faq_nmia
TRANSCRIPT
-
8/12/2019 FAQ_nmia
1/7
Fre
Navi Mumb
______________________
1. What is the air trafThe air traffic foreca
40 million passenger
The present day air t
triple by 2030, due to
rise in the disposable
2. What are the salieThe airport is being d
passengers per ann
simultaneous and in
parallel taxiways an
aircrafts like the A38
(NMIA) is envisaged
domestic and intern
3. What is meant by Grairport development:
Greenfield airport
vis Brownfield a
upgradation of oper
4. How is the airport prNMIA is proposed toproject under desi
concession framew
CIDCO to a Special
and subscribed eq
(Concessionaire)
nominees (including
uently Asked Questions (FAQ)
i International Airport (NMIA) roject
________________________________
ic forecast for MMR :
t for the MMR predicts that the dema
by the year 2017 and 100 million by
ips per capita in MMR are 1.4 which ar
the economic growth in the region an
income levels of the population.
nt features of the airport :
esigned to cater to an ultimate capaci
um. It will accommodate two parall
dependent operations with provisions
conform to ICAO Aerodrome Code 4F
0 and B747-8. The Navi Mumbai Intern
to be state-of-the-art, with modular fa
tional passengers.
enfield airport development vis--vis B
evelopments are developments on vir
irport developments which are
ting airports. NMIA is a greenfield airp
posed to be developed:
be developed as a Public Private Pan, build, finance, operate and tra
rk. A long term concession will be
Purpose Vehicle (SPV) wherein 74% o
ity will be held by the selected Airp
nd the remaining 26% will be held b
Project Affected persons)
__________
d will exceed
he year 2030.
expected to
the resultant
ty of 60 million
l runways for
for full length
to serve large
tional Airport
ilities for both
ownfield
gin land vis--
odernization/
rt project.
tnership (PPP)nsfer (DBFOT)
awarded by
f the paid up
ort developer
CIDCO & its
-
8/12/2019 FAQ_nmia
2/7
Fre
Navi Mumb
______________________
5. What is the airport imThe airport is propos
passenger handling
in the first phase sh
second phase to 2
phase to 60 MPPA.
6. What is the airport prThe total project c
development works i
of pre-development
part Airport site d
Transmission Lines).
7. What are the pre-deThe project involves
the Airport develoblasting of hills in the
re-coursing of the Ul
the Extra High Volta
proposed that CID
development work
operations and thes
18 months. The cost
Crore.
8. What are the majorThe major roads surr
enhancement on pri
with service lanes o
widened to 8 lanes
being implemented
uently Asked Questions (FAQ)
i International Airport (NMIA) roject
________________________________
plementation plan :
ed to be developed in four phases wi
capacity of 60 MPPA. The Airport dev
ll cater to a passenger throughput of
MPPA, the third phase to 45 MPPA
ject cost. :
st of the NMIA project, including co
s estimated at Rs. 14,574 Crore (FY 13 pr
works is estimated at Rs. 2,358 Crore
evelopment and shifting of Extra
elopment works proposed to be taken
pre-development activities to be co-
ment works. They include land deproject area, filling / reclamation of th
e river flowing through the airport site
e Transmission (EHVT) lines crossing air
CO shall carry out the above m
to expedite the commenceme
are expected to be completed with
of pre-development works is estimate
rojects planned to enhance airport co
ounding the NMIA site that have bee
ority are the Aamra Marg ( to be wide
either side), the National Highway (
ith service lanes on either side) , bot
by the Mumbai JNPT Port Road
__________
h an ultimate
lopment plan
10 MPPA, the
and the final
t of the pre-
ices). The cost
(comprising of
High Voltage
up by CIDCO
rdinated with
elopment byairport area,
and shifting of
port land. It is
ntioned pre-
t of Airport
in a period of
d at Rs. 2,358
nectivity:
taken up for
ed to 8 lanes
H) 4B ( to be
of which are
ompany Ltd.
-
8/12/2019 FAQ_nmia
3/7
Fre
Navi Mumb
______________________
(MJPRCL) and arepresently being wid
Department , constr
The new expresswa
Alibaug Multi Modal
outer fringes of MM
and the Mumbai Tra
Sewri to Nhava whic
Central & Westerncoastal road with 60
thus providing a dire
New Transit Corridors
cater to the deman
CIDCO has planned
Kharghar Pendh
NMIA. The Phase 1
implementation and
Passenger Water Tra
Water transport proj
being implemented
Corporation (MSRDC
9. What are the approvProject approvals/cl
clearance from Mo
Stage 1 Forest CleaThe Honble Bomb
mangroves in the
comprising peripher
approval for the shifti
uently Asked Questions (FAQ)
i International Airport (NMIA) roject
________________________________
urrently at the Bid Stage. Sion - Panvned to 10 lanes by the Maharashtra
ction of which is expected to be comp
projects proposed for implementatio
Corridor (MMC) which provides conn
with NMIA (DPR is being prepared b
ns-Harbour Link (MTHL), also an MMRD
h provides connectivity to the business
arts of Mumbai with NMIA. CIDCO imetre ROW for connecting the MTHL
t access to the Airport.
(Metro & Suburban Rail) are also bein
during the later phases of the Airport
the first metro system in Navi Mumbai
r Taloja - Khandeshwar route with a
of the project from Belapur to Pen
is expected to be operational by 2015.
nsport (PWT) by Hovercrafts is also bein
ects on the east and west coasts o
by the Maharashtra State Road
) with a terminal at Nerul in Navi Mumb
ls obtained for the project:
arances, namely from MoCA, Environ
F, Defence clearance from MoD, are
ance and Wildlife Clearance have bay High Court has permitted the
irport area. CRZ clearance for off-site
l roads and interchanges has been re
ng of EHVT lines has been received fro
__________
l Expressway,Public Works
leted by 2015.
are Vasai to
ectivity to the
the MMRDA)
project, from
hubs of South,
is providing aith NMIA and
proposed to
development.
n the Belapur
onnection to
har is under
g considered.
Mumbai are
Development
i.
mental & CRZ
in place. The
en obtained.clearance of
infrastructure
ceived. Route
the DGCA.
-
8/12/2019 FAQ_nmia
4/7
Fre
Navi Mumb
______________________
10.What is the status of lThe core airport ar
Developer) is 1160
balance is in the p
Acquisition Act hav
Consent Award. The
allot developed pl
modern township P
11.What is the status of thA preliminary estima
have to be re-locate
in line with extant
been accepted by
development of R &
12.What are the villagesThe Gaothans of vill
Airport Project are as
Sr. No. Name
Villa
1. Targhar2. Ulwe3. Owale4. Pargaon5. Kopar6. Vadghar7. Waghiva
uently Asked Questions (FAQ)
i International Airport (NMIA) roject
________________________________
nd acquisition for the airport :
a to be awarded to the Concessi
a, of which presently, 75% is in posse
rocess of acquisition. Notifications un
e been issued. It is proposed to ac
proposed model for acquisition of pri
ts of land in lieu of monetary comp
shpak Nagar being developed near t
airport related resettlement and rehabilita
te indicates that approximately 3500
d due to airport project. CIDCOs R&R
entral and Maharashtra Governmen
he PAPs and the same is under imple
R sites in the vicinity of airport have co
that have to be re-located due to the
ages in Panvel Taluka proposed for R
follows:
of
e
Name of Padas
Targhar, Kombadbhuje
Ulwe, Ganeshpuri
Waghiviliwada, Upper Owale
Kolhi
Kopar
Chinchpada
li Waghivali
__________
naire (Airport
ssion and the
der the Land
uire land by
ate land is to
ensation in a
e airport.
tion (R&R):
ouseholds will
Policy which is
t policies has
entation. The
menced.
irport project:
&R under the
-
8/12/2019 FAQ_nmia
5/7
Fre
Navi Mumb
______________________
13.Who are the consultThe consultants asso
Consultant M/s. Louis
Plan, DPR and Finan
M/s KPMG) and M/s
14.What are the salient fei. CIDCO has a
the bidder fo
International
Model RFQ do
Govt. of India.
ii. The first stagqualification
Application in
Qualification (
iii. At the end ofqualified Appl
second stage
Request for Pr
iv. Bid parameteroffer to pay a
gross revenu
Concession
v. The EstimateCrores, which
excluding pre
vi. The cost of pre
uently Asked Questions (FAQ)
i International Airport (NMIA) roject
________________________________
nts assisting CIDCO on the airport proje
iated with CIDCO for the NMIA project
Berger Group, Inc. USA for the prepara
ial & Transaction Advisory Services (Sub
emant Sahai and Associates, Legal C
tures of the Request for Qualification (RFQ)
opted a two-stage bidding process f
r award of the Project to develop
irport through PPP on DBFOT basis, o
cument for PPP projects of the Plannin
e (Qualification Stage) of the pro
f interested parties/ Consortia w
accordance with the provisions of th
FQ) document.
this stage, the Authority shall announc
icants who shall be eligible for partic
of the Bidding Process (the Bid St
posal (RFP).
: Bids will be invited for the Project on t
Premium in the form of percentage sh
payable to the Authority over t
Project Cost of the project conside
is the combined cost of Phase 1 a
evelopment cost.
-development works estimated at Rs. 2
__________
ct :
are the Prime
tion of Master
Consultant
nsultants
document *:
r selection of
Navi Mumbai
n the lines of
Commission,
cess involves
o make an
e Request for
e a list of pre-
ipation in the
ge) i.e. the
e basis of the
re of annual
e tenure of
red is Rs 9500
nd Phase 2 ,
,358 Crores.
-
8/12/2019 FAQ_nmia
6/7
Fre
Navi Mumb
______________________
vii. The technical,for pre-qualific
viii. The technicaexperience of
[(ports, highw
power and re
sector wherein
more than 950adjusted for th
aggregate ex
than 9500.
ix. The financialnetworth whic
x. Operations anbased on exyears with a
the three year
ASQ ranking
consideration.
xi. Entities who sFinancial Cap
Aggregate Ex
as all other pro
xii. Mumbai Internthe Right of Fi
airport. MIAL c
highest bidder
uently Asked Questions (FAQ)
i International Airport (NMIA) roject
________________________________
financial and O&M capacity is evalua
ation of entities
l capacity is evaluated through
projects in the airport sector & othe
ays, expressways, railways (includin
l estate)] and construction experienc
the capital cost of each project shall
Cr.. The development and constructie prescribed weights, is summed up to
erience score which must be equal
capacity shall be evaluated on the
shall be not less than Rs. 2375 Crores.
d Maintenance (O&M) capacity shall
erience in operating an airport forinimum passenger throughput of 10 M
and with a Skytrax ranking within the
ithin the top 100 in each quarter for t
tisfy the eligibility conditions of Techn
acity and O&M experience criteria
erience Score equal to or greater tha
visions of the RFQ, will be prequalified.
ational Airport Private Limited (MIAL) h
rst Refusal (ROFR) by Govt. of India f
an exercise the ROFR, if their offer is wi
.
__________
ed in the RFQ
development
core sectors
metro rail),
in the airport
e equal to or
n experience,determine the
to or greater
basis of the
be evaluated
consecutivePPA in one of
top 100 or an
e year under
ical capacity,
nd have an
9500, as well
s been given
r the second
hin 10% of the
-
8/12/2019 FAQ_nmia
7/7
Fre
Navi Mumb
______________________
xiii. The RFQ capsin the SPV for
equity.
*Elaborate de
from the RFQ
website : www
15.Who is the contact perAttention Of:
Designation:
Address:
Tel. No.:
Fax No.:
Email Address:
*
uently Asked Questions (FAQ)
i International Airport (NMIA) roject
________________________________
the equity participation by airlines & tNMIA at 10% of the total subscribed
ails on each of the above points ca
ocument, which can be downloade
.cidco.maharashtra.gov.in
on in CIDCO to seek information/clarificati
Mr. Soma Vijayakumar
Chief General Manager (Transport & Airport),Transportation and Communication Planning D
CIDCO Bhavan, 6thfloor, CBD BelapurNavi Mumbai 400614Maharashtra, India
+91 22-67918601/67918697
+91 22-67918166
[email protected]@gmail.com
*** **** *****
__________
eir associatesand paid up
be obtained
from CIDCO
ons :
ept., CIDCO Ltd