  • 7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012

    1/167

    WILLIAM

    H.

    FARQUHAR

    MIDDLE

    SCHOOL

    ModernizationFeasibilityStudy

    Preparedfor

    Montgomery

    County

    Public

    Schools

    by

    HordCoplanMachtBaltimore,Maryland

    July2011

    RevisedOctober2012

  • 7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012

    2/167

    WILLIAMH.FARQUHARMIDDLESCHOOL HORDCOPLANMACHTModernizationFeasibilityStudy

    WILLIAMH.FARQUHARMIDDLESCHOOLModernizationFeasibilityStudy

    July2011

    RevisedOctober2012

    SECTION PAGENO.

    I. Introduction 1

    II. ExecutiveSummary 9

    III. ProjectScope,Methodology,andGoals 26

    IV. ExistingConditions 28V. DescriptionofOptions 35

    VI. Recommendations 70

    VII. ProposedProjectImplementationSchedule 71

    VIII. Appendices

    AppendixA. EducationalSpecifications A1

    AppendixB. ExistingConditionsSurvey B1

    AppendixC.

    ProjectPhotographs

    C1

    AppendixD. SiteUtilities D1

    AppendixE. Option6&LifeCycleCostAnalysis E1

  • 7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012

    3/167

    WILLIAMH.FARQUHARMIDDLESCHOOL HORDCOPLANMACHTModernizationFeasibilityStudy 1

    I.INTRODUCTION

    Thismodernization feasibility study was conducted for Montgomery County Public Schools (MCPS) by the architectural firm HordCoplanMacht.WilliamH. FarquharMiddle School is locatedat16915Batchellors ForestRoad,Olney,Marylandand ispartof the

    NortheastConsortiumandSherwoodclusters.ThefeasibilitystudyworkwasperformedunderthedirectionoftheMCPSDepartment

    ofFacilitiesManagement,DivisionofConstruction.

    MONTGOMERYCOUNTYBOARDOFEDUCATION

    Mr.ChristopherS.Barclay President

    Ms.Shirley

    Brandman

    Vice

    President

    Ms.LauraBerthiaume Member

    Dr.JudithDocca Member

    Mr.MichaelA.Durso Member

    Mr.PhilipKauffman Member

    Mrs.PatriciaB.ONeill Member

    Mr.AlanXie StudentMember

    MONTGOMERY

    COUNTY

    SCHOOLS

    ADMINISTRATION

    Dr.JoshuaStarr SuperintendentofSchools

    Mr.JamesC.Song Director,DepartmentofFacilitiesManagement

    Mr.R.CraigSchuman Director,DivisionofConstruction

    Mr.MichaelP.Shpur Architect,DivisionofConstruction

    Mr.RayMarhamati ProjectManager,DivisionofConstruction

    Ms.AdrienneL.Karamihas FacilityPlanner,DepartmentofFacilitiesManagement

  • 7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012

    4/167

  • 7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012

    5/167

    WILLIAMH.FARQUHARMIDDLESCHOOL HORDCOPLANMACHTModernizationFeasibilityStudy 3

    INTRODUCTION

    FACILITYADVISORYCOMMITTEEMEMBERS(CONTINUED)

    JamieCastle Parent BrookeGroveElementarySchool

    KarenCastle Parent BrookeGroveElementarySchool

    AndreaMassaroCavanaugh Parent BrookeGroveElementarySchool

    BiniChacko Parent FarquharMiddleSchool

    JohnClifford Parent FarquharMiddleSchool&SherwoodElementarySchool

    MaryDePasqualeCobb Parent FarquharMiddleSchool&SherwoodElementarySchool

    JenniCoopersmith Parent SherwoodElementarySchool

    JenniferCostello Parent CloverlyElementarySchool

    NeetaDatt MontgomeryCountyGovernment CommunityLiaisonforSenatorMontgomery

    JennaDean Neighbor FarquharMiddleSchool

    DebbieDeans Parent FarquharMiddleSchool

    DebbieDeosaran Parent FarquharMiddleSchool&CloverlyElementarySchool

    SharonDeutch Parent FarquharMiddleSchool&BrookeGroveElementarySchool

    AndrewDunn Parent BrookeGroveElementarySchool

    CheriDunn Parent BrookeGroveElementarySchool

    AngelaEdwards Parent CloverlyElementarySchool

    RickEisenacher Staff FarquharMiddleSchool

    VolkerEnglisch Parent FarquharMiddleSchool

    S.Eppley Parent FarquharMiddleSchool

    JudyExler Parent BrookeGroveElementarySchool

    RamezFahmy Parent BrookeGroveElementarySchool

    SherifaFahmy Parent BrookeGroveElementarySchool

    SumayaFahmy Parent BrookeGroveElementarySchool

    KathyFinan Staff FarquharMiddleSchool

    ButchFleischer Parent FarquharMiddleSchool

    CharlesL.Frederick Parent BrookeGroveElementarySchool

  • 7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012

    6/167

    WILLIAMH.FARQUHARMIDDLESCHOOL HORDCOPLANMACHTModernizationFeasibilityStudy 4

    INTRODUCTION

    FACILITYADVISORYCOMMITTEEMEMBERS(CONTINUED)

    DonnaFrederick Parent FarquharMiddleSchool

    StephenFye Parent FarquharMiddleSchool

    AngelGarcia AssistantDirector DepartmentofTransportation,MCPS

    MelissaGatlin Parent FarquharMiddleSchool,StonegateElementarySchool

    WalterGeddes Staff FarquharMiddleSchool

    MelissaGooding Parent FarquharMiddleSchool

    LoriGoodwin Parent SherwoodElementarySchool

    MissyGover Parent BrookeGroveElementarySchool

    ManethP.Gravell Parent FarquharMiddleSchool

    MichaelGreenberg Parent FarquharMiddleSchool

    JeanGries PlanningSpecialist MontgomeryCountyDepartmentofTransportation

    JoeGriffin Parent,PTAPresident FarquharMiddleSchool

    MaryGross Parent BrookeGroveElementarySchool

    JenniferHallmark Parent FarquharMiddleSchoolDr.UrsulaA.Hermann CommunitySuperintendent MontgomeryCountyPublicSchools

    KristinHewitt Parent FarquharMiddleSchool

    WailHigazi Parent FarquharMiddleSchool

    MichaelHildebrand Parent CloverlyElementarySchool

    MichelleHintz Parent FarquharMiddleSchool

    Patrick Hintz Parent FarquharMiddleSchool

    TerriHogan Reporter Gazette

    KarenHolt Parent FarquharMiddleSchoolHankHyde Neighbor FarquharMiddleSchool

    TomHyde Neighbor FarquharMiddleSchool

    KimberlyIanniciello Parent SherwoodElementarySchool

    DawnJacob Parent FarquharMiddleSchool

    ShabeenJafri Parent FarquharMiddleSchool

    JoyceJessell AssistanttotheDirector DivisionofConstruction,MCPS

  • 7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012

    7/167

    WILLIAMH.FARQUHARMIDDLESCHOOL HORDCOPLANMACHTModernizationFeasibilityStudy 5

    INTRODUCTION

    FACILITYADVISORYCOMMITTEEMEMBERS(CONTINUED)

    AnnJohnson Parent CloverlyElementarySchool

    EricJohnson Parent CloverlyElementarySchool

    BarryJordan Parent FarquharMiddleSchool

    JihyunJung Parent FarquharMiddleSchool

    GailKahan Parent FarquharMiddleSchool

    JackKaminski Parent FarquharMiddleSchool

    AdrienneKaramihas FacilityPlanner DepartmentofFacilitiesManagement,MCPS

    KarenKaufman Parent FarquharMiddleSchool

    NancyKeener Parent BrookeGroveElementarySchool

    AndreaKeller Parent FarquharMiddleSchool

    FeliciaKimmel Parent FarquharMiddleSchool

    TroyKimmel Parent BrookeGroveElementarySchool

    RichKonzmann Parent FarquharMiddleSchool

    SimonaKostka Parent FarquharMiddleSchool

    AnneL.Kozma Staff FarquharMiddleSchool

    HaifaKrakaur Parent FarquharMiddleSchool

    MichaelKrakaur Parent FarquharMiddleSchool

    GregoryLampshire Parent FarquharMiddleSchool

    LauraLampshire Parent FarquharMiddleSchool,BrookeGroveElementarySchool

    ConaeLee Parent FarquharMiddleSchool

    EllenLemberger Parent BrookeGroveElementarySchool

    JoyLeven Parent FarquharMiddleSchool

    JeffLevine Staff FarquharMiddleSchool

    JanetLevy Parent FarquharMiddleSchool

    StuartLevy Parent FarquharMiddleSchool

    JeffLin Parent FarquharMiddleSchool

    LindaLindstrom Staff FarquharMiddleSchool

    PattyLiszewski Parent BrookeGroveElementarySchool

  • 7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012

    8/167

    WILLIAMH.FARQUHARMIDDLESCHOOL HORDCOPLANMACHTModernizationFeasibilityStudy 6

    INTRODUCTION

    FACILITYADVISORYCOMMITTEEMEMBERS(CONTINUED)

    PaulineLoveland Staff FarquharMiddleSchool

    ReneeRosenblumLowden Grandparent FarquharMiddleSchool

    BrianLowe Parent FarquharMiddleSchool

    MaryLunden Parent FarquharMiddleSchool&SherwoodElementarySchool

    RayMarhamati ProjectManager DivisionofConstruction,MCPS

    EdMcCarthy Parent FarquharMiddleSchool

    KristinMcGervey Parent BrookeGroveElementarySchool

    SeanMcGervey Parent BrookeGroveElementarySchool

    JenniferMcKneely Parent SherwoodElementarySchool

    KenMcKneely Parent SherwoodElementarySchool

    KevinMcLaren Parent FarquharMiddleSchool

    DebbieMetrey Parent FarquharMiddleSchool

    HeatherMilke Parent BrookeGroveElementarySchool

    ToddMiller Parent BrookeGroveElementarySchool

    ElizabethMiller Parent BrookeGroveElementarySchool

    JoannMirgon Parent SherwoodElementarySchool,PTAPresident

    DeepaMittu Parent FarquharMiddleSchool

    BethMontgomery Parent SherwoodElementarySchool

    KristyMontgomery Parent FarquharMiddleSchool&CloverlyElementarySchool

    MarkMooney Parent CloverlyElementarySchool

    TeresaMooney Parent CloverlyElementarySchool

    RandolphMussotte ClusterManager TransportationAdministration,MCPS

    BryanNatoli Parent BrookeGroveElementarySchool

    KendraNewman Parent FarquharMiddleSchool

    ShellyNiverth Parent BrookeGroveElementarySchool&FarquharMiddleSchool

    StacyNoland Parent BrookeGroveElementarySchool

    StephanieNoland Parent BrookeGroveElementarySchool

    StephaniePack Parent CloverlyElementarySchool

    LarryPacker Parent BrookeGroveElementarySchool

  • 7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012

    9/167

    WILLIAMH.FARQUHARMIDDLESCHOOL HORDCOPLANMACHTModernizationFeasibilityStudy 7

    INTRODUCTION

    FACILITYADVISORYCOMMITTEEMEMBERS(CONTINUED)

    RachelPacker Parent BrookeGroveElementarySchool

    JoePasternak Parent BrookeGroveElementarySchool

    MicheleNebelPeake Parent SherwoodElementarySchool

    MegPeaseFye Neighbor FarquharMiddleSchool

    DougPophamJr. Parent FarquharMiddleSchool

    JudithSetkinPorzel Parent FarquharMiddleSchool

    JoePospisil PlanningSpecialist MontgomeryCountyDepartmentofTransportation

    LoriPost Parent BrookeGroveElementarySchool&FarquharMiddleSchool

    CherylPotyk Parent BrookeGroveElementarySchool

    SarahQureshi Parent FarquharMiddleSchool

    JohnRamsay Parent BrookeGroveElementarySchool

    SusanRamsay Parent BrookeGroveElementarySchool

    BarbaraRay Parent FarquharMiddleSchool

    SuzanneRedman Parent FarquharMiddleSchool

    LisaRodriguez Staff FarquharMiddleSchool

    MichaelRonan Parent BrookeGroveElementarySchoolAnneRood Parent BrookeGroveElementarySchool

    ElaineSalter Parent FarquharMiddleSchool

    MurielSenderling Parent FarquharMiddleSchool

    MichaelShpur Architect DivisionofConstruction,MCPS

    HelenShueh Parent FarquharMiddleSchool&CloverlyElementarySchool

    AndreaSmith Parent FarquharMiddleSchool

    KenSmith Parent FarquharMiddleSchool

    SusanSmithBauk Parent FarquharMiddleSchoolJamesSong Director DepartmentofFacilitiesManagement,MCPS

    Kerri St.Laurent Parent BrookeGroveElementarySchool

    HeatherSteffan Parent BrookeGroveElementarySchool

    ChrisStenger Parent SherwoodElementarySchool

    DeborahStenger Parent SherwoodElementarySchool

  • 7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012

    10/167

    WILLIAMH.FARQUHARMIDDLESCHOOL HORDCOPLANMACHTModernizationFeasibilityStudy 8

    INTRODUCTION

    FACILITYADVISORYCOMMITTEEMEMBERS(CONTINUED)JillianStorms Architect SchoolFacilitiesBranch,MDStateDepartmentofEducation

    RobertTarloff Parent FarquharMiddleSchool

    BrandiTippery Parent SherwoodElementarySchool

    TinaVelazquez Parent SherwoodElementarySchool,PTAClusterRepresentative

    PatriciaVia Parent FarquharMiddleSchool,StonegateElementarySchool

    KerriWalenta Parent FarquharMiddleSchool

    KristenWeinberg Parent FarquharMiddleSchool

    JasonWeisenthal Parent FarquharMiddleSchoolJohnS.Weske Neighbor FarquharMiddleSchool

    BrantWest Parent SherwoodElementarySchool

    DanaWest Parent SherwoodElementarySchool

    MelanieWhelan Parent FarquharMiddleSchool

    RicWugalter Parent BrookeGroveElementarySchool

    ErinZagami Parent FarquharMiddleSchool

    FEASIBILITYSTUDYA/ETEAM

    HordCoplanMacht ArchitecturalTeamLeader

    CMJStructuralEngineering,Inc. StructuralEngineer

    JamesPoseyAssociates Mechanical/ElectricalEngineer

    AMortonThomasandAssociates,Inc. CivilEngineer

  • 7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012

    11/167

    WILLIAMH.FARQUHARMIDDLESCHOOL HORDCOPLANMACHTModernizationFeasibilityStudy 9

    II.EXECUTIVESUMMARYPurpose

    ThepurposeofthisfeasibilitystudyistoexplorealternativesformodernizingtheexistingWilliamH.FarquharMiddleSchoolthatsatisfy

    therequirementsoftheEducationalSpecificationssetforthfortheproject.Furthermore,thestudyprovidesspecificrecommendations

    toMontgomeryCountyPublicSchools(MCPS)forimplementation.Whencompleted,themodernizedfacilitywillhaveacapacityof793

    studentswithcorespacesdesignedtoaccommodate1,000students.

    History

    WilliamH.FarquharMiddleSchool is locatedat16915BatchellorsForestRoad,Olney,MD.Theschool isamemberoftheNortheastConsortiumand Sherwood clusters.Theoriginal structurewasbuilt in1968.Agymnasiumadditionwas constructed in1981 at the

    northeastcornerofthebuilding.Mechanicalandelectricalupgradesandselectwindowanddoorreplacementshaveoccurredoverthe

    last fewyears.Presently, theschoolcapacity is890studentsand theenrollment is637students ingrades6 through8.Theexisting

    buildingisapproximately116,300grosssquarefeet.Theexistingsiteis20.03acres.

    Methodology

    Theexistingschoolhasbeenevaluatedbyadesignteamofarchitectsandengineerstodeterminemodificationsrequiredtomodernize

    thefacilitytocomplywiththerequirementsoftheWilliamH.FarquharMiddleSchoolEducationalSpecifications,datedJanuary2011

    (seeAppendixA).Thestudyisbasedon:

    SixWorkSessionswiththeFacilityAdvisoryCommittee(FAC)andMCPSstaff; Analysisoftheexistingphysicalplant; Reviewoftheconstructiondocumentsfortheexistingfacility,asprovidedbyMCPS; ReviewoftheEducationalSpecificationsprovidedbyMCPS;and Researchconductedbythedesignteam.

  • 7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012

    12/167

  • 7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012

    13/167

  • 7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012

    14/167

    WILLIAMH.FARQUHARMIDDLESCHOOL HORDCOPLANMACHTModernizationFeasibilityStudy 12

    EXECUTIVESUMMARY

    Overview

    (continued)

    Fivebasic siteplanoptionsand threebuildingplanoptionsweredeveloped in response to theMCPSEducationalSpecifications for

    WilliamH. FarquharMiddle School. Eachoption addresses thedesiredphysical and instructional improvements to the school, and

    satisfies the Educational Specification requirements. The site options include two on the adjacent 17.2 acre parcel that allow the

    studentstoremainattheexistingbuildingwhilethenewbuilding isconstructed.Athirdoption isanewbuilding locatedbehindthe

    existingbuildingthatalsoallowsthestudentstoremainattheexistingbuildingwhilethenewbuildingisconstructed.Twoadditional

    options includenewbuildings locatedon the footprintof the existingbuilding. These twooptionswould require relocationof the

    studentstotheTildenHoldingCenterduringconstruction.Thethreebuildingplansincludetwoandthreestoryoptionsandarebasedonprovenmiddle schoolmodels thatmeet the requirementsof the Educational Specifications.Cost estimates foreachoptionare

    presentedintheDescriptionofOptionssectionofthereport.ThepreferredoptionbytheFacilityAdvisoryCommitteewasOption1.

  • 7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012

    15/167

  • 7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012

    16/167

    WILLIAMH.FARQUHARMIDDLESCHOOL HORDCOPLANMACHTModernizationFeasibilityStudy 14

    EXECUTIVESUMMARY

  • 7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012

    17/167

  • 7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012

    18/167

    WILLIAMH.FARQUHARMIDDLESCHOOL HORDCOPLANMACHTModernizationFeasibilityStudy 16

    EXECUTIVESUMMARY

  • 7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012

    19/167

  • 7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012

    20/167

    WILLIAMH.FARQUHARMIDDLESCHOOL HORDCOPLANMACHTModernizationFeasibilityStudy 18

    EXECUTIVESUMMARY

  • 7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012

    21/167

  • 7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012

    22/167

    WILLIAMH.FARQUHARMIDDLESCHOOL HORDCOPLANMACHTModernizationFeasibilityStudy 20

    EXECUTIVESUMMARY

  • 7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012

    23/167

  • 7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012

    24/167

    WILLIAMH.FARQUHARMIDDLESCHOOL HORDCOPLANMACHTModernizationFeasibilityStudy 22

    EXECUTIVESUMMARY

  • 7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012

    25/167

    WILLIAMH.FARQUHARMIDDLESCHOOL HORDCOPLANMACHTModernizationFeasibilityStudy 23

    EXECUTIVESUMMARY

    OPTION1 OPTION2 OPTION3

    Existing:116,300SF

    Demolition:0SF

    New:132,500SF

    Existing:116,300SF

    Demolition:0SF

    New:131,550SF

    Existing:116,300SF

    Demolition:116,300SF

    New:131,550SF

    OPTION4 OPTION5

    Existing:116,300SF

    Demolition:116,300SF

    New:132,500SF

    Existing:116,300SF

    Demolition:116,300SF

    New:136,400SF

  • 7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012

    26/167

    WILLIAMH.FARQUHARMIDDLESCHOOL HORDCOPLANMACHTModernizationFeasibilityStudy 24

    EXECUTIVESUMMARYCOSTANALYSIS

    PresentedbelowisatabulationofareasandcostsassociatedwitheachrecommendedoptionformodernizationofWilliamH.Farquhar

    MiddleSchool.Theserecommendedoptionsprovidethebestsolutionstothesite,educationalprogram,andfacilitydevelopmentgoals.

    TheestimatesarebasedonthecurrentmarketandreflectcurrentMontgomeryCountyPublicSchoolconstructioncosts.

    CostAnalysisWilliamH.FarquharMiddleSchoolModernization

    SquareFootage

    Option1 Option2 Option3 Option4 Option5 Existing 116,300 116,300 116,300 116,300 116,300

    NewConstruction 132,500 131,550 131,550 132,500 136,400

    Demolition(Total) 0 0 116,300 116,300 116,300

    ExistingToRemain 0 0 0 0 0

    TotalGross 132,500 131,550 131,550 132,500 136,400

    PDF/FEASIBILITYSTUDYCOSTOUTLINE

    ConstructionCostEstimate $33,357,000 $33,116,000 $33,751,000 $33,171,000 $34,111,000

    ProjectPlanningCost $2,462,000 $2,447,000 $2,486,000 $2,451,000 $2,507,000

    RelatedConstructionCosts $1,240,000 $1,240,000 $1,240,000 $1,240,000 $1,240,000

    Contingency $1,334,000 $1,325,000 $1,350,000 $1,327,000 $1,364,000

    TotalCostinFY2012Dollars $38,393,000 $38,128,000 $38,827,000 $38,189,000 $39,222,000

    Notes:

    1.Thiscostestimatedoesnotincludefurnitureandequipment.

    2.AnanalysisoftransportationcostbystaffshowstransportingstudentstoTildenHoldingCenterwillincreasethetotalconstructioncostsforOptions4and5by$1,536,000overatwoyearconstructionperiod.

  • 7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012

    27/167

    WILLIAMH.FARQUHARMIDDLESCHOOL HORDCOPLANMACHTModernizationFeasibilityStudy 25

    EXECUTIVESUMMARYCONCLUSIONSANDRECOMMENDATIONS

    Although Option 1 was the Facility Advisory Committees preferred option, MCPS staff believes that Option 2 provides a smaller

    footprint,amoreefficientbuilding,andmoresitespaceforamenities.

  • 7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012

    28/167

    WILLIAMH.FARQUHARMIDDLESCHOOL HORDCOPLANMACHTModernizationFeasibilityStudy 26

    III.PROJECTSCOPE,METHODOLOGYANDGOALS

    ScopeandIntent

    WilliamH. FarquharMiddle School is scheduled tobemodernized tomeet current specifications relative to educationalprograms,

    instructionalphilosophy,andprogramspaceallocations.Themodernizedfacilitywillmeetcurrentenergy,ADA,federal,and local life

    safetycodes.Whencompleted,thefacilitywillhaveacapacityof793,withcorespacesdesignedfor1,000students.

    Theintentofthisfeasibilitystudyistoexplorealternativesforplacementofamodernizedfacilityonboththeexistingschoolsiteandan

    alternative17.2acresite locatednext to theexistingsite.Thealternativesaccommodateandmeet theeducational requirementsof

    studentenrollment,satisfy thestaffandcommunityconcerns,andcontribute toasafe,costeffectiveandenergyefficient facility to

    meettheneedsofa21stcenturyschool.

    Thescopeofwork includesasurveyoftheexistingphysicalplantandevaluationoftheexistingmechanical,electrical,andplumbing

    systems. TheA/E design team analyzed the educational specifications and developed five distinct site concepts and three building

    conceptsaddressingthecriteriaforamodernizedfacility.TheFeasibilityStudyCommitteereviewedtheprogressionoftheseconcepts

    throughouttheentireprocess.Theircommentsandsuggestionswerediscussedandevaluated,andinfluencedthedevelopmentofallof

    theoptionsbeingconsidered.ThefinalconceptsarepresentedinthisreportasOptionsOne,Two,Three,Four,andFive.

    Methodology

    The existing schoolhasbeen evaluatedby adesign teamof architectsand engineers todetermine thebestapproach toprovide a

    modernized facility that complieswith the requirementsof theWilliamH.FarquharMiddleSchoolEducationalSpecifications,dated

    January2011.Thestudyisbasedon:

    SixWorkSessionswiththeFacilityAdvisoryCommittee(FAC)andMCPSstaff; Analysisoftheexistingphysicalplant; Reviewoftheconstructiondocumentsfortheexistingfacility,asprovidedbyMCPS; ReviewoftheEducationalSpecificationsprovidedbyMCPS;and Researchconductedbythedesignteam.

  • 7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012

    29/167

    WILLIAMH.FARQUHARMIDDLESCHOOL HORDCOPLANMACHTModernizationFeasibilityStudy 27

    PROJECTSCOPE,METHODOLOGYANDGOALSGoalsandObjectives

    Insatisfyingtherequirementsoftheeducationalspecifications,thefollowingaretheprimarygoalsandobjectivesestablishedbythe

    FacilityAdvisoryCommitteememberstobeaddressedbytheA/EteamandstaffofMCPS.

    OPTIMIZESTUDENTPERFORMANCE Studentstoremainonsiteduringconstruction LargerCafeteria Hightech(wiredandwireless) Furnitureflexibilitytoallowsmallandlargegroup

    instruction

    Flexibilitywithchangeintechnology Abilitytodarkenroomstoallowuseof

    Prometheanboards

    Temperaturecontrolintheclassrooms,bettercomfort

    Stageforperformances,needbetteracoustics

    CULTUREANDTRADITION Sympatheticdesigntotheneighborhood Smallschoolfeel(intimate) Traditional(oldschoolhousefeel) Communityuseoftheschoolisimportant Teachersareterritorial needaplacethatistheir

    own

    SCHOOLORGANIZATION Artstobethecentralhub Separategradelevels Centralscience Privatizegradeclusterfrompublicspace Facultyrestroomsineachwing AdequateParking

    SUSTAINABILITY Windowsthatopen Naturallight Schoolasateachingtool Automaticflushtoilet

    SAFETY Safedropoffandpickuparea Separatebusandstudentdropoffloops Safeplaceinbuildingduringstorms Emergencylightsintoiletrooms

  • 7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012

    30/167

    WILLIAMH.FARQUHARMIDDLESCHOOL HORDCOPLANMACHTModernizationFeasibilityStudy 28

    IV.EXISTINGCONDITIONS

  • 7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012

    31/167

    WILLIAMH.FARQUHARMIDDLESCHOOL HORDCOPLANMACHTModernizationFeasibilityStudy 29

    EXISTINGCONDITIONS

  • 7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012

    32/167

    WILLIAMH.FARQUHARMIDDLESCHOOL HORDCOPLANMACHTModernizationFeasibilityStudy 30

    EXISTINGCONDITIONS

  • 7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012

    33/167

    WILLIAMH.FARQUHARMIDDLESCHOOL HORDCOPLANMACHTModernizationFeasibilityStudy 31

    EXISTINGCONDITIONS

  • 7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012

    34/167

  • 7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012

    35/167

  • 7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012

    36/167

  • 7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012

    37/167

  • 7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012

    38/167

  • 7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012

    39/167

  • 7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012

    40/167

    WILLIAM

    H.

    FARQUHAR

    MIDDLE

    SCHOOL

    HORD

    COPLAN

    MACHTModernizationFeasibilityStudy 38

    DESCRIPTIONOFOPTIONSRoofLevel: Theroofframingsystemisassumedtoconsistof1 20gagetypeBmetaldecksupportedbyopenwebjoists.Theroof

    systemwillbesupportedbysteelcolumns.Thelateralresistingsystemwillbereinforcedmasonryshearwall.Theexteriorwallswillbe

    acompositionofreinforcedmasonryandbrickveneer.

    ApplicableCodesandStandards

    TheInternationalBuildingCode2009,asmodifiedbyMontgomeryCountyReferenceCodeOrganizations ACIAmericanConcreteInstitute AISCAmericanInstituteofSteelConstruction ANSIAmericanNationalStandardInstitute ASTMAmericanSocietyforTestingandMaterials PCAPortlandCementAssociation CRSIConcreteReinforcingSteelInstitute AWSAmericanWeldingSociety AISIAmericanIronandSteelInstitute BIABrickInstituteofAmerica NCMANationalConcreteMasonryAssociation PCIPrecastPrestressedConcreteInstitute

    HVACSYSTEMS:

    Two different systemswill be explored to ensure high energy efficiency,meet the state IAC requirements and meetMontgomery

    Countys requirement forLEEDcertification. Thesesystemsarevariableairvolume (VAV)andgeothermalwater sourceheatpump

    system.

    TheVAVsystemwouldconsistofthefollowing:

    Highefficiencycondensingboilerswillbeusedtoproducetheheatingwaterforthesystem. Basedonthesizeofthenewschool,twoorthreeboilerswouldbeconsidered.

  • 7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012

    41/167

    WILLIAMH.FARQUHARMIDDLESCHOOL HORDCOPLANMACHTModernizationFeasibilityStudy 39

    DESCRIPTIONOFOPTIONS

    Chilled

    water

    plant

    will

    consist

    of

    two

    water

    cooled

    centrifugal

    chillers.

    Two

    induced

    draft

    cooling

    towers,

    one

    dedicated

    to

    each

    chiller,willbeplacedontheroof. Thetowerswillbeprovidedwithsoundattenuatinginletsanddischarges.

    Fanpoweredvariableairvolumeterminalswillconditionthemajorityofthespaces. Hotwaterheatingcoilswillbeprovidedoneachterminalforexcellentroomtemperaturecontrol.

    AirhandlerssupplyingprimaryairtotheVAVterminalswillbelocatedontheroofinmechanicalpenthousesorexposedwithinteriorservicecorridor. Unitswillbeinstalledwithsupplyairandreturnairfans,heatingwatercoil,chilledwatercoilandsystemfiltration.

    Largeareassuchasgymnasium, instructionalmediacenter,anddiningwillbeconditionedbysinglezonevariableairvolumeairhandlingunits. Outsideairquantitieswillbecontrolledbycarbondioxidesensorsandroomairvolumewillbecontrolledbyvariable

    frequencydrives. Mechanicalexhaustshallbeprovidedfortoiletrooms,storageroomsandotherspecialareas. Automatictemperaturecontrolswillbedirectdigitalcontrols(DDC)connectedtoMontgomeryCountyPublicSchoolscentralcontrol

    center.

    Thegeothermalheatpumpsystemwouldconsistofthefollowing:

    Geothermalwatersourceheatpumpunits,oneforeachclassroom,willconditionthespace. Unitswillbelocatedinaclosetnexttoclassroomandductedtotheroom.

    Outsideairwillbeconditionedby100percentoutsideairrooftopenergyrecoveryunitswithgeothermalheatpumpcompressors.Unitswill supply conditionedoutsideairdirectly to the classroomandexhaustair from the classrooms, storage room,and toilet

    rooms.

    A singlezone rooftopheatpumpairhandlingunitwillprovide room conditioning foreachof the followingareas;MediaCenter,Administration,Music,ArtandTechnologies.

    Asinglezonerooftopheatpumpenergyrecoveryunitwillprovideroomconditioningforeachofthefollowingareas: GymnasiumandDining/Stage.

    Geothermalboreholefieldwillbelocatedundertheathleticfields. Mechanicalexhaustoftoilets,storagerooms,andotherspecialareas. Automatic temperature controls will be direct digital controls (DDC), connected to Montgomery County Public Schools central

    controlcenter.

  • 7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012

    42/167

    WILLIAMH.FARQUHARMIDDLESCHOOL HORDCOPLANMACHTModernizationFeasibilityStudy 40

    DESCRIPTIONOFOPTIONS

    PlumbingSystems:

    Allplumbingfixtureswillbeinstitutionalgradewitha1.6gallonperflushvalveonwaterclosetsand1.0pintonurinals. Flowrestrictors

    willbe installedonallfaucetsfor0.5gallonsperminute. LeadfreewatercoolerswillbeprovidedandcertainfixtureswillmeetADA

    requirements. Domestichotwaterwillbegeneratedbygeothermalwatertowaterheatexchangersornaturalgasfiredstoragetype

    waterheater. Sanitaryandstormwatermainsfromthenewbuildingwillconnectintoutilitymainsaroundthebuilding.

    FireProtectionSystem:

    Theentirebuildingwillbesprinklered. Thebuildingwillbeseparatedintoseveralzonesthatwillmatchthefirealarmpullzonesforthe

    building. Themunicipalwatersystemwillbeevaluatedduring thedesignphase toconfirmadequatepressure to serve thesystem

    withouttheneed fora firepump. Also,anyairhandlingunitssupplying2,000cfmormoretoaspacewillbeequippedwithsmoke

    detectorsinthesupplyandreturnairductworktomeetcurrentcodes.

    ELECTRICAL:

    PowerDistribution Thenewelectricalserviceanddistributionsystemwillconsistofanewswitchboardwithmultiplemainbreakers,feeders,drytype

    transformersandpanelboards.Autilitycompanypadmountedtransformerwillprovidethe277/480voltpowertothebuilding.

    The277/480voltpanelboardswillserve lightingandmechanicalloads. Energyefficientdrytypetransformers inelectricalclosetsthroughoutthebuildingwillfeed120/208voltpanelboards.Kratedtransformerswillservepanelboardswith200percentneutrals

    forcomputerpower. Designatedreceptaclesinallclassroomsandofficeswillbeconnectedtothecomputerpowerpanelboards.

    EmergencyPowerAnew emergency generatorwillprovideboth emergency and standbypower for the facility. The generatorwill supplypower to

    heatingequipment,foodservicerefrigerationequipment,communicationssystems,emergencylighting,andotherlifesafetysystems.

  • 7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012

    43/167

  • 7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012

    44/167

    WILLIAMH.FARQUHARMIDDLESCHOOL HORDCOPLANMACHTModernizationFeasibilityStudy 42

    DESCRIPTIONOFOPTIONS

    SecuritySystemThesecurity systemwillmeetcurrentMontgomeryCountyPublicSchools (MCPS)standards. Provisions foraCCTVsystemwith

    monitoranddigitalcameraswillbeprovided. Coveragewillincludetheexteriorandmainentrancesofthebuilding. Provisionsfor

    an access control systemwillbeprovided for themain entrance andotherdoors as required. Intrusiondetectionwill include

    motionsensorsanddoorcontacts.

  • 7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012

    45/167

    DESCRIPTION OF OPTIONS

  • 7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012

    46/167

    WILLIAMH.FARQUHARMIDDLESCHOOL HORDCOPLANMACHTModernizationFeasibilityStudy 44

    DESCRIPTIONOFOPTIONS

    DESCRIPTION OF OPTIONS

  • 7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012

    47/167

    WILLIAMH.FARQUHARMIDDLESCHOOL HORDCOPLANMACHTModernizationFeasibilityStudy 45

    DESCRIPTIONOFOPTIONS

    DESCRIPTION OF OPTIONS

  • 7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012

    48/167

    WILLIAMH.FARQUHARMIDDLESCHOOL HORDCOPLANMACHTModernizationFeasibilityStudy 46

    DESCRIPTIONOFOPTIONS

    DESCRIPTION OF OPTIONS

  • 7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012

    49/167

    WILLIAMH.FARQUHARMIDDLESCHOOL HORDCOPLANMACHTModernizationFeasibilityStudy 47

    DESCRIPTIONOFOPTIONS

    OPTIONONE PROS&CONS

    Pros:

    NoRelocationtotheTildenHoldingCenter Geothermalispossible Goodabilityforsupervision/securitywithplanorganization Goodsolarorientationofbuildingplan Accesstoadjacentplayfields/parkamenitiesatproposednewpark Buildingisplacedinoptimallocationonsitesincesiteiscurrentlyundeveloped Buildingiszonedwellforafterhoursuse

    Cons:

    Sanitarysewerisatthesouthendoftheexistingschoolproperty,requiringextensionupBatchellorsForestRoad Reducedquantityofonsiteballfields/sportscourtscomparedtooptionsonoriginalsite Soccerandsoftballfieldsoverlap,allowinguseofonlyoneatatime Buildingisnexttoadjacentneighbor Accesstositeisviaexistingschoolsiteratherthannewcurbcutsperrequirementsofthe2005OlneyMasterPlanwhichcreates

    mixingofcarsandbussesastheyenterandexitthesite.(Notethisissuecouldbeeliminatedifanadditionalcurbcutisallowed)

  • 7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012

    50/167

    DESCRIPTION OF OPTIONS

  • 7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012

    51/167

    WILLIAMH.FARQUHARMIDDLESCHOOL HORDCOPLANMACHTModernizationFeasibilityStudy 49

    DESCRIPTIONOFOPTIONS

    DESCRIPTION OF OPTIONS

  • 7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012

    52/167

    WILLIAMH.FARQUHARMIDDLESCHOOL HORDCOPLANMACHTModernizationFeasibilityStudy 50

    DESCRIPTIONOFOPTIONS

    DESCRIPTION OF OPTIONS

  • 7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012

    53/167

    WILLIAMH.FARQUHARMIDDLESCHOOL HORDCOPLANMACHTModernizationFeasibilityStudy 51

    DESCRIPTIONOFOPTIONS

    DESCRIPTIONOFOPTIONS

  • 7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012

    54/167

    WILLIAMH.FARQUHARMIDDLESCHOOL HORDCOPLANMACHTModernizationFeasibilityStudy 52

    SC O O O O S

    DESCRIPTIONOFOPTIONS

  • 7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012

    55/167

    WILLIAMH.FARQUHARMIDDLESCHOOL HORDCOPLANMACHT

    ModernizationFeasibilityStudy 53

    OPTION

    TWO

    PROS

    &

    CONS

    Pros:

    NorelocationtotheTildenHoldingCenter Geothermalispossible Goodsolarorientationofbuildingplan Accesstoadjacentplayfields/parkamenitiesatproposednewpark Buildingisplacedinoptimallocationonsitesincesiteiscurrentlyundeveloped Buildingiszonedwellforafterhoursuse Threestorybuildingplanismorecompactallowingmorespaceonsiteforsportscourtsandfields

    Cons:

    Sanitarysewerisatthesouthendoftheexistingschoolproperty,requiringextensionupBatchellorsForestRoad Soccerandsoftballfieldsoverlap,allowinguseofonlyoneatatime Buildingisnexttoadjacentneighbor Threestorybuildinginthemiddleofafieldwouldnotbeinscalewithneighborhood Safety/supervisionofathreestorybuildingismoredifficultthanatwostorybuilding Accesstositeisviaexistingschoolsiteratherthannewcurbcutsperrequirementsofthe2005OlneyMasterPlanwhichcreates

    mixingofcarsandbussesastheyenterandexitthesite.(Notethisissuecouldbeeliminatedifanadditionalcurbcutisallowed)

  • 7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012

    56/167

    DESCRIPTIONOFOPTIONS

  • 7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012

    57/167

    WILLIAMH.FARQUHARMIDDLESCHOOL HORDCOPLANMACHT

    ModernizationFeasibilityStudy 55

    DESCRIPTIONOFOPTIONS

  • 7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012

    58/167

    WILLIAMH.FARQUHARMIDDLESCHOOL HORDCOPLANMACHT

    ModernizationFeasibilityStudy 56

    DESCRIPTIONOFOPTIONS

  • 7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012

    59/167

    WILLIAMH.FARQUHARMIDDLESCHOOL HORDCOPLANMACHT

    ModernizationFeasibilityStudy 57

    DESCRIPTIONOFOPTIONS

  • 7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012

    60/167

    WILLIAMH.FARQUHARMIDDLESCHOOL HORDCOPLANMACHT

    ModernizationFeasibilityStudy 58

    DESCRIPTIONOFOPTIONS

  • 7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012

    61/167

    WILLIAMH.FARQUHARMIDDLESCHOOL HORDCOPLANMACHT

    ModernizationFeasibilityStudy 59

    OPTION

    THREE

    PROS

    &

    CONS

    Pros:

    NorelocationtotheTildenHoldingCenter Geothermalispossible Goodsolarorientationofbuildingplan Accesstoadjacentplayfields/parkamenitiesatproposednewpark Buildingiszonedwellforafterhoursuse Threestorybuildingplanismorecompactallowingmorespaceonsiteforsportscourtsandfields

    Cons:

    Impactonlearningforthesixclassroomsadjacenttothenewconstruction Soccerandsoftballfieldsoverlap,allowinguseofonlyoneatatime Threestorybuildinginthemiddleofafieldwouldnotbeinscalewithneighborhood Sanitarysewerforcemainisrequired Safety/supervisionofathreestorybuildingismoredifficultthanatwostorybuilding Longerconstructiontimeframe(3years) Noise/dust/andgeneralconstructionactivityonanoccupiedschoolsite

  • 7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012

    62/167

    DESCRIPTIONOFOPTIONS

  • 7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012

    63/167

    WILLIAMH.FARQUHARMIDDLESCHOOL HORDCOPLANMACHT

    ModernizationFeasibilityStudy 61

    DESCRIPTIONOFOPTIONS

  • 7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012

    64/167

    WILLIAMH.FARQUHARMIDDLESCHOOL HORDCOPLANMACHT

    ModernizationFeasibilityStudy 62

    DESCRIPTIONOFOPTIONS

  • 7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012

    65/167

    WILLIAMH.FARQUHARMIDDLESCHOOL HORDCOPLANMACHT

    ModernizationFeasibilityStudy 63

    DESCRIPTIONOFOPTIONS

  • 7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012

    66/167

    WILLIAMH.FARQUHARMIDDLESCHOOL HORDCOPLANMACHT

    ModernizationFeasibilityStudy 64

    OPTIONFOUR PROS&CONS

    Pros:

    Geothermalispossible Goodabilityforsupervision/securitywithplanorganization Goodsolarorientationofbuildingplan Accesstoadjacentplayfields/parkamenitiesatproposednewpark Buildingisplacedinoptimallocationonsitesincesitewillbeunoccupied Buildingiszonedwellforafterhoursuse Buildingdoesnotaffectadjacentneighbor

    Cons:

    RelocationtotheTildenHoldingCenter Impacttostudentsandparentsforafterschoolactivities Lengthybusridehasimpactonstudentacademicperformance Increasedtransportationcosts Unpredictabilityoftraffic/congestiontoTildenHoldingCenter Heavilyreducedparentinvolvement Sanitarysewerforcemainisrequired Soccerandsoftballfieldsoverlap,allowinguseofonlyoneatatime CostsforfuelfortransportingstudentstoTildenHoldingCenter

  • 7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012

    67/167

    DESCRIPTIONOFOPTIONS

  • 7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012

    68/167

    WILLIAMH.FARQUHARMIDDLESCHOOL HORDCOPLANMACHT

    ModernizationFeasibilityStudy 66

    DESCRIPTIONOFOPTIONS

  • 7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012

    69/167

    WILLIAMH.FARQUHARMIDDLESCHOOL HORDCOPLANMACHT

    ModernizationFeasibilityStudy 67

    DESCRIPTIONOFOPTIONS

  • 7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012

    70/167

    WILLIAMH.FARQUHARMIDDLESCHOOL HORDCOPLANMACHT

    ModernizationFeasibilityStudy 68

    DESCRIPTIONOFOPTIONSOPTIONFIVE PROS&CONS

  • 7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012

    71/167

    WILLIAMH.FARQUHARMIDDLESCHOOL HORDCOPLANMACHT

    ModernizationFeasibilityStudy 69

    Pros:

    Geothermalispossible Goodsolarorientationofbuildingplan Accesstoadjacentplayfields/parkamenitiesatproposednewpark Buildingisplacedinoptimallocationonsitesincesitewillbeunoccupied Buildingiszonedwellforafterhoursuse Buildingdoesnotaffectadjacentneighbor

    Cons:

    RelocationtotheTildenHoldingCenter Impacttostudentsandparentsforafterschoolactivities

    Lengthybus

    ride

    has

    impact

    on

    student

    academic

    performance

    Increasedtransportationcosts Unpredictabilityoftraffic/congestiontoTildenHoldingCenter Heavilyreducedparentinvolvement Sanitarysewerforcemainisrequired Safety/Supervisionoftheplanmoredifficultthanotheroptions Soccerandsoftballfieldsoverlap,allowinguseofonlyoneatatime Longwalktopublicentrance,requiresalongcanopy CostsforfuelfortransportingstudentstoTildenHoldingCenter

    VI.RECOMMENDATIONS

  • 7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012

    72/167

    WILLIAMH.FARQUHARMIDDLESCHOOL HORDCOPLANMACHT

    ModernizationFeasibilityStudy 70

    Although Option 1 was the Facility Advisory Committees preferred option, MCPS staff believes that Option 2 provides a smaller

    footprint,amoreefficientbuilding,andmoresitespaceforamenities.

    VII.PROJECTIMPLEMENTATIONSCHEDULE

  • 7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012

    73/167

    WILLIAMH.FARQUHARMIDDLESCHOOL HORDCOPLANMACHT

    ModernizationFeasibilityStudy 71

    TWO

    YEAR

    IMPLEMENTATION

    SCHEDULE

    (OPTIONS:

    1,

    2,

    4,

    &

    5)

    THREEYEARIMPLEMENTATIONSCHEDULE(OPTION3)

    APPENDIXA:EDUCATIONALSPECIFICATIONS

    TableofContents PageNo.

  • 7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012

    74/167

    WILLIAMH.FARQUHARMIDDLESCHOOL HORDCOPLANMACHT

    ModernizationFeasibilityStudy A1

    Introduction A2

    SquareFootSummary A3

    GeneralPlanningConsiderations A10

    TechnologyFramework A13

    DescriptionofFacilities A14

    StandardClassrooms A 14

    ComputerLaboratory A 15

    ScienceLaboratories A 16InstructionalSupportRooms A 19

    SpecialEducationFacilities A 21

    MusicSuite A 23

    VisualArtsSuite A 26

    MultipurposeTechnology A 28

    MultipurposeLaboratory A30

    PhysicalEducation A 32

    ComputerSupport A39InstructionalMediaCenter(IMC) A 40

    MultimediaProductionRoom A 44

    StudentActivitiesFacilities A 45

    AdministrationSuite A 46

    GuidanceSuite A49

    HealthServicesSuite A 50

    StaffRoom A 54

    Cafeteria A 55Kitchen A57

    BuildingServiceFacilities A 60

    SiteRequirements A 64

  • 7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012

    75/167

    EDUCATIONALSPECIFICATIONSWilliamH.FarquharMiddleSchool

    Square Foot Summary

  • 7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012

    76/167

    WILLIAMH.FARQUHARMIDDLESCHOOL HORDCOPLANMACHT

    ModernizationFeasibilityStudy A3

    SquareFootSummary

    Whenthisprojectiscomplete,thefollowingspacesaretobeprovided:

    Capacityaftermodernizationwillbe793.

    Net TotalNet

    Facility # Sq.Ft. Sq.Ft.

    English/ForeignLanguage/Math/SocialStudies

    Classroom 14 900 12600

    ComputerLaboratory 3 950 2850

    Science

    Laboratory 6 1300 7800

    Prep/Project/Storage 3 250 750

    ChemicalStorage 1 250 250

    OtherInstructionalSupportAreas

    TeamResourceCenter/Workroom 8 300 2400

    InterdisciplinaryTextbookStorage 3 150 450

    DepartmentalTextbookStorage 3 150 450

    ForeignLanguageTextbookStorage 1 150 150

    InstructionalDataAssistantRoom 1 400 400

    DevelopmentalReading 1 600 600

    ESOLClassrooms

    ESOLClassrooms 1 600 600

    EDUCATIONALSPECIFICATIONS

    Net Total Net

  • 7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012

    77/167

    WILLIAMH.FARQUHARMIDDLESCHOOL HORDCOPLANMACHT

    ModernizationFeasibilityStudy A4

    Net TotalNet

    Facility # Sq.Ft. Sq.Ft.

    SpecialEducation

    SpecialEducationClassrooms(LAD) 3 900 2700

    SpecialEducationClassrooms(SCB) 1 900 900

    SpecialEducationClassrooms(LFI) 2 900 1800

    SpecialEducationTeamRoom 1 300 300

    ResourceRoom 1 800 800

    Speech&LanguageTherapySupportRoom 1 250 250

    MusicSuite

    InstrumentalMusicRoom 1 1900 1900

    GeneralMusic/ChoralRoom 1 1000 1000

    General/ChoralStorage 1 250 250

    MusicOffice 1 150 150

    VisualArtsSuite

    ArtRoom 1 1300 1300

    Storage 1 350 350

    KilnRoom 1 150 150

    EDUCATIONALSPECIFICATIONS

    Net TotalNet

    F ilit # S Ft S Ft

  • 7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012

    78/167

    WILLIAMH.FARQUHARMIDDLESCHOOL HORDCOPLANMACHT

    ModernizationFeasibilityStudy A5

    Facility # Sq.Ft. Sq.Ft.

    Laboratories

    MultiPurposeTechnologyLaboratory 1 1600 1600

    ComputerTechnologyLaboratory 1 900 900

    MultiPurposeLaboratory 1 1600 1600

    PhysicalEducation

    Gymnasium(Equals

    2teaching

    stations)

    1

    6800

    6800

    AuxiliaryGym(Dance/Wrestling) 1 1600 1600

    AuxiliaryGym(Fitness/WeightRoom) 1 1600 1600

    HealthClassroom 1 900 900

    LockerRooms 2 1650 3300

    StorageRooms 2 100 200

    ToiletRooms 2 150 300

    Shower/DryingRooms 2 250 500

    LaundryRoom 1 150 150

    Offices 2 300 600

    GeneralStorage 2 650 1300

    OutdoorStorage 1 200 200

    ICBStorage 1 100 100

    ComputerSupport

    StorageRoom/OfficeArea 1 150 150

    WireClosets 4 50 200

    HeadEndRoom 1 25 25

    EDUCATIONALSPECIFICATIONS

    N T l N

  • 7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012

    79/167

    WILLIAMH.FARQUHARMIDDLESCHOOL HORDCOPLANMACHT

    ModernizationFeasibilityStudy A6

    Net TotalNet

    Facility # Sq.Ft. Sq.Ft.

    ComputerSupport

    StorageRoom/OfficeArea 1 150 150

    WireClosets 4 50 200

    HeadEndRoom 1 25 25

    InstructionalMediaCenter

    ReadingRoom 1 3200 3200

    ListeningViewingProjectArea 2 200 400

    DirectInstructionalArea 1 300 300

    Workroom/MaterialsPrep.Room 1 450 450

    Office 1 200 200

    TechnologyInformationAccessCenter 1 500 500

    Storage,MediaGeneral 1 600 600

    Storage(UpperFloor) 1 200 200

    NetworkDistributionCenter(LAN) 1 60 60

    MultimediaProductionRoom 1 950 950

    StudentActivities

    SchoolStore 1 200 200

    StudentGovernmentStorageCloset 1 100 100

    EDUCATIONALSPECIFICATIONS

    Net Total Net

  • 7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012

    80/167

    WILLIAMH.FARQUHARMIDDLESCHOOL HORDCOPLANMACHT

    ModernizationFeasibilityStudy A7

    Net TotalNet

    Facility # Sq.Ft. Sq.Ft.

    AdministrationSuite

    GeneralOffice 1 700 700

    Principal'sOffice 1 250 250

    AssistantPrincipal'sOffice 3 150 450

    StudentSupportSpecialistOffice 1 150 150

    AdministrativeSecretary'sOffice 1 150 150Workroom/Storage/ToiletArea 1 500 500

    Storage 1 100 100

    ConferenceRoom 1 300 300

    CopierWorkroom 1 200 200

    InSchoolSuspensionRoom 1 400 400

    FinancialSecretary'sOffice 1 150 150

    StaffDevelopmentOffice 1 200 200

    SecurityOffice 1 150 150

    TestingRoom 1 150 150

    GuidanceSuite

    Counselor'sOffice 4 150 600

    WaitingRoom 1 250 250

    ConferenceRoom 1 300 300

    RecordsRoom 1 125 125

    EDUCATIONALSPECIFICATIONS

    Net Total Net

  • 7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012

    81/167

    WILLIAMH.FARQUHARMIDDLESCHOOL HORDCOPLANMACHT

    ModernizationFeasibilityStudy A8

    Net TotalNet

    Facility # Sq.Ft. Sq.Ft.

    HealthSuite

    WaitingRoom 1 100 100

    Treatment/MedicationArea 1 125 125

    Office/HealthAssessmentRoom 1 100 100

    HealthAssessment/IsolationRoom 1 100 100

    RestArea 2 100 200ToiletRoom2 2 50 100

    Storage 1 40 40

    StaffFacilities

    StaffRoom 1 950 950

    StudentDining

    StudentDiningArea 1 5000 5000

    Stage 1 1500 1500

    Storage 1 300 300

    ChairStorage 1 400 400

    EDUCATIONALSPECIFICATIONS

    Net Total Net

  • 7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012

    82/167

    WILLIAMH.FARQUHARMIDDLESCHOOL HORDCOPLANMACHT

    ModernizationFeasibilityStudy A9

    Net TotalNet

    Facility # Sq.Ft. Sq.Ft.

    KitchenArea

    FoodPreparation 1 900 900

    DryFoodStorage 1 350 350

    Refrigerator 1 125 125

    Freezer 1 225 225

    ServiceArea(4servicelines) 1 950 950Office 1 100 100

    Locker/ToiletRoom 1 120 120

    LoadingPlatform 1 125 125

    ReceivingArea 1 100 100

    ChemicalStorageRoom 1 48 48

    BuildingServiceFacilities

    BuildingServicesOffice 1 150 150

    Locker/ShowerArea 1 250 250

    PlantEquipmentOperatorOffice 1 75 75

    Compactor/TrashRoom 1 250 250

    RecyclingRoom 1 250 250

    ReceivingandStorageArea 1 800 800

    GeneralStorageRooms 2 250 500

    BuildingServicesOutdoorStorage 1 250 250

    TOTALNETSQUAREFOOT 40 88393

  • 7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012

    83/167

  • 7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012

    84/167

    EDUCATIONALSPECIFICATIONS Thelocationofwhiteboardsandtackboardsshouldrelatetoclassroomseatingandwindows.Thelocationofbulletinboardsandshowcases

    shouldrelatetoteamgroupingsandadministrativeareas.

  • 7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012

    85/167

    WILLIAMH.FARQUHARMIDDLESCHOOL HORDCOPLANMACHT

    ModernizationFeasibility

    Study

    A12

    Thenumberoflockersinthecorridorshouldbeequaltothecorecapacityplus10%ofthecorecapacity.

    Landscapingistobeincluded.Plantingistoincludescreenplantingandthatneededforerosioncontrol.Plantingsforsidewalks,andwooded

    andfloweredareas,aretobesituatedtoenablethephysicaleducationprogramtobecarriedonwithoutunduedisturbancetotheclassrooms.

    Other landscaping to support energy conservation and to relate the building to the site with aesthetic appeal must be included. Note:

    Landscapingmustbeminimal,tastefulandallowforeasymaintenance.

    Spacesthatservenorealeducationalfunction,suchascorridors,shouldbelimitedwhileatthesametimeassuringaneasytosuperviseandsmoothflowofpupiltraffictoandfromtheinstructionalmediacenter,multipurposeroom,gymnasium,specializedcenters,andsupportrooms.

    Carpetingshouldbelimitedtotheprincipalsoffice,assistantprincipalsofficeandconferenceroomintheadministrationsuiteandthemain

    readingroomoftheinstructionalmediacenter.

    Allstudentoccupiedspacesmustbeabletobesupervisedfromthecorridororanadjacentspace.

    Theshapeoftheclassroomandthedesignofbuiltin featuresandstorageareasshouldprovideoptimumnetusablefloorarea.Elongatedroomsandfeaturesthatprotrudeintofloorarea,limitingflexibility,aretobediscouraged.Rectangularshapedclassroomsarepreferred.

    Theclassroomsshouldbedesignedtoaccommodatevarioussizegroups.Eachclassroomshouldbereadilyadaptableforgroupwork,various

    presentationformats,andshouldhavemaximumconnectivitytooutsideresources.

    Metaladjustableshelvingistobeprovidedinallbuildingstorageclosets. AllplanreviewswillbecoordinatedthroughtheDivisionofConstruction.

    Specialconsiderationmustbegiventoenergyconservationincludingtotallifecyclecosts.ThecurrentMarylandStateDepartmentofGeneral

    Service(DGS)requirementswillbeappliedasdesigncriteria.LifecyclecostaccountinginaccordancewithDGScriteriaisrequired.

    EDUCATIONALSPECIFICATIONS

    TechnologyFramework

  • 7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012

    86/167

    WILLIAMH.FARQUHARMIDDLESCHOOL HORDCOPLANMACHT

    ModernizationFeasibility

    Study

    A13

    Thelatesttechnologyshouldbeintegratedintoeveryaspectofbuilding.ThearchitectshouldconsultwiththeOfficeofChiefTechnologyOfficer

    (OCTO)andtheDivisionofConstruction(DOC)forthelatesttechnologyrequirements.Thearchitectmustataminimumplanforthefollowing

    elements.

    Throughtheuseoflocalareaandwideareacomputerandvideonetworks,studentsshouldhaveaccesstoeachother,toschoolsthroughout

    thecountywithsimilarcapabilities,andtouniversitiesandgovernmentinstitutionsthroughouttheworld.

    Eachclassroomistohaveadedicated20ampelectricalcircuitservingfiveelectricaloutletsforcomputerslocated3'apartalongthebackor

    sidewall.

    Computernetworkoutlets (CNOs)consistingofa flushmountedstandardelectricalboxwith11/2"conduit to theceilingspaceoverhead

    shouldbelocatedinallclassrooms,offices,andotherworklocationsaccordingtothefollowinggeneralrules:

    oneCNOontheteachingwalloftheclassroomunderthelocationforaPrometheanBoardandadjacenttoanelectricaloutlet

    asecondCNOshouldbelocatedinthebacksideofeachclassroomadjacenttothefivecomputerelectricaloutletsconnectedtothededicated

    circuit

    oneCNOperoffice,resourceroom,planningroom,etc.adjacenttotelephoneoutlet

    MultipleCNOsinmediacenteratcirculationdesk,referenceareas,etc.

    oneCNOateachsciencelabworkstation

    Allotherareassuchasthestage,bookstore,diningroom,etc.,wherecomputersmightbeused.

    Thenumberandlocationoftelecommunicationclosetsrequiredtosupportthebuildingwidecomputernetworkisdependentonthesizeand

    geometryofthebuilding.Thelayoutofthetelecommunicationclosetswillbedeterminedduringthedesignphaseoftheproject.

    EDUCATIONALSPECIFICATIONS

    Description of FacilitiesThe following is an approach to the design of new and modernized schools. Please refer to the summary of spaces for the square foot

    i f h d ib d b l S f ll i h ld b id d h d d b f ll d l h h i

  • 7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012

    87/167

    WILLIAMH.FARQUHARMIDDLESCHOOL HORDCOPLANMACHT

    ModernizationFeasibility

    Study

    A14

    requirements for each space described below. Squarefoot allocations should be considered the standard to be followed, although minordeviationsareallowed.

    Standard Classrooms Classroomsshouldbearranged tosupportthegrade levelteamorganization formiddleschools.Eachgrade'sareaofthebuildingalsowill

    havetwoorthreesciencelaboratoriesandvariousinstructionalsupportspaces.

    Eachclassroomshouldbedesignedasfollows:

    Alockableteacher'scloset,asperDOCconstructionstandards,istobeprovidedforgeneralsupplystorage,personalstorage,andwardrobe. Bookstorageshouldbelocatedalongthewindowwallwithhalfofthecabinetsequippedwithhinged,lockabledoors.Aminimumof60linear

    feet shouldbeprovided forbook storage.The topsof these cabinetswill serveas counter space,which shouldbeatworktopheight.The

    counterspaceatthebackoftheroomshouldbedesignedwithkneeholesforuseforcomputersandprinters,andhaveelectricoutletsabove

    thecounters.

    Eachclassroomshouldhavebetween28and40feetofwhiteboardandabout20feetoftackboard.Mainteachinglayoutwillbedesignedin

    accordancewithDOCconstructionstandards.

    Map

    rails

    and

    tack

    rails

    are

    to

    be

    placed

    above

    all

    whiteboards.

    Hooks

    suitable

    for

    hanging

    drawing

    instruments

    are

    to

    be

    placed

    beneath

    the

    whiteboardsineachacademicclassroom.

    Oneflagholderattachmentistobeplacedonallmaprailswithfourtosixmapholders.Twoinchcorktackrailsshouldbeplacedinavailable

    spaceinallteachingspacesandinallcorridors.

    Eachclassroomshouldbeequippedwithtwoinchblinds.

    EDUCATIONALSPECIFICATIONS

    Computer Laboratory

  • 7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012

    88/167

    WILLIAMH.FARQUHARMIDDLESCHOOL HORDCOPLANMACHT

    Modernization

    Feasibility

    Study

    A

    15

    Onecomputerlaboratoryshouldbedesignedineachgradelevelareaofthebuilding.

    Eachcomputerlaboratoryistoaccommodate32studentworkstations.

    Fileserverandprintersaretobelocatednearteachersdeskorinoffice.

    Electricalservicetothecomputer labsshouldbe isolated fromcircuitsthatpowerairconditioning,heavydutyelectricmotors,kilns forartclasses,and,ingeneral,anydeviceordevicesthatdrawheavilyonelectriccurrent.

    Inordertomaximizeafterhoursuse,thecomputercomplexistohaveaselfcontainedairconditioningsystem.

    Thecomputerlaboratoriesaretohavewhiteboardandtackboard.

    ElectricalanddataoutletsshouldbeprovidedintheceilingforaceilingmountedLCDprojector.

    ThearchitectshouldconsultwiththeOCTO/DOCforthelatesttechnologyrequirements.

    EDUCATIONALSPECIFICATIONS

    ScienceLaboratories

    S ti l N d

  • 7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012

    89/167

    WILLIAMH.FARQUHARMIDDLESCHOOL HORDCOPLANMACHT

    Modernization

    Feasibility

    Study

    A

    16

    SpatialNeeds

    Laboratory

    Preparation/Project/StorageRoom

    ChemicalStorage

    Sciencelaboratoriesshouldbedesignedinpairs,withinteamareas,withpreparation/projectandstorageroomsadjacent,preferablybetween

    pairsoflabs.

    Ifthesciencelabsareonseparatefloorsofthebuilding,theyshouldbelocatednearanelevator.

    Theteachingwallshouldbeononeofthelongwallsofthelaboratory.

    ThearchitectalsoshouldrefertotheMSDEdocument,ScienceFacilitiesDesignGuidelines,1994whendesigningthesciencelaboratories. Theseroomsserveasalecture/laboratoryspaceandshouldbeequippedwiththebasicequipmentaslistedbelow.

    Eachsciencelabshouldhavetwoexits.

    Sevenislandstyleworktableswithhotandcoldwater,electricity,andgasaretobeprovided.

    Onemobilebench(drysinktype)shouldbelocatedunderwindowsineachlabtofacilitateworkwithplants. A threebyfivefootdemonstration tableshouldbe locatedat the frontof the room.Thisdemonstration tableshouldbeequippedwitha

    stonesink,hotandcoldrunningwater,gas,andelectricity.

    Twentyfourfeetofwhiteboardandadequatetackboardarerequired.Wiringforaprometheanboardshouldbeprovidedinthecenterofthe

    whiteboard.

    Twofourfootprojectcabinetsandtwofourfootstoragecabinets,alllockable,aretobelocatedineachroom.

    Allroomsaretobecapableofcompletedarkening.

    Eachlabshouldhaveafumehoodandadequateventilation.

    Eachroomshouldbewiredfortieintotheschoolcomputernetworkateachlabstation.

    Thereshouldbeamastercutoffswitchforgas,water,andelectricineachroom.Themastercutoffswitchshouldbestrategicallylocatedso

    thatitisnotoverlyaccessibletostudents,andshouldnotbelocatedneartheexitdooroftheclassroom.Thecutoffsshouldoperateelectrically

    EDUCATIONALSPECIFICATIONS(aspanicbuttons)withavisiblelightindicatorforgasandelectric.

    A safety station must be installed with shower eyewash and drain

  • 7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012

    90/167

    WILLIAMH.FARQUHARMIDDLESCHOOL HORDCOPLANMACHT

    Modernization

    Feasibility

    Study

    A

    17

    Asafetystationmustbeinstalled,withshower,eyewash,anddrain.

    In accordance with ADA guidelines, at least one science lab station in each laboratory should be made accessible to individuals with

    disabilities.

    Cabinetryforstorageoflaboratoryequipmentandmicroscopesshouldbeprovidedinallofthelabs.

    Asanitizinggogglecabinetshouldbeprovidedforalllabs.

    Ateacherswardrobeshouldbeprovided.

    Alocationshouldbeidentifiedforafilecabinet.

    Lockswithacommonkeyaretobeprovidedondrawersinspecialareasandtheteacherdemonstrationtable.

    ElectricalanddataoutletsshouldbeprovidedintheceilingforaceilingmountedLCDprojector.

    Twopulldownelectricaloutletfixturesshouldbeprovidedineachlab:oneinthecenter,oneintherear.

    Preparation/Project/StorageRooms Theseroomsaretofacilitatethepreparationofstudentprojectsandshorttermstorageofprojects,aswellastoprovidegeneralstorage.

    Eachroomistocontainadjustablelockedstorageandcounterfacilities,electricalhookupandspaceforarefrigerator.

    Easyaccessibilitytothescienceroomsisimportantandisarequiredforvisualcontroloftheroomsfromadjacentrooms.

    ChemicalStorageRoom Thisstorageroomshouldbelocatedadjacenttothe7thand8thgradesciencelabsandmustmeetcoderequirementsforchemicalstorage

    including:

    Thisroommusthavea24hour,365dayperyearexhaustsystemventeddirectlytotheoutsideincompliancewiththelatestapplicablecodes.

    Itshouldincludenoncorrosivewoodenshelvingwithlips,flammablecabinetandacidcabinet.

    EDUCATIONALSPECIFICATIONS

    Theseroomsshouldcontainsinksequippedwithhotandcoldrunningwaterandafloordrainandworkbenchesequippedwithelectricaland

    gas outlets

  • 7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012

    91/167

    WILLIAMH.FARQUHARMIDDLESCHOOL HORDCOPLANMACHTModernizationFeasibilityStudy A18

    gasoutlets.

    Spaceandutilitiesshouldbeprovidedineachpreproomforadishwasher.

    Emergencyshutoffandtelephoneshouldbelocatedinthechemicalstorageandpreproomonly.

    EDUCATIONALSPECIFICATIONS

    InstructionalSupportRooms

    Spatial Needs

  • 7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012

    92/167

    WILLIAMH.FARQUHARMIDDLESCHOOL HORDCOPLANMACHTModernizationFeasibilityStudy A19

    SpatialNeeds

    TeamWorkroom

    InterdisciplinaryTextbookStorageRoom

    DepartmentalTextbookStorageRoom

    ForeignLanguageTextbookStorageRoom

    InstructionalDataAssistantRoom

    DevelopmentalReadingRoom

    ESOLCLassrooms

    TeamWorkroom Twoteamresourcecenter/workroomsaretobeprovidedforeachgradelevel,providingspaceineachforteacherdesksoralargeconference

    table.

    Theseroomsshouldbelocatednexttoeachotherandhaveaninterconnectingdooranda4'x6'windowwithblindsbetweenoneanother.

    Atelephonewillbelocatedintheserooms.

    Storageandopen/closedbookshelvestostoreteachingsuppliesandinstructionalmaterialsshouldbeprovided.

    Aworkcounterwithsinkandelectricoutletsisneeded.

    Threefeetoftackboardandfourfeetofwhiteboardarerequired.

    Wiringforfourcomputersineachteamroomisrequired.

    InterdisciplinaryTextbookStorageRoom

    Aninterdisciplinarytextbookstorageroomistobeprovidedforeachgradelevelandistobeeasilyaccessiblefromtheclassroomsandtheteamworkroomandshouldhaveadjustablebuiltinshelving.

    TheseroomsmusthaveadequateHVACandlightingforflexibleusebystaffasofficespace.

    Securestorageforcomputersshouldbeprovidedwithinthisspaceandshouldincludeadequateelectricpowerforrechargingbattery

    poweredlaptopcomputers.

    EDUCATIONALSPECIFICATIONS

    DepartmentalTextbookStorageRoom Threedepartmentaltextbookstorageareasaretobeprovidedwiththesamerequirementsastheinterdisciplinarytextbookstoragerooms.

  • 7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012

    93/167

    WILLIAMH.FARQUHARMIDDLESCHOOL HORDCOPLANMACHTModernizationFeasibilityStudy A20

    p g p q p y g

    ForeignLanguageTextbookStorageRoom Aforeignlanguagetextbookstorageroommustbecentrallylocatednearthe7thand8thgradesforforeignlanguagematerials.

    ItneedstohaveadequateHVACforflexibleuseasofficespaceforstaff.

    InstructionalDataAssistantRoom Theroomneedstobecentrallylocated,isrequiredforanaidewhoconductsassessmentsandupdatesindividualstudentrecords.

    Securestorageforschoolwiderecordsandmaterialsshouldbeincluded.

    Theroomshouldbewiredforacomputerwithprinter.

    Thisroomneedsatelephone.

    Atackboardshouldbeinstalled.

    Developmental

    Reading

    Room

    Thedevelopmentalreadingroomshouldbecentrallylocated.

    Thisroomisrequiredtofacilitateinstructioninreadingcompositionstudyskills.

    Spaceforsmallgroupworkinreadingalsoisconductedinthisroom.

    Twelvefeetofwhiteboardandtwelvefeetoftackboardshouldbeprovided.

    ESOLClassrooms The ESOL classrooms shouldbe located in theacademicareasof thebuilding andbedesignedwith the same requirementsasa regular

    classroom.

    EDUCATIONALSPECIFICATIONS

    SpecialEducationFacilities

    SpatialNeeds

  • 7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012

    94/167

    WILLIAMH.FARQUHARMIDDLESCHOOL HORDCOPLANMACHTModernizationFeasibilityStudy A21

    p

    SpecialEducationClassrooms

    TeamWorkroom

    ResourceRoom

    SpeechandLanguageRoom

    OccupationalTherapy/PhysicalTherapyRoom

    Storage(textbooksandinstructionalmaterials)

    FileSpace

    (Secured)

    SpecialEducationClassrooms Thespecialeducationclassroomsshouldbelocatedintheacademicareasofthebuildingandbedesignedwiththesamerequirementsas

    regularclassrooms.

    TeamWorkroom Theteamworkroomshouldbedesignedexactlyliketheteamroomsintheregulareducationareasbutshouldbelocatedadjacenttothe

    supportsuite.

    ResourceRoom Thespecialeducationresourceroomneedsopenshelving,counterspace,andclosedstorage.

    TheroomistobesufficientlywiredtoaccommodateAVequipment,computers,andhavetackandwhiteboard.

    Itshouldbelocatedinassociationwiththeacademicclassrooms.

    SpeechLanguageRoom Thisroomrequiresawhiteboard,tackboard,openandclosedlockablestorage,openshelving,andalockableteacherwardrobe.

    Roomforateacher'sdesk,lockablefilecabinet,andtabletoworkwithsmallgroupsofstudentsisrequired.

    Thespeech/languageroomshouldbewiredforaccesstoonecomputerworkstationeach.

    EDUCATIONALSPECIFICATIONS

    Thespeechroommustbelocatedonthefirstfloorandbeacousticallytreated.

    Thespeechroomneedsa4x4mirrormountedtothewall.

  • 7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012

    95/167

    WILLIAMH.FARQUHARMIDDLESCHOOL HORDCOPLANMACHTModernizationFeasibilityStudy A22

    Thespeechroomrequiresasinkwithcounterspace.

    OccupationalTherapy/PhysicalTherapy(OT/PT)Room

    Eachroommusthavewhiteboardthatismountedtwofeetoffthefloor.

    Atackboard,openandclosedlockablestorage,openshelving,andalockableteacherwardrobearerequired.

    AsinkwithcounterspaceisrequiredintheOT/PTroom.

    Roomforateacher'sdesk,lockablefilecabinet,andassortedsizedfurniturewithadjustablelegsshouldbeprovided.

    TheOT/PTroomsshouldbewiredforaccesstoonecomputerworkstationeach.

    TheOT/PTrequiresaceilingmountedhookforaswing.

    TheOT/PT room requires lockable storagewith sufficientarea tohouse largegrossmotorequipment (minimumof35 square feet) suchas

    therapyballs,scooterboards,walkers,balancebeams,ramps,etc.

    EDUCATIONALSPECIFICATIONS

    MusicSuite

    Spatial

    Needs

    Instrumental Music Room (with approximately 400 sq. ft. of perimeter storage)

  • 7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012

    96/167

    WILLIAMH.FARQUHARMIDDLESCHOOL HORDCOPLANMACHTModernizationFeasibilityStudy A23

    InstrumentalMusicRoom(withapproximately400sq.ft.ofperimeterstorage)

    General/ChoralMusicRoom

    General/ChoralStorageRoom

    MusicOffice

    Themusicareashouldbeatthesame levelasthestage, ifpossible,tofacilitatethemovementofequipmentfromthemusicroomstothe

    stage.

    Eachroomistobeacousticallyisolatedfromtherestoftheschoolandthegeneral/choralandinstrumentalareasseparatedbyanacousticalbarrierorwallwithaSoundTransmissionClassification(STC)of50ormore.

    Listening isan importantskill related tomusiceducation,and thus theneed forquietventilation.Therefore,noisecriterion (NC) levelsof

    lightingandventilatingsystemsmustnotexceedNC25forthelargerehearsalroomsandNC30forthepracticerooms

    BothmusicroomsmusthaveaccesstoallcomputertechnologyincludingtheLAN,andbeequippedforamultimediastation.

    Awaterfountainshouldbelocatedinthemusicsuite.

    InstrumentalMusic

    Theinstrumentalmusicroommusthavealevelfloor.

    Thespecified1,900squarefeetisaminimumrequirementandmustnotbereducedtoaccommodateotherdesignneeds.

    400squarefeetoftheinstrumentalmusicroomshouldaccommodateWengertypecagesforinstrumentstoragearoundtheperimeterwalls

    oftheroom.Theroomdepthmaybevariedifitwillprovidebetteracoustics.

    Acoustical treatmentandcarpeting isneededso that the room issoundengineered forabandwithmaximum sizeof80membersanda

    decibellevelinthesaferange,keepinginmindthatthetypicalbandproducesdecibelsinthe100120range.

    A16footceilingisnecessarytoobtainpropervolume.

    EDUCATIONALSPECIFICATIONS Nosupportingpillarsorfabricfoldingdoorsaretobeusedintheroom.

    Anoutsideentranceshouldbenear,butnotin,themusicsuiteifpossible.

    Approximately 80 square feet should be devoted to an acoustically treated room located in the rear and side area that can double as two

  • 7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012

    97/167

    WILLIAMH.FARQUHARMIDDLESCHOOL HORDCOPLANMACHTModernizationFeasibilityStudy A24

    Approximately80square feetshouldbedevoted toanacousticallytreatedroom located intherearandsidearea thatcandoubleastwo

    practiceroomsandforpercussionstorage.Afourfootdoorandsecuritylockshouldbeprovidedsothatheavyequipmentmayberolledoutfor

    rehearsalsandrolledbackintotheroomfornightstorage.

    Whiteboardandtackboardmustbeprovided.

    Bookcasesandamusic foldercabinet shouldbe includedonone sideof the room.Thebandmusic folder cabinet shouldbehorizontally

    slottedwith150slotstohold14"x12"folderswithfacilitiesfornumberingeachcompartment.

    Twomicrophonesshouldbehungfromretractableceilingmountedfixturesforusewithrecordingequipment.

    Asinkisneededforcleaninginstruments.

    General/ChoralMusicRoom Thegeneral/choralmusicroomistohaveaceilingofapproximately16feet.

    Thedimensionsshouldbeapproximately38'x27'.

    Theentranceshouldbeadoubleentrydoor.

    Theroom istoseatapproximately80studentsandbeonone level.Theroomshouldbedesigned toaccommodatetwoseparateteaching

    areasoneforchoralmusicandtheotherforComputerAssistedGeneralMusicProgram(electronickeyboards).

    The room shouldhaveawhiteboardalong the front (longaxis)of the room, large tackboardsoneither sideof the roomwithbookcases

    beneathononeside,andblackoutblindsandwallscreen.

    Heavydutyceilingtilesshouldbeusedtoassuremaximumlossinsoundtransmission.Acousticaltreatmentistoprovideasoundtransmissionlossofatleast50decibelsandareverberationtimeofbetween1.2and1.6seconds.

    Adequateventilationisneeded.

    EDUCATIONALSPECIFICATIONS

    Amusicfoldercabinet,horizontallyslotted,withlockingdoors,withatleast100horizontalcompartments(15incheshigh,2incheswide),and

    withfacilitiesfornumberingeachcompartmentisrequired.

  • 7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012

    98/167

    WILLIAMH.FARQUHARMIDDLESCHOOL HORDCOPLANMACHTModernizationFeasibilityStudy A25

    General/ChoralStorageRoom

    Thegeneral/choralstorageroomshouldbeadjacenttoandhaveaccessfromboththegeneral/choralroomandtheinstrumentalmusicroom.

    Cabinetrymustbeadequatetostore20electronickeyboardsand33guitarsinspaces6incheshigh,40inchesdeep,and16incheswide.Thecabinetsshouldbecarpetedtoprotecttheinstrumentsfromscratching.

    Theroomshouldbearrangedsothataportionofitmaybeusedasapracticeroomwithapiano,asastorageareaforchoralmusicfile

    cabinets,andforstoragefordrums,etc.

    Maximumsecuritydoorswithupgradedlocks aretobeprovided.

    Afourfootdoorisrequired.

    MusicOffice

    Themusicofficemustbelocatedbetweentheinstrumentalandthegeneral/choralroom.

    Atelephoneistobeprovided.

    Cabinetryistobeprovidedforstorage.

  • 7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012

    99/167

    EDUCATIONALSPECIFICATIONS

    Eachclassroomshouldbeequippedwitharetractableprojectionscreen(7x7).Theprojectionscreenshouldnotbemountednearany

    emergencylightingtracks.Allareasofthescreenshouldbeilluminatedandreadablewhenthelightsaredimmed.

    ElectricalanddataoutletsshouldbeprovidedintheceilingforaceilingmountedLCDprojector.

  • 7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012

    100/167

    WILLIAMH.FARQUHARMIDDLESCHOOL HORDCOPLANMACHTModernizationFeasibilityStudy A27

    Openspaceshouldbeprovidednearthesinkforpotterswheelorcomputercarts.

    Ampleelectricaloutlets,approximatelyevery4shouldbeprovided.

    Openandclosedshelvesaretobeprovidedforstorageofartprojects,flammablematerials,andreferencebooks.

    Openspaceistobeprovidedintheartroomforthreebanksofblueprintcabinetsandtwodryingracks(NIC).

    Blackout

    facilities

    are

    to

    be

    included

    on

    windows.

    Storeroom

    Thisroomshouldbedesignedwithwindowstotheartroom.

    Asmuchopenshelvingaspossibleshouldbeprovidedinthisroom.

    Spaceshouldbeprovidedforteachers'files.

    Immediatelyinsidetheentrancetothestoreroom,aworktable6feetwide,30inchestall,34inchesdeepshouldbeprovidedwithbuiltin

    adjustableshelvesbelowand14inchdeepwallhungshelvesabove.Thistablewillaccommodatea30inchsquarepapercutterandstorageof

    largeartreproductionsandpapersbelow,in3banksofshelvingunits8inchesoncenter,20incheswide(insidewidth).

    Thestoreroomdoorshouldbelockable,and2coathooksaretobemountedbehindthedoor.

    KilnRoom

    Thekilnroomshouldbedesignedasfollows:

    Equippedwithspaceandutilitiesfor2kilns(tobeincluded)andanexhaustfanhood.

    18"deeptallmetalshelving.

    Asprayboothwithexhaust.

    Asmallworktablewithshelvesaboveandbelow.

    EDUCATIONALSPECIFICATIONSMultiPurposeTechnology

    SpatialNeeds

    MultipurposeTechnologyLaboratoryComputer Technology Laboratory

  • 7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012

    101/167

    WILLIAMH.FARQUHARMIDDLESCHOOL HORDCOPLANMACHTModernizationFeasibilityStudy A28

    ComputerTechnologyLaboratory

    Preparation/StorageRoom

    Sufficientlightingtocreateshadowlessworksurfaces.

    Ampleelectricalserviceandreceptaclestoaccommodatecomputers,machines,andportableelectrictools.Sufficientserviceshallbeprovided

    toaccommodateflexibilitywithinthestudiowithtabletopmachineryandoverheadpulldownreceptacles,providingformachinesandportable

    electrichandtools. Iffloorreceptaclesareprovided,theyshallbeflush.

    Hallwaywallsshouldincludeinteriorglassforviewingintothelaboratory.

    Windowsstarting36 fromthefloorshouldbeprovidedbetweenalloftheroomsinthissuite.

    MultipurposeTechnologyLaboratory ElectricalanddataoutletsshouldbeprovidedontheteachingwallforaPrometheanBoard.

    Adequateventilationsystemtoremoveairbornedustisrequired.

    Floorcoveringshallbenonsliptile.

    Threeemergencycontrolswitches.Oneswitchinthelab,onejustoutsidethelabandthethirdlocatedintheteachersofficewithakeyto

    restorepower.

    Theroomrequireswhiteboardandtackboard.

    Thislaboratoryrequiresawashupsink.

    Shelvingshouldbeprovidedaroundtheperimeteroftheroomforstudentprojectstorage.Theshelvingcanbelocatedbelowworkbenches

    andoverheadiftherearenotoolsbeingusedinthatarea.

    Smalltabletopmachineryshallbeinstalledalongtheperimeterofthelaboratory.Theheightofthesecountersshouldbe24".

    EDUCATIONALSPECIFICATIONS

    ComputerTechnologyLaboratory

    ThisroomshouldbelocatedadjacenttotheMultipurposeTechnologyLaboratory.

    Thisroomshouldbedesignedwithsamerequirementsastandardcomputerlaboratory.

  • 7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012

    102/167

    WILLIAMH.FARQUHARMIDDLESCHOOL HORDCOPLANMACHTModernizationFeasibilityStudy A29

    g q p y

    Preparation/StorageRoom ThepreparationroomshouldbelocatednexttotheMultipurposeTechnologyLaboratory.

    ThedoorandwallshouldhavewindowsintotheMultipurposeTechnologyLaboratorytoallowforsupervisionbythestaff.

    Onesideoftheroomshouldbedesignedhaveacounterwithwallandbasecabinets.

    Storageareawillbeequippedwithsteelshelvesandcabinetscapableofstoringavarietyofinstructionalmaterials,supplies,specialtools,

    equipment,andstudentprojects.

    Asmalllumberrackisnecessaryforstorageoflengthsoflumberandmetal.

    EDUCATIONALSPECIFICATIONSMultiPurposeLaboratory

    SpatialNeeds

    MultipurposeLaboratoryStorage

  • 7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012

    103/167

    WILLIAMH.FARQUHARMIDDLESCHOOL HORDCOPLANMACHTModernizationFeasibilityStudy A30

    Thisspacewillbedesignedforflexibleusebyart,familyandconsumerscience,andotherelectivecourses.

    Thedesignshouldincludefullcomputeraccesssothatthespacecouldbeusedasacomputerlaboratory.

    TheteachingwallshouldbedesignedaccordingtoDOCstandards.

    Perimetercountersshouldbeprovidedalongoneortwowallsofthelaboratorywithwallandbasecabinets.

    Adequateelectricalserviceandreceptaclestoaccommodatecomputers,smallandlargeappliances,andotherelectricmachinesareessential.

    Accessfromthelaboratorytothestorageroomisneeded.

    Akitchenareashouldhavethreekitchenunits,(tobeplacedalongoneortowadjoiningwalls)eachcontainingthefollowing:

    Eightfeetofcountertopspaceincludingastainlesssteelsink;

    Lockablebaseandwallstoragewithhingeddoors,withaminimumamountofdrawerspace(2drawersperkitchen);

    Walloven;

    Ampleelectricaloutletsalongthecountertobeusedforsmallappliancesandinductiontypestoves;

    Hotandcoldwater;

    OneofthekitchensshouldbeADAaccessible;

    Onesafetyeyewashstationshouldbeprovidedinthelab;and

    Spacefortworesidentialrefrigerators,accessibletothekitchensshouldbeprovided.

    EDUCATIONALSPECIFICATIONS

    Storage

    Thestorageroomshouldhavethefollowing:

  • 7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012

    104/167

    WILLIAMH.FARQUHARMIDDLESCHOOL HORDCOPLANMACHTModernizationFeasibilityStudy A31

    Lockabledoorwithaccesstotheteachingstation;

    Theroomistobeequippedwithmetalshelvingsecuredtotheperimeterwalls;

    SpaceandelectricalandplumbingrequirementsshouldbedesignedforAheavydutywasherandwallventeddryer;

    Perimetercountersshouldbeadjacenttothewasher/dryerandbeaminimumof24 deep;

    Spaceforoneresidentialrefrigeratorandoneresidentialfreezer;and

    Asink.

    EDUCATIONALSPECIFICATIONSPhysicalEducation

    SpatialNeeds

    Gymnasium(equals2teachingstations)AuxiliaryGymnasium(Dance/Wrestling)

  • 7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012

    105/167

    WILLIAMH.FARQUHARMIDDLESCHOOL HORDCOPLANMACHTModernizationFeasibilityStudy A32

    AuxiliaryGymnasium(Fitness/WeightRoom)

    HealthClassroom

    LockerRooms

    StorageRooms

    ToiletRooms

    Shower/DryingTowelRooms

    LaundryRoom

    Offices

    GeneralStorage

    OutdoorStorage

    ICBStorage

    OutsideStorageShed(SeeSiteRequirements)

    Major

    entrance

    doors

    to

    the

    gymnasiums

    and

    locker

    rooms

    should

    be

    double

    doors

    with

    no

    center

    posts.

    Non

    glazed

    doors

    throughout

    the

    entireareaarepreferred.

    Doorsshouldbefortyeightincheswide.

    Storageclosetsshouldhavenocenterpostsandshouldbeabletobeheldopentoallowforeasymovementofequipment.

    Ifdesignallows,operablewindowsinthegymnasiumshouldbeprovided.

    Gymnasium Thegymnasiumistohaveawoodenfloor.

    Thegymnasiumrequiresfiberglasselectricallyoperatedfoldingbleacherstoseatonethirdofthemaximumprojectedenrollmentalongonelongside,leavinganareaof65by100feetwhenfolded.

    A27footclearceilingisrequired.

    Anelectricallyoperatedfoldingpartitionwithpassthroughdooristobeinstalledwithconvenientcontrols.Thefoldingwallshouldfoldtothe

    bleacherside.

    EDUCATIONALSPECIFICATIONS

    Fixedequipmentwillincludethefollowing:

    Climbingropes(2withknots,2withoutknots)

    Highbarwithfloorplates

    i ( l ) fl l f ll b ll d b d i d d d i i

  • 7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012

    106/167

    WILLIAMH.FARQUHARMIDDLESCHOOL HORDCOPLANMACHTModernizationFeasibilityStudy A33

    Insertiontype(SENOHonly)floorplatesforvolleyballandbadmintongamestandardsandgymnasticequipmentSportsImports

    (Senoh)redaluminumcombinationuprightsthatworkforbothvolleyballandbadminton,thereforeonlyrequiringonesizeofpolesand

    onesizeofsleeves.

    Woodenringswithhoistandsafetystraps

    Floorplatesforunevenbars

    Scoreboard

    Aclockwithcageateachendofthegymnasium

    Archerynetwithhoistonnonbleacherside

    Sixbasketballbaskets,withsafetystraps.Fourshouldbecrosscourt.Thetwoendbasketsshouldhaverectangularglassbackboards

    andhydraulicrims.Allbasketsshouldbemotorizedandadjustablewithkey.Thereshouldbenodoorsunderthebasketballgoals.

    Wallsafetypaddingmustbemountedundereachbasket.

    Provisionsforreducingglareshouldbeconsidered.

    Shieldedmetalhalidelightingshouldbeprovided.

    Acousticsshouldbeaddressed.

    Itisparticularlyimportantthatventilationfunctionequallyandquietlyonbothsidesofthefoldingpartition.

    Allswitches,firealarms,etc.shouldbelocatedincorners,coveredwithwireboxes,andbeduplicatedoneachsideofthefolding

    partition.

    Eachwallofthegymnasiumshouldhavefoursetsofelectricaloutlets.

    Paintingandcreativeartisticwallgraphicsshouldbeprovided.

    Thegymnasiumshouldbeequippedwithacousticaldeck,computerandcablehookupsandsoundsystem.

    EDUCATIONALSPECIFICATIONS

    AlocationshouldbeidentifiedforaPrometheanBoardincludingtheappropriatepowerandwiring.

    Arecessedwaterfountainshouldbeprovidedoutsideeachendofthegymnasiumorintegratedintoanalcovewithinthegymnasium.

    Alobbywithphonebooth,displaycase,bulletinboard,andsmallstorageclosetshouldbeprovidedadjacenttothegymnasium.

  • 7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012

    107/167

    WILLIAMH.FARQUHARMIDDLESCHOOL HORDCOPLANMACHTModernizationFeasibilityStudy A34

    Securitydoorsshouldbeprovidedtocloseoffotherpartsofthebuildingfromthegymnasium/lobbyareas.

    Ifthegymopenstotheoutside,astepdownentrancewithconcretelandingisneeded.

    Emergencylightsshouldbeatleast12feetfromthefloor.

    MCPSstaffwillprovidegymnasiumcourtmarkings.

    Pluginserviceforscoretablecontrolsshallbeprovidedinthefloorandneedtobeflush.Controlsmustbeaccessiblewhenbleachersareintheopenposition.

    Attentionshouldbegiventothedesignoflightingfixturessothattheywillnotbedamagedbyindoorballsports.

    AuxiliaryGymnasiums Theauxiliarygymnasiumsshouldbelocatedadjacenttothegymnasiumareaandthelockersroomsandhavesixteenfootceilings.

    Thetwoauxiliarygymnasiumsshouldbelocatednexttoeachother.

    Directaccesstothecorridorisdesired.

    Projections,posts,orotherhazardsaretobeavoided.

    Thesegymnasiumsmusthaveaventilationsystem.

    Theminimumwidthoftheauxiliarygymnasiumsshouldbe34feet.

    Electricoutletsshouldbelocatedonallfourwalls.

    Bothauxiliarygymsmustincludeasmallrecessedlockableclosetwithshelving.

    Asmall6'x4'tackboardandwhiteboardaretobeinstalledineachauxiliarygymnasium.

    EDUCATIONALSPECIFICATIONS

    Acousticalpanels,tackboard,bulletinboard,auxiliarystereosoundsystem,computerandcableTVhookupsandclockswithcagesshouldbe

    includedinthetwoauxiliarygymnasiums.

    Operablewindowsaretobeinstalledwithgrates.

    WallgraphicsaretobespecifiedbyMCPSstaff.

  • 7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012

    108/167

    WILLIAMH.FARQUHARMIDDLESCHOOL HORDCOPLANMACHTModernizationFeasibilityStudy A35

    Exteriordoorsaretobekeyedforreentry.

    Lightswitchesaretobekeyed.

    Dance/WrestlingRoom Suspendedwoodfloorsaretobeinstalledinthedancestudio.

    Theroomwillneedtoaccommodatewrestlingmatstorageorhoist.

    Onewallmustbemirroredwithabarreprovidedwithaneyebolt6'2"high,dividingthespaceinhalflongway.

    Fitness/WeightRoom Thesecondauxiliarygymshouldhavearubberized,resilientfloorforweighttraining.

    Theceilingheightshouldbe16.

    6'x12'mirrorshouldbemountedononewalloftheweightroom.

    Aclimbingwallshouldbeinstalledalongtheotherlongwallofthisroom.

    Pullupchinupbarsandpegboard(6'x3')shouldbeinthisroom.

    GeneralStorageRoom Thegeneralstorageroomshouldbelocatedinthegymnasiumandneedstohavethesameceilingheightasthegymnasium.Thegeneral

    storagealsoneedstobeeasilyaccessiblefromtheauxiliarygymnasiums.

    Mats,gymnasticequipment,andotherphysicaleducationmaterialsandequipmentneedtobeaccommodated.

    Asmallintramuralathleticcoordinatorstorageclosetisneedednearthegym(separatekey).

    EDUCATIONALSPECIFICATIONS

    Twodoors,eachfourfeetwideandsevenfeethighwithnothresholdsorcentermullionsandheavydutyhardwarearerequiredforthe

    interiorstoragerooms.

    Anoutsidestoragearearequiresdoubledoorsthatneedtobesevenfeethigh.

    Allstorageareasshouldincludeshelves,bins,pegs,andpulleysystemforstoringgoals.

  • 7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012

    109/167

    WILLIAMH.FARQUHARMIDDLESCHOOL HORDCOPLANMACHTModernizationFeasibilityStudy A36

    ICBStorage Thisstorageroomisforusebycommunitygroupsandshouldbeinornearthemaingymnasium.

    Itshouldincludeshelvingononewallaswellasspaceforbadmintonandvolleyballuprights.

    Thisroomneedstobekeyedseparately.

    LockerRooms Thelockerroomsneedtomeetthefollowingrequirements:

    Interiordoubledoorentranceswithmazetoblockvisionintospacemustbedesigned.

    Thelockerroomsneedanoutsideexitforusebyphysicaleducationclasses.Thisexitdoormustbekeyedforreentrybyclasses.

    A"stepdown"withconcretelandingshouldbeplanned.

    Someshelvesshouldbeprovidedneartheentrancetothelockerroomforstudentbooks.

    MaleandfemalelockerroomsshouldbeadjacentandlocatedonthesamefloorsothatthePhysicalEducationOfficescanhaveaconnecting

    doorandcommonconnectedplanningroom.

    Lockerspaceshouldhandleatotalof1,440lockersevenlydividedbetweenmaleandfemalelockerrooms.Alllockersaretohavepadlocks

    andbe3tiered12"x12"x24".LockerrowsshouldbesituatedformaximumsupervisionfromthePEofficeareaandbenohigherthansixfeet.

    SeverallockerswithkeyentryareneededforADAaccommodations.

    Thelockerroomsaretobewellventilatedandincludeadeodorizersystem.

    Clocks,tackboard,PA,andawatercoolermustbeprovidedineachlockerroom.

    EDUCATIONALSPECIFICATIONS

    Benchesusedfordressingpurposesaretobesecuredtothefloorwithasinglebenchbetweenlockerrows.

    Full

    length

    mirrors

    are

    to

    be

    provided

    on

    the

    ends

    of

    each

    locker

    bank

    with

    convenient

    electrical

    outlets.

    Thelockerroomshouldreflectschoolcolors.

    S i hi h l k i b h ffi d h ld d i h i l d i li i d

  • 7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012

    110/167

    WILLIAMH.FARQUHARMIDDLESCHOOL HORDCOPLANMACHTModernizationFeasibilityStudy A37

    Storagewithinthelockerareaistobeneartheofficeandshouldaccommodatevariousphysicaleducationsupplies,equipment,and

    furnishings.Shelvingwithbinsandhookswillbespecifiedlater.Shelvingmusthaveliptokeepballsfromfalling.

    Ahosebibshouldbelocatedineachlockerarea.Appropriatedrainageofthelockerareaisrequired.

    Thefloorsurfacemustbeanonskidsurfacebutsmoothenoughforthoroughcleaning.CVT/roughsurfacetileispreferred.

    Toiletroomsaretobelocatedineachlockerareaandaretocontainlavatories,waterclosets,and/orurinals.

    Mirrorsaretobeinstalledoversinks.

    Iftheyaretoservecommunityneedsafterschoolhours,therestofthelockerareamustbegatedoff.Lightswitchesaretobekeyed.

    Shower/Drying/TowelRoom Theshowerareashouldbewellventilatedandfreefromhazardousprojections.

    Eachshowerroomistohavethreeindividualshowersandonehandicappedaccessibleshower,withmodestypanels,anonskidfloorsurfaceandrecessedsoapdishes.

    Acentrallockablecutoffvalvefortheshowersmustbeprovidedineachlockerroom.

    Thedryingroom,withnearbytowelstorage,shouldbelocatedbetweentheshowerroomandlockerroomandhavewallhooksandanonskid

    floorsurface,preferablytile.

    LaundryRoom Alaundryareawithfloordrainforacommercialwasheranddryerandlaundrytubshouldbeincludedwithshelvingfortowelstorage.

    EDUCATIONALSPECIFICATIONS

    Offices Theofficesneedtobecentrallylocatedwithaccesstobothmaleandfemalestudents,havewindowswithblindsforeffectivesupervisionof

    theappropriatelockerroomandhaveVCTfloors.

    Eachofficerequiresaseparateshower,toilet,sink,mirrorwithshelfoversinkthatislargeenoughtouseaschangingareasforthephysical

    d i ff