farquhar ms modernization feasibility study-october 2012
TRANSCRIPT
-
7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012
1/167
WILLIAM
H.
FARQUHAR
MIDDLE
SCHOOL
ModernizationFeasibilityStudy
Preparedfor
Montgomery
County
Public
Schools
by
HordCoplanMachtBaltimore,Maryland
July2011
RevisedOctober2012
-
7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012
2/167
WILLIAMH.FARQUHARMIDDLESCHOOL HORDCOPLANMACHTModernizationFeasibilityStudy
WILLIAMH.FARQUHARMIDDLESCHOOLModernizationFeasibilityStudy
July2011
RevisedOctober2012
SECTION PAGENO.
I. Introduction 1
II. ExecutiveSummary 9
III. ProjectScope,Methodology,andGoals 26
IV. ExistingConditions 28V. DescriptionofOptions 35
VI. Recommendations 70
VII. ProposedProjectImplementationSchedule 71
VIII. Appendices
AppendixA. EducationalSpecifications A1
AppendixB. ExistingConditionsSurvey B1
AppendixC.
ProjectPhotographs
C1
AppendixD. SiteUtilities D1
AppendixE. Option6&LifeCycleCostAnalysis E1
-
7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012
3/167
WILLIAMH.FARQUHARMIDDLESCHOOL HORDCOPLANMACHTModernizationFeasibilityStudy 1
I.INTRODUCTION
Thismodernization feasibility study was conducted for Montgomery County Public Schools (MCPS) by the architectural firm HordCoplanMacht.WilliamH. FarquharMiddle School is locatedat16915Batchellors ForestRoad,Olney,Marylandand ispartof the
NortheastConsortiumandSherwoodclusters.ThefeasibilitystudyworkwasperformedunderthedirectionoftheMCPSDepartment
ofFacilitiesManagement,DivisionofConstruction.
MONTGOMERYCOUNTYBOARDOFEDUCATION
Mr.ChristopherS.Barclay President
Ms.Shirley
Brandman
Vice
President
Ms.LauraBerthiaume Member
Dr.JudithDocca Member
Mr.MichaelA.Durso Member
Mr.PhilipKauffman Member
Mrs.PatriciaB.ONeill Member
Mr.AlanXie StudentMember
MONTGOMERY
COUNTY
SCHOOLS
ADMINISTRATION
Dr.JoshuaStarr SuperintendentofSchools
Mr.JamesC.Song Director,DepartmentofFacilitiesManagement
Mr.R.CraigSchuman Director,DivisionofConstruction
Mr.MichaelP.Shpur Architect,DivisionofConstruction
Mr.RayMarhamati ProjectManager,DivisionofConstruction
Ms.AdrienneL.Karamihas FacilityPlanner,DepartmentofFacilitiesManagement
-
7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012
4/167
-
7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012
5/167
WILLIAMH.FARQUHARMIDDLESCHOOL HORDCOPLANMACHTModernizationFeasibilityStudy 3
INTRODUCTION
FACILITYADVISORYCOMMITTEEMEMBERS(CONTINUED)
JamieCastle Parent BrookeGroveElementarySchool
KarenCastle Parent BrookeGroveElementarySchool
AndreaMassaroCavanaugh Parent BrookeGroveElementarySchool
BiniChacko Parent FarquharMiddleSchool
JohnClifford Parent FarquharMiddleSchool&SherwoodElementarySchool
MaryDePasqualeCobb Parent FarquharMiddleSchool&SherwoodElementarySchool
JenniCoopersmith Parent SherwoodElementarySchool
JenniferCostello Parent CloverlyElementarySchool
NeetaDatt MontgomeryCountyGovernment CommunityLiaisonforSenatorMontgomery
JennaDean Neighbor FarquharMiddleSchool
DebbieDeans Parent FarquharMiddleSchool
DebbieDeosaran Parent FarquharMiddleSchool&CloverlyElementarySchool
SharonDeutch Parent FarquharMiddleSchool&BrookeGroveElementarySchool
AndrewDunn Parent BrookeGroveElementarySchool
CheriDunn Parent BrookeGroveElementarySchool
AngelaEdwards Parent CloverlyElementarySchool
RickEisenacher Staff FarquharMiddleSchool
VolkerEnglisch Parent FarquharMiddleSchool
S.Eppley Parent FarquharMiddleSchool
JudyExler Parent BrookeGroveElementarySchool
RamezFahmy Parent BrookeGroveElementarySchool
SherifaFahmy Parent BrookeGroveElementarySchool
SumayaFahmy Parent BrookeGroveElementarySchool
KathyFinan Staff FarquharMiddleSchool
ButchFleischer Parent FarquharMiddleSchool
CharlesL.Frederick Parent BrookeGroveElementarySchool
-
7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012
6/167
WILLIAMH.FARQUHARMIDDLESCHOOL HORDCOPLANMACHTModernizationFeasibilityStudy 4
INTRODUCTION
FACILITYADVISORYCOMMITTEEMEMBERS(CONTINUED)
DonnaFrederick Parent FarquharMiddleSchool
StephenFye Parent FarquharMiddleSchool
AngelGarcia AssistantDirector DepartmentofTransportation,MCPS
MelissaGatlin Parent FarquharMiddleSchool,StonegateElementarySchool
WalterGeddes Staff FarquharMiddleSchool
MelissaGooding Parent FarquharMiddleSchool
LoriGoodwin Parent SherwoodElementarySchool
MissyGover Parent BrookeGroveElementarySchool
ManethP.Gravell Parent FarquharMiddleSchool
MichaelGreenberg Parent FarquharMiddleSchool
JeanGries PlanningSpecialist MontgomeryCountyDepartmentofTransportation
JoeGriffin Parent,PTAPresident FarquharMiddleSchool
MaryGross Parent BrookeGroveElementarySchool
JenniferHallmark Parent FarquharMiddleSchoolDr.UrsulaA.Hermann CommunitySuperintendent MontgomeryCountyPublicSchools
KristinHewitt Parent FarquharMiddleSchool
WailHigazi Parent FarquharMiddleSchool
MichaelHildebrand Parent CloverlyElementarySchool
MichelleHintz Parent FarquharMiddleSchool
Patrick Hintz Parent FarquharMiddleSchool
TerriHogan Reporter Gazette
KarenHolt Parent FarquharMiddleSchoolHankHyde Neighbor FarquharMiddleSchool
TomHyde Neighbor FarquharMiddleSchool
KimberlyIanniciello Parent SherwoodElementarySchool
DawnJacob Parent FarquharMiddleSchool
ShabeenJafri Parent FarquharMiddleSchool
JoyceJessell AssistanttotheDirector DivisionofConstruction,MCPS
-
7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012
7/167
WILLIAMH.FARQUHARMIDDLESCHOOL HORDCOPLANMACHTModernizationFeasibilityStudy 5
INTRODUCTION
FACILITYADVISORYCOMMITTEEMEMBERS(CONTINUED)
AnnJohnson Parent CloverlyElementarySchool
EricJohnson Parent CloverlyElementarySchool
BarryJordan Parent FarquharMiddleSchool
JihyunJung Parent FarquharMiddleSchool
GailKahan Parent FarquharMiddleSchool
JackKaminski Parent FarquharMiddleSchool
AdrienneKaramihas FacilityPlanner DepartmentofFacilitiesManagement,MCPS
KarenKaufman Parent FarquharMiddleSchool
NancyKeener Parent BrookeGroveElementarySchool
AndreaKeller Parent FarquharMiddleSchool
FeliciaKimmel Parent FarquharMiddleSchool
TroyKimmel Parent BrookeGroveElementarySchool
RichKonzmann Parent FarquharMiddleSchool
SimonaKostka Parent FarquharMiddleSchool
AnneL.Kozma Staff FarquharMiddleSchool
HaifaKrakaur Parent FarquharMiddleSchool
MichaelKrakaur Parent FarquharMiddleSchool
GregoryLampshire Parent FarquharMiddleSchool
LauraLampshire Parent FarquharMiddleSchool,BrookeGroveElementarySchool
ConaeLee Parent FarquharMiddleSchool
EllenLemberger Parent BrookeGroveElementarySchool
JoyLeven Parent FarquharMiddleSchool
JeffLevine Staff FarquharMiddleSchool
JanetLevy Parent FarquharMiddleSchool
StuartLevy Parent FarquharMiddleSchool
JeffLin Parent FarquharMiddleSchool
LindaLindstrom Staff FarquharMiddleSchool
PattyLiszewski Parent BrookeGroveElementarySchool
-
7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012
8/167
WILLIAMH.FARQUHARMIDDLESCHOOL HORDCOPLANMACHTModernizationFeasibilityStudy 6
INTRODUCTION
FACILITYADVISORYCOMMITTEEMEMBERS(CONTINUED)
PaulineLoveland Staff FarquharMiddleSchool
ReneeRosenblumLowden Grandparent FarquharMiddleSchool
BrianLowe Parent FarquharMiddleSchool
MaryLunden Parent FarquharMiddleSchool&SherwoodElementarySchool
RayMarhamati ProjectManager DivisionofConstruction,MCPS
EdMcCarthy Parent FarquharMiddleSchool
KristinMcGervey Parent BrookeGroveElementarySchool
SeanMcGervey Parent BrookeGroveElementarySchool
JenniferMcKneely Parent SherwoodElementarySchool
KenMcKneely Parent SherwoodElementarySchool
KevinMcLaren Parent FarquharMiddleSchool
DebbieMetrey Parent FarquharMiddleSchool
HeatherMilke Parent BrookeGroveElementarySchool
ToddMiller Parent BrookeGroveElementarySchool
ElizabethMiller Parent BrookeGroveElementarySchool
JoannMirgon Parent SherwoodElementarySchool,PTAPresident
DeepaMittu Parent FarquharMiddleSchool
BethMontgomery Parent SherwoodElementarySchool
KristyMontgomery Parent FarquharMiddleSchool&CloverlyElementarySchool
MarkMooney Parent CloverlyElementarySchool
TeresaMooney Parent CloverlyElementarySchool
RandolphMussotte ClusterManager TransportationAdministration,MCPS
BryanNatoli Parent BrookeGroveElementarySchool
KendraNewman Parent FarquharMiddleSchool
ShellyNiverth Parent BrookeGroveElementarySchool&FarquharMiddleSchool
StacyNoland Parent BrookeGroveElementarySchool
StephanieNoland Parent BrookeGroveElementarySchool
StephaniePack Parent CloverlyElementarySchool
LarryPacker Parent BrookeGroveElementarySchool
-
7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012
9/167
WILLIAMH.FARQUHARMIDDLESCHOOL HORDCOPLANMACHTModernizationFeasibilityStudy 7
INTRODUCTION
FACILITYADVISORYCOMMITTEEMEMBERS(CONTINUED)
RachelPacker Parent BrookeGroveElementarySchool
JoePasternak Parent BrookeGroveElementarySchool
MicheleNebelPeake Parent SherwoodElementarySchool
MegPeaseFye Neighbor FarquharMiddleSchool
DougPophamJr. Parent FarquharMiddleSchool
JudithSetkinPorzel Parent FarquharMiddleSchool
JoePospisil PlanningSpecialist MontgomeryCountyDepartmentofTransportation
LoriPost Parent BrookeGroveElementarySchool&FarquharMiddleSchool
CherylPotyk Parent BrookeGroveElementarySchool
SarahQureshi Parent FarquharMiddleSchool
JohnRamsay Parent BrookeGroveElementarySchool
SusanRamsay Parent BrookeGroveElementarySchool
BarbaraRay Parent FarquharMiddleSchool
SuzanneRedman Parent FarquharMiddleSchool
LisaRodriguez Staff FarquharMiddleSchool
MichaelRonan Parent BrookeGroveElementarySchoolAnneRood Parent BrookeGroveElementarySchool
ElaineSalter Parent FarquharMiddleSchool
MurielSenderling Parent FarquharMiddleSchool
MichaelShpur Architect DivisionofConstruction,MCPS
HelenShueh Parent FarquharMiddleSchool&CloverlyElementarySchool
AndreaSmith Parent FarquharMiddleSchool
KenSmith Parent FarquharMiddleSchool
SusanSmithBauk Parent FarquharMiddleSchoolJamesSong Director DepartmentofFacilitiesManagement,MCPS
Kerri St.Laurent Parent BrookeGroveElementarySchool
HeatherSteffan Parent BrookeGroveElementarySchool
ChrisStenger Parent SherwoodElementarySchool
DeborahStenger Parent SherwoodElementarySchool
-
7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012
10/167
WILLIAMH.FARQUHARMIDDLESCHOOL HORDCOPLANMACHTModernizationFeasibilityStudy 8
INTRODUCTION
FACILITYADVISORYCOMMITTEEMEMBERS(CONTINUED)JillianStorms Architect SchoolFacilitiesBranch,MDStateDepartmentofEducation
RobertTarloff Parent FarquharMiddleSchool
BrandiTippery Parent SherwoodElementarySchool
TinaVelazquez Parent SherwoodElementarySchool,PTAClusterRepresentative
PatriciaVia Parent FarquharMiddleSchool,StonegateElementarySchool
KerriWalenta Parent FarquharMiddleSchool
KristenWeinberg Parent FarquharMiddleSchool
JasonWeisenthal Parent FarquharMiddleSchoolJohnS.Weske Neighbor FarquharMiddleSchool
BrantWest Parent SherwoodElementarySchool
DanaWest Parent SherwoodElementarySchool
MelanieWhelan Parent FarquharMiddleSchool
RicWugalter Parent BrookeGroveElementarySchool
ErinZagami Parent FarquharMiddleSchool
FEASIBILITYSTUDYA/ETEAM
HordCoplanMacht ArchitecturalTeamLeader
CMJStructuralEngineering,Inc. StructuralEngineer
JamesPoseyAssociates Mechanical/ElectricalEngineer
AMortonThomasandAssociates,Inc. CivilEngineer
-
7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012
11/167
WILLIAMH.FARQUHARMIDDLESCHOOL HORDCOPLANMACHTModernizationFeasibilityStudy 9
II.EXECUTIVESUMMARYPurpose
ThepurposeofthisfeasibilitystudyistoexplorealternativesformodernizingtheexistingWilliamH.FarquharMiddleSchoolthatsatisfy
therequirementsoftheEducationalSpecificationssetforthfortheproject.Furthermore,thestudyprovidesspecificrecommendations
toMontgomeryCountyPublicSchools(MCPS)forimplementation.Whencompleted,themodernizedfacilitywillhaveacapacityof793
studentswithcorespacesdesignedtoaccommodate1,000students.
History
WilliamH.FarquharMiddleSchool is locatedat16915BatchellorsForestRoad,Olney,MD.Theschool isamemberoftheNortheastConsortiumand Sherwood clusters.Theoriginal structurewasbuilt in1968.Agymnasiumadditionwas constructed in1981 at the
northeastcornerofthebuilding.Mechanicalandelectricalupgradesandselectwindowanddoorreplacementshaveoccurredoverthe
last fewyears.Presently, theschoolcapacity is890studentsand theenrollment is637students ingrades6 through8.Theexisting
buildingisapproximately116,300grosssquarefeet.Theexistingsiteis20.03acres.
Methodology
Theexistingschoolhasbeenevaluatedbyadesignteamofarchitectsandengineerstodeterminemodificationsrequiredtomodernize
thefacilitytocomplywiththerequirementsoftheWilliamH.FarquharMiddleSchoolEducationalSpecifications,datedJanuary2011
(seeAppendixA).Thestudyisbasedon:
SixWorkSessionswiththeFacilityAdvisoryCommittee(FAC)andMCPSstaff; Analysisoftheexistingphysicalplant; Reviewoftheconstructiondocumentsfortheexistingfacility,asprovidedbyMCPS; ReviewoftheEducationalSpecificationsprovidedbyMCPS;and Researchconductedbythedesignteam.
-
7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012
12/167
-
7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012
13/167
-
7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012
14/167
WILLIAMH.FARQUHARMIDDLESCHOOL HORDCOPLANMACHTModernizationFeasibilityStudy 12
EXECUTIVESUMMARY
Overview
(continued)
Fivebasic siteplanoptionsand threebuildingplanoptionsweredeveloped in response to theMCPSEducationalSpecifications for
WilliamH. FarquharMiddle School. Eachoption addresses thedesiredphysical and instructional improvements to the school, and
satisfies the Educational Specification requirements. The site options include two on the adjacent 17.2 acre parcel that allow the
studentstoremainattheexistingbuildingwhilethenewbuilding isconstructed.Athirdoption isanewbuilding locatedbehindthe
existingbuildingthatalsoallowsthestudentstoremainattheexistingbuildingwhilethenewbuildingisconstructed.Twoadditional
options includenewbuildings locatedon the footprintof the existingbuilding. These twooptionswould require relocationof the
studentstotheTildenHoldingCenterduringconstruction.Thethreebuildingplansincludetwoandthreestoryoptionsandarebasedonprovenmiddle schoolmodels thatmeet the requirementsof the Educational Specifications.Cost estimates foreachoptionare
presentedintheDescriptionofOptionssectionofthereport.ThepreferredoptionbytheFacilityAdvisoryCommitteewasOption1.
-
7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012
15/167
-
7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012
16/167
WILLIAMH.FARQUHARMIDDLESCHOOL HORDCOPLANMACHTModernizationFeasibilityStudy 14
EXECUTIVESUMMARY
-
7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012
17/167
-
7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012
18/167
WILLIAMH.FARQUHARMIDDLESCHOOL HORDCOPLANMACHTModernizationFeasibilityStudy 16
EXECUTIVESUMMARY
-
7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012
19/167
-
7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012
20/167
WILLIAMH.FARQUHARMIDDLESCHOOL HORDCOPLANMACHTModernizationFeasibilityStudy 18
EXECUTIVESUMMARY
-
7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012
21/167
-
7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012
22/167
WILLIAMH.FARQUHARMIDDLESCHOOL HORDCOPLANMACHTModernizationFeasibilityStudy 20
EXECUTIVESUMMARY
-
7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012
23/167
-
7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012
24/167
WILLIAMH.FARQUHARMIDDLESCHOOL HORDCOPLANMACHTModernizationFeasibilityStudy 22
EXECUTIVESUMMARY
-
7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012
25/167
WILLIAMH.FARQUHARMIDDLESCHOOL HORDCOPLANMACHTModernizationFeasibilityStudy 23
EXECUTIVESUMMARY
OPTION1 OPTION2 OPTION3
Existing:116,300SF
Demolition:0SF
New:132,500SF
Existing:116,300SF
Demolition:0SF
New:131,550SF
Existing:116,300SF
Demolition:116,300SF
New:131,550SF
OPTION4 OPTION5
Existing:116,300SF
Demolition:116,300SF
New:132,500SF
Existing:116,300SF
Demolition:116,300SF
New:136,400SF
-
7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012
26/167
WILLIAMH.FARQUHARMIDDLESCHOOL HORDCOPLANMACHTModernizationFeasibilityStudy 24
EXECUTIVESUMMARYCOSTANALYSIS
PresentedbelowisatabulationofareasandcostsassociatedwitheachrecommendedoptionformodernizationofWilliamH.Farquhar
MiddleSchool.Theserecommendedoptionsprovidethebestsolutionstothesite,educationalprogram,andfacilitydevelopmentgoals.
TheestimatesarebasedonthecurrentmarketandreflectcurrentMontgomeryCountyPublicSchoolconstructioncosts.
CostAnalysisWilliamH.FarquharMiddleSchoolModernization
SquareFootage
Option1 Option2 Option3 Option4 Option5 Existing 116,300 116,300 116,300 116,300 116,300
NewConstruction 132,500 131,550 131,550 132,500 136,400
Demolition(Total) 0 0 116,300 116,300 116,300
ExistingToRemain 0 0 0 0 0
TotalGross 132,500 131,550 131,550 132,500 136,400
PDF/FEASIBILITYSTUDYCOSTOUTLINE
ConstructionCostEstimate $33,357,000 $33,116,000 $33,751,000 $33,171,000 $34,111,000
ProjectPlanningCost $2,462,000 $2,447,000 $2,486,000 $2,451,000 $2,507,000
RelatedConstructionCosts $1,240,000 $1,240,000 $1,240,000 $1,240,000 $1,240,000
Contingency $1,334,000 $1,325,000 $1,350,000 $1,327,000 $1,364,000
TotalCostinFY2012Dollars $38,393,000 $38,128,000 $38,827,000 $38,189,000 $39,222,000
Notes:
1.Thiscostestimatedoesnotincludefurnitureandequipment.
2.AnanalysisoftransportationcostbystaffshowstransportingstudentstoTildenHoldingCenterwillincreasethetotalconstructioncostsforOptions4and5by$1,536,000overatwoyearconstructionperiod.
-
7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012
27/167
WILLIAMH.FARQUHARMIDDLESCHOOL HORDCOPLANMACHTModernizationFeasibilityStudy 25
EXECUTIVESUMMARYCONCLUSIONSANDRECOMMENDATIONS
Although Option 1 was the Facility Advisory Committees preferred option, MCPS staff believes that Option 2 provides a smaller
footprint,amoreefficientbuilding,andmoresitespaceforamenities.
-
7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012
28/167
WILLIAMH.FARQUHARMIDDLESCHOOL HORDCOPLANMACHTModernizationFeasibilityStudy 26
III.PROJECTSCOPE,METHODOLOGYANDGOALS
ScopeandIntent
WilliamH. FarquharMiddle School is scheduled tobemodernized tomeet current specifications relative to educationalprograms,
instructionalphilosophy,andprogramspaceallocations.Themodernizedfacilitywillmeetcurrentenergy,ADA,federal,and local life
safetycodes.Whencompleted,thefacilitywillhaveacapacityof793,withcorespacesdesignedfor1,000students.
Theintentofthisfeasibilitystudyistoexplorealternativesforplacementofamodernizedfacilityonboththeexistingschoolsiteandan
alternative17.2acresite locatednext to theexistingsite.Thealternativesaccommodateandmeet theeducational requirementsof
studentenrollment,satisfy thestaffandcommunityconcerns,andcontribute toasafe,costeffectiveandenergyefficient facility to
meettheneedsofa21stcenturyschool.
Thescopeofwork includesasurveyoftheexistingphysicalplantandevaluationoftheexistingmechanical,electrical,andplumbing
systems. TheA/E design team analyzed the educational specifications and developed five distinct site concepts and three building
conceptsaddressingthecriteriaforamodernizedfacility.TheFeasibilityStudyCommitteereviewedtheprogressionoftheseconcepts
throughouttheentireprocess.Theircommentsandsuggestionswerediscussedandevaluated,andinfluencedthedevelopmentofallof
theoptionsbeingconsidered.ThefinalconceptsarepresentedinthisreportasOptionsOne,Two,Three,Four,andFive.
Methodology
The existing schoolhasbeen evaluatedby adesign teamof architectsand engineers todetermine thebestapproach toprovide a
modernized facility that complieswith the requirementsof theWilliamH.FarquharMiddleSchoolEducationalSpecifications,dated
January2011.Thestudyisbasedon:
SixWorkSessionswiththeFacilityAdvisoryCommittee(FAC)andMCPSstaff; Analysisoftheexistingphysicalplant; Reviewoftheconstructiondocumentsfortheexistingfacility,asprovidedbyMCPS; ReviewoftheEducationalSpecificationsprovidedbyMCPS;and Researchconductedbythedesignteam.
-
7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012
29/167
WILLIAMH.FARQUHARMIDDLESCHOOL HORDCOPLANMACHTModernizationFeasibilityStudy 27
PROJECTSCOPE,METHODOLOGYANDGOALSGoalsandObjectives
Insatisfyingtherequirementsoftheeducationalspecifications,thefollowingaretheprimarygoalsandobjectivesestablishedbythe
FacilityAdvisoryCommitteememberstobeaddressedbytheA/EteamandstaffofMCPS.
OPTIMIZESTUDENTPERFORMANCE Studentstoremainonsiteduringconstruction LargerCafeteria Hightech(wiredandwireless) Furnitureflexibilitytoallowsmallandlargegroup
instruction
Flexibilitywithchangeintechnology Abilitytodarkenroomstoallowuseof
Prometheanboards
Temperaturecontrolintheclassrooms,bettercomfort
Stageforperformances,needbetteracoustics
CULTUREANDTRADITION Sympatheticdesigntotheneighborhood Smallschoolfeel(intimate) Traditional(oldschoolhousefeel) Communityuseoftheschoolisimportant Teachersareterritorial needaplacethatistheir
own
SCHOOLORGANIZATION Artstobethecentralhub Separategradelevels Centralscience Privatizegradeclusterfrompublicspace Facultyrestroomsineachwing AdequateParking
SUSTAINABILITY Windowsthatopen Naturallight Schoolasateachingtool Automaticflushtoilet
SAFETY Safedropoffandpickuparea Separatebusandstudentdropoffloops Safeplaceinbuildingduringstorms Emergencylightsintoiletrooms
-
7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012
30/167
WILLIAMH.FARQUHARMIDDLESCHOOL HORDCOPLANMACHTModernizationFeasibilityStudy 28
IV.EXISTINGCONDITIONS
-
7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012
31/167
WILLIAMH.FARQUHARMIDDLESCHOOL HORDCOPLANMACHTModernizationFeasibilityStudy 29
EXISTINGCONDITIONS
-
7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012
32/167
WILLIAMH.FARQUHARMIDDLESCHOOL HORDCOPLANMACHTModernizationFeasibilityStudy 30
EXISTINGCONDITIONS
-
7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012
33/167
WILLIAMH.FARQUHARMIDDLESCHOOL HORDCOPLANMACHTModernizationFeasibilityStudy 31
EXISTINGCONDITIONS
-
7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012
34/167
-
7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012
35/167
-
7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012
36/167
-
7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012
37/167
-
7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012
38/167
-
7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012
39/167
-
7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012
40/167
WILLIAM
H.
FARQUHAR
MIDDLE
SCHOOL
HORD
COPLAN
MACHTModernizationFeasibilityStudy 38
DESCRIPTIONOFOPTIONSRoofLevel: Theroofframingsystemisassumedtoconsistof1 20gagetypeBmetaldecksupportedbyopenwebjoists.Theroof
systemwillbesupportedbysteelcolumns.Thelateralresistingsystemwillbereinforcedmasonryshearwall.Theexteriorwallswillbe
acompositionofreinforcedmasonryandbrickveneer.
ApplicableCodesandStandards
TheInternationalBuildingCode2009,asmodifiedbyMontgomeryCountyReferenceCodeOrganizations ACIAmericanConcreteInstitute AISCAmericanInstituteofSteelConstruction ANSIAmericanNationalStandardInstitute ASTMAmericanSocietyforTestingandMaterials PCAPortlandCementAssociation CRSIConcreteReinforcingSteelInstitute AWSAmericanWeldingSociety AISIAmericanIronandSteelInstitute BIABrickInstituteofAmerica NCMANationalConcreteMasonryAssociation PCIPrecastPrestressedConcreteInstitute
HVACSYSTEMS:
Two different systemswill be explored to ensure high energy efficiency,meet the state IAC requirements and meetMontgomery
Countys requirement forLEEDcertification. Thesesystemsarevariableairvolume (VAV)andgeothermalwater sourceheatpump
system.
TheVAVsystemwouldconsistofthefollowing:
Highefficiencycondensingboilerswillbeusedtoproducetheheatingwaterforthesystem. Basedonthesizeofthenewschool,twoorthreeboilerswouldbeconsidered.
-
7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012
41/167
WILLIAMH.FARQUHARMIDDLESCHOOL HORDCOPLANMACHTModernizationFeasibilityStudy 39
DESCRIPTIONOFOPTIONS
Chilled
water
plant
will
consist
of
two
water
cooled
centrifugal
chillers.
Two
induced
draft
cooling
towers,
one
dedicated
to
each
chiller,willbeplacedontheroof. Thetowerswillbeprovidedwithsoundattenuatinginletsanddischarges.
Fanpoweredvariableairvolumeterminalswillconditionthemajorityofthespaces. Hotwaterheatingcoilswillbeprovidedoneachterminalforexcellentroomtemperaturecontrol.
AirhandlerssupplyingprimaryairtotheVAVterminalswillbelocatedontheroofinmechanicalpenthousesorexposedwithinteriorservicecorridor. Unitswillbeinstalledwithsupplyairandreturnairfans,heatingwatercoil,chilledwatercoilandsystemfiltration.
Largeareassuchasgymnasium, instructionalmediacenter,anddiningwillbeconditionedbysinglezonevariableairvolumeairhandlingunits. Outsideairquantitieswillbecontrolledbycarbondioxidesensorsandroomairvolumewillbecontrolledbyvariable
frequencydrives. Mechanicalexhaustshallbeprovidedfortoiletrooms,storageroomsandotherspecialareas. Automatictemperaturecontrolswillbedirectdigitalcontrols(DDC)connectedtoMontgomeryCountyPublicSchoolscentralcontrol
center.
Thegeothermalheatpumpsystemwouldconsistofthefollowing:
Geothermalwatersourceheatpumpunits,oneforeachclassroom,willconditionthespace. Unitswillbelocatedinaclosetnexttoclassroomandductedtotheroom.
Outsideairwillbeconditionedby100percentoutsideairrooftopenergyrecoveryunitswithgeothermalheatpumpcompressors.Unitswill supply conditionedoutsideairdirectly to the classroomandexhaustair from the classrooms, storage room,and toilet
rooms.
A singlezone rooftopheatpumpairhandlingunitwillprovide room conditioning foreachof the followingareas;MediaCenter,Administration,Music,ArtandTechnologies.
Asinglezonerooftopheatpumpenergyrecoveryunitwillprovideroomconditioningforeachofthefollowingareas: GymnasiumandDining/Stage.
Geothermalboreholefieldwillbelocatedundertheathleticfields. Mechanicalexhaustoftoilets,storagerooms,andotherspecialareas. Automatic temperature controls will be direct digital controls (DDC), connected to Montgomery County Public Schools central
controlcenter.
-
7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012
42/167
WILLIAMH.FARQUHARMIDDLESCHOOL HORDCOPLANMACHTModernizationFeasibilityStudy 40
DESCRIPTIONOFOPTIONS
PlumbingSystems:
Allplumbingfixtureswillbeinstitutionalgradewitha1.6gallonperflushvalveonwaterclosetsand1.0pintonurinals. Flowrestrictors
willbe installedonallfaucetsfor0.5gallonsperminute. LeadfreewatercoolerswillbeprovidedandcertainfixtureswillmeetADA
requirements. Domestichotwaterwillbegeneratedbygeothermalwatertowaterheatexchangersornaturalgasfiredstoragetype
waterheater. Sanitaryandstormwatermainsfromthenewbuildingwillconnectintoutilitymainsaroundthebuilding.
FireProtectionSystem:
Theentirebuildingwillbesprinklered. Thebuildingwillbeseparatedintoseveralzonesthatwillmatchthefirealarmpullzonesforthe
building. Themunicipalwatersystemwillbeevaluatedduring thedesignphase toconfirmadequatepressure to serve thesystem
withouttheneed fora firepump. Also,anyairhandlingunitssupplying2,000cfmormoretoaspacewillbeequippedwithsmoke
detectorsinthesupplyandreturnairductworktomeetcurrentcodes.
ELECTRICAL:
PowerDistribution Thenewelectricalserviceanddistributionsystemwillconsistofanewswitchboardwithmultiplemainbreakers,feeders,drytype
transformersandpanelboards.Autilitycompanypadmountedtransformerwillprovidethe277/480voltpowertothebuilding.
The277/480voltpanelboardswillserve lightingandmechanicalloads. Energyefficientdrytypetransformers inelectricalclosetsthroughoutthebuildingwillfeed120/208voltpanelboards.Kratedtransformerswillservepanelboardswith200percentneutrals
forcomputerpower. Designatedreceptaclesinallclassroomsandofficeswillbeconnectedtothecomputerpowerpanelboards.
EmergencyPowerAnew emergency generatorwillprovideboth emergency and standbypower for the facility. The generatorwill supplypower to
heatingequipment,foodservicerefrigerationequipment,communicationssystems,emergencylighting,andotherlifesafetysystems.
-
7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012
43/167
-
7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012
44/167
WILLIAMH.FARQUHARMIDDLESCHOOL HORDCOPLANMACHTModernizationFeasibilityStudy 42
DESCRIPTIONOFOPTIONS
SecuritySystemThesecurity systemwillmeetcurrentMontgomeryCountyPublicSchools (MCPS)standards. Provisions foraCCTVsystemwith
monitoranddigitalcameraswillbeprovided. Coveragewillincludetheexteriorandmainentrancesofthebuilding. Provisionsfor
an access control systemwillbeprovided for themain entrance andotherdoors as required. Intrusiondetectionwill include
motionsensorsanddoorcontacts.
-
7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012
45/167
DESCRIPTION OF OPTIONS
-
7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012
46/167
WILLIAMH.FARQUHARMIDDLESCHOOL HORDCOPLANMACHTModernizationFeasibilityStudy 44
DESCRIPTIONOFOPTIONS
DESCRIPTION OF OPTIONS
-
7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012
47/167
WILLIAMH.FARQUHARMIDDLESCHOOL HORDCOPLANMACHTModernizationFeasibilityStudy 45
DESCRIPTIONOFOPTIONS
DESCRIPTION OF OPTIONS
-
7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012
48/167
WILLIAMH.FARQUHARMIDDLESCHOOL HORDCOPLANMACHTModernizationFeasibilityStudy 46
DESCRIPTIONOFOPTIONS
DESCRIPTION OF OPTIONS
-
7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012
49/167
WILLIAMH.FARQUHARMIDDLESCHOOL HORDCOPLANMACHTModernizationFeasibilityStudy 47
DESCRIPTIONOFOPTIONS
OPTIONONE PROS&CONS
Pros:
NoRelocationtotheTildenHoldingCenter Geothermalispossible Goodabilityforsupervision/securitywithplanorganization Goodsolarorientationofbuildingplan Accesstoadjacentplayfields/parkamenitiesatproposednewpark Buildingisplacedinoptimallocationonsitesincesiteiscurrentlyundeveloped Buildingiszonedwellforafterhoursuse
Cons:
Sanitarysewerisatthesouthendoftheexistingschoolproperty,requiringextensionupBatchellorsForestRoad Reducedquantityofonsiteballfields/sportscourtscomparedtooptionsonoriginalsite Soccerandsoftballfieldsoverlap,allowinguseofonlyoneatatime Buildingisnexttoadjacentneighbor Accesstositeisviaexistingschoolsiteratherthannewcurbcutsperrequirementsofthe2005OlneyMasterPlanwhichcreates
mixingofcarsandbussesastheyenterandexitthesite.(Notethisissuecouldbeeliminatedifanadditionalcurbcutisallowed)
-
7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012
50/167
DESCRIPTION OF OPTIONS
-
7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012
51/167
WILLIAMH.FARQUHARMIDDLESCHOOL HORDCOPLANMACHTModernizationFeasibilityStudy 49
DESCRIPTIONOFOPTIONS
DESCRIPTION OF OPTIONS
-
7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012
52/167
WILLIAMH.FARQUHARMIDDLESCHOOL HORDCOPLANMACHTModernizationFeasibilityStudy 50
DESCRIPTIONOFOPTIONS
DESCRIPTION OF OPTIONS
-
7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012
53/167
WILLIAMH.FARQUHARMIDDLESCHOOL HORDCOPLANMACHTModernizationFeasibilityStudy 51
DESCRIPTIONOFOPTIONS
DESCRIPTIONOFOPTIONS
-
7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012
54/167
WILLIAMH.FARQUHARMIDDLESCHOOL HORDCOPLANMACHTModernizationFeasibilityStudy 52
SC O O O O S
DESCRIPTIONOFOPTIONS
-
7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012
55/167
WILLIAMH.FARQUHARMIDDLESCHOOL HORDCOPLANMACHT
ModernizationFeasibilityStudy 53
OPTION
TWO
PROS
&
CONS
Pros:
NorelocationtotheTildenHoldingCenter Geothermalispossible Goodsolarorientationofbuildingplan Accesstoadjacentplayfields/parkamenitiesatproposednewpark Buildingisplacedinoptimallocationonsitesincesiteiscurrentlyundeveloped Buildingiszonedwellforafterhoursuse Threestorybuildingplanismorecompactallowingmorespaceonsiteforsportscourtsandfields
Cons:
Sanitarysewerisatthesouthendoftheexistingschoolproperty,requiringextensionupBatchellorsForestRoad Soccerandsoftballfieldsoverlap,allowinguseofonlyoneatatime Buildingisnexttoadjacentneighbor Threestorybuildinginthemiddleofafieldwouldnotbeinscalewithneighborhood Safety/supervisionofathreestorybuildingismoredifficultthanatwostorybuilding Accesstositeisviaexistingschoolsiteratherthannewcurbcutsperrequirementsofthe2005OlneyMasterPlanwhichcreates
mixingofcarsandbussesastheyenterandexitthesite.(Notethisissuecouldbeeliminatedifanadditionalcurbcutisallowed)
-
7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012
56/167
DESCRIPTIONOFOPTIONS
-
7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012
57/167
WILLIAMH.FARQUHARMIDDLESCHOOL HORDCOPLANMACHT
ModernizationFeasibilityStudy 55
DESCRIPTIONOFOPTIONS
-
7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012
58/167
WILLIAMH.FARQUHARMIDDLESCHOOL HORDCOPLANMACHT
ModernizationFeasibilityStudy 56
DESCRIPTIONOFOPTIONS
-
7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012
59/167
WILLIAMH.FARQUHARMIDDLESCHOOL HORDCOPLANMACHT
ModernizationFeasibilityStudy 57
DESCRIPTIONOFOPTIONS
-
7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012
60/167
WILLIAMH.FARQUHARMIDDLESCHOOL HORDCOPLANMACHT
ModernizationFeasibilityStudy 58
DESCRIPTIONOFOPTIONS
-
7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012
61/167
WILLIAMH.FARQUHARMIDDLESCHOOL HORDCOPLANMACHT
ModernizationFeasibilityStudy 59
OPTION
THREE
PROS
&
CONS
Pros:
NorelocationtotheTildenHoldingCenter Geothermalispossible Goodsolarorientationofbuildingplan Accesstoadjacentplayfields/parkamenitiesatproposednewpark Buildingiszonedwellforafterhoursuse Threestorybuildingplanismorecompactallowingmorespaceonsiteforsportscourtsandfields
Cons:
Impactonlearningforthesixclassroomsadjacenttothenewconstruction Soccerandsoftballfieldsoverlap,allowinguseofonlyoneatatime Threestorybuildinginthemiddleofafieldwouldnotbeinscalewithneighborhood Sanitarysewerforcemainisrequired Safety/supervisionofathreestorybuildingismoredifficultthanatwostorybuilding Longerconstructiontimeframe(3years) Noise/dust/andgeneralconstructionactivityonanoccupiedschoolsite
-
7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012
62/167
DESCRIPTIONOFOPTIONS
-
7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012
63/167
WILLIAMH.FARQUHARMIDDLESCHOOL HORDCOPLANMACHT
ModernizationFeasibilityStudy 61
DESCRIPTIONOFOPTIONS
-
7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012
64/167
WILLIAMH.FARQUHARMIDDLESCHOOL HORDCOPLANMACHT
ModernizationFeasibilityStudy 62
DESCRIPTIONOFOPTIONS
-
7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012
65/167
WILLIAMH.FARQUHARMIDDLESCHOOL HORDCOPLANMACHT
ModernizationFeasibilityStudy 63
DESCRIPTIONOFOPTIONS
-
7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012
66/167
WILLIAMH.FARQUHARMIDDLESCHOOL HORDCOPLANMACHT
ModernizationFeasibilityStudy 64
OPTIONFOUR PROS&CONS
Pros:
Geothermalispossible Goodabilityforsupervision/securitywithplanorganization Goodsolarorientationofbuildingplan Accesstoadjacentplayfields/parkamenitiesatproposednewpark Buildingisplacedinoptimallocationonsitesincesitewillbeunoccupied Buildingiszonedwellforafterhoursuse Buildingdoesnotaffectadjacentneighbor
Cons:
RelocationtotheTildenHoldingCenter Impacttostudentsandparentsforafterschoolactivities Lengthybusridehasimpactonstudentacademicperformance Increasedtransportationcosts Unpredictabilityoftraffic/congestiontoTildenHoldingCenter Heavilyreducedparentinvolvement Sanitarysewerforcemainisrequired Soccerandsoftballfieldsoverlap,allowinguseofonlyoneatatime CostsforfuelfortransportingstudentstoTildenHoldingCenter
-
7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012
67/167
DESCRIPTIONOFOPTIONS
-
7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012
68/167
WILLIAMH.FARQUHARMIDDLESCHOOL HORDCOPLANMACHT
ModernizationFeasibilityStudy 66
DESCRIPTIONOFOPTIONS
-
7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012
69/167
WILLIAMH.FARQUHARMIDDLESCHOOL HORDCOPLANMACHT
ModernizationFeasibilityStudy 67
DESCRIPTIONOFOPTIONS
-
7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012
70/167
WILLIAMH.FARQUHARMIDDLESCHOOL HORDCOPLANMACHT
ModernizationFeasibilityStudy 68
DESCRIPTIONOFOPTIONSOPTIONFIVE PROS&CONS
-
7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012
71/167
WILLIAMH.FARQUHARMIDDLESCHOOL HORDCOPLANMACHT
ModernizationFeasibilityStudy 69
Pros:
Geothermalispossible Goodsolarorientationofbuildingplan Accesstoadjacentplayfields/parkamenitiesatproposednewpark Buildingisplacedinoptimallocationonsitesincesitewillbeunoccupied Buildingiszonedwellforafterhoursuse Buildingdoesnotaffectadjacentneighbor
Cons:
RelocationtotheTildenHoldingCenter Impacttostudentsandparentsforafterschoolactivities
Lengthybus
ride
has
impact
on
student
academic
performance
Increasedtransportationcosts Unpredictabilityoftraffic/congestiontoTildenHoldingCenter Heavilyreducedparentinvolvement Sanitarysewerforcemainisrequired Safety/Supervisionoftheplanmoredifficultthanotheroptions Soccerandsoftballfieldsoverlap,allowinguseofonlyoneatatime Longwalktopublicentrance,requiresalongcanopy CostsforfuelfortransportingstudentstoTildenHoldingCenter
VI.RECOMMENDATIONS
-
7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012
72/167
WILLIAMH.FARQUHARMIDDLESCHOOL HORDCOPLANMACHT
ModernizationFeasibilityStudy 70
Although Option 1 was the Facility Advisory Committees preferred option, MCPS staff believes that Option 2 provides a smaller
footprint,amoreefficientbuilding,andmoresitespaceforamenities.
VII.PROJECTIMPLEMENTATIONSCHEDULE
-
7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012
73/167
WILLIAMH.FARQUHARMIDDLESCHOOL HORDCOPLANMACHT
ModernizationFeasibilityStudy 71
TWO
YEAR
IMPLEMENTATION
SCHEDULE
(OPTIONS:
1,
2,
4,
&
5)
THREEYEARIMPLEMENTATIONSCHEDULE(OPTION3)
APPENDIXA:EDUCATIONALSPECIFICATIONS
TableofContents PageNo.
-
7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012
74/167
WILLIAMH.FARQUHARMIDDLESCHOOL HORDCOPLANMACHT
ModernizationFeasibilityStudy A1
Introduction A2
SquareFootSummary A3
GeneralPlanningConsiderations A10
TechnologyFramework A13
DescriptionofFacilities A14
StandardClassrooms A 14
ComputerLaboratory A 15
ScienceLaboratories A 16InstructionalSupportRooms A 19
SpecialEducationFacilities A 21
MusicSuite A 23
VisualArtsSuite A 26
MultipurposeTechnology A 28
MultipurposeLaboratory A30
PhysicalEducation A 32
ComputerSupport A39InstructionalMediaCenter(IMC) A 40
MultimediaProductionRoom A 44
StudentActivitiesFacilities A 45
AdministrationSuite A 46
GuidanceSuite A49
HealthServicesSuite A 50
StaffRoom A 54
Cafeteria A 55Kitchen A57
BuildingServiceFacilities A 60
SiteRequirements A 64
-
7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012
75/167
EDUCATIONALSPECIFICATIONSWilliamH.FarquharMiddleSchool
Square Foot Summary
-
7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012
76/167
WILLIAMH.FARQUHARMIDDLESCHOOL HORDCOPLANMACHT
ModernizationFeasibilityStudy A3
SquareFootSummary
Whenthisprojectiscomplete,thefollowingspacesaretobeprovided:
Capacityaftermodernizationwillbe793.
Net TotalNet
Facility # Sq.Ft. Sq.Ft.
English/ForeignLanguage/Math/SocialStudies
Classroom 14 900 12600
ComputerLaboratory 3 950 2850
Science
Laboratory 6 1300 7800
Prep/Project/Storage 3 250 750
ChemicalStorage 1 250 250
OtherInstructionalSupportAreas
TeamResourceCenter/Workroom 8 300 2400
InterdisciplinaryTextbookStorage 3 150 450
DepartmentalTextbookStorage 3 150 450
ForeignLanguageTextbookStorage 1 150 150
InstructionalDataAssistantRoom 1 400 400
DevelopmentalReading 1 600 600
ESOLClassrooms
ESOLClassrooms 1 600 600
EDUCATIONALSPECIFICATIONS
Net Total Net
-
7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012
77/167
WILLIAMH.FARQUHARMIDDLESCHOOL HORDCOPLANMACHT
ModernizationFeasibilityStudy A4
Net TotalNet
Facility # Sq.Ft. Sq.Ft.
SpecialEducation
SpecialEducationClassrooms(LAD) 3 900 2700
SpecialEducationClassrooms(SCB) 1 900 900
SpecialEducationClassrooms(LFI) 2 900 1800
SpecialEducationTeamRoom 1 300 300
ResourceRoom 1 800 800
Speech&LanguageTherapySupportRoom 1 250 250
MusicSuite
InstrumentalMusicRoom 1 1900 1900
GeneralMusic/ChoralRoom 1 1000 1000
General/ChoralStorage 1 250 250
MusicOffice 1 150 150
VisualArtsSuite
ArtRoom 1 1300 1300
Storage 1 350 350
KilnRoom 1 150 150
EDUCATIONALSPECIFICATIONS
Net TotalNet
F ilit # S Ft S Ft
-
7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012
78/167
WILLIAMH.FARQUHARMIDDLESCHOOL HORDCOPLANMACHT
ModernizationFeasibilityStudy A5
Facility # Sq.Ft. Sq.Ft.
Laboratories
MultiPurposeTechnologyLaboratory 1 1600 1600
ComputerTechnologyLaboratory 1 900 900
MultiPurposeLaboratory 1 1600 1600
PhysicalEducation
Gymnasium(Equals
2teaching
stations)
1
6800
6800
AuxiliaryGym(Dance/Wrestling) 1 1600 1600
AuxiliaryGym(Fitness/WeightRoom) 1 1600 1600
HealthClassroom 1 900 900
LockerRooms 2 1650 3300
StorageRooms 2 100 200
ToiletRooms 2 150 300
Shower/DryingRooms 2 250 500
LaundryRoom 1 150 150
Offices 2 300 600
GeneralStorage 2 650 1300
OutdoorStorage 1 200 200
ICBStorage 1 100 100
ComputerSupport
StorageRoom/OfficeArea 1 150 150
WireClosets 4 50 200
HeadEndRoom 1 25 25
EDUCATIONALSPECIFICATIONS
N T l N
-
7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012
79/167
WILLIAMH.FARQUHARMIDDLESCHOOL HORDCOPLANMACHT
ModernizationFeasibilityStudy A6
Net TotalNet
Facility # Sq.Ft. Sq.Ft.
ComputerSupport
StorageRoom/OfficeArea 1 150 150
WireClosets 4 50 200
HeadEndRoom 1 25 25
InstructionalMediaCenter
ReadingRoom 1 3200 3200
ListeningViewingProjectArea 2 200 400
DirectInstructionalArea 1 300 300
Workroom/MaterialsPrep.Room 1 450 450
Office 1 200 200
TechnologyInformationAccessCenter 1 500 500
Storage,MediaGeneral 1 600 600
Storage(UpperFloor) 1 200 200
NetworkDistributionCenter(LAN) 1 60 60
MultimediaProductionRoom 1 950 950
StudentActivities
SchoolStore 1 200 200
StudentGovernmentStorageCloset 1 100 100
EDUCATIONALSPECIFICATIONS
Net Total Net
-
7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012
80/167
WILLIAMH.FARQUHARMIDDLESCHOOL HORDCOPLANMACHT
ModernizationFeasibilityStudy A7
Net TotalNet
Facility # Sq.Ft. Sq.Ft.
AdministrationSuite
GeneralOffice 1 700 700
Principal'sOffice 1 250 250
AssistantPrincipal'sOffice 3 150 450
StudentSupportSpecialistOffice 1 150 150
AdministrativeSecretary'sOffice 1 150 150Workroom/Storage/ToiletArea 1 500 500
Storage 1 100 100
ConferenceRoom 1 300 300
CopierWorkroom 1 200 200
InSchoolSuspensionRoom 1 400 400
FinancialSecretary'sOffice 1 150 150
StaffDevelopmentOffice 1 200 200
SecurityOffice 1 150 150
TestingRoom 1 150 150
GuidanceSuite
Counselor'sOffice 4 150 600
WaitingRoom 1 250 250
ConferenceRoom 1 300 300
RecordsRoom 1 125 125
EDUCATIONALSPECIFICATIONS
Net Total Net
-
7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012
81/167
WILLIAMH.FARQUHARMIDDLESCHOOL HORDCOPLANMACHT
ModernizationFeasibilityStudy A8
Net TotalNet
Facility # Sq.Ft. Sq.Ft.
HealthSuite
WaitingRoom 1 100 100
Treatment/MedicationArea 1 125 125
Office/HealthAssessmentRoom 1 100 100
HealthAssessment/IsolationRoom 1 100 100
RestArea 2 100 200ToiletRoom2 2 50 100
Storage 1 40 40
StaffFacilities
StaffRoom 1 950 950
StudentDining
StudentDiningArea 1 5000 5000
Stage 1 1500 1500
Storage 1 300 300
ChairStorage 1 400 400
EDUCATIONALSPECIFICATIONS
Net Total Net
-
7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012
82/167
WILLIAMH.FARQUHARMIDDLESCHOOL HORDCOPLANMACHT
ModernizationFeasibilityStudy A9
Net TotalNet
Facility # Sq.Ft. Sq.Ft.
KitchenArea
FoodPreparation 1 900 900
DryFoodStorage 1 350 350
Refrigerator 1 125 125
Freezer 1 225 225
ServiceArea(4servicelines) 1 950 950Office 1 100 100
Locker/ToiletRoom 1 120 120
LoadingPlatform 1 125 125
ReceivingArea 1 100 100
ChemicalStorageRoom 1 48 48
BuildingServiceFacilities
BuildingServicesOffice 1 150 150
Locker/ShowerArea 1 250 250
PlantEquipmentOperatorOffice 1 75 75
Compactor/TrashRoom 1 250 250
RecyclingRoom 1 250 250
ReceivingandStorageArea 1 800 800
GeneralStorageRooms 2 250 500
BuildingServicesOutdoorStorage 1 250 250
TOTALNETSQUAREFOOT 40 88393
-
7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012
83/167
-
7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012
84/167
EDUCATIONALSPECIFICATIONS Thelocationofwhiteboardsandtackboardsshouldrelatetoclassroomseatingandwindows.Thelocationofbulletinboardsandshowcases
shouldrelatetoteamgroupingsandadministrativeareas.
-
7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012
85/167
WILLIAMH.FARQUHARMIDDLESCHOOL HORDCOPLANMACHT
ModernizationFeasibility
Study
A12
Thenumberoflockersinthecorridorshouldbeequaltothecorecapacityplus10%ofthecorecapacity.
Landscapingistobeincluded.Plantingistoincludescreenplantingandthatneededforerosioncontrol.Plantingsforsidewalks,andwooded
andfloweredareas,aretobesituatedtoenablethephysicaleducationprogramtobecarriedonwithoutunduedisturbancetotheclassrooms.
Other landscaping to support energy conservation and to relate the building to the site with aesthetic appeal must be included. Note:
Landscapingmustbeminimal,tastefulandallowforeasymaintenance.
Spacesthatservenorealeducationalfunction,suchascorridors,shouldbelimitedwhileatthesametimeassuringaneasytosuperviseandsmoothflowofpupiltraffictoandfromtheinstructionalmediacenter,multipurposeroom,gymnasium,specializedcenters,andsupportrooms.
Carpetingshouldbelimitedtotheprincipalsoffice,assistantprincipalsofficeandconferenceroomintheadministrationsuiteandthemain
readingroomoftheinstructionalmediacenter.
Allstudentoccupiedspacesmustbeabletobesupervisedfromthecorridororanadjacentspace.
Theshapeoftheclassroomandthedesignofbuiltin featuresandstorageareasshouldprovideoptimumnetusablefloorarea.Elongatedroomsandfeaturesthatprotrudeintofloorarea,limitingflexibility,aretobediscouraged.Rectangularshapedclassroomsarepreferred.
Theclassroomsshouldbedesignedtoaccommodatevarioussizegroups.Eachclassroomshouldbereadilyadaptableforgroupwork,various
presentationformats,andshouldhavemaximumconnectivitytooutsideresources.
Metaladjustableshelvingistobeprovidedinallbuildingstorageclosets. AllplanreviewswillbecoordinatedthroughtheDivisionofConstruction.
Specialconsiderationmustbegiventoenergyconservationincludingtotallifecyclecosts.ThecurrentMarylandStateDepartmentofGeneral
Service(DGS)requirementswillbeappliedasdesigncriteria.LifecyclecostaccountinginaccordancewithDGScriteriaisrequired.
EDUCATIONALSPECIFICATIONS
TechnologyFramework
-
7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012
86/167
WILLIAMH.FARQUHARMIDDLESCHOOL HORDCOPLANMACHT
ModernizationFeasibility
Study
A13
Thelatesttechnologyshouldbeintegratedintoeveryaspectofbuilding.ThearchitectshouldconsultwiththeOfficeofChiefTechnologyOfficer
(OCTO)andtheDivisionofConstruction(DOC)forthelatesttechnologyrequirements.Thearchitectmustataminimumplanforthefollowing
elements.
Throughtheuseoflocalareaandwideareacomputerandvideonetworks,studentsshouldhaveaccesstoeachother,toschoolsthroughout
thecountywithsimilarcapabilities,andtouniversitiesandgovernmentinstitutionsthroughouttheworld.
Eachclassroomistohaveadedicated20ampelectricalcircuitservingfiveelectricaloutletsforcomputerslocated3'apartalongthebackor
sidewall.
Computernetworkoutlets (CNOs)consistingofa flushmountedstandardelectricalboxwith11/2"conduit to theceilingspaceoverhead
shouldbelocatedinallclassrooms,offices,andotherworklocationsaccordingtothefollowinggeneralrules:
oneCNOontheteachingwalloftheclassroomunderthelocationforaPrometheanBoardandadjacenttoanelectricaloutlet
asecondCNOshouldbelocatedinthebacksideofeachclassroomadjacenttothefivecomputerelectricaloutletsconnectedtothededicated
circuit
oneCNOperoffice,resourceroom,planningroom,etc.adjacenttotelephoneoutlet
MultipleCNOsinmediacenteratcirculationdesk,referenceareas,etc.
oneCNOateachsciencelabworkstation
Allotherareassuchasthestage,bookstore,diningroom,etc.,wherecomputersmightbeused.
Thenumberandlocationoftelecommunicationclosetsrequiredtosupportthebuildingwidecomputernetworkisdependentonthesizeand
geometryofthebuilding.Thelayoutofthetelecommunicationclosetswillbedeterminedduringthedesignphaseoftheproject.
EDUCATIONALSPECIFICATIONS
Description of FacilitiesThe following is an approach to the design of new and modernized schools. Please refer to the summary of spaces for the square foot
i f h d ib d b l S f ll i h ld b id d h d d b f ll d l h h i
-
7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012
87/167
WILLIAMH.FARQUHARMIDDLESCHOOL HORDCOPLANMACHT
ModernizationFeasibility
Study
A14
requirements for each space described below. Squarefoot allocations should be considered the standard to be followed, although minordeviationsareallowed.
Standard Classrooms Classroomsshouldbearranged tosupportthegrade levelteamorganization formiddleschools.Eachgrade'sareaofthebuildingalsowill
havetwoorthreesciencelaboratoriesandvariousinstructionalsupportspaces.
Eachclassroomshouldbedesignedasfollows:
Alockableteacher'scloset,asperDOCconstructionstandards,istobeprovidedforgeneralsupplystorage,personalstorage,andwardrobe. Bookstorageshouldbelocatedalongthewindowwallwithhalfofthecabinetsequippedwithhinged,lockabledoors.Aminimumof60linear
feet shouldbeprovided forbook storage.The topsof these cabinetswill serveas counter space,which shouldbeatworktopheight.The
counterspaceatthebackoftheroomshouldbedesignedwithkneeholesforuseforcomputersandprinters,andhaveelectricoutletsabove
thecounters.
Eachclassroomshouldhavebetween28and40feetofwhiteboardandabout20feetoftackboard.Mainteachinglayoutwillbedesignedin
accordancewithDOCconstructionstandards.
Map
rails
and
tack
rails
are
to
be
placed
above
all
whiteboards.
Hooks
suitable
for
hanging
drawing
instruments
are
to
be
placed
beneath
the
whiteboardsineachacademicclassroom.
Oneflagholderattachmentistobeplacedonallmaprailswithfourtosixmapholders.Twoinchcorktackrailsshouldbeplacedinavailable
spaceinallteachingspacesandinallcorridors.
Eachclassroomshouldbeequippedwithtwoinchblinds.
EDUCATIONALSPECIFICATIONS
Computer Laboratory
-
7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012
88/167
WILLIAMH.FARQUHARMIDDLESCHOOL HORDCOPLANMACHT
Modernization
Feasibility
Study
A
15
Onecomputerlaboratoryshouldbedesignedineachgradelevelareaofthebuilding.
Eachcomputerlaboratoryistoaccommodate32studentworkstations.
Fileserverandprintersaretobelocatednearteachersdeskorinoffice.
Electricalservicetothecomputer labsshouldbe isolated fromcircuitsthatpowerairconditioning,heavydutyelectricmotors,kilns forartclasses,and,ingeneral,anydeviceordevicesthatdrawheavilyonelectriccurrent.
Inordertomaximizeafterhoursuse,thecomputercomplexistohaveaselfcontainedairconditioningsystem.
Thecomputerlaboratoriesaretohavewhiteboardandtackboard.
ElectricalanddataoutletsshouldbeprovidedintheceilingforaceilingmountedLCDprojector.
ThearchitectshouldconsultwiththeOCTO/DOCforthelatesttechnologyrequirements.
EDUCATIONALSPECIFICATIONS
ScienceLaboratories
S ti l N d
-
7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012
89/167
WILLIAMH.FARQUHARMIDDLESCHOOL HORDCOPLANMACHT
Modernization
Feasibility
Study
A
16
SpatialNeeds
Laboratory
Preparation/Project/StorageRoom
ChemicalStorage
Sciencelaboratoriesshouldbedesignedinpairs,withinteamareas,withpreparation/projectandstorageroomsadjacent,preferablybetween
pairsoflabs.
Ifthesciencelabsareonseparatefloorsofthebuilding,theyshouldbelocatednearanelevator.
Theteachingwallshouldbeononeofthelongwallsofthelaboratory.
ThearchitectalsoshouldrefertotheMSDEdocument,ScienceFacilitiesDesignGuidelines,1994whendesigningthesciencelaboratories. Theseroomsserveasalecture/laboratoryspaceandshouldbeequippedwiththebasicequipmentaslistedbelow.
Eachsciencelabshouldhavetwoexits.
Sevenislandstyleworktableswithhotandcoldwater,electricity,andgasaretobeprovided.
Onemobilebench(drysinktype)shouldbelocatedunderwindowsineachlabtofacilitateworkwithplants. A threebyfivefootdemonstration tableshouldbe locatedat the frontof the room.Thisdemonstration tableshouldbeequippedwitha
stonesink,hotandcoldrunningwater,gas,andelectricity.
Twentyfourfeetofwhiteboardandadequatetackboardarerequired.Wiringforaprometheanboardshouldbeprovidedinthecenterofthe
whiteboard.
Twofourfootprojectcabinetsandtwofourfootstoragecabinets,alllockable,aretobelocatedineachroom.
Allroomsaretobecapableofcompletedarkening.
Eachlabshouldhaveafumehoodandadequateventilation.
Eachroomshouldbewiredfortieintotheschoolcomputernetworkateachlabstation.
Thereshouldbeamastercutoffswitchforgas,water,andelectricineachroom.Themastercutoffswitchshouldbestrategicallylocatedso
thatitisnotoverlyaccessibletostudents,andshouldnotbelocatedneartheexitdooroftheclassroom.Thecutoffsshouldoperateelectrically
EDUCATIONALSPECIFICATIONS(aspanicbuttons)withavisiblelightindicatorforgasandelectric.
A safety station must be installed with shower eyewash and drain
-
7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012
90/167
WILLIAMH.FARQUHARMIDDLESCHOOL HORDCOPLANMACHT
Modernization
Feasibility
Study
A
17
Asafetystationmustbeinstalled,withshower,eyewash,anddrain.
In accordance with ADA guidelines, at least one science lab station in each laboratory should be made accessible to individuals with
disabilities.
Cabinetryforstorageoflaboratoryequipmentandmicroscopesshouldbeprovidedinallofthelabs.
Asanitizinggogglecabinetshouldbeprovidedforalllabs.
Ateacherswardrobeshouldbeprovided.
Alocationshouldbeidentifiedforafilecabinet.
Lockswithacommonkeyaretobeprovidedondrawersinspecialareasandtheteacherdemonstrationtable.
ElectricalanddataoutletsshouldbeprovidedintheceilingforaceilingmountedLCDprojector.
Twopulldownelectricaloutletfixturesshouldbeprovidedineachlab:oneinthecenter,oneintherear.
Preparation/Project/StorageRooms Theseroomsaretofacilitatethepreparationofstudentprojectsandshorttermstorageofprojects,aswellastoprovidegeneralstorage.
Eachroomistocontainadjustablelockedstorageandcounterfacilities,electricalhookupandspaceforarefrigerator.
Easyaccessibilitytothescienceroomsisimportantandisarequiredforvisualcontroloftheroomsfromadjacentrooms.
ChemicalStorageRoom Thisstorageroomshouldbelocatedadjacenttothe7thand8thgradesciencelabsandmustmeetcoderequirementsforchemicalstorage
including:
Thisroommusthavea24hour,365dayperyearexhaustsystemventeddirectlytotheoutsideincompliancewiththelatestapplicablecodes.
Itshouldincludenoncorrosivewoodenshelvingwithlips,flammablecabinetandacidcabinet.
EDUCATIONALSPECIFICATIONS
Theseroomsshouldcontainsinksequippedwithhotandcoldrunningwaterandafloordrainandworkbenchesequippedwithelectricaland
gas outlets
-
7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012
91/167
WILLIAMH.FARQUHARMIDDLESCHOOL HORDCOPLANMACHTModernizationFeasibilityStudy A18
gasoutlets.
Spaceandutilitiesshouldbeprovidedineachpreproomforadishwasher.
Emergencyshutoffandtelephoneshouldbelocatedinthechemicalstorageandpreproomonly.
EDUCATIONALSPECIFICATIONS
InstructionalSupportRooms
Spatial Needs
-
7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012
92/167
WILLIAMH.FARQUHARMIDDLESCHOOL HORDCOPLANMACHTModernizationFeasibilityStudy A19
SpatialNeeds
TeamWorkroom
InterdisciplinaryTextbookStorageRoom
DepartmentalTextbookStorageRoom
ForeignLanguageTextbookStorageRoom
InstructionalDataAssistantRoom
DevelopmentalReadingRoom
ESOLCLassrooms
TeamWorkroom Twoteamresourcecenter/workroomsaretobeprovidedforeachgradelevel,providingspaceineachforteacherdesksoralargeconference
table.
Theseroomsshouldbelocatednexttoeachotherandhaveaninterconnectingdooranda4'x6'windowwithblindsbetweenoneanother.
Atelephonewillbelocatedintheserooms.
Storageandopen/closedbookshelvestostoreteachingsuppliesandinstructionalmaterialsshouldbeprovided.
Aworkcounterwithsinkandelectricoutletsisneeded.
Threefeetoftackboardandfourfeetofwhiteboardarerequired.
Wiringforfourcomputersineachteamroomisrequired.
InterdisciplinaryTextbookStorageRoom
Aninterdisciplinarytextbookstorageroomistobeprovidedforeachgradelevelandistobeeasilyaccessiblefromtheclassroomsandtheteamworkroomandshouldhaveadjustablebuiltinshelving.
TheseroomsmusthaveadequateHVACandlightingforflexibleusebystaffasofficespace.
Securestorageforcomputersshouldbeprovidedwithinthisspaceandshouldincludeadequateelectricpowerforrechargingbattery
poweredlaptopcomputers.
EDUCATIONALSPECIFICATIONS
DepartmentalTextbookStorageRoom Threedepartmentaltextbookstorageareasaretobeprovidedwiththesamerequirementsastheinterdisciplinarytextbookstoragerooms.
-
7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012
93/167
WILLIAMH.FARQUHARMIDDLESCHOOL HORDCOPLANMACHTModernizationFeasibilityStudy A20
p g p q p y g
ForeignLanguageTextbookStorageRoom Aforeignlanguagetextbookstorageroommustbecentrallylocatednearthe7thand8thgradesforforeignlanguagematerials.
ItneedstohaveadequateHVACforflexibleuseasofficespaceforstaff.
InstructionalDataAssistantRoom Theroomneedstobecentrallylocated,isrequiredforanaidewhoconductsassessmentsandupdatesindividualstudentrecords.
Securestorageforschoolwiderecordsandmaterialsshouldbeincluded.
Theroomshouldbewiredforacomputerwithprinter.
Thisroomneedsatelephone.
Atackboardshouldbeinstalled.
Developmental
Reading
Room
Thedevelopmentalreadingroomshouldbecentrallylocated.
Thisroomisrequiredtofacilitateinstructioninreadingcompositionstudyskills.
Spaceforsmallgroupworkinreadingalsoisconductedinthisroom.
Twelvefeetofwhiteboardandtwelvefeetoftackboardshouldbeprovided.
ESOLClassrooms The ESOL classrooms shouldbe located in theacademicareasof thebuilding andbedesignedwith the same requirementsasa regular
classroom.
EDUCATIONALSPECIFICATIONS
SpecialEducationFacilities
SpatialNeeds
-
7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012
94/167
WILLIAMH.FARQUHARMIDDLESCHOOL HORDCOPLANMACHTModernizationFeasibilityStudy A21
p
SpecialEducationClassrooms
TeamWorkroom
ResourceRoom
SpeechandLanguageRoom
OccupationalTherapy/PhysicalTherapyRoom
Storage(textbooksandinstructionalmaterials)
FileSpace
(Secured)
SpecialEducationClassrooms Thespecialeducationclassroomsshouldbelocatedintheacademicareasofthebuildingandbedesignedwiththesamerequirementsas
regularclassrooms.
TeamWorkroom Theteamworkroomshouldbedesignedexactlyliketheteamroomsintheregulareducationareasbutshouldbelocatedadjacenttothe
supportsuite.
ResourceRoom Thespecialeducationresourceroomneedsopenshelving,counterspace,andclosedstorage.
TheroomistobesufficientlywiredtoaccommodateAVequipment,computers,andhavetackandwhiteboard.
Itshouldbelocatedinassociationwiththeacademicclassrooms.
SpeechLanguageRoom Thisroomrequiresawhiteboard,tackboard,openandclosedlockablestorage,openshelving,andalockableteacherwardrobe.
Roomforateacher'sdesk,lockablefilecabinet,andtabletoworkwithsmallgroupsofstudentsisrequired.
Thespeech/languageroomshouldbewiredforaccesstoonecomputerworkstationeach.
EDUCATIONALSPECIFICATIONS
Thespeechroommustbelocatedonthefirstfloorandbeacousticallytreated.
Thespeechroomneedsa4x4mirrormountedtothewall.
-
7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012
95/167
WILLIAMH.FARQUHARMIDDLESCHOOL HORDCOPLANMACHTModernizationFeasibilityStudy A22
Thespeechroomrequiresasinkwithcounterspace.
OccupationalTherapy/PhysicalTherapy(OT/PT)Room
Eachroommusthavewhiteboardthatismountedtwofeetoffthefloor.
Atackboard,openandclosedlockablestorage,openshelving,andalockableteacherwardrobearerequired.
AsinkwithcounterspaceisrequiredintheOT/PTroom.
Roomforateacher'sdesk,lockablefilecabinet,andassortedsizedfurniturewithadjustablelegsshouldbeprovided.
TheOT/PTroomsshouldbewiredforaccesstoonecomputerworkstationeach.
TheOT/PTrequiresaceilingmountedhookforaswing.
TheOT/PT room requires lockable storagewith sufficientarea tohouse largegrossmotorequipment (minimumof35 square feet) suchas
therapyballs,scooterboards,walkers,balancebeams,ramps,etc.
EDUCATIONALSPECIFICATIONS
MusicSuite
Spatial
Needs
Instrumental Music Room (with approximately 400 sq. ft. of perimeter storage)
-
7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012
96/167
WILLIAMH.FARQUHARMIDDLESCHOOL HORDCOPLANMACHTModernizationFeasibilityStudy A23
InstrumentalMusicRoom(withapproximately400sq.ft.ofperimeterstorage)
General/ChoralMusicRoom
General/ChoralStorageRoom
MusicOffice
Themusicareashouldbeatthesame levelasthestage, ifpossible,tofacilitatethemovementofequipmentfromthemusicroomstothe
stage.
Eachroomistobeacousticallyisolatedfromtherestoftheschoolandthegeneral/choralandinstrumentalareasseparatedbyanacousticalbarrierorwallwithaSoundTransmissionClassification(STC)of50ormore.
Listening isan importantskill related tomusiceducation,and thus theneed forquietventilation.Therefore,noisecriterion (NC) levelsof
lightingandventilatingsystemsmustnotexceedNC25forthelargerehearsalroomsandNC30forthepracticerooms
BothmusicroomsmusthaveaccesstoallcomputertechnologyincludingtheLAN,andbeequippedforamultimediastation.
Awaterfountainshouldbelocatedinthemusicsuite.
InstrumentalMusic
Theinstrumentalmusicroommusthavealevelfloor.
Thespecified1,900squarefeetisaminimumrequirementandmustnotbereducedtoaccommodateotherdesignneeds.
400squarefeetoftheinstrumentalmusicroomshouldaccommodateWengertypecagesforinstrumentstoragearoundtheperimeterwalls
oftheroom.Theroomdepthmaybevariedifitwillprovidebetteracoustics.
Acoustical treatmentandcarpeting isneededso that the room issoundengineered forabandwithmaximum sizeof80membersanda
decibellevelinthesaferange,keepinginmindthatthetypicalbandproducesdecibelsinthe100120range.
A16footceilingisnecessarytoobtainpropervolume.
EDUCATIONALSPECIFICATIONS Nosupportingpillarsorfabricfoldingdoorsaretobeusedintheroom.
Anoutsideentranceshouldbenear,butnotin,themusicsuiteifpossible.
Approximately 80 square feet should be devoted to an acoustically treated room located in the rear and side area that can double as two
-
7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012
97/167
WILLIAMH.FARQUHARMIDDLESCHOOL HORDCOPLANMACHTModernizationFeasibilityStudy A24
Approximately80square feetshouldbedevoted toanacousticallytreatedroom located intherearandsidearea thatcandoubleastwo
practiceroomsandforpercussionstorage.Afourfootdoorandsecuritylockshouldbeprovidedsothatheavyequipmentmayberolledoutfor
rehearsalsandrolledbackintotheroomfornightstorage.
Whiteboardandtackboardmustbeprovided.
Bookcasesandamusic foldercabinet shouldbe includedonone sideof the room.Thebandmusic folder cabinet shouldbehorizontally
slottedwith150slotstohold14"x12"folderswithfacilitiesfornumberingeachcompartment.
Twomicrophonesshouldbehungfromretractableceilingmountedfixturesforusewithrecordingequipment.
Asinkisneededforcleaninginstruments.
General/ChoralMusicRoom Thegeneral/choralmusicroomistohaveaceilingofapproximately16feet.
Thedimensionsshouldbeapproximately38'x27'.
Theentranceshouldbeadoubleentrydoor.
Theroom istoseatapproximately80studentsandbeonone level.Theroomshouldbedesigned toaccommodatetwoseparateteaching
areasoneforchoralmusicandtheotherforComputerAssistedGeneralMusicProgram(electronickeyboards).
The room shouldhaveawhiteboardalong the front (longaxis)of the room, large tackboardsoneither sideof the roomwithbookcases
beneathononeside,andblackoutblindsandwallscreen.
Heavydutyceilingtilesshouldbeusedtoassuremaximumlossinsoundtransmission.Acousticaltreatmentistoprovideasoundtransmissionlossofatleast50decibelsandareverberationtimeofbetween1.2and1.6seconds.
Adequateventilationisneeded.
EDUCATIONALSPECIFICATIONS
Amusicfoldercabinet,horizontallyslotted,withlockingdoors,withatleast100horizontalcompartments(15incheshigh,2incheswide),and
withfacilitiesfornumberingeachcompartmentisrequired.
-
7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012
98/167
WILLIAMH.FARQUHARMIDDLESCHOOL HORDCOPLANMACHTModernizationFeasibilityStudy A25
General/ChoralStorageRoom
Thegeneral/choralstorageroomshouldbeadjacenttoandhaveaccessfromboththegeneral/choralroomandtheinstrumentalmusicroom.
Cabinetrymustbeadequatetostore20electronickeyboardsand33guitarsinspaces6incheshigh,40inchesdeep,and16incheswide.Thecabinetsshouldbecarpetedtoprotecttheinstrumentsfromscratching.
Theroomshouldbearrangedsothataportionofitmaybeusedasapracticeroomwithapiano,asastorageareaforchoralmusicfile
cabinets,andforstoragefordrums,etc.
Maximumsecuritydoorswithupgradedlocks aretobeprovided.
Afourfootdoorisrequired.
MusicOffice
Themusicofficemustbelocatedbetweentheinstrumentalandthegeneral/choralroom.
Atelephoneistobeprovided.
Cabinetryistobeprovidedforstorage.
-
7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012
99/167
EDUCATIONALSPECIFICATIONS
Eachclassroomshouldbeequippedwitharetractableprojectionscreen(7x7).Theprojectionscreenshouldnotbemountednearany
emergencylightingtracks.Allareasofthescreenshouldbeilluminatedandreadablewhenthelightsaredimmed.
ElectricalanddataoutletsshouldbeprovidedintheceilingforaceilingmountedLCDprojector.
-
7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012
100/167
WILLIAMH.FARQUHARMIDDLESCHOOL HORDCOPLANMACHTModernizationFeasibilityStudy A27
Openspaceshouldbeprovidednearthesinkforpotterswheelorcomputercarts.
Ampleelectricaloutlets,approximatelyevery4shouldbeprovided.
Openandclosedshelvesaretobeprovidedforstorageofartprojects,flammablematerials,andreferencebooks.
Openspaceistobeprovidedintheartroomforthreebanksofblueprintcabinetsandtwodryingracks(NIC).
Blackout
facilities
are
to
be
included
on
windows.
Storeroom
Thisroomshouldbedesignedwithwindowstotheartroom.
Asmuchopenshelvingaspossibleshouldbeprovidedinthisroom.
Spaceshouldbeprovidedforteachers'files.
Immediatelyinsidetheentrancetothestoreroom,aworktable6feetwide,30inchestall,34inchesdeepshouldbeprovidedwithbuiltin
adjustableshelvesbelowand14inchdeepwallhungshelvesabove.Thistablewillaccommodatea30inchsquarepapercutterandstorageof
largeartreproductionsandpapersbelow,in3banksofshelvingunits8inchesoncenter,20incheswide(insidewidth).
Thestoreroomdoorshouldbelockable,and2coathooksaretobemountedbehindthedoor.
KilnRoom
Thekilnroomshouldbedesignedasfollows:
Equippedwithspaceandutilitiesfor2kilns(tobeincluded)andanexhaustfanhood.
18"deeptallmetalshelving.
Asprayboothwithexhaust.
Asmallworktablewithshelvesaboveandbelow.
EDUCATIONALSPECIFICATIONSMultiPurposeTechnology
SpatialNeeds
MultipurposeTechnologyLaboratoryComputer Technology Laboratory
-
7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012
101/167
WILLIAMH.FARQUHARMIDDLESCHOOL HORDCOPLANMACHTModernizationFeasibilityStudy A28
ComputerTechnologyLaboratory
Preparation/StorageRoom
Sufficientlightingtocreateshadowlessworksurfaces.
Ampleelectricalserviceandreceptaclestoaccommodatecomputers,machines,andportableelectrictools.Sufficientserviceshallbeprovided
toaccommodateflexibilitywithinthestudiowithtabletopmachineryandoverheadpulldownreceptacles,providingformachinesandportable
electrichandtools. Iffloorreceptaclesareprovided,theyshallbeflush.
Hallwaywallsshouldincludeinteriorglassforviewingintothelaboratory.
Windowsstarting36 fromthefloorshouldbeprovidedbetweenalloftheroomsinthissuite.
MultipurposeTechnologyLaboratory ElectricalanddataoutletsshouldbeprovidedontheteachingwallforaPrometheanBoard.
Adequateventilationsystemtoremoveairbornedustisrequired.
Floorcoveringshallbenonsliptile.
Threeemergencycontrolswitches.Oneswitchinthelab,onejustoutsidethelabandthethirdlocatedintheteachersofficewithakeyto
restorepower.
Theroomrequireswhiteboardandtackboard.
Thislaboratoryrequiresawashupsink.
Shelvingshouldbeprovidedaroundtheperimeteroftheroomforstudentprojectstorage.Theshelvingcanbelocatedbelowworkbenches
andoverheadiftherearenotoolsbeingusedinthatarea.
Smalltabletopmachineryshallbeinstalledalongtheperimeterofthelaboratory.Theheightofthesecountersshouldbe24".
EDUCATIONALSPECIFICATIONS
ComputerTechnologyLaboratory
ThisroomshouldbelocatedadjacenttotheMultipurposeTechnologyLaboratory.
Thisroomshouldbedesignedwithsamerequirementsastandardcomputerlaboratory.
-
7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012
102/167
WILLIAMH.FARQUHARMIDDLESCHOOL HORDCOPLANMACHTModernizationFeasibilityStudy A29
g q p y
Preparation/StorageRoom ThepreparationroomshouldbelocatednexttotheMultipurposeTechnologyLaboratory.
ThedoorandwallshouldhavewindowsintotheMultipurposeTechnologyLaboratorytoallowforsupervisionbythestaff.
Onesideoftheroomshouldbedesignedhaveacounterwithwallandbasecabinets.
Storageareawillbeequippedwithsteelshelvesandcabinetscapableofstoringavarietyofinstructionalmaterials,supplies,specialtools,
equipment,andstudentprojects.
Asmalllumberrackisnecessaryforstorageoflengthsoflumberandmetal.
EDUCATIONALSPECIFICATIONSMultiPurposeLaboratory
SpatialNeeds
MultipurposeLaboratoryStorage
-
7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012
103/167
WILLIAMH.FARQUHARMIDDLESCHOOL HORDCOPLANMACHTModernizationFeasibilityStudy A30
Thisspacewillbedesignedforflexibleusebyart,familyandconsumerscience,andotherelectivecourses.
Thedesignshouldincludefullcomputeraccesssothatthespacecouldbeusedasacomputerlaboratory.
TheteachingwallshouldbedesignedaccordingtoDOCstandards.
Perimetercountersshouldbeprovidedalongoneortwowallsofthelaboratorywithwallandbasecabinets.
Adequateelectricalserviceandreceptaclestoaccommodatecomputers,smallandlargeappliances,andotherelectricmachinesareessential.
Accessfromthelaboratorytothestorageroomisneeded.
Akitchenareashouldhavethreekitchenunits,(tobeplacedalongoneortowadjoiningwalls)eachcontainingthefollowing:
Eightfeetofcountertopspaceincludingastainlesssteelsink;
Lockablebaseandwallstoragewithhingeddoors,withaminimumamountofdrawerspace(2drawersperkitchen);
Walloven;
Ampleelectricaloutletsalongthecountertobeusedforsmallappliancesandinductiontypestoves;
Hotandcoldwater;
OneofthekitchensshouldbeADAaccessible;
Onesafetyeyewashstationshouldbeprovidedinthelab;and
Spacefortworesidentialrefrigerators,accessibletothekitchensshouldbeprovided.
EDUCATIONALSPECIFICATIONS
Storage
Thestorageroomshouldhavethefollowing:
-
7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012
104/167
WILLIAMH.FARQUHARMIDDLESCHOOL HORDCOPLANMACHTModernizationFeasibilityStudy A31
Lockabledoorwithaccesstotheteachingstation;
Theroomistobeequippedwithmetalshelvingsecuredtotheperimeterwalls;
SpaceandelectricalandplumbingrequirementsshouldbedesignedforAheavydutywasherandwallventeddryer;
Perimetercountersshouldbeadjacenttothewasher/dryerandbeaminimumof24 deep;
Spaceforoneresidentialrefrigeratorandoneresidentialfreezer;and
Asink.
EDUCATIONALSPECIFICATIONSPhysicalEducation
SpatialNeeds
Gymnasium(equals2teachingstations)AuxiliaryGymnasium(Dance/Wrestling)
-
7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012
105/167
WILLIAMH.FARQUHARMIDDLESCHOOL HORDCOPLANMACHTModernizationFeasibilityStudy A32
AuxiliaryGymnasium(Fitness/WeightRoom)
HealthClassroom
LockerRooms
StorageRooms
ToiletRooms
Shower/DryingTowelRooms
LaundryRoom
Offices
GeneralStorage
OutdoorStorage
ICBStorage
OutsideStorageShed(SeeSiteRequirements)
Major
entrance
doors
to
the
gymnasiums
and
locker
rooms
should
be
double
doors
with
no
center
posts.
Non
glazed
doors
throughout
the
entireareaarepreferred.
Doorsshouldbefortyeightincheswide.
Storageclosetsshouldhavenocenterpostsandshouldbeabletobeheldopentoallowforeasymovementofequipment.
Ifdesignallows,operablewindowsinthegymnasiumshouldbeprovided.
Gymnasium Thegymnasiumistohaveawoodenfloor.
Thegymnasiumrequiresfiberglasselectricallyoperatedfoldingbleacherstoseatonethirdofthemaximumprojectedenrollmentalongonelongside,leavinganareaof65by100feetwhenfolded.
A27footclearceilingisrequired.
Anelectricallyoperatedfoldingpartitionwithpassthroughdooristobeinstalledwithconvenientcontrols.Thefoldingwallshouldfoldtothe
bleacherside.
EDUCATIONALSPECIFICATIONS
Fixedequipmentwillincludethefollowing:
Climbingropes(2withknots,2withoutknots)
Highbarwithfloorplates
i ( l ) fl l f ll b ll d b d i d d d i i
-
7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012
106/167
WILLIAMH.FARQUHARMIDDLESCHOOL HORDCOPLANMACHTModernizationFeasibilityStudy A33
Insertiontype(SENOHonly)floorplatesforvolleyballandbadmintongamestandardsandgymnasticequipmentSportsImports
(Senoh)redaluminumcombinationuprightsthatworkforbothvolleyballandbadminton,thereforeonlyrequiringonesizeofpolesand
onesizeofsleeves.
Woodenringswithhoistandsafetystraps
Floorplatesforunevenbars
Scoreboard
Aclockwithcageateachendofthegymnasium
Archerynetwithhoistonnonbleacherside
Sixbasketballbaskets,withsafetystraps.Fourshouldbecrosscourt.Thetwoendbasketsshouldhaverectangularglassbackboards
andhydraulicrims.Allbasketsshouldbemotorizedandadjustablewithkey.Thereshouldbenodoorsunderthebasketballgoals.
Wallsafetypaddingmustbemountedundereachbasket.
Provisionsforreducingglareshouldbeconsidered.
Shieldedmetalhalidelightingshouldbeprovided.
Acousticsshouldbeaddressed.
Itisparticularlyimportantthatventilationfunctionequallyandquietlyonbothsidesofthefoldingpartition.
Allswitches,firealarms,etc.shouldbelocatedincorners,coveredwithwireboxes,andbeduplicatedoneachsideofthefolding
partition.
Eachwallofthegymnasiumshouldhavefoursetsofelectricaloutlets.
Paintingandcreativeartisticwallgraphicsshouldbeprovided.
Thegymnasiumshouldbeequippedwithacousticaldeck,computerandcablehookupsandsoundsystem.
EDUCATIONALSPECIFICATIONS
AlocationshouldbeidentifiedforaPrometheanBoardincludingtheappropriatepowerandwiring.
Arecessedwaterfountainshouldbeprovidedoutsideeachendofthegymnasiumorintegratedintoanalcovewithinthegymnasium.
Alobbywithphonebooth,displaycase,bulletinboard,andsmallstorageclosetshouldbeprovidedadjacenttothegymnasium.
-
7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012
107/167
WILLIAMH.FARQUHARMIDDLESCHOOL HORDCOPLANMACHTModernizationFeasibilityStudy A34
Securitydoorsshouldbeprovidedtocloseoffotherpartsofthebuildingfromthegymnasium/lobbyareas.
Ifthegymopenstotheoutside,astepdownentrancewithconcretelandingisneeded.
Emergencylightsshouldbeatleast12feetfromthefloor.
MCPSstaffwillprovidegymnasiumcourtmarkings.
Pluginserviceforscoretablecontrolsshallbeprovidedinthefloorandneedtobeflush.Controlsmustbeaccessiblewhenbleachersareintheopenposition.
Attentionshouldbegiventothedesignoflightingfixturessothattheywillnotbedamagedbyindoorballsports.
AuxiliaryGymnasiums Theauxiliarygymnasiumsshouldbelocatedadjacenttothegymnasiumareaandthelockersroomsandhavesixteenfootceilings.
Thetwoauxiliarygymnasiumsshouldbelocatednexttoeachother.
Directaccesstothecorridorisdesired.
Projections,posts,orotherhazardsaretobeavoided.
Thesegymnasiumsmusthaveaventilationsystem.
Theminimumwidthoftheauxiliarygymnasiumsshouldbe34feet.
Electricoutletsshouldbelocatedonallfourwalls.
Bothauxiliarygymsmustincludeasmallrecessedlockableclosetwithshelving.
Asmall6'x4'tackboardandwhiteboardaretobeinstalledineachauxiliarygymnasium.
EDUCATIONALSPECIFICATIONS
Acousticalpanels,tackboard,bulletinboard,auxiliarystereosoundsystem,computerandcableTVhookupsandclockswithcagesshouldbe
includedinthetwoauxiliarygymnasiums.
Operablewindowsaretobeinstalledwithgrates.
WallgraphicsaretobespecifiedbyMCPSstaff.
-
7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012
108/167
WILLIAMH.FARQUHARMIDDLESCHOOL HORDCOPLANMACHTModernizationFeasibilityStudy A35
Exteriordoorsaretobekeyedforreentry.
Lightswitchesaretobekeyed.
Dance/WrestlingRoom Suspendedwoodfloorsaretobeinstalledinthedancestudio.
Theroomwillneedtoaccommodatewrestlingmatstorageorhoist.
Onewallmustbemirroredwithabarreprovidedwithaneyebolt6'2"high,dividingthespaceinhalflongway.
Fitness/WeightRoom Thesecondauxiliarygymshouldhavearubberized,resilientfloorforweighttraining.
Theceilingheightshouldbe16.
6'x12'mirrorshouldbemountedononewalloftheweightroom.
Aclimbingwallshouldbeinstalledalongtheotherlongwallofthisroom.
Pullupchinupbarsandpegboard(6'x3')shouldbeinthisroom.
GeneralStorageRoom Thegeneralstorageroomshouldbelocatedinthegymnasiumandneedstohavethesameceilingheightasthegymnasium.Thegeneral
storagealsoneedstobeeasilyaccessiblefromtheauxiliarygymnasiums.
Mats,gymnasticequipment,andotherphysicaleducationmaterialsandequipmentneedtobeaccommodated.
Asmallintramuralathleticcoordinatorstorageclosetisneedednearthegym(separatekey).
EDUCATIONALSPECIFICATIONS
Twodoors,eachfourfeetwideandsevenfeethighwithnothresholdsorcentermullionsandheavydutyhardwarearerequiredforthe
interiorstoragerooms.
Anoutsidestoragearearequiresdoubledoorsthatneedtobesevenfeethigh.
Allstorageareasshouldincludeshelves,bins,pegs,andpulleysystemforstoringgoals.
-
7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012
109/167
WILLIAMH.FARQUHARMIDDLESCHOOL HORDCOPLANMACHTModernizationFeasibilityStudy A36
ICBStorage Thisstorageroomisforusebycommunitygroupsandshouldbeinornearthemaingymnasium.
Itshouldincludeshelvingononewallaswellasspaceforbadmintonandvolleyballuprights.
Thisroomneedstobekeyedseparately.
LockerRooms Thelockerroomsneedtomeetthefollowingrequirements:
Interiordoubledoorentranceswithmazetoblockvisionintospacemustbedesigned.
Thelockerroomsneedanoutsideexitforusebyphysicaleducationclasses.Thisexitdoormustbekeyedforreentrybyclasses.
A"stepdown"withconcretelandingshouldbeplanned.
Someshelvesshouldbeprovidedneartheentrancetothelockerroomforstudentbooks.
MaleandfemalelockerroomsshouldbeadjacentandlocatedonthesamefloorsothatthePhysicalEducationOfficescanhaveaconnecting
doorandcommonconnectedplanningroom.
Lockerspaceshouldhandleatotalof1,440lockersevenlydividedbetweenmaleandfemalelockerrooms.Alllockersaretohavepadlocks
andbe3tiered12"x12"x24".LockerrowsshouldbesituatedformaximumsupervisionfromthePEofficeareaandbenohigherthansixfeet.
SeverallockerswithkeyentryareneededforADAaccommodations.
Thelockerroomsaretobewellventilatedandincludeadeodorizersystem.
Clocks,tackboard,PA,andawatercoolermustbeprovidedineachlockerroom.
EDUCATIONALSPECIFICATIONS
Benchesusedfordressingpurposesaretobesecuredtothefloorwithasinglebenchbetweenlockerrows.
Full
length
mirrors
are
to
be
provided
on
the
ends
of
each
locker
bank
with
convenient
electrical
outlets.
Thelockerroomshouldreflectschoolcolors.
S i hi h l k i b h ffi d h ld d i h i l d i li i d
-
7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012
110/167
WILLIAMH.FARQUHARMIDDLESCHOOL HORDCOPLANMACHTModernizationFeasibilityStudy A37
Storagewithinthelockerareaistobeneartheofficeandshouldaccommodatevariousphysicaleducationsupplies,equipment,and
furnishings.Shelvingwithbinsandhookswillbespecifiedlater.Shelvingmusthaveliptokeepballsfromfalling.
Ahosebibshouldbelocatedineachlockerarea.Appropriatedrainageofthelockerareaisrequired.
Thefloorsurfacemustbeanonskidsurfacebutsmoothenoughforthoroughcleaning.CVT/roughsurfacetileispreferred.
Toiletroomsaretobelocatedineachlockerareaandaretocontainlavatories,waterclosets,and/orurinals.
Mirrorsaretobeinstalledoversinks.
Iftheyaretoservecommunityneedsafterschoolhours,therestofthelockerareamustbegatedoff.Lightswitchesaretobekeyed.
Shower/Drying/TowelRoom Theshowerareashouldbewellventilatedandfreefromhazardousprojections.
Eachshowerroomistohavethreeindividualshowersandonehandicappedaccessibleshower,withmodestypanels,anonskidfloorsurfaceandrecessedsoapdishes.
Acentrallockablecutoffvalvefortheshowersmustbeprovidedineachlockerroom.
Thedryingroom,withnearbytowelstorage,shouldbelocatedbetweentheshowerroomandlockerroomandhavewallhooksandanonskid
floorsurface,preferablytile.
LaundryRoom Alaundryareawithfloordrainforacommercialwasheranddryerandlaundrytubshouldbeincludedwithshelvingfortowelstorage.
EDUCATIONALSPECIFICATIONS
Offices Theofficesneedtobecentrallylocatedwithaccesstobothmaleandfemalestudents,havewindowswithblindsforeffectivesupervisionof
theappropriatelockerroomandhaveVCTfloors.
Eachofficerequiresaseparateshower,toilet,sink,mirrorwithshelfoversinkthatislargeenoughtouseaschangingareasforthephysical
d i ff
-
7/31/2019 Farquhar MS Modernization Feasibility Study-October 2012
111/167
WILLIAMH.FARQUHARMIDDLESCHOOL HORDCOPLANMACHTModernizationFeasibility