fast & easy machine setup project ( simply exchange of fİxture-sef ) &

30
FAST & EASY MACHINE SETUP PROJECT (SIMPLY EXCHANGE OF FİXTURE-SEF ) & PILOT APPLICATION OF 4 AX MILLING MACHINE M üm taz ER D EM 6 Sigma

Upload: moeshe

Post on 01-Feb-2016

51 views

Category:

Documents


0 download

DESCRIPTION

6 Sigma. FAST & EASY MACHINE SETUP PROJECT ( SIMPLY EXCHANGE OF FİXTURE-SEF ) & PILOT APPLICATION OF 4 AX MILLING MACHINE. PROJECT SUMMARY. 6 Sigma. Project Y Project Description Project Objectives/Goals Customer/GE Benefits Financial Benefits Y Owner MBB/BB. - PRODUCTION. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: FAST & EASY MACHINE SETUP PROJECT ( SIMPLY EXCHANGE OF FİXTURE-SEF  ) &

FAST & EASY MACHINE SETUP PROJECT (SIMPLY EXCHANGE OF FİXTURE-SEF ) &

PILOT APPLICATION OF 4 AX MILLING MACHINE

Mümtaz ERDEM

6 Sigma

Page 2: FAST & EASY MACHINE SETUP PROJECT ( SIMPLY EXCHANGE OF FİXTURE-SEF  ) &

PROJECT SUMMARY

Project Y

ProjectDescription

ProjectObjectives/Goals

Customer/GEBenefits

Financial Benefits

Y Owner

MBB/BB

- PRODUCTION

SEF-Simply Exchange of Fixture and Pilot Application on 4 Axis Machine

Production Flexibility and Decrease Setup Time

•Reduced cycle time/improve capacity

6 Sigma

Page 3: FAST & EASY MACHINE SETUP PROJECT ( SIMPLY EXCHANGE OF FİXTURE-SEF  ) &

MMEASURE ANALYZE IMPROVE CONTROL

Project Title: Create an order to get tool, fixture, gage, and cnc program in digitam system

Status as of: Measure-Analyze Expected Completion Date:

Project Leader:

Project Y: PRODUCTIVITY

Y Owner:

Financial Benefits:

Team Members

Status

• Accomplishments: Data gathering, fixture and Machine

• Tools applied:• Significant findings:

Six Sigma Project Status

Name Function1-2-3-4-5-6-7-8-

Project ID#: -

BLACK BELTBLACK BELTSUPR.TOOLGREENBELTGREENBELT SUPERVISOR .SUPERVISORTOOL STOCKKEEPER

Project Statement & Benefits

• Scope:

• Goals & Objectives: Flexibility on production Decrease Setup Times

• Benefits: Reduced cycle time / Improve capacity

Next Steps

• Next steps:

• Additional tool to be applied: Design system &• Help needed: Yes

Page 4: FAST & EASY MACHINE SETUP PROJECT ( SIMPLY EXCHANGE OF FİXTURE-SEF  ) &

CTQ’s - Defect - Target

CTQ

Defect

Target

HIGH SET-UP TIME, NONFLEXIBLE SETUP

25% DECREASE OF S/U TIME & MORE FLEXIBILITY

STANDARDISATION

6 Sigma

Page 5: FAST & EASY MACHINE SETUP PROJECT ( SIMPLY EXCHANGE OF FİXTURE-SEF  ) &

4 AXIS / 36" PART NO OP. NO SET-UP RUN TIME N FIX NO FİXTURE GEO.FIX.DIA. FIX DIM(aXb) ALT.MACHMOUNT RING 1364M37G02 65 - 70 1,8 33.21 1 M91554 D 41"x 2.25

1364M37G02T 196 1 2MID GUTTER 1807M62P01 10 1,3 1,91 2 TEI 2764 D 24" X 2.5" MCB1210/MC98FORWARD RING1964M52P05 130 1 1,39 3 M93015 D 38" X 1.5" exp.LOWER BEAM 9348M61P01 3 0 2,35 4 TEI 1964 P 22"x7.5"x1"

115 2 2,03ACT.RING 9539M39G04 150 1,5 10,15 5 M91644 D 44" x 4

170 0,5 2,03 6 M91645 D 44 x 3"#7 BRG. HOUSINGL14405P02 70 1,5 3,2 7 M91057 D 28"X7" MCB1210/MC98TORK SHAFT L44815G01 105 0,5 3,8 8 M92420 P 41 "x 10" x1.5 "#4 BRG. HOUSING9646M10P03 60 0,3 3,3 9 M91102 D 26"X8" MCB1210/MC98

TABLE-1 MACHINE-FİXTURE & OPERATION DATAS

6 Sigma

Page 6: FAST & EASY MACHINE SETUP PROJECT ( SIMPLY EXCHANGE OF FİXTURE-SEF  ) &

01000020000300004000050000600007000080000

OPTIMES/U TIME

6 Sigma

Page 7: FAST & EASY MACHINE SETUP PROJECT ( SIMPLY EXCHANGE OF FİXTURE-SEF  ) &

0

5

10

15

20

25

30

35

M37 M52 M61 M39 L44815

OPS/U

OPERATION & S/U TIME RELATIONSHIP 6 Sigma

Page 8: FAST & EASY MACHINE SETUP PROJECT ( SIMPLY EXCHANGE OF FİXTURE-SEF  ) &

High S/UHours

METHODSEQUIPMENT

TRAINING

SHIFT

FLEXIBLE CHANGING

FIXTURE

FASTENİNG MAT’L

CARELESSNESS

CAUSE AND EFFECT

OPERATOR

CHIP CLEAN

STANDARDIZATION

6 Sigma

Page 9: FAST & EASY MACHINE SETUP PROJECT ( SIMPLY EXCHANGE OF FİXTURE-SEF  ) &

GENERAL VIEW OF THE 4 AX MILLING MACHINE

6 Sigma

b

•Capability of Holding up to 25” tools •Rotating Table & Machine Course•There is only one Milling Machine With this spesifications •Heavy & Large Fıxtures,• Because of small lot size Frequent Set-up Changıng, req.

WHY 4 AXIS MACHINE

Page 10: FAST & EASY MACHINE SETUP PROJECT ( SIMPLY EXCHANGE OF FİXTURE-SEF  ) &

DIFFERENT VIEWS FOR 4 AX MACHINE

6 Sigma

•Flexible Set-up Requırements, Geometric Differencies of the Fixtures •Group Technology Appl. diffuculties

Page 11: FAST & EASY MACHINE SETUP PROJECT ( SIMPLY EXCHANGE OF FİXTURE-SEF  ) &

For This Reason ; 4 axis Milling Machine were Selected to the Pilot Applicatıon.

•Due to 4 Axıs Milling Machıne Applıcatıon Results Wıll be Affected of Other Vertical-Horizontal and Multiple Axis Milling Machine Flexıbılıty Studıes...

6 Sigma

Page 12: FAST & EASY MACHINE SETUP PROJECT ( SIMPLY EXCHANGE OF FİXTURE-SEF  ) &

Fixture Handling from SRS

Fixture Cleaning

To the Machine

Machine Placement

Setup Control

Fixture Fastening

Part Handling

T nut, Fastener Finding

6 Sigma

Part positioning

FLOWCHART FOR SETUP

Internal S/U

External S/U

Page 13: FAST & EASY MACHINE SETUP PROJECT ( SIMPLY EXCHANGE OF FİXTURE-SEF  ) &

• WHY THE TIME IS INCREASING?• Dimensions and weights of the fixture

• Fix. Geometries haven’t standart Shapes

• Nonstandart Pın and Bolts slots & Holes

• Used Nonstandart Bolts

• Rotary Table Properties,

• Parts have different Datum Systems (Point ,area etc.)For this reason, there are very complex shape fixtures,

• Expanding fixtures

• T-Nut and Fastening Elements Problems

- Look for elements, Time requıred

6 Sigma

Page 14: FAST & EASY MACHINE SETUP PROJECT ( SIMPLY EXCHANGE OF FİXTURE-SEF  ) &

•As a Basement of Work;Fixtures will be fastened on machine as little as possible, No need positıonıng

•Fixtures and Machine datas are available; (Table-1)

Workıng Procedures 6 Sigma

•All Fixtures were layed out on Machine Rotary Table With Sub Plate. For this Reason Subplate Will be Designed & positioned with Pin-Bushing systems & Fastened to the fixture with Bolt-Nut

Page 15: FAST & EASY MACHINE SETUP PROJECT ( SIMPLY EXCHANGE OF FİXTURE-SEF  ) &

•Big Dimensions & Geometric Differencies and Datum Systems properties of Fixtures

• will be Controlled on Real/Right places

•Expanding Fixtures are some different Applications Requıred,

•Due to Set up reduction time works;

Workıng Procedures and troubles 6 Sigma

T-Nuts on the rotary table, -Bolts,Nuts Eye bolts will be placed near of the Machine These type of problems are caused increasing for Setup Times.

Page 16: FAST & EASY MACHINE SETUP PROJECT ( SIMPLY EXCHANGE OF FİXTURE-SEF  ) &

GENERAL VIEW OF FIXTURES

FIXTURES 6 Sigma

Page 17: FAST & EASY MACHINE SETUP PROJECT ( SIMPLY EXCHANGE OF FİXTURE-SEF  ) &

• We are working on the;

- Innovatıve and İmproved best Concepts Linear Bushing Systems

• One of the most important and innovative Equıpment are researching for Cleaning on the Machine Rotary Table

•Chips penetrated on the table, T-Nut channels, bolt holes and the other slots and holes.

•İnnovative cleaning, New easy cleaning Facility and Equıpments or;

•Chips may be holded without dropping These are researching for new innovation...

Workıng Procedures 6 Sigma

Page 18: FAST & EASY MACHINE SETUP PROJECT ( SIMPLY EXCHANGE OF FİXTURE-SEF  ) &

44" M39 fi xt .41" M37 F ixt .

TORK SHAFT F ixt

L OWER BEAM F ixt .

36" DÖNEL TABL A

AL T- PL AKA

ROTARY TABLE and 5 DIFFERENT PARTS FIXTURES ON THE TABLE

ROTARY TABLE and FİXTURE LAYOUT ON THE TABLE 6 Sigma

Page 19: FAST & EASY MACHINE SETUP PROJECT ( SIMPLY EXCHANGE OF FİXTURE-SEF  ) &

6 SigmaM39 Fixturing & Sub Plate section View

Page 20: FAST & EASY MACHINE SETUP PROJECT ( SIMPLY EXCHANGE OF FİXTURE-SEF  ) &

M39 Fixture & Sub Plate Assy.

AĞIRLIKLARAĞIRLIKLAR; FİKSTÜR;780 kg ALT TABLA; 289 kg.

6 Sigma

Page 21: FAST & EASY MACHINE SETUP PROJECT ( SIMPLY EXCHANGE OF FİXTURE-SEF  ) &

General View for Sub Plate 6 Sigma

Page 22: FAST & EASY MACHINE SETUP PROJECT ( SIMPLY EXCHANGE OF FİXTURE-SEF  ) &

GGG 60

6 SigmaGeneral View of SubPlate

Page 23: FAST & EASY MACHINE SETUP PROJECT ( SIMPLY EXCHANGE OF FİXTURE-SEF  ) &

LINEAR BUSHING SYSTEMS 6 Sigma

Page 24: FAST & EASY MACHINE SETUP PROJECT ( SIMPLY EXCHANGE OF FİXTURE-SEF  ) &

6 Sigma

Page 25: FAST & EASY MACHINE SETUP PROJECT ( SIMPLY EXCHANGE OF FİXTURE-SEF  ) &

• Machine datas,• Rotary table

• Course

• T NUT ChannelI

• Fixturing Datas• Geometry & Dimensions

• Holes

• Fixturing systems (EXP, Datum systems etc.).

• Define SEF systems• Designing Subplate

• Pın-bushing Systems Selectıon

• Design Pin-Bushing position of subplate-Fix. Assy

• Define Positıon and Tolerances

• Sub Plate properties• Weight

• Sub plate Strength Calculatıon

• Pin-Bushing stress analysis

• Fixture Pin & Nut Stress Analysis

• Sub Plate -Rotary Table Fastening Method.• T-Nut Channels• Sub plate/Rotary Table Assy Design

procedure 6 Sigma

Page 26: FAST & EASY MACHINE SETUP PROJECT ( SIMPLY EXCHANGE OF FİXTURE-SEF  ) &

SubPlate Material: GGG 60 - Spheroidal Cast IronWeight; 285 Kg.

TOTAL Max Load on Rotary Table; 1070Kg.

Materials 6 Sigma

Page 27: FAST & EASY MACHINE SETUP PROJECT ( SIMPLY EXCHANGE OF FİXTURE-SEF  ) &

Important Issues

• Subplate Dimensions and Position Tolerances (.0000-.0015)

• Pın-Bushing Application and Fixtures thickness Differencies,For this reason Pin-bushing Position,

• If using linear Bushing Systems, Big and heavy Fixtures will be damaged on roller Bushing. For this reason radial and axial loads and stress will be defined.

• Subplate -fixture fasteners like Bolt, Nut, Pin, eye bolt stress analysis

required

6 Sigma

Page 28: FAST & EASY MACHINE SETUP PROJECT ( SIMPLY EXCHANGE OF FİXTURE-SEF  ) &

SAVING• ALL PARTS HAVE 20 S/U /YEAR

• MİN %25 SAVING

• 30 HRS FOR M61 PARTS

• 20 HRS FOR M39 PARTS

• 20 HRS FOR M37 PARTS

• 20 HRS FOR M52 PARTS

• 16 HRS FOR L44815G01 PARTS

• TOTALLY 100 HRS/YEAR FOR 4 AXIS MACHINE

• 106*18=1908$

• FLEXIBLE SETUP AND OPERATOR SAVING

• RELAX SETUP

• APPROX % 50 SAVING FOR POSITIONING; NO NEED USE CLAMP, T-NUT etc. 5$ *25=125$

• OPERATOR ASSURANCE, SAFETY AND EASY SETUP

Page 29: FAST & EASY MACHINE SETUP PROJECT ( SIMPLY EXCHANGE OF FİXTURE-SEF  ) &

BB. : PLANNEDREV : OI COMPLETEDFW:61

HAZİRANSUBJECT RESPONSIBLE1 2 3 4 5 6 8 9 # # # # # # # # # # # # # # # #

1- OPERASYON ,TEZGAH VE FİKSTÜR DATALARININ TESPİTİ, ÖLÇÜMLER,FİKSTÜRLERİN PTEZGAH ÖNÜNDEDEĞERLENDİRİLMESİ 2-DELİKLERİN CIRCULAR EKSENLERİNİN TESPİTİNDEN SONRA BALL-LOCK ve/veya PİM P İLE YERLEŞTİRME KARARI , TAŞIYICI ASKI SEÇİMİ . . .

3- FİKSTURDEKİ BAĞLAMA DELİKLERİNDEN HAREKETLE SUB- PLATE TASARIMITEAM P

4-SUBPLATE İMALATI (DÖKÜM VE İŞLEMESİ), PİM-BURÇ İMALATI) ve TEDARİĞİTAKIM-KALIP P

5-FİKSTÜRLER BELİRLENDİKTEN SONRA İŞLEM SIRASINA GÖRE DELİNMELERİ VE BURÇ TK-KL/İMALAT PÇAKILMASI YERLEŞTİRİLMESİ

6-FİKSTURLERİN SUBPLATE İLE DENENMESİ , CNC PROGRAMLARININ PTADİLATI

MAYIS

PROGRAM PLAN FOR SETUP REDUCTION

OCAK ŞUBAT MART NİSAN

PROGRAM PLAN 6 Sigma

Page 30: FAST & EASY MACHINE SETUP PROJECT ( SIMPLY EXCHANGE OF FİXTURE-SEF  ) &

MeasureMeasure

Understand Environment- Meet business leader- Establish key contacts- Tour process- Identify process owner- Identify team members

Bound the Project

Identify Customer Requirements- CTQ’s via QFD- Identify additional data Needs

Evaluate measurement system- Gage R&R

Establish Product Capability- Calculate DPU- Calculate Z st and Zlt

Train Team on 6 sigma tools

Review Measure Phase- Champion comments- Update team / stakeholders

Train Team on 6 sigma tools

Process MapIdentify Variation Sources

Identify X’s- Cause & Effect Diagram

Analyze Data- Apply Statistical Tools- Hypothesis Tests

Review process mapDevelop new process flow

Identify Improvement Actionsand Implementation Plan

Implement Improvements--

Communicate Improvements

Develop Presentation- Review Team / MBB / Sponsor- Present results to Champions and Operational Leaders

Train Team on 6 sigma tools

Develop Presentation- Review Team / MBB / Sponsor- Present results to Champions and Operational Leaders

Implement Control Systemfor Process Fixes

Develop Risk AssessmentRisk Abatement Plan

Revalidate Cause & Effect ofX’s to Achieve Y’s

Identify Opportunities forStandardization

List Best Practices and Identify Lessons Learned

Obtain buy-in / support for improvement actions

Issue Revised QCWIs /procedures where applicable

Review Analyze Phase- Champion comments- Update team / stakeholders

Review Improve Phase- Champion comments- Update team / stakeholders

Identify opportunities toleverage improvements

Develop Presentation- Review Team / MBB / Sponsor- Present results to Champions and Operational Leaders

Develop Presentation- Review Team / MBB / Sponsor- Present results to Champions and Operational Leaders

Define performance standards- Gather / Pareto data - Review Historical data

Screen Potential CausesIdentify Root Causesof variation

Establish Operating Tolerances

Determine Process Capability

Define Performance Objective for “Y”

Create Process MapBenchmark similar productsand processes

Train Team on 6 sigma tools

Coordinate with ITS for systemsresources where applicable

Identify Follow-up Action Planand Individuals Responsible

Hand off project to Process Owner

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

Create Product Tree

Define additional data needs

Collect & analyze data to validate improvement

Monitor process performance

ImproveImprove ControlControlAnalyzeAnalyze

Six Sigma Project Scorecard 6 Sigma