Page 1: FAIR LAWN BOARD OF EDUCATION BUILDINGS & GROUNDS ACCOMPLISHMENTS BUILDINGS & GROUNDS ACCOMPLISHMENTS

FAIR LAWN BOARD OF EDUCATION

BUILDINGS & GROUNDS

ACCOMPLISHMENTS

Page 2: FAIR LAWN BOARD OF EDUCATION BUILDINGS & GROUNDS ACCOMPLISHMENTS BUILDINGS & GROUNDS ACCOMPLISHMENTS

SASSO FIELDNew Turf Field Installed

Page 3: FAIR LAWN BOARD OF EDUCATION BUILDINGS & GROUNDS ACCOMPLISHMENTS BUILDINGS & GROUNDS ACCOMPLISHMENTS

Sasso Field Painted buildings & new tent

Page 4: FAIR LAWN BOARD OF EDUCATION BUILDINGS & GROUNDS ACCOMPLISHMENTS BUILDINGS & GROUNDS ACCOMPLISHMENTS

Sasso Field Lightning Detector

Page 5: FAIR LAWN BOARD OF EDUCATION BUILDINGS & GROUNDS ACCOMPLISHMENTS BUILDINGS & GROUNDS ACCOMPLISHMENTS

SASSO FIELD

• New cameras Installed• Sealed blacktop under bleachers

Page 6: FAIR LAWN BOARD OF EDUCATION BUILDINGS & GROUNDS ACCOMPLISHMENTS BUILDINGS & GROUNDS ACCOMPLISHMENTS

High School A-gym Floor Refinished

Page 7: FAIR LAWN BOARD OF EDUCATION BUILDINGS & GROUNDS ACCOMPLISHMENTS BUILDINGS & GROUNDS ACCOMPLISHMENTS

FAIR LAWN HIGH SCHOOL

B-WING CAFETERIA

ROOF

Page 8: FAIR LAWN BOARD OF EDUCATION BUILDINGS & GROUNDS ACCOMPLISHMENTS BUILDINGS & GROUNDS ACCOMPLISHMENTS

HIGH SCHOOL

• Abated 3 classrooms (Rms B120, B122, B204)• Painted 5 classrooms• Retiled A-wing girls’ bathroom• HS Stage Lighting• HS Lighting (pending)• Auditorium underground conduit, carpeted

aisles

Page 9: FAIR LAWN BOARD OF EDUCATION BUILDINGS & GROUNDS ACCOMPLISHMENTS BUILDINGS & GROUNDS ACCOMPLISHMENTS

Memorial – Completed installation of windows on west side of building

Page 10: FAIR LAWN BOARD OF EDUCATION BUILDINGS & GROUNDS ACCOMPLISHMENTS BUILDINGS & GROUNDS ACCOMPLISHMENTS

Memorial SchoolPainted lockers on 1st and 2nd floor

Page 11: FAIR LAWN BOARD OF EDUCATION BUILDINGS & GROUNDS ACCOMPLISHMENTS BUILDINGS & GROUNDS ACCOMPLISHMENTS

MEMORIAL SCHOOL – Trimmed trees back from field

Page 12: FAIR LAWN BOARD OF EDUCATION BUILDINGS & GROUNDS ACCOMPLISHMENTS BUILDINGS & GROUNDS ACCOMPLISHMENTS

Memorial SchoolTrimmed trees back from steps

Page 13: FAIR LAWN BOARD OF EDUCATION BUILDINGS & GROUNDS ACCOMPLISHMENTS BUILDINGS & GROUNDS ACCOMPLISHMENTS

MEMORIAL SCHOOL

• Installed new energy efficient LED lights in auditorium

• Rm 214 – converted from storeroom to classroom instruction

• Auditorium – rebuilt exhaust fan• Repaired terrazzo floor outside main office

Page 14: FAIR LAWN BOARD OF EDUCATION BUILDINGS & GROUNDS ACCOMPLISHMENTS BUILDINGS & GROUNDS ACCOMPLISHMENTS

THOMAS JEFFERSON SCHOOL

Repaved & striped front lotWidened exit driveway to allow right & left turns upon exiting

Page 15: FAIR LAWN BOARD OF EDUCATION BUILDINGS & GROUNDS ACCOMPLISHMENTS BUILDINGS & GROUNDS ACCOMPLISHMENTS

THOMAS JEFFERSON SCHOOL

• Painted lockers and installed new lockers on 1st floor

• Carpeted 5 offices in Child Study Team room• Boys’ locker bathroom and boys’ room by Rm 119

– installed new floor drains & waterless urinals• Installed wireless clock system• Rm 116 – abated floor and installed VCT tile

Page 16: FAIR LAWN BOARD OF EDUCATION BUILDINGS & GROUNDS ACCOMPLISHMENTS BUILDINGS & GROUNDS ACCOMPLISHMENTS

EDISON SCHOOL

Moved sign from HS and installed at

Edison

Page 17: FAIR LAWN BOARD OF EDUCATION BUILDINGS & GROUNDS ACCOMPLISHMENTS BUILDINGS & GROUNDS ACCOMPLISHMENTS

EDISON SCHOOL

• Paving of front lot and re-striping for bus access (pending)

• Repaired windows

Page 18: FAIR LAWN BOARD OF EDUCATION BUILDINGS & GROUNDS ACCOMPLISHMENTS BUILDINGS & GROUNDS ACCOMPLISHMENTS

FORREST SCHOOL

• Installed VCT tile in 4 classrooms• Moved KECO from Forrest to Edison School

Page 19: FAIR LAWN BOARD OF EDUCATION BUILDINGS & GROUNDS ACCOMPLISHMENTS BUILDINGS & GROUNDS ACCOMPLISHMENTS

Lyncrest School Canopy, Ceiling & LED lights

Page 20: FAIR LAWN BOARD OF EDUCATION BUILDINGS & GROUNDS ACCOMPLISHMENTS BUILDINGS & GROUNDS ACCOMPLISHMENTS

MILNES SCHOOLRefurbished 2 storm drains in rear parking lot and repaved.

Page 21: FAIR LAWN BOARD OF EDUCATION BUILDINGS & GROUNDS ACCOMPLISHMENTS BUILDINGS & GROUNDS ACCOMPLISHMENTS

INSTALLED CHAIRLIFT

AT

MILNES SCHOOL

Page 22: FAIR LAWN BOARD OF EDUCATION BUILDINGS & GROUNDS ACCOMPLISHMENTS BUILDINGS & GROUNDS ACCOMPLISHMENTS

Radburn School

Kindergarten WindowsInstalled new

energy efficient thermopane

windows

Page 23: FAIR LAWN BOARD OF EDUCATION BUILDINGS & GROUNDS ACCOMPLISHMENTS BUILDINGS & GROUNDS ACCOMPLISHMENTS

RADBURN SCHOOL

• Converted music room to new kindergarten room on ground floor

• Installed new security gate on ground floor by new addition lobby

• Ground floor boys’ room in stairwell – installed new floor drains and waterless urinals

Page 24: FAIR LAWN BOARD OF EDUCATION BUILDINGS & GROUNDS ACCOMPLISHMENTS BUILDINGS & GROUNDS ACCOMPLISHMENTS

Warren Point SchoolInstalled new digital sign on

Broadway

Page 25: FAIR LAWN BOARD OF EDUCATION BUILDINGS & GROUNDS ACCOMPLISHMENTS BUILDINGS & GROUNDS ACCOMPLISHMENTS

Warren Point SchoolMilled and repaved teacher parking lot and installed new security

gates

Page 26: FAIR LAWN BOARD OF EDUCATION BUILDINGS & GROUNDS ACCOMPLISHMENTS BUILDINGS & GROUNDS ACCOMPLISHMENTS

Warren Point SchoolInstalled 100 cubic yards of mulch on playground

Page 27: FAIR LAWN BOARD OF EDUCATION BUILDINGS & GROUNDS ACCOMPLISHMENTS BUILDINGS & GROUNDS ACCOMPLISHMENTS

Warren Point SchoolInstalled new Fire Doors in old wing-1st floor

Page 28: FAIR LAWN BOARD OF EDUCATION BUILDINGS & GROUNDS ACCOMPLISHMENTS BUILDINGS & GROUNDS ACCOMPLISHMENTS

Westmoreland SchoolInstalled energy efficient thermopane windows in gym

Page 29: FAIR LAWN BOARD OF EDUCATION BUILDINGS & GROUNDS ACCOMPLISHMENTS BUILDINGS & GROUNDS ACCOMPLISHMENTS

WESTMORELAND SCHOOL

• Replacement of bathroom partitions (pending)

Page 30: FAIR LAWN BOARD OF EDUCATION BUILDINGS & GROUNDS ACCOMPLISHMENTS BUILDINGS & GROUNDS ACCOMPLISHMENTS

DISTRICT

• Installed security locks in all school buildings• Room numbers stenciled on exterior windows

in all school buildings• Purchased maintenance truck• Purchase of leaf vacuum (pending)• Purchase of salt spreader (pending)