Chris Bond Senior Design Engineer Faster Umbilical Recovery Minimises Production Disruption

Upload: others

Post on 13-Feb-2021

58 views

Category:

Documents


0 download

TRANSCRIPT

  • Chris Bond

    Senior Design Engineer

    Faster Umbilical Recovery MinimisesProduction Disruption

  • Subsea Cable Deployment a Growing Industry

    Communication Cables

    • Still preferred to satellite• Global network in excess of

    550,000 miles• Multiple routes prevent

    outages• Cables are still being

    developed

  • Subsea Cable Deployment a Growing Industry

    Power Cables (Windfarms)

    • Numerous turbines all connected to each other and to a central a substation

    • Larger cables back to land

  • Subsea Cable Risks

    Fishing

  • Subsea Cable Risks

    AnchorsJersey Internet Outage 2016

  • Subsea Cable Risks

    Nature

    2011 Tōhoku earthquake 2006 Hengchun earthquake

  • Subsea Cable Risks

    • Piracy / Theft

    • Abrasion

    • Sharks

    Other

  • Cable Repair

    • Locate the cable fault

    • Cut and remove faulty/damaged section

    • Retrieve cable ends to surface

    • Splice in new section

    • Test and return to surface

  • Webtool Cable Cutting

  • Webtool Cable Cutting

  • Webtool Cable Cutting

  • Current Retrieval Methods

  • Limitations and Failings

    • Required ROV trenching

    • Time consuming

    • Difficult to deploy

    • Unsafe

    • Weather condition dependant

    • Lifting position

  • CRT200 Cable Retrieval Tool

    LeadscrewHot Stab Interface

    Hydraulic Motor

    Retrieval Shackles

    Deployment Shackles

    Compensator

  • CRT200 Cable Retrieval Tool

    Clutch

  • DNV Verification

    • DNVGL-ST-N001 – Marine Operations & Marine Warranty, June 2016

    • DNVGL-ST-0378 – Standard for Offshore & Platform Lifting Appliances, May 2016

  • Deployment

  • Retrieval

  • Planned Qualification Process

    • 46 Tonne qualification pull test complying with DNV safety factors

    • Cable and umbilical pull tests• Offshore trials

  • Production Update

  • Expected Timeline

    • Prototype tool completion, February 2018

    • Qualification testing with DNV, March 2018

    • Offshore trials to follow

  • Future Development

    • Tool improvement

    • Torque bucket

    • Size range

    • Cutters

  • Thanks for listening Come and visit us at Stand 124

  • Chris Bond, Senior Design Engineer, Allspeeds Ltd (Webtool)

    Email: [email protected]

    www.allspeeds.co.uk