facility cover sheet- voorhees middle school audit...the typical hours of operation for voorhees...

98
VOORHEES TOWNSHIP BOARD OF EDUCATION VOORHEES MIDDLE SCHOOL 1000 HOLLY OAK DRIVE VOORHEES, NJ 08043 FACILITY ENERGY REPORT

Upload: others

Post on 09-Jun-2021

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Facility COVER SHEET- Voorhees Middle School Audit...The typical hours of operation for Voorhees Middle School are Monday through Friday between 7:00 am and 3:00 pm during the normal

VOORHEES TOWNSHIP BOARD OF EDUCATION

VOORHEES MIDDLE SCHOOL

1000 HOLLY OAK DRIVE VOORHEES, NJ 08043

FACILITY ENERGY REPORT

Page 2: Facility COVER SHEET- Voorhees Middle School Audit...The typical hours of operation for Voorhees Middle School are Monday through Friday between 7:00 am and 3:00 pm during the normal

Voorhees Township Public Schools – Voorhees Middle School Energy Audit

Concord Engineering Group, Inc. 9C11026 November 18, 2011 Page 1 of 32

TABLE OF CONTENTS

I.  HISTORIC ENERGY CONSUMPTION/COST ................................................................. 2 

II.  FACILITY DESCRIPTION ................................................................................................ 5 

III.  MAJOR EQUIPMENT LIST .............................................................................................. 7 

IV.  ENERGY CONSERVATION MEASURES ....................................................................... 8 

V.  ADDITIONAL RECOMMENDATIONS ......................................................................... 32 

Appendix A – ECM Cost & Savings Breakdown

Appendix B – New Jersey Smart Start® Program Incentives

Appendix C – Portfolio Manager “Statement of Energy Performance”

Appendix D – Major Equipment List

Appendix E – Investment Grade Lighting Audit

Appendix F – Renewable / Distributed Energy Measures Calculations

Appendix G – Geothermal Monthly Energy Report (Trace® 700 Output)

Page 3: Facility COVER SHEET- Voorhees Middle School Audit...The typical hours of operation for Voorhees Middle School are Monday through Friday between 7:00 am and 3:00 pm during the normal

Voorhees Township Public Schools – Voorhees Middle School Energy Audit

Concord Engineering Group, Inc. 9C11026 November 18, 2011 Page 2 of 32

I. HISTORIC ENERGY CONSUMPTION/COST The energy usage for the facility has been tabulated and plotted in graph form as depicted within this section. Each energy source has been identified and monthly consumption and cost noted per the information provided by the Owner. Electric Utility Provider: Public Service Electric & Gas (PSE&G) Electric Utility Rate Structure: Large Power and Light Secondary (LPLS) Third Party Supplier: Reliant Energy (Effective June 1, 2011) GDF Suez (Prior to June 1, 2011) The electric usage profile represents the actual electrical usage for the facility. The electric utility measures consumption in kilowatt-hours (KWH) and maximum demand in kilowatts (KW). One KWH usage is equivalent to 1000 watts running for one hour. One KW of electric demand is equivalent to 1000 watts running at any given time. The basic usage charges are shown as generation service and delivery charges along with several non-utility generation charges. Rates used in this report reflect the historical data received for the facility. Natural gas service is not currently provided to the Voorhees Middle School.

Page 4: Facility COVER SHEET- Voorhees Middle School Audit...The typical hours of operation for Voorhees Middle School are Monday through Friday between 7:00 am and 3:00 pm during the normal

Voorhees Township Public Schools – Voorhees Middle School Energy Audit

Concord Engineering Group, Inc. 9C11026 November 18, 2011 Page 3 of 32

Table 1 Electricity Billing Data

Utility Provider: PSE&GRate: LPLS

Meter No: 758000565Account # 42 003 693 03

Third Party Utility Provider: GDF SuezTPS Meter / Acct No: - / 14528-1600 (during this study period)

MONTH OF USE CONSUMPTION KWH TOTAL BILL

Mar-10 326,477 $42,944 Apr-10 202,944 $26,955 May-10 241,610 $31,881 Jun-10 295,988 $42,313 Jul-10 242,938 $33,380

Aug-10 263,605 $36,521 Sep-10 255,473 $37,584 Oct-10 253,190 $30,739 Nov-10 369,208 $45,763 Dec-10 651,201 $77,921 Jan-11 684,727 $81,165 Feb-11 519,292 $62,435

Totals 4,306,653 1810.2 Max $549,601

AVERAGE DEMAND 982.7 KW averageAVERAGE RATE $0.128 $/kWh

677.9841.2530.2

ELECTRIC USAGE SUMMARY

DEMAND KW

916.0603.5

1810.21581.0

598.4766.3664.2

1279.41524.5

Page 5: Facility COVER SHEET- Voorhees Middle School Audit...The typical hours of operation for Voorhees Middle School are Monday through Friday between 7:00 am and 3:00 pm during the normal

Voorhees Township Public Schools – Voorhees Middle School Energy Audit

Concord Engineering Group, Inc. 9C11026 November 18, 2011 Page 4 of 32

Figure 1 Electricity Usage Profile

0200

400

600

800

1000

1200

1400

1600

1800

2000

0

100,

000

200,

000

300,

000

400,

000

500,

000

600,

000

700,

000

800,

000

Demand (kW)

Usage (kWh)

Mon

th

Voo

rhee

s Mid

dle

Scho

olE

lect

ric

Usa

ge P

rofil

e M

arch

-10

thro

ugh

Feb-

11

ELEC

TRIC

USA

GE

KW

H

DEM

AN

D K

W

Page 6: Facility COVER SHEET- Voorhees Middle School Audit...The typical hours of operation for Voorhees Middle School are Monday through Friday between 7:00 am and 3:00 pm during the normal

Voorhees Township Public Schools – Voorhees Middle School Energy Audit

Concord Engineering Group, Inc. 9C11026 November 18, 2011 Page 5 of 32

II. FACILITY DESCRIPTION

Voorhees Township Middle School is located on 1000 Holly Oak Drive in Voorhees, New Jersey. The 198,270 square foot Middle School was built in 1972. A seven classroom and gymnasium addition was built in 1981. An eleven classroom, library and Auditorium addition was built in 1987. In 1992, the main Gymnasium and an eleven classroom addition was made to the facility. In 2002, a twenty classroom addition was built, which is now used as the 8th grade wing of the building.

Occupancy Profile

The typical hours of operation for Voorhees Middle School are Monday through Friday between 7:00 am and 3:00 pm during the normal school year from September through June. In addition portions of the school are occupied at various times in the evenings and over the summer months for meetings, afterschool activities and summer day camps.

Building Envelope

The exterior walls of the Middle School are a 4” face brick exterior with 6” concrete block interior walls. The cavity of the exterior wall is filled with 2” of insulation. Typical windows throughout the school are ¼” double pane windows with aluminum frames. In addition, the windows in the classrooms had blinds between the glass panes. The blinds are valuable because they help to reduce heat loss in the winter and reduce solar heat in the summer. The roof of the middle school is a flat, EPDM rubber roofing on metal decking and 2” of insulation. At the time of the survey, the roof the majority of the middle school was being replaced.

HVAC Systems

Heating and air conditioning is provided throughout the middle school via rooftop heat pumps, packaged rooftop air conditioning units, split system heat pumps and perimeter unit ventilator heat pumps.

The perimeter classrooms of the building are served by American Air Filter model classroom unit ventilator heat pumps, with auxiliary electric resistance heating coils. These units vary in capacity.

Classrooms B-3, 5, 7, 12 & 14 in the 8th grade wing are served by a total of five (5) rooftop packaged heat pumps. These heat pumps are all Ruud models, and range in cooling capacity from 4 to 5 tons.

The interior classrooms in the original section of the building are served by Trane packaged high efficiency rooftop heat pumps. The classrooms served are A-2, A-9, A-11, A-13, A-15, A-17, A-19, A-21, A-26, A-27, the Nurse’s office, and the school’s main office. These heat pumps were all installed within the last 2 to 3 years and are all in excellent condition.

The auditorium is served by two (2) 45-Ton split cooling systems. The remote rooftop condensers are McQuay models and are in good condition. The interior air handling units are

Page 7: Facility COVER SHEET- Voorhees Middle School Audit...The typical hours of operation for Voorhees Middle School are Monday through Friday between 7:00 am and 3:00 pm during the normal

Voorhees Township Public Schools – Voorhees Middle School Energy Audit

Concord Engineering Group, Inc. 9C11026 November 18, 2011 Page 6 of 32

McQuay model, ceiling suspended units with D/X coils and 120 kW electric resistance heating coils. These units each provide 481 MBH of cooling to the area.

The old cafeteria and lecture hall are each served by split system air conditioning units with electric resistance heating. The old cafeteria unit is a Trane unit rated for 20 Tons of cooling with the air handling unit is a Trane Climate Changer unit with an 84 kW electric resistance heating coil. The lecture hall unit is a Trane unit rated for 10 tons of cooling. The air handling unit in the lecture hall is also a Trane Climate Changer unit with a 36 kW electric resistance heating coil.

The auxiliary gym that was constructed in 1981 is served by a Carrier, 10-Ton packaged rooftop high efficiency heat pump.

The All-Purpose room is served by four (4) McQuay 16 Ton packaged rooftop units with D/X cooling and 80 kW electric resistance heat.

The Library is served by a Trane packaged rooftop unit, rated for 30 Tons of D/X cooling and 600MBH of electric heating. This unit was installed as part of the 1987 addition.

Exhaust System

Air is exhausted from the toilet rooms through the roof exhausters. The roof exhaust fans are controlled by wall mounted switches in the spaces they serve.

Domestic Hot Water

Domestic hot water for the restrooms and food service area is provided by an Adamson, 180 kW hot water generator and storage tank. The restrooms that were constructed as part of the 1987 Auditorium addition are served by a State 30 gallon electric hot water heater, with a heating capacity of 4.5 kW. The 2002 addition restrooms are served by an A.O. Smith 65 gallon electric hot water heater, with a heating capacity of 6 kW.

Lighting

Refer to the Investment Grade Lighting Audit Appendix for a detailed list of the lighting throughout the facility and estimated operating hours per space.

Page 8: Facility COVER SHEET- Voorhees Middle School Audit...The typical hours of operation for Voorhees Middle School are Monday through Friday between 7:00 am and 3:00 pm during the normal

Voorhees Township Public Schools – Voorhees Middle School Energy Audit

Concord Engineering Group, Inc. 9C11026 November 18, 2011 Page 7 of 32

III. MAJOR EQUIPMENT LIST

The equipment list contains major energy consuming equipment that through implementation of energy conservation measures could yield substantial energy savings. The list shows the major equipment in the facility and all pertinent information utilized in energy savings calculations. An approximate age was assigned to the equipment in some cases if a manufactures date was not shown on the equipment’s nameplate. The ASHRAE service life for the equipment along with the remaining useful life is also shown in the Appendix.

Refer to the Major Equipment List Appendix for this facility.

Page 9: Facility COVER SHEET- Voorhees Middle School Audit...The typical hours of operation for Voorhees Middle School are Monday through Friday between 7:00 am and 3:00 pm during the normal

Voorhees Township Public Schools – Voorhees Middle School Energy Audit

Concord Engineering Group, Inc. 9C11026 November 18, 2011 Page 8 of 32

IV. ENERGY CONSERVATION MEASURES Energy Conservation Measures are developed specifically for this facility. The energy savings and calculations are highly dependent on the information received from the site survey and interviews with operations personnel. The assumptions and calculations should be reviewed by the owner to ensure accurate representation of this facility. The following ECMs were analyzed:

Table 1 ECM Financial Summary

ENERGY CONSERVATION MEASURES (ECM's)

ECM #1 Lighting Upgrades $36,950 $7,037 5.3 185.7%

ECM #2 Lighting Controls $20,900 $5,985 3.5 329.5%

ECM #3 Split System Heat Pump and Rooftop Heat Pump

$110,607 $13,782 8.0 86.9%

ECM #4 AC Unit Replacement $117,634 $3,371 34.9 -57.0%

ECM #5 DDC Controls $693,946 $48,781 14.2 5.4%

ECM #6 Water Conservation $93,303 $7,350 12.7 18.2%

ECM #7 Geothermal Heat Pump System

$6,991,529 $270,983 25.8 -3.1%

REM #1 Rooftop Solar Array $990,305 $92,949 10.7 40.8%

Notes:

ECM NO.

ECM NO. DESCRIPTION

SIMPLE PAYBACK

(Yrs)

SIMPLE LIFETIME

ROI

NET INSTALLATION

COSTA

RENEWABLE ENERGY MEASURES (REM's)

ECM NO. DESCRIPTION

NET INSTALLATION

COST

ANNUAL SAVINGS

SIMPLE PAYBACK

(Yrs)

SIMPLE LIFETIME

ROI

A. Cost takes into consideration applicable NJ Smart StartTM incentives.B. Savings takes into consideration applicable maintenance savings.

ANNUAL SAVINGSB

Page 10: Facility COVER SHEET- Voorhees Middle School Audit...The typical hours of operation for Voorhees Middle School are Monday through Friday between 7:00 am and 3:00 pm during the normal

Voorhees Township Public Schools – Voorhees Middle School Energy Audit

Concord Engineering Group, Inc. 9C11026 November 18, 2011 Page 9 of 32

Table 2 ECM Energy Summary

ECM #1 Lighting Upgrades 32.0 60,094 -

ECM #2 Lighting Controls 26.2 46,754 -

ECM #3 Split System Heat Pump and Rooftop Heat Pump

35.9 107,669 -

ECM #4 AC Unit Replacement 21.9 26,337 -

ECM #5 DDC Controls - 381,098

ECM #6 Water Conservation - 28,987 -

ECM #7 Geothermal Heat Pump System

- 2,117,051 -

REM #1 Rooftop Solar Array 114.2 172,253 -

ENERGY CONSERVATION MEASURES (ECM's)

ELECTRIC DEMAND

(KW)

ENERGY CONSERVATION MEASURES (ECM's)

ELECTRIC DEMAND

(KW)

ELECTRIC CONSUMPTION

(KWH)

ECM NO. DESCRIPTION

ANNUAL UTILITY REDUCTION

ECM NO. DESCRIPTION

ANNUAL UTILITY REDUCTIONRENEWABLE ENERGY MEASURES (REM's)

NATURAL GAS (THERMS)

ELECTRIC DEMAND

(KW)

NATURAL GAS (THERMS)

ELECTRIC CONSUMPTION

(KWH)

Page 11: Facility COVER SHEET- Voorhees Middle School Audit...The typical hours of operation for Voorhees Middle School are Monday through Friday between 7:00 am and 3:00 pm during the normal

Voorhees Township Public Schools – Voorhees Middle School Energy Audit

Concord Engineering Group, Inc. 9C11026 November 18, 2011 Page 10 of 32

Table 3 Facility Project Summary

Design / Construction Extras is shown as an additional cost for the facility project summary. This cost is included to estimate the costs associated with construction management fees for a larger combined project.

Lighting Upgrades $7,037 $36,950 $0 $36,950 5.3

Lighting Controls $5,985 $22,650 $1,750 $20,900 3.5

Split System Heat Pump and Rooftop Heat Pump

$13,782 $114,287 $3,680 $110,607 8.0

AC Unit Replacement $3,371 $125,000 $7,366 $117,634 34.9

DDC Controls $48,781 $693,946 $0 $693,946 14.2

Water Conservation $7,350 $93,303 $0 $93,303 12.7

Geothermal Heat Pump System

$270,983 $7,666,529 $675,000 $6,991,529 25.8

Design / Construction Extras (15%)

$162,920 $162,920

Total Project $86,306 $1,249,056 $12,796 $1,236,260 14.3

ENERGY SAVINGS IMPROVEMENT PROGRAM - POTENTIAL PROJECT

* Highlighted ECMs are not included in the Total Project costs

ENERGY CONSERVATION

MEASURES

ANNUAL ENERGY

SAVINGS ($)

PROJECT COST ($)

CUSTOMER COST

SIMPLE PAYBACK

SMART START

INCENTIVES

Page 12: Facility COVER SHEET- Voorhees Middle School Audit...The typical hours of operation for Voorhees Middle School are Monday through Friday between 7:00 am and 3:00 pm during the normal

Voorhees Township Public Schools – Voorhees Middle School Energy Audit

Concord Engineering Group, Inc. 9C11026 November 18, 2011 Page 11 of 32

ECM #1: Lighting Upgrade – Interior spaces Description: The majority of the interior lighting throughout Voorhees Middle School is provided with 32W T8 lamps with electronic ballasts. There are still a limited number of areas that utilize fluorescent fixtures with 32W T8 lamps and magnetic ballasts. In addition, the Gymnasium utilizes T5HO fixtures with reflective lenses. CEG recommends replacing the magnetic ballasts with new, more efficient electronic ballasts The ECM also includes replacement of any incandescent lamps with compact fluorescent lamps. Compact fluorescent lamps (CFL’s) were designed to be direct replacements for the standard incandescent lamps which are common to table lamps, spot lights, hi-hats, bathroom vanity lighting, etc. The light output of the CFL has been designed to resemble the incandescent lamp. The color rendering index (CRI) of the CFL is much higher than standard fluorescent lighting, and therefore provides a much “truer” light. The CFL is available in a myriad of shapes and sizes depending on the specific application. Typical replacements are: a 13-Watt CFL for a 60-Watt incandescent lamp, an 18-Watt CFL for a 75-Watt incandescent lamp, and a 26-Watt CFL for a 100-Watt incandescent lamp. The CFL is also available for a number of “brightness colors” that is indicated by the Kelvin rating. A 2700K CFL is the “warmest” color available and is closest in color to the incandescent lamp. CFL’s are also available in 3000K, 3500K, and 4100K. The 4100K would be the “brightest” or “coolest” output. A CFL can be chosen to screw right into your existing fixtures, or hardwired into your existing fixtures. Where the existing fixture is controlled by a dimmer switch, the CFL bulb must be compatible with a dimmer switch. In some locations the bulb replacement will need to be tested to make sure the larger base of the CFL will fit into the existing fixture. The energy usage of an incandescent compared to a compact fluorescent approximately 3 to 4 times greater. In addition to the energy savings, compact fluorescent fixtures burn-hours are 8 to 15 times longer than incandescent fixtures ranging from 6,000 to 15,000 burn-hours compared to incandescent fixtures ranging from 750 to 1000 burn-hours. However, the maintenance savings due to reduced lamp replacement is offset by the higher cost of the CFL’s compared to the incandescent lamps. Energy Savings Calculations: The Investment Grade Lighting Audit Appendix outlines the hours of operation, proposed retrofits, costs, savings, and payback periods for each set of fixtures in the each building. Rebates and Incentives: There are no Smart Start Rebates or Incentives for this ECM.

Page 13: Facility COVER SHEET- Voorhees Middle School Audit...The typical hours of operation for Voorhees Middle School are Monday through Friday between 7:00 am and 3:00 pm during the normal

Voorhees Township Public Schools – Voorhees Middle School Energy Audit

Concord Engineering Group, Inc. 9C11026 November 18, 2011 Page 12 of 32

Replacement and Maintenance Savings: There is no replacement or maintenance savings for this ECM. Energy Savings Summary:

Installation Cost ($): $36,950NJ Smart Start Equipment Incentive ($): $0Net Installation Cost ($): $36,950Maintenance Savings ($/Yr): $0

Energy Savings ($/Yr): $7,037Total Yearly Savings ($/Yr): $7,037Estimated ECM Lifetime (Yr): 15Simple Payback 5.3Simple Lifetime ROI 185.7%Simple Lifetime Maintenance Savings $0Simple Lifetime Savings $105,555Internal Rate of Return (IRR) 17%Net Present Value (NPV) $47,057.25

ECM #1 - ENERGY SAVINGS SUMMARY

Page 14: Facility COVER SHEET- Voorhees Middle School Audit...The typical hours of operation for Voorhees Middle School are Monday through Friday between 7:00 am and 3:00 pm during the normal

Voorhees Township Public Schools – Voorhees Middle School Energy Audit

Concord Engineering Group, Inc. 9C11026 November 18, 2011 Page 13 of 32

ECM #2: Lighting Controls Upgrade – Occupancy Sensors Description: Some of the lights in the school building are left on unnecessarily. In many cases the lights are left on because of the inconvenience to manually switch lights off when a room is left or on when a room is first occupied. This is common in rooms that are occupied for only short periods and only a few times per day. In some instances lights are left on due to the misconception that it is better to keep the lights on rather than to continuously switch lights on and off. Although increased switching reduces lamp life, the energy savings outweigh the lamp replacement costs. The payback timeframe for when to turn the lights off is approximately two minutes. If the lights are expected to be off for at least a two minute interval, then it pays to shut them off.

Lighting controls come in many forms. Sometimes an additional switch is adequate to provide reduced lighting levels when full light output is not needed. Occupancy sensors detect motion and will switch the lights on when the room is occupied. Occupancy sensors can either be mounted in place of a current wall switch, or on the ceiling to cover large areas. The U.S. Department of Energy sponsored a study to analyze energy savings achieved through various types of building system controls. The referenced savings is based on the “Advanced Sensors and Controls for Building Applications: Market Assessment and Potential R&D Pathways,” document posted for public use April 2005. The study has found that commercial buildings have the potential to achieve significant energy savings through the use of building controls. The average energy savings are as follows based on the report:

• Occupancy Sensors for Lighting Control 20% - 28% energy savings.

Savings resulting from the implementation of this ECM for energy management controls are estimated to be 20% of the total light energy controlled by occupancy sensors and daylight sensors (The majority of the savings is expected to be after school hours when rooms are left with lights on) This ECM includes installation of ceiling or switch mount sensors for individual offices, classrooms, large bathrooms, and libraries. Sensors shall be manufactured by Sensorswitch, Watt Stopper or equivalent. The Investment Grade Lighting Audit Appendix of this report includes the summary of lighting controls implemented in this ECM and outlines the proposed controls, costs, savings, and payback periods. The calculations adjust the lighting power usage by the applicable percent savings for each area that includes lighting controls. Energy Savings Calculations:

( )( )kWh/YrEnergyLightControlledSavings%SavingsEnergy ×=

Page 15: Facility COVER SHEET- Voorhees Middle School Audit...The typical hours of operation for Voorhees Middle School are Monday through Friday between 7:00 am and 3:00 pm during the normal

Voorhees Township Public Schools – Voorhees Middle School Energy Audit

Concord Engineering Group, Inc. 9C11026 November 18, 2011 Page 14 of 32

( ) ⎟⎠⎞

⎜⎝⎛×=

kWh$CostElecAvekWhSavingsEnergySavings.

Rebates and Incentives:

From the NJ Smart Start® Program Incentives Appendix, the installation of a lighting control device warrants the following incentive: Smart Start Incentive

# Wall mount sensors $20 per sensor# Ceiling mount sensors $35 per sensor

Energy Savings Summary:

Installation Cost ($): $22,650NJ Smart Start Equipment Incentive ($): $1,750Net Installation Cost ($): $20,900Maintenance Savings ($/Yr): $0

Energy Savings ($/Yr): $5,985Total Yearly Savings ($/Yr): $5,985Estimated ECM Lifetime (Yr): 15Simple Payback 3.5

Simple Lifetime ROI 329.5%Simple Lifetime Maintenance Savings $0Simple Lifetime Savings $89,775Internal Rate of Return (IRR) 28%Net Present Value (NPV) $50,548.54

ECM #2 - ENERGY SAVINGS SUMMARY

Page 16: Facility COVER SHEET- Voorhees Middle School Audit...The typical hours of operation for Voorhees Middle School are Monday through Friday between 7:00 am and 3:00 pm during the normal

Voorhees Township Public Schools – Voorhees Middle School Energy Audit

Concord Engineering Group, Inc. 9C11026 November 18, 2011 Page 15 of 32

ECM #3: Split System and Packaged Rooftop Heat Pump Replacement

Description:

The Middle School classrooms and offices are conditioned by a combination of packaged rooftop air to air heat pumps, and split system air to air heat pump units. While many of these units are new and highly efficient, there are several units that have surpassed or are approaching their useful service life as defined by ASHRAE. In addition, several of the older units are inefficient compared to modern equipment and can be replaced with new high efficiency units. New heat pumps and A/C units provide higher full load and part load efficiencies due to advances in inverter motor technologies, heat exchangers and refrigerants. This ECM includes one-for-one replacement of the older heat pumps with new higher efficiency units. A summary of the unit replacements for this ECM can be found in the table below: Implementation Summary Table:

SYSTEM TYPE (UNIT NO. NUMBER OF UNITS

COOLING CAPACITY,

BTU/HR

TOTAL CAPACITY,

TONSREPLACE UNIT WITH

SS HP-1, Woodshop 1 48,000 4.0 Carrier - 25HNA9 Infinity Series

SS HP-2, Art Office 1 18,000 1.5 Carrier - 25HNA9 Infinity Series

SS HP-4 1 36,000 3.0 Carrier - 25HNA9 Infinity Series

RTU RTU-44, B-12 1 48,000 4.0 Carrier - 50XT-A48

RTU RTU-3, 4, 6 3 48,000 12.0 Carrier - 50XT-A48

RTU RTU-5 & 24 2 60,000 10.0 Carrier - 50XT-A60

RTU RTU-7 1 30,000 2.5 Carrier - 50XT-A30

RTU RTU-10 1 36,000 3.0 Carrier - 50XT-A36

Total 11 324,000 40.0

IMPLEMENTATION SUMMARY

Page 17: Facility COVER SHEET- Voorhees Middle School Audit...The typical hours of operation for Voorhees Middle School are Monday through Friday between 7:00 am and 3:00 pm during the normal

Voorhees Township Public Schools – Voorhees Middle School Energy Audit

Concord Engineering Group, Inc. 9C11026 November 18, 2011 Page 16 of 32

Energy Savings Calculations: Cooling Energy Savings: Seasonal energy consumption of the air conditioners at the cooling mode is calculated with the equation below:

Energy Savings, kWh Cooling Capacity,BTUHr

1SEERO

1SEERN

Operation Hours

1000 WkWh

Demand Savings, kW Energy Savings kWh

Hours of Cooling

Cooling Cost Savings Energy Savings, kWh Cost of Electricity $

kWh

Heating Energy Savings, kWh Heat Pumps Only

Heating Capacity,MBH

293.07 Operation Hours

1COPO

1COPN

Demand Savings, kW Energy Savings kWh

Hours of Heating

Heating Cost Savings Energy Savings, kWh Cost of Electricity $

kWh

ECM INPUTSCOOLING CAPACITY,

BTU/Hr

ANNUAL COOLING

HOURS

ANNUAL HEATING

HOURS

EXISTING UNITS EER

NEW UNITS EER

EXISTING UNITS COP

SPLIT UNITS COP

# OF UNITS

ENERGY SAVINGS COOLING

KWH

ENERGY SAVINGS HEATING

KWH

DEMAND SAVINGS

kW

SS 48,000 1,800 1,200 9.5 EER 11.2 EER 2.9 COP 3.64 COP 1 1,380 13,778 5.1

SS 18,000 1,800 1,200 9.5 EER 13.1 EER 2.9 COP 3 COP 1 937 847 0.6

SS 36,000 1,800 1,200 9.5 EER 11.7 EER 2.9 COP 3.56 COP 1 1,283 9,423 3.6

RTU 48,000 1,800 1,200 9.5 EER 11 EER 2.9 COP 3.3 COP 1 1,240 8,215 3.2

RTU 48,000 1,800 1,200 9.5 EER 11 EER 2.9 COP 3.3 COP 3 3,721 24,645 9.5

RTU 60,000 1,800 1,200 9.5 EER 11 EER 2.9 COP 3.3 COP 2 3,100 20,537 7.9

RTU 30,000 1,800 1,200 9.5 EER 11.6 EER 2.9 COP 3.4 COP 1 1,029 6,229 2.4

RTU 36,000 1,800 1,200 9.5 EER 12 EER 2.9 COP 3.6 COP 1 1,421 9,883 3.8

Total 11 14,112 93,558 35.9

ENERGY SAVINGS CALCULATIONS

Page 18: Facility COVER SHEET- Voorhees Middle School Audit...The typical hours of operation for Voorhees Middle School are Monday through Friday between 7:00 am and 3:00 pm during the normal

Voorhees Township Public Schools – Voorhees Middle School Energy Audit

Concord Engineering Group, Inc. 9C11026 November 18, 2011 Page 17 of 32

Project Cost, Incentives and Maintenance Savings From the NJ Smart Start® Program appendix, the replacement of split system AC units and unitary systems with high efficiency AC systems falls under the category “Unitary HVAC Split System” and warrants an incentive based on efficiency (EER/SEER). The program incentives are calculated as follows:

( )Incentive$/TonTonsCoolingIncentiveStartSmart ×=®

UNIT DESCRIPTION

UNIT EFFICIENCY REBATE $/TON

PROPOSED CAPACITY

TONS (TOTAL)

TOTAL REBATE

$

5.4 tons or less Unitary AC and

Split System≥14 SEER $92 40.0 $3,680

TOTAL 40.0 $3,680

SPLIT SYSTEM UNITS REBATE SUMMARY

A summary of cost, savings and payback for this ECM is below.

ECM INPUTS INSTALLED COST

# OF UNITS

TOTAL COST

REBATES NET COST ENERGY SAVING

PAY BACK YEARS

SS $9,200 1 $10,580 $368 $10,212 $1,940 5.3

SS $4,667 1 $5,367 $138 $5,229 $228 22.9

SS $8,338 1 $9,588 $276 $9,312 $1,370 6.8

RTU $9,900 1 $11,385 $368 $11,017 $1,210 9.1

RTU $9,900 3 $34,155 $1,104 $33,051 $3,631 9.1

RTU $11,250 2 $25,875 $920 $24,955 $3,026 8.2

RTU $6,750 1 $7,763 $230 $7,533 $929 8.1

RTU $8,325 1 $9,574 $276 $9,298 $1,447 6.4

Total $68,330 11 $114,287 $3,680 $110,607 $13,782 8.0

COST & SAVINGS SUMMARY

Page 19: Facility COVER SHEET- Voorhees Middle School Audit...The typical hours of operation for Voorhees Middle School are Monday through Friday between 7:00 am and 3:00 pm during the normal

Voorhees Township Public Schools – Voorhees Middle School Energy Audit

Concord Engineering Group, Inc. 9C11026 November 18, 2011 Page 18 of 32

There is no significant maintenance savings due to implementation of this ECM. Energy Savings Summary:

Installation Cost ($): $114,287NJ Smart Start Equipment Incentive ($): $3,680Net Installation Cost ($): $110,607Maintenance Savings ($/Yr): $0Energy Savings ($/Yr): $13,782Total Yearly Savings ($/Yr): $13,782Estimated ECM Lifetime (Yr): 15Simple Payback 8.0Simple Lifetime ROI 86.9%Simple Lifetime Maintenance Savings $0Simple Lifetime Savings $206,730Internal Rate of Return (IRR) 9%Net Present Value (NPV) $53,921.62

ECM #3 - ENERGY SAVINGS SUMMARY

Page 20: Facility COVER SHEET- Voorhees Middle School Audit...The typical hours of operation for Voorhees Middle School are Monday through Friday between 7:00 am and 3:00 pm during the normal

Voorhees Township Public Schools – Voorhees Middle School Energy Audit

Concord Engineering Group, Inc. 9C11026 November 18, 2011 Page 19 of 32

ECM #4: Rooftop Unit Replacement

Description:

The Middle School All Purpose Room, Lecture Hall and Old Cafeteria are conditioned by large rooftop air conditioning units and split system AC units. These units are approaching the end of their useful service life. In addition, they are inefficient compared to modern equipment and can be replaced with newer high efficiency units. New A/C units provide higher full load and part load efficiencies due to advances in inverter motor technologies, heat exchangers and refrigerants. This ECM includes one-for-one replacement of the older units with new higher efficiency units. A summary of the unit replacements for this ECM can be found in the table below: Implementation Summary Table:

ECM INPUTS SERVICE FORNUMBER OF UNITS

COOLING CAPACITY,

BTU/HR

TOTAL CAPACITY,

TONSREPLACE UNIT WITH

RTU RTU-A, APR 4 192,000 64.0 Carrier WeatherMaster -50HC

SS Lecture Hall 1 120,000 10.0 Carrier 38AKSSS Old Cafeteria 1 240,000 20.0 Carrier 38AKSTotal 4 552,000 94.0

IMPLEMENTATION SUMMARY

Energy Savings Calculations: Cooling Energy Savings: Seasonal energy consumption of the air conditioners at the cooling mode is calculated with the equation below:

Energy Savings, kWh Cooling Capacity,BTUHr

1SEERO

1SEERN

Operation Hours

1000 WkWh

Demand Savings, kW Energy Savings kWh

Hours of Cooling

Cooling Cost Savings Energy Savings, kWh Cost of Electricity $

kWh

Page 21: Facility COVER SHEET- Voorhees Middle School Audit...The typical hours of operation for Voorhees Middle School are Monday through Friday between 7:00 am and 3:00 pm during the normal

Voorhees Township Public Schools – Voorhees Middle School Energy Audit

Concord Engineering Group, Inc. 9C11026 November 18, 2011 Page 20 of 32

ECM INPUTS

COOLING CAPACITY,

BTU/Hr

ANNUAL COOLING

HOURS

EXISTING UNITS (S)EER

NEW UNITS (S)EER

# OF UNITS

ENERGY SAVINGS

kWh

DEMAND SAVINGS

kWRTU 192,000 1,200 9.5 EER 12.2 EER 4 21,470 17.9

SS 120,000 1,200 10.3 EER 12 EER 1 1,981 1.7SS 240,000 1,200 9.5 EER 10.5 EER 1 2,887 2.4Total 4 26,337 21.9

ENERGY SAVINGS CALCULATIONS

Project Cost, Incentives and Maintenance Savings From the NJ Smart Start® Program appendix, the replacement of split system AC units and unitary systems with high efficiency AC systems falls under the category “Unitary HVAC Split System” and warrants an incentive based on efficiency (EER/SEER). The program incentives are calculated as follows:

( )Incentive$/TonTonsCoolingIncentiveStartSmart ×=®

UNIT DESCRIPTION UNIT EFFICIENCY

REBATE $/TON

PROPOSED CAPACITY

TONS

TOTAL REBATE

$

≥20 to 30 tons 10.5 EER 79 20 $1,580

≥ 11.25 to < 20 tons 11.5 EER 79 64 $5,056

≥ 5.4 to < 11.25 tons 11.5 EER 73 10 $730

TOTAL 94 $7,366

SPLIT SYSTEM AC UNITS REBATE SUMMARY

Page 22: Facility COVER SHEET- Voorhees Middle School Audit...The typical hours of operation for Voorhees Middle School are Monday through Friday between 7:00 am and 3:00 pm during the normal

Voorhees Township Public Schools – Voorhees Middle School Energy Audit

Concord Engineering Group, Inc. 9C11026 November 18, 2011 Page 21 of 32

A summary of cost, savings and payback for this ECM is below.

ECM INPUTSINSTALLED

COST# OF

UNITSTOTAL COST REBATES NET COST

ENERGY SAVING

PAY BACK YEARS

RTU $21,000 4 $84,000 $5,056 $78,944 $2,748 28.7

SS $17,000 1 $17,000 $730 $16,270 $254 64.2SS $24,000 1 $24,000 $1,580 $22,420 $370 60.7Total $62,000 6 $125,000 $7,366 $117,634 $3,371 34.9

COST & SAVINGS SUMMARY

There is no significant maintenance savings due to implementation of this ECM. Energy Savings Summary:

Installation Cost ($): $125,000

NJ Smart Start Equipment Incentive ($): $7,366Net Installation Cost ($): $117,634Maintenance Savings ($/Yr): $0

Energy Savings ($/Yr): $3,371Total Yearly Savings ($/Yr): $3,371Estimated ECM Lifetime (Yr): 15

Simple Payback 34.9Simple Lifetime ROI -57.0%Simple Lifetime Maintenance Savings $0

Simple Lifetime Savings $50,565Internal Rate of Return (IRR) -9%Net Present Value (NPV) ($77,391.22)

ECM #4 - ENERGY SAVINGS SUMMARY

Page 23: Facility COVER SHEET- Voorhees Middle School Audit...The typical hours of operation for Voorhees Middle School are Monday through Friday between 7:00 am and 3:00 pm during the normal

Voorhees Township Public Schools – Voorhees Middle School Energy Audit

Concord Engineering Group, Inc. 9C11026 November 18, 2011 Page 22 of 32

ECM #5: DDC Controls Description:

The majority HVAC systems within the facility are controlled manually via local stand alone controls via electronic local thermostats. The thermostats, and consequently unit operation, are controlled by the building operators and occupants.

The typical hours of operation for this facility are Monday through Friday approximately 40 hours per week, dependent on after school activities and holidays. The building is typically closed on weekends.

There is no thermostat adjustments made and set back/set up functions are not employed. Therefore, a DDC system providing the Owner with full control over the HVAC equipment within the building appears to be an energy saving opportunity. The installation of a Building Automation system with Direct Digital Controls (DDC) wired through an Ethernet backbone and front end controller is the typical solution to gain control over the HVAC systems and to minimize the system energy use. In the long term, all equipment replacement should include for each unit being replaced a unit DDC controller. The system replacements should include new thermostat controllers for all indoor air-handling systems and the rooftop units, in addition to each piece of equipment being wired back to a front end controller and computer interface. With the communication between the devices and the front end computer interface, the Owner will be able to take advantage of equipment scheduling for occupied and unoccupied periods based on the actual occupancy of the facility. The DDC system will also aid in the response time to service / maintenance issues when the facility is not under normal maintenance supervision, i.e. after-hours and week-ends. The new DDC system has the potential to provide substantial savings by controlling the HVAC systems as a whole and provide operating schedules and features such as space averaging, night set-back, temperature override control, etc. The U.S. Department of Energy sponsored a study to analyze energy savings achieved through various types of building system controls. The referenced savings is based on the “Advanced Sensors and Controls for Building Applications: Market Assessment and Potential R&D Pathways,” document posted for public use April 2005. The study has found that commercial buildings have the potential to achieve significant energy savings through the use of building controls. The average energy savings are as follows based on the referenced report:

• Typical Energy Management and Control System Savings: 5%-15%.

Savings resulting from the implementation of this ECM for energy management controls are estimated to be 10% of the total energy cost for the facility.

Page 24: Facility COVER SHEET- Voorhees Middle School Audit...The typical hours of operation for Voorhees Middle School are Monday through Friday between 7:00 am and 3:00 pm during the normal

Voorhees Township Public Schools – Voorhees Middle School Energy Audit

Concord Engineering Group, Inc. 9C11026 November 18, 2011 Page 23 of 32

The cost of a full DDC system with new field devices, controllers, computer, software, programming, etc. is approximately $3.50 per SF in accordance with recent Contractor pricing for systems of this magnitude. Savings from the implementation of this ECM will be from the reduced energy consumption currently used by the HVAC system by proper control of schedule and temperatures via the DDC system. The total cost of a complete DDC system is estimated to be $693,945. Energy Savings Calculations: 10% Savings on Heating Calculations

( ) ⎟⎠⎞

⎜⎝⎛×××=

ThermCostGasAveSavingsThermsConsHeatSavings $%1090.0..

10% Savings on Cooling Calculations:

( ) ⎟⎠⎞

⎜⎝⎛××=

kWhCostElecAveSavingskWhConsCoolSavings $%10..

The calculations are summarized in the table below.

ECM INPUTS EXISTING PROPOSED SAVINGSBuilding Total Area (Sq.Ft.) 198,270 198,270 -Lighting Load (w/Sq.Ft.) 1.5 1.5 -Plug Load (w/Sq.Ft.) 1 1 -Annual Electrical Consumption (kWh/yr.) 4,306,653 4,306,653 -Net Annual Mechanical Electrical Consumption (kWh/yr.) 3,810,978 3,810,978 -Energy Savings 0% 10% -Electricity Cost ($/kWh) $0.128 $0.128 -Natural Gas Cost ($/Therm) - - -

ECM RESULTS EXISTING PROPOSED SAVINGSAnnual Mechanical Electricity Energy (kWh/yr.) 3,810,978 3,429,880 381,098Annual Electricity Cost ($) $487,805.18 $439,024.67 $48,781

Total Annual Savings ($/yr.) $487,805 $439,025 $48,781

ECM - DDC CONTROLS

ENERGY SAVINGS CALCULATIONS

Page 25: Facility COVER SHEET- Voorhees Middle School Audit...The typical hours of operation for Voorhees Middle School are Monday through Friday between 7:00 am and 3:00 pm during the normal

Voorhees Township Public Schools – Voorhees Middle School Energy Audit

Concord Engineering Group, Inc. 9C11026 November 18, 2011 Page 24 of 32

Energy Savings Summary:

Installation Cost ($): $693,946

NJ Smart Start Equipment Incentive ($): $0

Net Installation Cost ($): $693,946

Maintenance Savings ($/Yr): $0

Energy Savings ($/Yr): $48,781

Total Yearly Savings ($/Yr): $48,781

Estimated ECM Lifetime (Yr): 15

Simple Payback 14.2

Simple Lifetime ROI 5.4%

Simple Lifetime Maintenance Savings $0

Simple Lifetime Savings $731,715Internal Rate of Return (IRR) 1%Net Present Value (NPV) ($111,601.59)

ECM #5 - ENERGY SAVINGS SUMMARY

Page 26: Facility COVER SHEET- Voorhees Middle School Audit...The typical hours of operation for Voorhees Middle School are Monday through Friday between 7:00 am and 3:00 pm during the normal

Voorhees Township Public Schools – Voorhees Middle School Energy Audit

Concord Engineering Group, Inc. 9C11026 November 18, 2011 Page 25 of 32

ECM #6: Water Conservation Description: Voorhees Middle School utilizes standard plumbing fixtures. The typical water closet and urinal water consumption only meet the minimum federally required standard for water efficiency. New fixtures are available that use less water than today’s requirements and can add up to significant water reduction over a long period. This ECM includes the replacement of the existing sink faucets within the bathrooms. The estimated usage of the plumbing fixtures is based on the total population of the facility. The number of plumbing fixtures to be replaced is based on site survey of the facilities. The proposed retrofit includes installation of auto flow sink faucets and low flow aerators. For the basis of this calculation the LEED rating system was used to estimate the occupancy usage for students within the school. When water consumption information was not available, the GPF values were estimated for the existing fixtures. Energy Savings Calculations: Faucets:

⎟⎠⎞

⎜⎝⎛×⎟

⎠⎞

⎜⎝⎛×⎟⎟

⎞⎜⎜⎝

⎛×⎟⎠⎞

⎜⎝⎛=

MinGalFixture

UseSecTime Use

DayperPersonUseUse

YrDaysOccupancynConsumptioWater

( )

( )Gal1000Gal1000

$CostAveGallonsn ConsumptioWaterCostWater

⎟⎟⎠

⎞⎜⎜⎝

⎛×

=

Page 27: Facility COVER SHEET- Voorhees Middle School Audit...The typical hours of operation for Voorhees Middle School are Monday through Friday between 7:00 am and 3:00 pm during the normal

Voorhees Township Public Schools – Voorhees Middle School Energy Audit

Concord Engineering Group, Inc. 9C11026 November 18, 2011 Page 26 of 32

ECM INPUTS EXISTING PROPOSED SAVINGS

ECM INPUTS Existing Fixtures Low Flow / Auto Flow Fixtures

-

Total Number of Students 1,150 1,150 -

% Male to Female 50% 50% -Estimated % Floor Area Served by Older Bathrooms

100% 100% -

Occupied Days Per Year 250 250 -

Lavatory Uses per Day per Person 3 3 -

Sink flow time per use, sec 15 12 -

Sink Aerator Flow, GPM 1.5 0.5 -

WC Uses per Day per Person 2.0 2.0 -

Urinal Uses per Day per Person 1.0 1.0 -

Total Urinal Flushes Per Day 575 575 -

Total WC Flushes Per Day 1,150 1,150 -

Urinal Gallons Per Flush (GPF) 1.0 0.125 0.875

WC Gallons Per Flush (GPF) 1.6 1.28 0.32

** Water Cost ($/1000 Gal) $8.00 $8.00 -Electric Cost ($/Kwh) $0.128 $0.128

ECM RESULTS EXISTING PROPOSED SAVINGSWater Consumption, Urinal and WC (Gal)

603,750 385,969 217,781

Water Consumption, Faucets (Gal) 323,438 86,250 237,188

Total Water Consumption, (Gal) 927,188 472,219 454,969Water Cost ($) $7,418 $3,778 $3,640Gas Consumption (Therms) 1,349 360 989Gas Cost ($/Year) $0 $0 $0 Electric Consumption (Kwh) 39,527 10,541 28,987 Electric Cost ($/Year) $5,060 $1,349 $3,710 TOTAL SAVINGS $7,350 COMMENTS:

WATER CONSERVATION CALCULATIONS

ENERGY SAVINGS CALCULATIONS

*Savings are based on LEED Reference Guide for Green Building Design and Construction - 2009 Edition for WC and Urinal water usage. ** Cost of Water estimated.

There are no Smart Start rebates for installation of low flow plumbing fixtures.

Page 28: Facility COVER SHEET- Voorhees Middle School Audit...The typical hours of operation for Voorhees Middle School are Monday through Friday between 7:00 am and 3:00 pm during the normal

Voorhees Township Public Schools – Voorhees Middle School Energy Audit

Concord Engineering Group, Inc. 9C11026 November 18, 2011 Page 27 of 32

Energy Savings Summary:

Installation Cost ($): $93,303

NJ Smart Start Equipment Incentive ($): $0Net Installation Cost ($): $93,303

Maintenance Savings ($/Yr): $0Energy Savings ($/Yr): $7,350Total Yearly Savings ($/Yr): $7,350

Estimated ECM Lifetime (Yr): 15Simple Payback 12.7

Simple Lifetime ROI 18.2%Simple Lifetime Maintenance Savings 0Simple Lifetime Savings $110,250Internal Rate of Return (IRR) 2%Net Present Value (NPV) ($5,559.18)

ECM #6 - ENERGY SAVINGS SUMMARY

Page 29: Facility COVER SHEET- Voorhees Middle School Audit...The typical hours of operation for Voorhees Middle School are Monday through Friday between 7:00 am and 3:00 pm during the normal

Voorhees Township Public Schools – Voorhees Middle School Energy Audit

Concord Engineering Group, Inc. 9C11026 November 18, 2011 Page 28 of 32

ECM #7: Geothermal Heat Pump System Installation Description: The HVAC Systems at Voorhees Middle School are a combination of split system heat pump units, rooftop heat pumps, individual classroom heat pumps and packaged rooftop air conditioning units with electric resistance heating. A geothermal heat pump system utilizes the ground as a heat sink to extract and reject heat to depending on the season. Due to the large thermal mass provided by the ground, the HVAC equipment is able to take advantage of cooler temperatures is the summer and warmer temperatures in the winter compared to the ambient air. The benefits include substantial energy efficiency increase with respect to air source systems. In addition, no electrical resistance heat is required in the heating season also reducing electric usage. A geothermal system sized properly requires no additional heat production equipment (such as a boiler) or heat rejection equipment (such as a cooling tower). All loads are handled by the heat pumps and the geothermal water loop. Due to the inefficiency of the boiler and poor operational characteristics of the air to air heat pumps, a geothermal system energy costs become very appealing. This ECM includes the installation of ground source heat pumps installed above the ceilings of each classroom, or mounted upright in a closet style configuration. This is in place of the existing unit ventilators in the classrooms and offices. Outside air would be provided by a dedicated central outside air heat pump distributed by ductwork above the corridor to each occupied zone. This system would provide ventilation air to replace the outside air openings currently ducted to each unit ventilator. The air to air heat pumps would be replaced with packaged rooftop ground source heat pumps. The proposed outside air unit would include an energy recovery wheel for additional savings on ventilation air. This ECM also includes installation of new ground loop water pumps with VFD drives. The pumping system is included to pump transfer fluid from the building to the well field and back. The geothermal system would require (not limited to) the following major components:

1. 1500-Ton (Heating Dominant) bore field located Southwest end of the building. (500 bores, 450 ft deep each). Bore field sizing is based on 150 linear feet of bore per ton of cooling. A complete geotechnical analysis will have to be performed in order to confirm the actual soil thermal conductivity at the site.

2. (6) Loop condenser water pumps. 3. Condenser water piping distribution system from the well field to the roof top units

and indoor heat pumps. 4. Installation of high-efficiency (16 EER) geothermal rooftop units to provide heated

and cooled ventilation air and (18 EER) geothermal indoor heat pumps to replace the classroom unit ventilators.

5. Removal all existing AC units, air handlers and air to air heat pumps.

This ECM is based on Climate Master Tranquility Series water source heat pumps model TRE for the rooftop units, and model TS or TV for the horizontal / vertical units or equal. Note:

Page 30: Facility COVER SHEET- Voorhees Middle School Audit...The typical hours of operation for Voorhees Middle School are Monday through Friday between 7:00 am and 3:00 pm during the normal

Voorhees Township Public Schools – Voorhees Middle School Energy Audit

Concord Engineering Group, Inc. 9C11026 November 18, 2011 Page 29 of 32

Sizing indicated within the calculation of this ECM is based on a one for one replacement of the existing equipment. Owner should have a Professional Engineer verify heating and cooling loads prior to moving forward with this ECM. Energy Savings Calculations: The energy savings calculations are based on the energy analysis performed on the energy modeling software by Trane (Trace 700 ver. 6.2.4). The energy consumption of the baseline is compared to the proposed model to determine energy savings for each utility. The savings are applied to the average energy costs based on the facilities actual usage. Note: Heating and cooling is provided for the entire building the geothermal system model. Heating and cooling is only provided for the new addition in the baseline model with heating only provided for the original building. This ECM represents a significant upgrade to the building’s HVAC system.

ECM INPUTS EXISTING PROPOSED SAVINGS

ECM INPUTSExisting Energy Consumption

Proposed Energy Consumption

Elec Usage (KWH) 4,306,653 2,189,602 2,117,051

Electric Cost ($/KWH) $0.128 $0.128

ECM RESULTS EXISTING PROPOSED SAVINGS

Electric Energy Cost ($) $551,252 $280,269 $270,983

Total Energy Cost ($) $551,252 $280,269 $270,983

ECM #7 GEOTHERMAL SYSTEM CALCULATIONS

ENERGY SAVINGS CALCULATIONS

This ECM is based on energy models performed on energy analysis software by Trane (Trace 700).

COMMENTS:

Page 31: Facility COVER SHEET- Voorhees Middle School Audit...The typical hours of operation for Voorhees Middle School are Monday through Friday between 7:00 am and 3:00 pm during the normal

Voorhees Township Public Schools – Voorhees Middle School Energy Audit

Concord Engineering Group, Inc. 9C11026 November 18, 2011 Page 30 of 32

Energy Savings Summary:

*Note: ECM #7 – Geothermal System Installation is an alternate ECM. Implementation of ECM #7 would eliminate the potential for ECM #s – 2, 3 & 4.

Installation Cost ($): $7,666,529

NJ Smart Start Equipment Incentive ($): $675,000

Net Installation Cost ($): $6,991,529

Maintenance Savings ($/Yr): $0

Energy Savings ($/Yr): $270,983

Total Yearly Savings ($/Yr): $270,983

Estimated ECM Lifetime (Yr): 25

Simple Payback 25.8

Simple Lifetime ROI -3.1%

Simple Lifetime Maintenance Savings $0

Simple Lifetime Savings $6,774,575Internal Rate of Return (IRR) 0%Net Present Value (NPV) ($2,272,861.75)

ECM #7 - ENERGY SAVINGS SUMMARY

Page 32: Facility COVER SHEET- Voorhees Middle School Audit...The typical hours of operation for Voorhees Middle School are Monday through Friday between 7:00 am and 3:00 pm during the normal

Voorhees Township Public Schools – Voorhees Middle School Energy Audit

Concord Engineering Group, Inc. 9C11026 November 18, 2011 Page 31 of 32

REM #1: Rooftop Solar Array Description: Voorhees Middle School has approximately 14,695 square-foot of available roof space that can accommodate a 114.2 KW solar array, assuming the existing roof structure is capable of supporting such an array. The array will produce approximately 172,253 kilowatt-hours annually that will reduce the overall electric usage of the facility by 4.00 %. Energy Savings Calculations: See LGEA Solar Financials Appendix F for detailed financial summary and proposed solar layout areas. Energy Savings Summary:

Installation Cost ($): $990,305NJ Smart Start Equipment Incentive ($): $0Net Installation Cost ($): $990,305Maintenance Savings ($/Yr): $66,422

Energy Savings ($/Yr): $26,527Total Yearly Savings ($/Yr): $92,949Estimated ECM Lifetime (Yr): 15Simple Payback 10.7Simple Lifetime ROI 40.8%Simple Lifetime Maintenance Savings $996,330Simple Lifetime Savings $1,394,235Internal Rate of Return (IRR) 5%Net Present Value (NPV) $119,314.13

REM #1 - ENERGY SAVINGS SUMMARY

Page 33: Facility COVER SHEET- Voorhees Middle School Audit...The typical hours of operation for Voorhees Middle School are Monday through Friday between 7:00 am and 3:00 pm during the normal

Voorhees Township Public Schools – Voorhees Middle School Energy Audit

Concord Engineering Group, Inc. 9C11026 November 18, 2011 Page 32 of 32

V. ADDITIONAL RECOMMENDATIONS The following recommendations include no cost/low cost measures, Operation & Maintenance (O&M) items, and water conservation measures with attractive paybacks. These measures are not eligible for the Smart Start Buildings incentives from the office of Clean Energy but save energy none the less.

A. Chemically clean the condenser and evaporator coils periodically to optimize efficiency. Poorly maintained heat transfer surfaces can reduce efficiency 5-10%.

B. Maintain all weather stripping on windows and doors.

C. Clean all light fixtures to maximize light output.

D. Provide more frequent air filter changes to decrease overall system power usage and maintain better IAQ.

E. Turn off computers when not in use. Ensure computers are not running in screen saver mode which saves the monitor screen not energy.

F. Ensure outside air dampers are functioning properly and only open during occupied mode.

Page 34: Facility COVER SHEET- Voorhees Middle School Audit...The typical hours of operation for Voorhees Middle School are Monday through Friday between 7:00 am and 3:00 pm during the normal

Appendix Energy Audit

Concord Engineering Group, Inc.

APPENDIX A

Page 35: Facility COVER SHEET- Voorhees Middle School Audit...The typical hours of operation for Voorhees Middle School are Monday through Friday between 7:00 am and 3:00 pm during the normal

APPENDIX A1 of 1

LIFETIME ENERGY SAVINGS

LIFETIME MAINTENANCE

SAVINGSLIFETIME ROI SIMPLE PAYBACK INTERNAL RATE OF

RETURN (IRR)NET PRESENT VALUE

(NPV)

MATERIAL LABOR REBATES, INCENTIVES

NET INSTALLATION

COSTENERGY MAINT. / SREC TOTAL (Yearly Saving * ECM Lifetime)

(Yearly Maint Svaing * ECM Lifetime)

(Lifetime Savings - Net Cost) / (Net Cost) (Net cost / Yearly Savings)

($) ($) ($) ($) ($/Yr) ($/Yr) ($/Yr) (Yr) ($) ($) (%) (Yr) ($) ($)

ECM #1 Lighting Upgrades $14,780 $22,170 $0 $36,950 $7,037 $0 $7,037 15 $105,555 $0 185.7% 5.3 17.31% $47,057.25

ECM #2 Lighting Controls $9,060 $13,590 $1,750 $20,900 $5,985 $0 $5,985 15 $89,775 $0 329.5% 3.5 27.92% $50,548.54

ECM #3 Split System Heat Pump and Rooftop Heat Pump Replacement $68,572 $45,715 $3,680 $110,607 $13,782 $0 $13,782 15 $206,730 $0 86.9% 8.0 9.07% $53,921.62

ECM #4 AC Unit Replacement $62,500 $62,500 $7,366 $117,634 $3,371 $0 $3,371 15 $50,565 $0 -57.0% 34.9 -9.08% ($77,391.22)

ECM #5 DDC Controls $346,973 $346,973 $0 $693,946 $48,781 $0 $48,781 15 $731,715 $0 5.4% 14.2 0.67% ($111,601.59)

ECM #6 Water Conservation $55,982 $37,321 $0 $93,303 $7,350 $0 $7,350 15 $110,250 $0 18.2% 12.7 2.16% ($5,559.18)

ECM #7 Geothermal Heat Pump System $3,264,529 $4,402,000 $675,000 $6,991,529 $270,983 $0 $270,983 25 $6,774,575 $0 -3.1% 25.8 -0.24% ($2,272,861.75)

REM #1 Rooftop Solar Array $990,305 $0 $0 $990,305 $26,527 $66,422 $92,949 15 $1,394,235 $996,330 40.8% 10.7 4.62% $119,314.13

Notes: 1) The variable Cn in the formulas for Internal Rate of Return and Net Present Value stands for the cash flow during each period.2) The variable DR in the NPV equation stands for Discount Rate3) For NPV and IRR calculations: From n=0 to N periods where N is the lifetime of ECM and Cn is the cash flow during each period .

REM RENEWABLE ENERGY AND FINANCIAL COSTS AND SAVINGS SUMMARY

ECM COST & SAVINGS BREAKDOWNCONCORD ENGINEERING GROUP

Voorhees Township Public Schools – Voorhees Middle School

INSTALLATION COST YEARLY SAVINGSECM

LIFETIMEDESCRIPTIONECM NO.

ECM ENERGY AND FINANCIAL COSTS AND SAVINGS SUMMARY

Page 36: Facility COVER SHEET- Voorhees Middle School Audit...The typical hours of operation for Voorhees Middle School are Monday through Friday between 7:00 am and 3:00 pm during the normal

Appendix Energy Audit

Concord Engineering Group, Inc.

APPENDIX B

Page 37: Facility COVER SHEET- Voorhees Middle School Audit...The typical hours of operation for Voorhees Middle School are Monday through Friday between 7:00 am and 3:00 pm during the normal

Appendix B Page 1 of 3

Concord Engineering Group, Inc. 520 BURNT MILL ROAD VOORHEES, NEW JERSEY 08043 PHONE: (856) 427-0200 FAX: (856) 427-6508

SmartStart Building Incentives The NJ SmartStart Buildings Program offers financial incentives on a wide variety of building system equipment. The incentives were developed to help offset the initial cost of energy-efficient equipment. The following tables show the current available incentives as of February, 2010:

Electric Chillers Water-Cooled Chillers $12 - $170 per ton

Air-Cooled Chillers $8 - $52 per ton Energy Efficiency must comply with ASHRAE 90.1-2004

Gas Cooling Gas Absorption Chillers $185 - $400 per ton

Gas Engine-Driven Chillers Calculated through custom measure path)

Desiccant Systems $1.00 per cfm – gas or electric

Electric Unitary HVAC Unitary AC and Split Systems $73 - $93 per ton

Air-to-Air Heat Pumps $73 - $92 per ton Water-Source Heat Pumps $81 per ton

Packaged Terminal AC & HP $65 per ton Central DX AC Systems $40- $72 per ton

Dual Enthalpy Economizer Controls $250 Occupancy Controlled Thermostat

(Hospitality & Institutional Facility) $75 per thermostat

Energy Efficiency must comply with ASHRAE 90.1-2004

Ground Source Heat Pumps

Closed Loop & Open Loop $450 per ton, EER ≥ 16 $600 per ton, EER ≥ 18 $750 per ton, EER ≥ 20

Energy Efficiency must comply with ASHRAE 90.1-2004

Page 38: Facility COVER SHEET- Voorhees Middle School Audit...The typical hours of operation for Voorhees Middle School are Monday through Friday between 7:00 am and 3:00 pm during the normal

Appendix B Page 2 of 3

Gas Heating Gas Fired Boilers < 300 MBH $300 per unit

Gas Fired Boilers ≥ 300 - 1500 MBH $1.75 per MBH

Gas Fired Boilers ≥1500 - ≤ 4000 MBH $1.00 per MBH

Gas Fired Boilers > 4000 MBH (Calculated through Custom Measure Path)

Gas Furnaces $300 - $400 per unit, AFUE ≥ 92%

Variable Frequency Drives

Variable Air Volume $65 - $155 per hp Chilled-Water Pumps $60 per hp

Compressors $5,250 to $12,500 per drive

Natural Gas Water Heating Gas Water Heaters ≤ 50 gallons $50 per unit

Gas-Fired Water Heaters > 50 gallons $1.00 - $2.00 per MBH Gas-Fired Booster Water Heaters $17 - $35 per MBH Gas Fired Tankless Water Heaters $300 per unit

Prescriptive Lighting Retro fit of T12 to T-5 or T-8 Lamps

w/Electronic Ballast in Existing Facilities

$10 per fixture (1-4 lamps)

Replacement of T12 with new T-5 or T-8 Lamps w/Electronic Ballast in

Existing Facilities

$25 per fixture (1-2 lamps) $30 per fixture (3-4 lamps)

Replacement of incandescent with screw-in PAR 38 or PAR 30 (CFL)

bulb $7 per bulb

T-8 reduced Wattage (28w/25w 4’, 1-4 lamps)

Lamp & ballast replacement $10 per fixture

Hard-Wired Compact Fluorescent $25 - $30 per fixture

Metal Halide w/Pulse Start $25 per fixture LED Exit Signs $10 - $20 per fixture

T-5 and T-8 High Bay Fixtures $16 - $284 per fixture

HID ≥ 100w Retrofit with induction lamp, power coupler and generator

(must be 30% less watts/fixture than HID system)

$50 per fixture

HID ≥ 100w Replacement with new HID ≥ 100w $70 per fixture

LED Refrigerator/Freezer case lighting replacement of fluorescent in medium

and low temperature display case

$42 per 5 foot $65 per 6 foot

Page 39: Facility COVER SHEET- Voorhees Middle School Audit...The typical hours of operation for Voorhees Middle School are Monday through Friday between 7:00 am and 3:00 pm during the normal

Appendix B Page 3 of 3

Lighting Controls – Occupancy Sensors Wall Mounted $20 per control

Remote Mounted $35 per control Daylight Dimmers $25 per fixture

Occupancy Controlled hi-low Fluorescent Controls $25 per fixture controlled

Lighting Controls – HID or Fluorescent Hi-Bay Controls Occupancy hi-low $75 per fixture controlled Daylight Dimming $75 per fixture controlled

Daylight Dimming - office $50 per fixture controlled

Premium Motors Three-Phase Motors $45 - $700 per motor

Fractional HP Motors Electronic Communicated Motors (replacing shaded pole motors in

refrigerator/freezer cases)

$40 per electronic communicated motor

Other Equipment Incentives

Performance Lighting

$1.00 per watt per SF below program incentive threshold, currently 5% more energy efficient than ASHRAE 90.1-

2004 for New Construction and Complete Renovation

Custom Electric and Gas Equipment Incentives not prescriptive

Custom Measures

$0.16 KWh and $1.60/Therm of 1st year savings, or a buy down to a 1 year

payback on estimated savings. Minimum required savings of 75,000 KWh or 1,500 Therms and a IRR of at

least 10%. Multi Measures Bonus 15%

Page 40: Facility COVER SHEET- Voorhees Middle School Audit...The typical hours of operation for Voorhees Middle School are Monday through Friday between 7:00 am and 3:00 pm during the normal

Appendix Energy Audit

Concord Engineering Group, Inc.

APPENDIX C

Page 41: Facility COVER SHEET- Voorhees Middle School Audit...The typical hours of operation for Voorhees Middle School are Monday through Friday between 7:00 am and 3:00 pm during the normal

OMB No. 2060-0347

STATEMENT OF ENERGY PERFORMANCEVoorhees Middle School

Building ID: 2820752 For 12-month Period Ending: February 28, 20111

Date SEP becomes ineligible: N/A Date SEP Generated: August 03, 2011

FacilityVoorhees Middle School1000 Holly Oak DriveVoorhees, NJ 08043

Facility OwnerVoorhees Township Board of Education329 Route 73 Voorhees, NJ 08043

Primary Contact for this FacilityFrank DeBerardinis329 Route 73 Voorhees, NJ 08043

Year Built: 1972Gross Floor Area (ft2): 198,270

Energy Performance Rating2 (1-100) 3

Site Energy Use Summary3

Electricity - Grid Purchase(kBtu) 14,694,300 Natural Gas - (kBtu)4 0 Total Energy (kBtu) 14,694,300

Energy Intensity5 Site (kBtu/ft2/yr) 74 Source (kBtu/ft2/yr) 248 Emissions (based on site energy use) Greenhouse Gas Emissions (MtCO2e/year) 2,081 Electric Distribution Utility Public Service Electric & Gas Co National Average Comparison National Average Site EUI 40 National Average Source EUI 135 % Difference from National Average Source EUI 84% Building Type K-12

School

Stamp of Certifying Professional

Based on the conditions observed at thetime of my visit to this building, I certify that

the information contained within thisstatement is accurate.

Meets Industry Standards6 for Indoor EnvironmentalConditions:Ventilation for Acceptable Indoor Air Quality N/A Acceptable Thermal Environmental Conditions N/A Adequate Illumination N/A

Certifying ProfessionalMichael Fischette520 South Burnt Mill Road Voorhees, NJ 08043

Notes: 1. Application for the ENERGY STAR must be submitted to EPA within 4 months of the Period Ending date. Award of the ENERGY STAR is not final until approval is received from EPA.2. The EPA Energy Performance Rating is based on total source energy. A rating of 75 is the minimum to be eligible for the ENERGY STAR.3. Values represent energy consumption, annualized to a 12-month period.4. Values represent energy intensity, annualized to a 12-month period.5. Based on Meeting ASHRAE Standard 62 for ventilation for acceptable indoor air quality, ASHRAE Standard 55 for thermal comfort, and IESNA Lighting Handbook for lighting quality.

The government estimates the average time needed to fill out this form is 6 hours (includes the time for entering energy data, Licensed Professional facility inspection, and notarizing the SEP) andwelcomes suggestions for reducing this level of effort. Send comments (referencing OMB control number) to the Director, Collection Strategies Division, U.S., EPA (2822T), 1200 Pennsylvania Ave.,NW, Washington, D.C. 20460.

EPA Form 5900-16

Page 42: Facility COVER SHEET- Voorhees Middle School Audit...The typical hours of operation for Voorhees Middle School are Monday through Friday between 7:00 am and 3:00 pm during the normal

ENERGY STAR®

Data Checklistfor Commercial Buildings

In order for a building to qualify for the ENERGY STAR, a Professional Engineer (PE) or a Registered Architect (RA) must validate the accuracy of the data underlyingthe building's energy performance rating. This checklist is designed to provide an at-a-glance summary of a property's physical and operating characteristics, as well asits total energy consumption, to assist the PE or RA in double-checking the information that the building owner or operator has entered into Portfolio Manager.

Please complete and sign this checklist and include it with the stamped, signed Statement of Energy Performance.NOTE: You must check each box to indicate that each value is correct, OR include a note.

CRITERION VALUE AS ENTERED INPORTFOLIO MANAGER VERIFICATION QUESTIONS NOTES

Building Name Voorhees Middle School Is this the official building name to be displayed inthe ENERGY STAR Registry of LabeledBuildings?

Type K-12 School Is this an accurate description of the space inquestion?

Location 1000 Holly Oak Drive,Voorhees, NJ 08043

Is this address accurate and complete? Correctweather normalization requires an accurate zipcode.

Single Structure Single Facility

Does this SEP represent a single structure? SEPscannot be submitted for multiple-buildingcampuses (with the exception of acute care orchildren's hospitals) nor can they be submitted asrepresenting only a portion of a building

Voorhees Middle School (K-12 School)

CRITERION VALUE AS ENTERED INPORTFOLIO MANAGER VERIFICATION QUESTIONS NOTES

Gross Floor Area 198,270 Sq. Ft.

Does this square footage include all supportingfunctions such as kitchens and break rooms usedby staff, storage areas, administrative areas,elevators, stairwells, atria, vent shafts, etc. Alsonote that existing atriums should only include thebase floor area that it occupies. Interstitial(plenum) space between floors should not beincluded in the total. Finally gross floor area is notthe same as leasable space. Leasable space is asubset of gross floor area.

Open Weekends? No

Is this building normally open at all on theweekends? This includes activities beyond thework conducted by maintenance, cleaning, andsecurity personnel. Weekend activity could includeany time when the space is used for classes,performances or other school or communityactivities. If the building is open on the weekend aspart of the standard schedule during one or moreseasons, the building should select ?yes? for openweekends. The ?yes? response should applywhether the building is open for one or both of theweekend days.

Number of PCs 347 (Default) Is this the number of personal computers in theK12 School?

Number of walk-inrefrigeration/freezer

units 2 (Default)

Is this the total number of commercial walk-in typefreezers and coolers? These units are typicallyfound in storage and receiving areas.

Presence ofcooking facilities Yes

Does this school have a dedicated space in whichfood is prepared and served to students? If theschool has space in which food for students is onlykept warm and/or served to students, or has only agalley that is used by teachers and staff then theanswer is "no".

Percent Cooled 100 % Is this the percentage of the total floor space withinthe facility that is served by mechanical coolingequipment?

Percent Heated 100 % Is this the percentage of the total floor space withinthe facility that is served by mechanical heatingequipment?

Months 11(Optional) Is this school in operation for at least 8 months ofthe year?

Page 1 of 3

Page 43: Facility COVER SHEET- Voorhees Middle School Audit...The typical hours of operation for Voorhees Middle School are Monday through Friday between 7:00 am and 3:00 pm during the normal

High School? No

Is this building a high school (teaching grades 10,11, and/or 12)? If the building teaches to highschool students at all, the user should check 'yes'to 'high school'. For example, if the school teachesto grades K-12 (elementary/middle and highschool), the user should check 'yes' to 'highschool'.

Page 2 of 3

Page 44: Facility COVER SHEET- Voorhees Middle School Audit...The typical hours of operation for Voorhees Middle School are Monday through Friday between 7:00 am and 3:00 pm during the normal

ENERGY STAR®

Data Checklistfor Commercial Buildings

Energy ConsumptionPower Generation Plant or Distribution Utility: Public Service Electric & Gas Co

Fuel Type: Electricity

Meter: Electric (kWh (thousand Watt-hours))Space(s): Entire Facility

Generation Method: Grid Purchase

Start Date End Date Energy Use (kWh (thousand Watt-hours))

02/01/2011 02/28/2011 519,292.00

01/01/2011 01/31/2011 684,727.00

12/01/2010 12/31/2010 651,201.00

11/01/2010 11/30/2010 369,208.00

10/01/2010 10/31/2010 253,190.00

09/01/2010 09/30/2010 255,473.00

08/01/2010 08/31/2010 263,605.00

07/01/2010 07/31/2010 242,938.00

06/01/2010 06/30/2010 295,988.00

05/01/2010 05/31/2010 241,610.00

04/01/2010 04/30/2010 202,944.00

03/01/2010 03/31/2010 326,477.00

Electric Consumption (kWh (thousand Watt-hours)) 4,306,653.00

Electric Consumption (kBtu (thousand Btu)) 14,694,300.04

Total Electricity (Grid Purchase) Consumption (kBtu (thousand Btu)) 14,694,300.04

Is this the total Electricity (Grid Purchase) consumption at this building including allElectricity meters?

Additional FuelsDo the fuel consumption totals shown above represent the total energy use of this building?Please confirm there are no additional fuels (district energy, generator fuel oil) used in this facility.

On-Site Solar and Wind EnergyDo the fuel consumption totals shown above include all on-site solar and/or wind power located atyour facility? Please confirm that no on-site solar or wind installations have been omitted from thislist. All on-site systems must be reported.

Certifying Professional (When applying for the ENERGY STAR, the Certifying Professional must be the same PE or RA that signed and stamped the SEP.)

Name: _____________________________________________ Date: _____________

Signature: ______________________________________ Signature is required when applying for the ENERGY STAR.

Page 3 of 3

Page 45: Facility COVER SHEET- Voorhees Middle School Audit...The typical hours of operation for Voorhees Middle School are Monday through Friday between 7:00 am and 3:00 pm during the normal

FOR YOUR RECORDS ONLY. DO NOT SUBMIT TO EPA.

Please keep this Facility Summary for your own records; do not submit it to EPA. Only the Statement of Energy Performance(SEP), Data Checklist and Letter of Agreement need to be submitted to EPA when applying for the ENERGY STAR.

FacilityVoorhees Middle School1000 Holly Oak DriveVoorhees, NJ 08043

Facility OwnerVoorhees Township Board of Education329 Route 73 Voorhees, NJ 08043

Primary Contact for this FacilityFrank DeBerardinis329 Route 73 Voorhees, NJ 08043

General InformationVoorhees Middle School

Gross Floor Area Excluding Parking: (ft2) 198,270 Year Built 1972 For 12-month Evaluation Period Ending Date: February 28, 2011

Facility Space Use SummaryVoorhees Middle School

Space Type K-12 School

Gross Floor Area(ft2) 198,270

Open Weekends? No

Number of PCsd 347

Number of walk-in refrigeration/freezerunitsd 2

Presence of cooking facilities Yes

Percent Cooled 100

Percent Heated 100

Monthso 11

High School? No

School Districto N/A

Energy Performance ComparisonEvaluation Periods Comparisons

Performance Metrics Current(Ending Date 02/28/2011)

Baseline(Ending Date 02/28/2011) Rating of 75 Target National Average

Energy Performance Rating 3 3 75 N/A 50

Energy Intensity

Site (kBtu/ft2) 74 74 32 N/A 40

Source (kBtu/ft2) 248 248 105 N/A 135

Energy Cost

$/year N/A N/A N/A N/A N/A

$/ft2/year N/A N/A N/A N/A N/A

Greenhouse Gas Emissions

MtCO2e/year 2,081 2,081 886 N/A 1,133

kgCO2e/ft2/year 10 10 4 N/A 5

More than 50% of your building is defined as K-12 School. Please note that your rating accounts for all of the spaces listed. The National Average column presentsenergy performance data your building would have if your building had an average rating of 50. Notes:o - This attribute is optional.d - A default value has been supplied by Portfolio Manager.

Page 46: Facility COVER SHEET- Voorhees Middle School Audit...The typical hours of operation for Voorhees Middle School are Monday through Friday between 7:00 am and 3:00 pm during the normal

2011Voorhees Middle School1000 Holly Oak DriveVoorhees, NJ 08043

Portfolio Manager Building ID: 2820752

The energy use of this building has been measured and compared to other similar buildings using theEnvironmental Protection Agency’s (EPA’s) Energy Performance Scale of 1–100, with 1 being the least energyefficient and 100 the most energy efficient. For more information, visit energystar.gov/benchmark.

This building’sscore

3

100

Most Efficient

This building uses 248 kBtu per square foot per year.*

*Based on source energy intensity for the 12 month period ending February 2011

Date of certification

Date Generated: 08/03/2011

Statement ofEnergy Performance

1

Least Efficient

50

Average

Buildings with a score of75 or higher may qualifyfor EPA’s ENERGY STAR.

I certify that the information contained within this statement is accurate and in accordance with U.S.Environmental Protection Agency’s measurement standards, found at energystar.gov

Page 47: Facility COVER SHEET- Voorhees Middle School Audit...The typical hours of operation for Voorhees Middle School are Monday through Friday between 7:00 am and 3:00 pm during the normal

Appendix Energy Audit

Concord Engineering Group, Inc.

APPENDIX D

Page 48: Facility COVER SHEET- Voorhees Middle School Audit...The typical hours of operation for Voorhees Middle School are Monday through Friday between 7:00 am and 3:00 pm during the normal

Appendix DPage 1 of 15

AC UnitsTag RTU-1 RTU-A HP-1

Unit Type Rooftop Unit Rooftop Unit Heat Pump

Qty 1 4 1

Location Roof Roof Roof

Area Served Food Service Area All Purpose Room A31/Woodshop

Manufacturer Ruud McQuay York

Model # USND-0420 CUR160E047 E1RC030506D

Serial # 4581F50929794 - WFMM004642

Cooling Type R22, DX R22, DX R22, DX

Cooling Capacity (Tons) 3.5 16.0 4

Cooling Efficiency (SEER/EER)

8.0 (est) 9.1 9.5

Heating Type Heat Pump N/A Heat Pump

Heating Input (MBH) N/A N/A 48 MBH

Efficiency N/A N/A N/A

Fuel N/A N/A Heat Pump

Approx Age 19 8 8

ASHRAE Service Life 15 15 15

Remaining Life (4) 7 7

Comments

Note:

MAJOR EQUIPMENT LISTConcord Engineering Group

Voorhees Middle School

"N/A" = Not Applicable. "-" = Info Not Available

Page 49: Facility COVER SHEET- Voorhees Middle School Audit...The typical hours of operation for Voorhees Middle School are Monday through Friday between 7:00 am and 3:00 pm during the normal

Appendix DPage 2 of 15

AC UnitsTag

Unit Type

Qty

Location

Area Served

Manufacturer

Model #

Serial #

Cooling Type

Cooling Capacity (Tons)

Cooling Efficiency (SEER/EER)

Heating Type

Heating Input (MBH)

Efficiency

Fuel

Approx Age

ASHRAE Service Life

Remaining Life

Comments

Note:"N/A" = Not Applicable. "-" = Info Not Available

HP-2 RTU-2 RTU-44

Condensing Unit Rooftop Unit Packaged Heat Pump

1 1 1

Roof Roof Roof

C-Wing Art Office Library Classroom B-12

Payne Trane Rheem

PH10JA018-E TED360B4D*2A6DE RJMA-A048DL

4303E25586 C10E02430 5594F09

R22, DX R22, DX R22, DX

1.5 30.0 4.0

9.5 10.0 9.5

Heat Pump Electric Heat Pump

17 MBH 90 kW 48 MBH

- 100% 3.04 COP

Heat Pump Electric Heat Pump

8 8 8

15 15 15

7 7 7

Page 50: Facility COVER SHEET- Voorhees Middle School Audit...The typical hours of operation for Voorhees Middle School are Monday through Friday between 7:00 am and 3:00 pm during the normal

Appendix DPage 3 of 15

AC UnitsTag

Unit Type

Qty

Location

Area Served

Manufacturer

Model #

Serial #

Cooling Type

Cooling Capacity (Tons)

Cooling Efficiency (SEER/EER)

Heating Type

Heating Input (MBH)

Efficiency

Fuel

Approx Age

ASHRAE Service Life

Remaining Life

Comments

Note:"N/A" = Not Applicable. "-" = Info Not Available

RTU-3 RTU-4 RTU-5

Packaged Heat Pump Packaged Heat Pump Packaged Heat Pump

1 1 1

Roof Roof Rooftop Unit

B-14 B-7 B-5

Rheem Rheem Rheem

RJMA-A048DL015 RJMA-A048DL RJMA-A060DL

- - 5598F090305647

R22, DX R22, DX R22, DX

4.0 4.0 5.0

9.3 9.3 9.3

Heat Pump Heat Pump Heat Pump

48 MBH 48 MBH 60 MBH

3.04 COP 3.04 COP 3.04 COP

Heat Pump Heat Pump Heat Pump

8 8 8

15 15 15

7 7 7

Page 51: Facility COVER SHEET- Voorhees Middle School Audit...The typical hours of operation for Voorhees Middle School are Monday through Friday between 7:00 am and 3:00 pm during the normal

Appendix DPage 4 of 15

AC UnitsTag

Unit Type

Qty

Location

Area Served

Manufacturer

Model #

Serial #

Cooling Type

Cooling Capacity (Tons)

Cooling Efficiency (SEER/EER)

Heating Type

Heating Input (MBH)

Efficiency

Fuel

Approx Age

ASHRAE Service Life

Remaining Life

Comments

Note:"N/A" = Not Applicable. "-" = Info Not Available

RTU-6 RTU-7 RTU-1.08

Packaged Heat Pump Rooftop Unit Packaged Heat Pump

1 1 1

Roof Roof Roof

B-3 Guidance/Assistant Principle A-15

Rheem York Trane

RJMA-A048DL B1HH030A46B 4WCC3036A300AS

5594F090305639 (S) NEMM049279 9345NAL9H

R22, DX R-22, D/X R-410A

4.0 30 MBH 3.0

9.3 12.0 11.0

Heat Pump Heat Pump Heat Pump

48 MBH 31.7 MBH 35 MBH

3.04 COP 3.04 COP N/A

Heat Pump Heat Pump R-410A

8 8 2

15 15 15

7 7 13

Page 52: Facility COVER SHEET- Voorhees Middle School Audit...The typical hours of operation for Voorhees Middle School are Monday through Friday between 7:00 am and 3:00 pm during the normal

Appendix DPage 5 of 15

AC UnitsTag

Unit Type

Qty

Location

Area Served

Manufacturer

Model #

Serial #

Cooling Type

Cooling Capacity (Tons)

Cooling Efficiency (SEER/EER)

Heating Type

Heating Input (MBH)

Efficiency

Fuel

Approx Age

ASHRAE Service Life

Remaining Life

Comments

Note:"N/A" = Not Applicable. "-" = Info Not Available

RTU-1.09 RTU-1.10 RTU-1.11

Packaged Heat Pump Packaged Heat Pump Packaged Heat Pump

1 1 1

Roof Roof Roof

A-17 A-19 A-21

Trane Trane Trane

4WCC3036A300 4WCC3036A 4WCC3024A

9324R729H 10025LWD9H 10264M249H

R-410A R-410A R-410A

3.0 3.0 2.0

11.0 11.0 11.0

Heat Pump Heat Pump Heat Pump

35 MBH 35 MBH 22.4 MBH

N/A N/A N/A

R-410A R-410A R-410A

2 1 1

15 15 15

13 14 14

Page 53: Facility COVER SHEET- Voorhees Middle School Audit...The typical hours of operation for Voorhees Middle School are Monday through Friday between 7:00 am and 3:00 pm during the normal

Appendix DPage 6 of 15

AC UnitsTag

Unit Type

Qty

Location

Area Served

Manufacturer

Model #

Serial #

Cooling Type

Cooling Capacity (Tons)

Cooling Efficiency (SEER/EER)

Heating Type

Heating Input (MBH)

Efficiency

Fuel

Approx Age

ASHRAE Service Life

Remaining Life

Comments

Note:"N/A" = Not Applicable. "-" = Info Not Available

RTU-1.12 RTU-1.05 RTU-1.06

Packaged Heat Pump Packaged Heat Pump Packaged Heat Pump

1 1 1

Roof Roof Roof

A-23 A-9 A-11

Trane Trane Trane

4WCC3024A 4WCC3024A1 4WCC3036A4

10263T559H 102621199 100641DB9H

R-410A R-410A R-410A

2.0 2.0 3.0

11.0 11.0 11.0

Heat Pump Heat Pump Heat Pump

22.4 MBH 22.4 MBH 35 MBH

N/A N/A N/A

R-410A R-410A R-410A

1 1 1

15 15 15

14 14 14

Page 54: Facility COVER SHEET- Voorhees Middle School Audit...The typical hours of operation for Voorhees Middle School are Monday through Friday between 7:00 am and 3:00 pm during the normal

Appendix DPage 7 of 15

AC UnitsTag

Unit Type

Qty

Location

Area Served

Manufacturer

Model #

Serial #

Cooling Type

Cooling Capacity (Tons)

Cooling Efficiency (SEER/EER)

Heating Type

Heating Input (MBH)

Efficiency

Fuel

Approx Age

ASHRAE Service Life

Remaining Life

Comments

Note:"N/A" = Not Applicable. "-" = Info Not Available

RTU-1.07 CU-3 RTU-1.13

Packaged Heat Pump Condensing Unit Packaged Heat Pump

1 1 1

Roof Roof Roof

A-13 Server Room Server Room / P-17

Trane Mitsubishi Trane

4WCC3036A3 PUY-A36NHA2 4WCC3024A1

10014CK09M 8ZU020314 10263T5L9H

R-410A R-410A R-410A

3.0 3.0 2.0

11.0 12.0 11.0

Heat Pump N/A Heat Pump

35 MBH N/A 22.4 MBH

N/A N/A N/A

R-410A N/A R-410A

1 1 1

15 15 15

14 14 14

Page 55: Facility COVER SHEET- Voorhees Middle School Audit...The typical hours of operation for Voorhees Middle School are Monday through Friday between 7:00 am and 3:00 pm during the normal

Appendix DPage 8 of 15

AC UnitsTag

Unit Type

Qty

Location

Area Served

Manufacturer

Model #

Serial #

Cooling Type

Cooling Capacity (Tons)

Cooling Efficiency (SEER/EER)

Heating Type

Heating Input (MBH)

Efficiency

Fuel

Approx Age

ASHRAE Service Life

Remaining Life

Comments

Note:"N/A" = Not Applicable. "-" = Info Not Available

RTU-A3 RTU-8 RTU-1.01

Rooftop Unit Rooftop Unit Packaged Heat Pump

1 1 1

Roof Roof Roof

- - Main Office

York York Trane

DJ300E28C4MAA1A DJ180E18CHMAA1D 4WCC3024A1

NFMM069619 NFMM069616 1026210G94

25 15 R-410A

25.0 15.0 2.0

11.0 10.0 11.0

Electric Electric Heat Pump

28 KW 18 KW 22.4 MBH

100% 100% N/A

Electric Electric R-410A

8 8 1

15 15 15

7 7 14

Page 56: Facility COVER SHEET- Voorhees Middle School Audit...The typical hours of operation for Voorhees Middle School are Monday through Friday between 7:00 am and 3:00 pm during the normal

Appendix DPage 9 of 15

AC UnitsTag

Unit Type

Qty

Location

Area Served

Manufacturer

Model #

Serial #

Cooling Type

Cooling Capacity (Tons)

Cooling Efficiency (SEER/EER)

Heating Type

Heating Input (MBH)

Efficiency

Fuel

Approx Age

ASHRAE Service Life

Remaining Life

Comments

Note:"N/A" = Not Applicable. "-" = Info Not Available

RTU-1.04 RTU-1.03 CU-5, CU-6

Packaged Heat Pump Packaged Heat Pump Condensing Unit

1 1 2

Roof Roof Roof

Nurse Office A-2 Theater Left / Right Auditorium

Trane Trane McQuay

4WCC3048A4 4WCC3048A4 ALP045C

907283C9H 10062K1F9H 5TH0175000 / 5TH0175500

R-410A R-410A R22, DX

4.0 4.0 45.0

11.0 11.0 9.2

Heat Pump Heat Pump N/A

47 MBH 47 MBH N/A

N/A N/A N/A

R-410A R-410A N/A

2 1 7

15 15 15

13 14 8

Page 57: Facility COVER SHEET- Voorhees Middle School Audit...The typical hours of operation for Voorhees Middle School are Monday through Friday between 7:00 am and 3:00 pm during the normal

Appendix DPage 10 of 15

AC UnitsTag

Unit Type

Qty

Location

Area Served

Manufacturer

Model #

Serial #

Cooling Type

Cooling Capacity (Tons)

Cooling Efficiency (SEER/EER)

Heating Type

Heating Input (MBH)

Efficiency

Fuel

Approx Age

ASHRAE Service Life

Remaining Life

Comments

Note:"N/A" = Not Applicable. "-" = Info Not Available

RTU-9 RTU RTU

Rooftop Unit Split System AC Split System AC

1 1 1

Roof Roof Roof

Auditorium Lobby Lecture Hall Old Cafeteria

International Comfort Products Trane Trane

RAS096L0CA0AAAF TTA120B400EA TTA240B400CA

G103810552 32040F5AD 32035MCAP

R-410A R22, DX R22, DX

7.5 10.0 20.0

11.2 10.3 10.3

N/A Electric Electric

N/A 100 MBH 120 MBH

N/A N/A N/A

N/A R22 R22

2 8 8

15 15 15

13 7 7

Cooling Only

Page 58: Facility COVER SHEET- Voorhees Middle School Audit...The typical hours of operation for Voorhees Middle School are Monday through Friday between 7:00 am and 3:00 pm during the normal

Appendix DPage 11 of 15

AC UnitsTag

Unit Type

Qty

Location

Area Served

Manufacturer

Model #

Serial #

Cooling Type

Cooling Capacity (Tons)

Cooling Efficiency (SEER/EER)

Heating Type

Heating Input (MBH)

Efficiency

Fuel

Approx Age

ASHRAE Service Life

Remaining Life

Comments

Note:"N/A" = Not Applicable. "-" = Info Not Available

RTU CU-4 RTU-10Single Package Rooftop

Unit Packaged Heat Pump Packaged Heat Pump

1 1 1

Gym Roof Roof Roof

Gym Band Office Instrument Room

Carrier York York

50HJQ012-631 B1HH036A46B B2HH036A46B

3808G52452 S2002E41455 NCMM029291

R22, DX R22, DX R22, DX

10.0 3.0 3.0

11.0 9.3 9.3

Heat Pump Heat Pump Heat Pump

103 35 MBH 35 MBH

3.3 COP N/A N/A

N/A R22 R22

3 9 8

15 15 15

12 6 7

Page 59: Facility COVER SHEET- Voorhees Middle School Audit...The typical hours of operation for Voorhees Middle School are Monday through Friday between 7:00 am and 3:00 pm during the normal

Appendix DPage 12 of 15

AC UnitsTag

Unit Type

Qty

Location

Area Served

Manufacturer

Model #

Serial #

Cooling Type

Cooling Capacity (Tons)

Cooling Efficiency (SEER/EER)

Heating Type

Heating Input (MBH)

Efficiency

Fuel

Approx Age

ASHRAE Service Life

Remaining Life

Comments

Note:"N/A" = Not Applicable. "-" = Info Not Available

RTU-24

Packaged Heat Pump

1

Roof

A-24

York

B2HH060A46B

NEMM050726

R22, DX

5.0

9.5

Heat Pump

58 MBH

N/A

R22

8

15

7

Page 60: Facility COVER SHEET- Voorhees Middle School Audit...The typical hours of operation for Voorhees Middle School are Monday through Friday between 7:00 am and 3:00 pm during the normal

Appendix DPage 13 of 15

AHUsTag MU-1 MU-2

Unit Type Makeup Air Unit Makeup Air Unit

Qty 1 1

Location Roof Roof

Area Served B-5 B-12

Manufacturer Greenheck Greenheck

Model # MSX-109-H12-013 MSX-109-H12-DB

Serial # 02L10955 02L10956

Cooling Type N/A N/A

Cooling Capacity (Tons) N/A N/A

Cooling Efficiency (SEER/EER)

N/A N/A

Heating Type Electric Electric

Heating Input (MBH)

Efficiency

Fuel

Approx Age 19 19

ASHRAE Service Life 15 15

Remaining Life (4) (4)

Comments

Note:

MAJOR EQUIPMENT LISTConcord Engineering Group

Voorhees Middle School

"N/A" = Not Applicable. "-" = Info Not Available

Page 61: Facility COVER SHEET- Voorhees Middle School Audit...The typical hours of operation for Voorhees Middle School are Monday through Friday between 7:00 am and 3:00 pm during the normal

Appendix DPage 14 of 15

Unit VentilatorsTag UV

Unit Type Thru Wall Unit Ventilator

Qty 150 (est)

Location Classrooms

Manufacturer AAF

Model # U.AED.5.040.K.G.13HB7AL226BB1

Serial # Varies

Cooling Capacity (Tons) N/A

Estimated Cooling Efficiency (EER)

N/A

Heating Type Electric

Heating Input (MBH) -

Approx Age Varies

Ashrae Service Life 15

Remaining Life -

Comments

Note:

MAJOR EQUIPMENT LISTConcord Engineering Group

Voorhees Middle School

"N/A" = Not Applicable. "-" = Info Not Available

Page 62: Facility COVER SHEET- Voorhees Middle School Audit...The typical hours of operation for Voorhees Middle School are Monday through Friday between 7:00 am and 3:00 pm during the normal

Appendix DPage 15 of 15

Domestic Water HeatersTag

Unit Type Electric Hot Water Heater

Electric Hot Water Heater

Electric Hot Water Heater

Qty 1 1 1

Location Main Storage Room 2002 Addition Storage 1987 Auditorium

Area Served Original Building 2002 Addition 1987 Auditorium

Manufacturer Adamson A.O. Smith State

Model # PE163K DSE-65 PV-30-2RS

Serial # AE18D105H48F - -

Size (Gallons) - 65 30

Input Capacity (MBH/KW)

180KW 6KW 4.5KW

Recovery (Gal/Hr) - 82 -

Efficiency % 100% 100% 100%

Fuel Electric Electric Electric

Approx Age 39 9 24

ASHRAE Service Life 12 12 12

Remaining Life (27) 3 (12)

Comments

Note:

MAJOR EQUIPMENT LISTConcord Engineering Group

Voorhees Middle School

"N/A" = Not Applicable. "-" = Info Not Available

Page 63: Facility COVER SHEET- Voorhees Middle School Audit...The typical hours of operation for Voorhees Middle School are Monday through Friday between 7:00 am and 3:00 pm during the normal

Appendix Energy Audit

Concord Engineering Group, Inc.

APPENDIX E

Page 64: Facility COVER SHEET- Voorhees Middle School Audit...The typical hours of operation for Voorhees Middle School are Monday through Friday between 7:00 am and 3:00 pm during the normal

Investment Grade Lighting Audit APPENDIX E1 of 30

CEG Job #: 9C11026

Project: Voorhees Township BOE LGEA KWH COST: $0.128

1000 Holly Oak Drive

Voorhees, NJ 08043Bldg. Sq. Ft. 198,270

ECM #1: Lighting Upgrade - GeneralEXISTING LIGHTING PROPOSED LIGHTING SAVINGS

CEG Fixture Yearly No. No. Fixture Fixt Total kWh/Yr Yearly No. No. Retro-Unit Watts Total kWh/Yr Yearly Unit Cost Total kW kWh/Yr Yearly Yearly SimpleType Location Usage Fixts Lamps Type Watts kW Fixtures $ Cost Fixts Lamps Description Used kW Fixtures $ Cost (INSTALLED) Cost Savings Savings $ Savings Payback

232.22 B20 1800 9 32x4, 3 Lamp, 32w T8, Elect.

Ballast, Recessed Mnt., Parabolic Lens

86 0.77 1,393.2 $178.33 9 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

232.22 B19 1800 9 32x4, 3 Lamp, 32w T8, Elect.

Ballast, Recessed Mnt., Parabolic Lens

86 0.77 1,393.2 $178.33 9 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

232.22 B18 1800 9 32x4, 3 Lamp, 32w T8, Elect.

Ballast, Recessed Mnt., Parabolic Lens

86 0.77 1,393.2 $178.33 9 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

232.22 B17 1800 9 32x4, 3 Lamp, 32w T8, Elect.

Ballast, Recessed Mnt., Parabolic Lens

86 0.77 1,393.2 $178.33 9 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

232.22 B15 1800 9 32x4, 3 Lamp, 32w T8, Elect.

Ballast, Recessed Mnt., Parabolic Lens

86 0.77 1,393.2 $178.33 9 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

232.22 B16 1800 9 32x4, 3 Lamp, 32w T8, Elect.

Ballast, Recessed Mnt., Parabolic Lens

86 0.77 1,393.2 $178.33 9 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

232.22 B13 1800 9 32x4, 3 Lamp, 32w T8, Elect.

Ballast, Recessed Mnt., Parabolic Lens

86 0.77 1,393.2 $178.33 9 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

232.22 B14 1800 12 32x4, 3 Lamp, 32w T8, Elect.

Ballast, Recessed Mnt., Parabolic Lens

86 1.03 1,857.6 $237.77 12 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

232.22 B14 Storage 500 3 32x4, 3 Lamp, 32w T8, Elect.

Ballast, Recessed Mnt., Parabolic Lens

86 0.26 129.0 $16.51 3 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

232.22 B12 1800 12 32x4, 3 Lamp, 32w T8, Elect.

Ballast, Recessed Mnt., Parabolic Lens

86 1.03 1,857.6 $237.77 12 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

222.21 Corridor B20 - B12 3600 14 22x4, 2 Lamp, 32w T8, Elect.

Ballast, Recessed Mnt., Prismatic Lens

62 0.87 3,124.8 $399.97 14 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

232.22 B11 1800 9 32x4, 3 Lamp, 32w T8, Elect.

Ballast, Recessed Mnt., Parabolic Lens

86 0.77 1,393.2 $178.33 9 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

237.23 Staff Toilet 1800 5 32x2, 3 Lamp, 17w T8, Elect.

Ballast, Recessed Mnt., Prismatic Lens

51 0.26 459.0 $58.75 5 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

232.21 B10 1800 9 32x4, 3 Lamp, 32w T8, Elect.

Ballast, Recessed Mnt., Prismatic Lens

86 0.77 1,393.2 $178.33 9 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

222.21 Boy's Room 1800 3 22x4, 2 Lamp, 32w T8, Elect.

Ballast, Recessed Mnt., Prismatic Lens

62 0.19 334.8 $42.85 3 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

237.23 JC 500 2 32x2, 3 Lamp, 17w T8, Elect.

Ballast, Recessed Mnt., Prismatic Lens

51 0.10 51.0 $6.53 2 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

222.21 1800 3 22x4, 2 Lamp, 32w T8, Elect.

Ballast, Recessed Mnt., Prismatic Lens

62 0.19 334.8 $42.85 3 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

Girl's Room

Voorhees Middle School

Page 65: Facility COVER SHEET- Voorhees Middle School Audit...The typical hours of operation for Voorhees Middle School are Monday through Friday between 7:00 am and 3:00 pm during the normal

Investment Grade Lighting Audit APPENDIX E2 of 30

ECM #1: Lighting Upgrade - GeneralEXISTING LIGHTING PROPOSED LIGHTING SAVINGS

CEG Fixture Yearly No. No. Fixture Fixt Total kWh/Yr Yearly No. No. Retro-Unit Watts Total kWh/Yr Yearly Unit Cost Total kW kWh/Yr Yearly Yearly SimpleType Location Usage Fixts Lamps Type Watts kW Fixtures $ Cost Fixts Lamps Description Used kW Fixtures $ Cost (INSTALLED) Cost Savings Savings $ Savings Payback

237.23 1800 1 32x2, 3 Lamp, 17w T8, Elect.

Ballast, Recessed Mnt., Prismatic Lens

51 0.05 91.8 $11.75 1 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

232.21 B9 1800 9 32x4, 3 Lamp, 32w T8, Elect.

Ballast, Recessed Mnt., Prismatic Lens

86 0.77 1,393.2 $178.33 9 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

232.21 B8 1800 9 32x4, 3 Lamp, 32w T8, Elect.

Ballast, Recessed Mnt., Prismatic Lens

86 0.77 1,393.2 $178.33 9 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

232.21 B7 1800 12 32x4, 3 Lamp, 32w T8, Elect.

Ballast, Recessed Mnt., Prismatic Lens

86 1.03 1,857.6 $237.77 12 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

232.21 P19 Storage 500 4 32x4, 3 Lamp, 32w T8, Elect.

Ballast, Recessed Mnt., Prismatic Lens

86 0.34 172.0 $22.02 4 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

232.21 B5 1800 12 32x4, 3 Lamp, 32w T8, Elect.

Ballast, Recessed Mnt., Prismatic Lens

86 1.03 1,857.6 $237.77 12 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

232.21 B6 1800 9 32x4, 3 Lamp, 32w T8, Elect.

Ballast, Recessed Mnt., Prismatic Lens

86 0.77 1,393.2 $178.33 9 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

232.21 B4 1800 9 32x4, 3 Lamp, 32w T8, Elect.

Ballast, Recessed Mnt., Prismatic Lens

86 0.77 1,393.2 $178.33 9 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

232.21 B3 1800 10 32x4, 3 Lamp, 32w T8, Elect.

Ballast, Recessed Mnt., Prismatic Lens

86 0.86 1,548.0 $198.14 10 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

232.21 B2 1800 9 32x4, 3 Lamp, 32w T8, Elect.

Ballast, Recessed Mnt., Prismatic Lens

86 0.77 1,393.2 $178.33 9 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

232.21 Faculty Room 1800 2 32x4, 3 Lamp, 32w T8, Elect.

Ballast, Recessed Mnt., Prismatic Lens

86 0.17 309.6 $39.63 2 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

237.23 Faculty Men's Room 1800 1 32x2, 3 Lamp, 17w T8, Elect.

Ballast, Recessed Mnt., Prismatic Lens

51 0.05 91.8 $11.75 1 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

237.23 Faculty Women's Room 1800 1 3

2x2, 3 Lamp, 17w T8, Elect. Ballast, Recessed Mnt.,

Prismatic Lens51 0.05 91.8 $11.75 1 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

232.21 B1 1800 9 32x4, 3 Lamp, 32w T8, Elect.

Ballast, Recessed Mnt., Prismatic Lens

86 0.77 1,393.2 $178.33 9 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

232.21 Grade 8 Main Office 1800 3 32x4, 3 Lamp, 32w T8, Elect.

Ballast, Recessed Mnt., Prismatic Lens

86 0.26 464.4 $59.44 3 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

232.21 3600 2 32x4, 3 Lamp, 32w T8, Elect.

Ballast, Recessed Mnt., Prismatic Lens

86 0.17 619.2 $79.26 2 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

237.21 3600 1 32x2, 3 Lamp, 31w T8 Ulamp,

Elect. Ballast, Recessed Mnt., Prismatic Lens

92 0.09 331.2 $42.39 1 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

232.21 Asst. Principal 1800 2 32x4, 3 Lamp, 32w T8, Elect.

Ballast, Recessed Mnt., Prismatic Lens

86 0.17 309.6 $39.63 2 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

232.21 Guidance 1800 2 32x4, 3 Lamp, 32w T8, Elect.

Ballast, Recessed Mnt., Prismatic Lens

86 0.17 309.6 $39.63 2 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

Girl s Room

Grade 8 Conference Room

Page 66: Facility COVER SHEET- Voorhees Middle School Audit...The typical hours of operation for Voorhees Middle School are Monday through Friday between 7:00 am and 3:00 pm during the normal

Investment Grade Lighting Audit APPENDIX E3 of 30

ECM #1: Lighting Upgrade - GeneralEXISTING LIGHTING PROPOSED LIGHTING SAVINGS

CEG Fixture Yearly No. No. Fixture Fixt Total kWh/Yr Yearly No. No. Retro-Unit Watts Total kWh/Yr Yearly Unit Cost Total kW kWh/Yr Yearly Yearly SimpleType Location Usage Fixts Lamps Type Watts kW Fixtures $ Cost Fixts Lamps Description Used kW Fixtures $ Cost (INSTALLED) Cost Savings Savings $ Savings Payback

222.21 Corridor 8 Office - B11 3600 20 2

2x4, 2 Lamp, 32w T8, Elect. Ballast, Recessed Mnt.,

Prismatic Lens62 1.24 4,464.0 $571.39 20 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

222.21 Bwing to D Corridor 3600 5 22x4, 2 Lamp, 32w T8, Elect.

Ballast, Recessed Mnt., Prismatic Lens

62 0.31 1,116.0 $142.85 5 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

232.21 D1 1800 20 32x4, 3 Lamp, 32w T8, Elect.

Ballast, Recessed Mnt., Prismatic Lens

86 1.72 3,096.0 $396.29 20 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

232.21 D1 Storage/Office 500 5 32x4, 3 Lamp, 32w T8, Elect.

Ballast, Recessed Mnt., Prismatic Lens

86 0.43 215.0 $27.52 5 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

232.21 D20 1800 6 32x4, 3 Lamp, 32w T8, Elect.

Ballast, Recessed Mnt., Prismatic Lens

86 0.52 928.8 $118.89 6 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

232.21 D2 1800 20 32x4, 3 Lamp, 32w T8, Elect.

Ballast, Recessed Mnt., Prismatic Lens

86 1.72 3,096.0 $396.29 20 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

122.21 P-9 Storage 500 3 22x4, 2-Lamp, 34w T8, Mag.

Ballast, Recessed Mnt., Prismatic Lens

78 0.23 117.0 $14.98 3 2 2 Lamp, 17w T8, Elect. Ballast; retrofit 58 0.17 87 $11.14 $80.00 $240.00 0.06 30 $3.84 62.50

227.21 1800 7 22x2, 2 Lamp, 32w T8, Elect.

Ballast, Recessed Mnt., Prismatic Lens

65 0.46 819.0 $104.83 7 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

211.44 1800 24 11x4, 1 Lamp, 32w T8, Elect.

Ballast, Surface MNt., No Lens

32 0.77 1,382.4 $176.95 24 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

128.34 1800 26 28' Channel, 2 Lamp, 75w

T12, Mag. Ballast, Pendant Mnt., No Lens

142 3.69 6,645.6 $850.64 26 4(2) 8' Lamps to (4) 4'

Lamps - 32w T8, Elect Ballast; retrofit

104 2.70 4867.2 $623.00 $100.00 $2,600.00 0.99 1778.4 $227.64 11.42

121.34 1800 2 11x4, 1-Lamp, 34w T8, Mag. Ballast, Pendant Mnt., No

Lens48 0.10 172.8 $22.12 2 1 1 Lamp, 32w T8, Elect.

Ballast; retrofit 58 0.12 208.8 $26.73 $80.00 $160.00 -0.02 -36 -$4.61 -34.72

211.14 1800 12 21x3 2 Lamp, 32w T8, Elect.

Ballast, Pendent Mnt., Prismatic Lens

34 0.41 734.4 $94.00 12 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

211.34 1800 8 11x4, 1 Lamp, 32w T8, Elect.

Ballast, Pendant Mnt., No Lens

30 0.24 432.0 $55.30 8 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

128.14 1800 8 18' Channel, 1 Lamp, 75w

T12, Mag. Ballast, Pendent Mnt., No Lens

75 0.60 1,080.0 $138.24 8 1 (1) 8' Lamps - 32w T8, Elect Ballast; retrofit 104 0.83 1497.6 $191.69 $100.00 $800.00 -0.23 -417.6 -$53.45 -14.97

128.46 1800 4 16' Channel, 1 Lamp, 57w

T12, Mag. Ballast, Pendent Mnt., No Lens

57 0.23 410.4 $52.53 4 16' Lamp to (1) 4' Lamp - 32w T8, Elect Ballast;

retrofit29 0.12 208.8 $26.73 $80.00 $320.00 0.11 201.6 $25.80 12.40

227.21 Library Office 1800 10 22x2, 2 Lamp, 32w T8, Elect.

Ballast, Recessed Mnt., Prismatic Lens

65 0.65 1,170.0 $149.76 10 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

222.21 Library Storage 500 6 22x4, 2 Lamp, 32w T8, Elect.

Ballast, Recessed Mnt., Prismatic Lens

62 0.37 186.0 $23.81 6 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

222.21 Library Back Office 1800 3 22x4, 2 Lamp, 32w T8, Elect.

Ballast, Recessed Mnt., Prismatic Lens

62 0.19 334.8 $42.85 3 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

222.21 D3 1800 12 22x4, 2 Lamp, 32w T8, Elect.

Ballast, Recessed Mnt., Prismatic Lens

62 0.74 1,339.2 $171.42 12 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

Library

Page 67: Facility COVER SHEET- Voorhees Middle School Audit...The typical hours of operation for Voorhees Middle School are Monday through Friday between 7:00 am and 3:00 pm during the normal

Investment Grade Lighting Audit APPENDIX E4 of 30

ECM #1: Lighting Upgrade - GeneralEXISTING LIGHTING PROPOSED LIGHTING SAVINGS

CEG Fixture Yearly No. No. Fixture Fixt Total kWh/Yr Yearly No. No. Retro-Unit Watts Total kWh/Yr Yearly Unit Cost Total kW kWh/Yr Yearly Yearly SimpleType Location Usage Fixts Lamps Type Watts kW Fixtures $ Cost Fixts Lamps Description Used kW Fixtures $ Cost (INSTALLED) Cost Savings Savings $ Savings Payback

222.21 D4 1800 12 22x4, 2 Lamp, 32w T8, Elect.

Ballast, Recessed Mnt., Prismatic Lens

62 0.74 1,339.2 $171.42 12 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

222.21 D5 1800 12 22x4, 2 Lamp, 32w T8, Elect.

Ballast, Recessed Mnt., Prismatic Lens

62 0.74 1,339.2 $171.42 12 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

222.21 D6 1800 12 22x4, 2 Lamp, 32w T8, Elect.

Ballast, Recessed Mnt., Prismatic Lens

62 0.74 1,339.2 $171.42 12 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

222.21 Corridor D20 - D6 3600 15 22x4, 2 Lamp, 32w T8, Elect.

Ballast, Recessed Mnt., Prismatic Lens

62 0.93 3,348.0 $428.54 15 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

222.21 Corridor D6 - 6th Grade Office 3600 18 2

2x4, 2 Lamp, 32w T8, Elect. Ballast, Recessed Mnt.,

Prismatic Lens62 1.12 4,017.6 $514.25 18 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

222.21 D10 1800 12 22x4, 2 Lamp, 32w T8, Elect.

Ballast, Recessed Mnt., Prismatic Lens

62 0.74 1,339.2 $171.42 12 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

222.21 D9 1800 12 22x4, 2 Lamp, 32w T8, Elect.

Ballast, Recessed Mnt., Prismatic Lens

62 0.74 1,339.2 $171.42 12 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

222.21 D8 1800 12 22x4, 2 Lamp, 32w T8, Elect.

Ballast, Recessed Mnt., Prismatic Lens

62 0.74 1,339.2 $171.42 12 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

222.21 D7 1800 12 22x4, 2 Lamp, 32w T8, Elect.

Ballast, Recessed Mnt., Prismatic Lens

62 0.74 1,339.2 $171.42 12 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

222.21 1800 2 22x4, 2 Lamp, 32w T8, Elect.

Ballast, Recessed Mnt., Prismatic Lens

62 0.12 223.2 $28.57 2 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

211.41 1800 2 11x4, 1 Lamp, 32w T8, Elect.

Ballast, Surface Mnt., Prismatic Lens

30 0.06 108.0 $13.82 2 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

227.21 1800 1 22x2, 2 Lamp, 32w T8, Elect.

Ballast, Recessed Mnt., Prismatic Lens

65 0.07 117.0 $14.98 1 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

222.21 1800 2 22x4, 2 Lamp, 32w T8, Elect.

Ballast, Recessed Mnt., Prismatic Lens

62 0.12 223.2 $28.57 2 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

211.41 1800 2 11x4, 1 Lamp, 32w T8, Elect.

Ballast, Surface Mnt., Prismatic Lens

30 0.06 108.0 $13.82 2 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

227.21 1800 1 22x2, 2 Lamp, 32w T8, Elect.

Ballast, Recessed Mnt., Prismatic Lens

65 0.07 117.0 $14.98 1 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

222.22 6th Grade Office 1800 2 22x4, 2 Lamp, 32w T8, Elect.

Ballast, Recessed Mnt., Parabolic Lens

58 0.12 208.8 $26.73 2 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

222.22 Guidance 1800 2 22x4, 2 Lamp, 32w T8, Elect.

Ballast, Recessed Mnt., Parabolic Lens

58 0.12 208.8 $26.73 2 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

222.22 Asst. Principal 1800 2 22x4, 2 Lamp, 32w T8, Elect.

Ballast, Recessed Mnt., Parabolic Lens

58 0.12 208.8 $26.73 2 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

221.11 A16 1800 15 21x4, 2 Lamp, 32w T8, Elect.

Ballast, Surface Mnt., Prismatic Lens

62 0.93 1,674.0 $214.27 15 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

Boy's Room

Girl's Room

Page 68: Facility COVER SHEET- Voorhees Middle School Audit...The typical hours of operation for Voorhees Middle School are Monday through Friday between 7:00 am and 3:00 pm during the normal

Investment Grade Lighting Audit APPENDIX E5 of 30

ECM #1: Lighting Upgrade - GeneralEXISTING LIGHTING PROPOSED LIGHTING SAVINGS

CEG Fixture Yearly No. No. Fixture Fixt Total kWh/Yr Yearly No. No. Retro-Unit Watts Total kWh/Yr Yearly Unit Cost Total kW kWh/Yr Yearly Yearly SimpleType Location Usage Fixts Lamps Type Watts kW Fixtures $ Cost Fixts Lamps Description Used kW Fixtures $ Cost (INSTALLED) Cost Savings Savings $ Savings Payback

222.21 Officers Office 1800 2 22x4, 2 Lamp, 32w T8, Elect.

Ballast, Recessed Mnt., Prismatic Lens

62 0.12 223.2 $28.57 2 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

222.21 Girl's Room 1800 2 22x4, 2 Lamp, 32w T8, Elect.

Ballast, Recessed Mnt., Prismatic Lens

62 0.12 223.2 $28.57 2 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

221.11 A14 1800 15 21x4, 2 Lamp, 32w T8, Elect.

Ballast, Surface Mnt., Prismatic Lens

62 0.93 1,674.0 $214.27 15 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

221.11 A13 1800 15 21x4, 2 Lamp, 32w T8, Elect.

Ballast, Surface Mnt., Prismatic Lens

62 0.93 1,674.0 $214.27 15 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

221.11 A12 1800 15 21x4, 2 Lamp, 32w T8, Elect.

Ballast, Surface Mnt., Prismatic Lens

62 0.93 1,674.0 $214.27 15 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

221.11 A11 1800 15 21x4, 2 Lamp, 32w T8, Elect.

Ballast, Surface Mnt., Prismatic Lens

62 0.93 1,674.0 $214.27 15 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

221.11 A10 1800 15 21x4, 2 Lamp, 32w T8, Elect.

Ballast, Surface Mnt., Prismatic Lens

62 0.93 1,674.0 $214.27 15 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

221.11 A9 1800 12 21x4, 2 Lamp, 32w T8, Elect.

Ballast, Surface Mnt., Prismatic Lens

62 0.74 1,339.2 $171.42 12 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

221.11 A8 1800 15 21x4, 2 Lamp, 32w T8, Elect.

Ballast, Surface Mnt., Prismatic Lens

62 0.93 1,674.0 $214.27 15 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

222.31 P17 Electrical Room 500 2 22x4, 2 Lamp, 32w T8, Elect.

Ballast, Pendant Mnt., Prismatic Lens

58 0.12 58.0 $7.42 2 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

221.11 A23 1800 12 21x4, 2 Lamp, 32w T8, Elect.

Ballast, Surface Mnt., Prismatic Lens

62 0.74 1,339.2 $171.42 12 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

221.11 A26 1800 15 21x4, 2 Lamp, 32w T8, Elect.

Ballast, Surface Mnt., Prismatic Lens

62 0.93 1,674.0 $214.27 15 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

221.11 A27 1800 15 21x4, 2 Lamp, 32w T8, Elect.

Ballast, Surface Mnt., Prismatic Lens

62 0.93 1,674.0 $214.27 15 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

221.11 A21 1800 12 21x4, 2 Lamp, 32w T8, Elect.

Ballast, Surface Mnt., Prismatic Lens

62 0.74 1,339.2 $171.42 12 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

221.11 A24 1800 15 21x4, 2 Lamp, 32w T8, Elect.

Ballast, Surface Mnt., Prismatic Lens

62 0.93 1,674.0 $214.27 15 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

221.11 A22 1800 12 21x4, 2 Lamp, 32w T8, Elect.

Ballast, Surface Mnt., Prismatic Lens

62 0.74 1,339.2 $171.42 12 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

221.11 A25 1800 24 21x4, 2 Lamp, 32w T8, Elect.

Ballast, Surface Mnt., Prismatic Lens

62 1.49 2,678.4 $342.84 24 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

221.11 A19 1800 15 21x4, 2 Lamp, 32w T8, Elect.

Ballast, Surface Mnt., Prismatic Lens

62 0.93 1,674.0 $214.27 15 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

221.11 A17 1800 15 21x4, 2 Lamp, 32w T8, Elect.

Ballast, Surface Mnt., Prismatic Lens

62 0.93 1,674.0 $214.27 15 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

Page 69: Facility COVER SHEET- Voorhees Middle School Audit...The typical hours of operation for Voorhees Middle School are Monday through Friday between 7:00 am and 3:00 pm during the normal

Investment Grade Lighting Audit APPENDIX E6 of 30

ECM #1: Lighting Upgrade - GeneralEXISTING LIGHTING PROPOSED LIGHTING SAVINGS

CEG Fixture Yearly No. No. Fixture Fixt Total kWh/Yr Yearly No. No. Retro-Unit Watts Total kWh/Yr Yearly Unit Cost Total kW kWh/Yr Yearly Yearly SimpleType Location Usage Fixts Lamps Type Watts kW Fixtures $ Cost Fixts Lamps Description Used kW Fixtures $ Cost (INSTALLED) Cost Savings Savings $ Savings Payback

221.11 A20 1800 18 21x4, 2 Lamp, 32w T8, Elect.

Ballast, Surface Mnt., Prismatic Lens

62 1.12 2,008.8 $257.13 18 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

612 JC 500 1 1 Surface Mnt., 100w A19 Lamp 100 0.10 50.0 $6.40 1 1 (1) 26w CFL Lamp 26 0.03 13 $1.66 $20.00 $20.00 0.07 37 $4.74 4.22

221.11 A18 1800 24 21x4, 2 Lamp, 32w T8, Elect.

Ballast, Surface Mnt., Prismatic Lens

62 1.49 2,678.4 $342.84 24 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

221.11 A18 Storage 500 4 21x4, 2 Lamp, 32w T8, Elect.

Ballast, Surface Mnt., Prismatic Lens

62 0.25 124.0 $15.87 4 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

221.11 A7 1800 15 21x4, 2 Lamp, 32w T8, Elect.

Ballast, Surface Mnt., Prismatic Lens

62 0.93 1,674.0 $214.27 15 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

222.21 A1 1800 15 22x4, 2 Lamp, 32w T8, Elect.

Ballast, Recessed Mnt., Prismatic Lens

62 0.93 1,674.0 $214.27 15 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

222.21 A2 1800 6 22x4, 2 Lamp, 32w T8, Elect.

Ballast, Recessed Mnt., Prismatic Lens

62 0.37 669.6 $85.71 6 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

222.21 Nurse's Office 1800 10 22x4, 2 Lamp, 32w T8, Elect.

Ballast, Recessed Mnt., Prismatic Lens

62 0.62 1,116.0 $142.85 10 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

222.21 Teacher's Lounge 1800 13 22x4, 2 Lamp, 32w T8, Elect.

Ballast, Recessed Mnt., Prismatic Lens

62 0.81 1,450.8 $185.70 13 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

612 Teacher's Lounge Women's Toilet Room 1800 1 1 Surface Mnt., 100w A19

Lamp 100 0.10 180.0 $23.04 1 1 (1) 26w CFL Lamp 26 0.03 46.8 $5.99 $20.00 $20.00 0.07 133.2 $17.05 1.17

612 Teacher's Lounge Men's Toilet Room 1800 1 1 Surface Mnt., 100w A19

Lamp 100 0.10 180.0 $23.04 1 1 (1) 26w CFL Lamp 26 0.03 46.8 $5.99 $20.00 $20.00 0.07 133.2 $17.05 1.17

227.21 Toilet Corridor 3600 2 22x2, 2 Lamp, 32w T8, Elect.

Ballast, Recessed Mnt., Prismatic Lens

65 0.13 468.0 $59.90 2 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

222.21 Boy's Room 1800 2 22x4, 2 Lamp, 32w T8, Elect.

Ballast, Recessed Mnt., Prismatic Lens

62 0.12 223.2 $28.57 2 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

222.21 P1 CER Storage 500 2 22x4, 2 Lamp, 32w T8, Elect.

Ballast, Recessed Mnt., Prismatic Lens

62 0.12 62.0 $7.94 2 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

222.21 Corridor A Wing 3600 48 22x4, 2 Lamp, 32w T8, Elect.

Ballast, Recessed Mnt., Prismatic Lens

62 2.98 10,713.6 $1,371.34 48 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

222.22 CER 1800 6 22x4, 2 Lamp, 32w T8, Elect.

Ballast, Recessed Mnt., Parabolic Lens

58 0.35 626.4 $80.18 6 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

222.22 CER Conference 1800 5 22x4, 2 Lamp, 32w T8, Elect.

Ballast, Recessed Mnt., Parabolic Lens

58 0.29 522.0 $66.82 5 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

222.22 DIR CER Office 1800 4 22x4, 2 Lamp, 32w T8, Elect.

Ballast, Recessed Mnt., Parabolic Lens

58 0.23 417.6 $53.45 4 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

227.22 3600 5 22x2, 2 Lamp, 32w T8, Elect.

Ballast, Recessed Mnt., Parabolic Lens

58 0.29 1,044.0 $133.63 5 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

Corridor CER

Page 70: Facility COVER SHEET- Voorhees Middle School Audit...The typical hours of operation for Voorhees Middle School are Monday through Friday between 7:00 am and 3:00 pm during the normal

Investment Grade Lighting Audit APPENDIX E7 of 30

ECM #1: Lighting Upgrade - GeneralEXISTING LIGHTING PROPOSED LIGHTING SAVINGS

CEG Fixture Yearly No. No. Fixture Fixt Total kWh/Yr Yearly No. No. Retro-Unit Watts Total kWh/Yr Yearly Unit Cost Total kW kWh/Yr Yearly Yearly SimpleType Location Usage Fixts Lamps Type Watts kW Fixtures $ Cost Fixts Lamps Description Used kW Fixtures $ Cost (INSTALLED) Cost Savings Savings $ Savings Payback

222.22 3600 3 22x4, 2 Lamp, 32w T8, Elect.

Ballast, Recessed Mnt., Parabolic Lens

58 0.17 626.4 $80.18 3 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

222.22 1800 6 22x4, 2 Lamp, 32w T8, Elect.

Ballast, Recessed Mnt., Parabolic Lens

58 0.35 626.4 $80.18 6 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

227.22 1800 2 22x2, 2 Lamp, 32w T8, Elect.

Ballast, Recessed Mnt., Parabolic Lens

58 0.12 208.8 $26.73 2 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

222.22 Principal Office 1800 4 22x4, 2 Lamp, 32w T8, Elect.

Ballast, Recessed Mnt., Parabolic Lens

58 0.23 417.6 $53.45 4 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

221.11 Principal Conference Room 3600 7 2

1x4, 2 Lamp, 32w T8, Elect. Ballast, Surface Mnt.,

Prismatic Lens62 0.43 1,562.4 $199.99 7 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

612 Principal Toilet Room 1800 1 1 Surface Mnt., 100w A19 Lamp 100 0.10 180.0 $23.04 1 1 (1) 26w CFL Lamp 26 0.03 46.8 $5.99 $20.00 $20.00 0.07 133.2 $17.05 1.17

222.21 Mail Room 1800 2 22x4, 2 Lamp, 32w T8, Elect.

Ballast, Recessed Mnt., Prismatic Lens

62 0.12 223.2 $28.57 2 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

221.11 Child Study 1800 4 21x4, 2 Lamp, 32w T8, Elect.

Ballast, Surface Mnt., Prismatic Lens

62 0.25 446.4 $57.14 4 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

221.11 Child Study Office 1800 2 21x4, 2 Lamp, 32w T8, Elect.

Ballast, Surface Mnt., Prismatic Lens

62 0.12 223.2 $28.57 2 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

242.21 Child Study Conference 1800 5 4

2x4, 4 Lamp, 32w T8, Elect. Ballast, Recessed Mnt.,

Prismatic Lens107 0.54 963.0 $123.26 5 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

222.21 Women's Room 1800 2 22x4, 2 Lamp, 32w T8, Elect.

Ballast, Recessed Mnt., Prismatic Lens

62 0.12 223.2 $28.57 2 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

222.21 Men's Room 1800 2 22x4, 2 Lamp, 32w T8, Elect.

Ballast, Recessed Mnt., Prismatic Lens

62 0.12 223.2 $28.57 2 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

221.11 Office A Wing 1800 2 21x4, 2 Lamp, 32w T8, Elect.

Ballast, Surface Mnt., Prismatic Lens

62 0.12 223.2 $28.57 2 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

222.22 3600 7 22x4, 2 Lamp, 32w T8, Elect.

Ballast, Recessed Mnt., Parabolic Lens

58 0.41 1,461.6 $187.08 7 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

227.22 3600 10 22x2, 2 Lamp, 32w T8, Elect.

Ballast, Recessed Mnt., Parabolic Lens

58 0.58 2,088.0 $267.26 10 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

132.21 E7 1800 16 32x4, 3-Lamp, 32w T8, Mag.

Ballast, Recessed Mnt., Prismatic Lens

121 1.94 3,484.8 $446.05 16 22 Lamp, 32w T8, Elect.

Ballast, Specular Reflector; retrofit

58 0.93 1670.4 $213.81 $100.00 $1,600.00 1.01 1814.4 $232.24 6.89

132.21 E6 1800 20 32x4, 3-Lamp, 32w T8, Mag.

Ballast, Recessed Mnt., Prismatic Lens

121 2.42 4,356.0 $557.57 20 22 Lamp, 32w T8, Elect.

Ballast, Specular Reflector; retrofit

58 1.16 2088 $267.26 $100.00 $2,000.00 1.26 2268 $290.30 6.89

132.21 E6 Storage 500 8 32x4, 3-Lamp, 32w T8, Mag.

Ballast, Recessed Mnt., Prismatic Lens

121 0.97 484.0 $61.95 8 22 Lamp, 32w T8, Elect.

Ballast, Specular Reflector; retrofit

58 0.46 232 $29.70 $100.00 $800.00 0.50 252 $32.26 24.80

232.21 E8 1800 16 32x4, 3 Lamp, 32w T8, Elect.

Ballast, Recessed Mnt., Prismatic Lens

86 1.38 2,476.8 $317.03 16 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

Corridor CER

Mian Office

Corridor Main Office

Page 71: Facility COVER SHEET- Voorhees Middle School Audit...The typical hours of operation for Voorhees Middle School are Monday through Friday between 7:00 am and 3:00 pm during the normal

Investment Grade Lighting Audit APPENDIX E8 of 30

ECM #1: Lighting Upgrade - GeneralEXISTING LIGHTING PROPOSED LIGHTING SAVINGS

CEG Fixture Yearly No. No. Fixture Fixt Total kWh/Yr Yearly No. No. Retro-Unit Watts Total kWh/Yr Yearly Unit Cost Total kW kWh/Yr Yearly Yearly SimpleType Location Usage Fixts Lamps Type Watts kW Fixtures $ Cost Fixts Lamps Description Used kW Fixtures $ Cost (INSTALLED) Cost Savings Savings $ Savings Payback

132.21 1800 20 32x4, 3-Lamp, 32w T8, Mag.

Ballast, Recessed Mnt., Prismatic Lens

121 2.42 4,356.0 $557.57 20 22 Lamp, 32w T8, Elect.

Ballast, Specular Reflector; retrofit

58 1.16 2088 $267.26 $100.00 $2,000.00 1.26 2268 $290.30 6.89

211.27 1800 4 11x4, 1 Lamp, 32w T8, Elect.

Ballast, Recessed Mnt., Prismatic Lens

30 0.12 216.0 $27.65 4 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

132.21 E9 1800 16 32x4, 3-Lamp, 32w T8, Mag.

Ballast, Recessed Mnt., Prismatic Lens

121 1.94 3,484.8 $446.05 16 22 Lamp, 32w T8, Elect.

Ballast, Specular Reflector; retrofit

58 0.93 1670.4 $213.81 $100.00 $1,600.00 1.01 1814.4 $232.24 6.89

121.16 P-13 Electrical Storage 500 4 2

1x4, 2-Lamp, 34w T8, Mag. Ballast, Pendent Mnt.,

Prismatic Lens78 0.31 156.0 $19.97 4 2 2 Lamp, 32w T8, Elect.

Ballast; retrofit 58 0.23 116 $14.85 $80.00 $320.00 0.08 40 $5.12 62.50

132.21 E10 1800 16 32x4, 3-Lamp, 32w T8, Mag.

Ballast, Recessed Mnt., Prismatic Lens

121 1.94 3,484.8 $446.05 16 22 Lamp, 32w T8, Elect.

Ballast, Specular Reflector; retrofit

58 0.93 1670.4 $213.81 $100.00 $1,600.00 1.01 1814.4 $232.24 6.89

232.21 E11 1800 16 32x4, 3 Lamp, 32w T8, Elect.

Ballast, Recessed Mnt., Prismatic Lens

86 1.38 2,476.8 $317.03 16 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

132.21 E4 1800 16 32x4, 3-Lamp, 32w T8, Mag.

Ballast, Recessed Mnt., Prismatic Lens

121 1.94 3,484.8 $446.05 16 22 Lamp, 32w T8, Elect.

Ballast, Specular Reflector; retrofit

58 0.93 1670.4 $213.81 $100.00 $1,600.00 1.01 1814.4 $232.24 6.89

132.21 E3 1800 16 32x4, 3-Lamp, 32w T8, Mag.

Ballast, Recessed Mnt., Prismatic Lens

121 1.94 3,484.8 $446.05 16 22 Lamp, 32w T8, Elect.

Ballast, Specular Reflector; retrofit

58 0.93 1670.4 $213.81 $100.00 $1,600.00 1.01 1814.4 $232.24 6.89

132.21 E2 1800 16 32x4, 3-Lamp, 32w T8, Mag.

Ballast, Recessed Mnt., Prismatic Lens

121 1.94 3,484.8 $446.05 16 22 Lamp, 32w T8, Elect.

Ballast, Specular Reflector; retrofit

58 0.93 1670.4 $213.81 $100.00 $1,600.00 1.01 1814.4 $232.24 6.89

132.21 E12 1800 16 32x4, 3-Lamp, 32w T8, Mag.

Ballast, Recessed Mnt., Prismatic Lens

121 1.94 3,484.8 $446.05 16 22 Lamp, 32w T8, Elect.

Ballast, Specular Reflector; retrofit

58 0.93 1670.4 $213.81 $100.00 $1,600.00 1.01 1814.4 $232.24 6.89

132.21 E1 1800 16 32x4, 3-Lamp, 32w T8, Mag.

Ballast, Recessed Mnt., Prismatic Lens

121 1.94 3,484.8 $446.05 16 22 Lamp, 32w T8, Elect.

Ballast, Specular Reflector; retrofit

58 0.93 1670.4 $213.81 $100.00 $1,600.00 1.01 1814.4 $232.24 6.89

132.21 E13 1800 16 32x4, 3-Lamp, 32w T8, Mag.

Ballast, Recessed Mnt., Prismatic Lens

121 1.94 3,484.8 $446.05 16 22 Lamp, 32w T8, Elect.

Ballast, Specular Reflector; retrofit

58 0.93 1670.4 $213.81 $100.00 $1,600.00 1.01 1814.4 $232.24 6.89

132.21 E14 1800 16 32x4, 3-Lamp, 32w T8, Mag.

Ballast, Recessed Mnt., Prismatic Lens

121 1.94 3,484.8 $446.05 16 22 Lamp, 32w T8, Elect.

Ballast, Specular Reflector; retrofit

58 0.93 1670.4 $213.81 $100.00 $1,600.00 1.01 1814.4 $232.24 6.89

121.11 Custodian 1800 1 21x4, 2-Lamp, 34w T8, Mag.

Ballast, Surface Mnt., Prismatic Lens

78 0.08 140.4 $17.97 1 2 2 Lamp, 32w T8, Elect. Ballast; retrofit 58 0.06 104.4 $13.36 $100.00 $100.00 0.02 36 $4.61 21.70

132.21 Corridor E14 - E7 3600 18 32x4, 3-Lamp, 32w T8, Mag.

Ballast, Recessed Mnt., Prismatic Lens

121 2.18 7,840.8 $1,003.62 18 22 Lamp, 32w T8, Elect.

Ballast, Specular Reflector; retrofit

58 1.04 3758.4 $481.08 $100.00 $1,800.00 1.13 4082.4 $522.55 3.44

121.11 P14 500 1 21x4, 2-Lamp, 34w T8, Mag.

Ballast, Surface Mnt., Prismatic Lens

78 0.08 39.0 $4.99 1 2 2 Lamp, 32w T8, Elect. Ballast; retrofit 58 0.06 29 $3.71 $100.00 $100.00 0.02 10 $1.28 78.13

221.31 CER Storage 500 8 21x4, 2 Lamp, 32w T8, Elect.

Ballast, Pendant Mnt., Prismatic Lens

62 0.50 248.0 $31.74 8 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

132.21 1800 2 32x4, 3-Lamp, 32w T8, Mag.

Ballast, Recessed Mnt., Prismatic Lens

121 0.24 435.6 $55.76 2 22 Lamp, 32w T8, Elect.

Ballast, Specular Reflector; retrofit

58 0.12 208.8 $26.73 $100.00 $200.00 0.13 226.8 $29.03 6.89

221.11 1800 1 21x4, 2 Lamp, 32w T8, Elect.

Ballast, Surface Mnt., Prismatic Lens

62 0.06 111.6 $14.28 1 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

E5

Boy's Room

Page 72: Facility COVER SHEET- Voorhees Middle School Audit...The typical hours of operation for Voorhees Middle School are Monday through Friday between 7:00 am and 3:00 pm during the normal

Investment Grade Lighting Audit APPENDIX E9 of 30

ECM #1: Lighting Upgrade - GeneralEXISTING LIGHTING PROPOSED LIGHTING SAVINGS

CEG Fixture Yearly No. No. Fixture Fixt Total kWh/Yr Yearly No. No. Retro-Unit Watts Total kWh/Yr Yearly Unit Cost Total kW kWh/Yr Yearly Yearly SimpleType Location Usage Fixts Lamps Type Watts kW Fixtures $ Cost Fixts Lamps Description Used kW Fixtures $ Cost (INSTALLED) Cost Savings Savings $ Savings Payback

132.21 1800 2 32x4, 3-Lamp, 32w T8, Mag.

Ballast, Recessed Mnt., Prismatic Lens

121 0.24 435.6 $55.76 2 22 Lamp, 32w T8, Elect.

Ballast, Specular Reflector; retrofit

58 0.12 208.8 $26.73 $100.00 $200.00 0.13 226.8 $29.03 6.89

221.11 1800 2 21x4, 2 Lamp, 32w T8, Elect.

Ballast, Surface Mnt., Prismatic Lens

62 0.12 223.2 $28.57 2 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

132.21 Office E Wing 1800 4 32x4, 3-Lamp, 32w T8, Mag.

Ballast, Recessed Mnt., Prismatic Lens

121 0.48 871.2 $111.51 4 22 Lamp, 32w T8, Elect.

Ballast, Specular Reflector; retrofit

58 0.23 417.6 $53.45 $100.00 $400.00 0.25 453.6 $58.06 6.89

132.21 Guidnace Office 1800 4 32x4, 3-Lamp, 32w T8, Mag.

Ballast, Recessed Mnt., Prismatic Lens

121 0.48 871.2 $111.51 4 22 Lamp, 32w T8, Elect.

Ballast, Specular Reflector; retrofit

58 0.23 417.6 $53.45 $100.00 $400.00 0.25 453.6 $58.06 6.89

132.21 Asst. Principal 1800 3 32x4, 3-Lamp, 32w T8, Mag.

Ballast, Recessed Mnt., Prismatic Lens

121 0.36 653.4 $83.64 3 22 Lamp, 32w T8, Elect.

Ballast, Specular Reflector; retrofit

58 0.17 313.2 $40.09 $100.00 $300.00 0.19 340.2 $43.55 6.89

127.21 Corridor E Wing Office 3600 2 2

2x2, 2 Lamp, 34w T12 U-Tube, Mag. Ballast, Recessed

Mnt., Prismatic Lens72 0.14 518.4 $66.36 2 2 2x2, 2 Lamp, 14w T5,

Indirect; Fixture 31 0.06 223.2 $28.57 $215.00 $430.00 0.08 295.2 $37.79 11.38

132.21 Maintenance 1800 17 32x4, 3-Lamp, 32w T8, Mag.

Ballast, Recessed Mnt., Prismatic Lens

121 2.06 3,702.6 $473.93 17 22 Lamp, 32w T8, Elect.

Ballast, Specular Reflector; retrofit

58 0.99 1774.8 $227.17 $100.00 $1,700.00 1.07 1927.8 $246.76 6.89

121.21 Kitchen 1800 18 21x4, 2-Lamp, 34w T8, Mag.

Ballast, Recessed Mnt., Prismatic Lens

78 1.40 2,527.2 $323.48 18 2 2 Lamp, 32w T8, Elect. Ballast; retrofit 58 1.04 1879.2 $240.54 $80.00 $1,440.00 0.36 648 $82.94 17.36

121.21 Kitchen Storage 500 2 21x4, 2-Lamp, 34w T8, Mag.

Ballast, Recessed Mnt., Prismatic Lens

78 0.16 78.0 $9.98 2 2 2 Lamp, 32w T8, Elect. Ballast; retrofit 58 0.12 58 $7.42 $80.00 $160.00 0.04 20 $2.56 62.50

362.34 APR 1800 24 6 2x4, 4 Lamp, 54w T5HO Fixture 354 8.50 15,292.8 $1,957.48 24 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

221.31 APR Storage 500 12 21x4, 2 Lamp, 32w T8, Elect.

Ballast, Pendant Mnt., Prismatic Lens

62 0.74 372.0 $47.62 12 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

221.31 P-5 Sprinkler 500 10 21x4, 2 Lamp, 32w T8, Elect.

Ballast, Pendant Mnt., Prismatic Lens

62 0.62 310.0 $39.68 10 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

232.21 C10 1800 12 32x4, 3 Lamp, 32w T8, Elect.

Ballast, Recessed Mnt., Prismatic Lens

86 1.03 1,857.6 $237.77 12 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

232.22 C9 Art 1800 17 32x4, 3 Lamp, 32w T8, Elect.

Ballast, Recessed Mnt., Parabolic Lens

86 1.46 2,631.6 $336.84 17 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

232.22 Art Storage 1800 3 32x4, 3 Lamp, 32w T8, Elect.

Ballast, Recessed Mnt., Parabolic Lens

86 0.26 464.4 $59.44 3 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

232.22 Art Office 1800 2 32x4, 3 Lamp, 32w T8, Elect.

Ballast, Recessed Mnt., Parabolic Lens

86 0.17 309.6 $39.63 2 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

232.22 C7 1800 15 32x4, 3 Lamp, 32w T8, Elect.

Ballast, Recessed Mnt., Parabolic Lens

86 1.29 2,322.0 $297.22 15 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

232.21 C8 1800 9 32x4, 3 Lamp, 32w T8, Elect.

Ballast, Recessed Mnt., Prismatic Lens

86 0.77 1,393.2 $178.33 9 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

221.31 C8 Storage 500 1 21x4, 2 Lamp, 32w T8, Elect.

Ballast, Pendant Mnt., Prismatic Lens

62 0.06 31.0 $3.97 1 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

Girl's Room

Page 73: Facility COVER SHEET- Voorhees Middle School Audit...The typical hours of operation for Voorhees Middle School are Monday through Friday between 7:00 am and 3:00 pm during the normal

Investment Grade Lighting Audit APPENDIX E10 of 30

ECM #1: Lighting Upgrade - GeneralEXISTING LIGHTING PROPOSED LIGHTING SAVINGS

CEG Fixture Yearly No. No. Fixture Fixt Total kWh/Yr Yearly No. No. Retro-Unit Watts Total kWh/Yr Yearly Unit Cost Total kW kWh/Yr Yearly Yearly SimpleType Location Usage Fixts Lamps Type Watts kW Fixtures $ Cost Fixts Lamps Description Used kW Fixtures $ Cost (INSTALLED) Cost Savings Savings $ Savings Payback

232.21 C6 1800 12 32x4, 3 Lamp, 32w T8, Elect.

Ballast, Recessed Mnt., Prismatic Lens

86 1.03 1,857.6 $237.77 12 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

121.21 Women's Room 1800 2 21x4, 2-Lamp, 34w T8, Mag.

Ballast, Recessed Mnt., Prismatic Lens

78 0.16 280.8 $35.94 2 2 2 Lamp, 32w T8, Elect. Ballast; retrofit 58 0.12 208.8 $26.73 $80.00 $160.00 0.04 72 $9.22 17.36

121.21 Men's Room 1800 2 21x4, 2-Lamp, 34w T8, Mag.

Ballast, Recessed Mnt., Prismatic Lens

78 0.16 280.8 $35.94 2 2 2 Lamp, 32w T8, Elect. Ballast; retrofit 58 0.12 208.8 $26.73 $80.00 $160.00 0.04 72 $9.22 17.36

221.13 Maintenance 1800 1 21x4, 2 Lamp, 32w T8, Elect.

Ballast, Surface Mnt., No Lens

58 0.06 104.4 $13.36 1 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

232.22 C5 1800 8 32x4, 3 Lamp, 32w T8, Elect.

Ballast, Recessed Mnt., Parabolic Lens

86 0.69 1,238.4 $158.52 8 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

232.22 C4 1800 8 32x4, 3 Lamp, 32w T8, Elect.

Ballast, Recessed Mnt., Parabolic Lens

86 0.69 1,238.4 $158.52 8 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

232.22 C3 1800 8 32x4, 3 Lamp, 32w T8, Elect.

Ballast, Recessed Mnt., Parabolic Lens

86 0.69 1,238.4 $158.52 8 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

222.21 Corridor C10 - Ewing 3600 27 22x4, 2 Lamp, 32w T8, Elect.

Ballast, Recessed Mnt., Prismatic Lens

62 1.67 6,026.4 $771.38 27 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

232.22 C2 1800 15 32x4, 3 Lamp, 32w T8, Elect.

Ballast, Recessed Mnt., Parabolic Lens

86 1.29 2,322.0 $297.22 15 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

221.11 C2 Green House 1800 4 21x4, 2 Lamp, 32w T8, Elect.

Ballast, Surface Mnt., Prismatic Lens

62 0.25 446.4 $57.14 4 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

232.22 C2 Storage 500 4 32x4, 3 Lamp, 32w T8, Elect.

Ballast, Recessed Mnt., Parabolic Lens

86 0.34 172.0 $22.02 4 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

232.22 C1 1800 15 32x4, 3 Lamp, 32w T8, Elect.

Ballast, Recessed Mnt., Parabolic Lens

86 1.29 2,322.0 $297.22 15 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

221.31 Food Service 500 1 21x4, 2 Lamp, 32w T8, Elect.

Ballast, Pendant Mnt., Prismatic Lens

62 0.06 31.0 $3.97 1 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

221.11 Kichen 1800 24 21x4, 2 Lamp, 32w T8, Elect.

Ballast, Surface Mnt., Prismatic Lens

62 1.49 2,678.4 $342.84 24 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

221.11 1800 1 21x4, 2 Lamp, 32w T8, Elect.

Ballast, Surface Mnt., Prismatic Lens

62 0.06 111.6 $14.28 1 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

200 1800 1 21x2, 2 Lamp, 17w T8, Elect.

Ballast, Surface Mnt., Prismatic Lens

34 0.03 61.2 $7.83 1 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

612 Kitchen Toilet 1800 2 1 Surface Mnt., 100w A19 Lamp 100 0.20 360.0 $46.08 2 1 (1) 26w CFL Lamp 26 0.05 93.6 $11.98 $20.00 $40.00 0.15 266.4 $34.10 1.17

221.11 500 6 21x4, 2 Lamp, 32w T8, Elect.

Ballast, Surface Mnt., Prismatic Lens

62 0.37 186.0 $23.81 6 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

612 500 1 1 Surface Mnt., 100w A19 Lamp 100 0.10 50.0 $6.40 1 1 (1) 26w CFL Lamp 26 0.03 13 $1.66 $20.00 $20.00 0.07 37 $4.74 4.22

P16 Kitchen Locker

Kitchen Storage

Page 74: Facility COVER SHEET- Voorhees Middle School Audit...The typical hours of operation for Voorhees Middle School are Monday through Friday between 7:00 am and 3:00 pm during the normal

Investment Grade Lighting Audit APPENDIX E11 of 30

ECM #1: Lighting Upgrade - GeneralEXISTING LIGHTING PROPOSED LIGHTING SAVINGS

CEG Fixture Yearly No. No. Fixture Fixt Total kWh/Yr Yearly No. No. Retro-Unit Watts Total kWh/Yr Yearly Unit Cost Total kW kWh/Yr Yearly Yearly SimpleType Location Usage Fixts Lamps Type Watts kW Fixtures $ Cost Fixts Lamps Description Used kW Fixtures $ Cost (INSTALLED) Cost Savings Savings $ Savings Payback

221.11 Kitchen Dishwasher 1800 4 21x4, 2 Lamp, 32w T8, Elect.

Ballast, Surface Mnt., Prismatic Lens

62 0.25 446.4 $57.14 4 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

612 P-5 Electrical 500 2 1 Surface Mnt., 100w A19 Lamp 100 0.20 100.0 $12.80 2 1 (1) 26w CFL Lamp 26 0.05 26 $3.33 $20.00 $40.00 0.15 74 $9.47 4.22

612 1800 6 1 Surface Mnt., 100w A19 Lamp 100 0.60 1,080.0 $138.24 6 1 (1) 26w CFL Lamp 26 0.16 280.8 $35.94 $20.00 $120.00 0.44 799.2 $102.30 1.17

222.31 1800 1 22x4, 2 Lamp, 32w T8, Elect.

Ballast, Pendant Mnt., Prismatic Lens

58 0.06 104.4 $13.36 1 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

222.11 Maintenance Break Room 1800 2 2

2x4, 2 Lamp, 32w T8, Elect. Ballast, Surface Mnt.,

Prismatic Lens62 0.12 223.2 $28.57 2 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

612 Custodian 500 1 1 Surface Mnt., 100w A19 Lamp 100 0.10 50.0 $6.40 1 1 (1) 26w CFL Lamp 26 0.03 13 $1.66 $20.00 $20.00 0.07 37 $4.74 4.22

232.21 Old Café 1800 45 32x4, 3 Lamp, 32w T8, Elect.

Ballast, Recessed Mnt., Prismatic Lens

86 3.87 6,966.0 $891.65 45 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

221.11 Stage 1800 18 21x4, 2 Lamp, 32w T8, Elect.

Ballast, Surface Mnt., Prismatic Lens

62 1.12 2,008.8 $257.13 18 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

221.11 Stage Storage #1 500 2 21x4, 2 Lamp, 32w T8, Elect.

Ballast, Surface Mnt., Prismatic Lens

62 0.12 62.0 $7.94 2 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

612 Stage Storage Toilet 500 1 1 Surface Mnt., 100w A19 Lamp 100 0.10 50.0 $6.40 1 1 (1) 26w CFL Lamp 26 0.03 13 $1.66 $20.00 $20.00 0.07 37 $4.74 4.22

221.11 Stage Storage #2 500 2 21x4, 2 Lamp, 32w T8, Elect.

Ballast, Surface Mnt., Prismatic Lens

62 0.12 62.0 $7.94 2 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

612 Stage Storage Toilet 500 1 1 Surface Mnt., 100w A19 Lamp 100 0.10 50.0 $6.40 1 1 (1) 26w CFL Lamp 26 0.03 13 $1.66 $20.00 $20.00 0.07 37 $4.74 4.22

242.21 1800 12 42x4, 4 Lamp, 32w T8, Elect.

Ballast, Recessed Mnt., Prismatic Lens

107 1.28 2,311.2 $295.83 12 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

551 1800 18 1 Recessed Down Light, 100w A Lamp 100 1.80 3,240.0 $414.72 18 1 26w CFL Lamp 26 0.47 842.4 $107.83 $20.00 $360.00 1.33 2397.6 $306.89 1.17

221.11 1800 5 21x4, 2 Lamp, 32w T8, Elect.

Ballast, Surface Mnt., Prismatic Lens

62 0.31 558.0 $71.42 5 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

362.34 Mini Gym 1800 12 6 2x4, 4 Lamp, 54w T5HO Fixture 354 4.25 7,646.4 $978.74 12 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

221.11 Mini Gym Storage 500 4 21x4, 2 Lamp, 32w T8, Elect.

Ballast, Surface Mnt., Prismatic Lens

62 0.25 124.0 $15.87 4 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

362.34 Gym 1800 18 6 2x4, 4 Lamp, 54w T5HO Fixture 354 6.37 11,469.6 $1,468.11 18 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

612 Gym Storage 500 1 1 Surface Mnt., 100w A19 Lamp 100 0.10 50.0 $6.40 1 1 (1) 26w CFL Lamp 26 0.03 13 $1.66 $20.00 $20.00 0.07 37 $4.74 4.22

Lecture Hall

Maintenance Hall

Page 75: Facility COVER SHEET- Voorhees Middle School Audit...The typical hours of operation for Voorhees Middle School are Monday through Friday between 7:00 am and 3:00 pm during the normal

Investment Grade Lighting Audit APPENDIX E12 of 30

ECM #1: Lighting Upgrade - GeneralEXISTING LIGHTING PROPOSED LIGHTING SAVINGS

CEG Fixture Yearly No. No. Fixture Fixt Total kWh/Yr Yearly No. No. Retro-Unit Watts Total kWh/Yr Yearly Unit Cost Total kW kWh/Yr Yearly Yearly SimpleType Location Usage Fixts Lamps Type Watts kW Fixtures $ Cost Fixts Lamps Description Used kW Fixtures $ Cost (INSTALLED) Cost Savings Savings $ Savings Payback

221.11 Girls Locker Room 1800 17 21x4, 2 Lamp, 32w T8, Elect.

Ballast, Surface Mnt., Prismatic Lens

62 1.05 1,897.2 $242.84 17 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

221.11 Girls Locker Room Office 1800 2 2

1x4, 2 Lamp, 32w T8, Elect. Ballast, Surface Mnt.,

Prismatic Lens62 0.12 223.2 $28.57 2 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

612 Girls Locker Room Office Toilet 1800 2 1 Surface Mnt., 100w A19

Lamp 100 0.20 360.0 $46.08 2 1 (1) 26w CFL Lamp 26 0.05 93.6 $11.98 $20.00 $40.00 0.15 266.4 $34.10 1.17

612 Girls Locker Room Office Storage 500 1 1 Surface Mnt., 100w A19

Lamp 100 0.10 50.0 $6.40 1 1 (1) 26w CFL Lamp 26 0.03 13 $1.66 $20.00 $20.00 0.07 37 $4.74 4.22

221.11 Boy's Locker Room 1800 20 21x4, 2 Lamp, 32w T8, Elect.

Ballast, Surface Mnt., Prismatic Lens

62 1.24 2,232.0 $285.70 20 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

221.11 Boy's Locker Room Office 1800 3 2

1x4, 2 Lamp, 32w T8, Elect. Ballast, Surface Mnt.,

Prismatic Lens62 0.19 334.8 $42.85 3 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

612 Boy's Locker Room Office Toilet 1800 1 1 Surface Mnt., 100w A19

Lamp 100 0.10 180.0 $23.04 1 1 (1) 26w CFL Lamp 26 0.03 46.8 $5.99 $20.00 $20.00 0.07 133.2 $17.05 1.17

221.11 Boy's Toilet Room 1800 2 21x4, 2 Lamp, 32w T8, Elect.

Ballast, Surface Mnt., Prismatic Lens

62 0.12 223.2 $28.57 2 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

612 P-2 Storage 500 1 1 Surface Mnt., 100w A19 Lamp 100 0.10 50.0 $6.40 1 1 (1) 26w CFL Lamp 26 0.03 13 $1.66 $20.00 $20.00 0.07 37 $4.74 4.22

222.21 Gym Corridor 3600 6 22x4, 2 Lamp, 32w T8, Elect.

Ballast, Recessed Mnt., Prismatic Lens

62 0.37 1,339.2 $171.42 6 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

222.21 Teacher Lounge 1800 8 22x4, 2 Lamp, 32w T8, Elect.

Ballast, Recessed Mnt., Prismatic Lens

62 0.50 892.8 $114.28 8 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

221.11 A31 1800 40 21x4, 2 Lamp, 32w T8, Elect.

Ballast, Surface Mnt., Prismatic Lens

62 2.48 4,464.0 $571.39 40 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

612 A31 Storage 500 2 1 Surface Mnt., 100w A19 Lamp 100 0.20 100.0 $12.80 2 1 (1) 26w CFL Lamp 26 0.05 26 $3.33 $20.00 $40.00 0.15 74 $9.47 4.22

221.11 A30 1800 30 21x4, 2 Lamp, 32w T8, Elect.

Ballast, Surface Mnt., Prismatic Lens

62 1.86 3,348.0 $428.54 30 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

612 A30 Storage 500 1 1 Surface Mnt., 100w A19 Lamp 100 0.10 50.0 $6.40 1 1 (1) 26w CFL Lamp 26 0.03 13 $1.66 $20.00 $20.00 0.07 37 $4.74 4.22

222.21 Boy's Room 1800 2 22x4, 2 Lamp, 32w T8, Elect.

Ballast, Recessed Mnt., Prismatic Lens

62 0.12 223.2 $28.57 2 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

222.21 Girl's Room 1800 2 22x4, 2 Lamp, 32w T8, Elect.

Ballast, Recessed Mnt., Prismatic Lens

62 0.12 223.2 $28.57 2 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

242.21 A29 1800 20 42x4, 4 Lamp, 32w T8, Elect.

Ballast, Recessed Mnt., Prismatic Lens

107 2.14 3,852.0 $493.06 20 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

221.11 A28 1800 33 21x4, 2 Lamp, 32w T8, Elect.

Ballast, Surface Mnt., Prismatic Lens

62 2.05 3,682.8 $471.40 33 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

Page 76: Facility COVER SHEET- Voorhees Middle School Audit...The typical hours of operation for Voorhees Middle School are Monday through Friday between 7:00 am and 3:00 pm during the normal

Investment Grade Lighting Audit APPENDIX E13 of 30

ECM #1: Lighting Upgrade - GeneralEXISTING LIGHTING PROPOSED LIGHTING SAVINGS

CEG Fixture Yearly No. No. Fixture Fixt Total kWh/Yr Yearly No. No. Retro-Unit Watts Total kWh/Yr Yearly Unit Cost Total kW kWh/Yr Yearly Yearly SimpleType Location Usage Fixts Lamps Type Watts kW Fixtures $ Cost Fixts Lamps Description Used kW Fixtures $ Cost (INSTALLED) Cost Savings Savings $ Savings Payback

211.44 A28 Storage 500 1 11x4, 1 Lamp, 32w T8, Elect.

Ballast, Surface MNt., No Lens

32 0.03 16.0 $2.05 1 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

222.21 A28 Office 1800 8 22x4, 2 Lamp, 32w T8, Elect.

Ballast, Recessed Mnt., Prismatic Lens

62 0.50 892.8 $114.28 8 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

222.21 Corridor A Wing - C Wing 3600 13 2

2x4, 2 Lamp, 32w T8, Elect. Ballast, Recessed Mnt.,

Prismatic Lens62 0.81 2,901.6 $371.40 13 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

612 P-1 Storage 500 4 1 Surface Mnt., 100w A19 Lamp 100 0.40 200.0 $25.60 4 1 (1) 26w CFL Lamp 26 0.10 52 $6.66 $20.00 $80.00 0.30 148 $18.94 4.22

222.21 Maintenance 1800 2 22x4, 2 Lamp, 32w T8, Elect.

Ballast, Recessed Mnt., Prismatic Lens

62 0.12 223.2 $28.57 2 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

222.21 School Store 500 2 22x4, 2 Lamp, 32w T8, Elect.

Ballast, Recessed Mnt., Prismatic Lens

62 0.12 62.0 $7.94 2 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

222.21 1800 4 22x4, 2 Lamp, 32w T8, Elect.

Ballast, Recessed Mnt., Prismatic Lens

62 0.25 446.4 $57.14 4 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

227.21 1800 3 22x2, 2 Lamp, 32w T8, Elect.

Ballast, Recessed Mnt., Prismatic Lens

65 0.20 351.0 $44.93 3 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

222.21 Auditorium Corridor 3600 22 22x4, 2 Lamp, 32w T8, Elect.

Ballast, Recessed Mnt., Prismatic Lens

62 1.36 4,910.4 $628.53 22 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

222.22 1800 2 22x4, 2 Lamp, 32w T8, Elect.

Ballast, Recessed Mnt., Parabolic Lens

58 0.12 208.8 $26.73 2 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

227.22 1800 2 22x2, 2 Lamp, 32w T8, Elect.

Ballast, Recessed Mnt., Parabolic Lens

58 0.12 208.8 $26.73 2 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

211.31 1800 7 11x4, 1 Lamp, 32w T8, Elect.

Ballast, Recessed Mnt., Prismatic Lens

30 0.21 378.0 $48.38 7 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

222.22 1800 2 22x4, 2 Lamp, 32w T8, Elect.

Ballast, Recessed Mnt., Parabolic Lens

58 0.12 208.8 $26.73 2 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

211.31 1800 8 11x4, 1 Lamp, 32w T8, Elect.

Ballast, Recessed Mnt., Prismatic Lens

30 0.24 432.0 $55.30 8 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

222.21 Storage 500 1 22x4, 2 Lamp, 32w T8, Elect.

Ballast, Recessed Mnt., Prismatic Lens

62 0.06 31.0 $3.97 1 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

211.34 P-11 Storage 500 1 11x4, 1 Lamp, 32w T8, Elect.

Ballast, Pendant Mnt., No Lens

30 0.03 15.0 $1.92 1 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

551 Auditorium Lobby 3600 22 1 Recessed Down Light, 100w A Lamp 100 2.20 7,920.0 $1,013.76 22 1 26w CFL Lamp 26 0.57 2059.2 $263.58 $20.00 $440.00 1.63 5860.8 $750.18 0.59

200 Display Case 3600 6 21x2, 2 Lamp, 17w T8, Elect.

Ballast, Surface Mnt., Prismatic Lens

34 0.20 734.4 $94.00 6 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

621 Control Room 1800 4 1 Recessed Light, 100w A Lamp 100 0.40 720.0 $92.16 4 1 (1) 26w CFL Lamp 26 0.10 187.2 $23.96 $20.00 $80.00 0.30 532.8 $68.20 1.17

Dressing Room

Women's Room

Men's Room

Page 77: Facility COVER SHEET- Voorhees Middle School Audit...The typical hours of operation for Voorhees Middle School are Monday through Friday between 7:00 am and 3:00 pm during the normal

Investment Grade Lighting Audit APPENDIX E14 of 30

ECM #1: Lighting Upgrade - GeneralEXISTING LIGHTING PROPOSED LIGHTING SAVINGS

CEG Fixture Yearly No. No. Fixture Fixt Total kWh/Yr Yearly No. No. Retro-Unit Watts Total kWh/Yr Yearly Unit Cost Total kW kWh/Yr Yearly Yearly SimpleType Location Usage Fixts Lamps Type Watts kW Fixtures $ Cost Fixts Lamps Description Used kW Fixtures $ Cost (INSTALLED) Cost Savings Savings $ Savings Payback

551 Auditorium 1800 60 1 Recessed Down Light, 100w A Lamp 100 6.00 10,800.0 $1,382.40 60 1 26w CFL Lamp 26 1.56 2808 $359.42 $20.00 $1,200.00 4.44 7992 $1,022.98 1.17

745 1800 4 1 250w MH Down Light w/Prismatic Lens 295 1.18 2,124.0 $271.87 4 6 2x4, 6 Lamp, 32w T8,

Elect. Ballast, Lo Bay 168 0.67 1209.6 $154.83 $220.00 $880.00 0.51 914.4 $117.04 7.52

612 1800 10 1 Surface Mnt., 100w A19 Lamp 100 1.00 1,800.0 $230.40 10 1 (1) 26w CFL Lamp 26 0.26 468 $59.90 $20.00 $200.00 0.74 1332 $170.50 1.17

111.11 1800 1 11x4, 1-Lamp, 34w T8, Mag.

Ballast, Surface Mnt., Prismatic Lens

48 0.05 86.4 $11.06 1 1 1 Lamp, 32w T8, Elect. Ballast; retrofit 30 0.03 54 $6.91 $80.00 $80.00 0.02 32.4 $4.15 19.29

121.14 P-12 Electrical 500 3 21x4, 2-Lamp, 34w T8, Mag.

Ballast, Surface Mnt., No Lens

78 0.23 117.0 $14.98 3 2 2 Lamp, 32w T8, Elect. Ballast; retrofit 58 0.17 87 $11.14 $100.00 $300.00 0.06 30 $3.84 78.13

222.11 Loading Dock 1800 9 22x4, 2 Lamp, 32w T8, Elect.

Ballast, Surface Mnt., Prismatic Lens

62 0.56 1,004.4 $128.56 9 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

222.11 Loading Dock Storage 500 5 22x4, 2 Lamp, 32w T8, Elect.

Ballast, Surface Mnt., Prismatic Lens

62 0.31 155.0 $19.84 5 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

Totals 2,209 557 358,640 $45,906 2,209 98 25.4 46,500 $5,952 $36,950 29.2 54,979 $7,037 5.25

Stage

Page 78: Facility COVER SHEET- Voorhees Middle School Audit...The typical hours of operation for Voorhees Middle School are Monday through Friday between 7:00 am and 3:00 pm during the normal

APPENDIX E15 of 30

CEG Job #: 9C11026Project: Voorhees Township BOE LGEA KWH COST: $0.128Address: 1000 Holy Oak Drive

Voorhees, NJ 08043Building SF: FALSE

ECM #2: Lighting Controls

EXISTING LIGHTING PROPOSED LIGHTING CONTROLS SAVINGSCEG Fixture Yearly No. No. Fixture Fixt Total kWh/Yr Yearly No. No. Controls Watts Total Reduction kWh/Yr Yearly Unit Cost Total kW kWh/Yr Yearly Yearly Simple

Type Location Usage Fixts Lamps Type Watts kW Fixtures $ Cost Fixts Cont. Description Used kW (%) Fixtures $ Cost (INSTALLED) Cost Savings Savings $ Savings Payback

232.22 B20 1800 9 32x4, 3 Lamp, 32w T8,

Elect. Ballast, Recessed Mnt., Parabolic Lens

86 0.774 1393.2 178.3296 9 Existing Occupancy Sensor - Remote Mnt. 86 0.62 20% 1114.56 $142.66 $0.00 0.15 278.64 $35.67 0.00

232.22 B19 1800 9 32x4, 3 Lamp, 32w T8,

Elect. Ballast, Recessed Mnt., Parabolic Lens

86 0.774 1393.2 178.3296 9 Existing Occupancy Sensor - Remote Mnt. 86 0.62 20% 1114.56 $142.66 $0.00 0.15 278.64 $35.67 0.00

232.22 B18 1800 9 32x4, 3 Lamp, 32w T8,

Elect. Ballast, Recessed Mnt., Parabolic Lens

86 0.774 1393.2 178.3296 9 Existing Occupancy Sensor - Remote Mnt. 86 0.62 20% 1114.56 $142.66 $0.00 0.15 278.64 $35.67 0.00

232.22 B17 1800 9 32x4, 3 Lamp, 32w T8,

Elect. Ballast, Recessed Mnt., Parabolic Lens

86 0.774 1393.2 178.3296 9 Existing Occupancy Sensor - Remote Mnt. 86 0.62 20% 1114.56 $142.66 $0.00 0.15 278.64 $35.67 0.00

232.22 B15 1800 9 32x4, 3 Lamp, 32w T8,

Elect. Ballast, Recessed Mnt., Parabolic Lens

86 0.774 1393.2 178.3296 9 Existing Occupancy Sensor - Remote Mnt. 86 0.62 20% 1114.56 $142.66 $0.00 0.15 278.64 $35.67 0.00

232.22 B16 1800 9 32x4, 3 Lamp, 32w T8,

Elect. Ballast, Recessed Mnt., Parabolic Lens

86 0.774 1393.2 178.3296 9 Existing Occupancy Sensor - Remote Mnt. 86 0.62 20% 1114.56 $142.66 $0.00 0.15 278.64 $35.67 0.00

232.22 B13 1800 9 32x4, 3 Lamp, 32w T8,

Elect. Ballast, Recessed Mnt., Parabolic Lens

86 0.774 1393.2 178.3296 9 Existing Occupancy Sensor - Remote Mnt. 86 0.62 20% 1114.56 $142.66 $0.00 0.15 278.64 $35.67 0.00

232.22 B14 1800 12 32x4, 3 Lamp, 32w T8,

Elect. Ballast, Recessed Mnt., Parabolic Lens

86 1.032 1857.6 237.7728 12 Existing Occupancy Sensor - Remote Mnt. 86 0.83 20% 1486.08 $190.22 $0.00 0.21 371.52 $47.55 0.00

232.22 B14 Storage 500 3 32x4, 3 Lamp, 32w T8,

Elect. Ballast, Recessed Mnt., Parabolic Lens

86 0.258 129 16.512 3 Existing Occupancy Sensor - Remote Mnt. 86 0.21 20% 103.2 $13.21 $0.00 0.05 25.8 $3.30 0.00

232.22 B12 1800 12 32x4, 3 Lamp, 32w T8,

Elect. Ballast, Recessed Mnt., Parabolic Lens

86 1.032 1857.6 237.7728 12 Existing Occupancy Sensor - Remote Mnt. 86 0.83 20% 1486.08 $190.22 $0.00 0.21 371.52 $47.55 0.00

222.21 Corridor B20 - B12 3600 14 22x4, 2 Lamp, 32w T8, Elect. Ballast, Recessed

Mnt., Prismatic Lens62 0.868 3124.8 399.9744 14 No Change 62 0.87 0% 3124.8 $399.97 $0.00 0.00 0 $0.00 0.00

232.22 B11 1800 9 32x4, 3 Lamp, 32w T8,

Elect. Ballast, Recessed Mnt., Parabolic Lens

86 0.774 1393.2 178.3296 9 Existing Occupancy Sensor - Remote Mnt. 86 0.62 20% 1114.56 $142.66 $0.00 0.15 278.64 $35.67 0.00

237.23 Staff Toilet 1800 5 32x2, 3 Lamp, 17w T8,

Elect. Ballast, Recessed Mnt., Prismatic Lens

51 0.255 459 58.752 5 No Change 51 0.26 0% 459 $58.75 $0.00 0.00 0 $0.00 0.00

232.21 B10 1800 9 32x4, 3 Lamp, 32w T8,

Elect. Ballast, Recessed Mnt., Prismatic Lens

86 0.774 1393.2 178.3296 9 Existing Occupancy Sensor - Remote Mnt. 86 0.62 20% 1114.56 $142.66 $0.00 0.15 278.64 $35.67 0.00

222.21 Boy's Room 1800 3 22x4, 2 Lamp, 32w T8, Elect. Ballast, Recessed

Mnt., Prismatic Lens62 0.186 334.8 42.8544 3 Existing Occupancy Sensor -

Remote Mnt. 62 0.15 20% 267.84 $34.28 $0.00 0.04 66.96 $8.57 0.00

198,270

Page 79: Facility COVER SHEET- Voorhees Middle School Audit...The typical hours of operation for Voorhees Middle School are Monday through Friday between 7:00 am and 3:00 pm during the normal

APPENDIX E16 of 30

ECM #2: Lighting Controls

EXISTING LIGHTING PROPOSED LIGHTING CONTROLS SAVINGSCEG Fixture Yearly No. No. Fixture Fixt Total kWh/Yr Yearly No. No. Controls Watts Total Reduction kWh/Yr Yearly Unit Cost Total kW kWh/Yr Yearly Yearly Simple

Type Location Usage Fixts Lamps Type Watts kW Fixtures $ Cost Fixts Cont. Description Used kW (%) Fixtures $ Cost (INSTALLED) Cost Savings Savings $ Savings Payback

237.23 JC 500 2 32x2, 3 Lamp, 17w T8,

Elect. Ballast, Recessed Mnt., Prismatic Lens

51 0.102 51 6.528 2 No Change 51 0.10 0% 51 $6.53 $0.00 0.00 0 $0.00 0.00

222.21 1800 3 22x4, 2 Lamp, 32w T8, Elect. Ballast, Recessed

Mnt., Prismatic Lens62 0.186 334.8 42.8544 3 Existing Occupancy Sensor -

Remote Mnt. 62 0.15 20% 267.84 $34.28 $0.00 0.04 66.96 $8.57 0.00

237.23 1800 1 32x2, 3 Lamp, 17w T8,

Elect. Ballast, Recessed Mnt., Prismatic Lens

51 0.051 91.8 11.7504 1 No Change 51 0.05 0% 91.8 $11.75 $0.00 0.00 0 $0.00 0.00

232.21 B9 1800 9 32x4, 3 Lamp, 32w T8,

Elect. Ballast, Recessed Mnt., Prismatic Lens

86 0.774 1393.2 178.3296 9 Existing Occupancy Sensor - Remote Mnt. 86 0.62 20% 1114.56 $142.66 $0.00 0.15 278.64 $35.67 0.00

232.21 B8 1800 9 32x4, 3 Lamp, 32w T8,

Elect. Ballast, Recessed Mnt., Prismatic Lens

86 0.774 1393.2 178.3296 9 Existing Occupancy Sensor - Remote Mnt. 86 0.62 20% 1114.56 $142.66 $0.00 0.15 278.64 $35.67 0.00

232.21 B7 1800 12 32x4, 3 Lamp, 32w T8,

Elect. Ballast, Recessed Mnt., Prismatic Lens

86 1.032 1857.6 237.7728 12 Existing Occupancy Sensor - Remote Mnt. 86 0.83 20% 1486.08 $190.22 $0.00 0.21 371.52 $47.55 0.00

232.21 P19 Storage 500 4 32x4, 3 Lamp, 32w T8,

Elect. Ballast, Recessed Mnt., Prismatic Lens

86 0.344 172 22.016 4 Existing Occupancy Sensor - Remote Mnt. 86 0.28 20% 137.6 $17.61 $0.00 0.07 34.4 $4.40 0.00

232.21 B5 1800 12 32x4, 3 Lamp, 32w T8,

Elect. Ballast, Recessed Mnt., Prismatic Lens

86 1.032 1857.6 237.7728 12 Existing Occupancy Sensor - Remote Mnt. 86 0.83 20% 1486.08 $190.22 $0.00 0.21 371.52 $47.55 0.00

232.21 B6 1800 9 32x4, 3 Lamp, 32w T8,

Elect. Ballast, Recessed Mnt., Prismatic Lens

86 0.774 1393.2 178.3296 9 Existing Occupancy Sensor - Remote Mnt. 86 0.62 20% 1114.56 $142.66 $0.00 0.15 278.64 $35.67 0.00

232.21 B4 1800 9 32x4, 3 Lamp, 32w T8,

Elect. Ballast, Recessed Mnt., Prismatic Lens

86 0.774 1393.2 178.3296 9 Existing Occupancy Sensor - Remote Mnt. 86 0.62 20% 1114.56 $142.66 $0.00 0.15 278.64 $35.67 0.00

232.21 B3 1800 10 32x4, 3 Lamp, 32w T8,

Elect. Ballast, Recessed Mnt., Prismatic Lens

86 0.86 1548 198.144 10 Existing Occupancy Sensor - Remote Mnt. 86 0.69 20% 1238.4 $158.52 $0.00 0.17 309.6 $39.63 0.00

232.21 B2 1800 9 32x4, 3 Lamp, 32w T8,

Elect. Ballast, Recessed Mnt., Prismatic Lens

86 0.774 1393.2 178.3296 9 Existing Occupancy Sensor - Remote Mnt. 86 0.62 20% 1114.56 $142.66 $0.00 0.15 278.64 $35.67 0.00

232.21 Faculty Room 1800 2 32x4, 3 Lamp, 32w T8,

Elect. Ballast, Recessed Mnt., Prismatic Lens

86 0.172 309.6 39.6288 2 Existing Occupancy Sensor - Remote Mnt. 86 0.14 20% 247.68 $31.70 $0.00 0.03 61.92 $7.93 0.00

237.23 Faculty Men's Room 1800 1 32x2, 3 Lamp, 17w T8,

Elect. Ballast, Recessed Mnt., Prismatic Lens

51 0.051 91.8 11.7504 1 No Change 51 0.05 0% 91.8 $11.75 $0.00 0.00 0 $0.00 0.00

237.23 Faculty Women's Room 1800 1 3

2x2, 3 Lamp, 17w T8, Elect. Ballast, Recessed

Mnt., Prismatic Lens51 0.051 91.8 11.7504 1 No Change 51 0.05 0% 91.8 $11.75 $0.00 0.00 0 $0.00 0.00

232.21 B1 1800 9 32x4, 3 Lamp, 32w T8,

Elect. Ballast, Recessed Mnt., Prismatic Lens

86 0.774 1393.2 178.3296 9 Existing Occupancy Sensor - Remote Mnt. 86 0.62 20% 1114.56 $142.66 $0.00 0.15 278.64 $35.67 0.00

Girl's Room

Page 80: Facility COVER SHEET- Voorhees Middle School Audit...The typical hours of operation for Voorhees Middle School are Monday through Friday between 7:00 am and 3:00 pm during the normal

APPENDIX E17 of 30

ECM #2: Lighting Controls

EXISTING LIGHTING PROPOSED LIGHTING CONTROLS SAVINGSCEG Fixture Yearly No. No. Fixture Fixt Total kWh/Yr Yearly No. No. Controls Watts Total Reduction kWh/Yr Yearly Unit Cost Total kW kWh/Yr Yearly Yearly Simple

Type Location Usage Fixts Lamps Type Watts kW Fixtures $ Cost Fixts Cont. Description Used kW (%) Fixtures $ Cost (INSTALLED) Cost Savings Savings $ Savings Payback

232.21 Grade 8 Main Office 1800 3 32x4, 3 Lamp, 32w T8,

Elect. Ballast, Recessed Mnt., Prismatic Lens

86 0.258 464.4 59.4432 3 No Change 86 0.26 0% 464.4 $59.44 $0.00 0.00 0 $0.00 0.00

232.21 3600 2 32x4, 3 Lamp, 32w T8,

Elect. Ballast, Recessed Mnt., Prismatic Lens

86 0.172 619.2 79.2576 2 1Dual Tech. Occupancy Sensor w/ (1) 2 Pole

Powerpack - Remote Mnt.86 0.14 20% 495.36 $63.41 $450.00 $450.00 0.03 123.84 $15.85 28.39

237.21 3600 1 3

2x2, 3 Lamp, 31w T8 Ulamp, Elect. Ballast,

Recessed Mnt., Prismatic Lens

92 0.092 331.2 42.3936 1 No Change 92 0.09 0% 331.2 $42.39 $0.00 0.00 0 $0.00 0.00

232.21 Asst. Principal 1800 2 32x4, 3 Lamp, 32w T8,

Elect. Ballast, Recessed Mnt., Prismatic Lens

86 0.172 309.6 39.6288 2 1Dual Tech. Occupancy Sensor w/ (1) 2 Pole

Powerpack - Remote Mnt.86 0.14 20% 247.68 $31.70 $450.00 $450.00 0.03 61.92 $7.93 56.78

232.21 Guidance 1800 2 32x4, 3 Lamp, 32w T8,

Elect. Ballast, Recessed Mnt., Prismatic Lens

86 0.172 309.6 39.6288 2 1Dual Tech. Occupancy Sensor w/ (1) 2 Pole

Powerpack - Remote Mnt.86 0.14 20% 247.68 $31.70 $450.00 $450.00 0.03 61.92 $7.93 56.78

222.21 Corridor 8 Office - B11 3600 20 2

2x4, 2 Lamp, 32w T8, Elect. Ballast, Recessed

Mnt., Prismatic Lens62 1.24 4464 571.392 20 No Change 62 1.24 0% 4464 $571.39 $0.00 0.00 0 $0.00 0.00

222.21 Bwing to D Corridor 3600 5 2

2x4, 2 Lamp, 32w T8, Elect. Ballast, Recessed

Mnt., Prismatic Lens62 0.31 1116 142.848 5 No Change 62 0.31 0% 1116 $142.85 $0.00 0.00 0 $0.00 0.00

232.21 D1 1800 20 32x4, 3 Lamp, 32w T8,

Elect. Ballast, Recessed Mnt., Prismatic Lens

86 1.72 3096 396.288 20 Existing Occupancy Sensor - Remote Mnt. 86 1.38 20% 2476.8 $317.03 $0.00 0.34 619.2 $79.26 0.00

232.21 D1 Storage/Office 500 5 32x4, 3 Lamp, 32w T8,

Elect. Ballast, Recessed Mnt., Prismatic Lens

86 0.43 215 27.52 5 No Change 86 0.43 0% 215 $27.52 $0.00 0.00 0 $0.00 0.00

232.21 D20 1800 6 32x4, 3 Lamp, 32w T8,

Elect. Ballast, Recessed Mnt., Prismatic Lens

86 0.516 928.8 118.8864 6 Existing Occupancy Sensor - Remote Mnt. 86 0.41 20% 743.04 $95.11 $0.00 0.10 185.76 $23.78 0.00

232.21 D2 1800 20 32x4, 3 Lamp, 32w T8,

Elect. Ballast, Recessed Mnt., Prismatic Lens

86 1.72 3096 396.288 20 Existing Occupancy Sensor - Remote Mnt. 86 1.38 20% 2476.8 $317.03 $0.00 0.34 619.2 $79.26 0.00

122.21 P-9 Storage 500 3 22x4, 2-Lamp, 34w T8, Mag.

Ballast, Recessed Mnt., Prismatic Lens

78 0.234 117 14.976 3 No Change 78 0.23 0% 117 $14.98 $0.00 0.00 0 $0.00 0.00

227.21 1800 7 22x2, 2 Lamp, 32w T8, Elect. Ballast, Recessed

Mnt., Prismatic Lens65 0.455 819 104.832 7 No Change 65 0.46 0% 819 $104.83 $0.00 0.00 0 $0.00 0.00

211.44 1800 24 11x4, 1 Lamp, 32w T8, Elect. Ballast, Surface

MNt., No Lens32 0.768 1382.4 176.9472 24 2

Dual Tech. Occupancy Sensor w/ (1) 2 Pole

Powerpack - Remote Mnt.32 0.61 20% 1105.92 $141.56 $450.00 $900.00 0.15 276.48 $35.39 25.43

128.34 1800 26 28' Channel, 2 Lamp, 75w

T12, Mag. Ballast, Pendant Mnt., No Lens

142 3.692 6645.6 850.6368 26 2Dual Tech. Occupancy Sensor w/ (1) 2 Pole

Powerpack - Remote Mnt.142 2.95 20% 5316.48 $680.51 $450.00 $900.00 0.74 1329.12 $170.13 5.29

121.34 1800 2 11x4, 1-Lamp, 34w T8, Mag. Ballast, Pendant Mnt., No

Lens48 0.096 172.8 22.1184 2 No Change 48 0.10 0% 172.8 $22.12 $0.00 0.00 0 $0.00 0.00

Grade 8 Conference Room

Library

Page 81: Facility COVER SHEET- Voorhees Middle School Audit...The typical hours of operation for Voorhees Middle School are Monday through Friday between 7:00 am and 3:00 pm during the normal

APPENDIX E18 of 30

ECM #2: Lighting Controls

EXISTING LIGHTING PROPOSED LIGHTING CONTROLS SAVINGSCEG Fixture Yearly No. No. Fixture Fixt Total kWh/Yr Yearly No. No. Controls Watts Total Reduction kWh/Yr Yearly Unit Cost Total kW kWh/Yr Yearly Yearly Simple

Type Location Usage Fixts Lamps Type Watts kW Fixtures $ Cost Fixts Cont. Description Used kW (%) Fixtures $ Cost (INSTALLED) Cost Savings Savings $ Savings Payback

211.14 1800 12 21x3 2 Lamp, 32w T8, Elect.

Ballast, Pendent Mnt., Prismatic Lens

34 0.408 734.4 94.0032 12 1Dual Tech. Occupancy Sensor w/ (1) 2 Pole

Powerpack - Remote Mnt.34 0.33 20% 587.52 $75.20 $450.00 $450.00 0.08 146.88 $18.80 23.94

211.34 1800 8 11x4, 1 Lamp, 32w T8,

Elect. Ballast, Pendant Mnt.,No Lens

30 0.24 432 55.296 8 No Change 30 0.24 0% 432 $55.30 $0.00 0.00 0 $0.00 0.00

128.14 1800 8 18' Channel, 1 Lamp, 75w

T12, Mag. Ballast, Pendent Mnt., No Lens

75 0.6 1080 138.24 8 No Change 75 0.60 0% 1080 $138.24 $0.00 0.00 0 $0.00 0.00

128.46 1800 4 16' Channel, 1 Lamp, 57w

T12, Mag. Ballast, Pendent Mnt., No Lens

57 0.228 410.4 52.5312 4 No Change 57 0.23 0% 410.4 $52.53 $0.00 0.00 0 $0.00 0.00

227.21 Library Office 1800 10 22x2, 2 Lamp, 32w T8, Elect. Ballast, Recessed

Mnt., Prismatic Lens65 0.65 1170 149.76 10 Existing Occupancy Sensor -

Remote Mnt. 65 0.52 20% 936 $119.81 $0.00 0.13 234 $29.95 0.00

222.21 Library Storage 500 6 22x4, 2 Lamp, 32w T8, Elect. Ballast, Recessed

Mnt., Prismatic Lens62 0.372 186 23.808 6 Existing Occupancy Sensor -

Remote Mnt. 62 0.30 20% 148.8 $19.05 $0.00 0.07 37.2 $4.76 0.00

222.21 Library Back Office 1800 3 22x4, 2 Lamp, 32w T8, Elect. Ballast, Recessed

Mnt., Prismatic Lens62 0.186 334.8 42.8544 3 No Change 62 0.19 0% 334.8 $42.85 $0.00 0.00 0 $0.00 0.00

222.21 D3 1800 12 22x4, 2 Lamp, 32w T8, Elect. Ballast, Recessed

Mnt., Prismatic Lens62 0.744 1339.2 171.4176 12 Existing Occupancy Sensor -

Remote Mnt. 62 0.60 20% 1071.36 $137.13 $0.00 0.15 267.84 $34.28 0.00

222.21 D4 1800 12 22x4, 2 Lamp, 32w T8, Elect. Ballast, Recessed

Mnt., Prismatic Lens62 0.744 1339.2 171.4176 12 Existing Occupancy Sensor -

Remote Mnt. 62 0.60 20% 1071.36 $137.13 $0.00 0.15 267.84 $34.28 0.00

222.21 D5 1800 12 22x4, 2 Lamp, 32w T8, Elect. Ballast, Recessed

Mnt., Prismatic Lens62 0.744 1339.2 171.4176 12 Existing Occupancy Sensor -

Remote Mnt. 62 0.60 20% 1071.36 $137.13 $0.00 0.15 267.84 $34.28 0.00

222.21 D6 1800 12 22x4, 2 Lamp, 32w T8, Elect. Ballast, Recessed

Mnt., Prismatic Lens62 0.744 1339.2 171.4176 12 Existing Occupancy Sensor -

Remote Mnt. 62 0.60 20% 1071.36 $137.13 $0.00 0.15 267.84 $34.28 0.00

222.21 Corridor D20 - D6 3600 15 22x4, 2 Lamp, 32w T8, Elect. Ballast, Recessed

Mnt., Prismatic Lens62 0.93 3348 428.544 15 No Change 62 0.93 0% 3348 $428.54 $0.00 0.00 0 $0.00 0.00

222.21 Corridor D6 - 6th Grade Office 3600 18 2

2x4, 2 Lamp, 32w T8, Elect. Ballast, Recessed

Mnt., Prismatic Lens62 1.116 4017.6 514.2528 18 No Change 62 1.12 0% 4017.6 $514.25 $0.00 0.00 0 $0.00 0.00

222.21 D10 1800 12 22x4, 2 Lamp, 32w T8, Elect. Ballast, Recessed

Mnt., Prismatic Lens62 0.744 1339.2 171.4176 12 Existing Occupancy Sensor -

Remote Mnt. 62 0.60 20% 1071.36 $137.13 $0.00 0.15 267.84 $34.28 0.00

222.21 D9 1800 12 22x4, 2 Lamp, 32w T8, Elect. Ballast, Recessed

Mnt., Prismatic Lens62 0.744 1339.2 171.4176 12 Existing Occupancy Sensor -

Remote Mnt. 62 0.60 20% 1071.36 $137.13 $0.00 0.15 267.84 $34.28 0.00

222.21 D8 1800 12 22x4, 2 Lamp, 32w T8, Elect. Ballast, Recessed

Mnt., Prismatic Lens62 0.744 1339.2 171.4176 12 Existing Occupancy Sensor -

Remote Mnt. 62 0.60 20% 1071.36 $137.13 $0.00 0.15 267.84 $34.28 0.00

Library

Page 82: Facility COVER SHEET- Voorhees Middle School Audit...The typical hours of operation for Voorhees Middle School are Monday through Friday between 7:00 am and 3:00 pm during the normal

APPENDIX E19 of 30

ECM #2: Lighting Controls

EXISTING LIGHTING PROPOSED LIGHTING CONTROLS SAVINGSCEG Fixture Yearly No. No. Fixture Fixt Total kWh/Yr Yearly No. No. Controls Watts Total Reduction kWh/Yr Yearly Unit Cost Total kW kWh/Yr Yearly Yearly Simple

Type Location Usage Fixts Lamps Type Watts kW Fixtures $ Cost Fixts Cont. Description Used kW (%) Fixtures $ Cost (INSTALLED) Cost Savings Savings $ Savings Payback

222.21 D7 1800 12 22x4, 2 Lamp, 32w T8, Elect. Ballast, Recessed

Mnt., Prismatic Lens62 0.744 1339.2 171.4176 12 Existing Occupancy Sensor -

Remote Mnt. 62 0.60 20% 1071.36 $137.13 $0.00 0.15 267.84 $34.28 0.00

222.21 1800 2 22x4, 2 Lamp, 32w T8, Elect. Ballast, Recessed

Mnt., Prismatic Lens62 0.124 223.2 28.5696 2 Existing Occupancy Sensor -

Remote Mnt. 62 0.10 20% 178.56 $22.86 $0.00 0.02 44.64 $5.71 0.00

211.41 1800 2 11x4, 1 Lamp, 32w T8,

Elect. Ballast, Surface Mnt., Prismatic Lens

30 0.06 108 13.824 2 No Change 30 0.06 0% 108 $13.82 $0.00 0.00 0 $0.00 0.00

227.21 1800 1 22x2, 2 Lamp, 32w T8, Elect. Ballast, Recessed

Mnt., Prismatic Lens65 0.065 117 14.976 1 No Change 65 0.07 0% 117 $14.98 $0.00 0.00 0 $0.00 0.00

222.21 1800 2 22x4, 2 Lamp, 32w T8, Elect. Ballast, Recessed

Mnt., Prismatic Lens62 0.124 223.2 28.5696 2 Existing Occupancy Sensor -

Remote Mnt. 62 0.10 20% 178.56 $22.86 $0.00 0.02 44.64 $5.71 0.00

211.41 1800 2 11x4, 1 Lamp, 32w T8,

Elect. Ballast, Surface Mnt., Prismatic Lens

30 0.06 108 13.824 2 No Change 30 0.06 0% 108 $13.82 $0.00 0.00 0 $0.00 0.00

227.21 1800 1 22x2, 2 Lamp, 32w T8, Elect. Ballast, Recessed

Mnt., Prismatic Lens65 0.065 117 14.976 1 No Change 65 0.07 0% 117 $14.98 $0.00 0.00 0 $0.00 0.00

222.22 6th Grade Office 1800 2 22x4, 2 Lamp, 32w T8,

Elect. Ballast, Recessed Mnt., Parabolic Lens

58 0.116 208.8 26.7264 2 1Dual Tech. Occupancy Sensor w/ (1) 2 Pole

Powerpack - Remote Mnt.58 0.09 20% 167.04 $21.38 $450.00 $450.00 0.02 41.76 $5.35 84.19

222.22 Guidance 1800 2 22x4, 2 Lamp, 32w T8,

Elect. Ballast, Recessed Mnt., Parabolic Lens

58 0.116 208.8 26.7264 2 No Change 58 0.12 0% 208.8 $26.73 $0.00 0.00 0 $0.00 0.00

222.22 Asst. Principal 1800 2 22x4, 2 Lamp, 32w T8,

Elect. Ballast, Recessed Mnt., Parabolic Lens

58 0.116 208.8 26.7264 2 No Change 58 0.12 0% 208.8 $26.73 $0.00 0.00 0 $0.00 0.00

221.11 A16 1800 15 21x4, 2 Lamp, 32w T8,

Elect. Ballast, Surface Mnt., Prismatic Lens

62 0.93 1674 214.272 15 Existing Occupancy Sensor - Remote Mnt. 62 0.74 20% 1339.2 $171.42 $0.00 0.19 334.8 $42.85 0.00

222.21 Officers Office 1800 2 22x4, 2 Lamp, 32w T8, Elect. Ballast, Recessed

Mnt., Prismatic Lens62 0.124 223.2 28.5696 2 1

Dual Tech. Occupancy Sensor w/ (1) 2 Pole

Powerpack - Remote Mnt.62 0.10 20% 178.56 $22.86 $450.00 $450.00 0.02 44.64 $5.71 78.76

222.21 Girl's Room 1800 2 22x4, 2 Lamp, 32w T8, Elect. Ballast, Recessed

Mnt., Prismatic Lens62 0.124 223.2 28.5696 2 Existing Occupancy Sensor -

Remote Mnt. 62 0.10 20% 178.56 $22.86 $0.00 0.02 44.64 $5.71 0.00

221.11 A14 1800 15 21x4, 2 Lamp, 32w T8,

Elect. Ballast, Surface Mnt., Prismatic Lens

62 0.93 1674 214.272 15 Existing Occupancy Sensor - Remote Mnt. 62 0.74 20% 1339.2 $171.42 $0.00 0.19 334.8 $42.85 0.00

221.11 A13 1800 15 21x4, 2 Lamp, 32w T8,

Elect. Ballast, Surface Mnt., Prismatic Lens

62 0.93 1674 214.272 15 Existing Occupancy Sensor - Remote Mnt. 62 0.74 20% 1339.2 $171.42 $0.00 0.19 334.8 $42.85 0.00

221.11 A12 1800 15 21x4, 2 Lamp, 32w T8,

Elect. Ballast, Surface Mnt., Prismatic Lens

62 0.93 1674 214.272 15 Existing Occupancy Sensor - Remote Mnt. 62 0.74 20% 1339.2 $171.42 $0.00 0.19 334.8 $42.85 0.00

Boy's Room

Girl's Room

Page 83: Facility COVER SHEET- Voorhees Middle School Audit...The typical hours of operation for Voorhees Middle School are Monday through Friday between 7:00 am and 3:00 pm during the normal

APPENDIX E20 of 30

ECM #2: Lighting Controls

EXISTING LIGHTING PROPOSED LIGHTING CONTROLS SAVINGSCEG Fixture Yearly No. No. Fixture Fixt Total kWh/Yr Yearly No. No. Controls Watts Total Reduction kWh/Yr Yearly Unit Cost Total kW kWh/Yr Yearly Yearly Simple

Type Location Usage Fixts Lamps Type Watts kW Fixtures $ Cost Fixts Cont. Description Used kW (%) Fixtures $ Cost (INSTALLED) Cost Savings Savings $ Savings Payback

221.11 A11 1800 15 21x4, 2 Lamp, 32w T8,

Elect. Ballast, Surface Mnt., Prismatic Lens

62 0.93 1674 214.272 15 Existing Occupancy Sensor - Remote Mnt. 62 0.74 20% 1339.2 $171.42 $0.00 0.19 334.8 $42.85 0.00

221.11 A10 1800 15 21x4, 2 Lamp, 32w T8,

Elect. Ballast, Surface Mnt., Prismatic Lens

62 0.93 1674 214.272 15 Existing Occupancy Sensor - Remote Mnt. 62 0.74 20% 1339.2 $171.42 $0.00 0.19 334.8 $42.85 0.00

221.11 A9 1800 12 21x4, 2 Lamp, 32w T8,

Elect. Ballast, Surface Mnt., Prismatic Lens

62 0.744 1339.2 171.4176 12 Existing Occupancy Sensor - Remote Mnt. 62 0.60 20% 1071.36 $137.13 $0.00 0.15 267.84 $34.28 0.00

221.11 A8 1800 15 21x4, 2 Lamp, 32w T8,

Elect. Ballast, Surface Mnt., Prismatic Lens

62 0.93 1674 214.272 15 Existing Occupancy Sensor - Remote Mnt. 62 0.74 20% 1339.2 $171.42 $0.00 0.19 334.8 $42.85 0.00

222.31 P17 Electrical Room 500 2 2

2x4, 2 Lamp, 32w T8, Elect. Ballast, Pendant Mnt.,

Prismatic Lens58 0.116 58 7.424 2 No Change 58 0.12 0% 58 $7.42 $0.00 0.00 0 $0.00 0.00

221.11 A23 1800 12 21x4, 2 Lamp, 32w T8,

Elect. Ballast, Surface Mnt., Prismatic Lens

62 0.744 1339.2 171.4176 12 Existing Occupancy Sensor - Remote Mnt. 62 0.60 20% 1071.36 $137.13 $0.00 0.15 267.84 $34.28 0.00

221.11 A26 1800 15 21x4, 2 Lamp, 32w T8,

Elect. Ballast, Surface Mnt., Prismatic Lens

62 0.93 1674 214.272 15 Existing Occupancy Sensor - Remote Mnt. 62 0.74 20% 1339.2 $171.42 $0.00 0.19 334.8 $42.85 0.00

221.11 A27 1800 15 21x4, 2 Lamp, 32w T8,

Elect. Ballast, Surface Mnt., Prismatic Lens

62 0.93 1674 214.272 15 Existing Occupancy Sensor - Remote Mnt. 62 0.74 20% 1339.2 $171.42 $0.00 0.19 334.8 $42.85 0.00

221.11 A21 1800 12 21x4, 2 Lamp, 32w T8,

Elect. Ballast, Surface Mnt., Prismatic Lens

62 0.744 1339.2 171.4176 12 Existing Occupancy Sensor - Remote Mnt. 62 0.60 20% 1071.36 $137.13 $0.00 0.15 267.84 $34.28 0.00

221.11 A24 1800 15 21x4, 2 Lamp, 32w T8,

Elect. Ballast, Surface Mnt., Prismatic Lens

62 0.93 1674 214.272 15 Existing Occupancy Sensor - Remote Mnt. 62 0.74 20% 1339.2 $171.42 $0.00 0.19 334.8 $42.85 0.00

221.11 A22 1800 12 21x4, 2 Lamp, 32w T8,

Elect. Ballast, Surface Mnt., Prismatic Lens

62 0.744 1339.2 171.4176 12 Existing Occupancy Sensor - Remote Mnt. 62 0.60 20% 1071.36 $137.13 $0.00 0.15 267.84 $34.28 0.00

221.11 A25 1800 24 21x4, 2 Lamp, 32w T8,

Elect. Ballast, Surface Mnt., Prismatic Lens

62 1.488 2678.4 342.8352 24 Existing Occupancy Sensor - Remote Mnt. 62 1.19 20% 2142.72 $274.27 $0.00 0.30 535.68 $68.57 0.00

221.11 A19 1800 15 21x4, 2 Lamp, 32w T8,

Elect. Ballast, Surface Mnt., Prismatic Lens

62 0.93 1674 214.272 15 Existing Occupancy Sensor - Remote Mnt. 62 0.74 20% 1339.2 $171.42 $0.00 0.19 334.8 $42.85 0.00

221.11 A17 1800 15 21x4, 2 Lamp, 32w T8,

Elect. Ballast, Surface Mnt., Prismatic Lens

62 0.93 1674 214.272 15 Existing Occupancy Sensor - Remote Mnt. 62 0.74 20% 1339.2 $171.42 $0.00 0.19 334.8 $42.85 0.00

221.11 A20 1800 18 21x4, 2 Lamp, 32w T8,

Elect. Ballast, Surface Mnt., Prismatic Lens

62 1.116 2008.8 257.1264 18 Existing Occupancy Sensor - Remote Mnt. 62 0.89 20% 1607.04 $205.70 $0.00 0.22 401.76 $51.43 0.00

612 JC 500 1 1 Surface Mnt., 100w A19 Lamp 100 0.1 50 6.4 1 No Change 100 0.10 0% 50 $6.40 $0.00 0.00 0 $0.00 0.00

Page 84: Facility COVER SHEET- Voorhees Middle School Audit...The typical hours of operation for Voorhees Middle School are Monday through Friday between 7:00 am and 3:00 pm during the normal

APPENDIX E21 of 30

ECM #2: Lighting Controls

EXISTING LIGHTING PROPOSED LIGHTING CONTROLS SAVINGSCEG Fixture Yearly No. No. Fixture Fixt Total kWh/Yr Yearly No. No. Controls Watts Total Reduction kWh/Yr Yearly Unit Cost Total kW kWh/Yr Yearly Yearly Simple

Type Location Usage Fixts Lamps Type Watts kW Fixtures $ Cost Fixts Cont. Description Used kW (%) Fixtures $ Cost (INSTALLED) Cost Savings Savings $ Savings Payback

221.11 A18 1800 24 21x4, 2 Lamp, 32w T8,

Elect. Ballast, Surface Mnt., Prismatic Lens

62 1.488 2678.4 342.8352 24 Existing Occupancy Sensor - Remote Mnt. 62 1.19 20% 2142.72 $274.27 $0.00 0.30 535.68 $68.57 0.00

221.11 A18 Storage 500 4 21x4, 2 Lamp, 32w T8,

Elect. Ballast, Surface Mnt., Prismatic Lens

62 0.248 124 15.872 4 No Change 62 0.25 0% 124 $15.87 $0.00 0.00 0 $0.00 0.00

221.11 A7 1800 15 21x4, 2 Lamp, 32w T8,

Elect. Ballast, Surface Mnt., Prismatic Lens

62 0.93 1674 214.272 15 Existing Occupancy Sensor - Remote Mnt. 62 0.74 20% 1339.2 $171.42 $0.00 0.19 334.8 $42.85 0.00

222.21 A1 1800 15 22x4, 2 Lamp, 32w T8, Elect. Ballast, Recessed

Mnt., Prismatic Lens62 0.93 1674 214.272 15 Existing Occupancy Sensor -

Remote Mnt. 62 0.74 20% 1339.2 $171.42 $0.00 0.19 334.8 $42.85 0.00

222.21 A2 1800 6 22x4, 2 Lamp, 32w T8, Elect. Ballast, Recessed

Mnt., Prismatic Lens62 0.372 669.6 85.7088 6 Existing Occupancy Sensor -

Remote Mnt. 62 0.30 20% 535.68 $68.57 $0.00 0.07 133.92 $17.14 0.00

222.21 Nurse's Office 1800 10 22x4, 2 Lamp, 32w T8, Elect. Ballast, Recessed

Mnt., Prismatic Lens62 0.62 1116 142.848 10 1

Dual Tech. Occupancy Sensor w/ (1) 2 Pole & (1) 1 Pole Powerpacks - Remote

Mnt.

62 0.50 20% 892.8 $114.28 $600.00 $600.00 0.12 223.2 $28.57 21.00

222.21 Teacher's Lounge 1800 13 22x4, 2 Lamp, 32w T8, Elect. Ballast, Recessed

Mnt., Prismatic Lens62 0.806 1450.8 185.7024 13 1

Dual Tech. Occupancy Sensor w/ (1) 2 Pole

Powerpack - Remote Mnt.62 0.64 20% 1160.64 $148.56 $450.00 $450.00 0.16 290.16 $37.14 12.12

612Teacher's Lounge Women's Toilet

Room1800 1 1 Surface Mnt., 100w A19

Lamp 100 0.1 180 23.04 1 No Change 100 0.10 0% 180 $23.04 $0.00 0.00 0 $0.00 0.00

612 Teacher's Lounge Men's Toilet Room 1800 1 1 Surface Mnt., 100w A19

Lamp 100 0.1 180 23.04 1 No Change 100 0.10 0% 180 $23.04 $0.00 0.00 0 $0.00 0.00

227.21 Toilet Corridor 3600 2 22x2, 2 Lamp, 32w T8, Elect. Ballast, Recessed

Mnt., Prismatic Lens65 0.13 468 59.904 2 No Change 65 0.13 0% 468 $59.90 $0.00 0.00 0 $0.00 0.00

222.21 Boy's Room 1800 2 22x4, 2 Lamp, 32w T8, Elect. Ballast, Recessed

Mnt., Prismatic Lens62 0.124 223.2 28.5696 2 Existing Occupancy Sensor -

Remote Mnt. 62 0.10 20% 178.56 $22.86 $0.00 0.02 44.64 $5.71 0.00

222.21 P1 CER Storage 500 2 22x4, 2 Lamp, 32w T8, Elect. Ballast, Recessed

Mnt., Prismatic Lens62 0.124 62 7.936 2 No Change 62 0.12 0% 62 $7.94 $0.00 0.00 0 $0.00 0.00

222.21 Corridor A Wing 3600 48 22x4, 2 Lamp, 32w T8, Elect. Ballast, Recessed

Mnt., Prismatic Lens62 2.976 10713.6 1371.3408 48 No Change 62 2.98 0% 10713.6 $1,371.34 $0.00 0.00 0 $0.00 0.00

222.22 CER 1800 6 22x4, 2 Lamp, 32w T8,

Elect. Ballast, Recessed Mnt., Parabolic Lens

58 0.348 626.4 80.1792 6 1Dual Tech. Occupancy Sensor w/ (1) 2 Pole

Powerpack - Remote Mnt.58 0.28 20% 501.12 $64.14 $450.00 $450.00 0.07 125.28 $16.04 28.06

222.22 CER Conference 1800 5 22x4, 2 Lamp, 32w T8,

Elect. Ballast, Recessed Mnt., Parabolic Lens

58 0.29 522 66.816 5 1Dual Tech. Occupancy Sensor w/ (1) 2 Pole

Powerpack - Remote Mnt.58 0.23 20% 417.6 $53.45 $450.00 $450.00 0.06 104.4 $13.36 33.67

222.22 DIR CER Office 1800 4 22x4, 2 Lamp, 32w T8,

Elect. Ballast, Recessed Mnt., Parabolic Lens

58 0.232 417.6 53.4528 4 1Dual Tech. Occupancy Sensor w/ (1) 2 Pole

Powerpack - Remote Mnt.58 0.19 20% 334.08 $42.76 $450.00 $450.00 0.05 83.52 $10.69 42.09

Page 85: Facility COVER SHEET- Voorhees Middle School Audit...The typical hours of operation for Voorhees Middle School are Monday through Friday between 7:00 am and 3:00 pm during the normal

APPENDIX E22 of 30

ECM #2: Lighting Controls

EXISTING LIGHTING PROPOSED LIGHTING CONTROLS SAVINGSCEG Fixture Yearly No. No. Fixture Fixt Total kWh/Yr Yearly No. No. Controls Watts Total Reduction kWh/Yr Yearly Unit Cost Total kW kWh/Yr Yearly Yearly Simple

Type Location Usage Fixts Lamps Type Watts kW Fixtures $ Cost Fixts Cont. Description Used kW (%) Fixtures $ Cost (INSTALLED) Cost Savings Savings $ Savings Payback

227.22 3600 5 22x2, 2 Lamp, 32w T8,

Elect. Ballast, Recessed Mnt., Parabolic Lens

58 0.29 1044 133.632 5 No Change 58 0.29 0% 1044 $133.63 $0.00 0.00 0 $0.00 0.00

222.22 3600 3 22x4, 2 Lamp, 32w T8,

Elect. Ballast, Recessed Mnt., Parabolic Lens

58 0.174 626.4 80.1792 3 No Change 58 0.17 0% 626.4 $80.18 $0.00 0.00 0 $0.00 0.00

222.22 1800 6 22x4, 2 Lamp, 32w T8,

Elect. Ballast, Recessed Mnt., Parabolic Lens

58 0.348 626.4 80.1792 6 1Dual Tech. Occupancy Sensor w/ (1) 2 Pole

Powerpack - Remote Mnt.58 0.28 20% 501.12 $64.14 $450.00 $450.00 0.07 125.28 $16.04 28.06

227.22 1800 2 22x2, 2 Lamp, 32w T8,

Elect. Ballast, Recessed Mnt., Parabolic Lens

58 0.116 208.8 26.7264 2 No Change 58 0.12 0% 208.8 $26.73 $0.00 0.00 0 $0.00 0.00

222.22 Principal Office 1800 4 22x4, 2 Lamp, 32w T8,

Elect. Ballast, Recessed Mnt., Parabolic Lens

58 0.232 417.6 53.4528 4 No Change 58 0.23 0% 417.6 $53.45 $450.00 $0.00 0.00 0 $0.00 0.00

221.11 Principal Conference Room 3600 7 2

1x4, 2 Lamp, 32w T8, Elect. Ballast, Surface Mnt.,

Prismatic Lens62 0.434 1562.4 199.9872 7 1

Dual Tech. Occupancy Sensor w/ (1) 2 Pole

Powerpack - Remote Mnt.62 0.35 20% 1249.92 $159.99 $450.00 $450.00 0.09 312.48 $40.00 11.25

612 Principal Toilet Room 1800 1 1 Surface Mnt., 100w A19

Lamp 100 0.1 180 23.04 1 No Change 100 0.10 0% 180 $23.04 $0.00 0.00 0 $0.00 0.00

222.21 Mail Room 1800 2 22x4, 2 Lamp, 32w T8, Elect. Ballast, Recessed

Mnt., Prismatic Lens62 0.124 223.2 28.5696 2 1

Dual Tech. Occupancy Sensor w/ (1) 2 Pole

Powerpack - Remote Mnt.62 0.10 20% 178.56 $22.86 $450.00 $450.00 0.02 44.64 $5.71 78.76

221.11 Child Study 1800 4 21x4, 2 Lamp, 32w T8,

Elect. Ballast, Surface Mnt., Prismatic Lens

62 0.248 446.4 57.1392 4 1Dual Tech. Occupancy Sensor w/ (1) 2 Pole

Powerpack - Remote Mnt.62 0.20 20% 357.12 $45.71 $450.00 $450.00 0.05 89.28 $11.43 39.38

221.11 Child Study Office 1800 2 21x4, 2 Lamp, 32w T8,

Elect. Ballast, Surface Mnt., Prismatic Lens

62 0.124 223.2 28.5696 2 1Dual Tech. Occupancy Sensor w/ (1) 2 Pole

Powerpack - Remote Mnt.62 0.10 20% 178.56 $22.86 $450.00 $450.00 0.02 44.64 $5.71 78.76

242.21 Child Study Conference 1800 5 4

2x4, 4 Lamp, 32w T8, Elect. Ballast, Recessed

Mnt., Prismatic Lens107 0.535 963 123.264 5 1

Dual Tech. Occupancy Sensor w/ (1) 2 Pole

Powerpack - Remote Mnt.107 0.43 20% 770.4 $98.61 $450.00 $450.00 0.11 192.6 $24.65 18.25

222.21 Women's Room 1800 2 22x4, 2 Lamp, 32w T8, Elect. Ballast, Recessed

Mnt., Prismatic Lens62 0.124 223.2 28.5696 2 Existing Occupancy Sensor -

Remote Mnt. 62 0.10 20% 178.56 $22.86 $0.00 0.02 44.64 $5.71 0.00

222.21 Men's Room 1800 2 22x4, 2 Lamp, 32w T8, Elect. Ballast, Recessed

Mnt., Prismatic Lens62 0.124 223.2 28.5696 2 Existing Occupancy Sensor -

Remote Mnt. 62 0.10 20% 178.56 $22.86 $0.00 0.02 44.64 $5.71 0.00

221.11 Office A Wing 1800 2 21x4, 2 Lamp, 32w T8,

Elect. Ballast, Surface Mnt., Prismatic Lens

62 0.124 223.2 28.5696 2 1Dual Tech. Occupancy Sensor w/ (1) 2 Pole

Powerpack - Remote Mnt.62 0.10 20% 178.56 $22.86 $450.00 $450.00 0.02 44.64 $5.71 78.76

222.22 3600 7 22x4, 2 Lamp, 32w T8,

Elect. Ballast, Recessed Mnt., Parabolic Lens

58 0.406 1461.6 187.0848 7 No Change 58 0.41 0% 1461.6 $187.08 $0.00 0.00 0 $0.00 0.00

227.22 3600 10 22x2, 2 Lamp, 32w T8,

Elect. Ballast, Recessed Mnt., Parabolic Lens

58 0.58 2088 267.264 10 No Change 58 0.58 0% 2088 $267.26 $0.00 0.00 0 $0.00 0.00

Corridor CER

Mian Office

Corridor Main Office

Page 86: Facility COVER SHEET- Voorhees Middle School Audit...The typical hours of operation for Voorhees Middle School are Monday through Friday between 7:00 am and 3:00 pm during the normal

APPENDIX E23 of 30

ECM #2: Lighting Controls

EXISTING LIGHTING PROPOSED LIGHTING CONTROLS SAVINGSCEG Fixture Yearly No. No. Fixture Fixt Total kWh/Yr Yearly No. No. Controls Watts Total Reduction kWh/Yr Yearly Unit Cost Total kW kWh/Yr Yearly Yearly Simple

Type Location Usage Fixts Lamps Type Watts kW Fixtures $ Cost Fixts Cont. Description Used kW (%) Fixtures $ Cost (INSTALLED) Cost Savings Savings $ Savings Payback

132.21 E7 1800 16 32x4, 3-Lamp, 32w T8, Mag.

Ballast, Recessed Mnt., Prismatic Lens

121 1.936 3484.8 446.0544 16 Existing Occupancy Sensor - Remote Mnt. 121 1.55 20% 2787.84 $356.84 $0.00 0.39 696.96 $89.21 0.00

132.21 E6 1800 20 32x4, 3-Lamp, 32w T8, Mag.

Ballast, Recessed Mnt., Prismatic Lens

121 2.42 4356 557.568 20 Existing Occupancy Sensor - Remote Mnt. 121 1.94 20% 3484.8 $446.05 $0.00 0.48 871.2 $111.51 0.00

132.21 E6 Storage 500 8 32x4, 3-Lamp, 32w T8, Mag.

Ballast, Recessed Mnt., Prismatic Lens

121 0.968 484 61.952 8 Existing Occupancy Sensor - Remote Mnt. 121 0.77 20% 387.2 $49.56 $0.00 0.19 96.8 $12.39 0.00

232.21 E8 1800 16 32x4, 3 Lamp, 32w T8,

Elect. Ballast, Recessed Mnt., Prismatic Lens

86 1.376 2476.8 317.0304 16 Existing Occupancy Sensor - Remote Mnt. 86 1.10 20% 1981.44 $253.62 $0.00 0.28 495.36 $63.41 0.00

132.21 1800 20 32x4, 3-Lamp, 32w T8, Mag.

Ballast, Recessed Mnt., Prismatic Lens

121 2.42 4356 557.568 20 Existing Occupancy Sensor - Remote Mnt. 121 1.94 20% 3484.8 $446.05 $0.00 0.48 871.2 $111.51 0.00

211.27 1800 4 11x4, 1 Lamp, 32w T8,

Elect. Ballast, Recessed Mnt., Prismatic Lens

30 0.12 216 27.648 4 No Change 30 0.12 0% 216 $27.65 $0.00 0.00 0 $0.00 0.00

132.21 E9 1800 16 32x4, 3-Lamp, 32w T8, Mag.

Ballast, Recessed Mnt., Prismatic Lens

121 1.936 3484.8 446.0544 16 Existing Occupancy Sensor - Remote Mnt. 121 1.55 20% 2787.84 $356.84 $0.00 0.39 696.96 $89.21 0.00

121.16 P-13 Electrical Storage 500 4 2

1x4, 2-Lamp, 34w T8, Mag. Ballast, Pendent Mnt.,

Prismatic Lens78 0.312 156 19.968 4 No Change 78 0.31 0% 156 $19.97 $0.00 0.00 0 $0.00 0.00

132.21 E10 1800 16 32x4, 3-Lamp, 32w T8, Mag.

Ballast, Recessed Mnt., Prismatic Lens

121 1.936 3484.8 446.0544 16 Existing Occupancy Sensor - Remote Mnt. 121 1.55 20% 2787.84 $356.84 $0.00 0.39 696.96 $89.21 0.00

232.21 E11 1800 16 32x4, 3 Lamp, 32w T8,

Elect. Ballast, Recessed Mnt., Prismatic Lens

86 1.376 2476.8 317.0304 16 Existing Occupancy Sensor - Remote Mnt. 86 1.10 20% 1981.44 $253.62 $0.00 0.28 495.36 $63.41 0.00

132.21 E4 1800 16 32x4, 3-Lamp, 32w T8, Mag.

Ballast, Recessed Mnt., Prismatic Lens

121 1.936 3484.8 446.0544 16 Existing Occupancy Sensor - Remote Mnt. 121 1.55 20% 2787.84 $356.84 $0.00 0.39 696.96 $89.21 0.00

132.21 E3 1800 16 32x4, 3-Lamp, 32w T8, Mag.

Ballast, Recessed Mnt., Prismatic Lens

121 1.936 3484.8 446.0544 16 Existing Occupancy Sensor - Remote Mnt. 121 1.55 20% 2787.84 $356.84 $0.00 0.39 696.96 $89.21 0.00

132.21 E2 1800 16 32x4, 3-Lamp, 32w T8, Mag.

Ballast, Recessed Mnt., Prismatic Lens

121 1.936 3484.8 446.0544 16 Existing Occupancy Sensor - Remote Mnt. 121 1.55 20% 2787.84 $356.84 $0.00 0.39 696.96 $89.21 0.00

132.21 E12 1800 16 32x4, 3-Lamp, 32w T8, Mag.

Ballast, Recessed Mnt., Prismatic Lens

121 1.936 3484.8 446.0544 16 Existing Occupancy Sensor - Remote Mnt. 121 1.55 20% 2787.84 $356.84 $0.00 0.39 696.96 $89.21 0.00

132.21 E1 1800 16 32x4, 3-Lamp, 32w T8, Mag.

Ballast, Recessed Mnt., Prismatic Lens

121 1.936 3484.8 446.0544 16 Existing Occupancy Sensor - Remote Mnt. 121 1.55 20% 2787.84 $356.84 $0.00 0.39 696.96 $89.21 0.00

132.21 E13 1800 16 32x4, 3-Lamp, 32w T8, Mag.

Ballast, Recessed Mnt., Prismatic Lens

121 1.936 3484.8 446.0544 16 Existing Occupancy Sensor - Remote Mnt. 121 1.55 20% 2787.84 $356.84 $0.00 0.39 696.96 $89.21 0.00

E5

Page 87: Facility COVER SHEET- Voorhees Middle School Audit...The typical hours of operation for Voorhees Middle School are Monday through Friday between 7:00 am and 3:00 pm during the normal

APPENDIX E24 of 30

ECM #2: Lighting Controls

EXISTING LIGHTING PROPOSED LIGHTING CONTROLS SAVINGSCEG Fixture Yearly No. No. Fixture Fixt Total kWh/Yr Yearly No. No. Controls Watts Total Reduction kWh/Yr Yearly Unit Cost Total kW kWh/Yr Yearly Yearly Simple

Type Location Usage Fixts Lamps Type Watts kW Fixtures $ Cost Fixts Cont. Description Used kW (%) Fixtures $ Cost (INSTALLED) Cost Savings Savings $ Savings Payback

132.21 E14 1800 16 32x4, 3-Lamp, 32w T8, Mag.

Ballast, Recessed Mnt., Prismatic Lens

121 1.936 3484.8 446.0544 16 Existing Occupancy Sensor - Remote Mnt. 121 1.55 20% 2787.84 $356.84 $0.00 0.39 696.96 $89.21 0.00

121.11 Custodian 1800 1 21x4, 2-Lamp, 34w T8, Mag.

Ballast, Surface Mnt., Prismatic Lens

78 0.078 140.4 17.9712 1 No Change 78 0.08 0% 140.4 $17.97 $0.00 0.00 0 $0.00 0.00

132.21 Corridor E14 - E7 3600 18 32x4, 3-Lamp, 32w T8, Mag.

Ballast, Recessed Mnt., Prismatic Lens

121 2.178 7840.8 1003.6224 18 No Change 121 2.18 0% 7840.8 $1,003.62 $0.00 0.00 0 $0.00 0.00

121.11 P14 500 1 21x4, 2-Lamp, 34w T8, Mag.

Ballast, Surface Mnt., Prismatic Lens

78 0.078 39 4.992 1 No Change 78 0.08 0% 39 $4.99 $0.00 0.00 0 $0.00 0.00

221.31 CER Storage 500 8 21x4, 2 Lamp, 32w T8,

Elect. Ballast, Pendant Mnt.,Prismatic Lens

62 0.496 248 31.744 8 No Change 62 0.50 0% 248 $31.74 $0.00 0.00 0 $0.00 0.00

132.21 1800 2 32x4, 3-Lamp, 32w T8, Mag.

Ballast, Recessed Mnt., Prismatic Lens

121 0.242 435.6 55.7568 2 1Dual Tech. Occupancy Sensor w/ (1) 2 Pole

Powerpack - Remote Mnt.121 0.19 20% 348.48 $44.61 $450.00 $450.00 0.05 87.12 $11.15 40.35

221.11 1800 1 21x4, 2 Lamp, 32w T8,

Elect. Ballast, Surface Mnt., Prismatic Lens

62 0.062 111.6 14.2848 1 No Change 62 0.06 0% 111.6 $14.28 $0.00 0.00 0 $0.00 0.00

132.21 1800 2 32x4, 3-Lamp, 32w T8, Mag.

Ballast, Recessed Mnt., Prismatic Lens

121 0.242 435.6 55.7568 2 1Dual Tech. Occupancy Sensor w/ (1) 2 Pole

Powerpack - Remote Mnt.121 0.19 20% 348.48 $44.61 $450.00 $450.00 0.05 87.12 $11.15 40.35

221.11 1800 2 21x4, 2 Lamp, 32w T8,

Elect. Ballast, Surface Mnt., Prismatic Lens

62 0.124 223.2 28.5696 2 No Change 62 0.12 0% 223.2 $28.57 $0.00 0.00 0 $0.00 0.00

132.21 Office E Wing 1800 4 32x4, 3-Lamp, 32w T8, Mag.

Ballast, Recessed Mnt., Prismatic Lens

121 0.484 871.2 111.5136 4 1Dual Tech. Occupancy Sensor w/ (1) 2 Pole

Powerpack - Remote Mnt.121 0.39 20% 696.96 $89.21 $450.00 $450.00 0.10 174.24 $22.30 20.18

132.21 Guidnace Office 1800 4 32x4, 3-Lamp, 32w T8, Mag.

Ballast, Recessed Mnt., Prismatic Lens

121 0.484 871.2 111.5136 4 1Dual Tech. Occupancy Sensor w/ (1) 2 Pole

Powerpack - Remote Mnt.121 0.39 20% 696.96 $89.21 $450.00 $450.00 0.10 174.24 $22.30 20.18

132.21 Asst. Principal 1800 3 32x4, 3-Lamp, 32w T8, Mag.

Ballast, Recessed Mnt., Prismatic Lens

121 0.363 653.4 83.6352 3 1Dual Tech. Occupancy Sensor w/ (1) 2 Pole

Powerpack - Remote Mnt.121 0.29 20% 522.72 $66.91 $450.00 $450.00 0.07 130.68 $16.73 26.90

127.21 Corridor E Wing Office 3600 2 2

2x2, 2 Lamp, 34w T12 U-Tube, Mag. Ballast,

Recessed Mnt., Prismatic Lens

72 0.144 518.4 66.3552 2 No Change 72 0.14 0% 518.4 $66.36 $0.00 0.00 0 $0.00 0.00

132.21 Maintenance 1800 17 32x4, 3-Lamp, 32w T8, Mag.

Ballast, Recessed Mnt., Prismatic Lens

121 2.057 3702.6 473.9328 17 No Change 121 2.06 0% 3702.6 $473.93 $0.00 0.00 0 $0.00 0.00

121.21 Kitchen 1800 18 21x4, 2-Lamp, 34w T8, Mag.

Ballast, Recessed Mnt., Prismatic Lens

78 1.404 2527.2 323.4816 18 No Change 78 1.40 0% 2527.2 $323.48 $0.00 0.00 0 $0.00 0.00

121.21 Kitchen Storage 500 2 21x4, 2-Lamp, 34w T8, Mag.

Ballast, Recessed Mnt., Prismatic Lens

78 0.156 78 9.984 2 No Change 78 0.16 0% 78 $9.98 $0.00 0.00 0 $0.00 0.00

Girl's Room

Boy's Room

Page 88: Facility COVER SHEET- Voorhees Middle School Audit...The typical hours of operation for Voorhees Middle School are Monday through Friday between 7:00 am and 3:00 pm during the normal

APPENDIX E25 of 30

ECM #2: Lighting Controls

EXISTING LIGHTING PROPOSED LIGHTING CONTROLS SAVINGSCEG Fixture Yearly No. No. Fixture Fixt Total kWh/Yr Yearly No. No. Controls Watts Total Reduction kWh/Yr Yearly Unit Cost Total kW kWh/Yr Yearly Yearly Simple

Type Location Usage Fixts Lamps Type Watts kW Fixtures $ Cost Fixts Cont. Description Used kW (%) Fixtures $ Cost (INSTALLED) Cost Savings Savings $ Savings Payback

362.34 APR 1800 24 6 2x4, 4 Lamp, 54w T5HO Fixture 354 8.496 15292.8 1957.4784 24 2

Dual Tech. Occupancy Sensor w/ (1) 2 Pole

Powerpack - Remote Mnt.354 6.80 20% 12234.24 $1,565.98 $450.00 $900.00 1.70 3058.56 $391.50 2.30

221.31 APR Storage 500 12 21x4, 2 Lamp, 32w T8,

Elect. Ballast, Pendant Mnt.,Prismatic Lens

62 0.744 372 47.616 12 No Change 62 0.74 0% 372 $47.62 $0.00 0.00 0 $0.00 0.00

221.31 P-5 Sprinkler 500 10 21x4, 2 Lamp, 32w T8,

Elect. Ballast, Pendant Mnt.,Prismatic Lens

62 0.62 310 39.68 10 No Change 62 0.62 0% 310 $39.68 $0.00 0.00 0 $0.00 0.00

232.21 C10 1800 12 32x4, 3 Lamp, 32w T8,

Elect. Ballast, Recessed Mnt., Prismatic Lens

86 1.032 1857.6 237.7728 12 Existing Occupancy Sensor - Remote Mnt. 86 0.83 20% 1486.08 $190.22 $0.00 0.21 371.52 $47.55 0.00

232.22 C9 Art 1800 17 32x4, 3 Lamp, 32w T8,

Elect. Ballast, Recessed Mnt., Parabolic Lens

86 1.462 2631.6 336.8448 17 Existing Occupancy Sensor - Remote Mnt. 86 1.17 20% 2105.28 $269.48 $0.00 0.29 526.32 $67.37 0.00

232.22 Art Storage 1800 3 32x4, 3 Lamp, 32w T8,

Elect. Ballast, Recessed Mnt., Parabolic Lens

86 0.258 464.4 59.4432 3 No Change 86 0.26 0% 464.4 $59.44 $0.00 0.00 0 $0.00 0.00

232.22 Art Office 1800 2 32x4, 3 Lamp, 32w T8,

Elect. Ballast, Recessed Mnt., Parabolic Lens

86 0.172 309.6 39.6288 2 1Dual Tech. Occupancy Sensor w/ (1) 2 Pole

Powerpack - Remote Mnt.86 0.14 20% 247.68 $31.70 $450.00 $450.00 0.03 61.92 $7.93 56.78

232.22 C7 1800 15 32x4, 3 Lamp, 32w T8,

Elect. Ballast, Recessed Mnt., Parabolic Lens

86 1.29 2322 297.216 15 Existing Occupancy Sensor - Remote Mnt. 86 1.03 20% 1857.6 $237.77 $0.00 0.26 464.4 $59.44 0.00

232.21 C8 1800 9 32x4, 3 Lamp, 32w T8,

Elect. Ballast, Recessed Mnt., Prismatic Lens

86 0.774 1393.2 178.3296 9 No Change 86 0.77 0% 1393.2 $178.33 $0.00 0.00 0 $0.00 0.00

221.31 C8 Storage 500 1 21x4, 2 Lamp, 32w T8,

Elect. Ballast, Pendant Mnt.,Prismatic Lens

62 0.062 31 3.968 1 No Change 62 0.06 0% 31 $3.97 $0.00 0.00 0 $0.00 0.00

232.21 C6 1800 12 32x4, 3 Lamp, 32w T8,

Elect. Ballast, Recessed Mnt., Prismatic Lens

86 1.032 1857.6 237.7728 12 Existing Occupancy Sensor - Remote Mnt. 86 0.83 20% 1486.08 $190.22 $0.00 0.21 371.52 $47.55 0.00

121.21 Women's Room 1800 2 21x4, 2-Lamp, 34w T8, Mag.

Ballast, Recessed Mnt., Prismatic Lens

78 0.156 280.8 35.9424 2 Existing Occupancy Sensor - Remote Mnt. 78 0.12 20% 224.64 $28.75 $0.00 0.03 56.16 $7.19 0.00

121.21 Men's Room 1800 2 21x4, 2-Lamp, 34w T8, Mag.

Ballast, Recessed Mnt., Prismatic Lens

78 0.156 280.8 35.9424 2 Existing Occupancy Sensor - Remote Mnt. 78 0.12 20% 224.64 $28.75 $0.00 0.03 56.16 $7.19 0.00

221.13 Maintenance 1800 1 21x4, 2 Lamp, 32w T8,

Elect. Ballast, Surface Mnt., No Lens

58 0.058 104.4 13.3632 1 No Change 58 0.06 0% 104.4 $13.36 $0.00 0.00 0 $0.00 0.00

232.22 C5 1800 8 32x4, 3 Lamp, 32w T8,

Elect. Ballast, Recessed Mnt., Parabolic Lens

86 0.688 1238.4 158.5152 8 Existing Occupancy Sensor - Remote Mnt. 86 0.55 20% 990.72 $126.81 $0.00 0.14 247.68 $31.70 0.00

232.22 C4 1800 8 32x4, 3 Lamp, 32w T8,

Elect. Ballast, Recessed Mnt., Parabolic Lens

86 0.688 1238.4 158.5152 8 Existing Occupancy Sensor - Remote Mnt. 86 0.55 20% 990.72 $126.81 $0.00 0.14 247.68 $31.70 0.00

Page 89: Facility COVER SHEET- Voorhees Middle School Audit...The typical hours of operation for Voorhees Middle School are Monday through Friday between 7:00 am and 3:00 pm during the normal

APPENDIX E26 of 30

ECM #2: Lighting Controls

EXISTING LIGHTING PROPOSED LIGHTING CONTROLS SAVINGSCEG Fixture Yearly No. No. Fixture Fixt Total kWh/Yr Yearly No. No. Controls Watts Total Reduction kWh/Yr Yearly Unit Cost Total kW kWh/Yr Yearly Yearly Simple

Type Location Usage Fixts Lamps Type Watts kW Fixtures $ Cost Fixts Cont. Description Used kW (%) Fixtures $ Cost (INSTALLED) Cost Savings Savings $ Savings Payback

232.22 C3 1800 8 32x4, 3 Lamp, 32w T8,

Elect. Ballast, Recessed Mnt., Parabolic Lens

86 0.688 1238.4 158.5152 8 Existing Occupancy Sensor - Remote Mnt. 86 0.55 20% 990.72 $126.81 $0.00 0.14 247.68 $31.70 0.00

222.21 Corridor C10 - Ewing 3600 27 2

2x4, 2 Lamp, 32w T8, Elect. Ballast, Recessed

Mnt., Prismatic Lens62 1.674 6026.4 771.3792 27 No Change 62 1.67 0% 6026.4 $771.38 $0.00 0.00 0 $0.00 0.00

232.22 C2 1800 15 32x4, 3 Lamp, 32w T8,

Elect. Ballast, Recessed Mnt., Parabolic Lens

86 1.29 2322 297.216 15 Existing Occupancy Sensor - Remote Mnt. 86 1.03 20% 1857.6 $237.77 $0.00 0.26 464.4 $59.44 0.00

221.11 C2 Green House 1800 4 21x4, 2 Lamp, 32w T8,

Elect. Ballast, Surface Mnt., Prismatic Lens

62 0.248 446.4 57.1392 4 No Change 62 0.25 0% 446.4 $57.14 $0.00 0.00 0 $0.00 0.00

232.22 C2 Storage 500 4 32x4, 3 Lamp, 32w T8,

Elect. Ballast, Recessed Mnt., Parabolic Lens

86 0.344 172 22.016 4 No Change 86 0.34 0% 172 $22.02 $0.00 0.00 0 $0.00 0.00

232.22 C1 1800 15 32x4, 3 Lamp, 32w T8,

Elect. Ballast, Recessed Mnt., Parabolic Lens

86 1.29 2322 297.216 15 Existing Occupancy Sensor - Remote Mnt. 86 1.03 20% 1857.6 $237.77 $0.00 0.26 464.4 $59.44 0.00

221.31 Food Service 500 1 21x4, 2 Lamp, 32w T8,

Elect. Ballast, Pendant Mnt.,Prismatic Lens

62 0.062 31 3.968 1 No Change 62 0.06 0% 31 $3.97 $0.00 0.00 0 $0.00 0.00

221.11 Kichen 1800 24 21x4, 2 Lamp, 32w T8,

Elect. Ballast, Surface Mnt., Prismatic Lens

62 1.488 2678.4 342.8352 24 No Change 62 1.49 0% 2678.4 $342.84 $0.00 0.00 0 $0.00 0.00

221.11 1800 1 21x4, 2 Lamp, 32w T8,

Elect. Ballast, Surface Mnt., Prismatic Lens

62 0.062 111.6 14.2848 1 No Change 62 0.06 0% 111.6 $14.28 $0.00 0.00 0 $0.00 0.00

200 1800 1 21x2, 2 Lamp, 17w T8,

Elect. Ballast, Surface Mnt., Prismatic Lens

34 0.034 61.2 7.8336 1 No Change 34 0.03 0% 61.2 $7.83 $0.00 0.00 0 $0.00 0.00

612 Kitchen Toilet 1800 2 1 Surface Mnt., 100w A19 Lamp 100 0.2 360 46.08 2 No Change 100 0.20 0% 360 $46.08 $0.00 0.00 0 $0.00 0.00

221.11 500 6 21x4, 2 Lamp, 32w T8,

Elect. Ballast, Surface Mnt., Prismatic Lens

62 0.372 186 23.808 6 1Dual Tech. Occupancy Sensor w/ (1) 2 Pole

Powerpack - Remote Mnt.62 0.30 20% 148.8 $19.05 $450.00 $450.00 0.07 37.2 $4.76 94.51

612 500 1 1 Surface Mnt., 100w A19 Lamp 100 0.1 50 6.4 1 No Change 100 0.10 0% 50 $6.40 $0.00 0.00 0 $0.00 0.00

221.11 Kitchen Dishwasher 1800 4 21x4, 2 Lamp, 32w T8,

Elect. Ballast, Surface Mnt., Prismatic Lens

62 0.248 446.4 57.1392 4 No Change 62 0.25 0% 446.4 $57.14 $0.00 0.00 0 $0.00 0.00

612 P-5 Electrical 500 2 1 Surface Mnt., 100w A19 Lamp 100 0.2 100 12.8 2 No Change 100 0.20 0% 100 $12.80 $0.00 0.00 0 $0.00 0.00

612 1800 6 1 Surface Mnt., 100w A19 Lamp 100 0.6 1080 138.24 6 No Change 100 0.60 0% 1080 $138.24 $0.00 0.00 0 $0.00 0.00

P16 Kitchen Locker

Kitchen Storage

Maintenance Hall

Page 90: Facility COVER SHEET- Voorhees Middle School Audit...The typical hours of operation for Voorhees Middle School are Monday through Friday between 7:00 am and 3:00 pm during the normal

APPENDIX E27 of 30

ECM #2: Lighting Controls

EXISTING LIGHTING PROPOSED LIGHTING CONTROLS SAVINGSCEG Fixture Yearly No. No. Fixture Fixt Total kWh/Yr Yearly No. No. Controls Watts Total Reduction kWh/Yr Yearly Unit Cost Total kW kWh/Yr Yearly Yearly Simple

Type Location Usage Fixts Lamps Type Watts kW Fixtures $ Cost Fixts Cont. Description Used kW (%) Fixtures $ Cost (INSTALLED) Cost Savings Savings $ Savings Payback

222.31 1800 1 22x4, 2 Lamp, 32w T8,

Elect. Ballast, Pendant Mnt.,Prismatic Lens

58 0.058 104.4 13.3632 1 No Change 58 0.06 0% 104.4 $13.36 $0.00 0.00 0 $0.00 0.00

222.11 Maintenance Break Room 1800 2 2

2x4, 2 Lamp, 32w T8, Elect. Ballast, Surface Mnt.,

Prismatic Lens62 0.124 223.2 28.5696 2 1

Dual Tech. Occupancy Sensor w/ (1) 2 Pole

Powerpack - Remote Mnt.62 0.10 20% 178.56 $22.86 $450.00 $450.00 0.02 44.64 $5.71 78.76

612 Custodian 500 1 1 Surface Mnt., 100w A19 Lamp 100 0.1 50 6.4 1 No Change 100 0.10 0% 50 $6.40 $0.00 0.00 0 $0.00 0.00

232.21 Old Café 1800 45 32x4, 3 Lamp, 32w T8,

Elect. Ballast, Recessed Mnt., Prismatic Lens

86 3.87 6966 891.648 45 No Change 86 3.87 0% 6966 $891.65 $0.00 0.00 0 $0.00 0.00

221.11 Stage 1800 18 21x4, 2 Lamp, 32w T8,

Elect. Ballast, Surface Mnt., Prismatic Lens

62 1.116 2008.8 257.1264 18 No Change 62 1.12 0% 2008.8 $257.13 $0.00 0.00 0 $0.00 0.00

221.11 Stage Storage #1 500 2 21x4, 2 Lamp, 32w T8,

Elect. Ballast, Surface Mnt., Prismatic Lens

62 0.124 62 7.936 2 No Change 62 0.12 0% 62 $7.94 $0.00 0.00 0 $0.00 0.00

612 Stage Storage Toilet 500 1 1 Surface Mnt., 100w A19 Lamp 100 0.1 50 6.4 1 No Change 100 0.10 0% 50 $6.40 $0.00 0.00 0 $0.00 0.00

221.11 Stage Storage #2 500 2 21x4, 2 Lamp, 32w T8,

Elect. Ballast, Surface Mnt., Prismatic Lens

62 0.124 62 7.936 2 No Change 62 0.12 0% 62 $7.94 $0.00 0.00 0 $0.00 0.00

612 Stage Storage Toilet 500 1 1 Surface Mnt., 100w A19 Lamp 100 0.1 50 6.4 1 No Change 100 0.10 0% 50 $6.40 $0.00 0.00 0 $0.00 0.00

242.21 1800 12 42x4, 4 Lamp, 32w T8, Elect. Ballast, Recessed

Mnt., Prismatic Lens107 1.284 2311.2 295.8336 12 Existing Occupancy Sensor -

Remote Mnt. 107 1.03 20% 1848.96 $236.67 $0.00 0.26 462.24 $59.17 0.00

551 1800 18 1 Recessed Down Light, 100w A Lamp 100 1.8 3240 414.72 18 No Change 100 1.80 0% 3240 $414.72 $0.00 0.00 0 $0.00 0.00

221.11 1800 5 21x4, 2 Lamp, 32w T8,

Elect. Ballast, Surface Mnt., Prismatic Lens

62 0.31 558 71.424 5 No Change 62 0.31 0% 558 $71.42 $0.00 0.00 0 $0.00 0.00

362.34 Mini Gym 1800 12 6 2x4, 4 Lamp, 54w T5HO Fixture 354 4.248 7646.4 978.7392 12 2

Dual Tech. Occupancy Sensor w/ (1) 2 Pole

Powerpack - Remote Mnt.354 3.40 20% 6117.12 $782.99 $450.00 $900.00 0.85 1529.28 $195.75 4.60

221.11 Mini Gym Storage 500 4 21x4, 2 Lamp, 32w T8,

Elect. Ballast, Surface Mnt., Prismatic Lens

62 0.248 124 15.872 4 No Change 62 0.25 0% 124 $15.87 $0.00 0.00 0 $0.00 0.00

362.34 Gym 1800 18 6 2x4, 4 Lamp, 54w T5HO Fixture 354 6.372 11469.6 1468.1088 18 2

Dual Tech. Occupancy Sensor w/ (1) 2 Pole

Powerpack - Remote Mnt.354 5.10 20% 9175.68 $1,174.49 $450.00 $900.00 1.27 2293.92 $293.62 3.07

612 Gym Storage 500 1 1 Surface Mnt., 100w A19 Lamp 100 0.1 50 6.4 1 No Change 100 0.10 0% 50 $6.40 $0.00 0.00 0 $0.00 0.00

Maintenance Hall

Lecture Hall

Page 91: Facility COVER SHEET- Voorhees Middle School Audit...The typical hours of operation for Voorhees Middle School are Monday through Friday between 7:00 am and 3:00 pm during the normal

APPENDIX E28 of 30

ECM #2: Lighting Controls

EXISTING LIGHTING PROPOSED LIGHTING CONTROLS SAVINGSCEG Fixture Yearly No. No. Fixture Fixt Total kWh/Yr Yearly No. No. Controls Watts Total Reduction kWh/Yr Yearly Unit Cost Total kW kWh/Yr Yearly Yearly Simple

Type Location Usage Fixts Lamps Type Watts kW Fixtures $ Cost Fixts Cont. Description Used kW (%) Fixtures $ Cost (INSTALLED) Cost Savings Savings $ Savings Payback

221.11 Girls Locker Room 1800 17 21x4, 2 Lamp, 32w T8,

Elect. Ballast, Surface Mnt., Prismatic Lens

62 1.054 1897.2 242.8416 17 2Dual Tech. Occupancy Sensor w/ (1) 2 Pole

Powerpack - Remote Mnt.62 0.84 20% 1517.76 $194.27 $450.00 $900.00 0.21 379.44 $48.57 18.53

221.11 Girls Locker Room Office 1800 2 2

1x4, 2 Lamp, 32w T8, Elect. Ballast, Surface Mnt.,

Prismatic Lens62 0.124 223.2 28.5696 2 1

Dual Tech. Occupancy Sensor w/ (1) 2 Pole

Powerpack - Remote Mnt.62 0.10 20% 178.56 $22.86 $450.00 $450.00 0.02 44.64 $5.71 78.76

612 Girls Locker Room Office Toilet 1800 2 1 Surface Mnt., 100w A19

Lamp 100 0.2 360 46.08 2 No Change 100 0.20 0% 360 $46.08 $0.00 0.00 0 $0.00 0.00

612 Girls Locker Room Office Storage 500 1 1 Surface Mnt., 100w A19

Lamp 100 0.1 50 6.4 1 No Change 100 0.10 0% 50 $6.40 $0.00 0.00 0 $0.00 0.00

221.11 Boy's Locker Room 1800 20 21x4, 2 Lamp, 32w T8,

Elect. Ballast, Surface Mnt., Prismatic Lens

62 1.24 2232 285.696 20 2Dual Tech. Occupancy Sensor w/ (1) 2 Pole

Powerpack - Remote Mnt.62 0.99 20% 1785.6 $228.56 $450.00 $900.00 0.25 446.4 $57.14 15.75

221.11 Boy's Locker Room Office 1800 3 2

1x4, 2 Lamp, 32w T8, Elect. Ballast, Surface Mnt.,

Prismatic Lens62 0.186 334.8 42.8544 3 1

Dual Tech. Occupancy Sensor w/ (1) 2 Pole

Powerpack - Remote Mnt.62 0.15 20% 267.84 $34.28 $450.00 $450.00 0.04 66.96 $8.57 52.50

612 Boy's Locker Room Office Toilet 1800 1 1 Surface Mnt., 100w A19

Lamp 100 0.1 180 23.04 1 No Change 100 0.10 0% 180 $23.04 $0.00 0.00 0 $0.00 0.00

221.11 Boy's Toilet Room 1800 2 21x4, 2 Lamp, 32w T8,

Elect. Ballast, Surface Mnt., Prismatic Lens

62 0.124 223.2 28.5696 2 1Dual Tech. Occupancy Sensor w/ (1) 2 Pole

Powerpack - Remote Mnt.62 0.10 20% 178.56 $22.86 $450.00 $450.00 0.02 44.64 $5.71 78.76

612 P-2 Storage 500 1 1 Surface Mnt., 100w A19 Lamp 100 0.1 50 6.4 1 No Change 100 0.10 0% 50 $6.40 $0.00 0.00 0 $0.00 0.00

222.21 Gym Corridor 3600 6 22x4, 2 Lamp, 32w T8, Elect. Ballast, Recessed

Mnt., Prismatic Lens62 0.372 1339.2 171.4176 6 No Change 62 0.37 0% 1339.2 $171.42 $0.00 0.00 0 $0.00 0.00

222.21 Teacher Lounge 1800 8 22x4, 2 Lamp, 32w T8, Elect. Ballast, Recessed

Mnt., Prismatic Lens62 0.496 892.8 114.2784 8 1

Dual Tech. Occupancy Sensor w/ (1) 2 Pole

Powerpack - Remote Mnt.62 0.40 20% 714.24 $91.42 $450.00 $450.00 0.10 178.56 $22.86 19.69

221.11 A31 1800 40 21x4, 2 Lamp, 32w T8,

Elect. Ballast, Surface Mnt., Prismatic Lens

62 2.48 4464 571.392 40 No Change 62 2.48 0% 4464 $571.39 $0.00 0.00 0 $0.00 0.00

612 A31 Storage 500 2 1 Surface Mnt., 100w A19 Lamp 100 0.2 100 12.8 2 No Change 100 0.20 0% 100 $12.80 $0.00 0.00 0 $0.00 0.00

221.11 A30 1800 30 21x4, 2 Lamp, 32w T8,

Elect. Ballast, Surface Mnt., Prismatic Lens

62 1.86 3348 428.544 30 No Change 62 1.86 0% 3348 $428.54 $0.00 0.00 0 $0.00 0.00

612 A30 Storage 500 1 1 Surface Mnt., 100w A19 Lamp 100 0.1 50 6.4 1 No Change 100 0.10 0% 50 $6.40 $0.00 0.00 0 $0.00 0.00

222.21 Boy's Room 1800 2 22x4, 2 Lamp, 32w T8, Elect. Ballast, Recessed

Mnt., Prismatic Lens62 0.124 223.2 28.5696 2 Existing Occupancy Sensor -

Remote Mnt. 62 0.10 20% 178.56 $22.86 $0.00 0.02 44.64 $5.71 0.00

Page 92: Facility COVER SHEET- Voorhees Middle School Audit...The typical hours of operation for Voorhees Middle School are Monday through Friday between 7:00 am and 3:00 pm during the normal

APPENDIX E29 of 30

ECM #2: Lighting Controls

EXISTING LIGHTING PROPOSED LIGHTING CONTROLS SAVINGSCEG Fixture Yearly No. No. Fixture Fixt Total kWh/Yr Yearly No. No. Controls Watts Total Reduction kWh/Yr Yearly Unit Cost Total kW kWh/Yr Yearly Yearly Simple

Type Location Usage Fixts Lamps Type Watts kW Fixtures $ Cost Fixts Cont. Description Used kW (%) Fixtures $ Cost (INSTALLED) Cost Savings Savings $ Savings Payback

222.21 Girl's Room 1800 2 22x4, 2 Lamp, 32w T8, Elect. Ballast, Recessed

Mnt., Prismatic Lens62 0.124 223.2 28.5696 2 Existing Occupancy Sensor -

Remote Mnt. 62 0.10 20% 178.56 $22.86 $0.00 0.02 44.64 $5.71 0.00

242.21 A29 1800 20 42x4, 4 Lamp, 32w T8, Elect. Ballast, Recessed

Mnt., Prismatic Lens107 2.14 3852 493.056 20 1

Dual Tech. Occupancy Sensor w/ (1) 2 Pole

Powerpack - Remote Mnt.107 1.71 20% 3081.6 $394.44 $450.00 $450.00 0.43 770.4 $98.61 4.56

221.11 A28 1800 33 21x4, 2 Lamp, 32w T8,

Elect. Ballast, Surface Mnt., Prismatic Lens

62 2.046 3682.8 471.3984 33 1Dual Tech. Occupancy Sensor w/ (1) 2 Pole

Powerpack - Remote Mnt.62 1.64 20% 2946.24 $377.12 $450.00 $450.00 0.41 736.56 $94.28 4.77

211.44 A28 Storage 500 1 11x4, 1 Lamp, 32w T8, Elect. Ballast, Surface

MNt., No Lens32 0.032 16 2.048 1 No Change 32 0.03 0% 16 $2.05 $0.00 0.00 0 $0.00 0.00

222.21 A28 Office 1800 8 22x4, 2 Lamp, 32w T8, Elect. Ballast, Recessed

Mnt., Prismatic Lens62 0.496 892.8 114.2784 8 Existing Occupancy Sensor -

Remote Mnt. 62 0.40 20% 714.24 $91.42 $0.00 0.10 178.56 $22.86 0.00

222.21 Corridor A Wing - C Wing 3600 13 2

2x4, 2 Lamp, 32w T8, Elect. Ballast, Recessed

Mnt., Prismatic Lens62 0.806 2901.6 371.4048 13 No Change 62 0.81 0% 2901.6 $371.40 $0.00 0.00 0 $0.00 0.00

612 P-1 Storage 500 4 1 Surface Mnt., 100w A19 Lamp 100 0.4 200 25.6 4 No Change 100 0.40 0% 200 $25.60 $0.00 0.00 0 $0.00 0.00

222.21 Maintenance 1800 2 22x4, 2 Lamp, 32w T8, Elect. Ballast, Recessed

Mnt., Prismatic Lens62 0.124 223.2 28.5696 2 No Change 62 0.12 0% 223.2 $28.57 $0.00 0.00 0 $0.00 0.00

222.21 School Store 500 2 22x4, 2 Lamp, 32w T8, Elect. Ballast, Recessed

Mnt., Prismatic Lens62 0.124 62 7.936 2 1

Dual Tech. Occupancy Sensor w/ (1) 2 Pole

Powerpack - Remote Mnt.62 0.10 20% 49.6 $6.35 $450.00 $450.00 0.02 12.4 $1.59 283.52

222.21 1800 4 22x4, 2 Lamp, 32w T8, Elect. Ballast, Recessed

Mnt., Prismatic Lens62 0.248 446.4 57.1392 4 1

Dual Tech. Occupancy Sensor w/ (1) 2 Pole

Powerpack - Remote Mnt.62 0.20 20% 357.12 $45.71 $450.00 $450.00 0.05 89.28 $11.43 39.38

227.21 1800 3 22x2, 2 Lamp, 32w T8, Elect. Ballast, Recessed

Mnt., Prismatic Lens65 0.195 351 44.928 3 No Change 65 0.20 0% 351 $44.93 $0.00 0.00 0 $0.00 0.00

222.21 Auditorium Corridor 3600 22 2

2x4, 2 Lamp, 32w T8, Elect. Ballast, Recessed

Mnt., Prismatic Lens62 1.364 4910.4 628.5312 22 No Change 62 1.36 0% 4910.4 $628.53 $0.00 0.00 0 $0.00 0.00

222.22 1800 2 22x4, 2 Lamp, 32w T8,

Elect. Ballast, Recessed Mnt., Parabolic Lens

58 0.116 208.8 26.7264 2 1Dual Tech. Occupancy Sensor w/ (1) 2 Pole

Powerpack - Remote Mnt.58 0.09 20% 167.04 $21.38 $450.00 $450.00 0.02 41.76 $5.35 84.19

227.22 1800 2 22x2, 2 Lamp, 32w T8,

Elect. Ballast, Recessed Mnt., Parabolic Lens

58 0.116 208.8 26.7264 2 No Change 58 0.12 0% 208.8 $26.73 $0.00 0.00 0 $0.00 0.00

211.31 1800 7 11x4, 1 Lamp, 32w T8,

Elect. Ballast, Recessed Mnt., Prismatic Lens

30 0.21 378 48.384 7 No Change 30 0.21 0% 378 $48.38 $0.00 0.00 0 $0.00 0.00

222.22 1800 2 22x4, 2 Lamp, 32w T8,

Elect. Ballast, Recessed Mnt., Parabolic Lens

58 0.116 208.8 26.7264 2 1Dual Tech. Occupancy Sensor w/ (1) 2 Pole

Powerpack - Remote Mnt.58 0.09 20% 167.04 $21.38 $450.00 $450.00 0.02 41.76 $5.35 84.19

Dressing Room

Women's Room

Men's Room

Page 93: Facility COVER SHEET- Voorhees Middle School Audit...The typical hours of operation for Voorhees Middle School are Monday through Friday between 7:00 am and 3:00 pm during the normal

APPENDIX E30 of 30

ECM #2: Lighting Controls

EXISTING LIGHTING PROPOSED LIGHTING CONTROLS SAVINGSCEG Fixture Yearly No. No. Fixture Fixt Total kWh/Yr Yearly No. No. Controls Watts Total Reduction kWh/Yr Yearly Unit Cost Total kW kWh/Yr Yearly Yearly Simple

Type Location Usage Fixts Lamps Type Watts kW Fixtures $ Cost Fixts Cont. Description Used kW (%) Fixtures $ Cost (INSTALLED) Cost Savings Savings $ Savings Payback

211.31 1800 8 11x4, 1 Lamp, 32w T8,

Elect. Ballast, Recessed Mnt., Prismatic Lens

30 0.24 432 55.296 8 No Change 30 0.24 0% 432 $55.30 $0.00 0.00 0 $0.00 0.00

222.21 Storage 500 1 22x4, 2 Lamp, 32w T8, Elect. Ballast, Recessed

Mnt., Prismatic Lens62 0.062 31 3.968 1 No Change 62 0.06 0% 31 $3.97 $0.00 0.00 0 $0.00 0.00

211.34 P-11 Storage 500 1 11x4, 1 Lamp, 32w T8,

Elect. Ballast, Pendant Mnt.,No Lens

30 0.03 15 1.92 1 No Change 30 0.03 0% 15 $1.92 $0.00 0.00 0 $0.00 0.00

551 Auditorium Lobby 3600 22 1 Recessed Down Light, 100w A Lamp 100 2.2 7920 1013.76 22 No Change 100 2.20 0% 7920 $1,013.76 $0.00 0.00 0 $0.00 0.00

200 Display Case 3600 6 21x2, 2 Lamp, 17w T8,

Elect. Ballast, Surface Mnt., Prismatic Lens

34 0.204 734.4 94.0032 6 No Change 34 0.20 0% 734.4 $94.00 $0.00 0.00 0 $0.00 0.00

621 Control Room 1800 4 1 Recessed Light, 100w A Lamp 100 0.4 720 92.16 4 No Change 100 0.40 0% 720 $92.16 $0.00 0.00 0 $0.00 0.00

551 Auditorium 1800 60 1 Recessed Down Light, 100w A Lamp 100 6 10800 1382.4 60 No Change 100 6.00 0% 10800 $1,382.40 $0.00 0.00 0 $0.00 0.00

745 1800 4 1 250w MH Down Light w/Prismatic Lens 295 1.18 2124 271.872 4 No Change 295 1.18 0% 2124 $271.87 $0.00 0.00 0 $0.00 0.00

612 1800 10 1 Surface Mnt., 100w A19 Lamp 100 1 1800 230.4 10 No Change 100 1.00 0% 1800 $230.40 $0.00 0.00 0 $0.00 0.00

111.11 1800 1 11x4, 1-Lamp, 34w T8, Mag.

Ballast, Surface Mnt., Prismatic Lens

48 0.048 86.4 11.0592 1 No Change 48 0.05 0% 86.4 $11.06 $0.00 0.00 0 $0.00 0.00

121.14 P-12 Electrical 500 3 21x4, 2-Lamp, 34w T8, Mag.

Ballast, Surface Mnt., No Lens

78 0.234 117 14.976 3 No Change 78 0.23 0% 117 $14.98 $0.00 0.00 0 $0.00 0.00

222.11 Loading Dock 1800 9 22x4, 2 Lamp, 32w T8,

Elect. Ballast, Surface Mnt., Prismatic Lens

62 0.558 1004.4 128.5632 9 No Change 62 0.56 0% 1004.4 $128.56 $0.00 0.00 0 $0.00 0.00

222.11 Loading Dock Storage 500 5 2

2x4, 2 Lamp, 32w T8, Elect. Ballast, Surface Mnt.,

Prismatic Lens62 0.31 155 19.84 5 No Change 62 0.31 0% 155 $19.84 $0.00 0.00 0 $0.00 0.00

Totals 2,209 557 187.4 358,640.0 $45,906 2,209 50 161.6 312,591.2 $40,011.68 $22,650 25.81 46,049 $5,894 3.84

Stage

Men s Room

Page 94: Facility COVER SHEET- Voorhees Middle School Audit...The typical hours of operation for Voorhees Middle School are Monday through Friday between 7:00 am and 3:00 pm during the normal

Appendix Energy Audit

Concord Engineering Group, Inc.

APPENDIX F

Page 95: Facility COVER SHEET- Voorhees Middle School Audit...The typical hours of operation for Voorhees Middle School are Monday through Friday between 7:00 am and 3:00 pm during the normal

Appendix FPage 1 of 2

Location Description

Area (Sq FT) Panel Qty

Panel Sq Ft

Panel Total Sq

FtTotal KWDC

Total Annual kWh

Total KWAC

Panel Weight

(41.9 lbs) W/SQFTVoorhees Middle

School 14695 SHARP NU-U235F2 600 17.5 10,524 141.00 172,253 114.2 25,140 13.40

.= Proposed PV LayoutNotes:

1. Estimated kWH based on the National Renewable Energy Laboratory PVWatts Version 1 Calculator Program.

Page 96: Facility COVER SHEET- Voorhees Middle School Audit...The typical hours of operation for Voorhees Middle School are Monday through Friday between 7:00 am and 3:00 pm during the normal

Appendix FPage 1 of 1

Project Name: Voorhees Middle SchoolLocation: Voorhees, NJ

Description: Photovoltaic System 100% Financing - 15 year

Simple Payback Analysis

Total Construction Cost $855,224Annual kWh Production 172,253

Annual Energy Cost Reduction $22,048Average Annual SREC Revenue $66,422

Simple Payback: Years

Life Cycle Cost AnalysisAnalysis Period (years): 15 Financing %: 100%

Discount Rate: 3% Maintenance Escalation Rate: 3.0%Average Energy Cost ($/kWh) $0.128 Energy Cost Escalation Rate: 3.0%

Financing Rate: 6.00% Average SREC Value ($/kWh) $0.386Period Additional Energy kWh Energy Cost Additional SREC Interest Loan Net Cash Cumulative

Cash Outlay Production Savings Maint Costs Revenue Expense Principal Flow Cash Flow0 $0 0 0 0 $0 0 0 0 01 $0 172,253 $22,048 $0 $94,739 $50,327 $36,276 $30,185 $30,1852 $0 171,392 $22,710 $0 $94,265 $48,089 $38,513 $30,373 $60,5583 $0 170,535 $23,391 $0 $85,267 $45,714 $40,889 $22,056 $82,6144 $0 169,682 $24,093 $0 $76,357 $43,192 $43,411 $13,847 $96,4615 $0 168,834 $24,816 $1,739 $75,975 $40,514 $46,088 $12,449 $108,9116 $0 167,990 $25,560 $1,730 $75,595 $37,672 $48,931 $12,823 $121,7347 $0 167,150 $26,327 $1,722 $66,860 $34,654 $51,949 $4,863 $126,5968 $0 166,314 $27,117 $1,713 $66,526 $31,450 $55,153 $5,327 $131,9239 $0 165,482 $27,930 $1,704 $57,919 $28,048 $58,554 ($2,458) $129,465

10 $0 164,655 $28,768 $1,696 $57,629 $24,437 $62,166 ($1,901) $127,56411 $0 163,832 $29,631 $1,687 $49,149 $20,602 $66,000 ($9,509) $118,05512 $0 163,012 $30,520 $1,679 $48,904 $16,532 $70,071 ($8,858) $109,19713 $0 162,197 $31,436 $1,671 $40,549 $12,210 $74,393 ($16,288) $92,90914 $0 161,386 $32,379 $1,662 $40,347 $7,621 $78,981 ($15,539) $77,37015 $0 160,579 $33,350 $1,654 $32,116 $2,750 $83,852 ($22,790) $54,580

Totals: 2,495,292 $410,076 $18,658 $962,198 $443,812 $855,224 $54,580 $1,468,123Net Present Value (NPV)

Photovoltaic System 100% Financing - 15 year

9.67

$63,815

Page 97: Facility COVER SHEET- Voorhees Middle School Audit...The typical hours of operation for Voorhees Middle School are Monday through Friday between 7:00 am and 3:00 pm during the normal

Appendix Energy Audit

Concord Engineering Group, Inc.

APPENDIX G

Page 98: Facility COVER SHEET- Voorhees Middle School Audit...The typical hours of operation for Voorhees Middle School are Monday through Friday between 7:00 am and 3:00 pm during the normal

MONTHLY ENERGY CONSUMPTIONBy CONCORD ENGINEERING GROUP

Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec TotalUtility

------- Monthly Energy Consumption -------

Alternative: 1 VOORHEES MS

Electric4,264,570521,468355,093215,983238,322269,171232,845163,513219,310203,175499,328804,809541,552On-Pk Cons. (kWh)

5,2404,7034,2832,0442,0462,6912,7012,1242,2392,0344,5045,2404,847On-Pk Demand (kW)

BuildingSource

Floor Area

72,973218,941

ft2

Btu/(ft2-year)

199,457

CO2SO2NOX

Energy Consumption Environmental Impact Analysis3,039,769 lbm/year

8,261 gm/year4,260 gm/year

Btu/(ft2-year)

Alternative: 2 VOORHEES MS

Electric2,189,602249,102193,421153,504134,142142,631122,942101,370133,032141,674259,449302,842255,492On-Pk Cons. (kWh)

1,8331,8011,7791,7511,3491,4071,3851,3491,6181,7561,8061,8331,812On-Pk Demand (kW)

BuildingSource

Floor Area

37,467112,413

ft2

Btu/(ft2-year)

199,457

CO2SO2NOX

Energy Consumption Environmental Impact Analysis1,560,740 lbm/year

4,241 gm/year2,187 gm/year

Btu/(ft2-year)

Project Name: TRACE® 700 v6.2.6 calculated at 11:16 AM on 09/15/2011Voorhees Township Public Schools LGEADataset Name: BRICKTWPHS.TRC Alternative - 2 Monthly Energy Consumption report Page 1 of 1