Page 1: FBSO_IFSA_Requirements_Capital Projects_V12

Version 1.1 Page 1

Capital Projects Funding Request

System Requirements

12/29/2014

Version 1.1

Page 2: FBSO_IFSA_Requirements_Capital Projects_V12

Version 1.1 Page 2

Document Revision History

Version Revision Summary Author Date

1.0 Initiation Paul Tubinis

Erin Gross

12/29/2014

1.1 Revision of original requirement:

1) Use the OOB Agency list as is. This was the list

we looked at together that has the high level --

Army - Navy etc.

2) Greg wants the building search to be against

ALL buildings not a smaller defined list.

3) Work Order Type should be arranged as it is on

the DD2647

A) Initial

B) Cancelation

C) Change Number

There is no reporting requirement on this Work

Order Type value once picked.

4) Greg wants to change the entire process label

from "FUNDING REQUEST" to "WORK

REQUEST"

5) As previously discussed there is not a

requirement to be able to pick multiple rooms.

Paul Tubinis

Erin Gross

1/14/2015

Contents

1 Project Requirements Overview .......................................................................................... 4

1.1 Background ...................................................................................................................... 4

1.2 Purpose, Scope and Objectives ........................................................................................ 4

1.3 Roles and Responsibilities ............................................................................................... 4

2 Assumptions, Constraints, and Dependencies, .................................................................... 5

2.1 Assumptions ..................................................................................................................... 5

Page 3: FBSO_IFSA_Requirements_Capital Projects_V12

Version 1.1 Page 3

2.2 Constraints ........................................................................................................................ 5

2.3 Dependencies ................................................................................................................... 5

3 Business Processes ............................................................................................................... 6

4 Functional Capabilities ........................................................................................................ 7

5 Data Elements ...................................................................................................................... 7

6 Non-Functional Requirements ............................................................................................. 9

7 Appendix A DD Form 2647 .............................................................................................. 11

8 Appendix B Funding Request Form .................................................................................. 11

............ 12

Page 4: FBSO_IFSA_Requirements_Capital Projects_V12

Version 1.1 Page 4

1 Project Requirements Overview

The Project Management Office (PMO) has requested TRIRIGA’s Project Management Module

to support the PMO’s business processes. This Requirements document is focused on the

Funding Request Process only.

1.1 Background

Engineering & Construction Management (ECM) currently uses a manual process for tracking

and reporting their capital projects. A previous effort to develop a TRIRIGA solution was

abandoned upon the consolidation of several TRIRIGA instances. In November, ECM and

FBSO reconvened to discuss a way forward with the development of the capital projects in the

new TRIRIGA environment.

1.2 Purpose, Scope and Objectives

The purpose of this document is to define the requirements for the Funding Request functionality

so that the application can act as a single entry point for all capital projects conducted across the

WHS real estate portfolio.

The objective is to provide ECM with an interface that mimics the fields used in section 1 of the

DD Form 2647.

1.3 Roles and Responsibilities

POC Agency Role

Greg Parker FSD/PCD/PMO PMO Program Manager

Mike Stebbing FSD/EECM/PCD Stakeholder (SME)

Paul Tubinis NET TRIRIGA (SME)

Faizullah Khattak FSD/FFD/FBSO COR

Adetutu Bosede EISTD Application Development Manager

Aaron Foster EITSD IFSA Project Manager

Erin Gross FBSO TRIRIGA Assistant Business Analyst

Page 5: FBSO_IFSA_Requirements_Capital Projects_V12

Version 1.1 Page 5

2 Assumptions, Constraints, and Dependencies,

2.1 Assumptions

TRIRIGA will be the base application to allow the required functionality to meet the Funding

Request Use Case.

There will only be one TRIRIGA system user for this functionality.

2.2 Constraints

TRIRIGA out of the box functionality does not map directly to all the needs for FSD/PCD/PMO

Funding Request Requirements.

2.3 Dependencies

Long-term is the ability to upload documents using the CAC enabled version.

Page 6: FBSO_IFSA_Requirements_Capital Projects_V12

Version 1.1 Page 6

3 Business Processes

The PMO receives a request for a capital project from an Agency. The PMO initiates the

process, and works with the agency, to complete the DD Form 2647, Request for Reimbursable

Project Work. Once the 2647 is complete the Funding Request process commences.

ECM reviews the request and determines whether the project fits within the Capital Program. If

so, a Rough Order of Magnitude (ROM) or an Independent Government Estimate (IGE) is

generated and returned to the agency for review. Upon review, and agreement, the PMO initiates

the approval process.

Page 7: FBSO_IFSA_Requirements_Capital Projects_V12

Version 1.1 Page 7

4 Functional Capabilities

Req# Requirement Comments Priority Date Rvwd

1 To be able to enter a Project

Request based off of Section 1 of

Form DD2647

RELEASE I. See Appendix A #1 1/30/2014

5 Data Elements

See Appendix B for screenshot of user interface.

Data Element Label Type Max

Length

Required? Format Default

Value

Description

Name of Business

Object

Work Request Work Request NOT Funding

Request

General Tab / General

Section

“Name” change to

“Project Name”

Open Field Yes Alpha Numeric

“Request Type” change to “Work

Order Type”

Pull Down Values

Yes Values: A) Initiate

B) Cancelation

C) Change Number

Remove the “Request For”

Field

Radio Button Options

Remove the “Program Funding”

and the “Project or

Operational Funding” Options

associated with the

“Request For” Field

Radio Button

Add a field titled

“Agency Control Number”

Open Field No Alpha Numeric

General Tab / Request

Details Section

“Organization”

change to “Agency”

Pull Down

Values

Yes Values:

Out of the Box Agency high

level values : AF

ARMY

CONST DFAS

DHRA

DIA DISA

DLA

DLSA DMA

DODCC

DODEA DODIG

DTSA HAC

HQMC

JS MDA

NASA

NAVY NGA

NGB

NSA OMC

OSD

Page 8: FBSO_IFSA_Requirements_Capital Projects_V12

Version 1.1 Page 8

OUSD (P)

PFPA TRMC

USD(P&R)

WHS

Data Element Label Type Max

Length

Required? Format Default

Value

Description

“Building” change

to “Site” Pull Down Values

Yes Values:

Query is to ALL Buildings

“Floor” Pull Down

Values

Values:

will be based upon real property

records

“Room” Pull Down

Values

Values:

will be based upon the selected

‘site’ and ‘floor’

Add a field titled:

“Additional

Location

Information”

Open Field 100 TEXT User will be able to add

additional information

pertaining to the worksite.

General Tab / Service

Request Section

Default Selection Capital

Request

“Capital Request” should

always be the default selection

as all requests will be considered Capital.

General Tab / Details

Section

Remove the

“Program Requested For”

field

Spyglass

search

Remove the

“Program Start Date” field

Blank

Remove the

“Program End Date” field

Blank

Remove the

“Responsible

Organization” field

Spyglass

Search

Remove the

“Customer

Organization” field

Spyglass

Search

Change “Proposed

Start Date” to NOT

REQUIRED

No Calendar Proposed Start is currently

Required, it should be changed

to Not Required.

Change “Proposed End Date” to

REQUIRED

Yes Calendar Proposed End date is currently Not Required, it should be

changed to Required.

Keep the “Describe Your Request”

section

Open Field Text

Box

TEXT Ability to cut and paste in the text box.

Add a field titled:

“Division Control Number”

Open Field No Alpha Numeric

Add a field titled:

“FSD Number”

Open Field No/Yes Alpha Numeric When “Create Project”

transition takes place FSD Number becomes required.

General Tab / Describe

Your Request Section

“Line Item Cost

Estimate” section

label change to “Cost Estimate”

Data Element

Label

Type

Max

Required?

Format

Default

Description

Page 9: FBSO_IFSA_Requirements_Capital Projects_V12

Version 1.1 Page 9

Length Value

General Tab / Line Item

Cost Estimate Section

Add a field titled:

“ROM”

Open Field

US Currency ($)

Add a field titled:

“IGCE”

Open Field US Currency ($)

General Tab /

Additional Costs Section

Remove/Hide the

“Additional Costs” section

Remove/Hide everything

associated with the “Additional Costs” section.

General Tab / Estimated

Cost and Rating

Summary Section

Remove/Hide the

“Estimated Cost

and Rating Summary” section

Remove/Hide everything

associated with the “Estimated

Cost and Rating Summary” section.

General Tab /

Opportunities Section Remove/Hide the

“Opportunities” section

Remove/Hide everything

associated with the “Opportunities” section.

Funding Tab / General

Section

“Funding Type”

change to

“Funding Sources”

Pull Down

Values

Values:

BMF

Milcon O&M

Other

PRMRF Procurement

RE&FD

Add a field titled: “ORC”

Open Field Alpha Numeric

Notes & Documents Tab

/ Related Documents

Section

Document

Upload

Section will be used for the

client to store the DD form 2647

and other appropriate documents associated with the Funding

Request process

6 Non-Functional Requirements

Greg Parker has user permissions to test the funding request functionality

User needs access rights to allow for data input into Funding Request.

User needs ability to update records for Funding Requests prior to submittal to approval process.

(approval process is not in the release)

Approvals and Signoff

Page 10: FBSO_IFSA_Requirements_Capital Projects_V12

Version 1.1 Page 10

Digitally signing this document below constitutes my concurrence.

Government Manager Approval (digital signature)

Digitally signing this document below constitutes my concurrence.

Application Development Manager Approval (digital signature)

Page 11: FBSO_IFSA_Requirements_Capital Projects_V12

Version 1.1 Page 11

7 Appendix A DD Form 2647

8 Appendix B Funding Request Form

Page 12: FBSO_IFSA_Requirements_Capital Projects_V12

Version 1.1 Page 12