Science Lab (Secondary) 25
Voc./Industrial Tech, Foods, Etc. 25
Gym (Secondary) 80
Computer Lab (Elementary)* 26
Computer Lab (Secondary) 33
Spec. Ed. - Severe 9
Spec. Ed. - Resource 0
Alternative Education 18
Portable 0
*These spaces do not contribute to capacity
Scheduling Factors
Elementary Schools 95.0%
Middle Schools 85.0%
High Schools 75.0%
Source: MGT of America, Inc., 2009.
Caddo Parish School Board Capacity Calculations
Walnut HillES/M K-8
K-1 Classroom: 13
PK Classroom: 2
ES (2) Classroom: 8
ES (3-5) Classroom: 22
ART: 1
Secondary (6-12): 23
MU Inst: 3
MU Vocal: 3
Science: 1
GYM: 2
VO/TEC: 1
*Computer Lab: 2
SE - Resource: 15
SE - Severe: 0
Alt: 0
**Temp Bldg: 20
20
24
20
26
33
25
30
25
25
80
25
33
0
9
18
Room Type # of Classrooms x Students/Room = Capacity
Total Capacity (w/o scheduling factor) =
Walnut Hill Capacity =
x Scheduling factor =
40
192
260
572
575
33
90
75
25
160
25
66
0
0
0
0
*Computer Labs at Elementary Schools do not contribute to capacity**The temporary building number represents the number of temporary building teaching stations or rooms, not the number of temporary buildings.
1,796
2,113
85%
N/A
Future Facility and Site Assessment Report
FUTURE FACILITY AND SITE ASSESSMENT
School WALNUT HILL ELEMENTARY / MIDDLE SCHOOL 9360 Woolworth Road Shreveport, LA 71129
Site Description 77.58 acre site (of which 27.58 acres are used by the school and 50 acres are leased out) in a rural area south of Metcalf in the west part of the parish surrounded by farmland and facing a 2-lane rural road. The site is crowned at the school location and slopes significantly to the north and south and gently to the road along the east side. The school complex consists of 1-story, flat roof, brick veneer double-loaded corridor classroom wings in a finger pattern connected by covered walkways; classroom wings have punched windows on the south walls and large ribbon window walls on the north walls; and there is a variety of wood temporary buildings. Site features include concrete, asphalt and gravel paving, surface drainage swales, lawns and numerous trees, recreation fields, a lit football practice field, and paved tennis and basketball courts.
SUMMARY Topic Grade Comments
Site Adequacy Adequate
Land for expansion of building is plentiful and without inhibiting constraints. SITE ASSESSMENT
Site Size Status Adequate
Student Capacity: 1796 Min. Acres Recommended: 28 Actual Site Acres: 27.58
Usable Area Remaining
Adequate
5.65 Acres. Approximates the reasonably usable land adjacent to the current facilities. Assumes major setbacks from property lines and roadways and aligns with building forms shown on graphic. Expansion areas would not consume recreation fields or courts.
• Flood Plain No Constraint
• Potable Water No Constraint Pressure may be low.
• Sanitary Sewer No Constraint
• Storm Drainage No Constraint
• Electricity No Constraint
• Natural Gas No Constraint
• Ground Water No Constraint
• Air Pollution No Constraint
• HazMat/Soils No Constraint
• Habitats No Constraint No conflicts identified by DEQ.
Ease of Access No Constraint
Ease of Traffic Flow Needs Improvement
Buses and autos have separated access drives but need bypass lanes, especially for autos.
Design Compatibility No Constraint
The school facility fits into the rural neighborhood; expansion would not be intrusive.
Compatibility of Structures
No Constraint
The scheme of 1-story buildings with interior corridors and multiple wings or “houses” is generally compatible with contemporary design approaches to schools although the 1960’s aesthetic is not desirable and does not adequately support today’s building systems. The gymnasium is a successful contemporary design that blends well with the original facility. The covered walkways pose a security risk.
WA
LN
UT
HIL
L E
LE
M./M
IDD
LE
SC
HO
OL
9360 W
oo
lwo
rth R
oad
Sh
revep
ort, L
A 7
1129
WOOLWORTH ROAD
N
+FH
+FH
+FH
+FH
+FH
+FH
VIEW
PROPERTY
FARMLAND
Slope
Slope
Slope
Slo
pe
FARMLAND
Primary 1: 0.86 Ac
Primary 2: 2.61 Ac
Secondary 1: 0.65 Ac
Secondary 2: 0.83 Ac
Secondary 3: 0.70 Ac
Total: 5.65 Ac
Pro
perty C
ontin
ues N
orth
Pro
perty C
ontin
ues S
outh
Secondary 3
Primary 1
Bus Drop-off
ParkingParking
ParkingAut
o Dro
p-off
Primary 2
Secondary 2
Secondary 1
GMWM
Pu
blis
he
d 0
1.2
9.1
0
Utility Data Not Available
FUT.
PKG.
FUT.
PKG.FUT.
PKG.
Building Code Verification Report
Building Code Number COMPLYNOT
COMPLY
FCA
DEFICIENCY
NOT
KNOWN
SYSTEM
NOT
PRESENT
NA TO FCA
DATA
1Code of Federal Regulations 28 CFR Part
36, 1994 edition, Paragraph 4.1.2,
Paragraph 4.1.6
1 NPFA 101:15.2.3.2; IBC 1017.2
3 IBC 1005.2
5
a
b
c
d
6
a
b
1
2
4 IBC 1011.5.3
1 IBC 1007.3
2 IBC 1020.1
Are all means of egress illuminated at all times building is occupied?
Do exit stairways have a minimum 48” clearance width between handrails?
Are stairs separated by 1-hour fire resistance rating?
3
Does all door hardware comply by not requiring tight grasping, tight pinching or
twisting to operate?
Maintenance shops?
IBC 508.2
C10 Interior Construction
C1010 Partitions
C1020 Interior Doors
1
IBC 1005.2
Are corridors 1-hour rated (exceptions: building is sprinklered or each room for
instruction has at least one door directly to the exterior)?IBC 1017.1
2
3
Laundries? NFPA 101:15.3.2.1; IBC 508.2
School Name: Walnut Hill ES/MS
NFPA101:15.2.11.1.1
G2030 Pedestrian Paving
B2020 Exterior Windows
4
BUILDING CODE COMPLIANCE REPORT
Code Provision
Is there a continuous path of entry/exit for handicap accessibility to all parts of
the building?
Do exit access corridors have not less than 6’ of clear width?
Are both 1-hour rating and sprinkler protection provided for the following:
Science labs?
7
IBC 1008.1.8.1
NFPA 101:7.1.3.2.1; IBC 1020.1.2
C2010 Stair Construction
8
Boiler and furnace rooms?
Are corridor doors rated a minimum 20-minute rating?
Is glazing in rated doors above 20 minutes limited to 100 square inches?
NFPA 101:15.3.7
NFPA 101:15.3.2.1; IBC 508.2
Does every room or space greater than 250 SF and used for educational
purposes have not less than one outside window for emergency rescue
(exceptions: sprinklered building or room that has a door directly to the
outside)?
Do doors opening in the path of egress travel not reduce the required width to
less than 1/2 during the course of the swing?
When fully open, do corridor doors not project more than 7 inches into the
required corridor width?
Is the building subdivided into compartments by smoke partitions having not
less than a 1-hour fire rating? (Maximum area of compartment is 30,000 SF.
Length or width of building exceeds 300’ unless sprinklered.)
IBC 715.4.4.1
Is 1-hour rating or sprinkler protection provided for the following:
Hazardous storage?
Janitor’s closet?
Where there is a chiller, is it separated from a boiler or water heater by a 2-
hour assembly?
Are penetrations into stairs limited to doors, electrical conduit serving the
stairway, piping necessary for the heating or cooling of the exit enclosure,
sprinkler piping, standpipes and penetrations for fire alarm circuits?
Building Code Number COMPLYNOT
COMPLY
FCA
DEFICIENCY
NOT
KNOWN
SYSTEM
NOT
PRESENT
NA TO FCA
DATACode Provision
4
a NFPA 101:7.2.2.2.4.2; IBC 1012.4
b IBC 1012.5
c NFPA 101:7.2.2.4.4.6; IBC 1012.1
d NFPA 101:7.2.2.4.4.2; IBC 1012.2
5 IBC 1007.6
1
2
1 IBC 508.2
2 IBC 1203.1
3INTERNATIONAL MECHANICAL CODE
2000, 606.4
4 IBC 908.6
1 IBC 903.2
1 IBC 907.2
3Does the Elevator Machine Room have ventilation or air conditioning to protect
controls from overheating?
Continuously graspable?
3 IBC 907.11
IBC 907.2.12.2
Does the shaft have exhaust directly to the outside, an access ladder to the pit,
and battery backup lighting in the shaft/pit?
Are the mechanical rooms separated by fire rated partitions from remainder of
building?
Is there a standard and emergency ventilation system provided?
Are there automatic sprinkler systems provided in assembly spaces with more
than 300 occupants?
2
Is there a refrigerant detection and alarm system provided?
Are there emergency shut-offs provided?
Are the duct smoke detectors connected to the building’s fire alarm control
panel?
Is there a monitored fire alarm system provided?
Does the operation of fire detector, sprinkler device or manual fire alarm box
immediately sounds an alert tone followed by voice instructions giving
approved information and directions for an evacuation?
IBC 3004.1; IBC 3006.1
D30 HVAC Systems
D40 Fire Protection
D4010 Sprinklers
D50 Electrical
D5030 Communications and Security
4
D10 Conveying
D1010 Elevators
Is there a telephone or intercom communication in the cab?
Is there a fireman control panel at the ground floor controls?
Are handrails:
IBC 3006.2
IBC 3003.2
Is there an Area of Refuge in the stairwell or in a vestibule entering the stair? Is
there a communication device there?
Between 34” and 38” above the surface of the tread?
Between 1-1/4” and 2” in diameter?
Returning to wall, guard or walking surface?
Energy Conservation Opportunities Report
System Energy Conservation FCA Deficiency Replacement Cost
SCHOOL TYPEENERGY CONSERVATION OPPORTUNITIES
Walnut Hill ES/MS
1956, 1966, 1967 Buildings Roof Covering No No
Exterior Windows Yes Yes $459,386.00
Interior Lighting Partial Yes $77,152.00
Bldg Controls & Instrumentation No No
Heating No No
Other HVAC Systems (Ventilation) No No
Terminal & Package Units Partial Yes $52,648.00
Cooling No No
1987 Office Roof Covering Yes Yes $8,049.00
Exterior Windows No No
Interior Lighting No No
Bldg Controls & Instrumentation No No
Heating No No
Other HVAC Systems (Ventilation) No No
Terminal & Package Units No No
Cooling No No
1998, 2004, 2008 Additions Roof Covering No No
Exterior Windows No No
Interior Lighting No No
Bldg Controls & Instrumentation No No
Heating No No
Other HVAC Systems (Ventilation) No No
Terminal & Package Units No No
Cooling No No
Site Exterior Lighting Yes Yes $213,101.00